Loading...
HomeMy Public PortalAboutKingridge Sewer Line Rehabilitation Emergency Slope Stabilization - Phase I, Project #469922-46007 (3)SAUSALI SAN FRANCISC SAN ATEO HALF MOON BAY VICINITY MAP OAKLAND 880 PROJECT LOCATIOCI NTS 2 FRE \ONT 101 880 I 680 SAN 280 JOSE CITY OF SAN MATED KINGRIDGE SEWER LINE REHABILITATION EMERGENCY SLOPE STABILIZATION - PHASE CITY OF SAN MATEO, SAN MATEO COUNTY, CALIFORNIA CITY PROJECT NO. 469922-46007 PROJECT LOCATION MAP NO SCALE SHEET INDEX 1 TITLE SHEET 2 NOTES, ABBREVIATIONS AND LEGEND 3 SITE PLAN AND PROFILE 4 CIVIL DETAILS 5 EROSION CONTROL AND SITE ACCESS PLAN S1 STRUCTURAL -GENERAL PLAN S2 STRUCTURAL - WALL DETAILS No. 1 S3 STRUCTURAL - WALL DETAILS No. 2 S4 STRUCTURAL - WALL DETAILS No. 3 S4A STRUCTURAL - WALL DETAILS No. 3A S5 STRUCTURAL - WALL DETAILS No. 4 S6 STRUCTURAL - MISCELLANEOUS DETAILS RECORD DRAWING BASED ON FIELD INFORMATION PROVIDED BY ENGINEERED SOILS REPAIRS THRU THE CITY OF SAN MATEO w a C T N O T T U, LO /CC V CI w DESCRIPTION STATION LINE REVISION RECORD DRAWINGS 0 c >2 cc Lu a a a 8 O Director of Public Works 0 P w 0 0 a` APPROVED F 0 g w N APPROVED m to Deputy Director of Public Works cDru N°'go NC cna !t x U � � N a -4 o<o czt cdrsrl 4ZB) no -4 U W w 13- Z Ocow J (A Q w}a V Z W W Z wO�yrOO LLJ Ii pW It cc W J W CC SURVEYED BY: w 0 z 0 0 LO DATE: 8/27/10 DRAWN BY: UK CHECKED BY: EDS DATE: 8/27/10 SCALE: AS SHOWN CASE 4 DRAWER 19 SET 30 SHEET 1 of 11 GENERAL NOTES 1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE GENERAL AND SPECIFIC PROVISIONS, STANDARD DRAWINGS, AND REQUIREMENTS OF THE CITY OF SAN MATEO. 2. NO CHANGE TO THE PROJECT IMPROVEMENT PLANS SHALL BE PERMITTED WITHOUT PRIOR APPROVAL BY THE CITY ENGINEER AND DESIGN ENGINEER. 3. CONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE CITY AND ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPT TO THE EXTENT ARISING FROM THE SOLE NEGLIGENCE OF THE CITY OR ENGINEER. 4. CONTRACTOR SHALL CONFORM TO THE RULES AND REGULATIONS OF THE STATE CONSTRUCTION SAFETY ORDERS PERTAINING TO EXCAVATION AND TRENCHING. CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR SHORING DESIGN AND INSTALLATION. 5. INFORMATION CONCERNING EXISTING UTILITIES IS NOT GUARANTEED; LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE ONLY. CONTRACTOR SHALL REQUEST THAT UNDERGROUND FACILITIES BE LOCATED AND MARKED IN THE FIELD A MINIMUM OF 48 HOURS PRIOR TO THE START OF CONSTRUCTION BY CALLING UNDERGROUND SERVICE ALERT NORTH (U.S.A.) AT 800-227-2600. 6. EXISTING UTILITIES SHALL BE LEFT IN PLACE DURING CONSTRUCTION. BRACING, SHORING AND SUPPORT FOR EXISTING UTILITIES SHALL BE APPROVED BY THE APPLICABLE UTILITY ENGINEER. CONTRACTOR SHALL NOTIFY UTILITY ENGINEERS AT LEAST 48 HOURS IN ADVANCE OF THE START OF ANY RELATED CONSTRUCTION ACTIVITY. IN THE EVENT OF DAMAGE TO ANY UTILITY OCCASIONED BY THE CONTRACTOR OPERATIONS, THE CONTRACTOR, AT HIS SOLE COST AND EXPENSE, WILL IMMEDIATELY CAUSE REPAIRS TO BE MADE TO THE SATISFACTION OF THE AFFECTED UTILITY. NOTIFY THE ENGINEER OF ANY ADJUSTMENTS NECESSITATED BY WAY OF CONFLICT WITH EXISTING UTILITY. 7. CONTRACTOR SHALL NOTIFY THE CITY OF SAN MATEO AT LEAST 48 HOURS IN ADVANCE OF THE START OF ANY CONSTRUCTION ACTIVITY. ALL UTILITY SHUTDOWNS ARE TO BE COORDINATED THROUGH THE CITY PUBLIC WORKS DEPARTMENT. ANY TEMPORARY SUSPENSION OF THE WORK OR SUBSEQUENT RESUMPTION OF WORK REQUIRES THE NOTIFICATION OF THE CITY AND THE ENGINEER. 9. CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAG MEN, CONES OR OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC SAFETY IN ACCORDANCE WITH THE SPECIFICATIONS. SEE ALSO TRAFFIC CONTROL NOTES BELOW. 10. CONTRACTOR SHALL REPLACE IN KIND, AT HIS EXPENSE, ALL TREES, SHRUBS, LAWNS, FENCES, IRRIGATION SYSTEMS AND IMPROVEMENTS WHICH ARE TO REMAIN INTACT BUT HAVE BEEN REMOVED OR DAMAGED DURING CONSTRUCTION. CONTRACTOR SHALL NOT REMOVE OR DAMAGE IMPROVEMENTS LOCATED WITHIN CITY PROPERTY WITHOUT WRITTEN PERMISSION FROM THE CITY; OR WITHIN PRIVATE PROPERTY WITHOUT WRITTEN PERMISSION FROM THE PROPERTY OWNER. 11. WRITTEN PERMISSION FROM APPROPRIATE PROPERTY OWNERS MUST BE OBTAINED PRIOR TO REMOVING ANY EXISTING FENCES, SHEDS, OR OTHER PROPERTY OUTSIDE OF THE PUBLIC RIGHT-OF-WAY OR CITY PROPERTY. 12. ALL PERMANENT IMPROVEMENTS REMOVED OR DAMAGED BY THE CONTRACTOR, THAT ARE NOT SPECIFICALLY SHOWN TO BE REMOVED, SHALL BE RESTORED TO THEIR ORIGINAL LOCATION AND CONDITION BY THE CONTRACTOR USING NEW MATERIALS AS DIRECTED BY THE ENGINEER. 13. CONTRACTOR TO PROVIDE TEMPORARY FENCING AND GATES WHENEVER AND WHEREVER EXISTING FENCING OR GATES ARE REMOVED FOR CONSTRUCTION PURPOSES. 14. CONTRACTOR SHALL CONTROL DUST ACCORDING TO THE SPECIFICATIONS. 15. CONSTRUCTION WATER MAY BE OBTAINED FROM CITY OF SAN MATEO FIRE HYDRANTS. CONTRACTOR SHALL CONTACT CITY OF SAN MATEO PUBLIC WORKS ENGINEERING DEPARTMENT TO OBTAIN WATER METER AND PERMISSION. 16. CONTRACTOR TO MAINTAIN A MEANS OF ACCESS TO PROPERTIES, DRIVEWAYS, AND DWELLINGS AT ALL TIMES AS DETERMINED BY THE ENGINEER. 17. THE CONTRACTOR SHALL NOTIFY, BY CIRCULAR, AS DIRECTED BY THE CITY, ALL BUSINESS ESTABLISHMENTS AND RESIDENCES AFFECTED BY THE WORK, AT LEAST 48 HOURS PRIOR TO START OF CONSTRUCTION. CIRCULAR SHALL BE SUBJECT TO APPROVAL BY THE DIRECTOR OF PUBLIC WORKS OR CITY ENGINEER. 18. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REPLACE ALL STREET MONUMENTS, LOT CORNER PIPES, AND GRADE STAKES DISTURBED DURING THE PROCESS OF CONSTRUCTION AT THE DIRECTION OF THE CITY ENGINEER. 19. ALL SURPLUS AND UNSUITABLE MATERIAL SHALL BE REMOVED FROM THE SITE AND PUBLIC RIGHT-OF-WAY 20. CONTRACTOR SHALL PERFORM HIS CONSTRUCTION AND OPERATION IN A MANNER WHICH WILL NOT ALLOW HARMFUL POLLUTANTS TO ENTER THE STORM DRAIN SYSTEM OR ADJACENT CHANNELS. TO ENSURE COMPLIANCE, THE CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE BEST MANAGEMENT PRACTICE (BMP) TO SUIT THE CONSTRUCTION SITE AND JOB CONDITION AS OUTLINED IN THE BROCHURES TITLED "BEST MANAGEMENT PRACTICES FOR THE CONSTRUCTION INDUSTRY SERIES" ISSUED BY THE SAN MATEO COUNTY WIDE WATER POLLUTION PREVENTION PROGRAM (STOPPP), AND PER THE SPECIFICATIONS AND REGULATORY PERMITS. THE CONTRACTOR SHALL PRESENT HIS PROPOSED BMPS AT THE PRE -CONSTRUCTION MEETING FOR DISCUSSION AND APPROVAL. 21. THE CONTRACTOR SHALL NEITHER WASTE NOR DEPOSIT ANY HAZARDOUS MATERIALS ON THE GRADING SURFACES OR WITHIN THE GRADED CUT AND FILL AREAS OF THIS PROJECT, INCLUDING BUT NOT LIMITED TO GASOLINE OR DIESEL FUELS, MOTOR OILS OR TRANSMISSION FLUIDS, ANTIFREEZE, HYDRAULIC FLUIDS, LUBRICANTS, STARTING FLUIDS AND FILTERS, AND/OR CONTAINERS FOR THESE PRODUCTS. HAZARDOUS MATERIAL SPILLS THAT OCCUR AS A RESULT OF EITHER EQUIPMENT FAILURES OR VANDALISM, INCLUDING ALL ADJACENT CONTAMINATED SOILS, SHALL BE REMOVED AND TRANSPORTED TO AN ENVIRONMENTALLY APPROVED DISPOSAL SITE. ALL REMOVAL, TRANSPORTATION AND DISPOSAL COSTS SHALL BE THE RESPONSIBLITY OF THE CONTRACTOR OR HIS SUBCONTRACTORS. 22. OVERNIGHT PARKING OF CONSTRUCTION EQUIPMENT IN THE STREET RIGHT-OF-WAY SHALL NOT BE PERMITTED, EXCEPT AT LOCATION(S) APPROVED BY THE CITY TRAFFIC ENGINEER. 23. MUD AND CONSTRUCTION DEBRIS ON STREETS OR SIDEWALKS SHALL BE CLEANED OFF IMMEDIATELY. 24. CONTRACTOR SHALL MAINTAIN EXISTING SEWER CAPACITY AT ALL TIMES. CONTRACTOR SHALL SUBMIT A BYPASS PLAN PER SPECIFICATIONS PRIOR TO COMMENCING WORK WHICH AFFECTS EXISTING SEWER CAPACITY. TRAFFIC CONTROL NOTES 1. CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN (T.C.P.) TO THE PUBLIC WORKS DEPARTMENT FOR APPROVAL A MINIMUM OF 5 DAYS PRIOR TO ANY WORK WITHIN AN EXISTING PUBLIC STREET, PEDESTRIAN PATH OR BICYCLE PATH. THE PLAN SHALL BE SIGNED BY A LICENSED CIVIL OR TRAFFIC ENGINEER WHEN IT INVOLVES AN ARTERIAL STREET. CONTRACTOR SHALL PROVIDE ALL NECESSARY TRAFFIC CONTROL IN ACCORDANCE WITH THE LATEST EDITION OF THE "CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" WHILE WORKING WITHIN THE PUBLIC RIGHT-OF-WAY. ONE TRAFFIC LANE (10' MIN) SHALL BE OPEN TO VEHICULAR TRAFFIC DURING ALL HOURS, WEEKENDS, AND HOLIDAYS. STREET CLOSURES AND DETOURS SHALL ONLY TAKE PLACE UPON CITY ENGINEER APPROVAL AND POLICE DEPARTMENT COORDINATION. 2. ALL TRAFFIC CONTROL DEVICES SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH PART 6 AND PART 9 OF THE LATEST EDITION OF THE "CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". 3. ALL CONES USED FOR LANE CLOSURE AFTER NIGHTFALL SHALL BE FITTED WITH RETROREFLECTIVE BANDS (OR SLEEVES). ALL ADVANCED WARNING SIGN INSTALLATIONS SHALL BE EQUIPPED WITH FLAGS FOR DAYTIME CLOSURES. FLASHING BEACONS SHALL BE USED DURING NIGHTIME CLOSURES. 4. ANY PERMANENT SIGN OR EXISTING PAVEMENT MARKINGS THAT CONFLICT WITH THE TRAFFIC CONTOL PLAN SHALL BE COVERED, OBLITERATED OR REMOVED AS DIRECTED BY THE ENGINEER. 5. DURING ALL CONSTRUCTION PERIODS, THE CONTRACTOR SHALL HAVE AT THE JOBSITE ALL NECESSARY TRAFFIC CONROL DEVICES (APPROPRIATE SIGN, LIGHTED ARROW DISPLAY, CHANNELIZING DEVICES, ETC.) 6. CONSTRUCTION SHALL BE SEQUENCED TO PROVIDE THE LEAST POSSIBLE ADVERSE EFFECT TO RESIDENCES. 7. CONSTRUCTION MATERIALS SHALL BE KEPT OFF DRIVEWAYS AND PRIVATE PROPERTY AND CONSOLIDATED IN AREAS WITHIN THE CITY RIGHT-OF-WAY AND EASEMENTS DURING WORKING HOURS UNLESS OTHERWISE APPROVED BY THE ENGINEER. 8. CONTRACTOR SHALL COORDINATE DETOUR ROUTES WITH THE CITY OF SAN MATEO. LEGEND PROPERTY LINE EASMENT LIMITS OF GRADING LIMITS OF DISTURBANCE CONTOUR - MAJOR CONTOUR - MINOR FENCE SANITARY SEWER TEMPORARY SANITARY SEWER STORM DRAIN REMOVE (E) INFRASTRUCTURE SS MANHOLE SS CLEAN OUT SD DRAIN INLET SD CLEAN OUT TREE FLOWLINE EXISTING PROPOSED SD -/////////////- O ssco am GEOTECHNICAL BORING, SEE GEOTECHNICAL DESIGN MEMORANDUM BY CORNERSTONE EARTH GROUP, INC. DATED AUGUST 11, 2010 FOR DETAILS GENERAL PIPELINE NOTES EB-1 X X SD 0 0 1. INDIVIDUAL SANITARY SEWER LATERALS ARE NOT SHOWN. CONTRACTOR SHALL LOCATE ALL EXISTING LATERALS BEFORE BEGINNING CONSTRUCTION OF PIPE REPLACEMENT REACHES. 2. LATERALS SHALL BE REPLACED TO CUSTOMER SIDE OF CLEANOUT IN ACCORDANCE WITH DETAIL SHOWN IN THIS PLAN SET. 3. CONTRACTOR SHALL MAINTAIN FLOW OF SEWER MAIN AT ALL TIMES DURING CONSTRUCTION. INDIVIDUAL LATERALS MAY BE ISOLATED DURING CONSTRUCTION DURING NORMAL WORKING HOURS. HOMES THAT ARE TO HAVE ISOLATED LATERALS SHALL BE PROPERLY NOTIFIED PER THE SPECIFICATIONS. CONTRACTOR TO COORDINATE ISOLATION WITH CALIFORNIA WATER SERVICE COMPANY FOR WATER SERVICE SHUTDOWN DURING LATERAL ISOLATION. 4. CONTRACTOR MAY ABANDON EXISTING VCP PIPE IN PLACE WHERE THE EXISTING PIPE DOES NOT INTERFERE WITH PLACEMENT OF PROPOSED PIPE. ABANDONED PIPE SHALL BE PLUGGED AT ENDS WITH CONCRETE. 5. PIPE LENGTHS AND DISTANCES IDENTIFIED ON THESE PLANS ARE HORIZANTAL LENGTHS. ACTUAL LENGTHS MAY VARY. 6. EXISTING MANHOLES WITH NEW PIPE SHALL BE MODIFIED TO ACCEPT NEW PIPE SO AS TO MEET INVERTS CALLED FOR ON THESE PLANS. BASIS OF BEARING THE BEARING OF NORTH 87°16'41" WEST BETWEEN TWO MONUMENTS LOCATED IN THE CENTERLINE OF KINGRIDGE DRIVE (SHOWN AS NORTH 88°46' WEST 518.69' ON THAT CERTAIN TRACT MAP "LAURELWOOD MAP NO. 4" FILED FOR RECORD ON FEBRUARY 15, 1955, IN VOLUME 41 OF OFFICIAL MAPS AT PAGES 17 THROUGH 18, SAN MATEO COUNTY RECORDS), WAS ADOPTED AS THE BASIS OF BEARINGS. BENCHMARK CITY OF SAN MATEO BENCHMARK# 071-007, ELEVATION= 106.718 FEET, SAN MATEO DATUM. DESCRIBED BY CITY AS "RAMSET NAIL AND WASHER, TOP OF CURB NORTHERLY CENTER ISLAND, ALAMEDA DE LAS PULGAS AND 36TH AVE" ABBREVIATIONS APPROX AC BW CIPP CL CLR CONC CONST CPLG DET DIA DIP E ELEV, EL EQ EXIST, (E) FG FL INV LT L LAT LF MAX MIN MP (N) N NTS OC OG OD PUE PVC (P) R RCP REQD REQTS RT RIM RWLOL R/W SDCO SDDI SS SSCO SSMH S SPECS STD STA SD SDMH TEMP TW TYP VCP W W/ APPROXIMATE ASPHALTIC CONCRETE BOTTOM OF WALL CURED IN PLACE PIPE CENTERLINE CLEAR CONCRETE CONSTRUCTION COUPLING DETAIL DIAMETER DUCTILE IRON PIPE EASTING ELEVATION EQUAL EXISTING FINISHED GRADE FLOW LINE INVERT LEFT LENGTH LATERAL LINEAR FEET MAXIMUM MINIMUM MICROPILE NEW NORTHING NOT TO SCALE ON CENTER ORIGINAL GRADE OUTSIDE DIAMETER PUBLIC UTILITY EASEMENT POLYVINYL CHLORIDE PROPOSED RADIUS REINFORCED CONCRETE PIPE REQUIRED REQUIREMENTS RIGHT RIM ELEVATION RETAINING WALL LAYOUT LINE RIGHT-OF-WAY / EASEMENT STORM DRAIN CLEAN OUT STORM DRAIN DRAIN INLET SANITARY SEWER, STAINLESS STEEL SANITARY SEWER CLEANOUT SANITARY SEWER MANHOLE SOUTH SPECIFICATIONS STANDARD STATION STORM DRAIN STORM DRAIN MANHOLE TEMPORARY TOP OF WALL TYPICAL VITRIFIED CLAY PIPE WEST WITH RECORD DRAWING BASED ON FIELD INFORMATION PROVIDED BY ENGINEERED SOILS REPAIRS THRU THE CITY OF SAN MATEO w I- 0 co C w DESCRIPTION RECORD DRAWINGS a a co v APPROVED Project Engineer co co 0 Senior Engineer APPROVED Deputy Director of Public Works w w z J U) 4 O wa a0 Z ct Z ' > w w :16- O mJC7 a m00 N Q Z -w� via z44 h. w 0 YWc~/) Z cc SURVEYED BY: w F- 0 0 DATE: 8/27/10 DRAWN BY: LJK CHECKED BY: EDS DATE: 8/27/10 SCALE: AS SHOWN CASE 4 DRAWER 19 SET 30 SHEET 2 of 11 CONTROL LINE STA 14+00 N2018884.09 E6036959.98 3921 COiTR Ot \x480 <7NF SSo CONNECT 8" DIP SS TO (E) 6" VCP (E) FENCE, REMOVE AND REPLACE AS NECESSARY FOR CONSTRUCTION CUT-OFF WALL UPSTREAM OF TIE IN TRANSITION SEE DETAIL k NOTES: 1. IF EXISTING STORM DRAIN LINE IS DISTURBED, TEMPORARY STORM DRAIN CONVEYANCE TO THE CREEK SHALL BE MAINTAINED AT ALL TIMES TO PREVENT EROSION. 2. HDPE DRAIN PIPE SHALL BE HANCOR AASHTO HDPE PIPE CONTAINING A MINIMUM OF 2% CARBON BLACK, OR APPROVED EQUAL. 3. CONSTRUCTION OF WALL AND SEWER LINE NEAR EXISTING 30" TREE MAY REQUIRE HAND EXCAVATION TO MINIMIZE DISRUPTION TO THE ROOTS. SEE SPECIFICATION SECTION 01532. 4. LOCATION OF EXISTING 18" STORM DRAIN LINE IS APPROXIMATE, CONTRACTOR SHALL LOCATE THE STORM DRAIN LINE PRIOR TO CONSTRUCTION AND VERIFY THAT IT DOES NOT CONFLICT WITH THE PROPOSED IMPROVEMENTS. 5. CONTRACTOR SHALL NOT ALLOW LOOSE SPOILS TO ACCUMULATE BELOW THE RETAINING WALL CONSTRUCTION AREA DURING CONSTRUCTION. 6. STORM DRAIN LATERAL IS INTENDED FOR FUTURE CONNECTION OF ADJACENT ROOF DRAINS, TO BE CONNECTED BY THE HOMEOWNER. 7. CONTRACTOR SHALL LOCATE AND REPLACE EXISTING SEWER LATERAL FOR 3927 KINGRIDGE DRIVE AS SHOWN IN DETAIL 2 ON SHEET 4. SEWER LATERAL SHALL BE CONNECTED TO TEMPORARY SEWER LINE DURING CONSTRUCTION. 8. TOPOGRAPHY IS APPROXIMATED BASED ON LIMITED SURVEY POINTS AND IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION. 9. CHAIN LINK FENCE AND CHAIN LINK RAILING SHALL BE CONNECTED AT THE INTERSECTIONS. 182 180 178 176 174 172 170 168 166 m en a p 0o z w N a H CO LIMITS OF DISTURBANCE SEE SHEET 5 APPROXIMATE LIMITS OF GRADING 6' TREE PROTECTION AREA NOT TO BE DISTURBED. \ SHORE IF REQUIRED FOR WALL CONSTRICTION INSTALL 51 LF OF 8" DIP SS PROPOSED EASEMENT (E) 30" TREE, PROTECT IN PLACE SSMH 1\ CENTER STA 15+20.76' 13.7' RT SEE DETAIL CUT-OFF WALL SEE DETAIL (E) HOUSE 0 a U Q W C J D U r +- m C en C 8" DIP SS N CREEK CENTERLINE 1 1 0 a cc > O in W�=z DOJJ C3~¢a W warp - W Oa uj Z m U W Y • 2c�o c'l ZO jw OUuiN. U6 '0 178 SLOPE FINAL GRADE UPHILL OF WALL TO GUTTER 3927 cc vin W W x m J ¢ ¢ jr D 00 Z zw I¢- w w p Z p - ¢ ZC ¢ Z U F_< W W J cn mz > ¢ O¢ F W C Q - SD LATERAL SEE DETAIL INSTALL 39 LF OF 8" DIP SS S PLAN SCALE: 1" = 10' 2n In C m ao m 0 r z m z In C 2-4" PVC PIPES FROM LOW POINT OF RETAINING WALL DRAIN TO DAYLIGHT, PLACE FERNCO FLEXIBLE PIPE COUPLINGS AND TRANSITION TO HDPE DRAIN PIPE. EXTEND TO EDGE OF CREEK AT 1% MIN SLOPE. FINAL LAYOUT TO BE DETERMINED BY THE ENGINEER DURING CONSTRUCTION NOTE: PIPE IS BELOW WEATHERED ROCK AT WALL SD PIPE SUPPORT WALL DRAIN WITH GRATE PLACED IN GUTTER PER CALTRANS STANDARD DETAIL B3-9. RIM/GUTTER INV = 175.45 CONNECT TO STORM DRAIN INLET WITH 4" PVC m m r z m (E) SSMH 28J-02 CHIP AND REFORM INVERT WITH NON -SHRINK GROUT FOR 8" PIPE AS IN DETAIL 4/4. BOLT LID PER DETAIL WALL DRAIN CLEANOUTS, TYP SEE DETAIL CUT-OFF WALL SEE DETAIL / CON �p225,p" 14.62.2a „--- REMOVE (E) TREE STUMP AS NECESSARY ® FOR CONSTRUCTION AND ACCESS, TYP INSTALL 14 LF 8" DIP SS, - CONNECT TO (E) 6" SS AT STA 15+77 TEMPORARILY RELOCATE (E) 6" SS DURING CONSTRUCTION. TEMPORARY LINE SHALL BE REMOVED AND THE SITE SHALL BE RESTORED UPON COMPLETION OF THE WALL AND NEW SEWER LINE REMOVE (E) CONCRETE GUTTER AND INLET 2'x2' SD INLET CENTER STA 15+58.68' ± 5.2' RT SEE DETAIL (E) HOUSE 3933 (E) 6" VCP SS 14+00 PIPE JOINTS AND CONNECTIONS BETWEEN NEW MANHOLE AND TIE IN TRANSITION SHALL BE RESTRAINED WITH A MEGALUGS OR APPROVED EQUAL (TIE IN DOES NOT NEED TO BE RESTRAINED) C U, 14+25 14+50 14+75 15+00 D m cc! a r- 2 U Zo 2-117 TOP OF WALL 176.5 8" DIP SS a m ao W rn II OCO.m 01 N ? 's. O N N N Co N II II II 2»> Z Z Z - tn io io S WWwz I- 0 a D m w a a w 0 a J (. J a ct �3 OQ a p z w CD F U cc en W w U m en > a co C z W -J¢ maW co O > a. cc O W >pw io r W U Q 0 M FU U D W w Z z°C Oio U X S CONTROL LINE ANGLE POINT STA 16+65.10 N2018810.95 E6037195.11 RETAINING WALL CONCRETE CAP, SEE STRUCTURAL SHEETS SHOTCRETE EXISTING GRADE FINAL GRADE (RESTORE TO EXISTING GRADE WHERE EXISTING GRADE IS FLATTER THAN 2:1) TEMPORARY EXCAVATION WALL DRAIN SEE STRUCTURAL SHEETS BOTTOM OF WALL LIMIT OF EXCAVATION / GRADING RESTORE TO EXISTING GRADE IF DISTURBED NOTES: 1. FINAL GRADE AT BASE OF WALL SHALL BE A MINIMUM OF 2' ABOVE WEATHERED ROCK LAYER AS SHOWN ON THE STRUCTURAL SHEETS. GRADING SHALL BE STEPENED AS REQUIRED TO MEET THE 2' REQUIREMENT. DEPTH OF WEATHERED ROCK LAYER TO BE DETERMINED BY THE GEOTECHNICAL ENGINEER IN THE FIELD DURING CONSTRUCTION. 2. ADDITIONAL TEMPORARY GRADING MAY BE REQUIRED AS NECESSARY TO CONSTRUCT THE WALL. 3. ANY TEMPORARY FILL USED TO CONSTRUCT THE WALL SHALL BE REMOVED UPON COMPMLETION. 4. ALL EXCAVATIONS REQUIRED TO CONSTRUCT THE RETAINING WALL SHALL BE BACKFILLED PER "GENERAL FILL" IN SPECIFICATION SECTION 02300. 5. EXCAVATIONS AND FILLS SHALL BE KEYED AND BENCHED AS DETERMINED IN THE FIELD BY THE GEOTECHNICAL ENGINEER. 6. WALL EXCAVATION METHODS DIFFERING FROM WHAT IS SHOWN HEREIN SHALL BE APPROVED BY THE ENGINEER PRIOR TO EXCAVATION AND BACKFILLING. 7. SOLDIER PILES AND MICRO PILES NOT SHOWN, SEE STRUCTURAL SHEETS FOR DETAILS. SECTION - TYPICAL WALL EXCAVATION NTS (E) GROUND ELEVATION AT CONTROL LINE (El CP SS 15+25 15+50 PROFILE HOR. SCALE: 1" = 10' VER. SCALE: 1" = 2' 15+75 16+00 Co II Q EF (0 coro 2 2 c_ co Io WW II > z l 16+25 16+50 182 180 178 176 174 172 170 168 166 16+75 17+00 RECORD DRAWING BASED ON FIELD INFORMATION PROVIDED BY ENGINEERED SOILS REPAIRS THRU THE CITY OF SAN MATEO W C m CO 0 w DESCRIPTION RECORD DRAWINGS z 0 >z 2 a 4 0 APPROVED C w m a` m 0 Senior Engineer APPROVED GI 0 Deputy Director of Public Works $.0 o W § a 4Zca¢oo �ad�0 U a N �z � 0 a et 4 06 U W Z N UJ (n Q CC W W Z woo L1.1 CC I - O N W J O CO Ca Z Q Q Y W N CC LL cc Q a I - co SURVEYED BY: W ct a O z 0 m DATE: 8/27/10 DRAWN BY: LJK CHECKED BY: EDS DATE: 8/27/10 SCALE: AS SHOWN CASE 4 DRAWER 19 SET 30 SHEET 3 of 11 SEWER LINE TRENCH DETAIL NOTES: 1. UTILITY TRENCH BACKFILLING SHALL BE PERFORMED UNDER THE OBSERVATION OF A GEOTECHNICAL ENGINEER. 2. PIPE ZONE BACKFILL SHALL CONSIST OF FREE -DRAINING CLEAN SAND. SAND SHALL BE COMPACTED WITH A VIBRATION PLATE TO AT LEAST 90% RELATIVE COMPACTION. PIPE ZONE BACKFILL SHALL ADHERE TO SPECIFICATION SECTION 02300. 3. TRENCH ZONE BACKFILL SHALL ADHERE TO THE REQUIREMENTS FOR GENERAL FILL IN SPECIFICATION SECTION 02300. COMPACTED NATIVE BACKFILL - 12" MIN. IN NATIVE SOIL CUTOFF WALL BOTTOM OF TRENCH /�/ UNDISTURBED NATIVE MATERIAL a i / a < //\j/\\ \ /17jj\\�\\�I //\/\/ LL U 12" MIN. IN NATIVE SOIL TRENCH SECTION RETAINING WALL /-- 12" MIN. UNDISTURBED NATIVE MATERIAL TRENCH AND CUTOFF WALL DETAIL CUTOFF WALL NOTES: 1. CUTOFF WALL TO EXTEND 1' PAST HORIZONTAL TRENCH LIMITS 2. CUTOFF WALL SHALL BE A BLENDED MIXTURE OF 1 -PART FREE DRAINING SAND AND 1 -PART DRY MIX CEMENT MIXED WITH WATER. WATER TO CEMENT RATIO SHALL BE LESS THAN 0.3, RESULTING IN A "DRY" MIX THAT IS HAND COMPACTED INTO THE KEYWAY AROUND THE PIPE. 12" SEWER OR STORM DRAIN PIPE P a - 24"a MIN. BOTTOM OF TRENCH // '/ /\// Q a a a x U W W CC N CUTOFF WALL /\ \ \\/ \\\/ \\\/ \\\/ 12" MIN. ;4\ \\\‘\\ A /".\\ TRENCH PROFILE I- z ww co J w LONG RADIUS Y8 BEND DIP WITH CALDER COUPLING PLACE WYE ON SUPPORT BRACKET ON RETAINING WALL PLAN THREADED PLUG EASEMENT LINE RETAINING WALL CITY MAIN SANITARY SEWER LINE 1' PVC PLACE WYE ON SUPPORT BRACKET PROFILE N.T.S. TO HOUSE A - NOTES: 1. LATERAL AT 3927 KINGRIDGE DRIVE SHALL BE REPLACED. 2. ALL LATERALS SHALL BE PVC, 4" MINIMUM. 3. SIZE OF CLEANOUT SHALL MATCH SIZE OF EXISTING LATERAL. 4" MIN. CLEAN OUT (E) LATERAL CALDER COUPLING SEWER LATERAL REPLACEMENT DETAIL i 2 \4 NTS PLACE MASTIC GASKET UNDER FRAME BOLT FRAME TO CONC MH SECTION PER FRAME MANUFACTURERS RECOMMENDATIONS PRECAST CONC CONE PRECAST CONC SECTIONS IPE ZONE BACKFI STORM DRAIN LATERAL TRIM (E) CMP AT SPRINGLINE (E) CMP A STORM DRAIN LATERAL SEE DETAIL (E) CMP DIA. VARIES FRAME AND GRATE FILL ENTIRE EXCAVATION WITHIN INLET AND BELOW SPRINGLINE WITH 560-C-3250 CAST IN PLACE CONCRETE STANDARD FRAME AND COVER GROUND EL. VARIES 2' 5-3/4" 4' 4 12" 4 1/8" a .d III U) w 6'6"MIN 560-C-3250 (POURED IN PLACE) SECTIONAL ELEVATION PLAN POUR CONC AROUND (E) CMP MIN 2% SLOPE TO INV (E) CMP A NOTE: 1. GRATE SHALL BE HOT DIPPED GALVANIZED STEEL IN ACCORDANCE WITH ASTM. ALL FABRICATING, SHEARING, BENDING AND WELDING SHALL BE DONE BEFORE GALVANIZING. FRAME AND GRATE SHALL BE RATED FOR H2O LOADING. 2. EXISTING CMP IS LINED WITH CURED -IN -PLACE PIPE SECTION A -A STORM DRAIN INLET DETAIL SECTION A -A MANHOLE DETAIL NTS NOTES: NON -SHRINK GROUT 4" PVC TO WALL DRAIN FROM GUTTER, 2% MIN. SLOPE PREACAST 24"x24" DROP INLET WITH FRAME AND GRATE, KNOCK -OUTS FOR (E) CMP 1. CONCRETE SLAB AROUND CASTING SHALL BE SQUARE AND FORMED WITH LUMBER IN EASEMENTS. 2. TAPER "SHELF" 1/2" PER FOOT TOWARDS CHANNEL. 3. MANHOLE EXCAVATION SHALL BE BACKFILLED IN ACCORDANCE WITH "GENERAL BACKFILL" AS DESCRIBED IN SPECIFICATION SECTION 02300 NTS 4 (E) CMP DIA. VARIES EASEMENT LINE PROFILE 4" PVC CALDER COUPLING CONCRETE STORM DRAIN INLET 4" CLEAN OUT 2"x2" OR 2" DIAM. FRP OR FR -4 POST WITH "STORM DRAIN" STENCILED ON TWO SIDES. EXTEND FROM PIPE INVERT TO 36" ABOVE FINISH GRADE. THREADED PLUG 4" PVC WYE STORM DRAIN LATERAL DETAIL NTSN T THREADED PLUG 1-1/2" DRAIN CLEAN CRUSHED ROCK PVC TEE CONNECTION SEE 4 4 CHRISTY B16BOX UTILITY BOX WITH B16D LID OR APPROVED EQUAL NOTE: 1. CLEANOUTS SHALL BE PLACED ON BOTH ENDS OF THE WALL. FINISH GRADE z 2 CD 4" PVC CLEAN OUT WALL DRAIN CLEANOUT DETAIL NTS RECORD DRAWING BASED ON FIELD INFORMATION PROVIDED BY ENGINEERED SOILS REPAIRS THRU THE CITY OF SAN MATEO I SHEET 4 of 11 DATE r r m CO w DESCRIPTION RECORD DRAWINGS REVISION NO. aaa‹a Project Engineer Date APPROVED Senior Engineer Date APPROVED Deputy Director of Public Works Date 8`1' SURVEYED BY: BOOK NO. DATE: DRAWN BY: UK DATE: 8/27/10 CHECKED BY: EDS DATE: 8/27/10 SCALE: AS SHOWN PROJECT NO.: 469922-46007 CASE 4 DRAWER 19 SET 30 392 SC -10 STORM DRAIN INLET PROTECTION (SEE NOTES) aS /7\ (E) HOUSE \xc.,`\N4 \ 0 • / 6' RADIUS TREE PROTECTION ZONE PROPOSED ADDITIONAL EASEMENT BACK OF CURB ON KINGRIDGE DRIVE SE -5 FIBER ROLLS, TYP (SEE NOTES) PROPOSED RETAINING WALL AND OTHER INFRASTRUCTURE, SEE SHEET 3 \ Oco a 0 V PROPOSED ADDITIONAL EASEMENT (E) HOUSE UTILITY EASEMENT CAN BE USED FOR SITE ACCESS AND CONVEYANCE OF MATERIALS; HOWEVER, TREES SHALL NOT BE DISTURBED AND ALL SITE IMPROVEMENTS AND LANDSCAPING SHALL BE RESTORED TO EXISTING CONDITIONS. LIMITS OF DISTURBANCE 3933 ct O) • O O FINAL EROSION CONTROL NOTES: 1. ONCE CONSTRUCTION IS COMPLETE AND ALL SLOPES ARE TO FINAL GRADE, ALL DISTURBED SOILS SHALL BE HYDROSEEDED PER THE SPECIFICATIONS. AN EROSION CONTROL BLANKET SHALL BE PLACED ON ALL SLOPES AND DISTURBED AREAS AFTER HYDROSEEDING PER THE SPECIFICATIONS. 2. ALL BACKFILL SHALL BE COMPACTED PER THE SPECIFICATIONS. SITE ACCESS NOTES: 1. SITE ACCESS FOR CONSTRUCTION EQUIPMENT AND MATERIALS IS THROUGH AN EXISTING DRIVEWAY AND A VERY STEEP SLOPE (APPROXIMATELY 60% GRADE). 2. SLOPE CAN BE TEMPORARILY GRADED TO PROVIDE FOR EASIER ACCESS; HOWEVER, NO TREES WITHIN THE TEMPORARY CONSTRUCTION ACCESS SHALL BE DISTURBED WITHOUT A WRITTEN AGREEMENT WITH THE PROPERTY OWNER. ALL TREES WITHIN AND ADJACENT TO THE WORK AREA SHALL BE PROTECTED IN PLACE PER SPECIFICATION SECTION 01532. 3. SEE SPECIFICATIONS FOR ADDITIONAL DETAIL. SE -5 FIBER ROLLS, TYP (SEE NOTES) • SE -5 FIBER ROLLS AT 10' INTERVALS (SEE NOTES) CORNER TEMP. CONST. ACCESS N2018755.75 E6037198.38 N2018705.26 E6037191.77 N2018704.19 E6037201.72 / LIMITS OF DISTURBANCE S EROSION CONTROL DURING CONSTRUCTION NOTES: 1. ALL SPECIFIED BMP'S REFERENCE BMP FACT SHEETS FOUND IN CASQA'S STORM WATER BEST MANAGEMENT PRACTICE MANUAL FOR CONSTRUCTION, NOVEMBER 2009. DETAILS, INSTALLATION, OPERATIONS AND MAINTENANCE, ETC. FOUND IN THE MANUAL SHALL APPLY. 2. WHERE EASEMENT BENCH IS RELATIVELY FLAT, FIBER ROLLS MAY BE PLACED ALONG THE EDGE OF THE BANK TO PREVENT SEDIMENT FROM TRAVELING DOWN THE SLOPE ADJACENT TO THE EASEMENT. WHERE THERE IS NO BENCH ALONG THE EASEMENT, FIBER ROLLS SHALL BE PLACED DOWNHILL OF DISTURBANCE EVERY 10 FEET ON CONTOUR WITH 2 FEET OF OVERLAP. THIS PLACEMENT DOWN -SLOPE OF PROJECT DISTURBANCE SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS AND IS SHOWN AS TYPICAL ON THIS DRAWING. ONCE CONSTRUCTION IS COMPLETED (OR IF THERE IS A HALT IN CONSTRUCTION WORK OR IF THERE IS A STORM THREATENING), FIBER ROLLS SHALL BE PLACED THROUGH CONSTRUCTION DISTURBANCE AREAS AS WELL, EVERY 10 FEET ON CONTOUR IF THE SLOPE IS STEEPER THAN 2:1 AND EVERY 20 FEET ON CONTOUR IF THE SLOPE IS MILDER THAN 4:1. 3. ACCEPTABLE ALTERNATIVES TO FIBER ROLLS INCLUDE SILT FENCE (SE -1), GRAVELBAG BERM (SE -6), OR SANDBAG BARRIER (SE -8). THE CHOSEN OPTION SHALL BE INSTALLED, OPERATED, AND MAINTAINED PER THE CASQA MANUAL, AND SHALL BE LOCATED AS DETAILED AND SPECIFIED HEREIN, 4. ANY STORMDRAIN INLETS ON KINGRIDGE DRIVE THAT HAVE POTENTIAL TO RECEIVE SEDIMENT TRACKED FROM THE PROJECT BY VEHICLES ENTERING AND EXITING, SHOULD BE PROTECTED AS DETAILED IN THE CASQA MANUAL. EDGE DRIVEWAY 3939 in ✓ 0 O N2018813.41 E6037219.60 7 i i TEMPORARY CONSTRUCTION ACCESS (SEE SPECIFICATIONS AND NOTES) CORNER TEMP. CONST. ACCESS N2018753.34 E6037208.16 i N2018832.59 E6037280.62 10 0 I J a 10 20 NM SCALE: 1 INCH = 10 FEET RECORD DRAWING BASED ON FIELD INFORMATION PROVIDED BY ENGINEERED SOILS REPAIRS THRU THE CITY OF SAN MATEO w a a >- m 0 w DESCRIPTION RECORD DRAWINGS z O E5 wz cc 4 co co 0 APPROVED Project Engineer 0 0 Senior Engineer APPROVED • 0 Deputy Director of Public Works W Z JO N lu J (n Q W V 0- Z U) O cc W 02N W J CC a Di CO Z = Fa - Y W CC Z Ja ca I- Z N O W VV Z Q O W cn O N cc W 0 Q SURVEYED BY: w I- 0 O z 0 CO DATE: 8/27/10 DRAWN BY: LJK CHECKED BY: EDS DATE: 8/27/10 SCALE: AS SHOWN CASE 4 DRAWER 19 SET 30 SHEET 5 of 11 175.0 170.0 165.0 160.0 Soldier pile spacing Battered pile spacing Weakened plane joint at center of CMP End Wall—\ (TW=176.5) Angle Point Existing SSMH 28J-02, behind wall L_j 155.0 Datum Elev = 150.0 RWLOL Stationing 01 60.14' measured along RWLOL See 'SOLDIER PILE DATA TABLE' See 'BATTERED MICROPILE DATA TABLE' Chain lin railing K -Ex i st i ng 18"-± CMP thru face of wall L Soldier pile, Bottom of B11-7 not all shown Wall (BW) ---Top of Wall (TW) Estimated unweathered rock layer L L� 9" � —Begin Wall (TW=176.5) Approximate OG ��SSMH behind wall Estimated top of weathered rock layer 10+75 10+50 10+25 DEVELOPED ELEVATION 1" = 5' SSMH 28J-02 00.61 Rt 'Control Line Proposed City `Easement R/W Line 0 f R/W Line Pri 1 i Exist 6" SS I ; Exist 18" CMP vir � 10' PUE I l� 1 1 i 15+61.86 <11 R/W Line RWLOL 10+63.54 4.50 Lt 'Control Line' 15+73.81 End Retaining Wall Note: The Contractor sha l fr' erify af'f controlling field dimensions before ordering or fabricating any material A 0 11 10+50 Proposed City. Easement 3.83 Lt 'Control Line' 15+59,03 A End of Chain Link Fence -SD Inlet 8" DIP SS SD Inlet 1.24 Rt`'Control Line 15+24.93 Begin of Chain Link Fence N 73°3400" W RWLOL 10+25 RWLOL 10+53.54 4.50 Lt 'Control Line' 15+61.89 Angle point Line I 15+25 Chain link railing R/W Line 10+00 --Manhole RWLOL 10+03.40 A \ 8.20 Rt 'Control Line' 15+17.01 egin Retaining Wall \ RWLOL -R,/4/ Line 8" DIP SS) Control Line' Existing tree to remain Exist 6" SS RWLOL 10+21.36 4.50 Lt 'Control Line' 15+29.72 Angle Point • 00 ,-Proposed City Easement Line R/W Line Varies Gutter Pipe support assembly as occurs, see 'Control Line' RWLOL R/W Line 10'-0" PUE B3-9 ` r 1 L -J H" Estimated top of weathered rock layer 2 Battered micropi le Soldier pile -- 2'-4' Varies i 0 C ��Chain link railing N Top of wall (TW) Approx OG FG Bottom of wall (BW) Estimated -� top of unweathered rock layer TYPICAL SECTION 3/8" = 1'-0" NOTES: 1. This plan accurate for structural retaining wall work only 2. Top of Wall (TW) and Bottom of Wall (BW) profiles are linear between points shown unless noted otherwise 3. See Civil Plans for right-of-way, utility, drainage, grading and layout information not noted 4. The estimated weathered and unweathered rock layers are shown for reference only. Actual depths may vary. Refer to Geotechnical Design Memorandum by Cornerstone Earth Group, dated August 1 1 , 2010 for additional information 5 For 'SOLDIER PILE DATA TABLE' and 'BATTERED MICROPILE DATA TABLE' and 'GENERAL NOTES', see 'WALL DETAILS No. 1 sheet 6 Approximate ground water elevation is at estimated weathered rock layer RECORD DRAWING BASED ON FIELD INFORMATION PROVIDED BY ENGINEERED SOILS REPAIRS THRU THE CITY OF SAN MATEO 0 0 N 0 n cp D' cc a 0 DESCRIPTION STATION LINE REVISION RECORD DRAWINGS z 0 (/ 0 a a a C APPROVED Project Engineer 0 Senior Engineer APPROVED u 0 Deputy Director of Public Works N U'" W O —z O NE I F L, U Q� Nopcnos r fl N Ut mm Eo_ osE - L 4,2,„ U LL I N ) tool ON NCI WEo CO N cc co Z_ REHAB EMERGENCY ZATION - PHASE Z Q J a GENERAL SURVEYED BY: w 0 0 Z 0 0 CO 0 co co DRAWN BY: TEH CHECKED BY:DBD DATE: 7/30/10 z 0 x rn J 0 0 In PROJECT NO.: 469922-46007 CASE 4 DRAWER 19 SET 30 SHEET Si oF1±1 (200924151) 2009241 GENERAL NOTES WORKING STRESS DESIGN DESIGN: Bridge Design Specifications April 2000 (1996 AASHTO w/ Interims and Revisions by Caltrans) LIVE LOADING: Includes Uniform Lateral Pressure of 72 psf due to surcharge REINFORCED CONCRETE: STRUCTURAL STEEL: SOIL PARAMETERS: SUPPLEMENTAL PILE DATA TABLE Pile Number Steel Pile Size (See Note 7) Offset from Main Soldier Pile, 'Y' SP -8A W12x58 8'-9" SP -9A W12x58 10'-3" SP -10A W12x58 1 1 '-9" NOTES: 1. The estimated weathered and unweathered rock layers are shown for reference only. Actual depths may vary and are to be determined in the field by the Geotechnical Engineer of Record during construction. Refer to Geotechnical Design Memorandum by Cornerstone Earth Group, dated August 1 1 , 2010 for additional information 2. The specified tip elevation was based on a minimum embedment of 10'-0" into the unweathered rock layer. Final specified tip elevation is subject to review and approval by the Geotechnical Engineer of Record 3. Bottom of wall shall extend 2'-0" minimum below the weathered rock layer 4. Battered Micropiles shall be constructed perpendicular in plan view to RWLOL unless noted otherwise 5. Finish grade in front of wall shall extend 2'-0" minimum above the weathered rock layer 6. Locate existing utilities prior to drilling 7 Alternate supplemental pile sizes include W14x48 or W10x88. Other steel sections are allowed provided: • Ix > 475 in.4 • Sx > 78.0 in.3 • 1" minimum clearance between the steel pile and drilled hole. Drilled holes > 19" allowed Note: The Contractor shall verify al l controlling field dimensions before ordering or fabricating any material ASTM Designation: A706 fy = 60,000 psi fs = 24,000 psi f'c = 3600 psi fc = 1440 psi n = 8 n = 10 Steel Piles: ASTM Designation: 4992/A992M, Grade 50 Welded Headed Studs: ASTM Designation: A108 and AASHTO/AWS D1.5M/D1.5 Steel Angles: ASTM Designation: A36/A36M A722 Grade 150 DYWIDAG Reinforcing° ASTM Designation: fu = 150 ksi Unit weight (?5) Active Earth Pressure Coeff (Ka) Additional Uniform Active Earth Pressure Passive Earth Pressure Coeff (Kp) Passive Arching Capability Bond Stress (6b) Soldier Pile Rock Socket Capacity Factor of Safety = 130 pcf = 0.35 (level backslope) = 8x (HT of retained soil) psf = 3.1 = 2.0 = 750 psf (Grouted) = 3200 psf (Post -Grouted) = 100 kips = 2.0 SOLDIER PILE DATA TABLE Pile Number RWLOL Station Steel Soldier Pile Size Cut-off Elevation Specified Tip Elevation SP -1 10+04.75 W10x49 175.0 162.0 SP -2 10+09.25 W10x49 175.0 160.0 SP -3 10+13.75 W10x49 175.0 155.0 SP -4 10+18.25 W10x49 175.0 150.0 SP -5 10+23.75 W10x49 175.0 150.0 SP -6 10+28.25 W10x49 175.0 150.0 SP -7 10+32.75 W10x49 175.0 150.0 SP -8 10+37.25 W10x49 175.0 150.0 SP -9 10+41.75 W10x49 175.0 150.0 SP -10 10+46.25 W10x49 175.0 153.0 SP -11 10+52.25 W10x49 175.0 156.0 SP -12 10+56.75 W10x49 175.0 159.0 SP -13 10+61.75 W10x49 175.0 159.0 BATTERED MICROPILE DATA TABLE Pile Number RWLOL Station Steel Soldier Pile Size Cut-off Elevation Axial Tension Force (T) MP -1 10+07.00 2-#11 Bars 173.5 40.0 kips MP -2 10+11.50 2-#11 Bars 173.5 40.0 kips MP -3 10+16.00 2-#11 Bars 173.5 75.0 kips MP -4 10+20.00 2-#11 Bars 173.5 75.0 kips MP -5 10+26.00 2-#11 Bars 173.5 75.0 kips MP -6 10+30.50 2-#11 Bars 173.5 75.0 kips MP -7 10+35.00 2-#11 Bars 173.5 75.0 kips MP -8 10+39.50 2-#11 Bars 173.5 75.0 kips MP -9 10+44.00 2-#11 Bars 173.5 75.0 kips MP -10 10+48.00 2-#11 Bars 173.5 75.0 kips MP -11 10+54.50 2-#11 Bars 173.5 40.0 kips MP -12 10+59.50 2-#11 Bars 173.5 40.0 kips RECORD DRAWING BASED ON FIELD INFORMATION PROVIDED BY ENGINEERED SOILS REPAIRS THRU THE CITY OF SAN MATEO w F- 0 >- m DESCRIPTION RECORD DRAWINGS 0 -o >z w a C1 0 w 0 CC a a CC a W N 0 0 0 w 0 a a a L C C W L 0 C m N • 4- a 0 Deputy Director of Public Works Y u! NZW • -z DNS .% J U �J ® Q NCBJ 0WS CO 40 " N Om ED crE - L O U2 � L F- Ell 01 N VC! WCo KINGRIDGE SEWER LINE REHAB EMERGENCY SLOPE r STABLIZATION - PHASE f 0 Z J J a SURVEYED BY: 0 z 0 co DATE:8/6/10 DRAWN BY:TEH CHECKED BY:DBD DATE:7/30/10 SCALE:AS SHOWN PROJECT NO2 469922-46007 CASE 4 DRAWER 19 SET 30 SHEET S2 OF1 (200924152) 2009241 CL Drilled hole =----` CL Steel soldier pile CL Battered Micropile c E 'Li U • • r Welded headed stud, typ R/W Line Pipe support a C pile i 1 ki s cn 0- • N 1/2 S Oa' R/W Line Note: The Contractor shall verify al l controlling field dimensions before ordering or fabricating any material 1/2 S f—� Battered Micropi le xxxxxxxxxxxxxxxxx i • • • Typical wall reinforcement • • f CL Drilled hole = CL Steel soldier pile O • • SECTION KAY 1I R/W Line-�` Exist manhole 7 i' \// d I iI / o•- R/W 0 Ln '-0" \S • • • • Supplemental pile, typ see 'SUPPLEMENTAL PILE DETAIL' on sheet S4A 50 10+50 ine i I.' • 6'-0" max, see Note 1 I 0 0 0 0 In 1'-9" min, dsee Note 1 b rn U) Cfl V) co I a_ Battered Micropi le • • Steel soldier (--- pile j c • • Geocomposite drain 7" ty a CO 0_ U) a_ _t --Exist 6"± SS not shown 0 >- o 0 N 73°34'00 10+40 Exist 18"± CMP, see Note 2 Thr CO I a_ U) C i • • Lo 0 0 Z i Drilled hole Modified vertical facing reinf layout (Reinf not shown) 2" expansion joint filler or mortar between cap beam and existing 18"-± dia CMP 24" dia formed hole in - concrete facing centered on existing CMP. Fil l space between formed hole and CMP with mortar 8" DIP SS C soldier pile 'Control Line' 4'00' W 10+30 CL V) 25° RWLOL See 'PARTIAL PLAN' on sheet S4A FOUNDATION PLAN [f 3/8" = 1/-0" dS3y S41 U') Cl) Exist 1 8"± CMP * Standard vertical facing reinf plus additional vertical facing reinf equal to 1/2 vertical reinf cut by opening (both faces) ** Standard vertical facing reinf above and below opening (both faces) 15 15 V� R/W Line 15+25 A \--R/W Line °S Existing tree to remain 1'-9" min, see Note 1 A A x 6'-0" (each face) #5 z #8 E #8 w a� a U 1/2" deep control joint above and below opening NOTE: Al l reinforcement to clear formed hole by 2" m i n NOTES: 1. Soldier pile and Micropi le location may be adjusted by 12"-± max as required, except where maximum or minimum spacing otherwise noted 2. Existing 18"± CMP location is approximate. Actual location For existing 18"± CMP penetration of concrete facing, see 3. See Civil Plans for details 4. See 'SOLDIER PILE DATA TABLE', 'MICROPILE DATA TABLE' on 'WALL DET may vary. 'SUPPLEMENTAL PILE DATA TABLE' A s eet or .i le and data not shown 5. Provide a minimum of 1'-0" between the edge of the sanitary sewer line and the edge of the supplemental pile drilled hole Concrete Fccin RECORD DRAWING BASED ON FIELD INFORMATION PROVIDED BY ENGINEERED SOILS REPAIRS THRU THE CITY OF SAN MATEO w I- 0 DESCRIPTION RECORD DRAWINGS 0 O — >z cc a d 0 C C w 0 CC 0- 0- a) w O o a 0 w 0 cc a a 01 L 0 m a) 4- 0 C Deputy Director of Public Works KINGRIDGE SEWER LINE REHAB EMERGENCY SLOPE ZATION - PHASE SURVEYED BY: O z 0 O m 0 CO CO w F- 0 0 Y m z a Q_ CHECKED BY:DBD DATE:7/30/10 0 0 NN L,I J a U !n PROJECT NO.: 469922-46007 CASE DRAWER SET 4 19 30 SHEET S3 oF_1_1 (2009241S3) 2009241 Chain Link Railing Concrete Gutter Cutoff elev L a) 1J 0 co is of stee E 9 #8, total 3 6" & varies Alternate hooks Specified --2 Tip elev 0 2' - Steel soldier pile RWLOL Varies f R/W Line (--TW each face 5/g x 6" welded headed stud (field welded) ad 12", typ Estimated top of weathered rock layer _,--4" min, 6" max, typ Estimated unweathered rock not shown a a 0 E E E co a N - a) a a a x w * Provide 3" cir to front face of reinforcement if cast in trench C 0 0 2 L U) C 0 0 a a 0 a ** Lift heights limited by stability of excavated soil Note: SECTION /A� 1 = 1 The Contractor shall verify al l controlling field dimensions before ordering or fabricating any material 4y x X0 0 /i. Cutoff elev U 0 #8 ��—RWLOL TW #5 #8 X x • • See X X X Geocomposite drain, see x 'WALL DETAILS No. 4' sheet -R/W Line f —See �54) for details not noted 18" dia drilled hole #5 4 Provide an additional stirrup at each side // of Micropile ;% soldier Grout CL Battered Micropile 8" dia dri I led hole 1 V4" dia DYWIDAG bar, epoxy coated SECTION Cc 1 1 /2" = 1 '-0" S4,1 1 T • #5 • Drain, see SECTION KB\ 0 S4y r#4 +I 0 (V _3 BW FG Outfa I I , see Civil Plans Estimated top 7 of weathered rock layer Estimated top of unweathered rock layer Steel pile Concrete 18" dia dri I led hole Steel soldier pile f—� Steel soldier pile Lean concrete backf i I I Lean concrete backf i I I to be removed Welded headed stud Steel soldier pile SECTION 1 1 /2" = V-0" S4 Concrete backf i I I RECORD DRAWING BASED ON FIELD INFORMATION DATE 7. 7. CO l' in in DESCRIPTION RECORD DRAWINGS 8 >Z w cc 4 (Project Engineer Date APPROVED Senior Engineer Date APPROVED Deputy Director of Public Works Date U4 NZW O z Ow aF—w 0< .a Nv3 0 ONrr EIC V1 o N U; Om E0 o •E _L Qwm Br 2 F -AD 'Ca' ON W cocogv W W Z J J Q co )•- W 0 W W E Q W 2 m C7 = Z roc CO ic a. 0 wC N J IC OD Q7 0 Z co J IF 0 4E SURVEYED BY: BOOK NO. DATE: DRAWN BY:TEH DATE:8/6/10 CHECKED BY:DBD DATE:?/30/101 SCALE:AS SHOWN PROJECT NO.: 469922-46007 CASE 4 DRAWER 19 SET 30 PROVIDED BY ENGINEERED SOILS REPAIRS I SHEET S 4 0 F� THRU THE CITY OF SAN MATED (2009241 S4) 2009241 C' Cutoff elev 0 0 0 -RWLOL Varies f R/W Line rTW \\ • / • I m21_ lr r 1" dia — DYWIDAG bar Steel soldier ----- pile Specified-,\ Tip elev • • • • 0 • • • • . • • 0 • • • 0 • SECTION KAY 1" = V-0" Note: f4 The Contractor shall verify al l controlling field dimensions before ordering or fabricating any material Bearing R1"x8"x0'-8 C Bar - Construction joint U (5- ) " dia formed hole FG -Estimated top of weathered rock layer y--BW Estimated unweathered rock not shown Note: For details not noted, see #8, see • . . i 1" Dia DYWIDAG bar, typ W10x soldier - pi le Cap beam or • •► .I • . • • • . -7, • • . • . . • • • • . . . / / 1—„s r �I I I I • 1 . . • . . . . . • . • #5 i . or N • • . 10+50 O 0 O a_ U) Bearing plate #8 x 8'-0", centered over opening #8 x 8'-0" total 4, centered over opening Existing 18"± CMP Soldier pile beyond Bar _ 9" typ_ #5 I) total 4 . .• I I I I • L — ti Typical horiz facing reinf 1i I I I I I I I I I I rn 0_ U) v w �vThrThr- 1 0 I40 co 0_ PARTIAL PLAN 1" = 1'-0„ ca. 1 2" Vertical facing reinf —#5 Rf RWLOL co 0 U) 7 • . 7 • . 0 K-2" dia formed hole, typ NOTE vvvvvvYYv�v 1. Al l exposed steel surfaces, including DYWIDAG reinforcing, shall be hot dip galvanized after fabrication and/or coated with 2 applications of zinc rich primer prior to backfill C DYWIDAG bar match elev at face of wall Note: All reinf to clear formed hole by 2" m i n O Co 18" dia dri I led ---- hole 2" dia hole, typ x 0 E CV ELEVATION Supplemental pile Bearing i'1 "x8"x0'-8" Bearing le Dri l led hole beyond SECTION SUPPLEMENTAL PILE DETAIL 1" = 1'-0" '-lt‘ORD DRAWING BASED ON FIELD INFORMATION PROVIDED BY ENGINEERED SOILS REPAIRS THRU THE CITY OF SAN MATEO w 0 N >- m CC 0 D DESCRIPTION RECORD DRAWINGS 0 (7)o 0 APPROVED Project Engineer 0 C Senior Engineer APPROVED 0 C Deputy Director of Public Works Ho a[a 0 1 0'0 ON e Of (( / ` O of Q 16 Or vin f mm oM Nei 00 °MI KINGRIDGE SEWER LINE REHAB EMERGENCY SLOPE r STABLIZATION - PHASE 0 Z J WALL DETA SURVEYED BY: Li] a 0 0 z 0 0 m DATE: 8/6/10 DRAWN BY: TEH CHECKED BY: DBD DATE: 7/30/10 z 0 0 x w J Q U N PROJECT NO.: 469922-46007 CASE 4 DRAWER 19 SET 30 SHEETS OF1] (2009241S4A) 2009241 w F- a 0 TW .—Q Pile Pile EO __ -1 CL G 9.. gil -YPtYP dra 1 n 1 P 7 I r ' 4 ^ • L � / BW— S Drain, see S eocompos i to in Bottom of concrete cap MIRRORED PARTIAL WALL ELEVATION 1 /2" - 1 '-0" Note: The Contractor shall verify all controlling field dimensions before ordering or fabricating any material Filter fabric wrap around top & sides Bottom of concrete cap Geocompos i to drain Geocompos to drain Top of weathered rock layer Universal drain fitting at weathered rock layer Face of concrete facing DETAIL C15 � NO SCALE S Drilled hole, backf i I led with lean concrete, as occurs Geocompos i to drain Cleanout pipe see 'CIVIL DETAILS' sheet Tee connection 4" dia outfall, see Civil Plans SECTION Universal drain fitting at base of geocompos i to drain Steel soldier pile, as occurs 4" dia drain, 1% min slope, typ NO SCALE �S5y FG as occurs Formed or cored hole CD Tee connection, see -Formed or cored hole DETAIL (2 NO SCALE S5� Universal drain fitting, typ 2" dia drain, typ Concrete facing Tee connection, typ Cleanout pipe see 'CIVIL DETAILS' sheet f- Begin wa l l RECORD DRAWING BASED ON FIELD INFORMATION PROVIDED BY ENGINEERED SOILS REPAIRS THRU THE CITY OF SAN MATEO o: o DESCRIPTION RECORD DRAWINGS a 0 BO 1 0 0 w CC c 0 L d N C w L O N Deputy Director of Public Works UO' N Z[id O z O w5 VFW u —c oa U� NUJ In J Qv) o10 N nv, N W m Eo of — L U �N t I Emit) wm ON le I @03 O° KINGRIDGE SEWER LINE REHAB EMERGENCY SLOPE *- W oic OD O ist N J m I- U, 0 Z J J 3 SURVEYED BY: F- 0 0 z 0 0 co DATE:8/6/10 DRAWN BY:TEH CHECKED BY:DBD DATE:7/30/10 SCALE:AS SHOWN PROJECT NO.: 469922-46007 CASE 4 DRAWER 19 SET 30 SHEET S5 OF111 (2009241S5) 2009241 Approx location -- of 8" DIP Welded headed -- stud, typ 2 S6 L6x6x1/2 Varies SECTION 11/2" = 1 ' 0 S6y 56 y� y 1 /4 N L6x6x1/z�� 3/-8" 1 -4J 4) L Pipe Support Assembly Note: The Contractor shall verify all controlling field dimensions before ordering or fabricating any material N- T 1 min DETAIL Kf C 1 /4 Soldier pile beyond NOTES: 1 , Pipe support assembly sha l I be galvanized after fabrication 2. See 'WALL DETAILS No. 2' sheet for location of pipe supports. x6" Welded headed stud, typ F -- DETAIL (2 11/z" = 1'-0" K562 RECORD DRAWING BASED ON FIELD INFORMATION PROVIDED BY ENGINEERED SOILS REPAIRS THRU THE CITY OF SAN MATEO CC C 0 DESCRIPTION RECORD DRAWINGS O - • >z cc w 0 C 0 w 0 CC IZ 0_ L 4) C C a C W t U N 0 L a 0 W 0 a a L 4) 4) C a, C W L O C 4) U) 4- O Ct Deputy Director of Public Works ow "0In E_° 0'c - L Qein U °N � L I H 0 LP tom ON N'I (0co CNV' KINGRIDGE SEWER LINE REHAB EMERGENCY SLOPE ON - PHASE MISCELLANEOUS SURVEYED BY: 0 z 0 O m DATE:8/6/10 DRAWN BY:TEH CHECKED BY:DBD DATE:7/30/10 PROJECT NO.: 469922-46007 CASE 4 DRAWER 19 SET 30 SHEET_SL OF1 1 (2009241S6) 2009241