Loading...
HomeMy Public PortalAbout06-0233 WordenN DATE ISSUED: 04 -24 -2006 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUAREFOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REROOF 1105 SECOND AVE CHARLES A. WORDEN PO BOX 859 TYBEE ISLAND GA 313280859 DAVIS ENTERPRISES PO BOX 22056 SAVANNAH GA 31403 P $ 53.00 $4,500.00 PERMIT #: 060233 TOTAL BALANCE DUE: $ 53.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, slate or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to bold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786-5737 www.cityoflybee.org C) CO -oZ3 3 CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Location: 1105 Sec; n 9 y . PIN # i1MV Al� AnnR PRR TPT PPR(IATP Owner l-O W -&n, A,+ it aS Z� % Ste• � T. 1 - - — ❑ k: 2 ❑ Repairs Architect or Engineer Building S Contractor (Check all that apply) ❑ New Construction ❑ Duplex ❑ Residential ❑ Footprint Changes r_ Other t- 4t 1-0 D T Estimated cost of Construction: Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: ❑ Renovation ❑ Single Family ❑ Commercial ❑ Repairs I -� 0 a o (Enter appropriate number) (4) Masonry (5) Steel & Masonry ❑ Minor Addition ❑ Substantial Addition ❑ Multi - Family ❑ Demolition (6) Other (please specify) ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units Lot Area # Off - street parking spaces Trees located & listed on site plan Access: Driveway Setbacks: Front # Bedrooms Living space (total sq. ft.) With culvert? Rear W.T. R IT1174 I, . With swale? Sides (L) _ (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by at by means of I understand that I must comply with zoning, flood damage control building fire shore protections and wetlands ordinances FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage iptpair d by this permitted construction. Date: Signature of Applicant: - C— Note: A permit normally takes 7 to 10 days to ru ocess. ----------------------------------------------------------------- The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm./Drainage Inspections City Manager Existing Signature Date FEES Permit 3 g, Inspections I S Water Tap Sewer Stub Aid to Const. TOTAL �3. DAVIS EMERPRISESS P.O. 80x22056 S4 VANNAH, GA 31403 (912) 441 -4882 FAX (912) 823 -2843 PROPOSAL RfLI"GADDRESS DATE ES77M4TE NO. Art & Vickie Wor 411&2009 437 1105 2nd Ave. Tybee Island, Ga JOB NAME JOB ADDJZESS ITEM DESCRLP77ON QTY TOTAL Roof Re_.'. Repaired roof per proposal 4,500 00 Tear off existing shingles Install new eave trim Apply rubber to flat roof Nail on new architectural shingles Replace pipe collars Install new ridge vent Note: if chimney needs to be flashed it will be an extra cost of $15o.00 Any rotted wood is an extra cost Clean up and haul away all debris from roof job 3 year workmanship warranty Labor & Material 1/3 down and balance due upon completion of job TOTAL $4,500.00 SIGNATURE ��