Loading...
HomeMy Public PortalAboutChange Order No. 1 to Contract No. 12-2021 - I&D - MW Designs - Furniture and Renovations to Council Chambers t&4IA Document - 2017 Change Order - PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: COUNCIL CHAMBERS/LOBBY Contract For:12+2021 Change Order Number:04 SON.FIFTH STREET Date: 02-04-2021 Date: 05-18-2021 OWNER: (name and address) ARCHITECT:(name and address) CONTRACTOR:(name and address) CITY OF RICHMOND 000 MW DESIGNS 50 N.FIFTH STREET 000 P.O.BOX 443 RICHMOND,IN 47374 000 RICHMOND,IN 47375 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits.Also include agreed upon adjustments attributable to executed Construction Change Directives.) Due to abatement removing existing ceiling,scope of work has changed from retexturing plastered ceiling to installing a complete new acoustical'tile ceiling and framing/finishing new bulkhead;new style changes electrical installation, removal of all cables remaining;light fixtures change to 2x2 led flat panels,directional lighting on walls,tech lighting at media;crown molding will not be used;cable railing for old ramp has been deducted(abatement disposed of ramp). New cove base in lobby due to removal in order to strip wallpaper. *Furnish and install flip receptacles/USB on council desk,additional receptacles for media speakers/TV as requested per Ron Oler. **CeilingBulkhead has to be done before other scopes of work with crew available week of 05/24; otherwise,next availability to resume mid-June. The original,(Contract.Sum),(Guaranteed 1\was $ 170910 The net change by previously authorized Change Orders $ 7475 The (Contract Sum)(Guaranteed Ibprior to this Change Order was $ 178385 The (Contract Sum)(Guaranteed l'will be (increased)(by this Change Order in the amount of $ 16435 The new(Contract Sum)(Guaranteed IV,including this Change Order,will be $ 194820 The Contract Time will be(increased)((by ( )days. The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. fir, 5 LJ Dr l�GGIr►2 ARCHITECT(Firm name) CONTRACTOR(Fim name) irnz name) SIGNATURE SIGNAIIIRE v..�.d-0•-- UR W e ,tr.Ac W l-SO .l I Ow,er "rl(t�j ra II'A.Q J ,Lbe- PRIMED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE DATE DATE AIA Document G701 TM—2017.Copyright©1979,1987,2000,2001 and 2017 by The American Institute of Architects.All rights reserved.WARNING: This AIA°Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was created on 05/17/2021 23:36:47 under the terms of AlA Documents-on-DemandTM Order No. 2010706428 ,and is not for resale.This document is licensed by The American Institute of Architects for one-time use only,and may not be reproduced prior to Its completion. MIN Designs Addendum #2 -MELINDA WILSON- PO BOX 443-RICHMOND,IN 47375 BILL TO: CITY OF RICHMOND ATT: BETH FIELDS 60 NORTH FIFTH STREET RICHMOND,IN 47374 #765-983-7211 BFIELDS@RICHM ON DI N DIANA.GOV DESCRIPTION OLD LABOR OLD MATERIAL NEW LABOR NEW MATERIAL DIFFERENCE COUNCIL CHAMBERS&3RD FLOOR LOBBY ELECTRICAL 7325 9464 12750 10895 $6,856.00 CEILINGS/PAINTING 16019 8156 23593 17217 $16,635.00 LAMINATE 'NO CHANGE FLOORING NO CHANGE CARPENTRY/ACCESSORIES/MEDIA 5375 8452 2625 2636 ($8,566.00) FURNITURE NO CHANGE ADD ON:COVE BASE IN LOBBY 220 165 $385.00 (HAD TO REMOVE OLD DUE TO WALLPAPER) DESIGN/LIASON 1125 $1,125.00 TOTAL DUE $16,436.00 *RAILINGS FOR RAMP DEDUCTED DUE TO RAMP BEING DISPOSED BY CITY-NO RAMP• • THAN!( Y011! SOON, YOU T00 "WILL FEEL THE RHYTHM!"