Loading...
HomeMy Public PortalAbout06-0270 Diane KaufmanCITY OF TYBEE ISLAND PROJECT VALUATION $ 0.01 TOTAL BALANCE DUE: $3,100.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental law ws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 7864573 - FAX (912) 7865737 www.cityoftybee.org BUILDING PERMIT DATE ISSUED: 05 -4 -2006 PERMIT #: 060270 WORK DESCRIPTION: NEWRERIDENTLU7Bt7BG W a4 3- vw a cS S2 ✓ or S" IO WORK LOCATION: 1414 SEVENTH AVENUE '3/4" OWNER NAME DIANE KAUFMAN ADDRESS PO BOX 2677 CITY, ST, ZIP TYBEE ISLAND GA 313282677 CONTRACTOR NAME DIANE KAUFMAN ADDRESS CITY STATE ZHr PO BOX 2677 TYBEE ISLAND GA 313282677 n Qa FLOOD ZONE C' S f 14-1 0 BUILDING VALUATION I 'S SQUARE FOOTAGE OCCUPANCY TYPE P (— TOTAL FEE'S CHARGED $3,100.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $ 0.01 TOTAL BALANCE DUE: $3,100.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental law ws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 7864573 - FAX (912) 7865737 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT � / /ID (P- (Z -7 C) I 14:;ocation: �'7 PIN # RV-1fNA 1-9 A T)T)R FCC TFT PP14(1TTF Owner New Construction ❑ Renovation Architect Duplex ❑ Single Family or Engineer Residential ❑ Commercial Building Contractor (Check all that apply) ❑ New Construction ❑ Renovation ❑ Duplex ❑ Single Family ❑ Residential ❑ Commercial Footprint Changes ❑ Repairs Other( TE;0 ML -TL -TL 9 5eu72r 14&. Estimated cost of Construction: $ Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE following information based # Units Lot Area # Off - street parking spaces Trees located & listed on site plan Access: Driveway Setbacks: Front appropriate number) Masonry ❑ Minor Addition ❑ Substantial Addition ❑ Multi - Family ❑ Demolition (6) Other (please specify) SURVEY OF LOTS and complete the and site plan: # Bathrooms Living spa (total sq. ft.) With culvert? With swale? Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by at by means of I understand that I must comply with zoning„ flood damage control building fire shore protections and wetlands ordinances FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permi construction. 7 1 ate: S - O S- i'S gnature of Applicant: Note: A permit normally takes 7 to 10 days to process. --------------------------------------------------------------------------------------------- The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage _ Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager a�. RAW � I Date 05- 0 q-6( FEES Permit Inspections Water Tap S5o, Sewer Stub Airlie- Eonst' p O° Cc 2 TOTAL REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval hi addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5 -4, Code of Ordinances. Section 5 -4 -9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actually meet the City Ordinance requirements. Applicant name: P(JY) U`a &L, v, Project I.D.: Attachments approved by: Date: