HomeMy Public PortalAbout06-0270 Diane KaufmanCITY OF TYBEE ISLAND
PROJECT VALUATION $ 0.01
TOTAL BALANCE DUE: $3,100.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental law ws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 7864573 - FAX (912) 7865737
www.cityoftybee.org
BUILDING PERMIT
DATE ISSUED: 05 -4 -2006
PERMIT #: 060270
WORK DESCRIPTION:
NEWRERIDENTLU7Bt7BG W a4 3- vw a cS S2 ✓ or S" IO
WORK LOCATION:
1414 SEVENTH AVENUE '3/4"
OWNER NAME
DIANE KAUFMAN
ADDRESS
PO BOX 2677
CITY, ST, ZIP
TYBEE ISLAND GA 313282677
CONTRACTOR NAME
DIANE KAUFMAN
ADDRESS
CITY STATE ZHr
PO BOX 2677
TYBEE ISLAND GA 313282677
n Qa
FLOOD ZONE
C' S f 14-1 0
BUILDING VALUATION
I
'S
SQUARE FOOTAGE
OCCUPANCY TYPE
P
(—
TOTAL FEE'S CHARGED
$3,100.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $ 0.01
TOTAL BALANCE DUE: $3,100.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental law ws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 7864573 - FAX (912) 7865737
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
� / /ID (P- (Z -7 C) I
14:;ocation: �'7 PIN #
RV-1fNA 1-9
A T)T)R FCC
TFT PP14(1TTF
Owner
New Construction
❑
Renovation
Architect
Duplex
❑
Single Family
or Engineer
Residential
❑
Commercial
Building
Contractor
(Check all that apply)
❑
New Construction
❑
Renovation
❑
Duplex
❑
Single Family
❑
Residential
❑
Commercial
Footprint Changes ❑ Repairs
Other( TE;0 ML -TL -TL 9 5eu72r 14&.
Estimated cost of Construction: $
Construction Type
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE
following information based
# Units
Lot Area
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway
Setbacks: Front
appropriate number)
Masonry
❑
Minor Addition
❑
Substantial Addition
❑
Multi - Family
❑
Demolition
(6) Other (please specify)
SURVEY OF LOTS and complete the
and site plan:
# Bathrooms
Living spa (total sq. ft.)
With culvert? With swale?
Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by at by means of
I understand that I must comply with zoning„ flood damage control building fire shore
protections and wetlands ordinances FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permi construction.
7
1
ate: S - O S- i'S gnature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
---------------------------------------------------------------------------------------------
The following is to be completed by City personnel:
Zoning certification
NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage _
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
a�.
RAW
� I
Date
05- 0 q-6(
FEES
Permit
Inspections
Water Tap
S5o,
Sewer Stub
Airlie- Eonst'
p O°
Cc 2
TOTAL
REQUIRED FOR: Building Permits
Relocation Permits
Sign Permits
Demolition Permits
Land Clearing, Disturbance or Excavation Permits
Tree Removal Permits
Relocation Permits
Special Review Permits
Site Plan Approval
Subdivision of Land
Sketch Plan Approval
Preliminary Plan Approval
Final Plat Approval
Minor Subdivision Plat Approval
Major Subdivision Plat Approval
hi addition to specific requirements for the above permits and approvals, applicants must
demonstrate that they are in compliance with the City of Tybee Island Storm Water Management
requirements as outlined in Chapter 5 -4, Code of Ordinances.
Section 5 -4 -9 Prohibition provides, in part, as follows:
(4.) It is unlawful for any person to cause or permit any storm water to flow from their
property onto the property of another person, unless such storm water naturally
flowed thereon prior to any development activity.
(5.) It is unlawful for any person to interrupt the flow of any storm water runoff from
adjacent property onto their property by any development activity.
As part of the City's approval process applicants must illustrate how these storm water
management prohibitions will be met, including a showing of how storm water naturally flowed
on the affected property (prior to any development activity), and what changes in storm water
flow have occurred or are expected to occur, as attachments to this form. The City's approval or
permit does not guarantee that the applicant's plans will result in meeting requirements. The final
product must actually meet the City Ordinance requirements.
Applicant name: P(JY) U`a &L, v,
Project I.D.:
Attachments approved by: Date: