Project No
CITY OF FULLERTON
Public Works Department — Engineering Division
52719
CONTRACT CHANGE ORDER NO.2
Project Title: Storm Drain Lining FY 20-21
Date: 1 /18/2022
To: Nor -Cal Pipeline Services
L]DRIGINAL
P.O. No.: C000141
Account No.: 74-52719-6374
You are hereby directed to make the herein -described changes from the plans and specifications or
do the following described work not included in the plans and specifications on this contract.
DESCRIPTION
1. COR#2 —Addition of construction work to lining an existing sewer pipe that runs behind four
properties in the same area as the Storm Drain Lining FY 20-21 project.
REASON
1. Directed by City. The contractor will be lining an existing storm drain in the area a sewer line
also requires urgent cleaning and lining. The contractor will be ordering material and working in
the area already, therefore the City has added cleaning and lining to the existing sewer. The
contractor will clean, CCTV, and line the existing sewer line.
COST
Payment for this change shall be, per Section 2, "Scope of the Work", of the Standard Specifications
for Public Works Construction at the agreed upon negotiated price, which shall constitute full
compensation, including all markups for this change and no additional payment will be made.
1. Agreed upon lump sum price
Net Cost C.C.O. Increase/Decrease =
Original PO Amount =
Previous C.C.O.'s Total Increase/Decrease =
Revised PO amount =
Account No.
$88,620.00 74-52719-6374
$88,620.00
$92,137.00
$11,214.00
$191,971.00
---------------------------------------------------------------------------
---------------------------------------------------------------------------
By reason of this order, the time of completion will be adjusted as follows: 0 Working Days
Page 7 of 2
52719 Stonn Drain Lining FY 20-21
CONTRACT CHANGE ORDER NO. 2
Submitted by:
David Grantham, Principal Civil Engineer
Date: 1 /19/2022
Approved by: Date: t9 2azz
Stephen Bise, City Engineer/ Asst. Public Works Director
roved b waazl_ Date:
A. 7 ' G
NN Y
Meg cW e, Public Works Director
MR
We, the undersigned contractor, have given careful consideration to the change proposed and
hereby agree that we will provide all equipment, furnish all materials, except as may otherwise be
noted above, and perform all services necessary for the work above specified, and will accept as
full payment therefore the prices shown above.
Accepted
Contractor:
Signature:
Name:
Title:
Date:
Page 2 of 2