Loading...
HomeMy Public PortalAbout06-0295 SHERRY SUE WARDDATE ISSUED: 05 -11 -2006 WORK DESCRIPTION: WORK LOCATION: CITY OF TYBEE ISLAND BUILDING PERMIT INSTALL FENCE 7 TERESA LANE OWNER NAME SHERRY SUE WARD ADDRESS PO BOX 2837 CITY, ST, ZIP TYBEE ISLAND GA 313282837 K�7�M Y:7:Ti ITC�7:7`. /:" ylll 1&3IF'711 BIA 1 a II M61111 lYOWI N BUILDING VALUATION SQUAREFOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION TYBEE GIRL HELPERS 1303 JONES AVE TYBEE ISLAND GA 31328 P $ 25.00 $2,500.00 TOTAL BALANCE DUE: PERMIT #: 060295 $ 25.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property, must be approved by the issuance of another building permit. Permit holder agrees to bold the City of Tybee Island harmless on ally construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 7865737 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT D(o- bZ9� Location: L Y7' --- � PIN # NAME U 1 MIW TELEPHONE Owner 1+ Z E 0 -_2. -70 3- SZ� 7- ❑ Duplex ❑ Single Family ALCh1YeCt Residential ❑ Commercial or En ' eer Building v 17: ?, Contractor `T _ (Check all that apply) ❑ New Construction ❑ Renovation ❑ Duplex ❑ Single Family ❑ Residential ❑ Commercial ootprintrChanges El Repairs Other LT - FY,r9 a_ L ,�--I -J- d c vt2� ry o{W- t+� So � A� — Estimated cost of Construction: $ � p r) Construction Type _ (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: (4) (5) ❑ Minor Addition ❑ Substantial Addition ❑ Multi - Family ❑ Demolition ��� (dam _ (Enter appropriate number) Masonry Steel & Masonry (6) Other (please specify) ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) _ (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through pWyt�V- On -site waste and debris containers will be provided by tJ ( 6--, Construction debris will be disposed by�2 � at i by means of . I understand that I must comply with zoning, flood damage control building fire shore protections and wetlands ordinances FEMA regWations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as-built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: — 1— (� Signature of Applic Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to buildine site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage _ Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager NFIP Flood Zone Existing Signature Date FEES Permit S. Inspections Water Tap Sewer Stub Aid to Const. TOTAL a S, REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5 -4, Code of Ordinances. Section 5 -4 -9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actually meet the City Ordinance requirements. Applicant name: 2 -- 4�L ; G Project I.D.: Attachments approved by: Date: 5 - (k 2S i ra N g U � f `. ul a d cl: