HomeMy Public PortalAbout06-0314 CRAIG&KIMCHI BLOWDATE ISSUED: 05 -24 -2006
WORK DESCRIPTION:
WORK LOCATION:
OWNER NAME
ADDRESS
CITY, ST, ZIP
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEE'S CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
pi
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPAIRS RESIDENTIAL BLDG
327 SBRC A
CRAIG & KI ICHI BLOW
495 COPPER CREEK CHR
POOLER GA 31322
CRAIG & KIMCH1 BLOW
495 COPPER CREEK CDR
POOLER GA 31322
P
$ 95.00
$10,000.00
TOTAL BALANCE DUE:
PERMIT #: 060314
$ 95.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The budding contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 7864573 - FAX (912) 786 -5737
www.cityoftybee.osg
MAY -23 -2006 1443 CITY OF TYBEE ISL. 912 786 9539
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
D (A- 03 t
Location: 12 -1 1 ?x -q 7 r LGIH k 2,7-,-7A. PIN #
NAME ADDRESS TELEPHONE
Owner
r(llg c i1Y1Ch1
121-1 y j'f
` G -331 i
31vw
[t�ik 32' A ) l e_jS. 5i3Z8
-5
Architect
or Engineer
Building
Contractor
(Check all that apply)
❑ New Construction Renovation ❑ Minor Addition
❑ Duplex N Single Family Substantial Addition
Residential E] Commercial Multi- Family
] Footprint Changes ❑ Repairs Demolition
❑ other (eY�0.Ci'f �c� (- ilZf_j (2..n;v ,ry ,nk ,W- We'll ktcin9 k�t�kc. -� Cth w�c Fs Pc�ir�t/ femme. ✓e1Cla5? -F-.
ir�T 5iri� JCwX:, - �..�ll) �Gllf74 chu,
�r�,;r�tc- Kr�c1� i",� � (eF9�c
Estimated cost of Construction: $ 10, OD&
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off - street parking spaces
Trees located & listed on site plan
# Bedrooms I # Bathrooms
Living space (total sq. ft.) F+
Access:
Driveway (ftJ With culvert?
Setbacks: Front Rear
With swale?
Sides (L) _ (R)
# Stories .�� Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
MAY -23 -2006 14:43 CITY OF TYBEE ISL. 912 786 9539 p.02,.04
During Construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by- hock_ at i wrn by means of
I understand that I must comply with zoning, flood damage control, building -fire. shore
Qrotections and wetlands ordinances. FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary tolre#re drainage impaired by this
permitted construction. // 7) r)
Date: )4 E �c Signature of App
Note: A permit normally takes 7 to 10 days to mmess.
-- - - - - -- ---------------------------------------
The following is to be completed by City personnel:
Zoning certification
NFIP Flood Zone
Approved rezomng/vanance?
Street address and number: New
Existing
Is it in compliance with City map?
If not has street name and/or number been reported to WC?- S
9
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
G
Describe any unusual finding(s)
P
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage _
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
Signature Date
FEES
Permit (� $
Inspections -,3,3
Water Tap
Sewer Stub
Aid to Const.
TOTAL gS
MAY -23 -2006 1444 CITY OF TYBEE ISL.
912 786 9539 P.04r04
City of Tybee Island
COMMUNITY DEVELOPMENT
CODES ENFORCEMENT NOTICE
Chuck Bargeron
City Marshal
Building Official
December 19, 2001
To Whom It May Concern:
Effective January 1, 2002 the State of Georgia will be enforcing the 2000 Standard
Building Code and 2000 CABO One and Two Family Dwelling Code. The 2000
Standard Building Code in Georgia is in reality the 2000 edition of the International
Building Code with the Georgia State Amendments. The 2000 CABO One and Two
Family Dwelling Code is the 2000 edition of the International Residential Code with
State Amendments.
The following design provisions will be effective on January 1, 2002 for construction in
The City of Tybee Island limits.
Please take the time to make yourself familiar with the changes to these codes, since
these are design standards that will be enforced on plans submitted for review and
inspection.
3- SECOND WIND GUST: 130 MPH
FASTEST MILE BASIC WIND SPEED: 110 MPH
SEISMIC DESIGN CATEGORY: "C"
WIND EXPOSURE: "D"
These are but a few of the design standards that new construction and additions to your
structures will need to comply with. The can affect all work.
If there are any further questions pertaining to design or construction provisions for
Tybee Island, please contact this office at 786 -4573 x 104.
TOTAL P.04
Mal' -23 -2006 14:43 CITY DF TYBEE ISL. 912 7B5 9539 p,03,04
REQUIRED FOR: Building Permits
Relocation Permits
Sign Permits
Demolition Permits
Land Clearing, Disturbance or Excavation Permits
Tree Removal Permits
Relocation Permits
Special Review Permits
Site Plan Approval
Subdivision of Land
Sketch Plan Approval
Preliminary Plan Approval
Final Plat Approval
Minor Subdivision Plat Approval
Major Subdivision Plat Approval
In addition to specific requirements for the above permits and approvals, applicants must
demonstrate that they are in compliance with the City of Tybee Island Storm Water Management
requirements as outlined in Chapter 5-4, Code of Ordinances.
Section 5 -4-9 Prohibition provides, in part, as follows:
(4.) It is unlawful for any person to cause or permit any storm water to flow from their
property onto the property of another person, unless such storm water naturally
flowed thereon prior to any development activity.
(5.) It is unlawful for any person to interrupt the flow of any storm water runoff from
adjacent property onto their property by any development activity.
As part of the City's approval process applicants must illustrate how these storm water
management prohibitions will be met, including a showing of how storm water naturally flowed
on the affected property (prior to any development activity), and what changes in storm water
flow have occurred or are expected to occur, as attachments to this form. The City's approval or
permit does not guarantee that the applicant's plans will result in meeting requirements. The final
product must actually meet the City Ordinance requirements.
Applicant name: � �Q i Q i K i meh _ Nu o
Project I.D.:
Attachments approved by: Date: