HomeMy Public PortalAboutChange Order No. 2 to Contract No. 72-2021 - Sanitation - Brackney - West side Interceptor RICHMOND SANITARY DISTRICT 2380 Liberty Avenue,Richmond,IN 47374 CHANGE ORDER#2 Change Order Date: September 14,2021 Owner: Richmond Sanitary District Contract No.: 72-2021 Contractor: Brackney,Inc. Contract Date: May 28,2021 Project: West Side Interceptor Improvements Project,Division A Project No.: S17069 SRF Project No.: WW21098908 The Contract Documents are modified as follows upon execution of this Change Order and Approval by SRF: Item P Description Qty Change Unit Cost/Unit Total Increase/(Decrease) 09-04 Phase 1 Siphon Construction-Temporary Coffer Dam -1.00 LS $ 410,000.00 $ (410,000.00) 09-05 Phase 2 Siphon Construction-Temporary Coffer Dam -1.00 LS $ 453,000.00 $ (453,000.00) 09-06 Phase 1 Siphon Construction-Additional Bracing -1.00 LS $ 55,000.00 $ (55,000.00) 09-07 Phase 2 Siphon Construction-Additional Bracing -1.00 LS $ 76,500.00 $ (76,500.00) Add 09-08 Siphon Construciton-Modifed Coffer Dam(See Attached) 1 LS $ 377,900.00 $ 377,900.00 NET CHANGE $ (616,600.00) Page 1of2 RICHMOND SANITARY DISTRICT 2380 Liberty Avenue,Richmond,IN 47374 CHANGE ORDER#2 Change Order Date: September 14,2021 Owner: Richmond Sanitary District Contract No.: 72-2021 Contractor: Brackney,Inc. Contract Date: May 28,2021 Project: West Side Interceptor Improvements Project,Division A Project No.: S17069 SRF Project No.: WW21098908 CHANGE IN CONTRACT PRICE Original Contract Price: $5,301,620.00 Net change from Previous Change Orders: $106,331.00 Contract price prior to this Change Order: $5,407,951.00 Net increase/(decrease)of this Change Order: ($616,600.00) Contract price with all approved Change Orders: $4,791,351.00 Percentage of increase/(decrease)with Change Orders: -9.62% CHANGE IN CONTRACT COMPLETION TIME Original Completion Time(days): (485 Substantial,515 Final) Net change from Previous Change Orders: (0 Substantial,0 Final) Completion time prior to this Change Order: (485 Substantial,515 Final) Net increase/decrease of this Change Order: (0 Substantial,0 Final) Completetion time with all approved Change Orders: (485 Substantial,515 Final) This Change Order is for complete and final settlement of all direct and indirect costs,impact costs and time extensions incurred at any time resulting from the performance of the changed work or associated claims. This Change Order is Subject to Final Approval by Funding Agency(SRF). Recommended by: LALG. 09/10/2021 Richmond Sanitary District Engineer Date Accepted by: Owner: Richmond Sanitary District Board President Signature Date Contractor: 4Y 9ha/01/ Brackney,Inc. Authorized nature Date Page 2 of 2 AI Submittal #5 1 \I ENGINEERS, INC. Awalth of mammas m master ocommon goal. Commonwealth Engineers Project:S17069-Richmond-West Side Interceptor Improvements 7256 Company Drive Richmi, 47375 Indianapolis,Indiana 46237 Phone:(317)888-1177 Fax:(317)887-8641 Distribution Summary Distributed on 09/8/2021 by Procore Commonwealth(Commonwealth Engineers Inc.) To: Gerald South (City of Richmond),Elijah Welch (City of Richmond),Kevin Brackney(Brackney,Inc.) ,Doug Bruns(Brackney,Inc.),Kevin Morrow(City of Richmond) Message: None Additional Attachments: NAME RESPONSE ATTACHMENTS COMMENT Brian Wilson(Commonwealth Furnish As Engineers Inc.) Corrected-AIS River Crossing RFl-RESPONSE. NOT Applicable • The Contractor's proposed siphon river crossing method significantly differs from (a)the certified cofferdam design provided in the Contract Drawings and(b) the fully contained inflatable bladder dam concept around all sides of the excavation. • If the Contractor wishes to construct the siphon river crossing utilizing their proposed means and methods,all risk and additional cost shall be assumed and paid by the Contractor. The Richmond Sanitary District,Commonwealth Engineers,Inc.,and SME geotechnical engineers shall bear no risk or additional cost if the Contractor's proposed siphon river crossing method is utilized and is unsuccessful. • The Contractor shall construct the siphon river crossing during a river flow and weather period that the Contractor deems acceptable. The time frame shall also be acceptable to the Richmond Sanitary District. • If during construction the Contractor deems their proposed siphon river crossing method is not successful,the Contractor will(a)construct the certified cofferdam design provided in the Contract Drawings at no additional cost to the Richmond Sanitary District, Commonwealth Engineers,Inc.,and SME or(b)obtain the services of a professional geotechnical engineer licensed in the State of Indiana to provide an alternative certified siphon river crossing design,and construct the river crossing in accordance with the engineer's plans,at no additional cost to the Richmond Sanitary District, Commonwealth Engineers,Inc.,and SME. • This submittal review shall be subject to the approval of a change order by the Richmond Sanitary District and shall not be considered applicable until the change order is executed. Doug Bruns(Brackney,Inc.) Submitted . Scan 0001.pdf Commonwealth Engineers Page 1 of 2 Printed On:09/08/2021 02:53 PM EXHIBIT to CHANGE ORDER NO.2 West Side Interceptor Improvements-DIV A (ikCOMMONWEALTH" Submittal #5 1 „ ENGINEERS, INC. AwaIN of raso+rwa w meawr a eemmen Owl. RIVER CROSSING RFI SPEC SECTION: SUBMITTAL MANAGER: Procore Commonwealth (Commonwealth Engineers Inc.) STATUS: Closed DATE CREATED: 08/16/2021 ISSUE DATE: 08/16/2021 REVISION: RESPONSIBLE Brackney,Inc. RECEIVED FROM: Doug Bruns CONTRACTOR: RECEIVED DATE: 09/2/2021 SUBMIT BY: FINAL DUE DATE: 09/16/2021 LOCATION: APPROVERS: Brad Ewart(SME),Gordon Stone(SME),Brian Wilson(Commonwealth Engineers Inc.),Aaron Burns(Commonwealth Engineers Inc.) BALL IN COURT: DISCLAIMER:This review of the shop drawing does not waive or alter the contract requirements.Any deviation from the contract requirements must be specifically brought to the attention of the engineer in writing and upon the drawings or by appropriate change order. Submitter/Approver caption is a title only and does not describe the actions being taken by the reviewer. DISTRIBUTION: Procore Commonwealth (Commonwealth Engineers Inc.) DESCRIPTION: ATTACHMENTS: Scan_0001.pdf • BY DATE COPIES TO Commonwealth Engineers Page 2 of 2 EXHIBIT to arAt erolgEW 1202:53 PM West Side Interceptor Improvements-DIV A —NI, w a1 $ , t Rol ' v v 1> \ _ \\ ' a et b 0 b� iv LA cv.n'� 44 EXHIBIT to CHANGE ORDER NO.2 West Side Interceptor Improvements-DIV A O i i / .tr- ..../ z ` Y� J; Jj\ - r r Os O n o • EXHIBIT to CHANGE ORDER NO.2 West Side Interceptor Improvements-DIV A