HomeMy Public PortalAboutChange Order No. 2 to Contract No. 72-2021 - Sanitation - Brackney - West side Interceptor RICHMOND SANITARY DISTRICT
2380 Liberty Avenue,Richmond,IN 47374
CHANGE ORDER#2
Change Order Date: September 14,2021
Owner: Richmond Sanitary District Contract No.: 72-2021
Contractor: Brackney,Inc. Contract Date: May 28,2021
Project: West Side Interceptor Improvements Project,Division A Project No.: S17069
SRF Project No.: WW21098908
The Contract Documents are modified as follows upon execution of this Change Order and Approval by SRF:
Item P Description Qty Change Unit Cost/Unit Total Increase/(Decrease)
09-04 Phase 1 Siphon Construction-Temporary Coffer Dam -1.00 LS $ 410,000.00 $ (410,000.00)
09-05 Phase 2 Siphon Construction-Temporary Coffer Dam -1.00 LS $ 453,000.00 $ (453,000.00)
09-06 Phase 1 Siphon Construction-Additional Bracing -1.00 LS $ 55,000.00 $ (55,000.00)
09-07 Phase 2 Siphon Construction-Additional Bracing -1.00 LS $ 76,500.00 $ (76,500.00)
Add 09-08 Siphon Construciton-Modifed Coffer Dam(See Attached) 1 LS $ 377,900.00 $ 377,900.00
NET CHANGE $ (616,600.00)
Page 1of2
RICHMOND SANITARY DISTRICT
2380 Liberty Avenue,Richmond,IN 47374
CHANGE ORDER#2
Change Order Date: September 14,2021
Owner: Richmond Sanitary District Contract No.: 72-2021
Contractor: Brackney,Inc. Contract Date: May 28,2021
Project: West Side Interceptor Improvements Project,Division A Project No.: S17069
SRF Project No.: WW21098908
CHANGE IN CONTRACT PRICE
Original Contract Price: $5,301,620.00
Net change from Previous Change Orders: $106,331.00
Contract price prior to this Change Order: $5,407,951.00
Net increase/(decrease)of this Change Order: ($616,600.00)
Contract price with all approved Change Orders: $4,791,351.00
Percentage of increase/(decrease)with Change Orders: -9.62%
CHANGE IN CONTRACT COMPLETION TIME
Original Completion Time(days): (485 Substantial,515 Final)
Net change from Previous Change Orders: (0 Substantial,0 Final)
Completion time prior to this Change Order: (485 Substantial,515 Final)
Net increase/decrease of this Change Order: (0 Substantial,0 Final)
Completetion time with all approved Change Orders: (485 Substantial,515 Final)
This Change Order is for complete and final settlement of all direct and indirect costs,impact costs and time
extensions incurred at any time resulting from the performance of the changed work or associated claims.
This Change Order is Subject to Final Approval by Funding Agency(SRF).
Recommended by: LALG. 09/10/2021
Richmond Sanitary District Engineer Date
Accepted by:
Owner:
Richmond Sanitary District Board President Signature Date
Contractor: 4Y 9ha/01/
Brackney,Inc. Authorized nature Date
Page 2 of 2
AI Submittal #5 1
\I ENGINEERS, INC.
Awalth of mammas m master ocommon goal.
Commonwealth Engineers Project:S17069-Richmond-West Side Interceptor Improvements
7256 Company Drive Richmi, 47375
Indianapolis,Indiana 46237
Phone:(317)888-1177
Fax:(317)887-8641
Distribution Summary
Distributed on 09/8/2021 by Procore Commonwealth(Commonwealth Engineers Inc.)
To: Gerald South (City of Richmond),Elijah Welch (City of Richmond),Kevin Brackney(Brackney,Inc.)
,Doug Bruns(Brackney,Inc.),Kevin Morrow(City of Richmond)
Message: None
Additional Attachments:
NAME RESPONSE ATTACHMENTS COMMENT
Brian Wilson(Commonwealth Furnish As
Engineers Inc.) Corrected-AIS River Crossing RFl-RESPONSE.
NOT Applicable
• The Contractor's proposed siphon river
crossing method significantly differs from
(a)the certified cofferdam design
provided in the Contract Drawings and(b)
the fully contained inflatable bladder dam
concept around all sides of the
excavation.
• If the Contractor wishes to construct the
siphon river crossing utilizing their
proposed means and methods,all risk
and additional cost shall be assumed and
paid by the Contractor. The Richmond
Sanitary District,Commonwealth
Engineers,Inc.,and SME geotechnical
engineers shall bear no risk or additional
cost if the Contractor's proposed siphon
river crossing method is utilized and is
unsuccessful.
• The Contractor shall construct the siphon
river crossing during a river flow and
weather period that the Contractor deems
acceptable. The time frame shall also be
acceptable to the Richmond Sanitary
District.
• If during construction the Contractor
deems their proposed siphon river
crossing method is not successful,the
Contractor will(a)construct the certified
cofferdam design provided in the Contract
Drawings at no additional cost to the
Richmond Sanitary District,
Commonwealth Engineers,Inc.,and SME
or(b)obtain the services of a
professional geotechnical engineer
licensed in the State of Indiana to provide
an alternative certified siphon river
crossing design,and construct the river
crossing in accordance with the
engineer's plans,at no additional cost to
the Richmond Sanitary District,
Commonwealth Engineers,Inc.,and
SME.
• This submittal review shall be subject to
the approval of a change order by the
Richmond Sanitary District and shall not
be considered applicable until the change
order is executed.
Doug Bruns(Brackney,Inc.) Submitted . Scan 0001.pdf
Commonwealth Engineers Page 1 of 2 Printed On:09/08/2021 02:53 PM
EXHIBIT to CHANGE ORDER NO.2
West Side Interceptor Improvements-DIV A
(ikCOMMONWEALTH" Submittal #5 1
„ ENGINEERS, INC.
AwaIN of raso+rwa w meawr a eemmen Owl.
RIVER CROSSING RFI
SPEC SECTION: SUBMITTAL MANAGER: Procore Commonwealth (Commonwealth
Engineers Inc.)
STATUS: Closed DATE CREATED: 08/16/2021
ISSUE DATE: 08/16/2021 REVISION:
RESPONSIBLE Brackney,Inc. RECEIVED FROM: Doug Bruns
CONTRACTOR:
RECEIVED DATE: 09/2/2021 SUBMIT BY:
FINAL DUE DATE: 09/16/2021 LOCATION:
APPROVERS: Brad Ewart(SME),Gordon Stone(SME),Brian Wilson(Commonwealth Engineers Inc.),Aaron Burns(Commonwealth
Engineers Inc.)
BALL IN COURT:
DISCLAIMER:This review of the shop drawing does not waive or alter the contract requirements.Any deviation from the contract
requirements must be specifically brought to the attention of the engineer in writing and upon the drawings or by appropriate change order.
Submitter/Approver caption is a title only and does not describe the actions being taken by the reviewer.
DISTRIBUTION:
Procore Commonwealth (Commonwealth Engineers Inc.)
DESCRIPTION:
ATTACHMENTS:
Scan_0001.pdf
•
BY DATE COPIES TO
Commonwealth Engineers Page 2 of 2 EXHIBIT to arAt erolgEW 1202:53 PM
West Side Interceptor Improvements-DIV A
—NI,
w
a1
$
,
t Rol '
v
v
1>
\ _ \\ '
a
et b
0
b� iv LA
cv.n'�
44
EXHIBIT to CHANGE ORDER NO.2
West Side Interceptor Improvements-DIV A
O
i
i
/ .tr-
..../
z `
Y�
J; Jj\
-
r
r Os
O
n
o
•
EXHIBIT to CHANGE ORDER NO.2
West Side Interceptor Improvements-DIV A