Loading...
HomeMy Public PortalAbout06-0363 MARK LANIERCITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 06 -21 -2006 PERMIT #: 060363 WORK DESCRIPTION: PERVIOUS DRIVEWAY / SPRINKLER WORK LOCATION: 4 HOSTI AVE OWNER NAME MARK LANIER ADDRESS 4 HOSTI AVE CITY, ST, ZIP TYBEE ISLAND GA 31328 c f e c o n CONTRACTOR NAME MARK LANIER O ADDRESS 4 HOSTI AVE CITY STATE ZIP TYBEE ISLAND GA 31328 FLOOD ZONE BUILDING VALUATION SQUAREFOOTAGE OCCUPANCY TYPE P TOTAL FEE'S CHARGED $ 45.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $3,000.00 TOTAL BALANCE DUE: $ 45.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: 01.4 ^� ^'0) C) � P. O. Box 2749 - 403 Boller Avenue, Tybee Isbud, Georgia 31328 (912) 786-4573 - FAX (912) 7865737 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT 0 Co -0s (� 3 IG � location: 7 A= A vi= PIN # rp 7 NAME A nr'%u Ve e TUT nnIIl X= Owner M K f1r� ldosT'I u -7 A- S21,3 -0 v Architect ❑ Residential ❑ or n ' eer ❑ Other wilding Contractor �� ��N pdc3 3o65s SA,J}tr✓Nf�� 3t�1� �7 -5"glZ (Check all that apply) ❑ New Construction ❑ Duplex ❑ Residential ❑ Footprint Changes ❑ Other ❑ Renovation ❑ Single Family ❑ Commercial ❑ Repairs t-ESfunated cost of Construction: $_ 2,2Q U Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: A& Remarks: (Enter appropriate number) (4) Masonry (5) Steel & Masonry e- W c'L, c, 9-- ❑ Minor Addition ❑ Substantial Addition ❑ Multi - Family ❑ Demolition (6) Other (please specify) ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units Lot Area # Off - street parking space Trees located & listed on Access: Driveway (ft.) Setbacks: Front # Bathrooms With swale? Sides (L) _ (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. D construction: -site restroom facilities will be provided through On -site waste and debris containers will be provided by -Mrwn Construction debris will be disposed by at I by means of I understand that I must comply with zoning flood damage control, building_ fire shore protections and wetlands ordinances_ FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as-built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. V llate: 1,,S ature of Applicant: L,,., Note: A permit normally takes 7 to 10 days to process. --------------------------------------- The foliowing is to be completed by City Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? - If not, has street name and/or number FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager Od a Date Flood Zone FEES Permit _j pO Inspections Water Tap Sewer Stub Aid to Const. TOTAL ���� 00, HIMI'EN (MI 0 r� o, t� i l r .I_ -- �........ ,.. v�vrii,v u. vv. g 3 -080 All driveways must be constructed a�q.07' R/W '23 Ill;t�I I II i e1 32 3zt li[ 111 I IM lI ^t`I� 11. it 1((' W; I. ' t{ AV(, I I I VA IIOII /9' Land 7 bee r, Y Deve 3- 080.13.1 lo Ament Code A driveway Opening Which a a Pub/ 1' connects residential lot with ric street shall not be e In Width. than tW I fi t width. t 2 � � I I A I I I I I I llti I I IOM Ill , i WuI tl) I I PII I �, I I It Ili A(;l II ---- -- — < — r,. t MJ` I'(1.(lll (ll )1, W MI 12 13 14 ' Tybea Land Development Code Iltlll nt : �id11,1(, 10 '111 "Il ` I -1i,.1 WoI , 3-080 IIII , 1 1 I`, IN All nh f1 I. L'I I I Iug) All driveways must be constructed I'I Il of permeable material, za-11 S AM 1Z, -2 O -6--1 20 11 :39.A _.