HomeMy Public PortalAbout022-Salisbury Rd. DesignCITY OF RICHMOND DEPARTMENT OF PUBLIC WORKS & ENGINEERING 50 NORTH FIFTH STREET - RICHMOND, IN 47374 PHONE (765) 983-7238 - FAX (765) 962-7024 To: The Board of Public Works and Safety From: Greg Stiens Interim City Engineer SALLY L. HUTTON Mayor February 10, 2005 RE: SALISBURY ROAD DESIGN SUPPLEMENTAL AGREEMENT TO CONTRACT #56-2004 ENGINEER — BURGESS AND NIPLE, INC. The Phase I Environmental Site Assessment for the Salisbury Road Widening Project recommends that a Phase 2 Environmental Site Assessment be conducted. Soil borings will be taken in the areas recommended in the Phase I Environmental Assessment and analyzed for contaminants. The area of land being tested is located in front of 2000 Salisbury Road. This site has been used to store junk cars for years. I recommended approving the attached fee schedule as presented by the Burgess and Niple. Total fees for the Phase 2 Environmental Site Assessment shall not exceed $8,975.00. Sincerely, �CGrel;idens Interim City Engineer ■ ON Burgess & Niple, Inc. 251 North Illinois Street Capital Center Suite 920 Indianapolis, IN 46204 317 237.2760 Fax 317 237.2755 BURGESS & NIPLE Mr. Greg Stiens City of Richmond Assistant City Engineer 50 N. 5`h Street Richmond, IN 47374 January 26, 2005 Dear Mr. Stiens: Re: Request for Supplemental Agreement for Salisbury Road Design Project The purpose of this letter is to advise you of the proposed costs to perform a Phase It Environmental Site Assessment, and to request a supplement to our contract fees as a result of this requirement. We had previously advised you of this change in our Grade Review meeting that was held on November 8, 2004. The Phase II Environmental Site Assessment was recommended during the Phase I ESA, and thus will be required to complete the Environmental Document. Our supplemental fee request for these additional services to be performed by CTL Engineering is itemized as follows: Field Testing (Borings will be taken and sampled in the field) $3,295 Laboratroy Testing (Eight soil samples will be analyzed for contaminants) $3,780 Reporting (Written report documenting activities and interpreting data) $1,100 Miscellaneous (Includes project management and other fees) $ 800 Total for Phase II Environmental Site Assessment $8,975 Hopefully, this information explains all elements concerning the request for additional services regarding the Salisbury Road Project. Please do not hesitate to contact us at (317) 237-2760 if you have any questions. Contract No. 22 — 2005 1 9 1 2 January 26, 2005 Page 2 This transmittal will serve as a letter form agreement to supplement the original agreement and is subject to all of the conditions of the original agreement with the expanded scope of work and modified fees outlined in this letter. Included are two copies of this letter form agreement to amend our contract for the additional services. If you concur with these changes please sign and return one copy of the agreement to us for our files. We will consider the signed document as our notice to proceed with the additional work. Please keep the other copy for your files. Sincerely, BURGESS & NIPLE, INC. CITY OF RICHMOND Scott Sondles, PE me Date Indianapolis District Director Barry Dix n, Name Date Director Cc: Mr. Scott Sondles, B&N Contract No. 22 — 2005 BURGESS ... .S 9 NIPLE Fax:317-237-2755 Feb 7 '05 10:31 P.01 .......... 77!Yee 77777 BURGESS & NIPLE Burgess & Niple, Limited 2s1 North Illinois Street Capital Center Suite 920 Indianapolis. IN 46204 317 237.2760 Fax 317 237,2755 TO: Card4ieviz-., -7&s- c?&z - -7 z 4 FAX PHONE NUMBER: We are sending you _rl additional pages, not counting this covor sheet. If all pages are not received, please call us as soon as possible. FAX COVER SHEET Date: Job Number: Re: COMMENTS: A,es.l0 lie4 1AVK1 1 �v►��¢ Q C�Q.I C Signed: BURGESS 9 NIPLE Fax:317-237-2755 Feb 7 '05 10:31 P.02 ;. I of 2 ATTACHMENT B Cost Proposal Limited Phase II Site Assessment CTL Project No. 04050037 A. FIELD WORK 1, Project Management: Project Manager, to coordinate activities and gather and review all the necessary information. Estimated 6 hours at $75.00/hr. $450.00 2. Continuous Push Sampling Unit Estimated 1 day at $1,500-00/day $1,500.00 4, Steam Cleaner and generator rental for decontamination of sampling equipment, estimated 1 day at $75.00/day $75.00 5. Project Geologist to travel, monitor, collect samples, and field -screen and collect soil samples. Estimated 14.0 hours at $70.00/hour $980-00 7. PID Estimated 1 day at $ t 00.00/day S100-00 8. Mileage (one round trip for Geologist) Estimated 200 miles at $0.45/mile $90.00 9. Disposable sampling supplies (lump -sum) 1� 00.00 TOTAL ITEM A $3,295.00 B. CHEMICAL ANALYSIS 1. TPH (DRO & GIGO) 4 soil samples at $85.00/sample $340.00 2. Volatile Organic Compounds (VOCs) 4 soil samples at $220.00/sample $880.00 3. 8 RCRA Heavy Metals 4 soil samples at $235.00/each S940.00 4. Polynuclear Aromatic Hydrocarbons (PNAs) 4 soil samples at $195.00/each $780.00 5. Polychlorinated biphenyls (PCBs) 4 soil samples at $135.00/each $540-00 6- pH 30 soil samples at $10.00/each $300.00 TOTAL ITEM B $3,780.00- " Price assumes a 5-10 day turnaround for laboratory analysis. If a rush (72 hour) analysis is required, a surcharge of 50?/, will be applied to the cost of the laboratory analysis. fAWNW&