HomeMy Public PortalAbout06-0381 NICA WEEKS0
. d.
A
Inspection Report
City of Tybee Island
403 Butler Avenue
P.O. Box 2749
Tybee Isldud, GA 31328
Phone: (912) 786 -4573 extension 114
Fdx" (912) 786 -9539
Permit No. ✓h- ��i A � pate UeouPSted i — ;ri "!—
Owner's Name \W PQ kS Date Needed J a V - l
At
Gen. Contractor \ S Subcontractor C
Contact Number C1hae
Location c o n�A� A�eJ
Date of Inspection 113010 / Time _ Inspector _ _
Type of Inspection 5 lnl • n"1 (vN o Q D o Ck soec-v SAS
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 07 -10 -2006 PERMIT #: 060381
WORK DESCRIPTION: SWIMMING POOL C)/ /a.9/O
WORK LOCATION: 148 S CAMPBELL C a r re ,�e-,j () d a ,,S S
OWNER NAME NICA WEEKS
ADDRESS 113 S CAMPBELL AVE
CITY, ST, ZIP TYBEE ISLAND GA 31328
CONTRACTOR NAME
ARCHITECTURAL POOLS & DECKS
ADDRESS
101 WINDFIELD DR
CITY STATE ZIP
SAVANNAH GA 31406
FLOOD ZONE
BUILDING VALUATION
SQUAREFOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 50.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $26,500.00
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to bold the City ofTybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786-4573 - FAX (912) 7865737
www.cltyoftybee.org
DATE ISSUED: 07 -10 -2006
WORK DESCRIPTION:
WORK LOCATION:
51 1510 :.: ul
ADDRESS
CITY, ST, ZIP
CK51J►I1� 7C,
I\ 1 1 'iJf$�
CITY STATE ZIP
FLOOD ZONE
CITY OF TYBEE ISLAND
BUILDING PERMIT
PERMIT #: 060381
SWIMMING POOL 1
119 SOUTH CAMPBELL AVE (r1 r- n n Q f. t SS
NICA WEEKS
113 S CAMPBELL AVE
TYBEE ISLAND GA 31328
ARCHITECTURAL POOLS & DECKS
101 WINDFIELD DR
SAVANNAH GA 31406
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 50.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION
$26,500.00
14g 5. CamP�ll
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: ) 10 rv-' p QL
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786-4573 - FAX (912) 786-5737
www.cityoftybee.org
031
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
LocationA So cr� C ry m uC f t "10 PIN #
NAME ADDRFCC TFT FP14l1NF
Owner
Nicol w S
n S So }h �a,r,i� y- AV,
}g6- 9 D 3 6
Duplex
❑
Residential
❑
Architect
❑
Other 1' G Tv- -
or Engineer
Building
Contractor
f Pc era
(Check all that apply)
❑
New Construction
❑
Duplex
❑
Residential
❑
Footp pt Qhanges
❑
Other 1' G Tv- -
❑
Renovation
❑
Single Family
❑
Commercial
❑
Repairs
e->
Estimated cost of Construction: $ 26i 500
Construction Type
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer
Proposed use: 5
Remarks:
(Enter appropriate number)
(4) Masonry
(5) Steel & Masonry
V,V\ ) A 4 !-nd
❑
Minor Addition
❑
Substantial Addition
❑
Multi - Family
❑
Demolition
(6) Other (please specify)
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway
Setbacks: Front
# Bedrooms
Living space (total sq. ft.)
With culvert?
Rear
# Bathrooms
With swale?
Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction: L
On -site restroom facilities will be provided through C -.., � r of l 7 o T
On -site waste and debris containers will be provided by j
Construction debris will be disposed by Au at by means of
-
I understand that I must comply with zoning, flood damage control, building_ fire,shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 6 Signature of Applicant: 'Y ✓'v {'
Note: A permit normally takes 7 to 10 days to process.
-------------------------------------------------------------------------------------
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site _
Water meter size
Storm drainage
NFIP Flood Zone
Existing
Approvals: Signature Date
Zoning Administrator
Code Enforcement Offic 06 - 23.--06
Water /Sewer
Storm/Drainage
Inspections
City Manager
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
O � TOTAL
N
U
A
c
W'
W
El
'E
a
H-F�
ski m Ob
0
F
Ra
`rte
O
W
E--4
M fl ro
r�r
Q
O m
Ci
Wn
N 67012'34"W
U) N
/F
w
F
�t:
Cyr
CD
CO
a -et zoz
U O
O F
+
09
O
W
CL
Q
m O U
N 0
w
m
C)
C) 0rd
+1
n
C).q
r3;1
w
A q H
ro 0 Fa
�
o
O �
a
a
o C3
�C6
❑3
O
P4
�
C14 r.
-H cl Fa
e
z
�
m
U
a
LL
E
0
Y�
RBF
alPa
7
1
Z
m
.y
F
0
S 67 007'47 "E 159.82''
i8
U- -0, 00
O Oa 6 c 0 00
ty - cj
m3x.a a I °C) �m
ro
0 0 6 '00
0 Li f---I � 0 O Q P. O W Z 9.
O m a El
0 (�] U a d IM
O ro U" O F'i i
Ez °Er U- r
1/2" RBF P/L EXTENDS TO CREEK
Z Q2o
o x
P/L EXTENDS TO CREEK
U
A
c
O
iFA
W
El
'E
H-F�
ski m Ob
0
E
Ra
`rte
O
m
E--4
M fl ro
U
Q
O m
Ci
Wn
N 67012'34"W
U) N
141.10'
w
m y O
p 0 m
Cyr
�
CO
a -et zoz
U O
i8
U- -0, 00
O Oa 6 c 0 00
ty - cj
m3x.a a I °C) �m
ro
0 0 6 '00
0 Li f---I � 0 O Q P. O W Z 9.
O m a El
0 (�] U a d IM
O ro U" O F'i i
Ez °Er U- r
1/2" RBF P/L EXTENDS TO CREEK
Z Q2o
o x
P/L EXTENDS TO CREEK
W O F) 4� W FI
�E
A
c
Q..o
qD
A .4�-
m .
H-F�
ski m Ob
0
E
Ra
ps
O
m
E--4
M fl ro
U
Q
O m
Ci
Wn
4, ,C
U) N
co
O
V
m y O
p 0 m
CO
1
U O
O F
O O
[.' 0 r
W
CL
Q
m O U
N 0
W O F) 4� W FI
b
A
z
Q..o
qD
A .4�-
m .
H-F�
ski m Ob
0
E
C +-
O
m
E--4
M fl ro
N C m
Q
W A
O 4- Cdd
r~
4, ,C
p " -P
co
o rd o
m y O
p 0 m
CO
O
U O
O F
O O
[.' 0 r
cad
m O U
N 0
10 F'
C)
C) 0rd
+1
n
C).q
r3;1
O
A q H
ro 0 Fa
O i
U r m A
A 4
F) 4- ,cl
❑3
O
O ro ro
m U b
C14 r.
-H cl Fa
W O F) 4� W FI
z
Q..o
Cc
W Lo "P
0
E
0
m
E--4
F F ,-i,
Q
�
V
rO
W
CO
O
U O
O F
6�ON
1
o
n
C).q
r3;1
C)
z
Q..o
Cc
W Lo "P
0
E
0
U) W c) no
W
F F ,-i,
W r'% �O C,2
O
Q W �OW
CO
r�1
U O
O F
6�ON
Oyster III
24' 7'
p
I l l i l l l l I
iV P C t'1 i7 in N
t
POOL LAYOUT
1 100
24' 7'
1
All construction most comply with
The Standard Swimming Pool Code-k"11+
Edition
All Plumbing Installations must
comply with The International Plumbing
'^ode'Zeocl Edition and State
', veo -ci, Arrerd! fits
All Electrical Installations must
comply with The National Meetric
code 2ragEdition and State
of Georgia Amendments
SPECIFICATIONS
LENGTH
WIDTH
I D1
D2
24 7'
1 11'5'
1 5.3-
3' 7'
LINEAL FEET VOLUME US GAL WEIGHT Its
- 604' "IN _ 1300
SpuCification sheet
GENERAL NOTES,
• When using a template for set out pnor to
excavation, mark perimeter line 2' outside
plastic edge.
• NI measurements for dig depths are from the
centreline to the outside of the coping.
• At seat ledges should be cut at least 2' 3'
from finished pod height and 6* renewer
than shell dimensions.
INSTALIA ➢ON CONSIDERATIONS
Kidney range
• The seat on the pile should be but to the apex
of the curve at the bid end and comes all the way
around to the 2nd step.
• The skimmer box is approximately 1' past
the end of Nis seal, diagonally opposite the steps.
• Use the pants marked as inference pools when
Jevelling
• Points A and B usually have income up 112tr
1 112' during packing
• lining water up so that it is level with the top of
the bottom step. Ltlgng the entry steps and seal
on the shell atlenvards, ensures that the floor of
the pool does not move.
• It may be useful to keep back sill marginally lower
than the rising water whilst installing to ensure that
F does not became a high porn. (i.e usually the
result of lifting bath seats and the wall F moving
inwards during the process).
• The walls of the excavation should be kept
relatively straight or plumb from the ground to the
floor of excavation.
T , 6„
When the fill sand has reached the bottom of the return inlet fittings, run all the pool piping to the
equipment site,
Appticabon is Spey#ot Atha Appilcrrtton p: Swtmrttlng Poob
U the pool is equipped with a light or other in wall accessory, run the appropriate conduit or piping,
continue the sand back fill and water compaction process until finish grade is reached.
rr �srL°o.sr�ri
All Elactrlcai Installations must
ra
comply wtth fhe�Uatlonat !?'lectrlo
Code?�Edition and State
of Georgia Amendments
All Plumbing Installations must
.. comply with The Irtemationti Plumbing
Code?noo Edition and State
of Georgia Amendments
Prepare for the concrete deck or collar by digging with a fiat shovel under the coping to the pool wail
as illustrated in figure #12. This will allow concrete to be worked in under and over the coping lip to
lock in the top of the pool. If the deck area around the pool is to be something other than concrete, a
concrete collar must be installed. The collar will reduce the chances of erosion or abnormal settiug
which may-lead to distortion or structural damage to the pool wall.
3.oya 4 "A
Rsw ✓.afu ca.ru�rs
frNw rr_a�r -Y�.�O r� sP
FMet Srr.Wn
%s <iABd /}Z
Ail construction must comply with ` -
Thc Standard Swimming Pool Coda
Edition