Loading...
HomeMy Public PortalAbout06-0381 NICA WEEKS0 . d. A Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Isldud, GA 31328 Phone: (912) 786 -4573 extension 114 Fdx" (912) 786 -9539 Permit No. ✓h- ��i A � pate UeouPSted i — ;ri "!— Owner's Name \W PQ kS Date Needed J a V - l At Gen. Contractor \ S Subcontractor C Contact Number C1hae Location c o n�A� A�eJ Date of Inspection 113010 / Time _ Inspector _ _ Type of Inspection 5 lnl • n"1 (vN o Q D o Ck soec-v SAS CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 07 -10 -2006 PERMIT #: 060381 WORK DESCRIPTION: SWIMMING POOL C)/ /a.9/O WORK LOCATION: 148 S CAMPBELL C a r re ,�e-,j () d a ,,S S OWNER NAME NICA WEEKS ADDRESS 113 S CAMPBELL AVE CITY, ST, ZIP TYBEE ISLAND GA 31328 CONTRACTOR NAME ARCHITECTURAL POOLS & DECKS ADDRESS 101 WINDFIELD DR CITY STATE ZIP SAVANNAH GA 31406 FLOOD ZONE BUILDING VALUATION SQUAREFOOTAGE OCCUPANCY TYPE P TOTAL FEE'S CHARGED $ 50.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $26,500.00 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to bold the City ofTybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 7865737 www.cltyoftybee.org DATE ISSUED: 07 -10 -2006 WORK DESCRIPTION: WORK LOCATION: 51 1510 :.: ul ADDRESS CITY, ST, ZIP CK51J►I1� 7C, I\ 1 1 'iJf$� CITY STATE ZIP FLOOD ZONE CITY OF TYBEE ISLAND BUILDING PERMIT PERMIT #: 060381 SWIMMING POOL 1 119 SOUTH CAMPBELL AVE (r1 r- n n Q f. t SS NICA WEEKS 113 S CAMPBELL AVE TYBEE ISLAND GA 31328 ARCHITECTURAL POOLS & DECKS 101 WINDFIELD DR SAVANNAH GA 31406 BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEE'S CHARGED $ 50.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $26,500.00 14g 5. CamP�ll TOTAL BALANCE DUE: $ 50.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: ) 10 rv-' p QL P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786-4573 - FAX (912) 786-5737 www.cityoftybee.org 031 CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT LocationA So cr� C ry m uC f t "10 PIN # NAME ADDRFCC TFT FP14l1NF Owner Nicol w S n S So }h �a,r,i� y- AV, }g6- 9 D 3 6 Duplex ❑ Residential ❑ Architect ❑ Other 1' G Tv- - or Engineer Building Contractor f Pc era (Check all that apply) ❑ New Construction ❑ Duplex ❑ Residential ❑ Footp pt Qhanges ❑ Other 1' G Tv- - ❑ Renovation ❑ Single Family ❑ Commercial ❑ Repairs e-> Estimated cost of Construction: $ 26i 500 Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: 5 Remarks: (Enter appropriate number) (4) Masonry (5) Steel & Masonry V,V\ ) A 4 !-nd ❑ Minor Addition ❑ Substantial Addition ❑ Multi - Family ❑ Demolition (6) Other (please specify) ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units Lot Area # Off - street parking spaces Trees located & listed on site plan Access: Driveway Setbacks: Front # Bedrooms Living space (total sq. ft.) With culvert? Rear # Bathrooms With swale? Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: L On -site restroom facilities will be provided through C -.., � r of l 7 o T On -site waste and debris containers will be provided by j Construction debris will be disposed by Au at by means of - I understand that I must comply with zoning, flood damage control, building_ fire,shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 6 Signature of Applicant: 'Y ✓'v {' Note: A permit normally takes 7 to 10 days to process. ------------------------------------------------------------------------------------- The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site _ Water meter size Storm drainage NFIP Flood Zone Existing Approvals: Signature Date Zoning Administrator Code Enforcement Offic 06 - 23.--06 Water /Sewer Storm/Drainage Inspections City Manager FEES Permit Inspections Water Tap Sewer Stub Aid to Const. O � TOTAL N U A c W' W El 'E a H-F� ski m Ob 0 F Ra `rte O W E--4 M fl ro r�r Q O m Ci Wn N 67012'34"W U) N /F w F �t: Cyr CD CO a -et zoz U O O F + 09 O W CL Q m O U N 0 w m C) C) 0rd +1 n C).q r3;1 w A q H ro 0 Fa � o O � a a o C3 �C6 ❑3 O P4 � C14 r. -H cl Fa e z � m U a LL E 0 Y� RBF alPa 7 1 Z m .y F 0 S 67 007'47 "E 159.82'' i8 U- -0, 00 O Oa 6 c 0 00 ty - cj m3x.a a I °C) �m ro 0 0 6 '00 0 Li f---I � 0 O Q P. O W Z 9. O m a El 0 (�] U a d IM O ro U" O F'i i Ez °Er U- r 1/2" RBF P/L EXTENDS TO CREEK Z Q2o o x P/L EXTENDS TO CREEK U A c O iFA W El 'E H-F� ski m Ob 0 E Ra `rte O m E--4 M fl ro U Q O m Ci Wn N 67012'34"W U) N 141.10' w m y O p 0 m Cyr � CO a -et zoz U O i8 U- -0, 00 O Oa 6 c 0 00 ty - cj m3x.a a I °C) �m ro 0 0 6 '00 0 Li f---I � 0 O Q P. O W Z 9. O m a El 0 (�] U a d IM O ro U" O F'i i Ez °Er U- r 1/2" RBF P/L EXTENDS TO CREEK Z Q2o o x P/L EXTENDS TO CREEK W O F) 4� W FI �E A c Q..o qD A .4�- m . H-F� ski m Ob 0 E Ra ps O m E--4 M fl ro U Q O m Ci Wn 4, ,C U) N co O V m y O p 0 m CO 1 U O O F O O [.' 0 r W CL Q m O U N 0 W O F) 4� W FI b A z Q..o qD A .4�- m . H-F� ski m Ob 0 E C +- O m E--4 M fl ro N C m Q W A O 4- Cdd r~ 4, ,C p " -P co o rd o m y O p 0 m CO O U O O F O O [.' 0 r cad m O U N 0 10 F' C) C) 0rd +1 n C).q r3;1 O A q H ro 0 Fa O i U r m A A 4 F) 4- ,cl ❑3 O O ro ro m U b C14 r. -H cl Fa W O F) 4� W FI z Q..o Cc W Lo "P 0 E 0 m E--4 F F ,-i, Q � V rO W CO O U O O F 6�ON 1 o n C).q r3;1 C) z Q..o Cc W Lo "P 0 E 0 U) W c) no W F F ,-i, W r'% �O C,2 O Q W �OW CO r�1 U O O F 6�ON Oyster III 24' 7' p I l l i l l l l I iV P C t'1 i7 in N t POOL LAYOUT 1 100 24' 7' 1 All construction most comply with The Standard Swimming Pool Code-k"11+ Edition All Plumbing Installations must comply with The International Plumbing '^ode'Zeocl Edition and State ', veo -ci, Arrerd! fits All Electrical Installations must comply with The National Meetric code 2ragEdition and State of Georgia Amendments SPECIFICATIONS LENGTH WIDTH I D1 D2 24 7' 1 11'5' 1 5.3- 3' 7' LINEAL FEET VOLUME US GAL WEIGHT Its - 604' "IN _ 1300 SpuCification sheet GENERAL NOTES, • When using a template for set out pnor to excavation, mark perimeter line 2' outside plastic edge. • NI measurements for dig depths are from the centreline to the outside of the coping. • At seat ledges should be cut at least 2' 3' from finished pod height and 6* renewer than shell dimensions. INSTALIA ➢ON CONSIDERATIONS Kidney range • The seat on the pile should be but to the apex of the curve at the bid end and comes all the way around to the 2nd step. • The skimmer box is approximately 1' past the end of Nis seal, diagonally opposite the steps. • Use the pants marked as inference pools when Jevelling • Points A and B usually have income up 112tr 1 112' during packing • lining water up so that it is level with the top of the bottom step. Ltlgng the entry steps and seal on the shell atlenvards, ensures that the floor of the pool does not move. • It may be useful to keep back sill marginally lower than the rising water whilst installing to ensure that F does not became a high porn. (i.e usually the result of lifting bath seats and the wall F moving inwards during the process). • The walls of the excavation should be kept relatively straight or plumb from the ground to the floor of excavation. T , 6„ When the fill sand has reached the bottom of the return inlet fittings, run all the pool piping to the equipment site, Appticabon is Spey#ot Atha Appilcrrtton p: Swtmrttlng Poob U the pool is equipped with a light or other in wall accessory, run the appropriate conduit or piping, continue the sand back fill and water compaction process until finish grade is reached. rr �srL°o.sr�ri All Elactrlcai Installations must ra comply wtth fhe�Uatlonat !?'lectrlo Code?�Edition and State of Georgia Amendments All Plumbing Installations must .. comply with The Irtemationti Plumbing Code?noo Edition and State of Georgia Amendments Prepare for the concrete deck or collar by digging with a fiat shovel under the coping to the pool wail as illustrated in figure #12. This will allow concrete to be worked in under and over the coping lip to lock in the top of the pool. If the deck area around the pool is to be something other than concrete, a concrete collar must be installed. The collar will reduce the chances of erosion or abnormal settiug which may-lead to distortion or structural damage to the pool wall. 3.oya 4 "A Rsw ✓.afu ca.ru�rs frNw rr_a�r -Y�.�O r� sP FMet Srr.Wn %s <iABd /}Z Ail construction must comply with ` - Thc Standard Swimming Pool Coda Edition