HomeMy Public PortalAbout06-0382 JEFFERY CRAMERJanuary 3, 2003
Dianne Otto
From: Jimmy C. Brown
Page 1 of 1
0(0 -o3?2Z
Sent: Monday, October 29, 2007 10:11 AM
To: Nalene E. Conway; Dianne Otto; Dispatch; April Moore; mburner @chathamcounty.org; McAlister,
Scarla M.
Cc: Dianne Otto
ADDRESS CHANGE
TO: Jeffery Cramer
102 General Marshall Blvd
Tybee Island, Ga. 31328
DATE: October 29,2007
REFERENCE: ADDRESS CHANGE
It has come to our attention that there is a House Numbering problem in the block in which you
reside. This causes public safety (Police, EMS, and Fire) problems of a critical nature; therefore it is
necessary to change the address of your house.
Please be advised that effective immediately the address of your house will be changed
FROM # 2 General Marshall Blvd TO # 102 General Marshall Blvd
Please change your records to reflect this address change and place the Correct Number on the outside <
o it c it can be clearly seen from the street. Failure to display the correct House Number may result
f Emergency
Services
A copy of this letter will be sent to the Police and Fire Departments, Electric Company, Telephone
Company and Water Billing to update their records to reflect the address change of the property. Please
notify any other agencies you deem necessary.
We apologize for any inconvenience this may cause. Thank You for your cooperation.
If you have any questions concerning this matter please call me at 912 - 785 -4573 X 112
Tybee Island Code of Ordinances
Section 5 -1 -1: All buildings, residential or commercial, shall be numbered with uniform, sequential
numbers based on information provided by the City. Owners failing to comply with this requirement
shall, after 30 days notice be subject to penalty under Section 5 -1 -2 of this code.
Section 5 -1 -2: All building numbers shall be placed on the outside of the building in a conspicuous
place with open view to the public.
JIMMY BROWN
10/29/2007
..14
„17
Inspection Report s
City of Tybee Island
403 Butler Avenue
P.O. Box 2749
Tybee Island, GA 31328
Phone: (912) 786 -4573 extension 114
Fax: (912) 786 -9539
Permit No. Q Lo - (6) ,3 F 2 Date Requested
Owner's Name Date Needed 3 Q (o
Gen. Contractor C 54-, _ Subcontractor
Contact Number e;-Q aT 0, r- '� 2 3 33 3
Location Z e a C o r /A
Date of Inspection Time _ Inspector
Type of Inspection o
29-��54
DATE ISSUED: 07 -10 -2006
WORK DESCRIPTION:
WORK LOCATION:
OWNER NAME
ADDRESS
CITY, ST, ZIP
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEE'S CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
A
CITY OF TYBEE ISLAND
BUILDING PERMIT
SWIMMING POOL
2 GEN GEO MARSHALL
JEFFERY CRAMER
PO BOX 1397
TYBEE ISLAND GA 313281397
JEFFERY CRAMER
PO BOX 1397
TYBEE ISLAND GA 313281397
P
$ 50.00
$30,000.00
PERMIT #: 060382
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all limes comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Boa 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 7865737
www.chyoflybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
O (o-o3RZ
Location:
Z Cene_r'os�
PIN #
NAME AT)T)RRRR TPT FPA()NR
Owner
e. rormyitr
'aGen�r u sQSc
Single Family
❑
Commercial
❑
Repairs
Architect
or Engineer
B ndin or
k • �r a
cl
� 5 �o
(Check all that apply)
❑ New Construction
❑ Duplex
❑ Residential
❑ FootprTt ges
'ER Other 'er
Estimated cost of Construction:
Construction Type _
(1) Wood Frame
(2) Wood & Masonry
(3) Brick"
Proposed i
Remarks:
❑
Renovation
❑
Single Family
❑
Commercial
❑
Repairs
01 aoV
(Enter appropriate number)
(4) Masonry
(5) Steel & Masonry
❑
Minor Addition
❑
Substantial Addition
❑
Multi- Family
❑
Demolition
(6) Other (please specify)
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the
following information based on the consetdiaw d site plan:
# Units
Lot Area
# Off - street parking spaces _
Trees located & listed on site
Access:
Driveway
Setbacks: Front
Im
# Bathrooms
With swale?
Sides (L) _ (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by 3 a at by means of
I understand that I must comply with zoning, flood damage control building fire shore
protections and wetlands ordinances FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary Lrestore age impaired by this
permitted constru o//
n. Date: E C 13 r4 Signature of Applicant:
Note: A permit normally takes 7 to 10 days to Nocess.
The following is to be completed by City personnel:
Zoning certification
Approved rezomng/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
NFIP Flood Zone
Existing
Signature Date
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
Manhattan
34' 9•
N
W
I I• I � r�� I � I
t r r t t r
N V
POOL LAYOUT b 7
1:100
34' 9'
io
12 1 24' 11" 3' 5" 112' 6 "11 31
Spa floor to be dug @ 3'3"
r 10°
SPEUICATIONS
LENGTH
WIDTH
D1
I
34' g
14'1'
3' r
5' 11'
IINEALMEfRES
VOLUMEUSGal
I WEIGHT It,
�g8'S��11887
20812081
'v
Spe�:ification sheet
GENERAL NOTES:
• When using a Impale far set out prior to
excavation, mark perimeter line 2' outside
plastic edge.
• All measurements for dig depths are from the
centreline to the outside of the wiling.
• All seat ledges should be out at least 2'3"
from finished pod height and 6' narrower
than shell dimensions.
INSTALLATION CONSIDERATIONS
• Vemcal deflectian of walls are workable
up to 6'
• Dig spa 4•biggerto allow for excessive
pipes.
• It is recommended that the area between the spa
and the steps at the shallow and be oomp entetywt
away. This allows for the plumbing and installation
at the safety suctions and other fittings.
• Beware of location of the spa manifold when
fling out lights and safety suctions in the spa nook.
• If thefilhagon is located at the deep end, it is
recommended that a separate beach be dug to
accommodate all the pipework from the spa rather
than placing inside the pod excavation.
• When screedirg the floor of the spa allow for
recess for table filing.
• Ensure floor is supported in the excavation before
entering to plumb fittings etc
• Level and backfill the pad area up to spa divider
• Nor to water entering the spa area adjust levels.
•Always keep alevel an the colong of the spa
Iyou ore hosing in the bockfil. This coact
Invariably rises at a rood rate and g is a very
big seat to dg out.
Ail construction must comply with
The Standard Swimming Pool Code„dl+
Edition
All Electrical! installaticns must
comp'y 4vith 1'n Naticnai I'_I°ctric
Oode20105 Edition and State
of Georgia Amendments
All Plumbing installations must
comply with The International Plumbing
Code 2con Edition and State
of Georgia Amendments
When the fill sand has reached the bottom of the return inlet Fittings, run. all the pool piping to the
equipment site,
If the pool is equipped with a light or other in wall accessory, run the appropriate conduit or piping,
continue the sand back fill and water compaction process until finish grade is ruched.
•YI®,aY�q \
MOB.
5k�. -m. All Electrical Installations must
comply with The National electric
CodeEdition and State
of Georgia Amendments
All Rumbing tnstartitlons munt
The International Plumbing
20rN> Edition and State
Prepare for the concrete deck or collar by digging with a flat shovel under the coping to the pool wall
as illustrated in figure #12. This will allow concrete to be worked in under and over the coping lip to
lock in the top of the pool. If the deck area around the pool is to be something other than eonerew, a
concrete collar must be installed The collar will reduce the chances . of erosion or abnormal setting
Which may lead to distortion or structural damage to the pool wall.
}A,V1I OC Gl1�SL
Rs -O ✓~ra =o C*s Av
Wr R tr_ a" -'e ro rte. er
FMst Sre.Wa
'q'r -aea j17Z
o�
i�
All construction must comply
The Standard Swimming Pool Code `'�t '
Edition
r