HomeMy Public PortalAboutChange Order No. 7 to Contract No. 62-2020 - Butler Fairman & Seufert - Professional Services - Whitewater Gorge Connector Trail - INDOT - R-41306 P f Contract No:R-41306 Change Order No.: 007 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R-41306 Letting Date:11/10/2020 District:GREENFIELD DISTRICT AE:Prather, Michael PE/S:Whitesel, Chad Status:Draft Change Order Information Change Order No.: 007 EWA: Y or Force Acct: N Date Generated: 11/03/2021 Date Approved: 00/00/0000 Reason Code: CHANGED COND, Constructability Related Description: Slope Seed Mix Original Contract Amount $ 1,388,682.00 Current Change Order Amount $3,463.02 Percent: 0.249 % Total Previous Approved Changes $ 104,455.80 Percent: 7.522 Total Change To-Date $ 107,918.82 Percent: 7.771 % Modified Contract Amount $ 1,496,600.82 Time Extension Information Date Initiated 00/00/0000 Date Completed 00/00/0000 . Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00 Previous Time Approved SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value$ Revised Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SS Date 00/00/0000 or SP Days 0 } Contract No:R-41306 Change Order No.: 007 INDIANA Department of Transportation Page: 2 Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority AE: DCE: SCE: * DDCM: * ($ per Change Order) (- LE $ 250K-) (-LE $ 750K- ) ( — LE $ 2M -- ) (-- GT$ 2M -- ) (Days per Contract) ( 50 SS days ) ( 100 SS days ) ( 200 SS Days ) ( GT 200 SS days) Verbal Approval Required? Y/N If Y, by Date Issued Total Change To-Date>5%? Y/N If Y , Copy to Program Budget Manager Scope/Design Recommendation Y/N If Y, Referred to Project Manager(PM) Required? Date to PM Date Returned Approval Authority Concurs with PM? Y/N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y/N If Y, Date to LPA Date Returned FHWA Signatures Required? Y/N If Y, Date to FHWA Date Returned * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract No:R-4.1.306 INDIANA Date:11110021 Change.Order No:007 Department of:Transportation Page:3 Contract:: R-41306 Project: 1702760-State:i70276000LC3 Change Order Nbr: 007 Change Order Description: Slope Seed MO( Reason Code: CHANGED COND,.Constructahility.Related CLN PEN: PLN Item Code Unit Unit Price CO:Qty• Comment Amount Change 0054 1702760. 0054 .621-04258 LBS 66000 52.470 C Amourit$ 3,46.3.02. Item Oescription:•.SEED.MIXTURE Supplemental Descriptiont.Stripe.Stabilizing Seed Mixture: Supplemental.Description2: Total Value ftir Change Order 007=4.3,463:02 Whereas,theStandard Specifications for this contract provides for such Workto bperfbrthed,the following change is.recommended: General or Standard Change Order Explanation • This change orderis necessary per the City of RIchmoncisrequest to use•a•slope StabiliatiOn seed mixture In place of the Type Reeed mixture. City of Richmond expressed concerns that could be difficult err the slope betWede•thaneWretaining:Well and existing ground.They requested recommendations for Vegetative cotter thatWOuld net require mowing After reviewing ciPtione,the slopestabilizatibrreeed mix will be added to the&oared-as CLN.0054 PIN.0054 Seed Mtge,Slope Seed'MixtUre.Ncitime iC hbedfor this change order. ChangeOrder Explanation for Specific:LIne Item .1.4.1r4-14.441.14*.lifei-kielrfrint***1.10.******.ttir**10,irk ii***.***1.1 ttitir.4.1.4.....444*********.inye*gra- It is the interitqf the parties that this change order is full and complete compensation for triewpric describe above. Notification.and conSent to this change order is hereby acknowledged. • . Contractor: United Construction Services, LLC • Signed:By: Date: 11/10/2021 NOTE:Other required State and FHWA signatures will be obtained plectronically:thrciugh the.SiteMatiager system. • • • • • • • • • • • Contract No:R-41306 INDIANA Date:11/10/2021 Change Order No:007 Department of Transportation Page: 4 • /f/ APPROVED FOR LOCAL PUBLIC AGENCY h;Ie er li-/S-2/ (SI NATUR ) (TITLE) (DATE) (SIG T ) (TITLE) {1/ (DATE) SUBMITTED FOR CONSIDERATION PE/S APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Approval Level Name of Approver Date Status _d_�__.�