Loading...
HomeMy Public PortalAboutChange Order No. 1 to Contract No. 142-2021 - Wetzel Ford - 2 crew cab trucks RICHMOND SANITARY DISTRICT 2380 Liberty Avenue,Richmond,IN 47374 CHANGE ORDER in Change Order Date: November9,2021 Owner: Richmond Sanitary District Contract No.: 142-2021 Contractor: Wetzel Ford Contract Date: TBD Project: 2021 Crew Cab Half Ton 4x4 Pickups(2 total) PO Number: TBD The Contract Documents are modified as follows upon execution of this Change Order: Item f Description Qty Change Unit Cost/Unit Totallncrease/(Decrease) A-1 Update Truck'A'to 6.5ft bed length and 3.5L V6 Ecoboost 1 LS $ 3,085.00 $ 3,085.00 Engine NET CHANGE $ 3,085.00 Notes: 'Changes based on updated toolbox fit. Engine change required due to 6.5ft bed length. Two engine options were available. The 3.5L V6 Ecoboost cost$590 more,but got better gas mileage. Better gas mileage will produce savings vs.the other available option(5.0L V8). Page 1 of 2 RICHMOND SANITARY DISTRICT 2380 Liberty Avenue,Richmond,IN 47374 CHANGE ORDER 111 Change Order Date: November 9,2021 Owner: Richmond Sanitary District Contract No.: 142-2021 Contractor: Wetzel Ford Contract Date: TBD Project: 2021 Crew Cab Half Ton 4x4 Pickups(2 total) PO Number: TBD 0 CHANGE IN CONTRACT PRICE Original contract Price: $96,003.00 Net change from Previous Change Orders: $0.00 Contract price prior to this Change Order: $96,003.00 Net increase/(decrease)of this Change Order: $3,085.00 Contract price with all approved Change Orders: $99,088.00 Percentage of increase/(decrease)with Change Orders: 3.21% This Change Order is for complete and final settlement of all direct and Indirect costs,impact costs and time extensions incurred at any time resulting from the performance of the changed work or associated claims. / Recommended by: �// ?Xl Richmond Sanitary District Engineer Date Accepted by: • Owner: r `-� /9/11 Richmond Sanitary District ./Board President Signature ' Date 1 c Contractor: / e,n -enic. L Wetzel Ford A Jb6rized Signature Date Page 2 of 2