HomeMy Public PortalAboutOrdinance 1552-a .. .,.
ADDENDi7M #2
Municipal Ordinance Number 15 5 2 ,,, ,_
Providing for the addition of Plainfield/Naperville Road Exam east edge of
pavement of IL Route 59 northeast 2.88 miles to the south edge of pavement of
127th Street to the Municipal Street System of the Village of Plainfield, Will
County, Illinois.
Whereas, the Village of Plainfield and the State of Illinois, under date
of , 195 entered into an Agreement for transfer of
jurisdiction of Plainfield/Naperville Road to the Municipal Street System.
Now, therefore, be it ordained by the President and Board of Trustees of the
Village of Plainfield, that Plainfield/Naperville Road fram east edg® of
pavement of IL Route 59 northeasterly to 2.88 miles to the south edge of
pavement of 127th street be added to the Municipal Street. System.
The Village Clerk is directed to forward a certified copy of this Ordinance to
the State of Illinois through its District Engineer's Office at Schaumburg,
Illinois.
Certificate
I, Janik , Village Clerk, in and for the Village of Plainfield in
the County of Will in the State of Illinois, and keeper of the records and
files thereof, as provi$ed by statute, do hereby certify the foregoing to be a
true, perfect, and complete copy of an ordinance passed by the President and
Board of Trustees of the Village of Plainfield at ite Board meeting held
on h 21 19 9,4
In testimony whereof, I have hereunto set my hand and affixed the seal of
Village at my office this ~~~h,,,,2„2 A.D., 1994
(SEAL)
V age Clerk
3078r
AGREEMENT
THIS AGREEMENT entered into this 2l 'day of March A.D. 194 ,
by and between the STATE OF ILLINOIS, acting by and through its DEPARTMENT OF
TRANSPORTATION, hereinafter called the STATE, and the Village of Plainfield,
County of Will, of the State of Illinois, hereinafter called the VILLAGE.
W I T N E S SET H:
WHEREAS, the VILLAGE proposes to improve Lockport Street (FAP Route 349,
US Route 30), by installing an ornamental highway lighting system from IL
Route 126 to IL Route 59, said work to be included in a project designated as
Village Section: 90-00021--QO-LT, State section: 14L, State Job No.
C-91-569-93, and hereinafter referred to as the "VILLAGE'S PROJECT"; and
WHEREAS, the STATE proposes to improve FAU Route 0324 (Naperville Road)
from IL Route 59 northeasterly 2.88 miles to 127th Street by milling 1-1/2
inches the existing 11 ft through traffic lane in each direction and
resurfacing with 1-1/2 inches of bituminous concrete, said PROJECT to be known
as STATE Section: 36RS-1, and hereinafter referred to as the "STATE'S
PROJECT"; and
WHEREAS, in consideration of STATE financial participation in the VILLAGE
PROJECT and provided the STATE PROJECT is completed, the VILLAGE is agreeable
to assuming jurisdiction of Naperville Raad within the aforedescribed STATE
PROJECT limits;
NOW, THEREFORE, in consideration of the mutual covenants contained herein,
the parties hereto agree as follows:
I. VILLAGE PROJECT
1. The VILLAGE agrees to make the surveys, prepare plane and specifications,
receive bids and award the contract, furnish engineering inspection during
construction and cause the improvement to be built in accordance with the
plans, specifications, and contract.
• ~ .. .
2. The VILLAGE agrees to pay all construction and engineering costs, subject
to reimbursement by the STATE as hereinafter stipulated.
3. It is mutually agreed by and between the parties hereto that the estimated
construction cost of this improvement is $250,000.
4. The STATE agrees tv reimburse the VILLAGE for 100$ of all construction
costs subject to a maxirqum of $50,000. Upon award of the contract and
receipt of an invoice, the STATE agrees to pay the VILLAGE an amount equal
to 95$ of its obligation incurred under this AGREEMENT and will pay the
remainder of the obligation upon completion of the improvement based upon
final costs.
5. The VILLAGE, at no expense to the STATE, shall cause private and public
utilities to be adjusted ar~d/or relocated.
6. The VILLAGE agrees, prior to advertising for bids, .to secure a letter from
the STATE approving the final plans and specifications as prepared. The
PROJECT shall be constructed in accordance with plans approved by the
STATE and the STATE's policies and procedures.
7. The VILLAGE shall maintain, for a minimum of five years after the
completion of the PROJRCT, adequate books, records, and supporting
documents to verify the amounts, recipients, and uses of all disbursement
of funds passing in conjunction with this Agreement. All books, records,
and supporting documents related to the PROJECT shall be available for
review and audit by the Auditor General and other State Auditors. The
VILLAGE agrees to cooperate fully with any audit conducted by the Auditor
General and to provide full access to all relevant materials. Failure to
maintain the books, records, and supporting documents required by this
paragraph shall establish a presumption in favor of the STATE for the
recovery of any funds paid by the STATE under this Agreement for which
adequate books, records, and supporting documentation are not available to
support their purported disbursement.
-2-
8. The VILLAGE agrees to comply with all applicable Executive Orders and
Federal Highway Acts pursuant to the Equal Employment opportunity and
non-discrimination regulations required by the Illinois Department of
Transportation.
9. Upon completion of the ornamental street lighting improvement, the VILLAGE
agrees to maintain, ar cause to be maintained, the ornamental lighting
system including energy, in its entirety.
IT. STATE PROJECT
1. The STATE agrees to make the surveps., prepare plans and specifications,
receive bids and award the contract, furnish engineering inspection during
construction and cause the improvement to be built in accordance with the
plans, specifications, and contract.
2. The STATE agrees to pay all construction and engineering coats estimated
to be $350,000.
3. The VILLAGE agrees to provide, prior to the STATE's advertising for the
work to be performed hereunder, approval of the plans and specifications
as prepared, by resolution or letter.
4. The VILLAGE shall exercise its franchise right to cause private utilities
to be relocated at no expense to the STATE, if made necessary by the
construction of this Agreement.
5. The VILLAGE agrees to cause its utilities located on right of way acquired
by the STATE ar installed within the limits of a roadway after the said
roadway was taken aver for maintenance by the STATE, to be relocated
and/or ad~usted at no expense to the STATE, if made necessary by the
construction of this improvement.
-3-
- - ~ PLAN APPROVAL ,
WHEREAS, in order to facilitate the improvement of Naperville Rond, known
as State Section: 36115-1, the Village of Plainfield hereby approves the plans
and t~pecifications for the proposed construction.
APP1t~D Max'ch 21 , 19 9 4
~2PJ<%w I../.~<~ .
Local Agenet- 'rylpe+~f 9gst ems Transfer
Illinois Department
~
of Transportation MunicipalitY PLAINFIELD TYp>; 4 ~ ~ '
~ ~ From
Township/ State Highway System
Road District To
County Local Highway System
LOCAL AG€NCY-STATE
JURISDICTIONAL TRANSFER Section No. 3ti RS--1 Indicate Type of Systems Transfer
(for transfers involvin an i vementl TYPE I
'rhe above local agency, and the State of Illinois, acting by and through i#s Department of Transportation. agree to transfer the
jurisdiction of the designated location in the manner indicated above under TYPE OF SYSTEMS TRANSFER
L.ocatton Oascription
Name PLAINFIELD/NAPERVILLE ROAD Route FAU 0324 Length Miles 2.88
Termini EAST„_..~DGE OF PAVEMENT IL U ,~„ TT,ES TO.127TH STREET TN
ITS ENTIRETY.
This transfer does/does not include Structure No. N/A
WHEREAS, the authority to enter into this contract is granted the STATE by Section 4-4Q9 of the Illinois Highway Code and the au-
thority to make changes in the State Highway System is granted the STATE under Section 2-101 of the Illinois Highway Code, and
Include for Nlunidpsllttes Onty
WHEREAS, the authority to make changes to the Municipal Stream System is granted to the Municipality by Section 7-101 of the lI-
linois Highway Code.
(Check One?
® Rinaj Inspection by the State (Type " ") ^ Final Inspection by the Local Agency
^ Acceptance py the State ^ Acceptance by the Local Agency
^ Execution of Agreement ~~ ,~
OF THE STATE PROTECT
S~
Additional information and/or stipulations. if any, are hereby attached and identified below as being a part of this jurisdictional
transfer.
Supplement
ADDENDUM 1 AND 2
(Insert supplement numbers of letters and page numbers, if applicable.)
IT IS FUATHE=A AGREED, that the provisions of this jurisaicttonat transfer shall be binding upon and Enure to the benefit of the par-
ties hereto, their successors and assigns.
BLR 160019/89)
NOW THEREFORE iT 15 AGREED that the corporate authority of said municipality will pass an ordinance providing for the transfer
of the above location and shall attach hereto and make a part hereof acopy of a location map as Addendum No. t and a copy of the
ordinance as Addendum No. 2. and
IT IS MUTUALLY AGREED, that this jurisdictional transfer will bacomeaffeCtive 21 calendar days after:
~• ~ ~
~' ,~rro
^
~l 126
1
^ ~
^
1
. C~h1~ON
CA`di FAIM
SHOREIN
^
^
~ ~ ~ r
^
.
^
F
6 ewn s
l C N
r
~ti~
. ~ ~
x
.
^ ~pRf1R4 fl0.
~r 1_o~zo
f
1.
1
~. ~ ~I
A~~rtriouM ~
~~
,. `
113RD ~ ~ Sr 1~]RD
f
I'
II ~ 7
r
;paRr`~ ~
,TM sr.
~' ^
~ \~ ~~
\\
LIMIT
~~s,
OF (C~sr H
n
JURISTICTIONAL
TRANSFER ~,
r`
p
Q~Ti
Ef.W00D
B60DGETr
~IANHAYrAN
~Od~
M
~N~x ~ ~
My'~r~~
. s~RroN
t-~~µIHOrON
s3
RITCFIIE
~a
.
~ -,
Illinois Department of Transportation
2300 South Dirksen Parkway/ Springfield, Illinois/627fi4
April 14, 1994
SUBJECT: PRELIMINARY ENGINEERING
Joint Village-State Agreement
F'A Route 349
State Section 14L
Village of Plainfield
Job No. C-91-569-93
Will County
Ms. Susan Janik
Village Clerk
1400 No. Division Street
Plainfield, TL 60544
Dear Ms. Janik:
The Joint Agreement providing for the improvement of this section
has been executed by this department.
I am sending you an original counterpart of the executed Agreement.
Very ru y yours,
Paul J. ternitzk
Chief of Preliminary Engineering
.John E. .Peterson
PRESIDENT
TRUSTEES
Jeffrey Dement
VILLAGE GF PLAINFIELD Jack Heimerdinger
Lawrence Kelly
WILL COUNTY'S OLDEST COMMUNITY Michael Lambert
Joseph Ray
Richard Rock
T0:
FROM;
DATE:
RE:
Susan Janik
JOHN E. PETERSON, VILLAGE PRESIDENT VILLAGE CLERK
BOARD OF TRUSTEES
DAVID P. VAN VOOREN, VILLAGE ADMINISTRATOR ~~-
MARCH 3, 1994
JOINT AGREEMENT IDOT - NAPERVILLE/PLAINFIELD ROAD
BACKGROUND:
At the February 21, 1994 regular meeting of the President and Board of
Trustees, the Board received a copy of the prapased Joint Agreement between IDOT
and the Village of Plainfield. The purpose of the agreement is as follows:
11 State of Illinois will provide up to 5250,000 for construction and
engineering of the ornamental lighting plan for Lockport Street in
Downtown Plainfield.
2) State of Illinois will provide all the necessary funding to resurface
Naperville/Plainfield Road from II. Rt. 59 to 127th Street.
31 Village will accept a jurisdictional transfer of maintenance of
Naperville/Plainfield Road.
4) Village will accept all costs associated in maintaining, including energy
of the ornamental street lighting.
At the request of the Board, I did discuss this agreement with both Mr. Ed Zak
and Mr. John Romamo of IDOT. The purpose of this discussion was to verify the date
March 9, 1994 for ratification, as well as some operational questions. As to the date,
the Village has been granted an extension to March 24, 1994. Regarding my
operational questions, I asked and received the following:
1) Will Village have ability to set a weight limit on Naperville/ Plainfield
Road? Both IDOT representatives stated Village will have control over
weight limit restrictions on road.
1400 NORTH DIVISION STREET •PLAINFIELD, ILLINOIS 60544 • (815) 436-7093 • Fax (815) 436-1950
RE: JOINT AGREEMENT IDOT- NAPERVILLE/PLAINFIELD RD.
MARCH 3, 1994
PAGE TWO
2) Will Village have ability to set speed limit on Naperville/Plainfield Road?
Both IDOT representatives stated Village will have ability to control
speed limit.
31 Could Village close the intersection of Naperville/Plainfield Road at Route
597 Both representatives said that as long as proper safety controls
(curbs or barricades) and IDOT's permits were obtained the intersection
could be closed and would be potentially supported by IDOT.
Finally, I have asked Mr. Romamo, as well as Mr. Steve Rosato, Perm9t Section,
if IDOT could complete the restoration of the drainage ditch adjacent to Lenwood
Estates. Both indicated this could be included in the resurfacing project and see no
problem with request.
In conclusion, for the past three years, the Village has debated how to fund the
ornamental lighting project of Lockport Street. By this agreement, we address the
funding for this project. There is however, a cost to be borne by the Village, that
being long term maintenance of Naperville/Plainfield Road. A decision will need to be
made shortly. I am willing to assist in any further discussion you may have, but the
Board must come to a conclusion on the agreement.
Illinois Department of Transportation
Division of Highways/District 1
201 West Center Court/Schaumburg, Illinois/80196-1096
C E R T I F I E D M A I L
BUREAU OF DESIGN
i age o a~nfield/State of Illinois
US Route 30 Improvement
FAP Route 349
State Secti on: 14 L
Wi 11 County
February 9, 1994
Mr. John E. Peterson
President
Village of Plainfield
1400 North Division Street
Plainfield, IL 60544
Dear Mr. Peterson:
Enclosed are two (2) copies of the Joint Agreement for the subject
improvement. Please have the Agreement approved and executed,
complete with attached plan approval, and return both copies to this
office for further processing,
Please be advised that in order for the STATE's project to meet its
scheduled letting, the executed Agreement must be received by this
office prior to March 9, 1994. Thank you for your cooperation in
the processing of this document.
Should you have any questions regarding the above, please feel free
to contact Mr. John M. Romano at (708) 7054238.
Very truly yours,
Duane P. Carl son, P.E.
District Engineer
~--`-°~_
Thomas M. Holtz, P.E. ~
Project Support Engineer
TMH:JMR:jrb
Enclosures
3078r
. John E. Peterson
PRESIDENT
TRUSTEES
VILLAGE OF PLAINFIELD
WILL COUNTY'S OLDEST COMMUNITY
March 22, 1994
Illinois Department of Transportation
Division of Highways/District 1
201 West Center Court
Schaumburg, xL 60196-1096
Attention: Mr. Thomas M. Holtz, P.E.
Project Support Engineer.
Re: Village of Plainfield/State of Illinois
US Raute 30 improvement
FAP Route 34.9
State Section: 14L
Wi11 County
Dear Mr. Holtz:
Jeffrey Dement
Jack Heimerdinger
Lawrence Kelly
Michael Lambert
Jpseph Ray
Richard Rock
Susan Janik
VILLAGE GLERK
Enclosed please find two (2) copies of the Joint Agreement far the
subject improvements. Pursuant to instructions, also attached is
Addendum #2, Ordinance No. 155.2 along with my certification.
If you need any additional information, please feel free to contact
me.
Sincerely yours,
I
Susan Janik,
Va,llage Clerk
sj
140D NORTM DIVISION STREET • PLAINFIELD, ILLINOIS 60544 • (815) 436-7093 • Fax (815) 436-1950
PLAN APPROVAL
WHEREAS, in order to facilitate the improvement of Naperville Road, known
as State Section: 36RS-l, the Village of Plainfield hereby approves the plans
and specifications for the proposed construction.
APPR~ED Ma rr_h 21 ,_,,,,,~, 19~[~
Illinois Department of Transportation
Division of Highways/District 1
201 West Center Court/Schaumburg, Illinois/60196-1096
January 23, 1995
Notification: Date of Jurisdictional Transfer
State-Village of Plainfield Agreement
Section: 36RS-1
Wi11 County
FAU Route 324
Contract # 82363
Mr. Jahn E. Peterson, President
Village of Plainfield
1400 North Division Street
Plainfield, Illinois 60544
Re: Jurisdictional Transfer' - Naperville-Plainfield Road
from the east edge of pavement o~ Illinois Route 59
northeasterly 2.88 miles to 127th Street in its
entirety.
Dear Mr. Peterson:
In accordance with the terms of the attached agreement,
executed on April 13, 7,994, the transfer of highway
jurisdiction from the State of Illinois to the Village of
Plainfield is confirmed to have occurred on December 27_,
1994. A map is attached showing the location for the
above referenced highway.
Very truly yours,
~,.r /~
Duane P. Carlson, P.E.
District Engineer
cc: Clara Hartley Woodard, County Clerk/will County
Harry Countryman, Village Engineer
Vera Krnac, Village Clerk
Roy S. Cousins - Will County Superintendent
~, ., a
VILLAGE OF PLAINFIELD
WILL COUNN'S OLDEST COMMUNITY
April 12, 1994
Mr. Ray Ritchie
IDOT Maintenance, .District #1
201 West Center Court
Schaumburg, IL 60196-1096
Re: Naperville/Plainfield Road Resurfacing
Dear Mr. Ritchie:
John E. Peterson
PRES16EN7
TRUSTEES
Jeffrey Dement
Jack Heimerdinger
Lawrence Kelly
Michael Lambert
Joseph Ray
Richard Rock
Susan Janik
VILLAGE CLEFIK
I am in receipt of the revised plans as forwarded to me on March 28, 1994 for
the above ~ referenced project. Said plans reflect the Village's original concern as
outlined in my letter of March 8, 1994 to Mr. Steve Rosato, IDOT Permits. since that
letter, however, ane additional concern has risen regarding an existing permit project
for the Lakelands entrance on Naperville/Plainfield Road. In our conversation regarding
this matter, we suggest the following:
1) Lakeland's will complete all necessary landscaping as outlined in their
permit.
2) Lakeland's will overlay the entire permit area with an 1 1 /2 inches of
binder course asphalt.
3} IDOT - in the Naperville/Plainfield project will delete all grinding (surface
removal) within the Lakeland's Permit limits.
4) IDOT - in the Naperville/Plainfield project will overlay the entire
Lakeland's Permit limits with 1 1 /2 inch of surface asphalt.
5) IDOT - in the Naperville/Plainfield project will install all necessary
pavement markings including those within the Lakeland's Permit limits.
6) All other improvements as stipulated in the plans and correspondence
dated March 8, 1994 for the Naperville/Plainfield Road Project will be
completed.
1400 NORTH DIVISION STREET •PLAINFIELD, ILLINOIS 60544 • (815) 436-7093 • Fax (815) 436-1950
RAY RITCHIE/IDOT
NAPERVILLE/PLAINFIELD RD. RESURFACING
APRIL 12, 1994
PAGE TWO
With the above comments as part of the project, I have executed the plan
approval sheet of the March 21, 1994 agreement. Should you have any additional
questions, please do not hesitate to contact me.
Sincerely,
`~`~ I , /
David P. Van' Vooren,
Village Administrator
DPV/smj
cc: Village Board
_._...~--.----_-~ . Y =- - -
b Lam. :-.-
1
' :.~
V
i
~ _ _. -
PROJECT IMPROVEMENT: ~ .w__ .
- _._~_
_._ - ,
Route: FAU 324 ~~ ~-,
~_ ,-
Section: 36RS-1 -. ~' ___.
County: Will .. ....____' ..__... _....
District: One ~} ...___ ___~.._, ___.. .
Project No.. ----- ;
Job No.. _ _-_~. , ...~_.." .__...
Contract No.: 82363 ~ _ _ ___ _ _ -.
Contractor: P.T. Ferro Construction -"""~~-_____ _. ,
Location: Naperville-Plainfield Road, Illinois Route 5g to ~_..._.__.
Chapins Road, Plainfield ' ~ -~-~ - _..._~.___._..
On November 30, 1994, the last field inspection for the
above-referenced project improvement was held and the project
is approved:
~ s r~ct ng7 Weer a e
Distribution:
Orig.: Bureau of Maintenance