HomeMy Public PortalAbout06-0398 RANDALL DAVISDATE ISSUED: 07 -14 -2006
WORK DESCRIPTION:
WORK LOCATION:
I\ 1) Am*&
CITY, ST, ZIP
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUAREFOOTAGE
OCCUPANCY TYPE
TOTAL FEE'S CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
DEMOLITION
612 BUTLER
RANDALL DAVIS
P O BOX 30158
SAVANNAH GA 31410
ALVIN L DAVIS INC
PO BOX 30159
SAVANNAH GA 31410
P
$ 200.00
$18,000.00
PERMIT #: 060398
TOTAL BALANCE DUE: $ 200.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, tire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: CD. QLL.
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 7864573 - FAX (912) 7865737
www.eityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
0(0-(::)39S) gy
Location: G 1 a R c)? is (L A %tc
f►/_\�
A T)r1R FQ C
PIN # 11- S -c3 -
rPUT VDiI XTr.
Owner
To, 1-39$46 7C PV j5
`Po o 1Sg
11V1 \li
35N
❑
Commercial
SAVAN�JAV A 3iyio
e- Qoo
Architect
or Engineer
Building
L�r+v's
` 3o15�
3
Contractor
IILV'"
SAV 3 I�{In
y4ao
(Check all that apply)
❑ New Construction
❑ Duplex
❑ Residential
❑ Footprint Changes
❑ Other
❑
Renovation
❑
Single Family
❑
Commercial
❑
Repairs
Estimated cost of Construction: $
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
❑
Minor Addition
❑
Substantial Addition
❑
Multi - Family
NDemolition
(6) Other (please specify)
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area Living space (total sq. ft.)
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert?
Setbacks: Front Rear
# Bathrooms
With Swale?
Sides (L) _ (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by at by means of
I understand that I must comply with zoning, flood damage control, building fire shore
protections and wetlands ordinances FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: % -/ v - p(, Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance? _
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Si a
Zoning Administrator
Code Enforcement Offic
Water /Sewer
Storm /Drainage
Inspections
City Manager
NFIP Flood Zone
Existing
Date
z - / -O
FEES
Permit 2 0 0
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL o D.
07/13/2006 12:53
July 13, 2006
9127866538
TYBEE ISL HIST SOC
TYBEE ISLAND HISTORIC REVIEW COMMISSION
Dianne Otto
Administrative Assistant
Building and Zoning
P.O. Box 2749
Tybee Island, Georgia 31328
Dear Dianne,
PAGE 01
I have made a site visit to 612 Butler Avenue and found that the house has no
architectural nor historic significance and would not be cost effective to move. Please feel
free to proceed with the Demo Permit.
Sincerely,
i '
Cullen Chambers
CULLEN CHAMBERS CHAIRMAN: P.O. BOX 366 TYBEE ISLAND GEORGIA
31328
JUL -13 -2006 13 :06 9127866536 96;
Date:
City of Tybee Island
BUILDING AND ZONING
P.O. Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749
(912) 7864573 — FAX (912) 786 -9539
www.cityoftybee.org
FAX TRANSMITTAL SHEET
Dri - IZ -O(4
Number of Pages Including Cover Sheet: 1
To:
Cullen Chambers
Company Name: Tybee Island Historic Review Commission
Fax Number: 786 -6538
From: Dianne K. Otto
Title: Administrative Assistant
Phone Number: 786 -4573 extension 114
Fax Number: 786 -9539
NOTICE OF APPLICATION FOR DEMOLITION
Date of Application
Name of Applicant an A a -Dow" S
Phone Number 2S4-4900
Location of Structure `p 1 Z �B u � (er Ayej
IM
Permit number:
t be visible from s
at all times!
Address: 6 /02 0&- A LO Pe z4oe,
Job Name:
I)a ✓
Type of Work:
Issued Date:
Rough Ins
Footings
Under slab
Slab
Nail Pattern
! Framing
Electrical
Plumbing
HVAC
Insulation
/ON
Date
Water meter issued
Finals
Electrical
Plumbing
HVAC
House
FEMA
to
Certificate of Occupancy
i