HomeMy Public PortalAboutChange Order No. 9 to Contract No. 62-2020 - Butler Fairman & Seufert - Professional Services - Whitewater Gorge Connector Trail - INDOT - R-41306 Contract No:R-41306 Change Order No.: 009 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R-41306 Letting Date:11/10/2020 District:GREENFIELD DISTRICT AE:Prather, Michael PE/S:Whitesel, Chad Status:Draft Change Order Information Change Order No.: 009 EWA: N or Force Acct: N Date Generated: 02/07/2022 Date Approved: 00/00/0000 Reason Code: CHANGED COND, Materials Related Description: Time adjustment for Specialty Item, Cable Rail, Delay Original Contract Amount $ 1,388,682.00 Current Change Order Amount $ 0.00 Percent: 0.000 % Total Previous Approved Changes $ 119,067.14 Percent: 8.574 % Total Change To-Date $ 119,067.14 Percent: 8.574 % Modified Contract Amount $ 1,507,749.14 Time Extension Information Date Initiated 00/00/0000 Date Completed 00/00/0000 Original Contract Time SS Completion Date 09/15/2021 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: The contractor contacted us in September and expressed concerns on the delivery date for the specialty item, Cable Railing. I spoke with Michael Prather the AE about htis and it was decided that a time adjustment would be made when and if the delay became apparent. This allowed for an acurate number of 38 days to be added by one change order. Current Time Extension SS Days 0 SP Days 0 SP Days Value$ 0.00 Previous Time Approved SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value$ Revised Contract Time SS Completion Date 00/00/0000 or SS Calendar Work Days 0 SS Date 00/00/0000 or SP Days 0 Contract No:R-4-1306 Change Order No.: 009 INDIANA Department of Transportation Page: 2 Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority AE: DCE: SCE: * DDCM: ($ perChangeOrder) (- LE $250K-) (-LE$ 750K- ) (-- LE $ 2M -- ) ( -- GT$ 2M -- ) (Days per Contract) ( 50 SS days ) ( 100 SS days ) (200 SS Days ) ( GT 200 SS days) Verbal Approval Required? Y/N If Y, by Date Issued Total Change To-Date>5%? Y/N If Y , Copy to Program Budget Manager Scope/Design Recommendation Y/N If Y, Referred to Project Manager(PM) Required? Date to PM Date Returned Approval Authority Concurs with PM? Y/N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y/N If Y, Date to LPA Date Returned FHWA Signatures Required? Y/N If Y, Date to FHWA Date Returned * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract.NE::R-41306 INDIANA bate:02107/2022 Change Order N.o:009 :Department of-Transportation Page: 3 Contract: .R-41:306 Project: State:1•702760A0LC3 Change OrderNbr. 009 Change Order Description_ Time adjustment for Specialty Item,.Gable Rail, Delay Reason Code: CHANGED COND;Materials Related CLN P.CN PLN_ Item Code Unit .Unit Piice• CO _+� Comment _ ^Amounf Change TdtalVaiue far Change Order 009=$0.Q0 Contract Completion Date Time.Adjustment: • Original Completion.dt: Q9/1$/2021. Adl,compl di 11/10/2021 Atli NO..of Days 38 Explanation;The contractor contacted us in.Septernber and expressed concerns dn.the;delikery;date for the specialty item;Cable Railing.i .spoke:with Michael Prather the AE about htis and it was decidedrthata time adjustment would be made when and'if the delay became-apparent: This allowed for an acurate number of 38•days to.be added byone'change order. Whereas,the.Standard Specifieations-forthis contract provides for such Work to be.perfomied,:the fell-Owing change-is recommended. General:orStandardChange Order Explanation - The contractorcontacted:us in September and expressed concems•on tha delikety date forthe specialty items,Cable.Railing..i spoke with Michael.Prather.the AEatiout htis and itwas•decided.that a'time•adiustineritwould be.made when and'if the delay became apparent.This allowed for an acurate nurtiber•of 38.days to be added by:one change order. • Change Order Explanation for Specific Line item • fiR;Mitf�*«ii«'i«Lii«i3tkki�#iiitkiii«4iiii.Y*teYY««i;iN«ifiw�ii#«1ii*k«tiiiiiliifrf«H ..;..11,41ri#«iii«410««fY,iiH«i;,,hy«fii It is the intent of the parties that this.change order is full:and complete compensation for the•wottdescribe above. Notification and consent tb•this change order is hereby acknowledged. • United Construction Services, LLC Contractor. Signed By; Date: 2/9/2022 • • ill.�....tiiiiirt«ii#«i««Yiiii«««««hill««i«iileiliNai«!Yl«iNiiiYi�a,Fi«iiiK#«ley«I,tiiii}it«illiif3««iyyyyr«««iyy!#i4i#3#«iy, • NOTE.:Otherrequired State•and.FHWA signatur.'es will be obtained electronicallythroUgh the SiteManager system. • Contract No:R -41306 INDIANA Date:02/07/2022 Change Order No:009 Department of Transportation Page: 4 APPROVED FOR LOCAL PUBLIC AGENCY tta‘.____. ryieRwbeA- (SIGNATUR ) (TITLE) (DATE) Z'/7-22zZ (SIGNATURE) (TITLE) (DATE) SUBMITTED FOR CONSIDERATION PE/S APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION uv. Approval Level Name of Approver Date Status y 219/22,2:27 PM CITY OF RICHMOND Mail-Change order#9 &mail • Greg Stiens<gstiens@richmondindiana.gov> Change order#9 1 message K Chad.Whitesel <kwhitesel@bfsengr.com> Wed, Feb 9, 2022 at 1:34 PM To: Greg Stiens <gstiens@richmondindiana.gov> Greg, Please find attached change order#9 for the Richmond Gorge Trail Contract. The change order is to address the time delay on the specialty item cable railing. K Chad.Whitesel Construction Supervisor Butler,Fairman&Seufert,Inc. 8450 Westfield Blvd.,Suite 300 I Indianapolis,IN 46240-8302 p 317-713-4615 I f 317-713-4616 I c 317-797-9126 kwhitesel@bfsengr.com I www.BFSEngr.com SBBIBIBBEST Pl PLPLPr L PLPLACES INUNUNUN NONDJANA I . 1,7 1.) r 1.1 CONFIDENTIALITY NOTICE:This Email and any attachments are confidential and may be protected by legal privilege.If you are not the intended recipient, be aware that any dia los re,copying,distribution,or use of this Email or any attachment is prohibited.If you have received this Email in error,please notify us immediately by retuming it to the sender and delete this copy from your system.Thankyou.Butler,Fairman&Seufert,Inc. ............................... .... • Disclaimer This email has been scanned for viruses and malware,and may have been automatically archived by Mimecast Ltd. tip CO#9-Signed-United.pdf 499K .. __ . ... ..._.. . _ ... - . _.__,_ _,,.,_-___.,_"--.,-_-_J en/.. n A AnnAn4A c-1.1 nr_,er_-/en,o..:... AAA