Loading...
HomeMy Public PortalAbout06-0415 KEITH GAY_1OF2.pdfInspection Report City of Tybee Island 403 butler Avenue P.O. Box 2749 Tybee Island, EGA 31328 Phone: (912) 786 -4573 extension 114 Fax: (912) 786 -9539 Permit No. Owner's Name - Gen. Contractor Contact Number Date Requested l 0 ' 0 (O Date Needed Subcontractor Location I D:3- 1) f S� v :5 -�. Date of Inspection -�- O 4� Time Inspector Type of Inspection ow h . 0 00 ZZ Inspection Report � k P P ,S City of Tybee Island 403 Butler Avenue P.O. Box 2 749 Tybee Island, GA 31328 Phone: 785 -4573 extensions 104, 107, or 114 Fax_ 755 -9539 Permit No. D (n - Q 41.� Gate Requested: n7 7 — L/a- ly Owner's Name; a..v Date Needed: — o Gen. Contractor- Contact Number: Location: 1 (-) 3 -T1 f" r s Date of Inspection: -=F 7/.2 Comments: Inspector: _ Subcontractor. S r�— Type of Inspection: -co 'D • n Chi Time of Inspection- /11 nspection- E- DATE ISSUED: 07 -25 -2006 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION � J CITY OF TYBEE ISLAND BUILDING PERMIT FOOTING & FOUNDATION ONLY 703 FIRST ST D KEITH GAY PO BOX 2841 TYBEE ISLAND GA 313282841 VIPER CONTRACTING LLC PO BOX 1968 TYBEE ISLAND GA 31328 1000 P $ 79.00 $8,000.00 PERMIT #: 060415 TOTAL BALANCE DUE: $ 79.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 7805737 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT C7ia 041 Location: 'i a?��1•) c-- (mac r %d75 PIN # r I __." M4N Al ADDRF.RR TFT PPI40MIP Owner gti r'+ t Renovation ❑ Architect ❑ Duplex ❑ Single Family or Engineer Substantial Addition ❑ Residential ❑ Building Contractor �r �i1P+.1�: t°"�L`lsX ��X�..l ❑ Footprint Changes (Check all that apply) ❑ New Construction ❑ Renovation ❑ Minor Addition ❑ Duplex ❑ Single Family ❑ Substantial Addition ❑ Residential ❑ Commercial ❑ Multi - Family ❑ Footprint Changes ❑ Repairs ❑ Demolition Other �f t. AJ4r-_+;r_ Estimated cost of Construction: $ 0, Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: 4f � Remarks: (Enter appropriate number) (4) Masonry (5) Steel & Masonry (6) Other (please specify) 0 1r� n AJq Q- �und -& o-AJ oaxf ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units ' Lot Area # Off - street parking spaces Trees located & listed on site plan Access: Driveway Setbacks: Front # Bedrooms I # Bathrooms Living space (total sq. ft.) 1 o,, O With culvert? Rear With swale? Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through°N On -site waste and debris containers will be provided Construction debris will be disposed by t3j _rte- at by means of I understand that I must comply with zoning, flood damage control, building fire shore protections and wetlands ordinances FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as-built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construcTt'n. - -- Date: .e Signature of Applicant: _ _,� Note: A permit normally takes 7 to 10 days to process. ------------------------------------------------------- The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage _ Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager NFIP Flood Zone Existing Signature Date �-� 4 -O 6 0� FEES Permit < Inspections f , 00 Water Tap Sewer Stub Aid to Const. TOTAL 7 9.O° REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5 -4, Code of Ordinances. Section 5 -4 -9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actually meet the City Ordinance requirements. Applicant name: �< Project I.D.:� Attachments approved by: Date: