RE: Letter of Permission fbr the maintenance of an existing riprap ba stabi n
project, 81.5 Miller Avenue, Tybee island, Chatham County, Georgia
i
Dear Ms. Brady:
This Letter of Permission (LOP) acknowledges your request of September 6 005 to tn'
maintenance on an existing; riprap bank stabilization at your property at 815 il.ler A
Tybee Island, Georgia. Department staff conducted on -site inspections in J ry and. 215
Riprap currently protects the non - vegetated bank along the end of your calls ay.
Additional riprap may be added only within the current footprint of your bat stabilizat
project. This letter does not authorize any expansion of the footprint of the e ting ri ank
stabilization_ No new riprap should be placed over marsh vegetation. Also, s LOP
meant to exempt the above referenced activity from future environmental la
This approval is based upon the description that you provided. This LOP saws as aut fatiott
to utilize state owned tidal water bottoms for your project as per the dimensito",lafniguiraa�t co ration
depicted in your request. Any change in the use, location, dimensions, or of the
approved project, without prior notification and approval from this office, could res in the k
revocation of this LOP and in required removal of the materials and related structures.
This project must be constructed precisely to the approved dimensions, eonli ation, the
exact location_ This authorization does not relieve you from obtaining arty of requir feral
(Amay Corps of Pngineers), state, or local permits. No equipment, materials debris e
placed, disposed of, or stored in jurisdictional areas_ Any incidental impacts , ociafied' thus
proiect must be rectified by ful l.y restoring areas to their pre - operational topo hic a
ve,gclative states_ Please ensure that fury activity that may take place within th latish ction
be coordinated through this office. Tidal water bottoms and marshlands of coal Georg re
public trust lands controlled by the State, except for such lands where a validated Crown C ;nt or `
State Grant exists, The construction of the project proposed for this LOP must be eomplet i
within 3 years from the date of issuance of the license, Otherwise, action will be initiated,
revoke the LOP. If you have any questions you may contact file at (912) 258 - 4198. !�
Sinecrcly,
Christina
Hodge
Permit Coordinator
cc, Dee Anderson, City ofTybee Island
i,
Georgia Department of .Natural Resources Coastal Resources Division
One Conservation Way + Brunswick, Georgia 31520
TEL: (912) 264 -7218 • FAX: (9-12) 262 -3143 • WEB: http : / /crd-d.xir.s(a .ga.us
1
Q Iw
Inspection Report
City of Tybee Island
403 Butler Avenue
P.O. Box 2749
Tybee Island, GA 31328
Phone: (912) 786-4573 extension 114
Fax: ( 312) 786 -9539
Permit No, (0 - I-) In
Owner's Name
Caen. Contractor
Contact Number ✓ �� r� r-�
Location 13 1 S ki I I .ter
Date Requested
Date Needed
Subcontractor
Lo 31- L4 y �o L)
V .
Gate of Inspection _ Time Inspector
Type of Inspection _ r S P r C� 1rl 0 4
Ar e
:Ajcal-
rKA QA8
�D
Inspection Report
City of Tybee Island
483 Butler Avenue
P.U. Box 2749
Tybee Island, GA 31328
Rhone: (912) 786 -4573 extension 114
Fax: ('912) 786 -9539
Permit No.
Owner`s Mame
Gen. Contractor
Contact Number
Location
rcer�
Date Requested
Date Needed
iJ - C) �, -��
Subcontractor
4 Lf to,D
V1 0,) "-e)
"
d IV
Date. of Inspection 1 66 _ Time Inspector
Type of Inspection o
A,
40+
��� -�--
cc Ck "Y
STATE OF GEORGIA
COUNTY OF CHATHAM
AFFIDAVIT
PERSONALLY appeared before the undersigned officer duly authorized to administer
oaths, DEBBIE BRADY ROBINSON, who after being duly sworn, deposes and states that the
following information is true and correct to the best of her knowledge and belief:
1.
I am a resident of Chatham County, Georgia, over 18 years of age and am competent to
execute this affidavit in all respects and have personal knowledge of the facts.
2.
In connection with the dock house at 815 Miller Avenue, neither I nor any member of my
family, nor any contractor retained by us, intended to cause the dock house to collapse or to be
demolished but, rather, strong winds cause the structure to collapse into the marsh during
renovations.
Further Affiant saith not.
This '22day of September, 2006.
Sworn to and subscribed b fore me
this day cif , 2006.
0. BARGERON
pAu maftm county, G-R
MW Contndsslon Exphs July 7, 2007
STATE OF GEORGIA )
COUNTY OF CHATHAM )
AFFIDAVIT
PERSONALLY appeared before the undersigned officer duly authorized to administer
oaths, CHRIS BRADY, who after being duly sworn, deposes and states that the following
information is true and correct to the best of his knowledge and belief:
1.
I am a resident of Chatham County, Georgia, over 18 years of age and am competent to
execute this affidavit in all respects and have personal knowledge of the facts.
2.
In connection with the dock house at 815 Miller Avenue, neither I nor any member of my
family, nor any contractor retained by us, intended to cause the dock house to collapse or to be
demolished but, rather, strong winds cause the structure to collapse into the marsh during
renovations.
Further Affiant saith not.
This ,;U-day of September, 2006.
CHRIS BRADY
Swc,rn to and subscribed before me
this day of - 92006.
V
o+ y Public
m8ftGA
Fatplrm July 7, 2007
April 4, 2006
Mr. Chuck Bergeron
City of Tybee Island
P.O. Box 2749
Tybee Island, GA 31328
GEO I
Coastal Resources Division
T2, '9.58 glgg (�e// ,
RE: Brady dock house maintenance, 815 Miller Ave, Tybee Island, Georgia
Dear Mr. Bergeron:
C) ac I
lg
CRD is aware of the plan to repair and maintain the upland dock house on the Brady
property at 815 Miller Avenue, Tybee Island, Georgia. The dock house is currently
located outside of jurisdictional marshlands on the end of an upland causeway. The City
of Tybee Island and the Environmental Protection Division of DNR may have concerns
with activities within 25 ft of the marsh jurisdiction line.
Please contact me if I can be of further assistance.
Sincerely,
Christina Hodge
Permit Coordinator
cc: Chris Brady
Georgia Department of Natural Resources • Coastal Resources Division
6555 Abercorn Street, Suite 110 B • Savannah, GA 31405
TEL: (912) 691 -6810 • FAX: (912) 353 -3234
TE
Thomas Engineering
218 Green Island Road
Savannah, Georgia 31411
September 5, 2006
Ms. Debbie Brady
815 Miller Avenue
Tybee Island, Georgia 31328
RE: Reported Damages to the Brady Residence Dock House
Location: 815 Miller Avenue
Tybee Island, Georgia
Job No.: 100 - 061008 -00
Dear Ms. Brady:
This report provides a summary of the findings and observations of the above - described loss for
the referenced residential dock house. A visual observation of the property was performed on
August 30, 2006, by Thomas Engineering ( "TE ") in the presence of Mr. Darren Michaels of DC
Construction, LLC. The purpose of the investigation was to determine the probable cause of the
reported damage to the dock house at the above - referenced address.
Limitations of Study
The observations and conclusions contained herein are based upon information provided to us at
the time of this report. The inspection performed on the above date was a limited visual
evaluation. Areas hidden from view such as underwater or otherwise not accessible were not
inspected. No structural analysis has been performed on any portion of this structure to
determine the load carrying capacity of the structural systems or elements. Should additional
information become available, we reserve the right to revise our report.
Description of the Structure
The structure can be described as a private boat dock house on Horse Pan Creek on Tybee Island,
Georgia. According to Mr. Michaels, the pier is approximately 50 years old. For the purposes of
this report, the dock house was referenced to face west.
Access to the dock house is over an earthen causeway which extends over the marsh for
approximately 300 feet. At the end of the causeway is the dock house which was constructed of
wood framing on a concrete slab -on -grade flooring with a metal roof system. The structure had
a metal siding exterior finish and was unfinished on the interior without insulation exposing the
wood framing.
Tel. No. 912 - 598 -5331; Fax No. 912 - 5984301
Structural Damage Report
Brady Residence
Project No.: 100 -061008 -00
September 5, 2006
Page 2 of 9
Owner's Comments and Areas of Concern
As we understood from Mr. Michaels, his company had been contracted by the owners to repair
and reinforce the existing boat house. Plans were to sister new wall studs to existing studs on
each wall as needed. A new ceil beam would be anchored to the existing concrete slab along the
inside of each wall where the sisters studs would be attached and extend to the roof supports.
Mr. Michaels stated that as his crew started work on August 24, 2006 they had just removed the
metal exterior finish on the south side of the structure when a strong gust of wind caught the
structure from underneath the roof and caused the entire structure to collapse.
Weather Background
The National Oceanic & Atmospheric Administration (NOAA) has monitoring stations which
continuously monitor weather conditions through out the nation. Archived information is
available through their "Quality Controlled Local Climatological Data" web site. The nearest
available weather station was at Hunter Army Airfield, identified as station 13824,
approximately 15 miles inland from the boat house structure. The NOAA automated data station
recorded a maximum sustained wind of 13 miles per hour and a maximum wind gust of 23 miles
per hour on August 24, 2006.
Observations
At the time of the site visit, during our visual, non - destructive observations of the referenced
structure, the following was evidenced: The observed conditions are documented in the attached
photographs;
• The structure had apparently shifted to the north into the adjacent marsh area. The debris
had been removed from the marsh and deposited on and around the concrete slab area;
• The type of construction was typical of the area and structure in that it was wood frames
with 2 by 4 studs and stick rafters with metal screen exterior siding and metal roof,
• The studs had been secured to the slab by a wood ceil beam anchored directly into the
concrete;
• Approximately 2/3 of the slab area had been raised approximately 4 inches by pouring an
additional concrete slab directly over the existing slab;
• The wood studs had pulled away from the underlying ceil beam;
Structural Damage Report
Brady Residence
Project No.: 100 -061008 -00
September 5, 2006
Page 3of9
Comments & Recommendations
Based on the observations at the time of the site visit, the following are comments and
recommendations offered by the engineer. These comments and/or recommendations are
conceptual in nature and are based on a reasonable degree of professional certainty. This report
does not address any subsurface, mechanical, electrical, or plumbing issues.
• It was the opinion of the engineer that:
• The referenced structure did represent an immediate dangerous or unsafe structural
condition.
• The floor had been raised approximately 4 inches. The timing of this alteration could
not be determined but had occurred some time in the past; By placing the new
concrete directly over the wood ceil beams and the lower portions of the wall studs,
the stress distribution from the live loads, ie wind, were changed. The loads could no
longer be adequately transferred to the ceil beam but transferred instead to the added
concrete toping. Over time the cyclic loading condition of the wind overstressed the
wall studs at their base As the weakened structure teetered on collapsed the
combination of removing the south exterior wall finish and the sudden gust of wind
caused the support studs to exceed their ultimate stress capacity. Once one stud gave
way the stresses were then redistributed to the other members overstressing them in
turn leading to the ultimate total collapse of the structure.
• It is the recommendation of this report that:
• The structure should be completely removed down to the concrete slab and rebuilt;
• All work should performed by a licensed contractor familiar with residential pier and
dock construction
• The engineer should be notified upon discovery of any additional structural damage.
• Once the items above have been completed, any remaining cosmetic /aesthetic issues
should be addressed.
Structural Damage Report
Brady Residence
Project No.: 100 -061008 -00
September 5, 2006
Page 4 of 9
Please contact me if you have any questions or need additional information. Please note that
Thomas Engineering reserves the right to revise these comments and /or recommendations as
conditions change or additional information becomes available.
Sincerely,
Thomas Engineering
Michael I. Thomas, P.E.
Principal Engineer
Attachments: Photographs
CC: Mr. Darren Michaels
DC Construction, LLC.
Structural Damage Report
Brady Residence
Project No.: 100 -061008 -00
September 5, 2006
Page 5 of 9
,r r
k`
Photograph 1— View of causeway leading to boat house.
Photograph 2 — View of boat house area
Structural Damage Report
Brady Residence
Project No.: 100 -061008 -00
September 5, 2006
Page 6 of 9
Photograph 3 — View of boat house area.
IPL�_
-
Photograph 4 — View of concrete slab of boat house. Note the raised section of concrete
flooring.
Structural Damage Report
Brady Residence
Project No.: 100 - 061008 -00
September 5, 2006
Page 7 of 9
Photograph 5 — View of concrete slab of boat house. Note the raised section of concrete
flooring.
Photograph 6 — View of concrete slab of boat house. Note the raised section of concrete
flooring.
t
Photograph 6 — View of concrete slab of boat house. Note the raised section of concrete
flooring.
Structural Damage Report
Brady Residence
Project No.: 100 -061008 -00
September 5, 2006
Page 8 of 9
� - .- - � .ice • y�
4
1
Photograph 7— View of debris from preexisting boat house.
Photograph 8 — View of debris from preexisting boat house.
Structural Damage R_ eport
Brady Residence
Project No.: 100 -061008 -00
September 5, 2006
Page 9 of 9
Photograph 9 — View of debris from preexisting boat house.
LEGAL N(]TICE
CITY OF TYBEE ISLAND
PERMIT _Oho - 041
(p
WHERAS, VIOLATIONS OF THE CODE OF THE CITY OF
TYBEE ISLAND HAVE BEEN FOUND, NOTICE IS
HERESY GIVEN IN ACCORDANCE WITH THE ABOVE
CODE THAT
ALL PERSONS CEASE, DESIST FROM AND
STOP WORK
Fur-r%E'cs- No" e t..
� AT ONCE ON ANY CONSTRUCTION, ALTERATION,
pL REPAIR OR FURTHER USE OF THESE PREMISES
low KNOWN AS __.6/S 4IL/-Ley - &�e -- - - - - --
O UNTIL THE VIOLATION HAS SEEN CORRECTED AND
>% APPROVED BY THE CITY OF TYBEE ISLAND.
R ALL PERSONS ACTING CONTRARY TO THIS NOTICE
OR REMOVING OR MUTILATING IT ARE LIABLE TO
SUMMARY ARREST UNLESS SUCH ACTION IS
AUTHORIZED BY THE CITY OF TYBEE ISLAND.
DATER -�-- P 4NE-Z0�?= �.��LQj
-- ----- - - - - --
12 I'Fy l�YI e YS I+ •A- t
re,u,;, 0� f'� -M
/ "� 1 �'°`. - ,trail. --
� g� zoc),�
lel;2 �,
Aui -25 -2006 11:31 am From -CRD ECOLOf, +9122623131 T --312 P. 002/002 F -358
Apri'14, 2006
Mr. Chuck Bergeron
City of Tybee Island
P.C. Box 2749
Tybee Island, GA 31328
EAR I
Coasts►! Resources Division
RE: 3rady dock house maintenance, 815 Miller Ave, Tybee Island, Georgia
Dear Mr. Bergeron:
A N -06 06 D
MQoil
CRD is aware of the plan to repair and maintain the upland dock house can -rhe Brady
property at 815 Miller Avenue, Tybee Island, Georgia. The dock house :is currently
located outside of jurisdictional marshlands on the end of an upland causeway. The City
of Tybee Island and the Environmental Protection Division of DNR may have concerns
with activities within 25 ft of the marsh jurisdiction line.
PleasC contact me if I can be of further assistance_
Sincerely,
C�"I'l
Christina Hodge -D
Permi;- Co ordinator
cc: Chris Brady
REF: Telephone Conversation, 25 Aug 06, 11AM
Chuck: CRD stands by the comments and observations as do,.umented
by Christina Hodge in April 2004. The structure located outside the
jurisdictional marshlands of the state of Ceoriga.
Please call me at (912) 262 -3132 or via email buck Bennett @dnr.state. ga. us
if you have any questions.
n
Sinc, irelye
Bul Bennett
Compliance & Enforcement Manager
CRD
Georgia Department of Natural Resources • Coastal Resources Division
,.J 6555 Abercorn Street, Suite 110 B • Savannah, GA 31405
n+r•t /wyl�Y /n.e r��n _ ��,i iihY'1\ nrry /�1�nw
TOTAL P.02
* * * * * * * * * * * * * ** —Comm. :NAL— * * * * * * * * * * * * * * * * * ** DATE AUG- 24 -20C * ** TIME 16:55 * * * * * * **
MODE = MEMORY TRANSMISSION START = AUG -24 16:55 END = AUG -24 1G:55
FILE N0. =581
STN COMM. ONE — TOUCH/ STATION NAME /EMAIL ADDRESS /TELEPHONE NO. PAGES DURATION
NO. ABBR NO.
001 OK : 19122623131 002/002 00 :00:27
—CITY OF TYBEE ISL. —
***** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** —CITY OF TYBEE — * * * ** — 912 786 9539— * * * * * * * **
03 Yre��
Mayor Jason Buelterman x \ _ 11 / City Manager
CITY COUNCIL.-,- Rw��
Eddie Crone Clerk of Council
Mallory Pearce CITY OF TYBEE ISLAND
Shirley Sessions
Paul Wolff City Attorney
Kathryn Williams Edward M. Hughes
Wanda Doyle
FAX TRANSMITTAL SHEET
Date: 7( Z
Number Of !C Pages Including Cover Sheet: -
To: , gu e. &n 4 r. 7e7l
Company Name: / Al2
Fax Number.�gl Z, 216-� -_3 /
From:
Title:
Phone Number:
Comments: o ,�
PO Box 2744.1113 Butler Arcane, Tybee lileed, Cieorl is 31328.2749 F
yof
(912) 7164573 . FAX (912) IW5737 fduc„ f
www.cig0f4,l ee.W8 O
* * * * * * * * * * * * * ** —Comm. NAL— * * * * * ** * * **. * * * ** * DATE AUG -24 -200 * ** TIME 16:50 * * * * * * **
MODE = MEMORY TRANSMISSION START = AUG -24 16:49 END = RUG -24 16:50
FILE N0. =580
STN COMM. ONE — TOUCH/ STATION NAME /EMAIL ADDRESS /TELEPHONE No. PAGES DURATION
NO. ABBR NO.
001 OK a 19122623131 002/002 00 :00:27
—CITY OF TYBEE ISL. —
**** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** —CITY OF TYBEE — * * * ** — 912 786 9539— * * * * * * * **
�y �r
t,
Mayor Jason Buelterman City Manager
CITY COUNCIL eEOatn►
Eddie Crone Clerk of Council
Mallory Pearce CITY OF TYBEE ISLAND
Shirley Sessions
Paul Wolff City Attorney
Edward M. Hu � s
Kathryn Williams
Wanda Doyle
FAX TRANSMITTAL SHEET
Date: 14' 5 - * Y/
Number Of Pages Including Cover Sheet: �.
To: & 0- k-,l
Company Name: b IV AE!
Fax Number :(Cf ! Z) �o.�
From:
Title:
Phone Number:
Comments: � ` ✓ T Ne ✓� 7j o c)
6"� L1B
P O. Box 2744 - 403 Butler Avetuu, Tybee Island, Georgia 31328.2744
(0 12) 7"4573 - FAX (912) 78t'i-5757
www_cityoltybx.org �►
Mayor Jason Buelterman
CITY COUNCIL
Eddie Crone
Mallory Pearce
Shirley Sessions
Paul Wolff
Kathryn Williams
Wanda Doyle
Date:
CITY OF TYBEE ISLAND
FAX TRANSMITTAL SHEET
Number Of Pages Including Cover Sheet: 2—
To: gu e k &,t 4 r. 77L
Company Name: /� "V 2
Fax Number. -(q, Z) 0210 -3 /3 /
From: Oxu e- /1 5ca YS
Title:
Phone Number:
4
Comments: vedS a D k)
Du r l'
P O Box 2749.403 Butler Avenue, Tybee Island, Georgia 31328 -2749
(912) 786-4573 - FAX (912) 786.5737
www.cityoftybee.org
City Manager
Clerk of Council
City Attorney
Edward M. Hughes
chy Of
O
April 4, 2006
Mr. Chuck Bergeron
City of Tybee Island
P.O. Box 2749
Tybee Island, GA 31328
IEORZ I
Coastal Resources Division
RE: Brady dock house maintenance, 815 Miller Ave, Tybee Island, Georgia
Dear Mr. Bergeron:
olea V�D
46,
lg
CRD is aware of the plan to repair and maintain the upland dock house on the Brady
property at 815 Miller Avenue, Tybee Island, Georgia. The dock house is currently
located outside of jurisdictional marshlands on the end of an upland causeway. The City
of Tybee Island and the Environmental Protection Division of DNR may have concerns
with activities within 25 ft of the marsh jurisdiction line.
Please contact me if I can be of further assistance.
Sincerely,
Christina Hodge
Permit Coordinator
cc: Chris Brady
Georgia Department of Natural Resources • Coastal Resources Division
6555 Abercorn Street, Suite 110 B • Savannah, GA 31405
TEL: (912) 691 -6810 • FAX: (912) 353 -3234
DATE ISSUED: 07 -27 -2006
WORK DESCRIPTION:
WORK LOCATION:
OWNER NAME
ADDRESS
CITY, ST, ZIP
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEE'S CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPAUVRENOVATE ROOF & WALLS
815 MILLER AVE
. ROBINSON, DEBRA
PO BOX 1252
TYBEE ISLAND GA 313281252
D C CONSTRUCTION OF COASTAL GA
PO BOX 2996
RICHMOND HILL GA 31324
P
$ 159.00
$17,500.00
PERMIT #: 060416
TOTAL BALANCE DUE: $ 159.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: ,
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 7864573 - FAX (912) 78(x5737
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Location: _ F,/,S— ,&I" zke gr PIN #
fiNIEW11�
ArnnuFCc
TRY -P-DU IATY'
Owner
❑
New Construction
❑
Duplex
❑
i Y
❑
Architect
❑
Other
or Engineer
Building
b c.CC rs f ru =f ; , rJ
Contractor
of <O xr
%L. -ZL-d -'S�(�S
(Check all that apply)
❑
New Construction
❑
Duplex
❑
Residential
❑
Footprint Changes
❑
Other
,,k Renovation
❑ Single Family
Commercial
Repairs
Estimated cost of Construction: $
Construction Type
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
(Enter appropriate number)
(4) Masonry
(5) Steel & Masonry
❑
Minor Addition
❑
Substantial Addition
❑
Multi- Family
❑
Demolition
(6) Other (please specify)
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway
Setbacks: Front
# Bedrooms
Living space (total sq. ft.)
With culvert?
Rear
# Bathrooms
With swale?
Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by at
by means of
I understand that I must comply with zoning flood damage control building fire shore
protections and wetlands ordinances FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 7/r2 ��� �A Signature of Applic
Note: A permit normally takes 7 to 10 days to process.
-------------------------------------------------------
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site _
Water meter size
Storm drainage
Approvals: gna -e
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
Date
67-26 -n6
FEES
Permit
ns; °O
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
��b N 0 1 v e v v % . a Y e
L E G A L N O T I C E
P E R M I T
C I T Y O F T Y B E E I S L A N D
W H E R E A S , V I O L A T I O N S O F T H E C O D E O F T H E C I T Y y r
T Y B E E I S L A N D H A V E B E E N F O U N D , N O T I C E I S H E R E B Y
'