Loading...
HomeMy Public PortalAbout06-0456 KEITH GAY.pdfr' Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: (912) 786 -4573 extension 114 Fax: (917 ) 785 -9531 Permit No. 06 ! L1 5L Date Requested Owner's Name Date Needed 2 1 - 0 Gen. Contractor 2 G� ��c��ubcantracter Contact Number Location � V =--;� Tl t"i (_1 � Date of Inspection Z Q Time ��� Inspector Type of Inspection 1- oo-� M 6L--S 74 /Z �u � �n� DATE ISSUED: 08 -21 -2006 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION i CITY OF TYBEE ISLAND BUILDING PERMIT INSTALL SIGN 602 FIRST ST A -C KEITH GAY PO BOX 2841 TYBEE ISLAND GA 313282841 SIGNS FOR MINDS SAVANNAH GA 00000 P $ 50.00 $8,390.00 TOTAL BALANCE DUE: PERMIT #: 060456 $ 50.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org Location: ��e_J led - bp- '_(�c e CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT NAME ADDRESS mss LA_ c1 PPIN # Owner 313�c Architect or En ' eer Building Contractor �� ! E' % U (Check all that apply) New Construction Duplex ❑ Residential ❑ Footprint Changes ❑ Other ❑ Renovation ❑ Single Family ❑ Commercial ❑ Repairs TELEPHONE :�% -D /o6 b1/-132 / ❑ Minor Addition ❑ Substantial Addition ❑ Multi- Family ❑ Demolition Estimated cost of Construction: $__ O J 9Q, -�o Construction Type (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (pleases specify) () Wood & Masonry (5) Steel & Masonry P fy) (3) Brick Veneer - --�� Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) R # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. Chatham County st COMO Wit fi1 t 1 �ar,3ruciio�'m`� LpdB_ -ire lntetnati�on� gutlt�iri� iiion aid $t�8 0��t�► .ndMOTO R CQDE CQMPLIANCE M REVIEPJ x 9 f Every effort has been made to identify code violations, no oversight by the 79.38 in reviewer shall ba construed asrauthority to violate, cameel, alter or set aside any applicable codes or ordinanc e guarantee. review and permit should a construed as a warran Reviewed By °I N , , e Of Plaza <Ineon N <neon cc I- No" 14 a1� Oz .3 c The sign is made of aluminum with plexiglass faces. The faces are illuminated from behind with flourescent light bulbs. The changeable letter sign is also illuminated from behind. The name of plaza is made of non illuminated 1 /2" pvc letters. The letters will be screwed into the sign, 2 -3 screws per letters. There are two stripes of single stroke neon on the top and the bottom of this sign. 00 ' eo �o e ® 1 P Name Of Plaza L concrete feet 3/4" x 24" anchor bolts will be used in the concrete foot. 4 anchor bolts will be used. The steel plate is 12" x 12" x.25" The concrete is 2'x 2'x 3.75'. The steel pole is 6" square x 1/4" thick. p\j 10 muss. c °r,��e� -'` o Jar ��C�,.G ;o�a� ���1o���at��$► N r < n �eo n 90-M . FcoYlNa Mlstak is TO 6E. C*WT*%V4P A#40 \M f-(E > eq A Llcs-NSW ST�wcr�IF AL. to c, NV4R1L• for- 00MP44.v M To TrrE. uttisp L0,40 - During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by at by means of I understand that I must comply with zoning, flood damage control building fire shore protections and wetlands ordinances.,- FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 2 - / 5 -4 t1,0 Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. '147 --------------------------------------------------- The following is to be completed by City personnel: -- - - - - -- Zoning certification Approved rezoning/variance? _ Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager NFIP Flood Zone Existing Signature Date S z v - .? C. 03 -o6 -v& FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL