Loading...
HomeMy Public PortalAbout2011STATIE OF 1[DAHO DEPARTMENT OF HEALTH AND WELFARE Division of Environment 801 Reserve Street Boise, Idaho 83702 February 28, 1977 Mr. Perc H. Shelton, Chairman Payette Lakes Water and Sewer District P.O. Box R McCall, Idaho 83638 Re: Effluent Limits - Payette Lakes Water and Sewer District, C-16 0174 Dear Mr. Shelton: Enclosed is an addendum to the draft effluent limitations for the City of. McCall and the Payette Lakes Water. and Sewer District. This addendum eliminates the requirement of zero discharge during periods of low flow in the North Fork of the Payette River. The remaining effluent limits are identical to those contained in the draft wasteload allocation transmitted by our department on October 13, 1976. We are becoming quite concerned that the Payette Lakes Water and Sewer District is not making satisfactory progress toward completing the plans and specifications for both the sewage treatment facilities and the sewer system rehabilitation. We realize that there have been pro- blems relating to the municipal bonds and the EDA grant. However, the local cost for design of the sewage treatment facilities and preparation of the sewer system rehabilitation specifications should not be exces- sive. There is a possibility that other projects in the State may not be ready to use the funds which have been committed to them. If this should happen, the Payette Lakes Water and Sewer District might be in a position to receive some of the reallocated funds for construction or sewer system rehabilitation. We, therefore, urge the District to complete the plans and specifications for both the sewage treatment facilities and the sewer system rehabilitation as quickly as possible. If you have any questions, please contact me. HDS/rb cc: Si,erely, H. David Sanders, P.E. Environmental Engineer Mike Silverman Orlando Dalke J-U-B Engineers, Nampa Larry Koenig Central District Health Department EQUAL OPPORTUNITY EMPLOYER PLWSD002784