HomeMy Public PortalAbout5.6) Public Works Division PUBLIC WORKS
Program 71:Administration and Engineering
Maintain City infrastructure.
Program72:Street Cleaning
Street sweeping and cleaning services.
Program 73:.Traffic Signal Maintenance
Maintain and operate traffic signals.
Program 74:Traffic Signs and Striping Maint.
Maintain and replace signs and street marking.
Program7S:Street Maintenance.
Repair and resurface public streets/alleys.
Program 76:Sidewalk Maintenance
Maintain/repair public sidewalks.
Program77:Solid Waste Management
Trash and recycling pick-up and programs.
Program 78:Street Lighting
Maint.and utility provision for street lights.
DEPARTMENT SUMMARY
FY 2014-15:Proposed Program Financing FY 2014-15:Proposed Resources Allocated
10,000 6,190 205,310
1% 0% ■General Fund 17Y
075
%
■Gas Tax
■Landscape Lighting ■Personnel Costs
District ■Operating Expenses
■Sewer
Reconstruction Fund
■Used 011 Grant
534,4014319"
9,945 987,580
45%
34% 83%
ACTUAL ADOPTED ESTIMATED •'r•• •'�•r
2012-13 2013-14 2013-14 t t
RESOURCES ALLOCATED
Personnel Costs 103,397 243,185 194,725 205,310 205,310
Operating Expenses 908,780 1,241,630 925,420 987,580 987,580
Total: $ 1,012,177 $ 1,484,815 $ 1,120,145 $ 1,192,890 $ 1,192,890
PROGRAM FINANCING
General Fund 187,046 314,110 240,690 242,075 242,075
Gas Tax 413,474 639,430 395,495 399,945 399,945
Landscape&Lighting District 402,436 525,085 477,770 534,680 534,680
Traffic Congestion Relief Fund - -
Sewer Reconstruction Fund 10,000 10,000
58821 - -
Used Oil Grant 9,221 6,190 6,190 6,190 6,190
Total: $ 1,012,177 $ 1,484,815 $ 1,120,145 :•t :•r
PERSONNEL[FTE) 1.00 2.93 r t
Total: 1.00 2.93 r t
185 (Revised)
(This page intentionally left blank)
i
186
COMMUNITY DEVELOPMENT
Program: Administration&Engineering
Account: 21-960-71
STATEMENT OF PURPOSE
The Administration&Engineering program provides the personnel and technical resources to maintain and improve the City's
physical infrastructure.
ACTUAL ADOPTED ••••• • •••••
STAFFING SUMMARY(FTEs) 2012-13
Community Dev Director 1/ 0.15 " 0.20 0.20 0.20
Community Dev Manager 1/ 0.10 ,O.pO 11
Office Assistant 0.00 :0.20, 1 0.20
Public Safety Supervisor 1/ 0.10 --0.10 0.10 0.10
Secretary-PubWorks 0.20 " ' 0,25 0.25 0.25
Public Safety&Services Manager 0.00 ",Q10 0 0
Management Analyst 0.00 :0:10 0 0
Part Time 3/ 0.00 ;0,88 00 00
Total: 0.55 -1.83 � 1-�0.950.95
ACTUAL ADOPTED'- .-. .¢ ••••• • ••••�
BUDGET SUMMARY 2012-13 2013=14 ' r t
Personnel Costs 60,255 " " ;144;780"
Operating Expenses 132,791 122'$901" + do IS I Mj
Total: $ 193,046 1 $ 267,610;:
ACTUAL ADOPTED'. "•'• • "••• • '',
FUNDING SOURCES 2012-13 2013-14 t t
Gas Tax 2107.5 6,000
General Fund 187,046 261;610..
Total: $ 193,046
KEY PROGRAM GOALS
i
1.Administer all infrastructure engineering and maintenance services including the Capital Improvement Program.
2.Continue to administer and implement NPDES(National Pollutant Discharge Elimination System)program.
3. Continue to monitor and reduce TMDLs(Total Maximum Daily Loads)of storm drain pollutants.
4. Develop Downtown Parking Master Plan and Citywide Traffic Calming Master Plan.
KEY WORKLOAD MEASURES
77 r
Staff attendance at the San Gabriel Valley Council of Governments Public Works Technical 12 12
Advisory Committee.
Staff attendance at NPDES training(10-15 staff members each time). 1 1
Administer NPDES consultant contract. 1 1
Develop Five Year Capital Improvement Program. 1 1
Adopt Downtown Parking and Citywide Traffic Calming Plans.4/ 2 2 ',
FOOTNOTES:
1/Reorganization and additional staff/duties allocation.
2/Elimination of position.
3/Secretary vacation coverage.
4/Project completion carryover to 2012-13 due to delays from windstorm.
187
COMMUNITY DEVELOPMENT
Program: Administration & Engineering
Account: 21-960-71
EXPENDITURE DETAIL
ACTUAL APDPTEq. •'r•� r "VIII• • i,,
PERSONNEL 2012-13 ,2013=14. L L+
ACCT.
4117 Community Dev Director 16,656 ^26,755
4116 Office Assistant 8,232 ;8,665
4132 Public Safety Supervisor 81599 '- 9,125
4135 Public Safety&Services Manager 10;450 '
4130 Secretary-Pub Works 11,379 15,085 0
4174 Management Analyst(2) - 4,255
4150 Overtime 31 '
4161 PartTime - `38,450 '�0�
4310 Optional Benefits Program 356 "-,.780. "+
4320 Health Insurance 5,828 - "42,010
4340 PERS Retirement 6,643 14 OSA,„' t t f
4350 Medicare Tax 1,078 - 1+620,
4360 Otherinsurance 1,453
4361 Life/Disability Insurance -
Total: $ 60,255 ;$ 144,786 + +
ACTUAL ”"APAPT�D - D- ••r•r r ••�•�
OPERATING COSTS 2012-13 2013;14; + L -
ACCT.
4215 LA CO-General Services 304 ',500. 1
4239 Engineering Services 71,488 50,000. _ + 40,500 40,500 -
4277 NPDES 58,074 - 64,700 90,000 •0 0r'0
4410 Meeting Expense 89 150;
4420 Travel &Conference 1,500 "3,000' 1,500 1,500
4425 Memberships/Subscriptions 230 4430 4,430
4440 Telephone - 720 360 360
4465 Special Dept Supplies 1,325 3,030. 900 900
4490 Training 11 „500
' 1,950 1950
Total: $ 132,791 $ 122,830_ �Qy
ACCOUNT MODIFICATIONS
Represents a minimum 10%variance(+/-)between the adopted FY2013-14 and proposed FY2014-15 budgets.
ACCT.
4239 Adjustment(-)reduction due to implementation of public service request software.
4277 Adjustment(+)increase due to new NPDES permit requirements.
4410 Adjustment(-)reduction due to no new meeting expenses.
4420 Adjustment(-)decrease due to use of City vehicle for travel.
4425 Adjustment(+)increase due to new subscriptions.
4440 Adjustment(-)reduction due to anticipated hiring of CDD Director after start of FY 2014-15.
4465 Adjustment(-)reduction due to moving of payment for engineering services to Building.
4490 Adjustment(+)increase due to additional training.
188
CITY OF TEMPLE CITY
BUDGET WORKSHEET
FY 2014-2015
ACCT.NO., DESCRIP710N
,21-96p-71 - ADMINISTRATIO'.N&"ENGINEERING,
SALARIES AND BENEFITS
4117 Community Development Director(20%) 26,995
4135 Public Safety&Services Manager(10%) 10,450
4132 Public Safety Supervisor(10%) 9,125
4116 Office Assistant(20%) 8,730 '',
4130 Secretary-Public Works(25%) 14,510
4174 Management Analyst(10%) 5,690
4310 Optional Benefits Program 780
4320 Health Insurance 11,520
4340 PERS Retirement 14,885
4350 Medicare Tax 1,095
4361 Life/Disability Insurance 1,655
TOTAL '105:435
MAINTENANCE AND OPERATIONS
4215 LA Co-General Services
General administrative services, public works plan checks,construction
permit processing,engineering surveys,and special project assistance
performed by the County, City portion of LAFCO costs ',.
,TOTAL 500'
4239 Engineering Services '!I
PUBLIC WORKS-Professional engineering services,
inspection services,engineering services,and special project
assistance for city projects
TOTAL 40,500,.
4277 NPDES !
National Pollutant Discharge Elimination System (Environmental Engineering
Servcies for NPDES Program Development and Implementation)
NPDES Storm Drain Filming For Illegal Connections
Administer TMDL(Total Maximum Daily Loads)mandated by California Regional
Water Quality Control Board annual waste discharge(SRWCB)
Increase Catch Basin Maintenance per MS4 Permit
TOTAL,, 901000.:
189
CITY OF TEMPLE CITY
BUDGET WORKSHEET
FY 2014-2015
AC,Ci.,NO:�, DESCRIPTION
21-960.71ADMINISTRATION&ENGINEERING
4420 Travel&Conferences,
I
Public Works Training/Conference for Public Safety Officer
and Director of Community Development
TOTAL ;1,500'i
4425 Memberships/Subscriptions
Memberships for Public Works Organizations
TOTAL %4,430 ',
4440 Telephone
Cell phone usage for Director of Community Development
TOTAL- 3601
4465 Special Department Supplies
General office suppliesli
(BNI Public Works Green Book,Cost Book,Standard Plans)
TOTAL' 900
4490 Training
Training for Public Works personnel (workshops,seminars&conferences)
TOTAL
190
CITY OF TEMPLE CITY
BUDGET WORKSHEET
FY 2015.2016
i ACCT.NQ., DESCRIPTION
21-960-71ADMINISTRATION&ENGINEERING
SALARIES AND BENEFITS
4117 Community Development Director(20%) 26,995
4135 Public Safety&Services Manager(10%) 10,450
4132 Public Safety Supervisor(10%) 9,125
4116 Office Assistant(20%) 8,730
4130 Secretary-Public Works(25%) 14,510
4174 Management Analyst(10%) 5,690
4310 Optional Benefits Program 780
4320 Health Insurance 11,520
4340 PERS Retirement 14,885
;
4350 Medicare Tax 1,095
4361 Life/Disability Insurance 1,655 f
i
TOTAL + 105,435
MAINTENANCE AND OPERATIONS
- 4215 LA Co-General Services
General administrative services,public works plan checks,construction �I
permit processing,engineering surveys,and special project assistance
performed by the County,City portion of LAFCO costs
'TOTAL 500s
4239 Engineering Services
PUBLIC WORKS-Professional engineering services,
inspection services,engineering services, and special project
assistance for city projects
TOTAL 40,500>
4277 NPDES
National Pollutant Discharge Elimination System(Environmental Engineering '.
Servcies for NPDES Program Development and Implementation) '
NPDES Storm Drain Filming For Illegal Connections
Administer TMDL(Total Maximum Daily Loads)mandated by California Regional
Water Quality Control Board annual waste discharge(SRWCB)
Increase Catch Basin Maintenance per MS4 Permit
TOTAL 90,0001 '....
191
i
CITY OF TEMPLE CITY
BUDGET WORKSHEET '..
FY 2015-2016
.ACCT.JVO, , DESCRIPTION
21-960-71: ADMINISTRATION&ENGINEERING
4420 Travel&Conference
Public Works Training/Conference for Public Safety Officer
and Director of Community Development
TOTAL `. 1y500
4425 Memberships/Subscriptions
Memberships for Public Works Organizations
TOTAL 4,430
4440 Telephone
Cell phone usage for Director of Community Development
TOTAL 360:
4465 Special Department Supplies
General office supplies
(BNI Public Works Green Book,Cost Book,Standard Plans)
-TOTAL ` ,900r
4490 Training
Training for Public Works personnel (workshops,seminars&conferences)
TO`fAL 1,950`
I
i
192
COMMUNITY DEVELOPMENT
Program: Street Cleaning '..
Account: 21-960-72
STATEMENT OF PURPOSE
Provide effective street cleaning services commensurate with public health and street maintenance requirements.
ACTUAL i ;ADDPT,ED. •.,•, , ••,•'• • '''.
STAFFING SUMMARY(FTEs) 2012-13 2013=14 r
Total: 0.00 "O:OQ '..
ACTUAL ;" ADOPTED. 63' E ' ••OPOSED PROPOSED,
BUDGETSUMMARY 2012-13 2013=i9" 14-15 2015-16
Personnel Costs
Operating Expenses 128,737 " ",122,340 "k000 200,000
Total: $ 128,737 $ ,122,340
ACTUAL ,'AOOPTEb PROPOSEDPROPOSED
FUNDING SOURCES 2012-13 2013-1q;
General Fund
Gas Tax(2105,2106,2107) 128,737 ;,122,349 10 400 of oil
Total: $ 128,737 1 $`"122,346,.
KEY PROGRAM GOALS
1. Ensure that all commercial areas and public parking facilities are thoroughly swept no less than once per week.
2.Conduct scheduled street inspections, identify street cleaning deficiencies and coordinate appropriate corrective action.
KEY WORKLOAD MEASURES
Number of curb miles swept. 3,600 6,900
Implementation of city wide street sweeping ordinance. 100% 100%
193
COMMUNITY DEVELOPMENT
I
Program: Street Cleaning
Account: 21-960-72
EXPENDITURE DETAIL
ACTUAL ' ,ADOPTED " sn •'O'Or PROPOSED
PERSONNEL 2012-13 2013-14 r2015-16
ACCT.
Total: $ $
ACTUAL ADOPTED r � '
OPERATING COSTS 2012-13 !,2013,14
Q '
ACCT.
4256 Street Cleaning128,737 122,340it off of #00
Total: $ 128,737 $ 122,340 $' 'u x:8 _;, „0; 11 oil 11 111
ACCOUNT MODIFICATIONS
Represents a minimum 10%variance(+/-)between the adopted FY2013-14 and proposed FY2014-15 budgets.
i
ACCT.
4256 Adjustment(+)increase due to cost of street sweeping all city streets once weekly.
I
194
CITY OF TEMPLE CITY
.BUDGET WORKSHEET
FY 2014-2015
ACCT,NOS DESCRIPTION
21-960-72 STREET CLEANING`
MAINTENANCE AND OPERATIONS
4256 Street Cleaning
Athens Services-Street sweeping contract services
Weekly street sweeping
TOTAL 200,000:
I
I
I
I
195
CITY OF TEMPLE CITY
BUDGET WORKSHEET
FY 2015-2016 '..
ACCT.NO. . DESCRIPTION
.21-960-72 €STREET CLEANING:
MAINTENANCE AND OPERATIONS
4256 Street Cleaning
i
Athens Services-Street sweeping contract services
Weekly street sweeping
TOTAL 200,000
ii
196
COMMUNITY DEVELOPMENT
I
Program: Traffic Signal Maintenance
Account: 47-960-73
STATEMENT OF PURPOSE
Provide the energy and maintenance services required to operate the City's 28 signalized intersections and ten additional
signalized intersections that are shared with the State of California,Los Angeles County,and City of Arcadia.
ACTUAL ;,ADOPTED!
STAFFING SUMMARY (FTEs) 2012-13 2013-I4:
0.00 '"'d.00 if I I Q
Total: 0.00
ACTUAL ADO,PTED:.�
BUDGET SUMMARY 2012-13 201344 - r
Personnel Costs
Operating Expenses 104,168 151,800,'
Total: $ 104,168
i
ACTUAL l'ADOPTED - '..' •. ".'r
FUNDING SOURCES 2012-13 - =201314„
Lighting&Landscape District 104,168 ",,"-151'80011
Total: $ 104,168 "$ 151,8001.
of
KEY PROGRAM GOALS
1. Provide comprehensive traffic signal maintenance services commensurate with contemporary industry standards.
2. Provide comprehensive traffic signal maintenance services commensurate with public safety requirements.
3. Monitor contract service operations,identify deficiencies,and promptly coordinate appropriate corrective action.
KEY WORKLOAD MEASURES
Traffic signals inspected and serviced. 100% 100%
197
COMMUNITY DEVELOPMENT
Program: Traff.Sig.Maint
Account: 47-960-73
EXPENDITURE DETAIL
ACTUAL ADOPTEDPROPOSED
4
PERSONNEL 2012-13 '2013-1 ,-Q -% t2015-16
ACCT.
Total: $ $
ACTUAL :ADOPTEDP%
OPERATING EXPENSES 2012-13 !201114 "I _ r r
ACCT.
4216 Contract Service-Public 85,020 � .:115,000 :. �� ��� 100,000
4435 Utilities 18,074 35,000 U - +a i 35,000 f
4960 Administrative Charges 1,074 1,800 �'. ,; 00 1,500 �
Total: $ 104,168 $ -151,800
ACCOUNT MODIFICATIONS
Represents a minimum 10%variance(+/-)between the adopted FY2013-14 and proposed FY2014-15 budgets.
ACCT.
4216 Adjustment(-)reduction due to staff reevaluation of necessary cost for traffic signal maintenance.
4960 Adjustment(-)reduction due to unnecessary expenditures for FY 2013-14. III
II
198
CITY OF TEMPLE CITY
BUDGET WORKSHEET
'. FY 2014-2015
DESCRIPT70N
47-960773 TRAFFIC SIGNAL MAINTENANCE'.
MAINTENANCE AND OPERATIONS
4216 Contract Service-Public
Los Angeles County Public Works Department
Las Tunas/Muscatel (50%)
Santa Anita/Freer (50%)
Temple City/Camino Real (50%)
i
Santa Anita/Live Oak
Rosemead/Longden (50%)
Signal maintenance services(estimated)38 signals control intersections
I
TOTAL' 100,000
4435 Utilities
Edison International-Energy for 38 signal controlled intersections
-TOTAL 35,000':
4960 Administration
Reimbursement for general fund direct and indirect cost associated with
managing the program budget
TOTAL f 1,500:
I
199
CITY OF TEMPLE CITY
BUDGET WORKSHEET
! FY 2015-2016 ''..
,' ,ACCT.NO.; DESCRIPTION, .
47-9,60.73TRAFFICSIGNgLMAINTENANCE
MAINTENANCE AND OPERATIONS
4216 Contract Service-Public
Los Angeles County Public Works Department
Las Tunas/Muscatel (50%)
Santa Anita/Freer (50%)
Temple City/Camino Real (50%)
Santa Anita/Live Oak
Rosemead/Longden (50%)
Signal maintenance services(estimated)38 signals control intersections
TOTAL 100,000
4435 Utilities
Edison International-Energy for 38 signal controlled intersections
TOTAL ,35,000
4960 Administration
Reimbursement for general fund direct and indirect cost associated with
managing the program budget
TOTAL 11500'.
200
COMMUNITY DEVELOPMENT
Program: Traffic Signs and Striping Maintenance
Account: 21-960-74
STATEMENT OF PURPOSE
Program provides the resources required to perform routine and emergency maintenance,the repairing& replacement of
traffic signs,and scheduled repainting of street markings.
ACTUAL ADOPTED ••.•• . PROPOSED
STAFFING SUMMARY(FTEs) 2012-13 2013-14, 7=4014-15 2015-16
Maintenance Lead Worker 0 30 ,'O;30 0.30
Maintenance Worker 0.00 0.400.40 0.40 i
Total: 0.301, ; `'0.70 0.70
ACTUAL ADOPTED PROP 6ib ..OPO
BUDGET SUMMARY 2012-13 " 202314 ajnjj6�5 2015-16
Personnel Costs 24,999 " 55,220MM,�.
t
Operating Expenses 85,248 170,400"=._v- -, t"' o f r
Total: $ 110,247 $ " 225,620..I �•x..- _;. ' 1 ' '
ACTUAL ADOPTED I i • ••.•. . PROPOSED
FUNDING SOURCES 2012-13 """2013-14 " 014-15 2015-16
Traffic Congestion Relief Fund
Gas Tax(2105, 2106, 2107) 110,247 225,620
Total: $ 110,247 $ '22516201VA " •
KEY PROGRAM GOALS
1. Conduct scheduled street sign and striping maintenance inspections.
2. Repaint all stop sign/bar-stop pavement markings.
3. Repaint all school zone pavement markings.
4. Repaint all pavement markings on primary thoroughfares and secondary collector streets,including crosswalks.
5. Repaint stop bars and pavement markings in areas with new asphalt or slurry seal.
KEY WORKLOAD MEASURES
Replace traffic signs with retro-reflectvity compliant signs. 100% 100% I
Repaint stop sign/bar pavement markings. 100% 100%
Repaint school zone pavement markings. 100% 100%
201
COMMUNITY DEVELOPMENT
Traf Sig/Stripe '..
Program: Maint
Account: 21-960-74
EXPENDITURE DETAIL
ACTUAL ;,ADOPTED ••0.6 ••�•• r
PERSONNEL 2012-13 2013�Aq- r t
ACCT.
4139 Maintenance Lead Worker 18,642 830,, r18,835 18,835
4146 Maintenance Worker 18 645- _ 18,650 18,650 'I
4310 Optional Benefits Program 147 SYS p575 575
4320 Health Insurance 2,411 6,660: + 8,475 8,475
4340 PERS Retirement 2,749 8,850 8,850
4350 Medicare Tax 449 "'54,5; 545 545
4360 Otherinsurance 601 ,1;Z85�
4361 Life/Disability Insurance 865 865
Total:
ACTUALOOPD;
OPERATING COSTS 2012-13 . =,ZO,��-19' t r
ACCT.
4255 Striping/Pavement 33,939 25,000 25,000
4266 Curb Addressing "'45,606; 10,000 10,000
4465 Special Dept Supplies ",,49BJ 400 400
4510 Maintenance&Repair 51,309 ` 60 000;; 00 18,000
Total: $ 85,248 $ ,.170;400; 53,400 $ 53,400
ACCOUNT MODIFICATIONS
Represents a minimum 10%variance f+/-f between the adopted FY2013-14 and proposed FY2014-15 budgets.
ACCT.
4255 Adjustment(-)reduction due to inclussion of street striping as part of alloted funding for street resurfaced.
4266 Adjustment(-)reduction due to majority of street addresses were painted during fiscal year 2013-14.
4510 Adjustment(-)reduction due to majority of signage installed during FY 2013-14.
202
CITY OF TEMPLE CITY '..
BUDGET WORKSHEET
FY 2014-2015
.pCCf.-f�0, I DESCRIPTION
21-960-74 - TRAFFIC SIGNS&STRIPING MAINTENANCE.
SALARIES AND BENEFITS
4139 Maintenance Lead Worker(30%) 18,835
4146 Maintenance Worker(40%) 18,650
4310 Optional Benefits Program 575
4320 Health Insurance 8,475 j
4340 PERS Retirement 8,850
4350 Medicare Tax 545
i
4361 Life/Disability Insurance 865
TOTAL $6;795 s
MAINTENANCE AND OPERATIONS
4255 Striping/Pavement
Schedule striping and pavement marking including select system 'I
school zones,curb painting, new pavement,and pavement reflector
replacement(estimated)
TOTAL 25,000+
4266 Curb Addressing
Perform every 5 years,next due FY2018-19
TOTAL 10,0001
4465 Special Department Supplies
Small Tools and Materials
TOTAL . 400
4510 Maintenance&Repair
City routine sign maintenance, replacement&repair(estimated)
TOTAL ' 38,000
i
203
CITY OF TEMPLE CITY
BUDGET WORKSHEET
-'. FY 2015-2016
". ACCT:NO: -ID SCRIPTION
21-960-74 TRAFFIC SIGNS&STRIPING MAINTENANCE,
SALARIES AND BENEFITS
4139 Maintenance Lead Worker(30%) 18,835
4146 Maintenance Worker 18,650
4310 Optional Benefits Program 575
4320 Health Insurance 8,475I
4340 PERS Retirement 8,850
4350 Medicare Tax 545
4361 Life/Disability Insurance 865
TOTAL 56,795!
MAINTENANCE AND OPERATIONS
4255 Striping/Pavement
Schedule striping and pavement marking including select system
school zones,curb painting, new pavement,and pavement reflector
replacement(estimated)
TOTpL 25,000
4266 Curb Addressing
Perform every 5 years, next due FY2018-19
TOTAL, 10,0001
4465 Special Department Supplies
Small Tools and Materials
TOTAL 400i
4510 Maintenance&Repair
City routine sign maintenance, replacement&repair(estimated)
I
TOTAL 18,000`:
i
204
COMMUNITY DEVELOPMENT
Program: Street Maintenance
Account: 21-960-75
STATEMENT OF PURPOSE
Program provides the resources required for the maintenance and repair of all public streets,alleys,and access easements.
i
ACTUAL ADOPTED '
STAFFING SUMMARY(FTEs) 2012-13 2013;14 " L
0.00 0:00 fee i s r
Total: 0.00
ACTUAL 'ADbpTED.�... �� ,.�; ••.•. . •'.•.
BUDGET SUMMARY 2012-13 2013-14 L
Personnel Costs -
Operating Expenses 75,422120,470 r t
Total: $ 75,422 $ �120,4Z0.
ACTUAL ; ADOPTED. z ''.i.r '•o•r ••�•� ',,
FUNDING SOURCES 2012-13 2013=19 L L
Sewer Reconstruction Fund
Gas Tax(2105, 2106, 2107) 75,422 , �;120;470"
Total: $ 75,422 $, :120,;470'111�' r r
KEY PROGRAM GOALS
1. Provide comprehensive street maintenance services to ensure proper maintenance of all public rights-of-way.
2. Perform scheduled street inspections, identify maintenance deficiencies and coordinate appropriate corrective action.
3. Perform scheduled resurfacing of selected streets from the pavement management study.
..e•� ••�u4jgi
KEY WORKLOAD MEASURES r L
Scheduled hardscape repair and slurry seal in Maintenance Areasl&2. 1/
Scheduled hardscape repair and slurry seal in Maintenance Areas 3&4. 1/ -
Conduct Pavement Management Study&schedule hardscape and slurry repairs. 100 100
FOOTNOTES:
1/As identified per the Pavement Management Study(PMS).
205
COMMUNITY DEVELOPMENT
I
Program: Street Maint.
Account: 21-960-75
EXPENDITURE DETAIL
ACTUAL ADOPTED pf" r M.M..'a
PERSONNEL 2012-13 2013-14
ACCT.
Total: $ - $ ` ,
ACTUAL ." ADOPTED lr,�,r�•:
OPERATING EXPENSES 2012-13 .`,2013-1,4„i
ACCT.
h
4216 Contract Service-Public 73,336 " 97,500`--µ : 't
4231 Pry/Spc Contract Services - - 1 off
4257 Street Maintenance 1,542 22,970 in :�• 0 1 lot I fit
4440 Telephone 544 „
Total: $ 75,422 .$'; 120;470! r
ACCOUNT MODIFICATIONS
Represents a minimum 10%variance(+/-)between the adopted FY 2013-14 and proposed FY2014-15 budgets.
ACCT.
4216 Adjustment(-)reduction due to bringing pothole patrol in-house.
4231 Adjustment(+)increase due to sewer reconstruction.
4257 Adjustment(-)reduction due to fewer pothole repairs in FY 2014-15 because of PMP implementation.
206
CITY OF TEMPLE CITY
BUDGET WORKSHEET
FY 2014-2015
ACCT,NQ., DESCRIPTION,
21-960.75 STREET MAINTENANCE
MAINTENANCE AND OPERATIONS
4216 Contract Service-Public
Los Angeles County Public Works Department
Routine street maintenance and repair 45,000
Storm damage repairs and debris removal 3,750
TOTAL 48,750
4231 Pry/Spc Contract Services
Sewer&Street Funding Analysis
(Sewer Reconstruction funded$10,000)
TOTAL �j,0,000,
4257 Street Maintenance
Pot Hole Repair
TOTAL "10,000
207
CITY OF TEMPLE CITY
BUDGET WORKSHEET
'. FY 2015-2016
+ ACCT.NO. DESCRIPTION ,
21-960-75 , STREET MAINTENANCE
MAINTENANCE AND OPERATIONS
4216 Contract Service-Public
Los Angeles County Public Works Department
I
i
Routine street maintenance and repair 45,000 '�
Storm damage repairs and debris removal 3,750 li
T 6TAil 48,750'
4231 Pry/Spc Contract Services
Sewer&Street Funding Analysis
(Sewer Reconstruction funded$10,000)
i
TOTAL 1%000:
I
4257 Street Maintenance
Pot Hole Repair
-, TOTAL 10,000. I
208
COMMUNITY DEVELOPMENT
Program: Sidewalk Maintenance
Account: 21-960-76
STATEMENT OF PURPOSE
Program provides the resources required to perform routine maintenance and repair of City sidewalks.
ACTUALl ' ADOPTELi; ".'• r '".'• r
STAFFING SUMMARY(FTEs) 2012-13 2013-14,1111r r
0.001 , 0.00 W, 1 22 oil
Total: 0.00 'Od10 r r
ACTUALJ ; 'iADOPTED; ••.•• r ••.•. r
BUDGET SUMMARY 2012-13 '201344: � � r 1 r
Personnel Costs 2
Operating Expenses 93,068 165;000, r r oil
Total: $ 93,068 ',$ -165,000 r r
ACTUAL - ADOPTED, I off
PROPOSED PROPOSED !
FUNDING SOURCES 2012-13 2013- a 2014-15 r
SB821
Gas Tax(2105, 2106, 2107) 93,068 '-165,000: 25,000 25,000
Total: $ 93,068 $ -'165;000,
KEY PROGRAM GOALS
1. Provide comprehensive sidewalk maintenance services to ensure the proper maintenance of all public sidewalks.
2. Perform scheduled sidewalk inspections, identify maintenance deficiencies.
3.Conduct citywide sidewalk needs assessment.
KEY WORKLOAD MEASURES 712
Scheduled hardscape repair in Maintenance Areas 1&2.
Scheduled hardscape repair in Maintenance Areas 3 &4.Monthly inspections of City sidewalks. 712Install new ADA ramps. 1/
Sidewalk construction and improvements. TBD TBD
i
FOOTNOTES:
1/ADA Ramps installation-CDBG funded.
209
COMMUNITY DEVELOPMENT
Program: Sidewalk Maint
Account: 21-960-76
EXPENDITURE DETAIL
ACTUAL ADOPTED
PERSONNEL 2012-13 .2013-14-.
ACCT.
Total: $ $ ' Cie
-,e
ACTUAL ADOPTED •'�'� ••�'�
OPERATING EXPENSES 2012-13 2013-14, r r
ACCT. r_
4216 Contract Service-Public 89,700 35,000' 10,000
4258 Sidewalk Maintenance 3,368 730,00015, 00 15,000
Total: $ 93,068 i65,000 i b r r t r
ACCOUNT MODIFICATIONS
Represents o minimum 10%variance(+/-)between the adopted FY2013-14 and proposed FY2014-15 budgets.
ACCT.
4216 Adjustment(-I reduction due to fewer temporary sidewalk repairs because of planned permanent sidewalk reconstruction.
4258 Adjustment(-)reduction due to majority of sidewalk reconstruction being done in FY 2013-14.
i
210
CITY OF TEMPLE CITY
BUDGET WORKSHEET
FY 2014-2015
ACCT,,N4.' DESCRIPTION -
21-960-76 `, SIDEWALK MAINTENgNCE'
MAINTENANCE AND OPERATIONS
4216 Contract Service-Public
Los Angeles County Public Works Department semi-annual sidewalk
I
inspection program and sidewalk repairs
TOTAL 130,000,
4258 Sidewalk Maintenance
Private contractors-Project design engineering services(estimated) j
Project administration and construction inspection (estimated)
Sidewalk replacement(estimated)
i
TOTAL [15,000':
i
i
i
i
211
CITY OF TEMPLE CITY
BUDGET WORKSHEET
FY 2015-2016
', ACCT.NQ DESCRIPTION
21-960-76 SI'DEWALk MAINTENANCE
MAINTENANCE AND OPERATIONS
4216 Contract Service-Public
Los Angeles County Public Works Department semi-annual sidewalk
inspection program and sidewalk repairs
TOTAL 10,000
4258 Sidewalk Maintenance
Private contractors-Project design engineering services(estimated)
Project administration and construction inspection(estimated)
Sidewalk replacement(estimated)
I
TOTAL j 15,000.
212
COMMUNITY DEVELOPMENT
Program: Solid Waste Management
Account: 01-960-77
STATEMENT OF PURPOSE
The Solid Waste Management Program provides the resources required to effectively administer the City's solid waste
disposal and source reduction services.
STAFFING SUMMARY(FTEs) - NONE 1/
ACTUAL ..,APAP.` 6 PROPOSED PROPOSED
BUDGET SUMMARY 201213 201445 2015-16
Personnel Costs
Operating Expenses 9,221 58,690;, 8,690 8,690
Total: $ 9,221
ACTUAL ,t,900PTED;' "OPOSED PROPOSEDI
FUNDING SOURCES 2012-13 103�4," r2015-16
General Fund25002,500
Used 011 Grant 9,221-
61190 6,190
Total: $ 9,2211,$,,,,,;58;690,; r r
KEY PROGRAM GOALS
1.Continue to administer the City's solid waste source reduction programs and ensure compliance with related state regulations per AB 939.
2.Continue to promote the proper disposal of all household hazardous waste by encouraging participation in the Los Angeles
County Household Hazardous Waste Recycling Program.
I
I
••r•r r ••r•r r
j
KEY WORKLOAD MEASURES r r
Provide outreach at various community events regarding used oil recycling. 5 5
Maintain City presence at the San Gabriel Valley Solid Waste Joint Powers Authority(monthly). 12 12
Administer solid waste contract. 1 1
Household Hazardous Waste event. 1 1
FOOTNOTES:
1/Solid waste pick-up and recycling service is currently provided by Athens Services for both residential and non-residential properties. '
i
213 (Revised) ',
COMMUNITY DEVELOPMENT
Program: Solid waste Mgmt
Account: 01-060-77
EXPENDITURE DETAIL
ACTUAL
OPERATING EXPENSES 2012-13
ACCT.
4231 PRV/SPC Contract Services Y0,900 �
4241 SRREProgram2,500 2,500
4605 Recycling Program 9,221a6,196'x •0 0
Total: $ 9,221 $ z„5881690 $ 8,690
ACCOUNT MODIFICATIONS
Represents o minimum 10%variance(+/-)between the adopted FY2013-14 and proposed FY2014-15 budgets.
ACCT.
i
214(Revised)
CITY OF TEMPLE CITY '..
BUDGET WORKSHEET
FY 2014-2015
DESCRIPTION
OT-960-77 SOLIb WASTE MANAGEMENT,,,
MAINTENANCE AND OPERATIONS
4241 SRRE Program
Professional consultation services.Solid waste reduction and
recycling element(SRRE) (estimated contingency)
- TOTAL ' 7,5001
4605 Recycling Program
(Fund 17)
Used Oil Program and Recycling Grant
> TOTAL
I
I
215 (Revised)
CITY OF TEMPLE CITY
BUDGET WORKSHEET
FY 2015-2016
ACCT.NO. DESCRIPTION '..
01960777. ';SOLID WASTE MANAGCMENT
MAINTENANCE AND OPERATIONS
4231 Pry/Spc Contract Services
R3 Consulting TOTAL ,
4241 SRRE Program
Professional consultation services.Solid waste reduction and j
recycling element(SRRE)(estimated contingency)
TbTAL 215001
4605 Recycling Program
(Fund 17)
Used Oil Program and Recycling Grant
TOYAL 8,190
216
COMMUNITY DEVELOPMENT
Program: Street Lighting
Account: 47-960-78
STATEMENT OF PURPOSE
Program provides comprehensive maintenance services and electrical power required to operate the City's street lighting
system.The cost for a portion of the safety lighting maintenance and repair is shared with other bordering jurisdictions.
ACTUAL ADOPTED PROPOSED
STAFFING SUMMARY(FTEs) 2012-13 nE46445 2015-16
Secretary-Pub Wrks 0.05 0.10. ' 0 0.10
Public Safety Supervisor 0.10 0.10 0
Public Safety&Services Manager 0.00 0.10 0.10 0.101
Management Analyst 0.00 "" 0.1Q . IN 0.10 0.10
Total: 0.15 0.40 r
ACTUAL ADOPTED,` PROPOSED PROPOSED
BUDGET SUMMARY 2012-13 2013-�4- _; L2015-16
Personnel Costs 18,143 i.,R3,185;. 43,08043,080
Operating Expenses 280,125 330,1Z; 355,100 355,100
Total: $ 298,268 $ ;373,285;
ACTUAL !ADOPTED PROPOSED PROPOSED
FUNDING SOURCES 2012-1s2o1s=14, 2014-1S 2015-16
General Fund
Lighting& Landscape District 298,268 373,285, 398,180 398,180
Total: $ 298,268 "$ '373,285" MEN=
KEY PROGRAM GOALS
1. Conduct scheduled street lighting system inspections,and identify maintenance deficiencies.
2. Update the City's lighting and maintenance assessment district engineer's report in accordance with the 1972 State
Lighting and Landscape Act. j
KEY WORKLOAD MEASURES r
i
Updated street light master plan. 100% 100%
Upgrade street lights with the latest energy efficiency technology. 100% 100%
217
COMMUNITY DEVELOPMENT
Program: Street Lighting
Account: 47-960-78
EXPENDITURE DETAIL
ACTUAL - ADOPTED
2012-13 01314-PERSONNEL r r
ACCT.
4116 Office Assistant 2,058
4130 Secretary- Pub Wrks 2,844 6,035 :00 5,800
4132 Public Safety Supervisor 8,599 :9,125' . 9 125 9,125
4135 Public Safety&Services Manager '10,450, "< - O,450 r ' r
4150 Overtime 8
4174 Management Analyst(2) 4;255, ••r
4310 Optional Benefits Program 107 330 330
4320 Health Insurance 1,758 5,150` -' S 4li
4340 PERS Retirement 2,004 " '6,22Q"�
4350 Medicare Tax 327 435 - 6;285
' •r • '•0 I
4360 Otherinsurance 438 1;1851"
4361 Life/Disability Insurance 685 •t
Total: $ 15,143 "$ 43,155; 4 f, r $ 43,080
ACTUAL i ADOPTED, PROPOSED PROPOSED
OPERATING COSTS 2011-13 2013=14 r
ACCT.
4240 Assessment District Eng 10,375 9,000 9,000 9,000
4271 Pry/Spc Prgs Contract Sry 1,596 1300 00 1,500
4465 Special Dept Supplies 100" 100 100
4510 Maintenance& Repair 14,751 40,000• � .QtO1 -*,000 0 r0
4570 Energy&Maintenance 250,087 275,000 4 360000 300000
4960 Administrative Charges 3,316 4,509 �� 00
Total: $ 280,125 $ 330,100' r r
ACCOUNT MODIFICATIONS
Represents a minimum 10%variance(+/-)between the adopted FY2013-14 and proposed FY2014-15 budgets.
I
ACCT.
218
CITY OF TEMPLE CITY
BUDGET WORKSHEET
FY 2014.2015 j
ACCT.'NO. DESCRIPTION !.
'47-9,60.78 .STREET,LIGHTING
SALARIES AND BENEFITS
4135 Public Safety&Services Manager(10%) 10,450
4132 Public Safety Supervisor(10%) 9,125
4130 Secretary-Public Works (10%) 5,800
4174 Management Analyst(10%) 5,690
4310 Optional Benefits Program 330
4320 Health Insurance 4,265
4340 PERS Retirement 6,285
4350 Medicare Tax 450
4361 Life/Disability Insurance 685
TOTAL 43;080
MAINTENANCE AND OPERATIONS
i
I
4240 Assessment District Engineer
Annual Lighting and Maintenance Assessment District Update ,'
To
4271
4271 Private/Special Programs Contract Services ',
Underground Service Alert program(estimated) !I
TOTAL 1,500`
4465 Special Department Supplies
General office supplies
TOTAL 1001:
4510 Maintenance&Repair
Los Angeles County Public Works Department Street Light
maintenance and repair(estimated-includes 3%liability insurance)
TOTAL' 40,000,'
4570 Energy&Maintenance
Edison International Street Light energy and maintenance costs
TOTAL '' 300,000
4960 Administrative Charges
Reimbursement of general funds direct and indirect costs associated
with managing the program budget '..
TOTAL ;4,500''
219
CITY OF TEMPLE CITY
BUDGET WORKSHEET
FY 2015-2016
ACCT.NO. DESCRIPTION
Zi
47-960.78 �5TREETLIGHTING' �'
SALARIES AND BENEFITS
4135 Public Safety&Services Manager(10%) 10,450
4132 Public Safety Supervisor(10%) 9,125
4130 Secretary-Public Works (10%) 5,800
4174 Management Analyst(10%) 5,690
4310 Optional Benefits Program 330
4320 Health Insurance 4,265
4340 PERS Retirement 6,285
4350 Medicare Tax 450
4361 Life/Disability Insurance 685
TOTAL 43,080'
MAINTENANCE AND OPERATIONS
4240 Assessment District Engineer
Annual Lighting and Maintenance Assessment District Update '',
TOTAL ' ' 9,000':
4271 Private/Special Programs Contract Services
Underground Service Alert program(estimated)
TOTAL 1,500'1
4465 Special Department Supplies
General office supplies
i
TOTAL ', 100
4510 Maintenance&Repair
Los Angeles County Public Works Department Street Light
maintenance and repair(estimated-includes 3%liability insurance)
TOTAL 40,000`.
4570 Energy&Maintenance SII
Edison International Street Light energy and maintenance costs
TOTAL 300,0007
4960 Administrative Charges
Reimbursement of general funds direct and indirect costs associated
with managing the program budget ',,
TOTAL ,4,500!
220