Loading...
HomeMy Public PortalAboutSTRAND AV_1101A.pdfMAYOR Jason Buelterman CITY COUNCIL Wanda Doyle, Mayor Pro Tem Barry Brown Rob Callahan Bill Garbett Monty Parks Paul Wolff May 7, 2014 Mr. Gerald Stewart Exterior Home Improvement 604 Suncrest Blvd Savannah, GA 31410 CITY OF TYBEE ISLAND RE: Building permit #13 -0426 for 1101 A Strand, Tybee Island, GA Dear Mr. Stewart, CITY MANAGER Diane Schleicher CITY CLERK Janet LeViner CITY ATTORNEY Edward M. Hughes On July 8, 2013, a permit was issued to redo the porch flooring at 1101 A Strand, Tybee Island. You are being sent this letter since we have not heard from you as to whether this project has been completed so a final inspection can be performed. Please contact me to provide an update or to set up a final inspection so we can close our file. Thank you, d Gam, Jerris A. Bryant Permit Technician (912) 472 -5033 P.O. Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749 (866) 786 -4573 — FAX (866) 786 -5737 www.cityoftybee.org DATE ISSUED: 07 -8 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION -mss - E b� CITY OF TYBEE ISLAND BUILDING PERMIT R &R PORCH FLOORING 1101 STRAND A ROBERT BERGLUND 2 RIVERVISTA DR CHATTANOOGA TN 37405 -4331 EXTERIOR HOME IMPROVEMENT 604 SUNCREST BLVD SAVANNAH GA 31410 P $ 68.00 PIN #4- 0007 -01 -017 $1,500.00 PERMIT #: 130426 TOTAL BALANCE DUE: $ 68.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, tire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 7864573 - FAX (912) 786 -9539 www.cityoftybee.org ��ygFF (S�� JJUI l Property Address: City of Tybee Island, Georgia 912 - 472 -5033 or 912 - 472 -5031 - Fax 912- 786 -9539 APPLICATION FOR BUILDING PERMIT If -OOo'1 -ol -.:,`7 (Check all that apply) Q' Single Family Q' Discovery/Tearout Q' Duplex Q' Footprint Changes  Q' Multi - Family units new square feet Q' Commercial units heated /cooled Details of Project: ' ���� ��LL ;��o��c�� 1 y iy��i��V�� Q' Demolition of Structure Q' Other S Estimated Cost of Construction: $ (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the worlf, r sets of construction drawings and /or a site plan may be required. d�� Year Built:'( Listed on National Historic Register or located within a National Historic District? Y / N * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. *Also see the Tybee Island Land Development Code Article 14: Historic Preservation Durina construction: On -site restroom facilities will be provided through . Construction debris will be disposed by by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date Signature of Applicant: kS�� Printed Name Note: A permit normally takes 7 to 10 days to process Approvals: g ture Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager D to FEES Permit _ Inspections _ Cap Cost Rec _ Water Tap Sewer Stub _ Eng. Fees _ Aid to Const. TOTAL Name M*iling Address Telephone 1 Home: Owner D&c ., .. ���� C Cell: Architect or Engineer Contractor tt�� :ovW,�� ��i- ��, Office: 6j t '[ ��, ��5������c��i`��S Cell: - (Check all that apply) Q' Single Family Q' Discovery/Tearout Q' Duplex Q' Footprint Changes  Q' Multi - Family units new square feet Q' Commercial units heated /cooled Details of Project: ' ���� ��LL ;��o��c�� 1 y iy��i��V�� Q' Demolition of Structure Q' Other S Estimated Cost of Construction: $ (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the worlf, r sets of construction drawings and /or a site plan may be required. d�� Year Built:'( Listed on National Historic Register or located within a National Historic District? Y / N * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. *Also see the Tybee Island Land Development Code Article 14: Historic Preservation Durina construction: On -site restroom facilities will be provided through . Construction debris will be disposed by by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date Signature of Applicant: kS�� Printed Name Note: A permit normally takes 7 to 10 days to process Approvals: g ture Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager D to FEES Permit _ Inspections _ Cap Cost Rec _ Water Tap Sewer Stub _ Eng. Fees _ Aid to Const. TOTAL Chatham County Board of Assessors: 21 ' Property Record Card 4- 0007 -01 -017 Page 1 of 2 2013 Chatham County Board of Assessors 4- 0007 -01 -017 Property Record Card 1 11TH ST UNIT A TYBEE ISLAND ,APPRAISER TJSHEPPA UNIT A SUB OF LOT B OF A RECOMBINATION OF LOTS 7, 8, 9 & A PT OF BERGLUND ROBERT K & CAMA ASMT LAST INSP 02/08/2011 BEACH BLK 67 WD 3 TYBEE PRB 14P 154 LAURA M` 412,300 412,300 LAND 1 APPR 000008 683,000 2 RIVER VISTA DRIVE 224,600 224,600 (ZONE 224,600 CHATTANOOGA TN 37405 BLDG 1 2009 705,500 347,500 14,800 14,800 OBXF 1 Over 2008 705,500 651,700 Cost - 1,053,000 Cama 2007 1651,700 MS - 1,102,000 SALES BOOK/ INS VI QU RSN PRICE 2006 750,000 CODES PAGE Cama 2005 PROPERTY 0006 RESIDENTIAL 22 Sep 276X 618 WD I Q 1,100,000 1,102,000 Cama USE 2004 234,500 984,500 UTA 0004 Tybee Island GRANTOR: SAXTON CRAIG R ++ 234,500 884,500 GRANTEE:BERGLUND ROBERT K & LAURA g' 550,000 NBHD 020204.00 T204 TYBEE 784,500 Cama 2001 BEACHFRON 08 Sep 206W 0670 WD I Q 553,000 ,� Cama EXEMPTIONS 1999 200,500 401,000 Cama GRANTOR:SKINNER BERTIE P GRANTEE: SAXTON CRAIG R 14 Sep 174T0101 WD V Q 195,000 1995 GRANTOR:DOBSON WEYMAN H JR GRANTEE: SKINNER BERTIE P 112 Jan 139Q 0313 QC V U UN 1988 GRANTOR:DOBSON WEYMAN H & JOYCE i GRANTEE.-DOBSON WEYMAN H JR PERMITS TYPE DATE AMOUNT 100169 _ 08 Feb 2011 Comp 5,500 COMMENTS: 120 Jan 2005 `TY05 SURV i05 Mar 1999 ADD CHG 3 -5 -99 DH PER P/O 99 114 Oct 1997 1997 NEW PIN; SPLIT OUT OF 635,100 4- 7 -1 -1A PRB 14P 154 2011 10/13/97 HISTORY LAND IMPR TOTAL 2012 412,300 222,800 635,100 Cama 2011 458,400 224,600 683,000 MAV 2010 458,400 224,600 683,000 Cama 2009 705,500 347,500 1,053,000 Over 2008 705,500 347,500 1,053,000 Cama 2007 750,000 352,000 1,102,000 Cama 2006 750,000 352,000 1,102,000 Cama 2005 750,000 352,000 1,102,000 Cama 2004 750,000 234,500 984,500 Cama 2003 650,000 234,500 884,500 Cama 2002 550,000 234,500 784,500 Cama 2001 200,500 200,500 401,000 Cama 2000 200,500 200,500 401,000 Cama 1999 113,500 168,500 282,000 Cama 1998 113,500 165,500 279,000 Cama 1997 271,000 A/C EXTRA FEATURES ID# BLDG # SYSTEM DESC DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYB EYB DT ECON FUNC SP SP% RCNLD MKT VALUE .138858 85504 RESIDENTIAL ELEV 42" 0 0 1.00 G 17,000.00 17,000 1996 1996 6R 14,790 14,800 ELEVATOR LAND ID# USE DESC FRONT DEPTH UNITS/TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE 109931 CONDO/TWNHN UNITS 31 75 31.00 -FF 19000.00 R2 DP -30 412300 http: // boa. chathamcounty. org/ DesktopModules/ ChathamCounty/ BoardofAssessors /PropertyRecordCard.aspx... 7/8/201: LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families Child Care Providers and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. Asbestos /Environmental Notification to Georgia EPD for Projects Involvinq Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http:// www. gaswcc .org /docs /field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signature for receipt of Lead Paint, Asbestos, and BMP notices. Date Printed Name Chatham County Board of Assessors: - " 13 Property Record Card 4- 0007 -01 -0" Page 2 of 2 2013 Chatham County Board of Assessors 4- 0007 -01 -017 Property Record Card 1 11TH ST UNIT A TYBEE ISLAND BUILDING SECTION CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL 85504 -1 -2013 Residential 267,362 1996 MS 16.00 0.00 0.00 0_00 16.00 _ 224,584 224,600 ------------------------------------------------------------------------------------------------ 9' % QUAL - - - - -- 109 a 100.00 R2 ." Composition Shingle 100.00 R3 352 ■ *w 4N Pr�� wY tW 100.00 R4 ■ ,a Automatic Floor Cover Allowance ti1J Pae� w11Y Raul u 601 Plumbing Fixtures ( #) 11.00 ■m ■ w, 602 Plumbing Rough -ins ( #) w ParciwM RW R6 622 Raised Subfloor (% or SF) ■ Bowe 100.00 R7 6• o..v.n 752.00 ■ w 903 Wood Deck (SF) 24.00 am.o.., SYL P -l��IY Rmi Is- Slab Porch (SF) with Roof 90.00 R11 904 Slab Porch (SF) with Roof 90.00 R11 904 Slab Porch (SF) with Roof 90.00 R11 904 Slab Porch (SF) with Roof 45.00 MOM MOPE\ Slab Porch (SF) with Roof 45.00 OPn rc� O'n Amy 904 [Click for larger picture] #1 -11 ST UNIT A SECTION TYPE TYPE FRAME STYLE QUALITY CONDITION # UNITS # OF BEDS / BATHS 1 - Main 2344 5 - Duplex 1 - Stud Frame 2 - Two Story 5.00 3.00 0 3/2.10 COMPONENTS Units % QUAL R1 109 Frame, Stucco 100.00 R2 208 Composition Shingle 100.00 R3 352 Heat Pump 100.00 R4 402 Automatic Floor Cover Allowance R6 601 Plumbing Fixtures ( #) 11.00 R6 602 Plumbing Rough -ins ( #) 1.00 R6 622 Raised Subfloor (% or SF) 100.00 R7 721 Carport, Flat Roof (SF) 752.00 R11 903 Wood Deck (SF) 24.00 R11 904 Slab Porch (SF) with Roof 90.00 R11 904 Slab Porch (SF) with Roof 90.00 R11 904 Slab Porch (SF) with Roof 90.00 R11 904 Slab Porch (SF) with Roof 45.00 R11 904 Slab Porch (SF) with Roof 45.00 R11 904 Slab Porch (SF) with Roof 45.00 R11 904 Slab Porch (SF) with Roof 45.00 R11 904 Slab Porch (SF) with Roof 45.00 R11 904 Slab Porch (SF) with Roof 72.00 http: //boa. chathamcounty. org/ DesktopModules/ ChathamCountyBoardofAssessors /PropertyRecordCard.aspx... 7/8/2013