HomeMy Public PortalAbout06-06-2005 Budget Work Session
.
.
.
Minutes
June 6, 2005 Public Hearing and Budget WOIlIshop
Page 1 of4
Minutes Approved:June13, 2005
173
Town
of
Hill~ -
MINUTES
HILLSBOROUGH TOWN BOARD
June 6, 2005
7:30 PM, Town Barn
gh '
The Hillsborough Town Board held a Budget Workshop on June 6, 2005 at 7:30 PM in
the Hillsborough Town Barn. Present for the Budget Workshop were Mayor Joe Phelps
and Commissioners Brian Lowen, L. Eric Hallman, Michael Gering, and Evelyn Lloyd.
Absent from the Budget Workshop was Frances Dancy. Staff present were Town
Manager Eric Peterson, Assistant Town ManagerlPublic Works Director Demetric Potts,
Town Clerk Donna Armbrister, Finance Director Greg Siler, Management Intern
Christina Riordan, and Town Engineer Kenny Keel.
7:35:56 PM 1. Mayor Joe Phelps called the meeting to order at 7:35 PM.
7:36: 11 PM 2. Town Manager Eric Peterson added a discussion regarding Fairview
Park information he had received from Orange County as Item 7.A.
7:36:31 PM
By consensus, Board approved agenda
7:37:27 PM 3. Town Manager Peterson introduced Jon Davis, Project Manager, and
Nicholas Giaimo, Lead Consultant, with Raftelis Financial Consultants who proceeded to
give a presentation on the Comprehensive Rate Design Study Preliminary Findings. A
copy of their presentation is hereby incorporated by reference and made a part of these
official Minutes as an Attachment.
Mr. Davis stated that the Project Objectives are to evaluate alternative rate structures that
may be more effective at addressing priority objectives and to provide forecasting and
financial planning capabilities through development of a Financial Planning and Rate
Setting Model. He noted the Rate Setting Objectives are to develop cost of service
based rates that meet the Town's financing and pricing objectives, specifically including:
revenue sufficiency, financial stability, equitable recovery of costs from different
customer types, and mitigation of rate impacts. He described how rates are set as a five
step process: Step 1 - Identify Financial and Pricing Objectives; Step 2 - Identify
Revenue Requirements; Step 3 - Allocate Costs; Step 4 - Design Rate Structure; and
Step 5 - Assess Effectiveness of Addressing Pricing Objectives.
Mr. Davis outlined a comparison of three rate structure options for the Board to consider.
Option 1 - Cost-of-Service based rates with a base and volume charge
Option 2 - Volume rates with a 3,000 gal/month minimum charge
Option 3 - Volume rate with a 2,500 gal/month minimum charge
1
.
.
.
Minutes
June 6, 2005 Public Hearing and Budget Workshop
Page2of4
Minutes Approved:June 13, 2005
174'
Each of the options includes the following assumptions:
· The existing 1.95x outside city differential will be maintained
· The minimum charge will be based on a fixed amount of use times the
calculated volume charge
· The FY 2006 Operating Budget and Capital Improvement Plan will be
adopted
The Raftelis Financial Consultants reviewed rate scenarios for each of the
aforementioned options and noted that the next steps for the Board to take would be to:
· Determine a preferred rate structure
· Finalize the FY 2006 Budget
· Finalize the Financial Planning and Rate Model around the preferred
rate structure
· Finalize water and sewer rate recommendations for FY 2006
· Adopt new rates
8:10:13 PM 4. The Raftelis' consultants fielded questions from the Water and Sewer
Advisory Committee, the Town Board, and a citizen.
8:41 :55 PM 5. There were no other public comments.
8:42:]2 PM 6. James Watts, Chair of the Water/Sewer Advisory Committee, presented
the Board with their written recommendation that read:
"We, the members of the Hil/sborough Water and Sewer
Advisory Committee, encourage the Town Board of
Commissioners to consider water and sewer as separate
funds, in accord with the Town Engineer's
recommendation, and to set separate rates for each based
on long-term capital needs, rather than short-term revenue
projections. We further recommend that the Town of
Hillsborough maintain for each fund a reserve level to
protect against unforeseen capital needs that may require
immediate attention. Lastly, we recommend that sinking
funds (e.g. Water Capital Improvements Fund and
Wastewater Capital Improvements Fund) be established
and maintained exclusively to pay for periodic major
capital improvements to the system. "
A copy of their written recommendation is hereby incorporated by reference and made a
part of these official Minutes as an Attachment.
8:47:50 PM Mayor Joe Phelps suggested setting a date for decision on a Water/Sewer
mte change. The Mayor also suggested that the Water/Sewer Advisory Committee
2
.
.
.
Minutes
June 6, 2005 Public Hearing and Budget Workshop
Page 3 of4
Minutes Approved:June 13, 2005
17~
schedule additional meetings to prepare a recommendation on rate structure options to
provide to the Town Board. James Watts stated that the information they have presented
to the Town Board over the last several months adequately address their
recommendations.
9:04:55 PM Town Manager Peterson stated that deciding between the different rate
structure options is really a philosophical issue.
9:13:05 PM Commissioner Gering stated that the base charge scenarios are primarily
based on equity and recovery of costs and is not a very compelling argument for him.
9:13:59 PM Commissioner Hallman agreed that he prefers the minimum charge
approach.
9: 15: 12 PM Mayor Phelps called for a brief recess.
9:24:59 PM Mayor Phelps reconvened the Budget Workshop.
9:25:07 PM 7. Town Manager Peterson noted a proposed $450,000 deficit in the
General Fund which includes a 3.9 cent tax increase. He stated that the proposed budget
includes cutting the merit program by 50% and includes a $500 COLA.
9:29: 12 PM Commissioner Lowen stated he felt these increases were too low.
9:29:21 PM Town Manager Peterson stated that after the audit is complete, if the
financial picture looks better, the Board can always do an additional COLA if they desire.
9:39:25 PM Mayor Phelps initiated discussion on Code Enforcement Officer Position.
9:40: 18 PM Manager Peterson reminded the Board that they had instructed staff in
March to recruit for the Code Enforcement Officer position which is currently being
done.
9:40:53 PM Peterson stated that he has proposed a full-time Fire Inspector position in
the Budget. He also suggested hiring a couple of MP A students as temporary employees
to bring the Code Enforcement up to date until such time the Town can hire the full-time
Fire Inspector.
10:16:12 PM Manager Peterson stated that the Fire Department is asking for $533,000
plus $40,000 in depreciation expenses.
3
.
.
.
Minutes
June 6, 2005 Public Hearing and Budget Workshop
Page 4 of4
Minutes Approved:June 13, 2005
17'6
After some discussion, and by consensus, the Board agreed to defer the following:
10:41 :28 PM Bullet Proof Glass
10:41:39 PM Sidewalks
10:41 :50 PM Library
10:41 :53 PM Park Design amend to $15,000 this year
10:49:47 PM Cut $40,000 from Code Enforcement for temporary students
10:56:39 PM Manager Peterson suggested agreeing to these changes and possibly
increase the amount of tax increase. He stated he will work up the figures with a 5.5 cent
tax increase and get the information to the Board within the next couple of days for their
consideration.
11: 11: 15 PM ADDED ITEM 7.A Fairview Park
Manager Peterson reported that Orange County has informed him that they have not yet
started work with the Fairview Park Planning Committee. Gwen Harvey, Assistant
County Manager, stated that the Memorandum of Understanding states that there will be
six residents from the neighborhood who will serve on the Master Planning Committee.
There are currently only two residents who have been approved by the County
Commissioners. They need four more before they can go forward, or they need to amend
the Memorandum of Understanding. The County Commissioners meet next on June 23rd
and the Town needs to have four applicants for them to consider serving on that
Committee at that meeting since they will not be back in session until August, which
means the residents would not be appointed until September.
8. No other items were discussed.
11: 17:29 PM 9. Upon a motion by Commissioner Lowen, seconded by Commissioner
Lloyd, the Board moved to Adjourn at 11: 17 PM by a vote of 4-0. The motion was
declared passed.
4
.
.
.
177
Town
of
Hill~
Hillsborough Water and Sewer Advisory Committee
May 5, 2005
We, the members of the Hillsborough Water and Sewer Advisory Committee request that
you, the Town Board of Commissioners, allocate funds in the 2006 Budget to conduct a
water rate study that accurately determines the cost of delivering water and sewer
services to both the in town and out of town customers. This work has been
recommended in every report that the WSAC has delivered to the Town Board of
Commissioners since the creation of the WSAC.
The WSAC congratulated the Town Board of Commissioners for addressing the
perceived inequities of the "double rate" policy when you decided to reduce the rate
multiplier charged to out of town customers to 195% of the in town rates. We applauded
when the Board indicated that it would continue to reduce the rate multiplier in future
rate deliberations. Now, we ask the Board of Commissioners to turn intent into action by
funding a rate study to determine the correct rate multiplier for out of town customers.
I
We, the WSAC, remain focused on working with you and the Water/Sewer utility staff to
ensure the continued success ofthe Water/Sewer utility now and in the challenging times
to come.
We respectfully submit this request and await your decision.
qc::;;~~
Chris Cole
Dorothy Johnson
Jim Singleton
Dan Barker
Katherine Sanders
Paul Kimple
I
.
I .
" .
.
I .
.
I .
.
I
I
I
I
.
I
I
I
I
I
I
..
I
I
1.7,8'
. Comprehensive Rate
Desi n Stud
Presentation of
Preliminary
Findings
1'0lRI ~.
,(If
Hin. fM~.~<gb
_, P.Wi l' I' f
,~
'-.;;t
June 6, 2005
RFC
RAFTEUS FINANCIAl
CONSULTANTS, INC.
. . . . . . . .
I
I
,
I
I
I
I
I
I
.
I
I
I
I
1
I
..
1
.1
179.
Presentation Agenda '
o Introduction
o Project Objectives
o Rate Setting Process
o Rate Options
o Preliminary Rates and
Customer Impacts
D Next Steps
.
.
.
.
.
.
.
. . .
Introduction
....... .
Page 1
I
I.
I
I
I
I
I
I
I
--
I
I
I
I
I
I
Ie
I
I
180
o National leaders in utility finance and pricing
DOver 500 successful projects for municipal
utilities
o Recognized specialists in consensus building
o Leadership role in A WW A~ WEF and other
industry organizations
o Authors of authoritative pricing texts and
national rate survey
RFC Project Team
Jon Davis. Project Manager
Nicholas Giaimo. Lead Consultant
Lex Warmath - Technical Advisor
George Raflelis. Technical Advisor
. .
Page 2
I
I.
I
I
I
I
I
I
I
--
I
I
I
I
I
I
Ie
I
I
181
.
.
.
.
Project Objectives
.. ..
Project Objectives
o Evaluate alternative rate structures that may
be more effective at addressing priority
objectives
o Provide forecasting and financial planning
capabilities through development of a
Financial Planning and Rate Setting Model
.
. .
Page 3
I
I.
I
I
I
I
I
I
I
--
I
I
I
I
I
I
Ie
I
I
l.R2
Rate Setting Objectives
Develop cost of service based rates that meet
the Town's financing and pricing objectives,
specifically including:
o Revenue sufficiency
o Financial Stability
o Equitable recovery of costs from different
customer types
o Mitigation of rate impacts
. .
.
.
.
.
.
.
Rate Setting Process
. .
.
Page 4
I
I.
I
I
I
I
I
I
I
--
I
I
I
I
I
I
Ie
I
I
183
How Rates Are Set
Step 5 - Assess Effectiveness of Addressing
Pricing Objectives
/
.Step 4 -Design-Rate Structure
Step 3 - Allocate Costs
Step 2 - Identify Revenue Requirements
Step 1 - Identify Financial and
Pricing Objectives
.
.
.
.
.
.
.
.
.
Rate Options
. .. ..
Page 5
I
I.
I
I
I
I
I
I
I
--
I
I
I
I
I
I
Ie
I
I
184'
Rate Options
At Staff direction, we have prepared a
comparison of three rate structure options:
o Option 1 - Cost-of-Service based rates with a
base and volume charge
o Option 2 - Volume rates with a 3~OOO gal/month
minimum charge
o Option 3 - Volume rates with a 2~500 gallmo
minimum charge
.
Rate Options - Pros & Cons
Page 6
I
I.
I
I
I
I
I
I
I
--
I
I
I
I
I
I
Ie
I
I
185
Assumptions
Each option includes the following
assumptions:
o The existing 1.95x outside city differential will be
maintained
o The minimum charge will be based on a fixed
amount of use times the calculated volume charge
o The FY 2006 Operating budget and Capital
Improvement Plan will be adopted
.
.
.
.
.
.
.
Preliminary Rates & Impacts
. ...
Page 7
I
I
.-
I
I
I
I
I
I
--
I
I
I
I
I
I
Ie
I
I
186
Preliminary FY 2006 Rates
(Inside City Customers)
Water Basel Water Sewer Basel Sewer
Minimum* Volume Minimum* Volume
Current* $19.35 $6.45 $17.43 $5.81
Option 1 $3.86 $6.64 $3.86 $7.04
Option 2* $17.85 $5.95 $19.23 $6.41
Option 3* $15.95 $6.38 $16.98 $6.79
. Preliminary FY 2006 Rates
(Outside City Customers)
Water Basel Water Sewer Basel Sewer
Minimum* Volume Minimum* Volume
Current* $37.74 $12.58 $33.99 $11.33
Option 1 $7.53 $12.95 $7.53 $13.73
Option 2* $34.83 $11.61 $37.50 $12.50
Option 3* $37.35 $12.45 $33.13 $13.25
Page 8
I
I
I-
I
I
I
I
I
I
--
I
I
I
I
I
I
Ie
I
I
.1
187
Bill Impacts - Average User
(5,000 gal/month Inside City Customer) :
Bill Amount Percent
Change
Current $61.30
Option 1 $76.12 24.2%
Option 2 $61.80 0.8%
Option 3 $65.85 7.4%
.
.
Bill Impacts - Low Volume User
(2,000 gal/month Inside City Customer)
Bill Amount Percent
Change
Current $36.78
Option 1 $35.08 -4.6%
Option 2 $37.08 0.8%
Option 3 $32.93 -10.5%
.
.
.
Page 9
I
I.
I
I
I
I
I
I
I
--
I
I
I
I
I
I
Ie
I
I
188'
Bill Impacts - High Volume User
(8,000 gal/month Inside City Customer)
Bill Amount Percent
Change
Current $98.08
Option 1 $117.16 19.5%
Option 2 $98.88 0.8%
Option 3 $105.36 7.4%
.
.
.
.
.
.
.
.
Next Steps
. . . .
Page 10
I
I.
I
I
I
I
I
I
I
--
I
I
I
I
I
I
Ie
I
I
189
Rate Options - Pros & Cons
o
. .
Next Steps
o Determine a preferred rate structure
o Finalize the FY 2006 Budget
o Finalize the Financial Planning and Rate
Model around the preferred rate structure
o Finalize water and sewer rate
recommendations for FY 2006
o Adopt new rates
.
Page 11