HomeMy Public PortalAbout09-213 DPB PROJECT PHASE 1 UG -ADDENDUM TWO 7-18-2013 FDR-
9
sell T,115
s Hyl j
L PL
I� I ! It_ I i� I
N
i� •
CD
CD
Z
N-
Mrl
Q
a
o
In
o
DRAWINGS FOR
ONNm IP AND
DRAMIN. AND
( A[ONI I
� m
These Drawings are NOT VALID
Brnnnon & Gillespie, LLC
SP RCATONS AS INSTRUMENTS
+
a
o
o'
fOr an g
'Purpose whichre vires the
AI TF�It C�NSTRL CTI��
FPL OVERHEAD TO UNDERGROUND CONVERSION
OF SNAUNEMAIN
o
ED
m
a
Do
0
R
onginal signature and raised seal
of the engineer unless the original
TOWN OF GULF STREAM
Consulting Engineers
8
P�NRMeEERMEOFAND
END—
MHEMER TIE PROECT - ARE
MADE FOR IS EXE CU TD OR N
THEY SHALL NOT BE USED BY ME
THESE DfL10TNG5 IRE PRELIMINARY
AND ARE PROVIDED FOR MONITORING
u
signature and raised seal are
affixed. Drawings not signed and
gs g
PROGRESS AND FOR OBTAINING
1a 8 W. Forest Hill Blvd, Suite 1oz
79
OWER ON oMER PROJECTS, FOR
PDDITONS
^
ti
o
_
sealed by the engineer shall not be
S
BUDGETARY CONSTRUCTION ESTIMATES.
Wellington, Florida 33414-4704
TO MIS PROJECT, OR
FOR OOMP1ETON To THIS PROECT
submitted to any authority or usetl
THU SFVd1 NOT BE USED FOR
(561) 0833 CAn 6784
BY oMERS, EXCEPT BY AGREEMENT
oranypMpoaewneeagneaand
CONSTRUCTION.
100 SEA ROAD GULF STREAM, FLORIDA
795
IN WMNG AND MM APPROPRIATE
COMPENSAnONTOMEENDINEER.