Loading...
HomeMy Public PortalAboutJob Dirt WorksJOBE'S DIRT WORKS LLC 5592 OLD RIVER ROAD BAKER, FL 32531 Jobe: 850 - 546 - 1514 '- Office: 850 - 375 - 6771 �• _ E-mail: JobesDirtWorks@amail.com COMMERCIAL & RESIDENTIAL DEMOLITION LICENSED & INSURED Feb. 4, 2020 To: Crestview Public Works c/o Chuck Powell 715 N. Ferdon Blvd. Crestview, FL 32536 E-mail: ChuckPowell@CityofCrestview.org Re: Bid for 130 Butler Circle, Crestview, Florida Parcel i.d. # 07-3N-23-1760-0001-0010 Includes: o Asbestos Abatement $ 27,500.00 To be paid at completion. "lobe Everson lobe's Dirt Works LLC 372i LJ h L-t'e 1i (Y.e re5 J ,' e4€ FL 3 AL5"3‘ Print me &t address Asbestos Abatement — Former Residential Crestview, FL Page 2 Scope of Work (Cont.);, 5. Install three -stage decontamination units, consisting of a clean room, shower and equipment room, as appropriate, for each regulated asbestos removal work area. Install sufficient HEPA-filtered negative air pressure machines, to change out the air in the work area, and vent the exhaust outside the building. 6. Remove and dispose of the following types and quantities of existing asbestos - containing materials: Item Description Units Unit Type Location Remove Vat/Mastic 1040 Square feet Remove Transite Siding 2300 Square feet Remove Windows 20 'Each Remove Drywall 2300 Square feet Remove Ceiling 1000 Square feet Remove Wood Panels } 2300 Square feet { 7. After removal is completed, the work areas will be HEPA vacuumed and/or wet wiped as appropriate and encapsulated to lockdown any remaining fibers. 8. Perform personal exposure monitoring of a minimum of 25% of the designated workforce for compliance with OSHA 29 CFR 1926.1101. 9. All designated bags of asbestos & lead waste will be stored in lockable dumpsters on -site and thentransported to a State of Florida licensed "Asbestos Landfill" facility. L0. Provide a copy of all applicable "Post -Job" submittals including, but not limited to the following; copies of LE's Daily Work logs, Exposure Logs, OSHA personal air monitoring results, and a copy of the applicable asbestos waste manifest/waste shipment receipt forms (WSRs). Work by Others: 1. Removal and disposal of all non -asbestos -containing contents, furniture and construction debris and power disconnection. 2, Provide temporary restrooms, water and electric service during the entirety of all asbestos removal operations. 3. Supply an independent testing laboratory and State of Florida licensed Asbestos Consultant to perform a final visual observation/inspection and/or final clearance air sampling and analysis, with acceptable levels being less than or equal to 0,01 fibers/cc, as measured by Phase Contrast Microscopy, Safety 444 (Manly Control Program: 1, Lang Environmental has an active safety program with a dedicated safety manager who wilt monitor the project and conduct weekly safety meetings, as appropriate. 2. Personnel air monitoring analysis will be performed by an independent testing lab. 3. All personnel working on this project will have pre -employment physicals, and have the medical examinations available for your review, in accordance with OSHA requirements. CES O;OSS EN :iiONVEMAI SEfMCES. TIC September 12, 2019 City of Crestview Public Services c/o Chuck A. Powell 715 North Ferdon Blvd. Crestview, FL 32536 (850) 682-6132 chuckpowell@cityofcrestview.org Subject: Asbestos Abatement for property located at 130 Butler Circle, Crestview, FL Proposal no.: P19-0574 Dear Mr. Powell: Cross Environmental Services, Inc. (CES) is pleased to provide a quotation for the above referenced project. The general scope of services associated with our quotation includes all labor, material, equipment, supervision, and disposal associated with the asbestos removal and as defined per the Southern Earth Sciences asbestos survey dtd. August 16, 2019. Scope of Services: Our specific scope of services includes the following items: a Filing of required regulatory notices, to Florida Department of Environmental Protection (DEP), if required. a Asbestos certified personnel. O Asbestos removal as defined per the Southern Earth Sciences asbestos survey cltd. August 16, 2019. • Proper disposal of all ACM and C&D debris removed by CES. 1 Estimated 10 working days to complete. D All material removed will be disposed of appropriately. • Equipment and labor. Price is based on a single mobilization. 155 Blake Ave. NW, Suite G3, Fort Walton Beach, FL 32548 * Office (850) 864-2200 * Fax (850) 864-2208 30 BE'S, DIRT WORKS LLC 5592 OLD RIVER ROAD BAKER, FL 32531 Jobe: 850 - 546 - 1514 Office: 850 - 375 - 6771 E-mail: JobesDirtWorks@gmail.com COMMERCIAL & RESIDENTIAL. DEMOLITION LICENSED u INSURED Feb. 4, 2020 To: Crestview Public Works c/o Chuck Powell 715 N, Ferdon Blvd. Crestview, FL 32536 E-mail: ChuckPowell@CityofCrestview.org r' Re: Bid for 130 Butler Circle, Crestview, Florida Parcel i.d. # 07-3N-23-1760-0001-0010 Includes: o Filing of NESHAP; Pulling of permit o Demolition of old residential structure (building # 2 as notated by the property appraiser) o Hauling and disposing of all debris o Leveling of disturbed area upon completion Does not include: o Silt fencing o Tree removal o Fill dirt o Seed or sod $ 3,500.00 To be paid at completion. e Everson Jobe's Dirt Works LLC 13 LA-)ht. (er, prz I, la r /?g- k/t/wok t-J f� Print name & (dress ,6 lc 4-6eh /771