HomeMy Public PortalAboutMatrix implementation task orderMatrix May 13, 2021(Revised July 6, 2021) Mr Tim Bolduc City Manager, City of Crestview 198 North Wilson Street Crestview, FL 32539 Subject: Proposal — Crestview Mobility Implementation Plan Dear Mr Bolduc, Matrix Design Group, inc. 320 Bayshore Drive, Suite B Niceville, FL 32578 0 850.279.4298 matrixdesigngroup.com Matrix Design Group, Inc. (Matrix) appreciates the opportunity to provide the City of Crestview with professional engineering services to develop Construction Documents for improvements to Main Street from US 90 to Railroad Avenue. The scope of the project builds upon the identified projects within the City of Crestview Community Redevelopment Agency Mobility Plan (Mobility Plan). Our integrated team of engineers, urban designers, and analysts will bring our combined experience to successfully deliver this project. Deliverables: • Conceptual design documents with revised Engineer's Opinion of Probable Cost (EOPC) • Construction documents, plans, specification, and (EOPC). Due Date: All work will be completed, and deliverables provided to client on or before May 1, 2022. Total cost: $375,000 and is inclusive of all labor, materials, and travel. Thank you again for the chance to partner with the City of Crestview on this exciting opportunity. If you have any questions, please do not hesitate to contact me at nodtomsan , rnatrixdes gn'rouw.cor or via telephone at 850.333.3102. s, Accept / Decline Sal M. mian, PE Chief Executive Officer Matrix Design Group, Inc. Approved by: 113 Whitten Mayor City of Crestview, Florida Anniston, AL Atlanta, GA Sacrame Tim Bolduc City Manager City of Crestview, Florida AtpSt: Elizabeth Roy City Clerk City of Crestview, Florida Colorado Springs, CO Denver, CO Niceville, FL Parsons, KS Phoenix, AZ to, CA Tamuning, GUAM i Texarkana, TX Washington, DC Matrix City of Crestview Mobility Implementation Plan Exhibit A Scope of Work Task 1- Project Management and Coordination The Scope of Work provided below identifies the tasks to be completed to develop an Infrastructure Master Plan, that will include the following: • Development of conceptual design with updated Engineer's Opinion of Probable Cost (EOPC). • Final design, plans and specifications and EOPC for each the project scope listed below. Task 1.1- Project Coordination — Matrix will ensure all agency stakeholders identified at the onset of the project are engaged throughout the project. It is assumed the following agencies will be impacted: • City of Crestview (Crestview) (8 meetings assumed) • Gulf Power (1 meeting assumed) • Other utility providers (2 meetings assumed) • Miscellaneous communication companies (2 meetings assumed) Task 1.2 - Project Management — Matrix will serve as the design project manager for this scope. There are several stakeholders that will be involved with the project, and we will actively manage through a series of meetings and other forms of communication. Assumed meetings and information include: • Project Kick-off meeting (1 meeting) —we will schedule and conduct a project kick-off meeting with Crestview to discuss and confirm the vision and goals of the project as well as discuss project schedule and next steps. • Progress meetings (26 meetings) —we will schedule progress meetings on a bi-weekly basis. These meetings will report on the progress of the project including project activities completed to date, schedule progress, follow-up on action items from previous meetings and discussion of new issues that have been uncovered. A set of minutes and action items will be distributed to all attendees. • Monthly progress reports/invoices — we will provide a progress report each month that is attached to our monthly invoice. The progress report will identify tasks that were worked on during the previous month, tasks that are anticipated to be worked on the following month, and identify any issues that may impact the scope, schedule or budget of the project. • Monthly schedule updates — we will update the project schedule monthly and be able to show progress against the agreed -upon baseline schedule. Page 2 for Matrix Task 1.3 - Public Outreach — Our team will support the City with efforts related to public outreach and communications for the project. We will prepare materials for public meetings and meetings with council. We have assumed that City staff will conduct public meetings and provide feedback to the design team. In addition, we have also assumed that City staff will provide updates with council and provide feedback to the design team. Construction Documents Project Scope Definition The Matrix team has developed scope for the Main Street project based on individual projects identified within the Mobility Plan, the proposed grouping of projects for this scope of work is listed below: Group 1— Projects north of Railroad Avenue, Main Street Focused Group 1A (Main Street US 90 — Railroad Avenue) Mobility Study Project ID Project / Description 1 Cedar Ave at US 90 Intersection Improvements — Design to modify the intersection of Cedar Avenue with US 90 2 & 3 Main Street from US 90 to Industrial D Roadway and Streetscape Improvements -Design of 5 8 N/A Main Street roadway and streetscape improvements from US 90 to Industrial Drive. Pine Avenue Roadway and Streetscape Improvements — Design for roadway and streetscape improvements for Pine Avenue from Wilson Street to Main Street Beech Avenue Roadway and Streetscape Improvements — Design for roadway and streetscape improvements for Beech Avenue from Wilson Street to Ferdon Boulevard Oakdale Avenue Roadway and Streetscape Improvements — Design for roadway and streetscape improvements for Oakdale Avenue from Wilson Street to Ferdon Boulevard N/A Woodruff Avenue Roadway and Streetscape Improvements — Design for roadway and streetscape improvements for Woodruff Avenue from Wilson Street to Ferdon Boulevard Task 2 — Pre -Design Activities The Matrix team will complete a series of data collection activities upon receiving notice to proceed. These data collection activities will include the following: Task 2.1- Topographic Survey — The Matrix team will provide a topographic and right-of-way survey for the project limits. Survey will include location of all right of way boundaries, topographic features, drainage features, doorways and building access points, and located utilities. The survey team will work with a utility locator to determine below grade facilities. Page 3 Task 2.2 —Subsurface Utility Investigation — Matrix will follow the Subsurface Utility Investigation best practices to determine the location of underground utilities within the limits of the project. We assume potholes will be required. As part of our preliminary design we will determine locations of potholes and coordinate the locations with the City. Once the need for potholes are finalized, we will provide a task order for the potholing activities. Task 2.3 - Geotechnical investigation — The Matrix team will provide geotechnical investigation to determine the existing soil conditions to inform pavement design. Task 2.4 — Environmental investigation — Matrix will provide a Phase 1 Environmental Site Assessment. Once Phase 1 is complete, we will provide recommendations to the City for any additional study that may be needed. Task 3 - Construction Documents Construction documents will be prepared for the submittal to the City of Crestview for infrastructure improvements and submitted through the City's review process. Packages will be submitted to the City at 60%, 90% and 100% design. The following plans will be submitted: Task 3.1 - Roadway Plans— Matrix will prepare roadway construction documents (per City standards) based on the design criteria established in Task 3 and based on the Mobility Plan defined scope. Matrix will include sidewalk grading for the sidewalk and streetscape improvements for the project, all grading in the pedestrian way and access points into buildings will meet all Americans with Disabilities Act requirements, Title II. Task 3.2 - Utility Plans— Matrix will work with impacted utility companies to identify infrastructure that needs to be relocated to accommodate the new roadway alignments. We will prepare plans that show these impacts as well as potential areas where the utilities can be relocated. Communication between the project team and the impacted utility companies will be continuous throughout the project design. Matrix will also prepare a utility matrix that will show the utility, utility owner, contact information, facility, as well as additional data. This task does not include design by Matrix and only includes coordination and identifying potential conflicts for the respective utility company's design. Task 3.3 - Potable Water Plans - Matrix will provide water plans per City of Crestview standards and requirements for the project. We assume new facilities will not be required, and the design will focus on facilities that need to be relocated based on the roadway design. Task 3.4 - Drainage Plans - Matrix will provide stormwater plans per City standards and requirements for the project. Plan and profile will be provided for below grade facilities. Design for water quality will be provided within the plans including plans and details for the improvements. Matrix will also analyze the drainage improvements along Oakdale Avenue near the intersection of Main Street where there are areas of inundation / minor flooding. Our team will prepare recommendations for improvements to reduce inundation / flooding at the drainage system to the City. Task 3.5 - Erosion Control Plans 'Matrix will provide erosion control plans for the project. The plans will include erosion control measures that meet the requirements of the City as well as appropriate details. Matrix will rely on the Contractor to apply for and obtain any state permits that may be required. Page 4 Task 3.6 - Landscape, Streetscape & Urban Design —The Matrix landscape team will prepare detailed design for the landscaping and streetscape for Main Street from the US 90 to Railroad Avenue This will include full streetscape design for sidewalk paving and streetscape elements such as furnishings, lighting, etc.; coordination with drainage elements within the streetscape; selecting types of plant materials and locations of plant materials that will be low maintenance; and, a designed streetscape that promotes the City's vision of the street. These plans will be included in overall plan submittal and submitted to the City for review. Task 3.7 - Irrigation Design —Irrigation plans for the project within the existing and proposed right-of- way will be provided for review and approval. Our team will verify the existing site conditions including the existing irrigation system and water tap connections as well as study the need for connections to future facilities to right size the design of the irrigation system. Task 3.8 - Construction Phasing and Traffic Control Design — Matrix will prepare construction phasing plans and high-level traffic control plan sheets that implement the proposed construction phasing. Task 3.9 - Specifications — Matrix will prepare technical specifications along with measurement and payment specifications for all bid items required to construct the project as part of the final construction document set. These will be prepared as revisions to FDOT specifications. Landscape specifications will be written as Special Provisions to FDOT specifications. Task 3.10 - Cost estimate — Matrix will prepare an opinion of probable construction cost based on our final design plans and specifications. Upon review of the opinion of probable construction cost, the project team can determine if any scope items should be added or removed or if any bid alternatives should be created. Task 3.11 - Submit Review Design Packages — The project team will prepare a design package at the 60%, 90% and 100% design levels consisting of the following items: • Drainage report • Roadway plan and profile design • Storm drain plan and profile design • Utility Plan Matrix and utilities to be potholed • Streetscape / Landscape plan • Engineers Opinion of Probable Cost • Construction phasing These deliverables will be submitted to the City for review and approval, we assume any referrals will be made by the City. Task 3.12 - Design Review Meetings (3) — Matrix will schedule and conduct design review meetings where all impacted stakeholders can attend and review their comments on the design package. Matrix staff will take meeting notes to document the comments received and will prepare a design comment matrix with responses for distribution. Stakeholders will have an opportunity to review the Matrix proposed responses so that a consensus can be reached on how to address the design comments. Task 4 - Engineering Reports Page 5 `iii Matrix In addition to the construction documents, reports are required by the City to gain approval. Reports include a drainage report, sanitary sewer report, and traffic impact study. Task 4.1— Drainage Plan and Report — Matrix will provide a drainage report for the limits of Group 1A defined above. The report will provide the necessary hydrologic and hydraulic calculations per City standards to project the amount of developed storm water runoff and to size the required storm sewer system to convey the developed runoffs. Water quality capture volume and required sizing calculations will also be provided in the drainage report. Task 5 - Final Plans Matrix will address any final comments that are provided from the review of the 100% design package and submit for approval. Comments will be addressed and coordinated with the review agencies, and final Construction Drawings (CD's) will be prepared and submitted to the City for approval. The CDs will contain civil plans necessary for the City of Crestview to bid and construct the improvements for the project. Task 5.1 — Final Plans: The Matrix team will prepare a final plan set for approval by the City, per the City's standards. Task 5.2 — Specifications: Our team will prepare final specifications for the project to be included in the bid documents. Specifications will include measurement and payment for bidding. Task 5.3 —Final Engineers estimate: Matrix will prepare a final opinion of probably construction cost based on our final design plans and specifications. Task 6 — Bidding Documents Matrix will prepare the construction documents for bidding through the City's process. It is our understanding that the following are required for bidding: • Advertisement for Bid. • Request for Bid. • Development of Evaluation Criteria we have assumed a Best Value Approach. • Evaluation of bids and recommendations of selection to City. • Preparation of Notice to Award. We have assumed that the City will provide all documents for standard City requirements and contracts. Exclusions and Assumptions The following services are excluded from this scope of work and task order: • Environmental Limited Site Investigation / Phase 2 are excluded from the scope. • All agency fees are excluded and shall be paid directly by the Owner • All work will be completed in AutoCAD and MS office format and as required by the review agencies. Page 6 Matrix • Infrastructure design not stated in the above text is excluded. • Supporting documentation for financing or regulatory packages that are not specifically referred to in the scope of services is excluded. • Construction management, construction inspections and construction support services are excluded and will be included in a future task order. • Improvements to utility infrastructure that is not identified in the scope above is excluded. • Construction Management and Inspection will be provided in a separate scope and is not included in this proposal and fee. Page 7 1r Matrix Recommended Future Studies The Mobility Plan identified several additional projects to improve the overall mobility for all modes. We suggest that the City continue to develop a comprehensive plan to implement and incorporate the mobility projects into the City's capital improvement plan. Our recommendations would include grouping of projects, as shown below, to create design and construction programs, developing conceptual design and defining or refining capital cost to implement the improvements. Group 1B (Wilson Street US 90 — Railroad Avenue) Project ID Project 30 Wilson Street Roadway, Streetscape and Bike Facility Improvements US 90 to Railroad Ave. 6 7 Pine Avenue Parking Lot — Parking lot design. Wilson St / Hickory Ave / Cedar Ave Roadway Improvements — Provide on -street parking as part of Hickory, Cedar, and Spring St roadway extensions. Group 1C (Placemaking north of Railroad Avenue) Project ID Project 4 Courthouse Ter Plaza — Create pedestrian plaza by closing roadway to traffic and reconstructing as a plaza. 31 Wayfinding Sign Plan — Develop wayfinding signage for downtown Group 2 — Projects South of Railroad Avenue Main Street Focused Group 2A (Main Street Railroad Avenue — SR 85) Project Project ID 28 29 Main St (South Roadway and Streetscape Improvements) — Main Street improvements from Industrial Drive to SR 85. Main Street at SR 85 Pavement Marking Refresh — Refresh striping on SR 85. MLK Parking Lot — Design of parking lot. Page 8 ;iii Matrix Group 2B (Railroad Avenue — SR 85) Project Project ID 30 Wilson Street Roadway, Streetscape and Bike Facility Improvements Railroad Ave — SR 85 from Railroad Avenue to SR 85 Group 3 — Projects South of Railroad Avenue Main Street Focused Group 3A (Railroad Avenue Pedestrian Improvements) Project Project ID 11 Multi -use Pathway to Twin Hills Park 13 Railroad Ave One Way Conversion 14 15 W Railroad Ave One Way Conversion Main Street Pedestrian Railroad Crossing 16 Wilson St Pedestrian Railroad Crossing Page 9 90 Milk Ave Pee — r'� O e f •0 � • „." \cape .. Rdi/�aAYe c4 Cityofcrestview Mobility Plan Projects Pedestrian Improvements Fxisi,Sidawalk Proposed Sidewalk Bike Improvements a-._. Pleased MuXiUse Pat Proposed Bike Laces Proposed SMrtow Traffic Improvements •• Proposed Streit Closure Proposed Street Extension • • Proposed Street MOEitatn »» Proposed OntWayStreet Bey Projects ] ieverveveemenees egineetg sorry «Mara, PMn Planning Area /OA DWel Water — ttirPway —^'- Railroad Feet 0 500 1,000 Ilh �t�I Project ID Project Name Cedar Ave at U.S. 90 intersection improvements Main St from U.S. 90 to Courhouse Ter Roadway and Streetscape Improvements Main St from Courhouse Te to Industrial Dr Roadway and Streetscape Improvements Courthouse Ter Plaza Pine Ave Roadway and Streetscape Improvements Pine Ave Parking Lot Wilson St/Hickory Ave / Cedar Ave Roadway Improvements 3/26/2021 Project List Street Name Cedar Ave Main St Main St Courthouse Ter Pine Ave Pine Ave Private Lot Wilson St/Hickory Ave / Cedar Ave / Spring St From 1 To Cedar Ave 1 U.S. 90 US 90 Courthouse Ter Courthouse Ter Industrial D U.S.90 Main St Main St Wilson St NA NA U.S. 90 Spring St Parl.ltw, Convert angled parking to parallel parking, except in front of courthouse. Convert angled parking to parallel parking Convert angled parking to parallel parking Develop public parking lot at the northwest quadrant of Pine Avenue and Wilson Street. (V13) Provide on -street parking as part of Hickory Ave, Cedar Ave, and Spring St roadway extensions Street }daiden.aUon Modify intersection with U.S. 90 to prevent wrongway ovement. (V10) Construct Main character area roadway cross- section. Construct Main S character area roadway cross- section. Roadway modification to construct plaza (V1) Construct Pine Av character area roadway cross- section. (V8) Extend Hickory Avenue, Cedar Avenue, and Spring Street to U.S. 90. (V2, V7) Pedestrian Reduce intersection sing distance for enhanced safety Widen sidewalks; reduce intersection crossing distance to enhance safety; provide streetscape amenities Widen sidewalks; reduce intersection crossing distance to enhance safety; provide streetscape amenities Create pedestrian plaza Widen sidewalks; provide streetscape amenities Provide sidewalk as part of roadway extension BkRa(Muz) Mao potht Sharrow (B9) pavement marking; Add bike parking as part of streetscape 5harrows (89) and bike parking; Add bike parking as part of streetscape Add bike parking Add bike parking as part of streetsrape Priori High High High High Medium Medium Medium Short -Term : < 5years Mid -Term: 5 -10 years Long -Term: > 10 years Status Short-term Long-term Mid-term Long-term Mid-term Long-term Long-term Magnitude of Cost $25,000 $883k - $1.03M $1.4M - $1.7M $690K - $1.2M $100,000-$200,000 Need preliminary design and real estate cost Need prelimina design Description -� Extend curb line along U.5.90 to end of on -street parking along Cedar Ave to reduce Inddents of wrong way driving Develop roadway and sidewalks along Main St consistent with the Main St Character Area; Parallel parking - exception: angled parking remains Infront of court house; Provide streetscape amenities; Add sharrow pavement markings Cost estimate assumes: Platinum Streetscape features for high end and Silver Streetscape for low end; Does not Include underground utilities. Develop roadway and sidewalks along Main St consistent with the Main St Character Area; Provide streetscape amenities; Add sharrow pavement markings Cost estimate assumes: Platinum Streetscape features for high end and Silver Streetscape for low end; Does not include underground utilities. Close Courthouse Ter roadway to vehicular traffic and convert into a pedestrian plaza and public park; Provide small event area, art, and clock tower; Expand Veteran's Memorial; Add bike parking Develop roadway and sidewalks along Pine Avenue consistent with the Pine Avenue Character Area; Provide streetscape amenities; Potential to convert Pine Ave to two- way to improve access and dreulation Cost estimate assumes: Minimal streetscape; Does not include underground utilities Develop public parking lot at the northwest quadrant of Pine Ave and Wilson St. Extend Hickory Ave, Cedar Ave, and Spring St to connect Spring St to U.S. 90; Realign to remove from the six -way intersection with U.S. 90, Main Stt, and Hickory Ave. Page 1 of 4 Prolelr m 10 11 12 14 15 Project Name Beach Ave Roadway and Streetscape Improvements Industrial Dr Parking Lot (West of SR 85) Industrial Dr Parking Lot (East of SR85) Multi -use Pathway to Twin Hills Park Industrial Dr Roadway Extension to U.S. 90 Railroad Ave One Way Convenors W. Railroad Ave One Way Conversion Main St Pedestrian Railroad Crossing 3/26/2021 Street Name Beech Ave Industrial Dr Private Lot (west of SR 85) Industrial Dr Private Lot (east of 5R 85) Industrial Dr Industrial Dr (east of SR 85) Railroad Ave W. Railroad Ave Main 5t (Railroad Crossing) From Main 5t Woodruff Ave Vacant parcels between Woodruff Ave and Industrial Dr Wilson St Brett St Main St Main St Industrial Dr To Wilson St NA NA U5 90 McCaskill St Wilson St Wilson St Railroad Ave Perking Convert to angled parking to parallel parking Develop public parking lot along west side of 5R 85 overpass between Industrial Drive and Woodruff Avenue. (V11) Develop public parking lot along east side of 5R 85 overpass between Industrial Drive and Woodruff Avenue. (V3, V12) 8tral Trai--Ourmatlnn Convert roadway to two way street (V9) Connect the two segments of Industrial Drive. (V6) Convert roadway to one way street (V15) Convert roadway to one way (V16) Improved crossing +drainage Pedestrian Widen sidewalks; provide streetscape menities Provide pedestrian crossing from public parking lotto multi - se pathway to Twin Hills Park Provide pedestrian crossing from public parking lotto multi - se pathway to Twin Hills Park Improved pedestrian connectivity with multi -use pathway Add sidewalk across tracks. (P3) Blk8Mulo-1se psum Develop a multi- use path that connects to Wilson Street, Main Street, Twin Hills Park, and U.S.90. (63) Priority Status Low Long-term High Short-term Low Long-term High Long-term Medium Long-term High Short-term High Short-term High Short-term Magnitude of Cost Need preliminary design $3108 Need preliminary design and real estate cost $206,000 Need preliminary design to determine cost estimate <51,000 <51,000 $120,000-$200,000 Description Develop sidewalks Hong Beech Avee consistent with the Pedestrian Character Area; Provide streetscape amenities; Convert Beech Ave to two-way to improve access and circulation Develop public parking lot along west side of SR 85 overpass between Industrial Dr and Woodruff Ave. Consider extending parking lot by vacating Woodruff Ave right-of-way to include with the proposed public parking lotto increase number of spaces. Cost Estimate does not include properly purchase or building demo. Develop public parking lot along east side of 5R 85 overpass between Industrial D and Woodruff Ave. Consider extending parking lot by vacating Woodruff Avenue right-of- way to include with the proposed public parking lotto increase number of spaces. Develop a multi -use path that connects to Wilson St, Main St, Twin Hills Park, and U.S. 90. This multi -use path should continue north along Industrial Dr beyond the CRA district. Con Estimate does not include trees, streetscape, or roadway improvements on Industrial Dr. Connect the two segments of Industrial Dr to improve access to US 90. Convert Railroad Ave from two-way traffic to one-way due to the narrow existing roadway width (<20 feet). Convert W. Railroad Ave from two-way traffic to one-way due to the narrow existing roadway width (<20 feet). Extend the sidewalk along the east side of Main St across the railroad, including a safe pedestrian crossing. Cost estimate assumes: 5' sidewalk crossing tracks with curb and gutter. No change to gate arms, circuitry or railroad house. No new track panels or drainage improvements. Includes Resurfacing of asphalt in railroad right -of --way. Page 2 of 4 P. rea 11: Project Name Street Name rrom 16 17 18 19 20 21 22 23 24 25 26 Wilson St Pedestrian Railroad Crossing MLK Parking Lot MLK Street Light Improvements MLK Sidewalk Improvements MLK Roadway and Streetswpe Improvements Railroad Ave Sidewalk Improvements Chestnut Ave Sidewalk Imrovements Walnut Ave Sidewalk Improvements H way t wy an SideethwalkSImRoadprovementsa d Hathwey St Railroad Crossing Multi -Use Pathway to Twin Hills Park adjacent to Railroad (North Side of Tracks) 3/26/2021 Wilson St (Railroad Crossing) Martin Luther King Jr. Ave - Private Lot Martin Luther King Jr Ave Martin Luther King Jr Ave Martin Luther King Jr. Ave Railroad Ave (east of SR 85) Chestnut Ave Walnut Ave (east of SR 85) Hathaway St Hathaway St (Railroad Crossing) NA W Railroad Ave SR85 Main St Uoyd St Spring St Lincoln St Lloyd St Lloyd St Spring St Chestnut Bypass/SR85 Chestnut Bypass/ SR 85 SR 85 Chestnut Ave Purl Adams Ave Industrial Dr Hathaway St Griffith Ave Griffith Ave U590 Railroad Ave Hathaway St Convert private lotto public parking (V4); Convert roadway to create additional parking area (V14) Parking lanes on both sides of roadway McHr rariLorn•aL-on Improved crossing + drainage Street lighting Street lighting+ roadway cross- section + drainage improvements (Martin Luther King Jr character area) Construct Bike Connectivity Character Area Construct Bike Connectivity Character Area; construct crossing Pedestrian Add sidewalk across tracks (P4) Provide sidewalk on Industrial Drive adjacent to the parking lot co nstruction Construct sidewalk on north side of roadway (P1) Construct sidewalk on both sides of the roadway(P3) Add sidewalk on one side of roadway or along tracks (P#) Add sidewalk on one side of roadway (P2) Add sidewalk on one side of roadway (P#) Add sidewalk Add sidewalk across tracks (P2) 5'r r*tdul,i 0. pcth: Sharrow pavement markings (313) Bike lanes (87) Bike Lanes (07) Multi -Use Path (84) Priority High High High High High Low High Low Low Low Low Status Short-term Short-term Mid-term Long-term Long-term Short-term Long-term Long-term Long-term Long-term Magnitude of Cost $120,000-$200,000 Need preliminary design and real estate cost $133,400 030,268 Need preliminary design $20,000 520,000 $20,000 Need preliminary design $350,000-5500,000 Need preliminary design Description Extend the sidewalk along the east side of Wilson St across the railroad, including a safe pedestrian crossing. Cost estimate assumes: 5' sidewalk crossing tracks with curb and gutter. No change to gate arms, circuitry or railroad house. No new track panels or drainage Improvements, Includes Reswf cing of asphalt in railroad right-of-way. Convert private lot to public parking. Extend parking lot by converting Woodruff Ave right-of-way into parking area connected to the adjacent private properties. Install additional street lights along Martin Luther King Jr Ave to improve visibility and night time conditions Construct sidewalk on north side of roadway from Lincoln St and Uoyd St Develop sidewalks along Martin Luther King 1r Ave consistent with the Martin Luther King Jr. Character Area; Add Sharrow pavement markings. Construct sidewalk along the north side of Railroad Avenue connecting Main St to Hathaway St. Construct sidewalk along the north side of Chestnut Ave connecting Main St to Hathaway St. Construct sidewalk along the north side of Walnut Ave connecting SR 85 to Hathaway St. Add bike lanes consistent with the Bike Connectivity Character Area. Add improve roadway crossing and install pedestrian crossing consistent with the Bike Connectivity Character Area. Develop a multi -use path connecting Downtown and Twin Hills Park north of the railroad and under the SR 85 overpass. Page 3 of 4 28 2 30 3 3 3 35 Project Name Multi -Use Pathway to Twin Hills Park adjacent to Railroad (South Side of Tracks) Main St (South) Roadway and Streetscape Improvements Main St at SR 85 Pavement Marking Refresh Wilson 5t Roadway, Streetscape, and Bike Path Improvements W ayfinding Sign Plan Main St at SR 85 Traffic Study SR 85 Mobility and Acces Study U.S. 90 Mobility and Acces Study Twin Hills Park Master Plan 3/26/2021 Street Name Main St (South) Main St (South) Wilson St Downtown Crestview Main St (South) / Field 5R 85 U.S. 90 Twin Hills Park rrcri SR 85 Te Hathaway St Industrial Dr 5R85 Field Ave SR 85 U.3.90 SR EIS SR 85 Wllson St U.S.90 Wilson 5t Eneor Rd Wilson 51 Parlung Street rensfornation Construct Main 3t South character area roadway cross section. Pavement marking refresh Construct Wilson 5t Character Area roadway cross- section Pedestrian Widen sidewalks Sidewalk improvements RaelMulll.Llve p.U,s Multi -Use Path (85) Sharrows (89) and bike parking Multi -Use Path (81) Low Low High Medium High Low Low Low Low Long-term Long -ter Short-term Long-term Mid-term Mid-term Mid-term Short-term Mid-term nitude of Cost Need preliminary design Need preliminary design <$7,000 Need preliminary design Need preliminary design Need Project Scope Coordinate with FDOT Coordinate with FDOT Need Project Scope Description Develop a multi -use path connecting Downtown and Twin Hills Park south of the railroad and under the SR 85 overpass. This will require easement acquisitions. Develop roadway and sidewalks along Main St consistent with the Main St South Character Area; Exception, angled parking remains in front of court house; Provide streetscape amenities; Add sharrow pavement markings Refresh roadway pavement markings on Main St Develop a multi -use path consistent with the Florida Greenways & Tails System Plan and the Wilson St Character Area. Develop and implement wayfinding signs for Downtown Conduct intersection study for intersection improvements. Coordinate with FDOT to Conduct mobility study and engineering study for SR 85. Evaluate signal warrant study for Griffith Ave and Oakdale Ave. Develop access management plan for intersections and private driveways. Coordinate with FDOT to Conduct mobility study and engineering study for U.S. 90. Develop access management plan for intersections and private driveways. Conduct Twin Hills Park Master Plan Page 4 of 4 Crestview Mobility Implementation Crestview Mobility Implementation Plan 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 ',ask Name CRESTV IEW MOBILITY IMPLEMENTATION Notice to Proceed Project Coordination City of Crestview Coordination (8 Meetings) Utility Company Meetings (5 Meetings) ;, Project Management Project Kickoff Meeting (1 Meeting) Progress Meetings (26 Meetings) Monthly Progress Repo rt Schule Update Public Outreach Construction Documents IMEMPIr Pre -Design Activities Survey (Field Work) Survey (Office Work) Subsurface Utility Investigation Geotech pica I Investigation Environmental Investigatio n 60% Submittal (CCD) -i 60% Construction Documents Prepa re Roadway Plans Prepare Drainage Plans Prepare Utility Plans Prepare Erosion Contro l 60% Reports Prepare Drainage Report Prepare SWMP Report Prepare Pa vement Design / Geotech Report Pha se 1 ESA QA/QC - 4 -I- 03 Q4 01 Q2 gut Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Notice to Proceed eting) 1 —i------i--- -I T £ .4 __.1 T-- 4 Survey (Field N ork) Survey (Off ce Wort) eote ch nical I nvestigaf ion nvironment�I Investi ation 1 Q3 04 01 Jul Aug Sep Oct Nov Dec Jan F eb Mar Iiii)1!LL l Project Coordination City ofiCrestvi4w C oor 'nation (8 Meet Utility C ompan M eeti s (5 Meetings) Pr oject Management i I Progress Meetings (26 Meetings) Monthly Pr ogress Report Schule Update' Public IOutreath I Constructi on Documents -- - Pre,IDesign Activities Subsurface Utility Investigation — — T 60% Submitt▪ al (CCD) 60% onstrugtion Document 1 Prepare Roa c(way Plans I---{ Prepare Drairage Plans F H Prepare Utilit 60% Reports Prepare Drai ge Report Prep re SW P Report Pre p re Paveme nt Design / Geo tech eport 1ESA gs) Exported on July 7, 2021 9:18:50 AM MDT Page 1 of 3 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 Task Nam e 60% Review 60% Review Constructi on Documents Submit to City Crestview Review Comments to Matrix •1 60% Rev iew Reports Submit to City Crestview Review Co mme nts to Matrix 90% Submittal (CCD) 90% Constructio n Documents Address Co mments 90% Reports Address Comme nts QA/QC —s 90% Review Submit to City Crestview Review Comments to Matrix 100% Submittal (CCD) 100% Construction Do cuments Addre ss Co mme nts 100% Reports Addre ss Comments QA/QC 100% Review Submit to City Crestview Review Comments to Matrix -'1 Final Construction Do cuments Address Comments -i Fina l Reports A ddre ss Co mments Final Review Submit to CCD Crestview Review / Signatures Approved Plans (Crestview) Exported on July 7, 2021 9:18:50 AM MDT 03 Q4 01 lul Aug S ep Oct Nov Dec Jan Feb Mar 60%Review Q2 03 04 01 Apr May Jun Jul Aug Sep Oct Nov De li Jan Feb 60 % Review Constrylction D6cuments S' bmit to ity �Cre tyiew re vi ew I �Corr✓ments to Matrix I r 6i.! % Revi w Reports I Sub it to Cif) I 7 I RevieW — i CI mment to Matrix - . -, 90% Submittal (CCD) = 0 % C okstructi n Documents ddress, Commnts 0% Reports ddr es s Comments j I QA/QC c7-7,1 921% Review. Submit to City l Crestview review irCo mmentsLto Mat> _ L J 7 j 100% Submittal (CCD) 100% C onstruction Do _Ad}Jress Comments' 1011 % Reports Address Comments I _ A/QC 100 %Review ubmit to City Crestview RevieW Comments to Matrix Final Construction Documents 1 Mar Apr May -r— Address Comm nts Final Reports AddressfComm nts Final Review 4,(Submit tb CCD Crestview Re view / Signatures I Approved Plans (Crestview) -r 1 I Page 2of3