Loading...
HomeMy Public PortalAbout10.06.21 FinCom Packet Town of Brewster Finance Committee 2198 Main St., Brewster, MA 02631 fincommeeting@brewster-ma.gov (508) 896-3701 MEETING AGENDA Remote Participation Only October 6, 2021 at 6:00 PM This meeting will be conducted by remote participation pursuant to Chapter 20 of the Acts of 2021,. No in-person meeting attendance will be permitted. If the Town is unable to live broadcast this meeting, a record of the proceedings will be provided on the Town website as soon as possible. The meeting may be viewed by: Live broadcast (Brewster Government TV Channel 18), Livestream (livestream.brewster- ma.gov), or Video recording (tv.brewster-ma.gov). Meetings may be joined by: 1. Phone: Call (929) 436-2866 or (301) 715-8592. Webinar ID: 862 2956 9696 Passcode: 565167 To request to speak: Press *9 and wait to be recognized. 2. Zoom Webinar: https://us02web.zoom.us/j/86229569696?pwd=MUhJNGpoU3VocTZ0cTU0VGpYcWdVQT09 Passcode: 565167 To request to speak: Tap Zoom “Raise Hand” button or type “Chat” comment with your name and address, then wait to be recognized. Finance Committee Harvey (Pete) Dahl Chair Frank Bridges Vice Chair William Meehan Clerk Andrew Evans William Henchy Alex Hopper Honey Pivirotto Robert Tobias Robert Young Town Administrator Peter Lombardi Finance Director Mimi Bernardo 1. Call to Order 2. Declaration of a Quorum 3. Meeting Participation Statement 4. Recording Statement 5. Public Announcements and Comment: Members of the public may address the Finance Committee on matters not on the meeting’s agenda for a maximum 3-5 minutes at the Chair’s discretion. Under the Open Meeting Law, the Finance Committee is unable to reply but may add items presented to a future agenda. 6. Town Administrator/Finance Director Report 7. Discussion and Vote - Fall Town Meeting Warrant Articles - CPC Funding Requests – Faythe Ellis - Captital Spending Requests – Town Adminisrtator 8. Review and approve Finance Committee Annual Report 2020 9. Liaison Assignments/Reports 10. Review and Approval of Minutes 11. Request for agenda items for future meetings. 12. Matters Not Reasonably Anticipated by the Chair 13. Next Finance Committee Meeting – Oct 13, 2021 14. Adjournment Date Posted: Date Revised: Received by Town Clerk: Rev. 09/24/21 Page 1 of 3 COMMUNITY PRESERVATION ACT FUNDING (Special Town Meeting) ARTICLE NO.X : To see if the Town will vote to act upon the recommendations of the Community Preservation Committee; to appropriate from Fund Balances Reserved for future expenditure, the amounts shown below, for the purpose of future expenditures, operating and administration expenses, and reserve funds related to Community Preservation, Historic Preservation, Open Space, Community Housing and/or Recreation; and to authorize the Town Administrator to enter into contracts for operating and administration related to Community Preservation, Historic Preservation, Community Housing and Open Space and/or Recreation, all as follows: Purpose Item Funding Source(s) Amount 1 Historic Preservation a.Crosby Mansion Committee/Crosby Mansion Restoration Crosby Mansion on- going reconstruction and restoration Transfer $72,400 from Historic Preservation Fund balance $72,400 Sub-total $72,400 2 Community Housing a.Brewster Town Administrator and Housing Office Update of Brewster’s 2017 Housing Production Plan. Transfer $25,000 from Undesignated Fund Balance 25,000 b.Latham Center Supportive housing for the Strong Start in Adult Living Program Transfer $155,000 from Undesignated Fund Balance 155,000 Sub-total $180,000 Grand Total $252,400 For Fiscal Year 2022 Community Preservation purposes, each item is considered a separate appropriation to be spent by the Community Preservation Committee; provided however, that the above expenditures may be conditional on the grant or acceptance of appropriate historic preservation restrictions for historic resources, open space restrictions for open space reserves, and housing restrictions for community housing, running in favor of an entity authorized by the Commonwealth to hold such restrictions for such expenditures, meeting the requirements of G.L. c.184 and G.L. c.44B, Section 12, and to authorize the Board of Selectmen to convey or accept such restrictions; And further, any revenues received in excess of the estimated receipts are transferred to their respective reserve fund balance(s) for future appropriation using the allocation formula of 50% Open Space, 10% Housing, 10% Historical and 30% for Budgeted Reserve for CPA. Rev. 09/24/21 Page 2 of 3 Or to take any other action relative thereto. (Community Preservation Committee) (Majority Vote Required) COMMENT In May of 2005, Brewster voters approved a ballot question which allowed for the adoption of the modified Community Preservation Act. The act appropriates a 3% surcharge on the town’s real estate tax revenues, which are reserved in a special fund in order to finance projects and programs for the purposes of preservation of open space, recreation, community housing, and historic preservation. Brewster is also eligible to receive up to 100% in matching funds from the State, although we anticipate a reduced reimbursement rate from the State for Fiscal Year 2022, which is projected at 15%. Brewster established, through a local bylaw, a distribution schedule for the CPA funds according to the following: 50% of the funds for open space, 10% for community housing, 10% for historic preservation, and 30% balance is available for housing, historic preservation and/or active or passive recreation projects. 1. Historic Preservation: a. Crosby Mansion Committee – Ongoing reconstruction and restoration of the Crosby Mansion – The goal of the project is to continue ongoing restoration needed to preserve the historic Crosby Mansion. The work will include restoration of chimneys to mitigate water intrusion, restoration of roof sections, 3 window restorations, and some exterior repainting. The amount requested includes $67,400 for the restoration work and a $5,000 set aside to pay for CPC expenses for historical consulting services to ensure work meets federal and state requirements for protection of historic properties. Total Project Cost: $67,400 CPC Request: $72,400 CPC Vote: 7-0-0 2.Community Housing: a. Town of Brewster- Update of Brewster’s 2017 Housing Production Plan – Brewster’s Housing Production Plan (HPP) is the foundation of the town’s Housing Program. The present plan has a 5 year term and is scheduled to expire in June 2022. This project is to complete an update of the town’s HPP for the next 5 years. The plan includes a housing needs assessment, goals, and implementation strategies. The new plan will include the latest census data, explore housing trends including the impact of the COVID-19 pandemic, involve outreach to the community, and be compiled in coordination with the Vision Planning effort. Total Project Cost: $25,000 CPC Request: $25,000 CPC Vote: 7-0-0 b. Latham Center – Strong Start in Adult Living Program Housing Latham Centers, Inc. proposes to develop seven affordable studio apartments for individuals ages 17 – 22 and a one-bedroom apartment for live-in staff, as part of its Strong Start in Adult Living (SSAL) program. The property is located at 1439 Main Street, Brewster. The SSAL program offers young adults with intellectual/developmental disabilities an affordable living arrangement and a supportive Rev. 09/24/21 Page 3 of 3 environment in which to learn new skills and develop readiness for living in the community. Young adults referred to SSAL will be provided housing and support with the goal of relocation to their own home in the community where SSAL case managers will guide and follow them as they transition to independent living. The amount requested is $150,000 for construction of the housing with an additional $5,000 of CPA funds to be set aside to cover the CPC’s legal expenses related to the project. Total Project Cost: $2,816,582 CPC Request: $155,000 CPC Vote: 7-0-0 TOWN OF BREWSTER FY22 Capital Dept Project Funding Source FY22 Plan FTM 2021 ATM 2022 Notes 1 DPW Drainage/Road Maintenance FC/Operating Budget 275,000 200,000 75,000 75,000 to go in FY23 budget 2 DPW MS4 Stormwater Compliance FC 100,000 90,000 0 3 DPW Landfill Monitoring FC 65,000 50,000 0 4 DPW Millstone Road Design Road Bond 20,000 0 0 Move to FY23 5 DPW Millstone Road Construction Road Bond 1,750,000 0 0 Move to FY23 6 DPW Other State Aid (Ch 90) Road Projects (TBD) CH. 90 315,000 0 311,485 actual FY22 7 DPW P-2 One Ton Dump Truck 2012 FC 100,000 0 0 Move to FY23 8 DPW P-G Scag 48 2010 FC 15,000 10,000 0 9 DPW P-D Great Dame Mower 2010 FC 15,000 10,000 0 10 DPW L-2 Front End Loader 1989(replace with smaller equip)FC 100,000 250,000 0 Need larger one 11 DPW P-J Scag Turf Tiger 2011 FC 15,000 0 0 moved to FY23 Subtotal DPW Department 2,770,000 610,000 386,485 1 POLICE Vehicle Replacement FC 135,000 145,000 0 2 POLICE Ballistic Vest Replacement (23)FC 25,000 25,000 0 3 POLICE Cruiser Video Replacement (Body Worn Video)FC 55,000 55,000 0 updated name Subtotal Police Department 215,000 225,000 0 1 FACILITIESDrummer Boy Gazebo Lighting and Shed FC 16,000 0 0 Move to FY23 2 FACILITIESTown Hall Window Replacement FC 50,000 0 50,000 3 FACILITIESTown Hall AC unit replacement FC 0 0 10,500 new request/possible GC 4 FACILITIESTown Hall New Room Divider FC 0 0 27,500 new request Subtotal Facilities Department 66,000 0 88,000 Library Elevator Replacement FC/Other Funding Sources 0 0 150,000 new 1 LIBRARY Library Renovation Design/Construction CPC/FC/MLBC/Debt Exclusion/Capital Stabilization 471,180 0 0 Move to FY23 Subtotal Ladies Library Department 471,304 0 150,000 1 IT Technology Upgrades/Replacement FC 25,000 50,000 0 Subtotal IT Department 25,000 50,000 0 1 DNR Beach & Landing Repairs and Improvements FC 30,000 0 30,000 2 DNR Long Pond Boat Ramp FC 80,000 0 80,000 Subtotal Natural Resources Department 110,000 0 110,000 1 SB Wing Island Boardwalk Desgin FC 50,000 2 SB Housing Trust STR/Operating 250,000 0 275,000 Operating FY23 3 SB Capital Stabilization STR/Operating 575,000 0 250,000 Operating FY23 4 SB Outdoor Hydration Stations (7)State Grant/CPC 90,000 0 0 Move to FY23 5 SB Integrated Water Resource Planning/Implementation FC 75,000 0 75,000 6 SB Millstone Road Housing CPC/Housing Trust 1,000,000 0 0 Move to FY23 7 SB Septic Upgrade -Golf Course FC 170,000 0 0 Move to FY23 8 SB CCSC Master Plan RFP consultant servicesRe-purpose Article 3 1a 11/19STM 185,000 Subtotal Select Board Department 1,990,000 235,000 600,000 1 ASSESS Valuation Services Overlay 80,000 80,000 0 Subtotal Assessors Department 80,000 80,000 0 #Dept Project Funding Source FY22 Plan FTM 2021 ATM 2022 1 NRS Annual Capital Allocation Raise & Appropriate 276,135 0 276,135 FY23 R&A 2 ELEM Combined Technology FC 60,000 0 30,000 3 ELEM Combined HVAC/Plumbing/Electrical Repairs FC 25,000 0 25,000 4 ELEM Combined Painting Int/Ext FC 20,000 0 20,000 5 ELEM Stony Brook School Flooring Replacement FC 25,000 0 0 6 ELEM Stony Brook School Hazardous Waste Abatement FC 20,000 0 0 7 ELEM Stony Brook School Asphalt Roof Design/Replacement **MSBA/FC/Short-Term Debt 200,000 0 0 Move out-Not MSBA eligible until roof is 29 yrs old 8 ELEM Eddy School Resurface Parking Lot & Drive FC 180,000 0 0 Move to FY24 or 25 9 ELEM Eddy School Sidewalk Shingle Replacement FC 400,000 0 0 Move to FY25 10 ELEM Stony Brook Boiler Replacement design FC 0 0 75,000 Moved from FY25 Subtotal School Departments 1,206,135 0 426,135 1 BUILDING Electronic Records Archival Database Project FC 25,000 0 0 move to FY23 Subtotal Building Department 25,000 0 0 1 REC Freemans Fields ADA Project CPC 135,000 0 0 Move to FY23 2 REC Freemans Fields Irrigation Replacement Rec Revolving/FC 30,000 20,000 0 Subtotal Recreation Department 165,000 20,000 0 #Dept Project Funding Source FY22 Plan FTM 2021 ATM 2022 1 FIRE Ambulance 243 Lease Ambulance Receipts 60,000 0 60,000 All Operating FY23 2 FIRE Ambulance 242 Lease Ambulance Receipts 65,000 0 65,000 3 FIRE Ambulance 244 Lease Ambulance Receipts 55,000 0 55,000 4 FIRE Squad 241 Lease Payment Ambulance Receipts 72,000 0 72,000 Total ARR/FIRE $252,000 $0 $252,000 #Dept Project Funding Source FY 2022 Plan FTM 2021 ATM 2022 1 WATER Construction Account Retained Earnings 180,000 0 180,000 2 WATER Land Acquisition for Water Protection Retained Earnings 70,000 0 70,000 FY23 Budget? 3 WATER Well #6 & or Well #4 Pump/Motor Replacement Retained Earnings 40,000 40,000 0 4 WATER Well #6 & or Well #4 Redevelopment Project Retained Earnings 40,000 40,000 0 5 WATER 2012 Pick Up Truck Retained Earnings 60,000 60,000 0 6 WATER Red Top Water Main Retained Earnings 125,000 150,000 0 7 WATER Fix Heaters in garage & Add heater in Pump House Retained Earnings 0 35,000 0 Total Water Reserve Funds 0 $515,000 $325,000 $250,000 #Dept Project Funding Source FY22 Plan FTM 2021 ATM 2022 1 GOLF HVAC/Boiler Upgrades Golf Reserves 0 80,000 0 New 2 GOLF Tree Work & Grinding Brush Pile Golf Reserves 0 35,000 0 New 3 GOLF Equipment Replacement Golf Reserves 242,000 232,000 0 4 GOLF Sink Hole Repairs Golf Reserves 55,000 55,000 0 5 GOLF Kitchen Equipment Replacement Golf Reserves 20,000 25,000 0 6 GOLF Pump House Protection Project Golf Reserves 0 10,000 0 New 7 GOLF Clubhouse/Pavillon Carpet Replacement Golf Reserves 25,000 20,000 0 8 GOLF Rental Clubs & Pushcarts Golf Reserves 0 30,000 0 New 9 GOLF Driving Range Equipment/Balls Golf Reserves 0 20,000 0 New 10 GOLF Clubhouse Window & Door Replacement Golf Reserves 50,000 70,000 0 11 GOLF Maintenance Building Study Golf Reserves 0 0 20,000 New 12 GOLF Irrigation Pump Reconditioning Golf Reserves 55,000 0 55,000 Total Golf Reserve Funds 0 $447,000 $577,000 $75,000 SOURCE OF FUNDS FTM 2021 ATM 2022 Total GF DEBT AUTHORIZATIONS $0 $0 FREE CASH $950,000 $523,000 $1,473,000 OVERLAY $80,000 $80,000 WATER RETAINED EARNINGS $325,000 $250,000 $575,000 AMBULANCE RECEIPTS $0 $252,000 $252,000 GOLF RESERVES $577,000 $75,000 $652,000 CHAPTER 90 $0 $311,485 $311,485 OPERATING BUDGET $0 $600,000 $600,000 RAISE & APPROPRIATE $0 $276,135 $276,135 RE-PURPOSE ARTICLE $185,000 $0 $185,000 REC REVOLVING $5,000 $0 $5,000 OTHER SOURCES $0 $50,000 $50,000 TOTAL (ALL FUNDING)$2,122,000 $2,337,620 $4,459,620 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 – FY2026 NEW REQUEST FORM PROJECT NAME: Road Maintenance & Drainage Department Priority Ranking: # Original Dept. Request: $ 200,000 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $ Submitted by: Department: DPW Proposed Funding Source(s): Project Description: Road Maintenance and Drainage Project funding. Project Justification and Purpose: Funding will provide professional services including engineering, permitting, and construction for Road Maintenance and Drainage projects. Cost Estimate & Timing: 200,000 – Projects throughout the year Estimated Annual Cost or Savings of Operation and Maintenance: Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2022 200,000 2023 2024 2025 2026 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 – FY2026 NEW REQUEST FORM PROJECT NAME: Municipal Separate Storm Sewer System (MS4) Funding Department Priority Ranking: # Original Dept. Request: $ 90,000 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $ Submitted by: Department: DPW Proposed Funding Source(s): Project Description: MS4 Stormwater Compliance funding Project Justification and Purpose: Stormwater management MS4 regulatory compliance, design, and construction services. Cost Estimate & Timing: Services throughout the fiscal year Estimated Annual Cost or Savings of Operation and Maintenance: Regulatory requirement Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2022 90,000 2023 2024 2025 2026 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 – FY2026 NEW REQUEST FORM PROJECT NAME: Landfill Monitoring Department Priority Ranking: # Original Dept. Request: $ 50,000 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $ Submitted by: Department: DPW Proposed Funding Source(s): Project Description: Landfill Monitoring Project Justification and Purpose: Landfill gas monitoring and well testing funding to meet regulatory requirements. Cost Estimate & Timing: Services provided throughout the fiscal year. Estimated Annual Cost or Savings of Operation and Maintenance: Regulatory requirement Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2022 50,000 2023 2024 2025 2026 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 – FY2026 NEW REQUEST FORM PROJECT NAME: Scag Mower Replacement Department Priority Ranking: # Original Dept. Request: $ 10,000 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $ Submitted by: Department: Proposed Funding Source(s): Project Description: DPW mower replacement. Project Justification and Purpose: Replacement of 2010 Scag walk behind mower used daily for the maintenance of Town properties. Cost Estimate & Timing: $10,000 and 0 to 6 months depending on stock. Estimated Annual Cost or Savings of Operation and Maintenance: Replacement would lower overall maintenance cost and out of service time. Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2022 10,000 2023 2024 2025 2026 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 – FY2026 NEW REQUEST FORM PROJECT NAME: Great Dane Mower Replacement Department Priority Ranking: # Original Dept. Request: $ 10,000 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $ Submitted by: Department: Proposed Funding Source(s): Project Description: DPW mower replacement. Project Justification and Purpose: Replacement of 2010 Great Dane stand up mower used daily for the maintenance of Town properties. Cost Estimate & Timing: $10,000 and 0 to 6 months depending on stock. Estimated Annual Cost or Savings of Operation and Maintenance: Replacement would lower overall maintenance cost and out of service time. Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2022 10,000 2023 2024 2025 2026 BREWSTER DPW 201 RUN HILL ROAD BREWSTER, MA 02631-2331 Ship ToBill To Contact Phone Cell Phone Department Mike Richards 13#(508) 896-3212 Counter Sales Counter Person Cody Morrison PO Number quote Date Printed 08/03/21 Transaction Estimate Morrison’s Power Equipment has been happily serving the south shore for over 35 years. We thank you for your business. Order Number 460850 Customer Tax Number 046-001-098 Reference 460850 Sales Person Cody Morrison 17381 Customer mrichards@brewster-ma.gov Email Address Turf Tiger II list price is $14,004, price below is state bid pricing. We are an FAC 116 contract holder, Our Vender Code is VC 0000489591 1Section AmountLineDescriptionShippedB/O'd NetModelOrderedList STTII52V31BV SCAW 52" 31 HP VANGUARD 1 $11,203.20 $11,203.201 Note price is good until September 1st. There is a price increased expected of approximately 5% Section 1 SubTotal $11,203.20 tiger cat II 48" list price is $10,515, 52" list price is $10,774. price below is state bid pricing. We are an FAC 116 contract holder 2Section AmountLineDescriptionShippedB/O'd NetModelOrderedList STCII52V26FTEFI SCAW 52" - 26HP Kawasaki EF/ Suspension Seat 1 $8,619.20 $8,619.201 STCII48V-22FX SCAW 48'' 22HP KAWI FX W/ SOFT RIDE SEAT 1 $8,412.00 $8,412.001 Note price is good until September 1st. There is a price increased expected of approximately 5% Section 2 SubTotal $17,031.20 Vride II 36" list price is $8,554, 48" list price is $9,512, 52" list price is $9,875. Price below is state bid pricing. We are an FAC 116 contract holder 3Section AmountLineDescriptionShippedB/O'd NetModelOrderedList SVRII52V26FTEFI SCAW 52" - 26HP KAWI EFI - VRIDE II 1 $7,900.00 $7,900.001 SVRII48V-22FX SCAW 48" 22HP KAWI V-RIDE II 1 $7,609.60 $7,609.601 SVRII36A-19FX SCAW 36" 19 HP KAWI V-RIDEII EL. ST.1 $6,843.20 $6,843.201 Note price is good until September 1st. There is a price increased expected of approximately 5% Section 3 SubTotal $22,352.80 $50,587.20 $0.00 $50,587.20 Invoice Total Sales Tax Grand Total Morrison's Power Equipment Order Number # 460850 - BREWSTER DPW 21ofPage TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 – FY2026 NEW REQUEST FORM PROJECT NAME: L2 – Front end loader replacement Department Priority Ranking: # Original Dept. Request: $ 250,000 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $ Submitted by: Department: Proposed Funding Source(s): Project Description: Replacement of L2 front end loader. Project Justification and Purpose: Replacement of 1989 John Deere front end loader. This loader is typically used for daily operations at the BRC and DPW as well as used in snow and ice operations. Cost Estimate & Timing: $250,000 and 0 to 6 months depending on stock. Estimated Annual Cost or Savings of Operation and Maintenance: Current unit is out of service due to structural failure which impacts the typical transfer station operations. Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2022 $250,000 2023 2024 2025 2026 Volvo CE - Sourcewell Contract Quote Page 1 of 2 Contract: 032119- VCE Date: Buying Agency:Dealership: Contact Person: Prepared By: Phone:Phone: Email:Email: Quan Unit Pr Total 1 $161,949 $161,949 $161,949 $0 $161,949 Quan Unit Pr Total 1 $14,300 $14,300 1 $6,200 $6,200 1 $16,985 $16,985 1 $4,750 $4,750 1 $22,766 $22,766 1 $0 1 $0 1 $0 $65,001 $1,500 $2,000 $2,500 $6,000 $232,950 Delivery Date: D. TOTAL PURCHASE PRICE (A+B+C): Subtotal B: C. Freight / Installation / Ext Warranty / Trade-Ins / Other Allowances/ Miscellaneous Charges Freight PDI ON SITE TRAINING Subtotal C: SOURCED : 4 IN 1 BUCKET SOURCED : SPARE TIRE AND WHEEL SOURCED; UPGRADE TO L5 AND FOAM FILL Additional Discount: Subtotal A: SOURCED : HOLMS PD3.6 POWER ANGLE PLOW SOURCED : SET OF FORKS B. Sourced and/or Non-Contracted Items Description Sourcewell Product Code D - Volvo Pricing Catalog: Wheel Loaders Large A. Catalog / Price Sheet Items being purchased NEW VOLVO L70H , COUPLER See next page for machine specs at List Price, Contract Discount, Machine Price TOTAL Purchse Price at Bottom of this Page Sourcewell Machine Price: TOWN OF BREWSTER WOODCO MACHINERY Quote Valid for 90 days TOWN OF BREWSTER FY2021 - FY2025 CIP FIVE YEAR PLAN Dept Project Funding Source FY21 FY22 FY23 FY24 FY25 FY26 DPW Drainage/Road Maintenance FC/Operating Budget 225,000 275,000 300,000 325,000 350,000 375,000 DPW Tree Work, Removal and Planting Operating Budget 20,000 20,000 20,000 20,000 20,000 20,000 DPW Irrigation Projects Operating Budget 15,000 15,000 15,000 15,000 15,000 15,000 DPW MS4 Stormwater Compliance FC 80,000 90,000 90,000 80,000 70,000 70,000 DPW Landfill Monitoring FC 60,000 50,000 70,000 75,000 80,000 85,000 DPW Millstone Road Design Road Bond 283,425 20,000 0 0 0 0 DPW Millstone Road Construction Road Bond 0 1,750,000 3,500,000 0 0 0 DPW Route 137 Design & Construction CH. 90 0 0 1,200,000 0 0 0 DPW Other State Aid (Ch 90) Road Projects (TBD)CH. 90 0 315,000 315,000 315,000 315,000 315,000 DPW Complete Streets Road Project(s)State Grant 0 0 0 400,000 0 0 DPW Crosby Culvert Federal Grant/Road Bond 416,474 0 0 0 0 0 DPW H-4 Dump Truck 2008 FC 235,000 0 0 0 0 0 DPW P-2 One Ton Dump Truck 2012 FC 0 0 100,000 0 0 0 DPW P-G Scag 48 2010 FC 0 10,000 0 0 0 0 DPW P-D Great Dame Mower 2010 FC 0 10,000 0 0 0 0 DPW H-13 Hot Box 2014 FC 0 0 0 0 50,000 0 DPW H-14 Asphalt Roller FC 0 0 0 0 50,000 0 DPW L-2 Front End Loader 1989 FC 0 250,000 0 0 0 0 DPW P-J Scag Turf Tiger 2011 FC 0 0 15,000 0 0 0 DPW H-11 15" Chipper FC 0 0 75,000 0 0 0 DPW L-3 Loader/Backhoe 2006 FC 0 0 0 225,000 0 0 DPW H-18 Paint Trailer 1991 FC 0 0 10,000 0 0 0 DPW H-19 Utility Trailer 1989 FC 0 0 0 10,000 0 0 DPW P-V Leaf Vacuum 2013 FC 0 0 0 0 20,000 0 DPW H-9 Silverado 1 ton 2015 FC 0 0 0 100,000 0 0 DPW H-17 Cam Trailer 2009 FC 0 0 0 10,000 0 0 DPW H-6 Dodge Ram 2015 FC 0 0 0 0 0 120,000 DPW G-12 Chevy 2016 Foreman Vehicle FC 0 0 0 0 80,000 0 Subtotal FC 375,000 410,000 360,000 500,000 350,000 0 Subtotal DPW Department 1,334,899 2,805,000 5,710,000 1,575,000 1,050,000 1,000,000 Delta from previously approved CIP Plan 0 5,000 -10,000 0 BREWSTER POLICE DEPARTMENT Chief Heath J. Eldredge 631 Harwich Road Brewster, Massachusetts 02631 Phone 508-896-7011 www.brewsterpolice.org Fax 508-896-4513 “In Partnership With Our Community” MEMORANDUM TO: Assistant Town Administrator Donna Kalinick FROM: Chief Heath Eldredge RE: Capital Planning DATE: August 12, 2021 Included are the five-year capital planning documents for the police department for FY22-FY26. As you will see, in addition to what is already on file, I am requesting funds in FY25 for additional dispatch upgrades, and in FY26 for vehicles. In the CIP request form for the vehicles, you will also see that we have added an increase in this year’s request, from $135,000 to $145,000. This is a result of us requesting to replace the animal control truck, which is at a higher price point than the other vehicles we normally replace. One last change we are requesting, is that in FY22, instead of “Cruiser Video Replacement” we change the language to read “Cruiser/Body Worn Video”. Please let me know if you need a fresh CIP request form for that change. TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 – FY2026 NEW REQUEST FORM PROJECT NAME: Police Cruisers Department Priority Ranking: # 1 Original Dept. Request: $ 705,000 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $ Submitted by: Chief Eldredge Department: Police Proposed Funding Source(s): Free Cash Project Description: Purchase three vehicles annually to replace outgoing vehicles. Project Justification and Purpose: This is our annual cruiser replacement program. In each fiscal year we purchase three vehicles to replace existing department vehicles that have typically reached or exceeded 100,000 miles. When practical, we transfer the outgoing vehicles to other town departments, as needed. If vehicles are not used within town, they are sold via GovDeals and the money collected is returned to the general fund. Cost Estimate & Timing: The cost estimate is based on previous quotes for the purchase of vehicles, transfer of usable equipment (computers, radar units, etc.), purchase of equipment in need of replacing (lighting/siren packages) and marking up the vehicles with appropriate decals. FY22 is priced slightly higher as we will be replacing a Ford F150 (Animal Control), which is priced higher than the frontline police cruisers. Unexpected fluctuations in market pricing on vehicles and equipment would impact the end dollar amount required for purchase. Estimated Annual Cost or Savings of Operation and Maintenance: The schedule we have developed for replacing vehicles, typically prevents us from having to cover more expensive repairs as vehicles get well over 100,000 miles. Minor repairs of existing line vehicles are covered within the R&M Vehicle line within our general expense budget. Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2022 $145,000 2023 $140,000 2024 $140,000 2025 $140,000 2026 $140,000 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 – FY2026 NEW REQUEST FORM PROJECT NAME: Ballistic Vest Program Department Priority Ranking: #2 Original Dept. Request: $ 25,000 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY20: $ Submitted by: Chief Eldredge Department: Police Department Proposed Funding Source(s): General Fund Project Description: Money to purchase and replace officer’s ballistic vests. Project Justification and Purpose: Officers are required to wear a ballistic vest as part of their duty uniform. The fabric used in the construction of the vests has a shelf life of five years. Each vest is custom fit for the officer. Based on officer turn over and vest expiration, the vests are replaced on a rolling basis. Cost Estimate & Timing: The amount requested is based on anticipated turn over and vest expirations over the next five years. The purchases are made on an as-needed basis and the exact dollar amount required in each year varies. Estimated Annual Cost or Savings of Operation and Maintenance: Annual cost is estimate only and is based on turnover of personnel and vest expiration. Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2022 $25,000 2023 2024 2025 2026 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 – FY2026 NEW REQUEST FORM PROJECT NAME: Cruiser Video Replacement & Body Worn Video Department Priority Ranking: #5 Original Dept. Request: $ 55,000 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY20: $ Submitted by: Chief Eldredge Department: Police Department Proposed Funding Source(s): General Fund Project Description: Replacing cruiser video equipment (6 units) and server/antenna. Project Justification and Purpose: The Brewster Police Department was the first on Cape Cod to introduce cruiser video in 2015. The equipment in the cars is still the original purchased. All units are now out of warranty and we have had to make small purchases for repairs of some parts. By FY22, the units will be 7 years old and a new platform will be released, to include the ability to transition to some body camera units. Cruiser video and body cameras helps us remain open and transparent to the public and the courts and should continue to be supported by the town. Cost Estimate & Timing: All money will be expended in year one for purchase and installation. Pricing is based on a recent quote, with some padding for inflation. Estimated Annual Cost or Savings of Operation and Maintenance: Units come with a two year warranty. Small repairs outside of the warranty are typically covered within the police operating budget. Units are expected to last 5-7 years before needing serious repairs/replacement. Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2020 2021 2022 $55,000 2023 2024 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2021 – FY2025 NEW REQUEST FORM PROJECT NAME: IT Department Priority Ranking: 1 Original Dept. Request: $ 50,000 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $ Submitted by: Kathleen Lambert Department: Information Technology Proposed Funding Source(s): Project Description: Technology Upgrade/Replacement Professional services and costs related to information system and equipment improvements including, but not limited to purchase of computers, servers, productivity and office software, backup systems, and other hardware software. Project Justification and Purpose: Capital request for routine upgrade and replacement of desktop computers, servers, switches, and other computer hardware and software. Upgrades of hardware and software are routine and required. Cost Estimate & Timing: $50,000 Estimated Annual Cost or Savings of Operation and Maintenance: Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2021 25,000 2022 50,000 2023 50,000 2024 50,000 2025 50,000 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2021 – FY2025 NEW REQUEST FORM PROJECT NAME: Department Priority Ranking: # 1 Original Dept. Request: $ 1.3 million (1 = highest, 2 = second highest, etc.)TA’s Rec.: $ Submitted by: Chris Miller Department: Natural Resources Proposed Funding Source(s): Grant, CPC match, private donor Project Description: Wing’s Island Access Path Project Justification and Purpose: Access to Wing’s Island is a direct impact to the salt marsh, floods either side of high tide, and relies on an unimproved easement for access. We have submitted a grant for design and permitting ($145,000 project, ask was for $100,000). The grant was accepted and funded at $50,000. We have a $30,000 cash match through a project partner, Brewster Conservation Trust, and a donor has proposed a substantial investment toward eventual construction. We are requesting $50,000 match from town funds. The remaining $15,000 is local match. Project will link Drummer Boy Park and adjacent conservation and open space parcels to Wing’s Island with an on-grade accessible path from Drummer Boy Park, across Cedar Ridge Reserve conservation area, to a raised boardwalk across the marsh to Wing’s Island and a connection to the existing easement at the Cape Cod Museum of Natural History. Estimated construction costs are $1,100,000. Cost Estimate & Timing: $145,000 fall 2021 for engineering/permits/final design; town cost is $50,000. Construction fall 2022, estimated total project cost $1,300,000 Estimated Annual Cost or Savings of Operation and Maintenance: unknown Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2021 Grant applied for in January 2021 Grant received summer 2021 Fall town meeting funding request $50,000 2022 Permits in hand summer 2021 CPC application anticipated, private donor funding Construction fall 2022 2023 2024 2025 1 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 – FY2026 NEW REQUEST FORM PROJECT NAME: Cape Cod Sea Camps Comprehensive Plans Department Priority Ranking: #1 Original Dept. Request: $ 185,000 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $ 185,000 Submitted by: Town Administration Department: Select Board/TA Proposed Funding Source(s): Re-purpose funds from Article 3a Nov 2019 TM Project Description: Comprehensive Planning Services for CCSC & other potentially related Town properties and facilities Project Justification and Purpose: Funding was allocated at the November 2019 Town Meeting to perform an Educational Study of the Elementary Schools, including consideration of consolidation, and to study the feasibility of a Community Center. The Elementary School Study is underway and there is $185,000 remaining in the original article. Since one critical potential public purpose for the Cape Cod Sea Camps Bay parcel is a Community Center, we are seeking to re-purpose these available funds to broadly study the potential future uses for the Sea Camps, including a Community Center, and to incorporate other Town facilities for study such as the COA, Town Hall, Spruce Hill, and the Robinson property (Long Pond Woodlands) as well as the results of the Elementary School Study. These plans will identify recommended future uses, estimated capital & operating costs, project phasing, financing, and partnerships. Cost Estimate & Timing: $10,000 to assist in developing the Scope of Work and solicitation; balance of available funding to be used for a consultant to help the Sea Camps Comprehensive Plan Committee(s) facilitate the community engagement and lead the comprehensive planning processes; additional funding at May 2022 Annual Town Meeting may be needed once bids are received Estimated Annual Cost or Savings of Operation and Maintenance: N/A Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2022 $185,000 $185,000 2023 2024 2025 2026 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 – FY2026 NEW REQUEST FORM PROJECT NAME: Valuation Services Department Priority Ranking: #1 Original Dept. Request: $ 80,000/yr (estimate) (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $ Submitted by: James Gallagher Department: Assessing Proposed Funding Source(s): Overlay Project Description: Property Valuation Services Project Justification and Purpose: The Valuation Contract performs all the inspections and data collection as required for New Growth and Cyclical Re-inspections. New Growth inspections review all building permits for new construction or additions that add value to properties. Cyclical Re-inspections are a DOR requirement that all properties be re-inspected at least once every 10 years. These inspections and the associated data entry into the Assessor Database are roughly the equivalent of two (2) full time employees. In addition, the contract includes data analysis and reporting to DOR for value certification ensuring that values are set and certified in a timely manner so that the Tax Rate is set and Tax Bills can be issued on time. Cost Estimate & Timing: Previous 3 year contract was funded at $80,000/year. New 5-year contract will go out to bid prior to Fall 2021 Town Meeting (FY22). Funding from an overlay transfer. Approval for funding on Fall Town Meeting each year. Estimated Annual Cost or Savings of Operation and Maintenance: Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2022 $80,000 2023 $80,000 2024 $80,000 2025 $80,000 2026 $80,000 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 NEW REQUEST FORM PROJECT NAME: Facility analysis and upgrade at Freemans Way fields Department Priority Ranking: # Original Dept. Request: $ NA (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $20,000 Submitted by: Mike Gradone Department: Recreation Department Proposed Funding Source(s): free cash Project Description: The Brewster Recreation Department would like to get an irrigation analysis done to assess the current system. It was installed about 30 years ago and not a lot is known about its condition. We would rather be pro-active, rather than reactive if something breaks down. We would also like to do a soil analysis and add new infield mix to both Little League fields, which seem to have too much clay in the mixture and puddle quite often. Project Justification and Purpose: Having spoken to Griffin Ryder, the Director of Public Works, we agree that it is important to have a professional look at the entire irrigation system, rather than keep on doing “patch work” each year. I have reached out to a few contractors to get quotes for this type of work. The analysis/updating of the infield mix is also important so that the participants are playing on a safe surface, and so that we don’t continue to use drying agents to dry the field when it has puddles. The fields also don’t fair well when folks try to sweep the water off onto the infield grass. Cost Estimate & Timing: The cost of this project is estimated to be about $20K. The best time to do this would be in the late fall, before the winter sets in. It will also allow the field time to heal before the following spring. Estimated Annual Cost or Savings of Operation and Maintenance: I’m not sure of the exact timeline of this project, or how it would be paid for.As I stated previously, it is not a substantial amount of money, so I am hoping it can get paid for with free cash.These fields are a huge asset to this town. Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2022 Facility analysis and upgrade at Freemans Way fields $5K irrigation analysis, 15K soil analysis and new mix – FREE CASH 2023 2024 2025 2026 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2021 – FY2025 NEW REQUEST FORM PROJECT NAME: Wells 6 & 4 Redevelopment Department Priority Ranking: # 3 Original Dept. Request: $40,000.00 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY20: $ Submitted by: Paul Anderson Department: Water Proposed Funding Source(s): Water Revenues Project Description: Funds will be used for the engineering services and construction phase of the redevelopment of well 6. Project Justification and Purpose: The overall performance of the wells is directly impacted by redevelopment. How often wells need to be redeveloped is dependent on the water quality. Cost Estimate & Timing: To be implemented after July 1st but likely in the fall. Estimated Annual Cost or Savings of Operation and Maintenance: NA Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2021 2022 $40,000 2023 2024 2025 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2021 – FY2025 NEW REQUEST FORM PROJECT NAME: Wells 6 & 4 Motor and Pump Replacement Department Priority Ranking: # 4 Original Dept. Request: $40,000.00 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY20: $ Submitted by: Paul Anderson Department: Water Proposed Funding Source(s): Water Revenues Project Description: As part of the Well Redevelopment Request these funds will be used to replace the motor and pump if necessary. Both will be inspected and refurbished if possible. Project Justification and Purpose: While the well is being redeveloped its prudent to have funds available to replace the pump and motor while it is out of the well. Cost Estimate & Timing: To be implemented after July 1st but likely in the fall. Estimated Annual Cost or Savings of Operation and Maintenance: NA Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2021 $40,000.00 2022 2023 2024 2025 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 – FY2026 NEW REQUEST FORM PROJECT NAME: Vehicle Replacement Department Priority Ranking: #3 Original Dept. Request: $ 60,000.00 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $ Submitted by: Paul Anderson Department: Proposed Funding Source(s): Project Description: Replacement of existing 2012 4x4 Pickup Truck Project Justification and Purpose: Vehicle currently has 121,141 miles and due to the nature of use it requires replacement. Cost Estimate & Timing: To be purchased when funded Estimated Annual Cost or Savings of Operation and Maintenance: NA Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2022 $60,000.00 2023 2024 2025 2026 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2022 – FY2026 NEW REQUEST FORM PROJECT NAME: Red Top Road Water Main Project Department Priority Ranking: # 2 Original Dept. Request: $ 150,000.00 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $ Submitted by: Department: Proposed Funding Source(s): Project Description: Engineering services and installation of water main on Red Top Road Project Justification and Purpose: Project will provide domestic water and fire protection to residents on this road as well as enhance the hydraulic grade. Cost Estimate & Timing: Work will be done by Water Department staff and will be scheduled once funded. Estimated Annual Cost or Savings of Operation and Maintenance: Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2022 2023 $150,000.00 2024 2025 2026 TOWN OF BREWSTER CAPITAL IMPROVEMENT PROGRAM FY2021 – FY2025 NEW REQUEST FORM PROJECT NAME: HVAC Repairs / Replacement Department Priority Ranking: # 2 Original Dept. Request: $35,000.00 (1 = highest, 2 = second highest, etc.)TA’s Rec. for FY22: $ Submitted by: Paul Anderson Department: Water Proposed Funding Source(s): Water Revenues Project Description: Replacement of existing venting on 3 space heaters and replacement of one existing HVAC unit. Project Justification and Purpose: The existing venting on 3 heating units in the garage have failed and require replacement. 1 heater at the treatment plant has failed and requires replacement. Cost Estimate & Timing: $35,000.00 Work will be conducted once funds are available within FY22 Estimated Annual Cost or Savings of Operation and Maintenance: NA Fiscal Year Dept. Request/Proposed TA Recommended/Plan 2021 2022 $35,000.00 2023 2024 2025 Finance Committee Minutes September 17, 2021 Page 1 of 2 TOWN OF BREWSTER FINANCE COMMITTEE Date: September 17, 2021 Time: 8:30 AM VIRTUAL MEETING MINUTES Present: Chair Pete Dahl, Vice Chair Frank Bridges, Clerk Bill Meehan, Honey Pivirotto, Bob Young, Alex Hopper, Andy Evans, Robert Tobias, Bill Henchy Also present: Peter Lombardi, Town Administrator; Mimi Bernardo, Finance Director Absent: The Chair called the meeting to order at 8:30 am and announced a quorum. This meeting will be conducted by remote participation pursuant to Chapter 20 of the Acts of 2021. No in-person meeting attendance will be permitted. If the Town is unable to live broadcast this meeting, a record of the proceedings will be provided on the Town website as soon as possible. The meeting may be viewed by: Live broadcast (Brewster Government TV Channel 18), Livestream (livestream.brerwster-ma.gov), or Video recording (tv.brewster-ma.gov). 1.Public Announcements and Comment- none 2.Town Administrator/Finance Director Report – none 3.Reserve Fund transfer request Peter Lombardi addressed the Committee saying that what is coming before you is a Reserve Fund transfer request. There was a structure fire in early January of this past year. The following day, the Building Commissioner deemed it structurally unsound. We worked with Town Counsel for several months trying to remedy the situation and have the homeowners take the structure down but were unable to do so. There are procedures under the Law that allow Towns to seek conjunctive relief. As there was some issue with ownership, ultimately, we went to Housing Court and sought a Preliminary Injunction to move forward with demolition of the structure. The Order was granted, and service was attempted on the current owner, however, the period for response has since expired. We are seeking a Reserve Fund transfer in the amount of $20,000. We have a quote from a local contractor of $18,000 and wanted to make sure if they went over, we would have a little room. There is a mechanism under MA General Law for the Town to place a lien against the owner for the costs of the site work and associated legal expenses which we will do once the work is completed. Pete said this is the Finance Committee’s Statutory Authority, we control a Reserve Fund that is appropriated at Town Meeting of $100,000 for such purposes as these types of emergency requests. He opened the floor to the Committee for questions. Approved: VOTE: Finance Committee Minutes September 17, 2021 Page 2 of 2 Bill Henchy concurs that legal action was appropriate, but wonders why the Town should undertake the responsibility and assume the liability of removing this structure as it is private property? Why should the Town spend its funds to remedy a public safety hazard on private property? Peter Lombardi answered that it is Town Counsel’s opinion which is based, not just on the Building Commissioner, but also the Board of Survey which was convened including the Fire Chief – looking at the neighborhood, which is relatively dense with several abutters who are close, and the concern is people potentially getting injured. The request is unique, however, there is a reason why there is a mechanism under the law for just such a circumstance. Bill Henchy said his issue is the step being asked today to use $20,000 from the Reserve Fund – why should the Town step in to assume the liability and responsibility for removing the structure and then be responsible for whatever hazards there may be following the removal. Peter Lombardi said there are clearly some issues identifying the heirs to the property and based on our information, we don’t think those individuals have the means or interest in remediating the property. We feel it is appropriate to move forward to taking the steps to secure the site. Frank asked if there would be a lien on the Estate? Peter Lombardi answered yes. Frank went on to say, logically, short of someone coming in and taking control of this property, this property will be absorbed by the Town by Foreclosure? Peter Lombardi said he would not want to speculate on that. Bob Young asked about the Lien for the costs to take down the structure and any future costs that may come? Peter Lombardi said the lien would accommodate the legal cost the Town has incurred. Pete said there will be a cost of not doing anything if something were to happen and we could have done something to prevent such an occurrence. Peter Lombardi offered to have Town Counsel attend a future Finance Committee meeting to answer any outstanding questions if the Committee does not feel it is ready to vote on this issue. Pete said he felt ready to vote and requested a motion be made. Pete Dahl MOVED that an amount of $20,000 be transferred from the Reserve Fund in accordance with Ch.40 Sec.6 of the MA General Laws to be transferred to Town Administrator Operating Budget New Account 81 Glenwood Road Demolition. Frank Bridges second. Roll Call Vote: Frank Bridges – yes, Bill Meehan – yes, Andy Evans – yes, Bill Henchy – no, Alex Hopper – yes, Honey Pivirotto – yes, Robert Tobias – yes, Bob Young – yes, Chair Pete Dahl– yes. The Committee voted: 8-yes 1-no 4.Matters Not Reasonably Anticipated by the Chair- none 5. Next Finance Committee Meeting – September 22, 2021 6. Adjournment Bill Meehan MOVED to adjourn the meeting at 8:50 PM. Frank Bridges second. Roll Call Vote: Frank Bridges – yes, Bill Meehan – yes, Honey Pivirotto – yes, Bob Young – yes, Andy Evans – yes, Robert Tobias – yes, Alex Hopper – yes, Bill Henchy – yes, Chair Pete Dahl– yes. The Committee voted: 9-yes 0-no Respectfully submitted, Beth Devine Packet of supporting materials on the website for public review. Finance Committee Minutes September 22, 2021 Page 1 of 4 TOWN OF BREWSTER FINANCE COMMITTEE Date: September 22, 2021 Time: 6:00 PM VIRTUAL MEETING MINUTES Present: Chair Pete Dahl, Vice Chair Frank Bridges, Clerk Bill Meehan (6:20), Honey Pivirotto, Robert Tobias, William Henchy, Alex Hopper Also present: Mimi Bernardo, Finance Director; Peter Lombardi, Town Administrator; Donna Kalinick, Assistant Town Administrator; Dave Whitney, Select Board Absent: Andy Evans, Bob Young The Chair called the meeting to order at 6:02 pm and announced a quorum. This meeting will be conducted by remote participation pursuant to Chapter 20 of the Acts of 2021. No in-person meeting attendance will be permitted. If the Town is unable to live broadcast this meeting, a record of the proceedings will be provided on the Town website as soon as possible. The meeting may be viewed by: Live broadcast (Brewster Government TV Channel 18), Livestream (livestream.brerwster-ma.gov), or Video recording (tv.brewster-ma.gov). 1.Public Announcements and Comment- none 2.Town Administrator/Finance Director Report – nothing additional 3.Special Town Meeting – Sept 25 - Update Peter Lombardi said we are keeping an eye on the weather for Saturday, and we will see where we are in another 24-36 hours about delaying to the rain date if necessary. We do want to give residents as much notice as possible. Should decide late tomorrow or early Friday – we will put info on website and a reverse 911 call for confirmation. If it is Sunday, it is a 1PM start with Noon check-in. It is very important for residents understand this is a two-step process to acquire these properties – Town Meeting vote and Ballot vote are necessary to pass this initiative. 4. Discussion and Re-Vote – Sept 25, 2021 Special Town Meeting Warrant Articles Peter Lombardi said it is important for Town Meeting to hear where the Committee stands with the new information. The details of the Sea Camp properties are more finite now, the goal throughout has been to seek negotiated sale of these properties. Felt like the totality of the information, the total acquisition cost of both properties was in line with the “floor” of what we would have expected to see had we gone the eminent domain route. The Select Board felt this was the best potential outcome at the lowest possible cost. At the very highest level, we are looking at the negotiated sales price of $6M for the Long Pond parcel and $20M for the Bay parcel. Approved: VOTE: Finance Committee Minutes September 22, 2021 Page 2 of 4 Pete said he would like to go around and ask for comments or questions. Honey fully supports this project. She recognizes the concerns regarding the future unknowns. She believes the town has a plan for the broad-spectrum involvement from the community plan. There is a tremendous successful effort to engage those in the town to the extent they can or would participate in all the planning. Each initiative will require a separate vote and budget considerations. She is very committed to a positive vote on this initiative as it is a remarkable opportunity and not one that will ever come again. Robert said he plans to vote in favor of the Warrants. Frank throws his full support behind this project. Adding these properties will add a lot to what it means to live in Brewster – enjoyment, peace of mind, and satisfaction to the people of this community. Even if this is not “the floor,” he supports this fully and hopes we have a good turnout for this Town Meeting to have a representative vote. Alex agrees and thinks this is an incredible opportunity for the Town of Brewster. This is really about the acquisition of land, and it will be a long road to see what will be used and for what – having the Town have ownership of it will be a more democratic process other than a developer making those decisions. Bill Henchy is fully in support as well. He wondered about the status of the actual contract. Peter Lombardi said the offer letters included language that sought to complete the P&S by close of business tomorrow with an eye toward having those agreements done to be able to go into Town Meeting without any outstanding questions. The Select Board will meet tomorrow afternoon with an eye toward discussing, voting, and potentially executing the P&S for both properties. Bill Meehan said the negotiated settlement is perfectly fine to him. He has questions about some recent activity on social media that may threaten our position. Pete stated the one thing he wants to say is that the only way the town can control the uses and accesses is by ownership, we can’t rely on other parties to give the Town the things that it really wants. We’ve seen enough private beach signs, people have asked for better access, they also want open spaces. This is the perfect situation to go out and acquire these properties. This will create significant debt, yet we know that we have debt off the balance sheet that we are responsible for – even with that, he gives this his full wholehearted support. Bill Henchy MOVED to approve Article 1 and recommend its passage to Town Meeting. Bill Meehan second. Roll Call Vote: Frank Bridges – yes, Bill Meehan – yes, Bill Henchy – yes, Alex Hopper – yes, Honey Pivirotto – yes, Robert Tobias – yes, Chair Pete Dahl– yes. The Committee voted: 7-yes 0-no Bill Meehan MOVED to approve Article 2 as printed in the Warrant. Alex Hopper second. Roll Call Vote: Frank Bridges – yes, Bill Meehan – yes, Bill Henchy – yes, Alex Hopper – yes, Honey Pivirotto – yes, Robert Tobias – yes, Chair Pete Dahl– yes. The Committee voted: 7-yes 0-no Bill Meehan MOVED to approve Article 3 as printed in the Warrant. Bill Henchy second. Roll Call Vote: Frank Bridges – yes, Bill Meehan – yes, Bill Henchy – yes, Alex Hopper – yes, Honey Pivirotto – yes, Robert Tobias – yes, Chair Pete Dahl– yes. The Committee voted: 7-yes 0-no Pete asked about the statement to present at Town Meeting. Bill Henchy said in the last few days, there has been a very public effort by one of the apparent suitors of the Bay Property that they will acquire the property on the Town’s behalf and provide some unspecified public access, giving tours of their current property, making public statements about their past charitable efforts towards the Town in the past. They will pursue this to suggest that they acquire the property, and it will be at no cost to the taxpayers. It is being used to sow Finance Committee Minutes September 22, 2021 Page 3 of 4 confusion and doubt in the Town. It is squarely in the public eye. He believes the Finance Committee’s role is to provide their recommendations to Town Meeting, he feels it appropriate to take a position on it. Alex thanked Bill Henchy for his written statement, and he wouldn’t want a statement to be read preemptively. He feels we should wait to see what the Town Meeting looks like before making such a statement. Frank said he hasn’t been paying attention to social media on this, but when he read Bill’s statement, it caused some alarm. Frank felt that this recommendation wouldn’t elevate the issue. He can support this statement and feels it is factual and opinion neutral. If this opposition effort has some momentum behind it, he thinks it’s a good idea to make our thoughts known. Bill Meehan said he thinks we should make a statement. This is a one issue Town Meeting and we voted unanimously to support these Articles. He feels Bill Henchy did a marvelous job and would suggest one word of change – “pledged” to “asserted” in paragraph two. Robert feels we should make a statement. Honey wonders if, as it is in a public forum tonight as a draft, and since this is a one issue Town Meeting, supports the fact to put it forward – what would be the plan for this? Pete answered that we would make a public statement on the floor of Town Meeting. Can we have this accepted as a statement from the committee by consensus? Bill Henchy said Bill Meehan’s edits were fine and wondered if the Select Board would want to make this available at Town Meeting, they may have it for distribution. Pete said he thinks the intention is to make this a public pronouncement stated publicly and verbally. He asked if everyone was ok with this, and it was accepted as a statement from the Committee. 5.Liaison Assignments/Reports Robert included, as part of the packet, a presentation to the Brewster Affordable Housing Trust (BAHT) by Jill Scalise, Housing Coordinator. He asked everyone to review the slide deck. BAHT was created by Town Meeting in 2018, charged with expanding affordable, moderate, low, and very low-income households. The State requires that towns work toward having 10% of year-round homes as affordable – affordable for those that are at less than 80% of median area income. In 2019 AMI $75,000, 80% $60K, 30% of that for housing and utilities at $18,000. We have 268 affordable units – 5.6%, and the State wants us at 10% - we need another 212 units to reach that threshold. In 2019, Brewster had 1500 low- and moderate-income households. Some 960 of those are cost burdened, spending greater than 30% on housing and utilities; 575 are severely cost burdened spending greater than 50% of their income on housing and utilities. This is a problem currently – housing is expensive. Our current affordable units all have a 2+ year waitlist – costs of rents are rising – median value went up over 40%. BAHT is working at this. A few ongoing projects – Brewster Woods will add 30 affordable units, Serenity Brewster will add 27 affordable units, Red Top Road - 2 Habitat homes, and Millstone Community Housing among others. Donna Kalinick added that the pandemic has made the housing crisis for those living on the Cape much worse. She said Jill Scalise takes many calls weekly from people who have lost their housing. Alex thanked Robert for the report – one point he would like to make, the incentive for towns to reach that 10% subsidized housing inventory is to be able to reject developers coming in using Ch. 40B. Even if we don’t have that, we can at least show that we have an active housing production plan we’re working toward. Bill Henchy said one of the math issues under 40B, in order to qualify for a comprehensive permit, a developer only needs to provide 25% of the units as affordable units. If developers came in with the two Sea Camp acquisitions, this would be without Brewster zoning. These acquisitions provide the opportunity for the Town to reach that 10% in a matter with the Town’s goals, not the developer’s goals. The town does a wonderful job in this area. 6. Review and Approval of Minutes – 8/18/21 & 8/25/21 Bill Meehan MOVED to approve the 8/18/21 Minutes as presented. Frank Bridges second. Roll Call Vote: Frank Bridges – yes, Bill Meehan – yes, Alex Hopper – yes, Robert Tobias – yes, Bill Henchy – abstain, Chair Pete Dahl– yes. Finance Committee Minutes September 22, 2021 Page 4 of 4 The Committee voted: 5-yes 0-no 1-abstain Bill Meehan MOVED to approve the 8/25/21 Minutes as presented. Frank Bridges second. Roll Call Vote: Frank Bridges – yes, Bill Meehan – yes, Alex Hopper – yes, Robert Tobias – yes, Bill Henchy – yes, Chair Pete Dahl– yes. The Committee voted: 6-yes 0-no 7. Request for agenda items for future meetings – please email Pete 8. Matters Not Reasonably Anticipated by the Chair- none 9. Next Finance Committee Meeting – September 29, 2021 10. Adjournment Frank Bridges MOVED to adjourn the meeting at 6:59 PM. Bill Meehan second. Roll Call Vote: Frank Bridges – yes, Bill Meehan – yes, Robert Tobias – yes, Alex Hopper – yes, Bill Henchy – yes, Chair Pete Dahl– yes. The Committee voted: 6-yes 0-no Respectfully submitted, Beth Devine Packet of supporting materials on the website for public review.