Loading...
HomeMy Public PortalAbout22-030 - Piggyback agrmt w/ Southeastern EngineeringSponsored by: Interim City Manager RESOLUTION NO. 22-030 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, AUTHORIZING THE INTERIM CITY MANAGER TO PIGGYBACK THE CITY OF FORT LAUDERDALE AGREEMENT WITH SOUTHEASTERN ENGINEERING CONTRACTORS, INC. TO INSTALL A FRENCH DRAIN, STORM DRAIN CATCH BASIN (M TYPE) SYSTEM, AND POLLUTION RETARDANT BAFFLES ALONG NW 147TH STREET, WITHIN THE CITY, TO MITIGATE FLOODING EVENTS ON THIS STREET; FURTHER AUTHORIZING A PROJECT CONTINGENCY BUDGET, IN A TOTAL AMOUNT NOT TO EXCEED ELEVEN THOUSAND, EIGHT HUNDRED ONE DOLLARS ($11,801.00); PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of the Opa-Locka ("City") seeks to mitigate flooding along NW 147th, within the City; and WHEREAS, the proposed work on NW 147th Street consists of seven (7) catch basins and six hundred and eleven (611) feet of French drains. The drainage system will be installed from NW 22nd Place to 26th Ave along NW 147th Street, including temporary pavement repair to those sections where the drainage system will be installed; and WHEREAS, the milling and resurfacing of this street was previously approved by the City Commission (Resolution 22-9963) for One Hundred Forty Thousand, Seven Hundred Forty -Five Dollars ($140,745.00) and is being deferred pendin completion of the installation of the proposed drainage system; and g WHEREAS, pursuant to Section 2-318(3) of the City's Purchasing Code (as approved by Ordinance 2020-07) the City may purchase and acquire under contracts with the federal government, the State of Florida or its political subdivisions and also municipal co-operative purchasing organizations and programs when the City Manager has determined that the prices of the original contract are competitive and reasonable; and WHEREAS, the City of Fort Lauderdale previously awarded a contract to Southeastern Engineering Contractors, Inc., attached as Exhibit "A", pursuant to its Resolution No. 22-030 Invitation to Bid (ITB) # 12504-613 Project No. 12220 for "Annual Construction of1 General Stormwater Infrastructure" for a two-year period commencing June 1 202 through June 1, 2023, with the City of Fort Lauderdale's right to extend the contra for two (2) additional one (1) year terms; and ct WHEREAS, the City received a proposal from Southeastern Engineering Contractors, Inc., attached hereto as Exhibit "B", for Two Hundred Forty -Three Thousand, Seven Hundred Seventy -Four Dollars ($243,774.00) to install a g renc Drain, Storm Drain Catch Basin (J Type) System and Pollution Retardant Baffles alon NW 147th Street, within the City, to mitigate flooding events on the Street; and g WHEREAS, additionally, the City Manager recommends the establishment ($11of a contingency budget of exceed Eleven Thousand, Eight Hundred One Dollar ,801.00) to address small issues which might arise in the completion t s of project; and he WHEREAS, the City Commission finds that it is in the best interest of the City to piggyback the City of Fort Lauderdale Agreement with Southeastern Engineering Contractors, Inc., attached hereto as Exhibit "A", in order to benefit from already negotiated rates and enter into an agreement, attached hereto as Exhibit "C, to install a French Drain, Storm Drain Catch Basin (J Type) System and Pollution Retardant Baffles along NW 147th Street, within the City, in an amount of Two Hundred Forty - Three Thousand, Seven Hundred Seventy Four Dollars ($243,774.00), with an additional contingency budget, not to exceed Eleven Thousand, Eight Hundred One Dollars ($11,801.00). NOW THEREFORE BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF OPA LOCKA, FLORIDA: Sects The recitals to the preamble herein are incorporated by reference. Sects The City Commission of the City of Opa-Locka hereby authorizes the City Manager to piggyback the City of Fort Lauderdale Agreement with Southeastern Engineering Contractors, Inc., attached hereto as Exhibit "A", in order to benefit from already negotiated rates and enter into an agreement, attached hereto as Exhibit "C, to install a French Drain, Storm Drain Catch Basin (J Type) System and Pollution Retardant Baffles along NW 147th Street, within the City, in an amount of Two Hundred Forty Three Thousand, Seven Hundred Seventy Four Dollars 2 Resolution No. 22-030 ($243,774.00), with an additional contingency budget, not to exceed Eleven Thousand, Eight Hundred One Dollars ($11,801.00). Section 3. This Resolution shall take effect immediately upon adoption, and is subject to the review of the State of Florida Financial Emergency Oversight Board. PASSED and ADOPTED this 14th day of September, 2022. ATTEST: Joa i a Flores, City Clerk LEGAL SUFF CIENCY: APPROVED AS TO FORM AND Burnadette Nor ' -Weeks, P.A. City Attorne Moved by: Commissioner Bass Seconded by: Vice Mayor Taylor VOTE: 4-0 Commissioner Dominguez YES Commissioner Bass YES Commissioner Davis ABSENT Commissioner Taylor YES Mayor Williams YES Veronica Williams, Mayor 3 City of Opa-locka Agenda Cover Memo Department Manager: City Manager: Commission Meeting Date: Fiscal Impact: (Enter Xin box) Funding Source: Account# : Contract/P.O. Required: (Enter Xin box) Strategic Plan Related (Enter X in box) Sponsor Name Adelina Gross Darvin Williams 09/14/2022 Yes X (Enter Fund & Dept.) Ex: See Financial Impact Section Yes X X City Manager Item Type: (Enter Xin box) Department Manager Signature: CM Signature: Resolution Ordinance Reading: (Enter X in box) Public Hearing: (Enter X in box) Advertising Requirement: (EnterXin box) No RFP/RFQ/Bid#: Department: X Ordinance 1st Reading Yes No Other 2nd Reading Yes No X Yes X No X Strategic Plan Obj./Strategy: (list the specific objective/strategy this item will address) City Manager Short Title: PROJECT No. 2022-09-024 NW 147TH STREET - Drainage Installation Staff Summary: A resolution from the City Commission of the City of Opa-locka, Florida to authorize the Interim City Manager to accept the fee proposal from Southeastern Engineering Contractors, Inc. to install a French Drain, Storm Drain Catch Basin (M Type) System, and Pollution Retardant Baffles along NW 147th Street to mitigate flooding events on this street. The proposed work on NW 147th Street consists of seven (7) catch basins and six hundred and eleven (6I l) feet of French drains. The drainage system will be installed from NW 22nd PI to 26th Ave along NW 147th Street, including temporary pavement repair to those sections where the drainage system will be installed. The milling and resurfacing of this street was 'nrepreviously of the bnstallaCommission on of the proposed drainage 9963) for $140,745 and is being deferred pending completion system. e of Fort erdale in Southeastern Engineering Contractors, Inc. has an 22201ng for "Annual Constontract with huction of General Stdormwater response to the City ITB # 12504-613 Project No. Infrastructure" that fits the scope of this project for piggybacking purposes. Financial Impact This project is proposed to cost $243,774.00 Additionally, h miht arise in the completion ofcommends the thispr ject. The ent of a contingency of $11,801 to address small issues g contingency is slightly smaller than is usually recommended conform availablef u d balance ent #4 where this project was addressed. Funding will come from Stormwater Remaining Project Contingency Account 87-541825 87-541825 Description NW 147 St — (Drainage) Total Project Available * Project Balance $243,774 $ 11,801 * To be available after approval of Budget Amendment #4. $243,774 $ 11,801 $255,575 Staff recommends the City Commission authorize the City Manager to enter into Avenue along NW Southeastern Engineering Contractors to install drainage from NW 22nd Place to 147th Street for $243,774.00 and to also authorize the establishment of a contingency of $11,801.00 for issues which may arise. 1. Agenda 2. Proposal provided by Southeastern Contractors 3. Additional Proposals received for the same project 4. Street Map 5. Street Pictures 6. City of Fort Lauderdale contract and BID form Package in response to the ITB No. 12504-613 7. Opa-locka Piggyback Contract. TASK ORDER N: 1 For Issuance of a Release on Master Blanket P.0 N CONTRACTOR: Southeastern Engineering Contractors TO: PROJECT NAME: NW 147th Street Drainage Improvements PROJECT LOCATION: NW 147th Street from NW 22nd PL to NW 26th Ave. 911 NW 209th Avenue, Suite 101 Pembroke Pines, FL 33029 Phone (305) 557-4226 Cityof Opa Locka 780 Fisherman Street Opa-Locka, FL 33054 CONTRACT NUMBER: CONTRACT DESC: CC AWARD: CONTRACT EXPIRES: UNIT COST: CITY CONTACT: PHONE: EMAIL FUNDING SOURCE: TASK ORDER DATE: 12504.613-1 Annual Construction of General Stormwater Infrastructure (P12220) 6/01/2021, PUR-6, CAME 21-0521 5/31/2023 $1,861,000.00 CONTRACT CAP Adelina Gross 305 953 2868 ext 3001 arr ro s s tin o pa l oc k a f I. go v xxxxxxxxxx 8/9/2022 SUMMARY OF WORK: The scope of work for this task order includes, Install 7 New Drainage Structures and 1,0111f of 24"HDPE Solid and Perforated Pipe. The construction phase will be completed (6) Weeks after issuance of the Notice to Proceed (NTP) 4 7 17 15 27 S7 MILLING EXIST ASPH PAVT 1 INCH AVG DEPTH AREA (1,580' x 22 61/9 x 70°, STORM MANHOLE TYPE M -S (60 INCHES ROUND) LESS THAN 10 FEET )FDOT PAY ITEM NUM PIPE CULVERT OPTIONAL MATERIAL ROUND 18 INCHES 24 INCHES STORM DRAIN (INSTAL 132 FRENCH DRAIN 24 INCHES 87 WORK ZONE SIGN FURNISH AND INSTALL (10 EA) CHANNELIZING DEVICE TYPES I II DI VP DRUM OR LCD FURNISH AND INSTALL (30 EA) CHANNELIZING DEVICE TYPE III 6 FEET FURNISH AND INSTALL (4 EA) TRAFFIC CONES FURNISH AND INSTALL (20 EA) FURNISH AND INSTALL STEEL TRAFFIC PLATES FOR 12 -FOOT LANES WEEKLY RATE (FOOT) (4ea)x4wk REGULAR EXCAVATION (1,580' x 22 6') x 0 67)/27 PLOWABLE FILL (If needed) 109 201 POLLUTION RETARDANT BAFFLE WITH 12 INCHES CLEANOUT ACCESS TO COVER IB INCH -24 I 420 1260 168 840 16 886 20 2778 7 400 611 14 day day day day each cubic yard cubic yard square yard each linear foot linear foot each 2 2 2.6 1.3 192 12.8 230.4 9 5387 104.B 175.4 576 Total Bid Price Included in Contract: 5840.00 52,110.00 5436.80 51,092 00 $3,072 00 S11,34080 84,608 00 515,00100 537,709 00 541,910 On 5107,169 40 59,064 00 $243,774.00 22 (SURVEY FIELD WORK AS PERFORMED BY CREW (FOOT PAY ITEM NUMBER NOT APPLICABLE)As-Bullt 1 36 1 hourly rate 166.4 55,990.401 Southeastern Engineering Contractors Contra ,6.e C1'6 lot ant Authar¢ed Sign ure Date lose C Perello Print Name and Title By: Project Manager/Estimator Task Order Number: 1 Project Number: Project Name: Contractor: Amount: NW 147th Street Drainage Improvements Southeastern Engineering Contractors $243,774.00 Task Order Number: 1 Contract Number: 12504.613.1 Project Number: o Project Name: NW 147th Street Drainage Improvements Contractor: Southeastern Engineering Contractors Amount: $243,774.00 IN WITNESS OF THE FOREGOING, the parties have set their hands and seals the day and year first written CITY CITY OF OPA-LOCKA, a municipal corporation of the State of Florida. Chief Procurement Officer Date: MAGGOLC INC. ENGINEERING CONTRACTOR — LIC: E-251302 11020 SW 55 ST., MIAMI, FL 33165 PRONE: 786-291-2949 FAX: 786-472-8831 PROJECT INFORMATION Project Name: Drainage Improvements NW 147 ST Owner: City of Opalocka Project Location: NW 147 ST PROPOSAL Date QUOTATION # 7/20/2022 I 20220212 Company Name: MAGGOLC INC. Contact Person: MARIO GONZALEZ Fax / Phone: 786-472 8831 / 786-291 2949 Item # 1 Description Mobilization Unit LS Quantity Unit Price $20,000.00 Total $20,000.00 1.00 2 Maintenance of Traffic LS 1.00 $12,000.00 $12,000.00 3 Clearing & Grubbing LS 1.00 $16,000.00 $16,000.00 4 Subgrade Preparation 12" thick SY 4,500.00 $10.00 $45,000.00 5 Base Course, limerock 8" thick SY 4,500.00 $28.00 $126,000.00 6 Remove Existing Asphalt SY 4,500.00 $9.00 $40,500.00 7 Asphalt SP, Traffic B, 1.5" thicknes SY 4,500.00 $16.00 $72,000.00 8 Manhole J-7 <10' with Inlet Swale Top EA 7.00 $5,800.00 $40,600.00 9 24" French Drain / 10 FT deep LF 615.00 $165.00 $101,475.00 10 24" Solid Pipe LF 400.00 $98.00 $39,200.00 11 Pollution Retardant Bafle/ Plastic FDOT Approved EA 14.00 $350.00 $4,900.00 12 Contingency (10 %) LS 1.00 $50,720.00 $50,720.00 7/e-a44e,,Tafae,J 7. 7 n J NW -24th CT PROJECT LOCATION NW 147th Street Road 1 Drainage Improvements Catch Basin French Drain Drainage Pipe Construction Section CITY OF FORT LAUDERDALE CONTRACT ANNUAL CONSTRUCTION OF GENERAL STORMWATER INFRASTRUCTURE (12504-613) DESCRIPTION Southeastern En: ineerin: Contractors Inc. CONTRACTOR Unit Price Contract AMOUNT June 1, 2021 COMMISSION APPROVAL DATE CITY OF FORT LAUDERDALE CONSTRUCTION AGREEMENT by and THIS Agreement made and entered into this 1st corday yrotion (City) and Southeasternand between the City of Fort Lauderdale, a Florida municipal or collectively En ineerin Contractors Inc., a Florida Corporation (Contractor), (Party "Parties"); WHEREAS, the City desires to retain a contractor for the ch waseopen d on as expresse Adpri_ in its Invitation to Bid No. 12504-613 , Project No. 12220 , 2021 ; and, WHEREAS, the Contractor has expressed its willingness and capability to perform the necessary work to accomplish the Project. NOW, THEREFORE, the City and the Contractor, in consideration le of cthe d actual ua covenants and conditions contained herein andg for other as follows: the receipt and sufficiency is hereby acknowledged, agree ARTICLE 1 — DEFINITIONS Whenever used in this Agreement or in other Contract Documents, and the following: l for terms have the meanings indicated which are applicable to both singularthe 1.1 A reement — This written Agreement between the City and Documents traarct r covering toe r to work e performed including other Contract incorporated in the Agreement. ment — The form accepted by the City which is to be used by the 1.2 A pp lication for Pa v ment and which is to include such Contractor in requesting progress or final pay supporting documentation as is required by the Contract Documents. 1.3 Ap` — The word approve is defined to mean review of the material, equipment or methods for general compliance with design concepts and with the information given in the Contract Documents. It does not imply a responsibility on the part of the City to verify in every detail conformance with plans and specifications. 1.4 Bid — The offer or Bid of the Contractor submitted on the prescribed form setting forth the total prices for the Work to be performed. 1.5 Bid Documents — Advertisement for Invitation to Bids, t e Instructions to Bidders Forms, , the Bid Form (with supplemental affidavits and sample agreements), General Conditions, the Supplementary Conditions, the Specifications, and the Plans, which documents all become an integral part of the Contract Documents. he y hat all 1.6 Certificate of Substantial Com letion - Certificate provided by t inspected, cer i ing t d by Work, excluding the punch list items, has been completed, o r ed, the City. C-1 1.7 Chan eOrder - by A change order is the City, authorizing defined as a written order to the approvedp and the Contractor that is directly revision related at underlying Contractor adjustment in the originalt contract price or the contracty g agreement between the o the original scope of work or thean original scope of work, issued on or after the effectivedte o the directly ntra related to 1.8 Cit date of contract. � —The City of Fort Lauderdale, Florida including agents, officials, representatives,van edt contractors, subcontractors, lf volunteers,succeto ssors su to assigns,with whom the Contractor has entered into the Agreement employees, the Work is to be provided. successors g Bement and for whom 1.9 Contract Documents Exhibits to this — The Contract Documents shall consist of this Bondx Agreement, Public Construction Bond, Performance and Certificates of Insurance Agreement, Orders, , Notice of andrfNnncect Bond, Payment General Conditions, Award Notice to Proceed Special Conditions, Task Plans/Drawings,applis a provisions of State Addenda,BidnFd r Federal Law Technical Specifications, supplementd Affidavits and Agreements, Change, all Orders or written amendments duly and any delivered after execution modof ggee lnvit ' Instructionsor to Bidders and y Bond, including Bid,to Bid, Schedule of Completion, Contractor's response to the City's Invitation ion to and suSchedule, work directive ton changes lesoUed taon and Agreement, as Values,all amendments modificationsae fthe well as any additional documents that aor re afterthe required tovb Date i under the Agreement. q be submitted Permits on file with the Citydir ve and/or those permits to be obtained shall be considered permits shall be given to Ihebe City fordinclusio part of this Agreement. permits shall be met prior to acceptance of then in the Contract Documents.copy of all 1.10 Work and release of the final Terms of Contract Price — The monies payment. Documents and in accordance with payable to eiCo tactor by the City under the Contract 1.11 unit prices listed in the Bid. Contract Time —The number of calendar days completion of the Work. The dates an completed aso statedin Notice to Proceedn y stated in the Agreementrted and for the which the work shall be started and shall be 1.12 and each subsequent Task Order. Contractor —The person, firm entered into the firm, Company, or corporation Agreement, including with whom entered contractors, but not limited to its the City has successors and assigns subcontractors, employees, agents, repr their subcontractors and their other 1.13 Day — A calendar day of twenty-four (24) hours ending at midnight. 1.14 Defer — When modifying faulty, or deficient, or does not conform t the to work that is unsatisfactory, the requirements of Contract Documents or does teat ctory Documents, t s e has been inspection, n, test or approval referred to in the meet final payment. damaged prior to the Project Manager's recommendationnacf of C-2 — The effective date of the Agreement shall be the Parties. The Contractor shall provide all required d 1.15 Effective te Date of the A reement 1 calendar pate the Contract is executed by the verificationity t o all( bonds and ce bonds and insurances to te City within ten pays following and performance approval. Upon days esthe theCity wCillty Coma w written n proceed (NTP) to the Contractor. insurances, City will issue a written notice top completed, including The date the Task Order Work is comp c in lotion Date — with those items specified 1.16 Final Com punch list, and delivered along completion of the final accepted bythe Contract Documents and is liquid, or gaseous material that is toxic, - Any solid, q unstable upon prolonged 1 17 Hazardous Materials Hp,ZMAT chemically reactive, or r the environment flammable, radioactive,ntiti that could pose a threat to life, property, Response, e in quantities could Comprehensive Environmental 49 CFR storage 101(14) of Compensation in Section of Transportation to be Liability Act of 1980 and in 40 CFse �etary Also defined by when and Lid Y material designated by the safety, and property 1 capable ofa substance pposing m unreasonable risk to oo designated.ah, sa posing transported in commerce and which has been Comprehensive Section 101(14) of the Comp As defined by substance p designated ns ve 1.18 Hazardous Substsp Compensation and Liability Act; any element,e comp Environmental Response, of the Clean Water Act; any pursuant to Section substance311(b) (2desi designated pursuant to Section102 identified edlud under anyor nd, Disposal Act { ollutant mixture, soltion or g any hazardous l powaste llutant listedpursuant d Sectionct 3001 of of theoCeanaWatr Act}; hazardous dour aira chemical listed imminently under Section o 30e[7 under Section 112 of the Clean Air Act; and any thereof, which is listed pursuant to Section 7 of the Toxic Substances Control Act. The substancee or mixturec P etroleum, including crude oil or anyfraction does not include p designated as a hazardous substance in the first gas term specifically listed or not otherwise this and the term does not include natural ga , natural gas sentencei of natural paragraph, synthetic gas usable for fuel liquids, liquefied natural gas, or and such synthetic gas}. wastes designated by OSHA in accordance with 40 CFR 1 19 HaR 261 261 Waste - due to the p ro P corrosivO reactivity, Those solid erties of ignitability, toxicity. Any or or of the EPA I that is subject to the Hazardous Waste Manifest re uire materia specified in 40 CFR Part 262. da s as established by the City Commission of Those designated non work Y 1.20 Holida s - Agreement the City of Fort Lauderdale. as used in this The term "inspection" and the act of inspecting s ectied — tion of construction to ensure that conformsrm l toot the 1.21 In_ � is defined to mean the examination plans and specifications. design concept expressed in the rintending and/or overseeing. o supervision, sup construed to mean sup that upon written notice by City to the Contractor stating Notice of Award - The precedent enumerated therein, within 1 22 Noti the Contractor with the conditions reement. compliance by will sign and deliver this Agreement. the time specified that the City C-3 1.23 Notice to Proceed — A written notice given by the City to on which the Contract Time will commence to run. on he work upo receipt of the Noticem the Contractor fixing the datee this Contract ll contain set timeframestofthe o which Contractorrde will immediately to Proceed. Task Orders executed under and completed. the Task Order work shall be started 1.24 Plans - The drawings which show the character and scope and which have been prepared or approved Contract Documents and/or Task Order by the City and/or are rkeferto bree d to performed the 1.25 Premises otherwise known as Site or Work Site — means the land, buildings, facilities, etc. upon which the Work is to be performed. 1.26 Project _The total construction of the Work to be provided as defined in the Contract Documents and each executed Task Order. 1.27 Proiect Manager - The employee of the City, or other herein referred to as the Project Manager, will assume all duties and will have the rights and authorities assigned designated individual who is andDoc tin connection with completion of the Work agend responsibilitiesnthec tt to the Project Manager in the contract Agreement. The Project Manager, or designee, shall be the authorized City unless otherwise specified. in accordance with this agent for the 1.28 Puny - The City's list of Work yet to be done or be corrected before the Final Completion date can be determined by the City. by the Contractor, 1.29 Record Documents - A complete set of all specifications, drawings, annotated to show all changes made during the construction process. g addenda, modifications, shop drawings, submittals and samples ann 1.30 Record Drawin s or "As-Builts" - A set of drawings which show significant changes in the work made during construction and which are usually based on drawings marked up in the field and other data furnished by the Contractor. These signed and sealed by a Professional Engineer or a Professional licensed in the State of Florida and employed by the Contractor documents will be at no cost to theuCity. y or 1.31 Substantial) Com leted Date — stating that the Work is substantially ially completed and is date when the ear has requested in writing, issuance of a final punch list for the Project. If, readyat i for of inspectionns o and determined the project is substantially completed, the the time inspection, it isf Substantial Completion along with a punch list of incomplete or completed prior to requesting a Final Completion inspection. y will issue a letter of deficient items to be 1.32 Task Order — A written agreement between the City and Contractor defining particular scope of work to be performed under this Contract. When permits and specifications may the the Task Order work. Each Task Order will contain a time necessary, plans, be provided by the City to clarify the requirements of be completed in order for the Contractor to avoid being frame in which the work shall damages. subjected to liquidated C-4 entire completed delivered pr oduct or the various separately identifiable 1.33 Work — The ed to be furnished under the Contract laborments and furnishingd/or Task and pads thereof is the performing services, furnishing the Contract Order. Work is the result of ui ment into the product, all as required by incorporating material and equipment Documents. ARTICLE 2 — SCOPE OF WORK complete all work as specified or indicated t in the Contract be 2.1 The Contractor shall P may Documents. The Project for whicathe ras follows:e Co the whole or only part is generally described CONSTRUCTION OF GENERAL STO T W1� 0 INFRASTRUCTURE ANNUAL C lTB 12504-613 PROJECT Project shall be constructed in accordance with the approved plans 2.2 All Work for the and Specifications. The Work generally involves: PROJECT DESCRIPTION out the City of Fort Lauderdale. The work to be accomplished T and project is located throughout but is not limited to, the construction and installation of variouslg stormnder thisw contract infrastructure includes, of: catch basins, storm water1 manholes, pervious pip ng, water consisting exfiltration trenches, tidal valves, swales regrades, retention area, p p pavements and repair of the aforementioned. r infrastructure, the contract covers restoration includes,a te t not In and miscellaneouslne the storm water needed to avers/pavement/asphalt removal and to,lan utility hardy relocations removall and ereinstall, p these projects. for specializedm work, med to, landscapelhardscap reinstall, relocation of various utility pipes and boxes, use of equipment mainte nance of traffic, dewatering activities and pollution prevention items. date noted Task 2.3 Withinde ten on10) days of a Notice to Proceed of the start Schedule of on each and a ed. The general sequence of the o co shall lce be Order, the Contractor shall submito a Construction Schedule, listing a all the Contractorn employed. Y approved by the City before any work ommate the s. submitted ey the and The City reserves the right to issue coerationlsn directives necessary conflict with op Work or to minimize any ARTICLE 3 — PROJECT MANAGER 3.1 The Project Manage r is hereby designated by the City as Rares V. Petrica, whose address is 16, is 101 NE 3rd Avenue Suite 1410 Fort Lauderdale f Maude dale U ov. assume all duties and responsibilities and will have the rights telephone number: (95 it 2 , and email address Contract Documents in and authoritieshot Manager will er in the completion of the Work in accordance with this Agreement. and assigned to the Project Manager connection with ARTICLE 4 — CONTRACT DOCUMENTS The Contract Documents which comprise the herein and attached entire Agreement between the following: City and Contractor are incorporated to this Agreement and consist of the 4.1 This Agreement. 4.2 Exhibits to this Agreement [Plans (sheets N/A ]to [ N/A ]inclusive)]. 4.3 Public Construction Bond, Performance Insurance. erformance Bond, Payment Bond and Certificates of 4.4 Notice of Award and Notice to Proceed. 4.5 General Conditions as amended by the Special Conditions. 4.6 Technical Specifications. 4.7 Plans/Drawings. 4.8 Addenda number 1 through 4 , inclusive. 4.9 Bid Form and supplement Affidavits and Agreements. 4.10 All applicable provisions of State and Federal Law. 4.11 Invitation to Bid No., 12504-613 Instructions to Bidders and Bid Bond. 4.12 Contractor's response to the City's Invitation to Bid No., 2�. 12504-613 ,dated Aril 4.13 Schedule of Completion. 4.14 All amendments, dill ctive changes, issuedmodifications, ii ati or aftersupplements, pl E nts, Task Orders, change order Effective Date of the Agreement. orders, and work 4.15 Any Additional documents that are required to be submitted under the Agreement. 4.16 Permits on file with the City permits to be obtained shall be considered directive in nature and will be considered a In the event of any part of this Agreement. In the c te conflict between the documents or an followingor priority is established: any ambiguity or missing specification a. Agreement. b. Approved change orders, addenda or amendment s. c. Specifications (quality) and Drawings (location and quantity). C-6 d. Supplemental conditions or special terms. e. General Terms and Conditions. ,and any attachments. f. This Agreement dated June 1 2021 the City. 12504-613 , and the specifications prepared by g. Invitation to Bid No., 12504-613 ,dated h. Co ntractor's response to the City's Invitation to Bid No., 8 2021 -. i. Schedule of Values. j. Schedule of Completion. ancy in the Contractor finds a conflict, error or dis writing, within five theDo performance tr cto Work, report to the Project Manager, written If during Contractor shall so Contractc Documents, before proceeding with the Work affected shall obtain a (5) calendar days, and P required interpretation or clarification from the City. the specifications or plans as being whether or not it is pecifically called to Work that may reasonably be inferred from e meaning are used to describeyc l Work, Any to produce the intended result shall be supplied or interpreted in accordance with such meanink, words for. which have swell-korks tall beanterpret me g I society, organization When technics Referenceefer to standard specifications, sach works s manuals or codes of any whether such reference be orassociations, s,or he code of any governmental authority sficciation i latest standard specification, manual or coeein if caeffect as of or a as may be otherwise sP the c implied, shall mean the except manual or code (whether or d. Agreement, specification, However,o Effective Date of this Ag a the duties provision of any referenced standard from no of theirmagents l employees tad by reference in the Contract Documents) shall change not specifically incorporated and responsibilities of the City, the Contractor, or any those set forth in the Contract Documents. TIME ARTICLE 5 - CONTRACT the date of award by the City and shall initial contract term shall commence upon terms, conditions and The that date. The City reserves the right extend the contract 5 1 (2) years from providing all and such expire two (1) year terms, for cwo i(2)on additional one oth parties agree to the extension, specifications remain the he City. Task extension is approved by that TIME IS OF THE ESSENCE. The Work on each recognizes receipt of an executedh Task 5.2 The Contractor commence upon the Contractor's Order shall immediately Order. begin construction activities within o the project site and the spcific date noted 5.3 The Contractor shall mobilize of the executed Task Order or by NIA calendar days of receipt within the Task Order (whichever applies). C-7 5.4 The Work on each Task Order shall be substantially completed within the timeframe agreed upon and noted in each executed Task Order. 5.5 The Work on each Task Order shall be finall Completion Date and read final y completed on or before the Final payment in accordance with Final Completion Date agreed upon and noted in ey forach ch executed Task 5.6 In the event services are scheduled endto Order. the Contractor shall continue the service upon the request because of the expiration of this contract, the awarding authority. q st of the City as authorized hundred Y The extension period shall not extend for more than and eighty (180) days beyond the by contract. The Contractor shall be compensated for the s one when this he clause invoked by hiration ea at of the is service at the rate in existing dasigned after the contract's expiration nor will an City. date. Y No new Task Orders will thatbe y new work be performed after ARTICLE 6 — CONTRACT PRICE 6.1 City shall pay Contractor for performance based on the value of the executed Task Ordershssed for accordance with Article 7 6.2 The Parties express)y agree or this Contract. accordance with those line item that the un t prices ContractPrice is a andc incorporated by reference herein. unit price contact, contained in the work in ther's opTB responseal aa rough approximation only. The quantities of in Proposal are a and actually The total quantities of work to be included in this Cont authorized by performed C ty thro through Task Orders, vary widel y depending upon the work that will Contract during the period of this Contract. 6.3 The Contract Price constitutes the total compensation payable to Contractor for the cumulative value of each p obligations assigned to or undertake ed byTask Order. without change in the Contract price. Contractor All beIes, at Contractor' sibilities and s expense ARTICLE 7 — PAYMENT PROCEDURES 7.1 Contractor shall submit Applications accordance shall the Co t Documents.Pa Payment, for each executed will bek Order, d by the City as provided for in the General Conditions. for Payment processed 7.2 Progress Payments. City shall make progress Price on the basis of Contractor's executed Task Order for Payment, payments on account of the Contract which shall be submitted by and corresponding tenth (10th) day after the end of each calendar Cm°tnth for which the first 1 Application or upon completion of the work of the executed Task Order. ( St) and the will be made on the basis of the progress of the Work co payment is requested, wrder. All progress payments completed on the executed Task 7.3 Prior to Final Completion of each Task Order, r e in an amount equal to ninety-five o progress payments will be case the aggregate of percentats pr io sl of the value of Work completed less din each payments previously made. C-8 of the Work under each mT sk Order, the City Final Payment: Upon final completion n 7'4 Contractor an amount sufficient to increase total payments shall pay percent (100%) of the Contract Price. 7.5 o d or The to the Contractor in accordance with a the l ri a re Prompt en shallt make onyme8t 2020), as Section 218.70, Florida Statutes Payment Ac complete and error free pay application is submitted. provided how, nt to the Contractor through utilization of the City's P -Card g The City The make payment a Purchasing Card (P -Card) o) Program the utilizi the MASTERCARD e e ProgramThe City has implemented Purchases from this contractill b from thed MASTERCARD and VISA n Card. Contractor will receive purchases.ent Accordingly, purchasingtilizing the City'si Purchasing ability to accept these credit cards or take card in the same mannerh as other credit card the contract term, presently have whateverotractor must p to implement the ability before the start of steps necessary tor's Y Cit All costs associated with theto CoThecCity rese1rves in contract award by the ci ation the or this urchasin ro ram shall be borne b Contractor. the right to revise this program as necessary- 7.7 Pa ment Card Indust PCI Com•liance applicable state, federal and as well e, agrees to comply with all access, use, Contractor as industry best practices, governing the collection, safeguarding and destruction of Protected Information. rd data must be, and Contractor and/or any subcontractor that handles credit ca provide mustdocumentation,and will 'n PCI compliant under the currente City of Fort Ldards auderdale, derdale, failure to produce remai on request by confirming compliance up documentation could result in termination of the contract. ARTICLE 8 — CONTRACTOR'S REPRESENTATIONS Agreement, and pr ior to agreeing to and e In order to induce the CityOto under this Contract, Contractor makes the following execution of each Task Order into this representations upon which the City has relied: 8.1 Contractor is to perform the qualified in the field of public construction and in particular Work and services set forth in this Agreement. extensive tests, warrants a thorough has visited the Work Site, conducted all necessary g 2 Contractor investigations and represents and examinations and and condition, C moisture nature and extent of each Task Order associated Contract Documntsfamiliarization with the , locality, soil conditions, water present), Documents, the Work, (past and p ns and ally Contractor and the Contractor's ontr affect the io ear-round local weather clbyate conditions conditions exd examination and investigations conducted Proposed Price can be completed for the Prop s has determined that no conditions exist that would in any Furthermore, experts, Proposed and that the understands and Order. in each submitted within the Contract Time as defined tally familiar with, CeS, rules, obligates iga es ntr warrants to clomp confirms wth that obligates Contra ctor comply all federal, state and local laws, ordinances, C-9 regulations and all market conditions that affect or may affect materials and labor needed to fulfill all provisions of this Agreement manner may affect cost, the cost and price of progress or performance of the Work.9 Bement or that in any 8.3 The Contractor has satisfied itself as to the nature each Task Order, the general and local conditions of the hed oProje of the Worky under bearing upon availability of transportation, disposal, handling availability of labor, water, electric power, and roads, t sect, particularly those at a ground based on City and storage of conditions materials, he conformation and a needed preliminary provided reports, the type of equipment and facilities to and during the prosecution of the Task Order and all o Task Order and associated Contract Documents. Cher matters which can in any way affect the Work, schedule, or the cost thereof under the 8.4 The Contractor has also studied on its own, subsurface at the site or otherwise affecting cost, and has or of determined nt no progress conditions exist and latent physical conditions progress or performance of the Works, and finds Proposed Price and that the Task Order Workl stn be wouldcompletedhat in Price submitted and within the timeframe agreed upon within any manner affect the Task the Proposed 8.5 Contractor has made or cause to be made exam' each Order. studies of such reports and related data in addition to those referred 8.2, 8.3 and above as it deems in nations, investigations, tests and each Task 8.4r te Contract Prices,s within the to in Paragraphs necessary for the performance of the Work under Order and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, Contract Time of the specified Task data are, or will be, required by investigations, tests, reports or similar Contractor for such purposes. 8.6 Contractor has correlated the results of all such observations, examinations, investigations, tests, reports and data related to each Task Order with the terms and conditions of the Contract Documents. 8.7 Contractor has given City written notice of all conflicts errors or discrepancies that it has discovered in the Contract Documents related to each T resolution by City is acceptable to the Contractor. Task Order and the written 8.8 Labor 8.8.1 The Contractor shall provide competent, suitable qualified and lay out the Work and q ified Documents for each Task Order. The Contractor personnel to survey perform construction as required by the Contract good discipline and order at the site. shall at all times maintain 8.8.2 The Contractor shall, at all times, have a competent s reading and thoroughly understanding the drawings and s ecif Contractor's agent on the Work, who shall, as the Contractor's agent, superintendent, capable of supervise, direct and otherwise conduct the Work un p as the 8.8.3 The Contractor shall designate the superintendenter on the job to the City, in understands and ag a ss that the superintendent'ask Order. Contra The physical presence on the jobtor C-10 If the to the successful completion of the Work. of may job site, the Project Manager site is indispensable reement supver writtenndent is nofrtice to the Contractor to thetop work or terminate the Agreement deliver notic in accordance with Article 17 • have a certified Where required and necessary, the contractor shall, at all times, 8.8.4 assigned to the job site for each at hake Order. The "competent person" job site personnel to the work, and Contractor mail assign the e sace) work, and programs related to trench safety, confined space completed training P g OT). Personnel certified by qualifications are maintenance a o s with FloridaDepartment ipal of Transportation q be required by Signalquir d relativens MOT. other certifications that may required to Any applicable permitting agencies for the Work assigned under each Task Order the Work with complied with by the Contractor. Failure to pursue work on a shall also staff may result in a notice to stop the properly certified supervisory s Task Order or termination of the Agreement in accordance with Article 17. 8.9 Matte equipment, labor, transportation, 8.9.1 The Contractor shall furnish all materials, equipment, appliances, fuel, power, light, construction equipment and machinery, completion water and sanitary facilities and all otherhn facilities and heat,d telephone,tals for the execution, testing, initial op incidentals necessary and new, except as of Work under each Task Ord Shall be of good quality and in the Contract Documents. Suppliers shall be selected and 8.9.2 All materials and equipment all sups thdrwise provided paid by the Contractor; the City reserves the right to approve materials. persons, or the in connection with the safety or protection of p t as otherwise indicated 8.10 Work Hours: Except performed during 9 Work, p property at the itiote s adjacent r at thesiteshall be the Supplementary Conditions, rn., Monday through Friday. working hours between 8 a.m. and 5:00 p. ay work on the City in advance, the Contractor will not f Fort Lauderdale) Unless approved by designated by the City Sunday or any legal holiday ( Y (72) in Saturday, Manager's written consent at least seventy-two o hoursy City advancet the Project Manag For any overtime inspection required such work. persona of startingo shall pay for the additional chargesto d e withbli t of personnel, the Contractor shall be a subsidiary to such overtime work.extra Such additionalall charges from 8:00 a.m. to k. It the shall be made to the Contractor for overtime work. shall be r one thato payment Inspector work hours are work requiring inspection oversight being 0 shall Monday notedd the City'sand any paid for cy the Contractoright as p.m., through Friday, a rate of $100.00 per hour. The cost to the Contractor to performed outside of this ti me frame shall e direct -labor andn overtime reimburse tohe at e uired. Incidental overtime costs for engineering, he actual reimburse the City for overtime inspection is established a cto costs foar each person or inspector q ed to the Contra testing and other related services will also be charged rate accrued. C-11 8.11 Patent Fee and Ro alties: The Contractor shall a assume all costs incident to the use in the incorporation in the c any invention, pay all license fees and royaltiesk or and the performance of the Work which the the subject of patent rights or copyrights design, process, product or device is expressly binds himself or itself to indmnify and hold harmless by others. The Contractor hereby claims and fees and from any and all suits and action of eve that may be brought against City on account of any the City from all such costs for any such invention or patent, and fromnt every name and descriptiones,or o brought such said City for the infringement d such claims, fees, royalties,may any and all suits n actions that rights claimed by any person, firm corporation or othertentity any all patents or patent 8.12 Pew The Contractor shall obtain and pay for all permits and licenses. There shall be no allowance for Contractor markup, overhead or profit for a permits and licenses. The Contractor shall pay all government charges which are applicable at the time of opening of proposals. It shall be the responsibility of the Contract for all necessary licenses and permits of a tempera prosecution of Work. Contractor to secure and pay temporary nature necessary for the 8.13 Law and Re ulations: The Contractor shall give all notices ordinances rules and regulations applicable to the Work. f and d comply that the specifications or plans are in conflict, the Contractor t y with all laws, Manager prompt written notice thereof within five he Contractor observes changes hall be adjusted by shall give the Project (5) calendar days and anye necessary performs any work knowing or having easen appropriate to kn Wo�hfatations. ordinances, rules, standards, specifications and regulations, if the Contractor the Project Manager, the Contractor shall bear all costs is contrary sucho such laws, and without notice to arising therefrom. 8.14 Taxes: The Contractor shall p a required to be y all sales, consumer, use and other similar taxes paid by him in accordance with the laws of the City of Fort Lauderdale, County of Broward, and the State of Florida. 8.15 Contractor Use of Premises: The Contractor shall confine construction equipment, the storage of materials and equipment and the operations of workmen by law, ordinances, permits and/or the requirements of the to areas permitted Contract Documents, and shall not unreasonably encumber the premises with construction materials or equipment. equipment or other The Contractor shall not enter upon securing the permission of the property lownevate p input writerty ing furnishing Manager with a co Y purpose without first py of said permission. ic the Project particularly with regard to such vacant properties asr nt will be dtrfory enforced, staging by the Contractor. may be utilized for storage or The Contractor shall conduct its work in such a manner adjacent private or public presort as to Y. Any damage to existing structures tructu esoof work damageid f any kind, including permanent reference markers or property corner markers, interruption of a utility service, shall be repaired or r s promptly a restored r or the any City or property owner. t no expense to C-12 protect all existing vegetation such as trees, shrubs anThd Contractor will preserve and The Contractor willh be to the site which does not reasonably interfere with the and grass on or adjacentt the Project Manager. that construction, for determined by any trees, shrubs, lawns and landscaping materials,aa responsible repairing or replacing , stockpiling damaged due to careless operation of equipment, may be of grass i ment or other construction activity. The Contractor will be litrable for,g of by equipment replace or restore at no expense to the City all protected or preserved as may be required that is destroyed propertiesole or will bes required to and areas not or damaged. the premises free from of the Work, the Contractor shall keep During the progress rubbish and debris resulting from the Work. At the accumulation the waste materials, materials, rubbish and rubbish an ofde Work, the Contractor shall remove and tion completion premises as well equipmentbris from ndd about the eave the site clean and machinery, and surplus materials and restorlelto their original condition ready for occupancy by the City. The Contractor shall the Contract Documents at those portions of the site not designated for alteration by no cost to the City. Contractor shall provide for the complete coordination of The 8.16 Project Coordination: This shall include, but not necessarily be limited to, the construction effort. coordination of the following: ui 8.16.1 Flow of material and equipment from suppliers.anies. facilities are 8.16.2 The interrelated work wwith with theaffected C City where tie-ins to existing y comp 8.16.3 The interrelated ork required. agencies. endent testing be directed by the Project Manager. 8.16.4 The effort of independent ep ed ro ert owners as may ager. 8.16.56 oCoordination with and scheduling of all required inspections from all permitting 8.16.6 agencies. Contractor shall be on site, r allh l responsible t Record ainumeng and date redline as-builtt drawings, and verified timesby a 8.17 surveyed for maintaining up to prole i construction. landon. All surveyor registered egi t r d in the Statermation lofbFloridaeContract draw ngshall provide thefes y wit land n umo re three signed and sealed record the City with a minimum of (3) sets of of al the electronic drawing files created in AutoCAoD {and 014 or la as -built All co ts) ands a CDe work required for construction lay All costs associated with survey ns'bility of the Contractor. preparation shall be the responsibility 8.18 Safet and Protection: maintaining and supervising responsible for initiating, The 8.18.1 The safety pre shall sb rndp ro rams in connection with the Wor d shall all safety precautions and pro precautions for the safety of, Contractor shall take all necessary damage, injury or loss to: provide the necessary protection to prevent employees working on the project and other persons who may be 8.18.1.1 affected thereby. C-13 8.18.1.2 All the Work therein, whetkeandst all e materials or 8.18.1.3 equipment to be incorporated Other property 9 on or off the site. lawns, y at the site or adjacent thereto, including trees walks, pavements, roadways, designated for removal, relocation or replacement 'shrubs, construction. and utilities not in the course of 8.18.2 The Contractor shall comply regulations and ro f any with all applicable laws, of ors andorders y public body having n fir hees rules, persons and property or to protect them from jurisdiction safety shall maintain all necessary damage, injury The Contractorn shall roe ry safeguards for such safetyr loss;and execution of Work notify owners of adjacent property and protection. advancex u (unlessthe Work me affect them at least seventy-two utilities when aused, directly required). All dams y fi"'O (72) hours in aued, or indirectly, in whole ordamage, injury or loss to an or anyone directly in part by the Contractor,rperty subcontractor or anyoe whose acts any or indirectly any anyone for. These acts a duties and responsibilities employed by ens i them the may be liable, shall be remedied by of the Work shall continue for safety and protection accepted by until such time as all the p the City. Work is completed and 8.19 Emer encies: or In emergencies affecting the safety or protection of Workrkction porroperty authorization theen sitem adjacent thereto, personshout o the damage, the City, is obligated the Contractor, without threatened 9 ,injury or loss. The Contractor shall give the Pro' act to special notice , injury or oficant changest in prevent written Documents caused thereby, the Work or Project Manager prompt deviations from the p written 8.20 Risk of Loss: Contract The risk of loss, injury or destruction shall be on acceptance of the Work b acceptance of the Work by by the City. Title to the the Contractor upountin the City. Work shall pass to the City upon as to the The Contractor has fully inspected the Premise presence of any asbestos, s and agrees,physical except condition, without representation or warrantyccept the Premises in limitation,any an "as is" and all existing by the City of any physical the presence ofa any environmental claims or obligations that ma arise without "contamination" on, in or about the Premises. Further, and all entitles claiming by, through may from the from any or under the Contractor, releases nddisc Contractor theCity, Contractor'so use claim, demand, or cause of decontamination, handling, storage, action arising out of m val,relatingbarges , cleanup, g , release, discharge, treatment, removal, transport, orte d clu nt asbestos disposal and/or presence of inn liabilityuding on, under, from or about the Premises.a T haze ardous substances any claims or "contamination" on the Premises.ractor shall have The Contractor shall not use, r shall Substanceshandle, store, discharge, dispose or the Premises Hazardousl t of ctincs from the g t treat,n,upon, remove, traosor f m Chan e g he at, s h under,City tapproved from 9 Order, which shall not include any City. At such time, perform such r, hes. profit, shall authorize the to Contractor to C-14 deliver to the Project Manager complete copies of all communications received by the Contractor from any n Toe Contractor shall immediately insurance company or board of governmental demands, or other coin or any way alleged violations or governmental or quasi -governmental authorityor in any the existence or any Environmental Law or otherwise the Piremisserwhich is or could be fire underwriters or like or similar entities re potential violations of condition or activity on potential existence of any erty, or the environment. dangerous to life, limb, P p agrees, at its sole cost Fo and hold harmless the Citys and its and additional consideration, the Contractor hereby and expense, and protect, defend, and ense, plo indemnify officers, representatives, contractors any exP to des, agents, officials, "City") and against subcontractors, tra employees, assigns (hereafter the fromng but not and costs, expenses, assessments,d subcontractors, successors,losses, damages, expenses, liabilities, and iti claims, demands, s and ees, and natural restoration judicial proceeding to mitigation, na, restoration, requirements and/or, penalties charges, administrative and r medial action req s' fees and fines, without limitation, attorney art the judgments, of oction, inind (including,ui in whole or in p hosts) directly actions ref anyrising out of or attributable to, discharge, treatment, e, release, threatened release, presencees of a costs) directly or indirectly stolen disposal and/or removal, 1,Contractor's use, handling, cleanup, disposal to or about the Premises transport, decontamination, (excluding exc u ingaasbestos) on, under, the Contractor removal, excluding Hazardous Substance ( handling, in connection with the use,l resource activity carried on or undertaken on or off the Premises u or any other Y or its employees, agents or subcontractors, presence or discharge, treatment, mitigation, natural threatened release, disposal and/or resent on, resstotoration, orat release,,removal,transport, decontamination, cleanup, disposal an restoration, transp asbestos located, is transported, d toor be present on, any Hazardous Substance secluding This indemnity successore section. undue, from, U.S.C.to, r about the Premises. and any ble 42 . Section 9607, as amended or revised, not limited to: (a) all under but is repair, cleanup, all scope cost of any required or necessary P iamentation ofr The of the indemni{heobligations includes, and imp ua detoxificational damages; (b) preparation i the costsn of consequential applicable real estate and the ithout limitation; (�) any closure, of the apP required plan, including government or the State of any removalor remedial action inothercurred the United States g es fromth a f other person, or semen such injury, or remedial I osts incurred by any including rho cost of assessing Environmental o Florida or reapon Comprehensive destruction of, or loss , natural resources, to the costs, fines, loss, incurred pursuant (ii) the clean-up destruction, applicable provisions of Florida , law; Response, andrr Liability Act, any pP amended; fines, damages, law; Respo correction or cleanup, d nd ageSh e r osna nips inc nsed ou other statute, law, and on) the cost and exp eases of abatement, revisions of any c liability for response costs, or penalties which arise from the p or common law tort p or legal requirement state Sttuory federal; and (c) regulation, code ordinance, damage arising under any public privatev nuisance, or property personal injury damages assessed for the maintenance of activity. theory, secluding in on of an abnormal) dangerous abnormally costs, or for the carrying and additional good and valuable consideration ration the re Extended Damency For other acknowledged, the 8.22 of construction or for any other reason or of which is hereby reason, claim or nts receipt and sufficiency delay and agrees that in the eventoof any the reason of f the they were caused allegation or claim, and notwithstanding or the construction delay allegation or who caused them C-15 by the City, that there will be no entitlement to Contractor to or financial damages or losses for extended corporate overhead for any direct or indirect overhead impacts, project support impact, extended project whatever other label or legal concept or theory mobilization or demobilization or by such claims may have, or any business damages or losses of whatever ry and types of names or labels or basis and Contractor hereby waives any right to make an provision will have application im type or cl or nature, and effect when construction delaycs are anticipated and agreed upon by both the City and the Contractor. and 8.23 No Liens: If any subcontractor, supplier, laborer, or materialmen person directly or indirectly acting for or through Contractor files or file a mechanic's or construction lien a ain of Contractor or any attempts to performed or any part or against any against the real property on which theeWork s rk is against any monies due or to becomeduefromrophe City to against to a r or, for or on account of property its Contractor or claim equipment, or other items furnished in connection with Contractor or from any work, labor, services, material, Contractor agrees to satisfy, the Work or an expense by bond,e payment, , remove, or discharge such lien or claim a ment, or otherwise within twenty (20) days of the filing or from receipt of written notice from the City. Additionally, until such time as such lien or claim is satisfied by Contractor, all monies due to Contractor, or that become ' removed tr ctor before the lien or claim is satisfied, removed or otherwise discharged, security for the satisfaction, removal and discharge due to Contractor before may be incurred satisfaction, obtaining such. Contractor shall be held by City a that me right,e in addition whileto other rightssuc and of such lien and any City shall all shall faile to do so, e shall have to satisfy, remove, or discharge such lien ores pclaim eb by this Agreement or by chooses at the entire and sole cost and expense of Contractor expenses shall, without limitation, include attorney's y whatever means City expenses and all court costs and assessments. which costs and fees, litigation costs, fees and 8.24 Weather Emer encies: Upon issuance of a hurricane Service, the Contractor shall submit to the City a plan to secure event a hurricane warning is issued. The plan shall detail how the Contractor watch by the National Weather event the Premises,equipment and materials in a the work area int will the the Work and prevent materials and equipment from becoming and property on and around the Premises. manner as to prevent damage to required e accomplish the hurricane preparations and n The plan shall include a time schedule to a hazard to persons a list of that will be available and in the City before, during and emer aftegthe the stormtacts immediately Upon issuance of a hurricane warning by the National Weather Service, if the Contractor has not already done so, the Contractor shall implement preparedness plan. Cost of development and implementation its hurricane preparedness plan shall be considered as incidental to construction. up and rework required after the storm will be considered of the hurricane within Florida and shall not entitle the Contractor to Cost of any clean Contractor shall be hallentitled to request an extension normal constructionpna risk in accordance with the provisions of Article 15 this any for completialon compensation. shut downrd for of the r in time completl to theof the Work, a ut oe implementation to at the Premises. Agreement, equal to storm it d preparedness plan, the duration of the and emises. C-16 8.25 Force MaleUre: No Party shall hold the other responsible for damages or for delays in by force majeure, acts of God, or have ts n or circumstances nably foreseens s beyondp eyormahee caused a or that could not ha nd control r thisf the other party epidemics, pandemics, be but not e prevented. For purpose, such acts or circumstances floods, s P II include, or and lockouts, limited to weather conditions affecting performance, enc riots, strikes, act of Governmental Authority,state st demonstrations.g Should such acts or war, other industrial occur, the parties, or p reasonably possible with the the shall use their best effortso overcome the difficulties arising circumstances arising therefrom and to resume the Work as soon as normal pursuit of the Work. ontinuous rain for less than three (3) days or the acts or Inclement weather, c third -party contractors, materialmen, suppliers, or their omissions of subcontractors, eure. subcontractors, shall not be considered acts of force maj under the Agreement out its obligations out its No Party shall be liable for its failure to carry majeure to carry is rendered unable by force such force majeure shall obldurigation, a period when such Party or Parties relying period than besus but the obligation t of the Party be suspende d only during the continuance of the inability and for no longer the unexpected or uncontrollable event. to The Contractor further agrees and stipulates, that its right to excuseits writtenfail re ce of be conditioned upon giving perform rform by reason of force majeure shallhas commenced within 96 hours after such an its occurrence. . that a oFntrace forMashall delay tractor shall use its reasonable efforts to minimize such delays. anticipated additional time occurrence. The Can promptlyhall provide an estimate of t The Contractor required to complete the Project. ment of Trans ortation anta • ed Business Enter • rises in De mate on the basis of trace, g 26 Financial al A ib Disaon nperformance of any DOT-assistedfrace, Financial Assisted Contracts: The the recipient p rforma of 49 CFR color, t or in the ad, ino sex or the requirements shall all necessary and reasonable steps under 49 CFR contract ore administration tak of its DBE program administration of DOT -assisted Part 26. The recipientune required by 49 CFR Part 26 and as Ponta tos. ensurerecipient's nondiscrimination gram, as r quo d Implementationrt26 n s contracts. The e reference in this Agreement. f approved by DOT, is incorporated by this program is a legal obligation and failure to carry out its terms shall be treated as a nt its failure to Agreement. Upon notification to the recip f as provided forcarry out is violationp of this Agre the Department may impose sanctions 8 its approved program, er cases, refer the matter for enforcement31 U SC 3801under et Part 26 and1 may, in appropriate U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of seq.). r sex ui the rocperors shall nodiodiscriminate the Contractor assures that it, the sub recipient o r its subcontractors shall national origin, Contractor shall carry out applicable requirements of 49 CFR not on the basis of race, color, - sisted contracts. Failure by the of this n Agreement. The Agreement, the Part in the award and administrationr uirements is a material breach toeof trh s Agr as the which for tor carry ouththese Agreement or such which may result in the termination additional language must be included in each recipient deems appropriate. subcontract the prime Contractor signs with a subcontractor. C-17 ARTICLE 9 — CITY'S RESPONSIBILITIES 9.1 The City shall furnish the data required of the City promptly and shall make payments to the Contractor promptly Contract Documents provided in Article 7. p y after they are due as 9.2 The City shall provide public installation of conduits, transformers ansformehss-of-way and easement, where available, for pads and related appurtenances only. the 9.3 Technical Clarifications and Inter retations: 9.3.1 The City shall issue, with reasonable promptness interpretations of the Contract Documents as it may which shall be consistent with or reasonably 'such written clarifications or thh Contract Documents. Should the onably inferable determineeoverall ll intent o y from the overall intent of of questionable items in the Contract Documents, the llC City shallo not interpretation t nte i y excuse for failure to execute the Work in a satisfactory not entertain any 9.3.2 The City shall interpret and decide matters co manner. requirements of the Contract Documents, and shall make concerning performance under the claims, disputes or other matters in claims, or othematter ol be delivered question. decisions onl all Written notice of each claim, event than five by to the other Parteventlater (5) days after the occurrence of event, and but in no supporting date will be submitted to the other Party written such occurrence. All written decisions of the City on any claim within five (5) days after final and binding. or dispute will be 9.4 The Contractor shall perform all Work to the reasonable accordance with the Contract Documents. In cases of disagreement City shall decide all questions, difficulties, and satisfaction of the City in arise underll or by reason of this Agreement disputes the g ement or ambiguity, may u quality, whateveramount nature,value which may Work, and the City's decisions on all claims qualit 9.5 ' questions and determination and efinalof the Cancellation For Una ro riated Funds: a Contractor is limited to the availability of funds appropriated The obligation of the Ci and continuation df the contract into a tY for payment to , appropriation of funds, unless otherwise au fis in a currento fiscal period, subsequent fiscal period is subject to authorized by law. ARTICLE 10 — BONDS AND INSURANCE 10.1 Public Construction Construction or Performance nn cand Other Bonds: The Construction100 of the value of each Task and ar issued Contractor shall furnish to Payment Bonds ("Bond"), in an amount equal to and payment of all the Contractor's obligations under the Contract as security for the faithful performance Bonds shall remain in effect until at least one (1) except as otherwise provided by law. Documents. These ex surety and shall be in substantially All Bonds shall be furnishedethe aan te of final payment, Documents andha be executed b such suretiesthe same asf form as d provided by the State Florida, and (ii) are named in the prescribed ny the Contract in thecates of Authority as Acceptable ( )are licensed li tof to conduct business p Sureties on Federal tBonds and ass Accepanies table p able C-18 (amended) by the Audit Staff Companies as published in DepartmentCircular 0 and (iii) the Bureau Reinsuring U S. Treasury otherwise by meet agent Bureau of Accounts, applyt to sureties. All Bonds signed requirements set forth heaeCe� fed copy of the authority to act. must be accompanied by public in the Bond: The Contractor shall executeand performance record cod bond u an 10.1.1 Performance B Florida, a payment insurer to records of least e d County, in accordanceauthorized to amount at equal to the Contract Price with a surety ith as may be amended or revised, as Sectiond business in theFl State of Florida asas , ("Bond"), tho Contractor'sr u 255.05,rthefaithful Statuteserf (2020), of all of security for faithful performance and payment obligations under the Contract Documents. approval of, running all issued, meeting the pp andrunning toA Corporatei Snram Bond legally repairs to the it in an amount not less than the Contract all improvements, a of the C y and fo i prove conditioned that the ctedConby the Contractorl at their own expense of improvements constructed eriod of one (1) year after the date of acceptance charge to the City, such the period of any imperfection of the material a eerfeut usedo the Work reason of periode by improper, o r reason of any defective workmanship, or such improvement shall be r by upon which any defective preparation of the base laid. the Contractor is Bond furnished by 0 2 Disqualdica nk p Sure If the Surety on any f clais o (i) and (ii) of 1 becomes insolvent or its right to do business is terminated in the Stateers Floridak bankrupt or requirements days thereafter substitute another of 110 or �Contractorceases tshall within efive (5) he City. Paragraph 10.1, the to t Bond and Surety, both of which shall be acceptable 10.3 Insurance Agreement, during the term of this precedent to the effectiveness of this Agreement, the As a condition p y renewal or extension term of this and with such Agreement and during shall provide insurance of such types adequate Contractor,msad i its sole expense,o proof of and maintaining terms and limits as noted below. Providing The Contractor's material obligations of the Contractor. The Contractor shall insurace coverage are such coverage. insurance applicable policies. The interpreted as provide the City a ecshallficate of imary insurance for all app not be intern e be p insurance undernderag policy maintained by the Contractor shall ts of e each p Y Agreement. All insurance coverage e in the Statera e iici the Cobntractor's liability and oor eligible towritepolicies royal by the limiting insurers authorized subject to pp of policies shall oe through of A-, VII or better, Florida and possess an A.M. Best rating City's Risk Manager. protect the interests of the required herein be relieds upon C The coverages,these limits, and/or limits, and/or n ro tiara types and upon these coverages, andlor endorsements shall in no way a result by the and the extent or determining o apes, whether as s its by Contractor ter assessing any loss exp of coverage to protect the Contractor against C-19 of this Agreement or City's review or otherwise. The requirements contained limity or acknowledgement, are not intended to herein, qualify the liabilities and obligations as well as the Agreement. and shallC not in assumed by the Contractor any manner The following insurance under this policies and coverages are required: Commercial General Liabilit Coverage must be afforded under a ss than: overage Commercial General Liabilit le • $1 000 each Liability policy with limits not Propert Damage, occurrence and $2,000,000 • $1,000,y D ge, and Personal and Adverti aggregate for Bodily each occurrence and sing Injury Injury, $2,000,000 aggregate for Products Policy must include covers and Completed Operationsge for contractual liability and independent contractors. The City, a be covered Floridaria municipal corporation, its officials, employees, to an additional insured with a CG 20 Designated Person and volunteers are equal or broader or Organization 26 0la 13 Additionalt providing — Endorsement or similar endorsement activities Additional Insured Covers performed by or on behalf of the Coverage with respect to liability providing activities limitation on the Contractor. The arising out of employees, and volunteers.scope of coverage shall contain no spec protection afforded to the City, its officials, Business Automobile Liabilit Coverage must be afforded for all Owned for era Bodily Injury and Property Owned, Hired, Scheduled focr itd single limit each accideDama a ,and Non -Owned vehicles Da inmage an amount not less than $1,000,000 IfIf the Contractor does Hi d and Contractor r not own vehicles, the Contractor shall maintain the Commercial General Lio ability L bility, which may be satisfied by coverage for policy or separate Business way of endorsement to Contractor's Pollution Liabilit Auto Liability policy. For sudden and Covers e gradual occurrences and in an amount not less than $1 0 identified under the Agreement. , 00,000 per claim arising out of this Agreement, including but not limited to, all hazardous materials Umbrella/Excess Liabilit : covers e The Contractor shall provide umbrella/excess 9 with limits of no less than General Liability, Automobile Liability and Em0pl excess of Dyer's Liability. Commercial Workers' Corn ensation and Coverage must be Em lo er's Liabilit Coverage gn afforded per Chapter 440, Florida Statutes. Any g work for or on behalf of the performing work or or o exemptions City must provide Workers' Compensation r entity they are in accordance with FloridaStatute. be allowed by the City's Risk Manager, if Contractor shall ensure that the Contractor's the C the City, its officials, The Contractor waives, and subrogation rights against the policy s, carrier waives, all subrog es. The City requires ethers or insurance to ht et Recover from be endorsed and volunteers for 131 losses faoua Rig employees, be with WC 00 and federal workers' equivalent. State compliance with all applicable Js The Co ntractor must be in comp U S Longshore Harbor Workers' Act and the one compensation laws, including the Act, if applicable. Coverage must be afforded in an amount not less than 100% of the total project cost, Pro • ert Covers • e Builder's Risk Coverage including soft costs, with a deductible of no more than $25,000 each claim. e shall include, but not be limited to: 'n Flood and Windstorm with no coinsurance clause form e including City to • All Risk Coverage provision • Guaranteed policy extension p which will enable the Occupancy Clause Endorsement, activity occupy the pccup suppl theies any kind whatsoever • u facility under constructsone ru pment, spp during • o to pY ort of material q • Storage and transport ro ect ressurized, or for cold testing of all mechanized, p to be used on or kdo ental to the p 1 Equipment Bre electrical equipment and name the City as a o contra sts of the owner, This erpolicy againstninsure risktof physical loss and damage,e work is completed and the property e all phpayee. ysical This insurance shall retie City effect until accepted by t property has been Ins ctor, and subcontractors inithe uirements City with valid Certificates of Insurance T g. The City shall be granted a Waiver of Subrogation on the Contractor's Compensation insurance policy. Workers' h. The title of the Agreement, Bid/Contract number, event dates, or other identifying reference must be listed on the Certificate of Insurance. The Certificate Holder should read as follows: City of Fort Lauderdale 100 N. Andrews Avenue Fort Lauderdale, FL 33301 The Contractor has the sole responsibility for all insurance premiums and and solely responsible for any costs or expenses as a result of a covers shall be fully 9 co-insurance penalty, or self -insured retention; including any loss not co e deductible, of the operation of such deductible, co-insurance penalty, self -insured coverage exclusion or limitation. Any costs for adding the City eyed because shall be at the Contractor's expense. as an Additional Insured retention, or If the Contractor's primary insurance policy/policies do not mee requirements, as set forth in this Agreement, the Contractor may t the minimumy provide evidence of an Umbrella/Excess insurance policy to comply with this requirement. The Contractor's insurance coverage shall be primary insurance as respects City, a Florida municipal corporation, its officials, employees, and to the insurance or self-insurance maintained by the City, a Florida municipal corporation, its officials, employees, or volunteers shall be non-contributory. volunteers. Any Any exclusion or provision in any insurance policy maintained by the excludes coverage required in this Agreement shall be deemed unacceptable and shall be considered breach of contract. Contractor that All required insurance policies must be maintained until the contract accepted by the City, or until this Agreement is terminated, whichever is later. lapse in coverage shall be considered breach of contract. In work has been provide to the City confirmation of coverage renewal via an updated Any addition, Contractor must any policies expire prior to the expiration of this Agreement. The City reserves right to review, at any time, coverage forms and limits certificate should policies. emits of Contractor's insurance policies. The Contractor shall provide notice of any and all claims, accidents, and occurrences associated with this Agreement to the Contractor's insurance comy otherpany or companies and the City's Risk Management office, as soon as practical. It is the Contractor's responsibility to ensure that any and all of t independent contractors and subcontractors comply om l he Contractor's requirements. All coverages for independent contractors and subcontractors subject to all of the applicable requirements stat p y with these insurance the responsibility of the Contractor. ed herein. qn shall be y and all deficiencies are NOTE: CITY RROJEC PROJECT NUMBER, PROJECT NAME AND BID ANUMBER LE MUST MUST NAMED ONAPPEAR ON EACH CERTIFICATE, AND THE TY ORNSURED'R ON GENERAL LIABILITY THE CERTIFICATE AS AN "ADDITIONAL POLICIES. ARTICLE 11- WARRANTY AND GUARANTEE, TESTS AND INSPECTIONS, CORR ECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK The Contractor warrants and guarantees to the City that all Wort not ill be e in 11.1 Waorda : . All defective work, whether or not in place, of accordance with the Contract Documents and will not be defective. Prompt all defects shall be given to the Contractor. may be rejected, corrected or accepted as provided in this Article. Title: The Contractor warrants to the City that it possesses good, 11.1.1 Warranty of Titl— equipment and materials provided and that there clear and marketable title to all the equipment and are no pending liens, claims or encumbrances against materials. 11.1.2 Warrant of S ecifications: The Contractor warrants that by all equipment, its materials and workmanship furnished, whether furnished drawings and subcontractors or suppliers, will comply with the specifications, performed in other descriptions supplied or adopted and that all services will be p a workmanlike manner. and all 1.1.3 Warrant of Merchantabilit : The Contractor warrants that any 1 � to be supplied pursuant to this Agreement r nt iwors merchantable, h p,ad fit forrom equipmente the defects, whether patent or latent in material ordinary purposes for which it is intended. ections: Contractor shall retain the services of independent, epende t, 11.2 Tests and Insp perform all testing as required by drawings,certif ct ie , and lab applicablet p permitting agency. Contractor shall provide evidence s shall b of certification to anyCity is done. Testing the City before the work and testing e er for review and approval at the time the results are submitted to the Project Manager j Manager and City hours' advanced notice of readiness °f the able prW ovided to the Contractor. The Contrctor shall give the Project Ic Inspector a minimum of twenty-four (24) approvals and shall notify all applicable permitting for all requiredci in inspections, atimely mannersbased, or on requirements set forth in the p permitting age documents. royals p 11.2.1 Neither observations by the Project Manager nor inspections,tests erform or ta Work in by others shall relieve the Contractor from Documents.its obligations to p accordance with the Contract 11.3 Uncovering Work. If any work that is to be inspected, tested or approved without approval or consent of the Project Manager, it must, if re pp ovby ish covered Manager, be uncovered for observation and/or testing. quested o the Project replacement shall be at the Contractor's sole expense unless the Contractor has the Project Manager timely notice of the Contractor's Such uncovering and the Project Manager has not acted with reasonable promptness given intention to cover such Work and notice. P in response to such 11.3.1 If the Project Manager considers it necessary or advisable that Work covered in accordance with Paragraphs 11.2.1, 11.2.2 and 11.2.3 be observed by the City or inspected or tested by others, the Contractor at the City's request, shall uncover, expose or otherwise make available for observation, inspection or testing as the Project Manager may require, that portion of h ork in question, furnishing all necessary labor, material and equipment tIfet is found that such Work is defective, the Contractor shall bear all the expenses of such uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction, including compensation for additional professional services, and an appropriate deductive Change Order shall be issued. If, however, such work is not found to be defective, the Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection testing and reconstruction if it makes a claim therefore as provided in Articles 14 and 15. 11.4 Cit Ma Sto the Work: If the Work is defective, or the Contractor sufficient skilled supervisory personnel or workmen or suitable materialsf or fails supply or the work area is deemed unsafe, the City may order the Contractor to stop Work, or any equipment portion thereof, until the cause for such order has been eliminated; however, this right of the City to stop the Work shall not give rise to any duty part of the City to exercise this right for the benefit of the Contractor or any other Party. The City will not award any increase in Contract Price or Con on the stopped due to the circumstances described herein. tract Time if the Work is 11.5 Correction or Removal of Defective Work Before Final Pa ment: If required Project Manager, the Contractor shall promptly, without cost to the City by the specified by the Project Manager, either correct any defective Work, whether or fabricated, installed or completed, or if the Work has been rejected and as it from the site and replace it with non -defective Work. not rejected the City, remove 11.6 One Year Correction Period After Final Pa ment: If, within one(1) final acceptance of work on each Task Order, or such longer period of time s may be prescribed by law or by the terms of any applicable year after the date the Contract Documents, any work is found to be defective, pecial gtheaCon required c Contractor shall by promptly, without cost to the City and in accordance with the City's written instructions, Contractor either correct such defective Work, or, if it has been rejected by the City, from the site and replace it with non -defective Work. remove it If the Contractor does not promptly comply with the terms of such instructions emergency where delay would cause serious risk of loss or damage, the City may and replaced, and all have the defective Work corrected or the rejected Work removed or in an direct and indirect costs for such removal and replacement, including c or additional professional services, shall be paid by the Contractor. °mpensation for C-24 tance of Defective Work Deductions: If, instead of requiring correction or the City, at the City's sole option, prefers 11.7 Acce to the removal and replacement of defective Work, to accept it, the City may do so. In such a case, if acceptance e der occurs priorl issued othe Manager's recommendation of final payments, a Chang Project sting revisions in the Contracts Documents, including incorporating the necessary appropriate reduction in appropriatethe am u n shall be paid by the Contractor to the City. recommendation, an app p within a 11.8 Cit Ma Correct Defective Work: If the Contractor fails correct reasonable time orftto written notice of the Project Manager to proceed to by the Project Manager in accordance remove and replace rejected ContractorWork as gfailsao perform the Work in accordance with with Paragraph 11.5, or if the days' written notice to the th the City may, after seven (7) Y Contractor,e Contract Documents, rightso completet correct and remedy any such deficiency. In they. To extent exercisingnecessa under this paragraph, the City shall proceed expeditiousexclude the Contractor from all or part of corrective and remedial action, the City may site, take possession of all or part of the Work, o suspend onr's services equipment the of the Contractor's related thereto and take possession be necessary City's 's materials stored at the site or elsewhere. The the s'te as may allow the City s and such access to to representative agents and employees All direct and indirect costs enable the City to exercise its rights under this paragraph. the Contractor in of the City in exercising such rights shall be charged against an eOrder shallt bract issued amount verified by the Project Manager, and a Chang the necessary revisions in the Contract Documents eats and in particular redo reduction but heContract incorporating the Contract Price. Such direct and indirect costs ed by correction, without li mitation, compensation for additional professional services amag required and costs of repair and replacement of work of others destroyn d or removal or P Work. in performance of replacement of the Contractor's defective oWork. del e Contractor shall not be allowed an extension of the Contract Time because the Work attributable to the exercise by the City of the City's right hereunder. ARTICLE 12 — INDEMNIFICATION 12.1 Disclaimer of Liability: The City shall not at any time, be liable for injury or damage erson or property from any cause, whatsoever, arising out of occurring to any p Contractor's construction and fulfillment of this Agreement. 12.2 Indemnification: the receipt and additional good valuable consideration, For other, acknowledged: sufficiency of which is hereby Contractor shall, at its sole cost and expense, indemnifya od d l ohfficials the 12.2.1 and elected P or City, its representatives, employees es, losses, liabilities and expenses, direct, on account of all claims, damages, arges of indirect or consequential including but not limited otheroprofess'onalsfees and hand court engineers, architects, attorneys, consultants and costs arising out of or in consequence of the performance of this Agreement at a out of or lI trial and appellate levels. Indemnification shall specifically nclude arising but not be limited to claims, damages, losses, liabilities and expenses from (a) the negligent or defective design of the project and Work of this b) any act, omission or default of the Contractor, its Agreement; ( subcontractors, agents, servants or employees; (c) any and all bodily C-25 injuries, sickness, disease or death; (d) property, including any resulting loss ofuse; n(e damages,otherjury to osuchr s liabilities, tangible or losses received or sustained by any person or persons during of any operations connected with the construction of this warranty or account period; (f) the use of any improper materials; Project includingnstu theodefect including both patent and latent defects;p (h) failure to timely work; (i) the violation of any federal, state, (g) any construction regulations by county or City laws, ordinanctese toe Contractor, its subcontractors, agents, servants, independent contractors or employees; (j) the breach or alleged breach b g the breach or alleged breach by Contractor of any term of the Agreement, including or guarantee. of any warranty 12.2.2 Contractor agrees to indemnify, agents and employees, from alldefend, damages,dliabildit liabilities, the City, its officers, fees, and from any and all suits and actions of every'losses, claims, fines and may be brought against City, its officers, agents and employees, on any claims, fees, royalties, or costs for any name and description that infringement of any invention or account theof and all copyrights or patent rights clamed patentaanyyr for firm, or corporation. by person, 12.2.3 Contractor shall pay all claims, losses, liens, settlements or nature in connection with the foregoing indemnifications including, but ut not any limited to, reasonable attorney's fees and costs for trials and appeals. 12.2.4 If any subcontractor, supplier, laborer, or materialmen of Contractor or other person directly or indirectly acting for or through Contractor attempts to file a mechanic's or construction lien against the real any which the work is performed or any r files or improvements thereon or make a claim aa against against any property on due from the City to rractk a from Contractor personal property or e g any monies due or subcontractor, or account of any work, labor, services, material, equipment, or Loth forte s furnished in connection with the Work or any change order, Contractor to satisfy, remove, or discharge such lien or claim at its own other items payment, or otherwise within five (5) days of the filing agrees notice from the City, expense of bond, or from receipt written Additionally, until such time as such lien or claim is satisfied, discharged by Contractor, all monies due to Contractor, or that removed or to Contractor before the lien or claim is satisfied, removedbeco of due to discharged, shall be held by City as security for the satisfaction, or removalv and discharge of such lien and any expense that may be incurred the discharge. and 9 If Contractor shall fail to do so, City shall have whthe right,ile l in g addition to all other rights and remedies provided by this Agreement to satisfy, remove, or discharge such lien or claim b chooses at the entire and sole cost and expense ofContractor g ent or by law, chooses shall, tirewithout lisole , include attorney's by or which means City es and expenses and all court costs Cfees, litigation costs, costs feand deducted from any amount owing to Contractor.d sIn the event the shall be Contractor is less than the amount required to satisfy a amount due under this, or any other article, Contractor shall be liable for the deficiency ph due section of this Agreemenor's t, the ncy the City. ' e C-26 agree that Section 725.06(2), Florida Statutes 12.2.5The (2020), as may and the amendedCy Agreement, if i and that be or revised, controlstheextent and limits oft e indemnification provisions of this and hold harmless p the Parties waive any defects in the wording of this Article that runs afoul of said statutory section. ARTICLE 13 — CHANGES IN THE WORK 13.1 Without invalidating revisio this Agreement, the City may, from time to time order additions, Uponoons or revi sions in the Work through the issuance of proceed with the Work shall be executed under the applicable conditions of the Contract receipt of a Task Order Amendment, the Contractor modify any or all pay items involved.Documents. All Work delete or m per unit price where unit andor The Allad adjustments shallhbe made on the p based on a fair basissd equitableereun and/or quantities.eAll 1 shall be prices are quoted. Other adjustments, if any, manner per the Contract Documents or mutually negotiated price between the completeand City that City. In the event the Contractor I have he right cannotto come to an Contractor and y price adjustment, the City shat agoreement on a price or 1 the Contract. No claim of loss of item or work by other means without invalidating profit shall be made against the City. 13.2 The authorize minor changes in the Work not involving an adjustment in the Contract Price or the Contract Time, er may which are consistent withn the overall intent of the Contract Documents. Such changes must be in writing and signed a Project by the City and the Contractor. change in the change affecting the general scope of the Work given the Surety, it 13.3 If notice of any Bond to be Contract Price is required by the provisions of any ctor's responsibility to so notify the Surety, ret,andsh the fmo n prooft of each l be the Contra applicable of Bond shall be adjusted accordingly. The Contractor such adjustment to the City. ARTICLE 14 — CHANGE OF CONTRACT PRICE Any i t Price shall not exceed that which is agreed to in this Agreement. increase acase to the Contract Price shall be executed through an Amendment to this Agreement and approved oved by the City Commission. cumulative unt rove Contract Amendment: Should thet Amendment mount of 14.1 Time for the Cit to A for this Contract if it be the approved executed Task Orders Commissionexcee tauthorizingt additional funding by the City exceeds the threshold established in the City Code. TIME ARTICLE 15 — CHANGE OF THE CONTRACT T award (2) ears from the date of Commission 15.1 The Contract Timone (1) year ree shall be for newal to ms. subject to two (2) in the Contract Documents and within e not exclude rch executed ecovery Orderr 15.2 arel time limits stated provisionse of this Article 15 shall of the essence. the Contractor. damages for delay by C-27 15.3 Delays caused by or resulting from entities, contractors or subcontractors who are not affiliated with the Contractor (non-affiliated Contractors) shall not give rise to a claim by the Contractor for damages for increases in material and/or labor costs. Such entities, contractors and subcontractors include, but are not limited to, the City's contractors and subcontractors, Florida Power and Light Company, AT&T and Florida East Coast Railway, LLC. 15.4 Rights of Various Interests: Whenever work being done by City's forces or by other contractors is contiguous to or within the limits of work covered by this Agreement, the respective rights of the various interests involved shall be established by the Project Manager to secure the completion of the various portions of the Work in general harmony. ARTICLE 16 — LIQUIDATED DAMAGES 16.1 Upon failure of the Contractor to complete the Work of an executed Task Order within the agreed upon and approved time for said Task Order, the Contractor shall pay to the City the sum of Five Hundred Dollars ($500.00) for each and every calendar day that the completion of the Task Order is delayed beyond the time agreed upon for said Task Order, as fixed and agreed liquidated damages and not as a penalty, so long as the delay is caused by the Contractor. Should an act of God or the acts or omissions of the City, its agents or representatives, in derogation to the terms of this Agreement cause the delay, the Contractor shall not be responsible for the delay nor liquidated damages. Liquidated damages are fixed and agreed upon between the Parties, recognizing the impossibility of precisely ascertaining the amount of damages that will be sustained by the City as a consequence of such delay and both Parties desiring to obviate any question of dispute concerning the amount of damages and the cost and effect of the failure of the Contractor to complete the Work on time. Liquidated damages shall apply separately to each Task Order for which a time of completion is given. The City shall have the right to deduct from or retain any compensation which may be due or which may become due and payable to the Contractor the amount of liquidated damages, and if the amount retained by the City is insufficient to pay in full such liquidated damages, the Contractor shall pay all liquidated damages in full. The Contractor shall be responsible for reimbursing the City, in addition to liquidated damages or other damages for delay, for all costs of engineering, architectural fees, and inspection and other costs incurred in administering the construction of the Project beyond the completion date specified or beyond an approved extension of time granted to the Contractor whichever is later. Delays caused by or resulting from entities, contractors or subcontractors who are not affiliated with the Contractor shall not give rise to a claim by Contractor for damages for increase in material and/or labor costs. Such entities, contractors and subcontractors include, but are not limited to, the City's contractors and subcontractors, Florida Power and Light Company, AT&T, and Florida East Coast Railway, LLC. 16.2 No Extended Damages: For other and additional good and valuable consideration the receipt and sufficiency of which is hereby acknowledged, the Contractor covenants and agrees that in the event of any delay of construction or for any reason, allegation or claim, and notwithstanding the reason of the delay, reason, claim or allegation or who caused them or the construction delay or whether they were caused by the City, that there will be no entitlement to Contractor to or for any direct or indirect financial damages or losses for extended corporate overhead impact, extended project C-28 overhead impacts, project support services, mobilization or demobilization or by d types of names or s whatever other label or legal concept or theory n of whatever type) o�nature, r basis such claims may have, or any business damages or lossessuch claim or claims. This and Contractor hereby waives any right to make any provision will have application and effect when construction delays are anticipated and agreed upon by both the City and the Contractor. ARTICLE 17 — SUSPENSION OF WORK AND TERMINATION 17.1 City May Suspend Work: The City may, at any time and without cause, suspend the ) days by Work or any portion of the Work for a period of not more than wh'ch WorOk shall be notice in writing to the Contractor which shall fix the date resumed. The Contractor shall resume the Work or an extension of the Contracton Timer will be allowed an increase in the Contract Price or both, directly attributable to any suspension, if the Contractor makes a claim as provided in Articles 14 and 15. 17.2 City May Terminate Work: The City retains the right written not cleatAdditionally, the City this Agreement as well as any task order, with thirty (30) days p may also terminate this Agreement as well as any task one or more ofdthe followinger upon eevents5) calendar days' notice upon the occurrence of any 17.2.1 If the Contractor makes a general assignment for the benefit of creditors. of the Contractor is appointed under custodian or agent 17.2.21f a trustee, receiver, applicable law or under Contract, whose appointment or authority to take charge of property of the Contractor is for the purpose of enforcing a lien against such property or for the purpose of general administration of such property for the benefit of the Contractor's creditors. ays the 17.2.3 If Contractor fails to begin the Work within {fifteen ork with calendar en workersrand Project Initiation Date, or fails to perform completion of the equipment or with sufficient materials to ensure the prompt d as Work, or shall perform the Work unsuitably, theause it to prosecutioneofetheeWork defective and unsuitable, or shall discontinue pursuant to the accepted schedule or if Contractor shall fail to perform other caany ny material term set forth in the Contract Documents, or from any Project whatsoever shall not carry on the Work in an acceptable manner, Manager may give notice in writing to Contractor and its Surety of such delay, neglect or default, specifying the same. 17.2.4 If the Contractor repeatedly fails to make prompt payments to subcontractors or for labor, material or equipment. 17.2.5 If the Contractor repeatedly disregards proper safety procedures. 17.2.6 If the Contractor disregards any local, state or federal laws or regulations. 17.2.7 If the Contractor otherwise violates any provisions of this Agreement. C-29 17.3 If Contractor, within a period of ten (10) calendar days proceed in accordance therewith, the City may exclude the Contractor from Work site and take the prosecution of the Work out y after such notice, shall not possession of the Work and all of the Contractor'sof theatoos of the Contractor, theandtake equipment and machinery at the site and use them without liability appliances, construction trespass or conversion, incorporate in the Work all materials and the site or for which the City has paid the Contractor but qty to the City for and finish the Work as the City may deeme expedient. or In equipment stored at shall nots ed to eive any further co which are stored elsewhere, this instance, Work the Contractor 17.3.1 If after notice of termination of compensation until the Work is finished. tor's any reason that Contractor was not incdefault, the ht ori rights anded, it is determinedion of for and Contractor shall be the same as if the notice of termination 9 obligations of City issued pursuant to the Termination for Convenience clause a had been s set forth in Section 17.5 below. 17.3.2 Upon receipt of Notice of Termination pursuant to Sections 17.2 or 17.5, Contractor shall promptly discontinue all affected work unless Termination directs otherwise and deliver or otherwise make availablethe Notice Cof ity all data, drawings, specifications, reports, estimates, and to City other information as may summaries such whether completed or in process. been required by the Contract Documents 17.4 If the Contractor commits a default due to its insolvency or bankruptcy, the following shall apply: 17.4.1 Should this Agreement be entered into and fully executed r (Debtor) files for bankruptcy, the following by the Parties, funds released and the Contractor shall 17.4.1.1 In the event the Contractor files a voluntary petition under 11 U.S.C. 301 or 302, or an order for relief is entered under 11 U.S.C. 303, the Contractor shall acknowledge the extent, validity, and priority lien recorded in favor of the City. The Contractor further agrees that f the the event of this default, the City shall, at its option, be entitled to in relief from the automatic stay seek shall be entitled to relief from the automatitc stay 11 U.S.C. pursuant 362.tt The City 362(d) (1) or (d) (2), and the Contractor agrees to waive othe 11 U.S.C. provisions in effect pursuant to 11 U.S.C. notice Local Rules of the United States Bankruptcy3Co and Tany applicableota acknowledges that such waiver is done knowingly and voluntarily. tractor 17.4.1.2 Alternatively, in the event the City does not seek stay relief, relief is denied, the City shall be entitled to monthlyyf, or if staye protection payments within the meaning of 11 U.S.C. 3adequate monthly adequate protection payments shall each be in a61amount determined in accordance with the Note and Mortgage execut the Contractor in favor of the City. ed by event the Contractor files for bankruptcy under Chapter 13 of provisions, 17.4.1.3 In the period Title 11, United States Code e an addition arrearssforegoing the Contractor agrees to cu any not m to exceed twenty-four (24) month shall s oe made na e i n to co nfirmation order, and such payments the Note and mortgage. the regular monthly payments require that the City is over secured dby Additionally, the Contractor shall agree ,s fees pursuant to 11 and, therefore, entitled n6(b). Such tointerest shalls be allowed and payable as an U.S.C. 5a administrative expense. Further, in then von the Notee trtheor has less Contra for remaining than five (5) years of payments the a rees that the treatment afforded to claimof f the City under any confirmed plan that the remaining g of reorganization shall provide payments e e, and that the shall be satisfied in accordance with did or amortized over remaining or claim shall not be payments under the Note. a longer period than the time remaining Agreement be entered into and fully executed by the parties, and 17.4.2 Should this shall occur: the funds have not been forwarded to Contractor, the followingition pursuant to 11 ary 17.4.2.1 In the event the Contractorr ordees a r for relief is entered under 11 U.Sent of.C. U.S.C. 301 or 302, or a 303., the Contractor acknowledges 9 an event of default undernthe terms bankruptcy proceeding constitutes es that this the Contractor acknowledges of 11 of this Agreement. Further, contract within the meaning Agreement constitutes an executory es that this Agreement is not U.S.C. 365. The Contractoracknowledges U.S.C. 365(c)(2), unless the capable of being assumed pursuant In the event the expressly City cop Y consents in writing to the assumption.assumption, the Contractor agrees to file a motion City consents to Agreement within ten (10) days after receipt of written to consentsn this the regardless of whether the bankruptcy from City, proceeding is pending under Chapter 7, 11, or 13 of Title 11 of the t t d States Code. The Contractor further actin owleduant oe 11ha U.S.C. Unite s able of being assign d P Agreement is not cap 365(b)(1). Agreement may be terminated for convenience in certified 17.5 Termination for Convenience: This A9 terminate and theo date on which such upon thirty (30) days' written noticetoContractor (delivered by writing by n City P p of intent to for all work mail, return receipt requested) ' r to termination in addition to termination had termination becomes effective. In suchscase, Contractor shall be paid I expenses incurred pry settlementee and Contractor relating to commitments which for costs reasonably incurred by mint shall include reasonable profit for become firm prior to the termination. Payment payment shall be made for p work/services satisfactorily performed. work/services which have not been performed. Contractor's service has been so terminated by the City, the termination 17.6 Where thea ri rights of the City against the Contractor a the Contractor by the City then existing or which may shall notft r accrue.cr any n retention or payment of money thereafter Any will not release the Contractor from liability. C-31 17.7 The Contractor has no right, authority or ability to terminate wrongful withholding of any payments due the Contractor from the Cit rk except for the Y• ARTICLE 18 — DISPUTE RESOLUTION 18.1 Resolution of Dis utes: Questions, claims, difficulties and disputes of whatever nature which may arise relative to the technical interpretation of the Co fulfillment of this Agreement as to the , done and materials furnished, or the to be done Contract valueofa Documents o and the Contract Documents which quality, furnished and under or, by or furnished reason Contract Administrator and Contractoanshall bbee r submitted resolvedbyresolution. When either Party has determined that a disputed mutual agreement of reor elution. is at an impasse, that party shall notify to the claim, difficulty for the question, claim, difficultypa e or dispute to question, claim, dsucmit the Consultantnfor party in tionng and submit may agree to the resolution. The Parties resolution at any time without the involvement and determination of the consultant. 18.1.1 Consultant shall notify Contract Administrator and Contractor in writing of Consultant's decision within twenty-one (21) calendar days from submission of the question, claim, difficulty the date of the requires time to gather information or allo the dispute, unless Consultant information. parties to provide additional 18.1.2 In the event the determination of a dispute by the Cons is unacceptable to any of the Parties hereto, the Partyyt under this Article determination must notify the other Party and the City Manager, in writing within ten (10) days after receipt of the determination. objecting to the the basis of the objection and the proposed resolution. Final res olutin such dispute shall be made by the City Ma The notice must state be final and binding on the Parties. Hager The City Manager's declsionf shall 18.1.3 All non -technical administrative disputes (such as billin determined by Contract Administrator. 9 and a p yment) shall be 18.1.4 During the pendency of any dispute and after a determination thereof, Contractor and Contract Administrator shall act in good faith to potential damages including utilization of construction schedule changes alternate means of construction. g mitigate any under this Agreement, other than terminationD herein,e pendency t any dispute arisingon the Work and adhere to the progress schedule. The Work shall Contractor shall carry on or postponed pending resolution of any disputes or disagreements.t be delayed 18.1.5 For any disputes which remain unsolved, within sixty 6 Final Completion of the Work, the Parties shall ( 0) calendar days after address all unresolved disputes. A mediator shall be mutuallyparticipate a agreed to the Parties. Should any objection not be resolved in mediation, retain all their legal rights and remedies under a greed upon by objecting to a determination, fails to comply in strict the Parties objecting h the ts of this Article, said Party applicable law. If nce i Party provided hereunder, including its rights and waives all of its Itri rights d remedies under applicable law.g C-32 ARTICLE 19 — NOTICES 19.1 All notices required by anyof the Contract Documents shall be in writing and shall be on mailing by certified mail, return receipt requested to the deemed delivered up following: To the City: with copies to: City Manager City of Fort Lauderdale 100 North Andrews Avenue Fort Lauderdale, Florida 33301-1016 Project Manager and City Attorney City of Fort Lauderdale 100 North Andrews Avenue Fort Lauderdale, Florida 33301-1016 To the Contractor: Eduardo Dominguez, Jr. Southeastern Engineering Contractors, Inc. 911 NW 209th Ave, Suite 101 Pembroke Tele ida phone: E-mail: (305) 557-4226 eddie(a�SoutheasternEng.com ARTICLE 20 — LIMITATION OF LIABILITY the City can place a Agreement only if in so doing Agreement, so that 20.1 The City desiresC to enter into tyisc e of action arising out of this For other good therait on s l City's for liability for any City's liability for any breach never exceeds the sum of $1,000. herebY consideration, the receipt and sufficiency of which is Agreement and valuable expresses its willingness to enter into aoythis claim acknowledged, t Contractorhatth Contractor's recovery from the City arising the knowledge the Contractor whichpu t amount Agreement is limited to a maximum amount of $1,000, sallbe from the 9 by the City the amount actually paid out of this Agreement. Nothing to shall reduced by action or claim arising way intendedNNothing this Agreement, for any is in any contained in this paragraph or elsewhere in this Agreement of the limitation placed upon the City's liability as set forth in Sectioneicher e a waiver Statutes (2020), as may be amended or revised , or to extend 768.28,ia Florida award against the City shall beyond the limits established in said Sectiono 768.28, Florid Statutes the 0,City's liability Y (2020), as may be amended or revised; and no claim fees, suit costs or prejudgment include attorney's fees, investigative costs, expert interest. C-33 20.2 No Extended Dama es: For other and additional good and valuable receipt and sufficiency of which is hereby acknowledged, the Contractor cove n the and agrees that in the event of any delay of construction or for any reason, or claim, and notwithstanding the reason of the delay,reason, covenants who caused them or the construction delay or whether they allegation who there will be no het s o Contractor claim a allegation or damages or losses for extended corporate overhead were caused by thein City, to or for any direct or indirect financial overhead impacts, project support impact, extended project whatever other label or legal concept or theory and types of names services, mobilization or demobilization or by such claims may have, or any business damages or losses of whatever or labels or basis and Contractor hereby waives any right to make any such claim provision will have application and effect when construction type or nature, agreed upon by both the City and the Contractor. delays are antic gated and ARTICLE 21 — GOVERNING LAW; WAIVER OF JURY TRIAL 21.1 This Agreement shall be governed by the laws of the State agree that the courts of the State of Florida shall have jurisdiction of any in connection with this Agreement. Venue for a of Florida. Both Parties out of this Agreement shall be in Broward Countyny, claim, objection or dispute arisinga. By enterinFlorid into this claim arising A • reement Contractor and Ci hereb ex • ressl waive an r . g ma have to a trial b 'u in an civil Iiti. ation related to or ar sis either ofPa Pro'ect. Contractor shall s • ecificall bind all subcontractors of this Agrees n out the to the • rovisions ARTICLE 22 — MISCELLANEOUS 22.1 The duties and obligations imposed b available to the Parties and in by this Agreement and the rights and remedies guaranties and obligations imposed upon athe Contracr but ctor andut aall the warranties, remedies available to the City, are in addition to, and are not to be construed way as a limitation of, any rights and remedies available of the rights and herwise imposedon rights s by m in any otherwise y er provisions of the to any or all of them whicht are laws or regulations, by special warranty or Paragraph will be as effective as if repeated speciifically in theocuments, Contract the cDocuments, of this and the provisions of this Paragraph will survive final a completion of this Agreement. Documents, payment and termination or 22.2 The Contractor shall not assign or transfer this Agreement interests. The obligations undertaken by the Contractor pursuantt its rights, title or shall not be delegated or assigned to any other person or firm. Violation of the terms of of this Paragraph shall constitute a material breach to this Agreement Agreement the Contractor and and the City any, at its discretion, cancel this Agreement and all ' interest of the Contractor which shall immediately cease and terminate. rights, title and 22.3 The Contractor and its employees, volunteers and agents independent contractor and not agents or employees of the City with the acts and services performed by shall be and remain an Agreement shall not in any way be constructed d etor tcre terms of this Ag Agreement. This all f any other kind of joint undertaking or venture between the artesership, association or C-34 to n reserves the right to audit the records of the Contractor relating in any wa to 22.4 The Wty performed pursuant to this Agreement any time during the performance and term of this Agreement 3 ears after the Work p and for a period of three () Y City. If required by the City, the Contractor agrees completion and acceptance by the independent certified public accountant selected by the to City. The Contractorsubmit an shall allow the City to inspect, examine and review the records of hours during the term of C the Contractor at any and all times during normal business this Agreement. 22.5 The remedies expressly provided rovided in this Agreement to the City shall not be deemed to ut shall be cumulative and in addition to all other remedies in favor o f be exclusive b equity. the City now or later existing at law or in provisions of this Agreement be decided by the courts to be term or 22.6 Should any part, invalid, illegal or in conflict with any state or federal law, the validity of the remaining portion or provision shall not be affected. contract for contract for goods or orn ies: 22.7 Prohibition A ainst Contractin With Scrutinized Gras tiotheCrenewanof any to anyPrasad, 876 servicesgeodc ofer$1 of n million or more Florida Inc., v V. Secretary, 31 million la more, affirmed toOdebrecht Construction, Inc.,I to the "Cuba Department t of (S.D. Fla. do20, (11th Cir. 2013), with regard Companies with Activities Aepartment of Transportation, 715 F.3d 1268 Sector Companies with Activities in the Iran Petroleum En igySeccio r Amendment," the Contractor certifies that it is not on the Scrutinized in thatt it the Scrutinized b for goods 287.135,1, and Statutesas not have business be amended or revised. As to any contract services of ody orservices Florida mou t and as may for goods amount,r n the of any amount and as to the renewal f any 0Companies 0 , as may be amended or Contractor certifies that it is not on the Scrutinized C� panies that Boycott Israel List re terminateamend this revised, and pursuantti is Sectionot 2 7in5 a boycott Israel. The City may Agreement m that it not engaged Florida Statutes bma (2020),a a may be the City's option if the Contractor is found to have submitted a false certification Agreement at Y (5) of Section 287.135, placed on the Scrutinized Companies with Activities in Sudan as provided under subsection List or Listameor theh or revised, or been in r Petroleumeu Energy Section Sector Lis or or Scrutinized Companies withAclsraelSL sthcreatedp boycott of Israel 5, the Scrutinized Companies that Boycott in a Florida Statutes (2020), as may be amended or revised, or is engageds defined in Section 287.135, Israel or has been engaged in business be amended or revised. or Syria, Florida Statutes (2020), as may Section 287.133, amended or revised, a person or affiliate who is a Public Entit Crimes: In accordance with the Public Crimes Act, vendor 22.8 as may be am conr ,Florida Statutes (2020), who has been placed on the convicted contractor, consultant or other provider, entity crime may not submit a bid on a contract to list vide any a convictionsorse for a public not submit a bid on a contract subm th the provide any goods services to the CityubirC building or public may City for the leases frreal property orerP to the City, may not be awarded work, perform work as a bids a of real prop Y of the threshold amount subcontractor, or consultant underexcess contract with the City, and contractor, supplier, business with the City in may not transact any as may be amended or revised, for a period of thirty-six (36) months from the date of being provided in Section cha 287.017,f rFloridaa Statutes (2020 ° Contractor shall result for ctegory two purchases placed on the convicted vendor list. andomaiy result in Contractor debarment. purchase in cancellation of the City C-35 4. 22.9 Attorney Fees: If City or Contractor incurs any expense in enforcing Agreement through litigation, the prevailing Part the terms of this for all such costs and expenses, including but not limited toI court costs,gation and reasonable attorney fees incurred during litigation. reasonable 22.10 Public Records IF THE CONTRACTOR HAS QUESTIONS REGARDING OF CHAPTER 119, FLORIDA STATUTES, TO THE THE APPLICATION TO PROVIDE PUBLIC RECORDS RELATING T TO DUTY CONTACT THE CUSTODIAN O THIS AGREEMENT, AT PRRCONTRACT FORTLAUDERDALE GOV OF PUBLIC RECORDS CLERK'S OFFICE, 100 N. ANDREWS AVENUE 954-828-5002, CITY FLORIDA 33301. FORT LAUDERDALE, Contractor shall: 1. Keep and maintain public records required by the City orde service. in r to perform the 2. Upon request from the City's custodian of public records, provide copy of the requested records or allow the records to be inspected or copied a within a reasonable time at a cost that does not exceed the cost r Chapter 119, Florida Statutes (2020), as may be amended or otherwise provided by law. provided in revised, or as 3. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion tis Agreement if the Contractor does not transfer the records to the City. of this Upon completion of the Agreement, transfer, at no cost, to the City records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor all public records to the City upon completion of this Agreement, the transfers all public or destroy any duplicate public records that are exempt or confidential anddtexe pt from public records disclosure requirements. If the Contractor exempt maintains public records upon completion of this Agreement, the Co shall meet all applicable requirements for retaining keeps and stored electronically must be provided to the City, upon request m retractor custodiantore el of public records, in a format public records.s Allteecords technology systems of the City. that is compatiblewith the information 12504-613 City of Fort Lauderdale Southeastern Engineering Contractors, Inc Bid Contact Eduardo Dominguez ed.sec@comcast.net Ph 3057862369681 was not found) Bid Bond 1 (Status: A bond with the supplied bid security percentage Unit Price Qty/Unit Item # Line Item 12504613-01-01 Base Bid: MOBILIZATION - NIGHT WORK Notes Supplier First Offer - $1,280.00 20 / each $25,600.00 Y Y Product Code: Address 12054 NW 98th Ave Hialeah Gardens, FL 33018 Attch. Docs Supplier First Offer - $1,536.00 20 / each 12504613--01-02 Base Bid: EMERGENCY MOBILIZATION - MOBILIZE WITHIN 24 Product HR FOR EACH PROJECT CY Supplier First Offer - $64.00 100 / hourly rate $6,400.0012504613-01-03 Base Bid: TRAFFIC CONTROL OFFICER Product Code: Supplier First Offer - $2.00 2500 / day $5,000.00 Y 12504613--01-04 Base Bid: WORK ZONE SIGN, FURNISH AND INSTALL Product Code: Supplier First Offer - $19.20 1500 / linear foot $28,800.00 Y 12504613-01-05 Base Bid: BARRIER WALL, TEMPORARY,FURNISH AND INSTALL, Code: ct CONCRETE, UP TO 30 DAYS Y Supplier First Offer - $12.80 1500 / linear foot $19,200.00 12504613--01-06 Base Bid: BARRIER WALL, Product TEMPORARY, FURNISH AND INSTALL, Code: WATERFILLED, UP TO 30 DAYS Y 12504613-01-07 Base Bid: CHANNELIZING DEVICE, Supplier First Offer - $2.00 5000 / day $10,000.00 TYPES I, II, DI, VP, DRUM, OR LCD, Product FURNISH AND INSTALL Code: Y 12504613--01-08 Base Bid: CHANNELIZING DEVICE, Supplier First Offer - $2.60 1000 / day $2,600.00 TYPE III, 6 FEET, FURNISH AND ProductCode: INSTALL y 12504-613-01-09 Base Bid: TRAFFIC CONES, FURNISH Supplier First Offer - $1.30 5000 / day $6,500.00 Product AND INSTALL Code: 12504613--01-10 Base Bid: ARROW BOARD/ADVANCE Supplier First Offer - $32.00 50 / day $1,600.00 Y WARNING ARROW PANEL, FURNISH Code: Product AND INSTALL Y 00 50 / day $2,000.00 12504613-01-11 Base Bid: PORTABLE CHANGEABLE Supplier First Offer - $40' MESSAGE SIGN, TEMPORARY, ProductCode: FURNISH AND INSTALL C -36(a) BidSync $30,720.00 Y p. 529 4/27/2021 1127/2021 City of Fort Lauderdale 12504613-01-12 Base Bid: PORTABLE REGULATORY, SIGN, FURNISH AND INSTALL ProductSupplie First Offer- $64.00 25 /day Product Code: $1,600.00 12504613-01-13 Base IGH L Bid: T TOWER, AMIDA/ IGH 4000 OR Supplier First EQUIVALENT INCLUDES POWER Codeuct Offer - $256.00 40 / day SOURCE (FDOT PAY I Code' $10,240.00 12504613--01-14 Base Bid: FDOT CERTIFIED FLAG Supplier First Offer- ) Product $23.10 1000 /hourly rate $23,100.00 PERSON (FDOT PAY ITEM NO NA Code: 12504-613-01-15 Base Bid: ORANGE PLASTIC MESH AND POST(FDOT PAY ITEM NO NA Supplier First Offer - $6.40 Product Code: 500 / linear foot $3,200.00 ) 12504613--01-16 Base Bid: FURNISH AND INSTALL STEEL TRAFFIC PLATES FOR 12 -FOOT Product First Offer - $115.20 LANES i�Yz DAILY RATE (FDOT P Code: 50 / each Code: $5,760.00 12504613_01-17 Base Bid: FURNISH AND INSTALL Supplier STEEL TRAFFIC PLATES FOR 12 -FOOT First Offer - $192.00 50 / each LANES 044 WEEKLY Product RATE (FDOT Code: $9,600.00 12504613--01-18 Base Bid: SEDIMENT BARRIER (SILT Su FENCE) pplier First Offer - Product Code: $2.60 1500 / linear foot $3,900.00 12504613-01-19 Base Bid: SEDIMENT BASIN/CONTANMENT SYSTEM FOR ProdSuppuct pi DEWATERING Prod rst Offer - $640.00 100 / day $64,000.00 12504613--01-20 Base Bid: FLOATING TURBIDITY BARRIER Supplier First Offer - Product Code: $12.80 2500 / linear foot $32,000.00 12504613-01-21 Base Bid: INLET PROTECTION Supplier First Offer - $76.80 500 / each $38,400.00 00 Code: 12504613--01-22 Base Bid: SURVEY FIELD WORK AS PERFORMED BY CREW (FDOT PAY Supplier First Offer - ITEM NUMBER NOT APPLICABLE Product $166.40 500 / hourly rate 200 Code: 12504613-01-23 Base Bid: UTILITY LOCATING AND P ucte First Offer - AREAS (FDOT PAY ITEM NUMBER EXCAVATION TEST HOLE IN GREEN Prodroduct $832 00 50 / each Code: $41'600.00 12504613-01-24 Base Bid: UTILITY LOCATING AND EXCAVATION TEST HOLE IN Product First Offer - ;1,216.00 50 / each PAVEMENT AREAS Pr NU (FDOT PAY ITEM Cododuct e: $60,800.00 12504613-01-25 Base Bid: REGULAR EXCAVATION Supplier First Offer- $12.80 1700 / cubicyard Product $21,760.00 C -36(b) BidSync Y 12504-613 Y Y Y Y Y Y Y Y Y Y Y Y Y p. 530 12504-613 City of Fort Lauderdale 12504613--01-26 Base Bid: EMBANKMENT 12504613-01-27 Base Bid: FLOWABLE FILL 12504613--01-28 Base Bid: SELECT BEDDING MATERIA Code: Supplier Product Code: Supplier Product Code: Supplier Product Code: 12504613-01-29 Base Bid: FILL SAND, FURNISH AND Supplier Product INSTALL Code: 12504613--01-30 Base Bid: FDOT PAY ITEM NO 145-1: Supplier First Offer - $46.10 5000 / square foot $230,500'00 Product GEOSYNTHETIC REINFORCED SOIL prodprod SLOPE 12504-613-01-31 Base B Supplier First Offer - $19.20 10000 /square yard $192,000' SWALE 00 TION/GR/GR : EXCAVATION/GRADING/RESTORATION Coodde � (UP TO 36 INCHES DEEP WITH 1:3 SLOPES OR FL First Offer - $19.20 500 / cubic yard $9,600.00 First Offer - $230.40 150 / cubic yard $34,560.00 Y First Offer- $115.20 50 / cubic yard $5,760.00 First Offer - $140.80 50 / cubic yard $7,040.00 Y Y 12504-613-01-32 PAVEMENT MARKERS LECTIVE Supplier First Offer - $6.40 100 / each Product Code: lier First Offer - $3.90 1000 / linear foot 12504613-01-33 Base Bid: PAINTED PAVEMENT Supp MARKINGS, STANDARD, WHITE, Product YELLOW, OR BLUE, SOLID, 6 INCHES Code: lien First Offer - $10.30 100 / linear foot 12504613-01-34 Base Bid: PAINTED PAVEMENT Supp MARKINGS, STANDARD, WHITE OR Product YELLOW, SOLID FOR CROSSWALK AND Code: RO 12504613-01-35 Base Bid: PAINTED PAVEMH IT OR MARKINGS, STANDARD, YELLOW, SOLID FOR STOP LINE OR CRO 12504613-01-36 Base Bid: PAINTED PAVEMENT MARKINGS, STANDARD, WHITE OR YELLOW, SKIP, 10-30 OR 3-9 SKIP, 6 12504613-01-37 12504613--01-38 4/2712021 Base Bid: PAINTED PAVEMENT MARKINGS, STANDARD, WHITE OR YELLOW ISLAND NOSE Supplier First Offer - $11.60 100 / linear foot Product Code: Supplier Product Code: First Offer - $3.90 100 / linear foot First Offer - $6.40 100 / square foot Supplier Product Code: Base Bid:THERMOPLASTIC Supplier First Offer - $6.40 1000 /linear foot Product PAVEMENT MARKINGS, STANDARD, WHITE, OR YELLOW, SOLID, 6 INCHES Code: C -36(c) BidSync Y $640.00 $3,900.00 $1,030.00 $1,160.00 $390.00 $640.00 $6,400.00 Y Y Y Y Y Y Y Y Y p. 5° City of Fort Lauderdale 12504613-01-39 Base Bid: THERMOPLASTIC Supplier First Offer _ $12.80 WHITE, SOLID, 12 INCHES PAVEMENT MARKINGS, STANDARD, Product 100/linear foot $1,280.00 Code: 12504-613 12504-613-01-40 Base Bid: THERMOPLASTIC Supplier First Offer - $15.40 Code: WHITE, SOLID, 24 INCHES 100 /linear foot Code: $1540.00 PAVEMENT MARKINGS, STANDARD, 12504613-01-41 Base Bid: THERMOPLASTIC, REMOVE Supplier First Product - $10'30 1000 / square foot $10,300.00 Code: 12504613-01-42 Base Bid: CURB OR CURB AND GUTTER REMOVAL (FDOT PAY ITEM Supplier First Offer - NUMBER NOT APPLICABLE) CodProeuct $6 1500 /linear foot $9,600'00 Code: Y 12504613-01-43 Base Bid: REMOVAL OF EXISTING Produ Supplier First Offer- $19.20 product 3000 /square yard $57,600.00 CONCRETE PAVEMENT Code: 12504613--01-44 Base Bid: PAVER BLOCK REMOVAL (FDOT PAY ITEM NUMBER NOT Supplier First Offer - $6.40 1500 / square $9,600.00 APPLICABLE) Product q yard Code: 12504613-01-45 Base Bid: REMOVAL AND DISPOSAL OF UNSUITABLE, NON- Pupplier First Offer- $57.60 150 /cubic yard CONTAMINATED MATERIALS(FDOT Code:Product ,� PAY ITEM 12504613--01-46 Base Bid: UTILITY PIPE, REMOVE & DISPOSE, 5-7.9 INCHES Supplier First Offer - 53.90 Product 2000 /linear foot Code: $7,800.00 Y 12504613-01-47 Base Bid: UTILITY PIPE, REMOVE & DISPOSE, 8-19.9 INCHES Supplier First Offer - $15.40 Product /linear foot $77,000.00 Code: 12504613-01-48 Base Bid: UTILITY PIPE, REMOVE & Supplier First Offer- $32.00 500 DISPOSE, 20-49.9 INCHES Product /linear foot $16,000,00 Code: 12504613-01-49 Base Bid: UTILITY PIPE, REMOVE & Supplier First Offer - product $70.40 100 /linear foot DISPOSE, 50 INCHES OR LARGER Code: $7,x'0 12504613--01-50 Base Bid: UTILITY PIPE, PLUG AND SupplierPLACE OUT OF SERVICE, 5-7.9 INCHES Product First Offer $25.60 100 /linear foot $2,560.00 Code: 12504613-01-51 Base Bid: UTILITY PIPE, PLUG AND PLACE OUT OF SERVICE, 8-19.9 Supplier First Product Offer $25'60 300 /linear foot INCHES $7,68000 Code: 12504613--01-52 Base Bid: UTILITY PIPE, PLUG AND Supplier First Offer - $57.60 Product 200 / linear foot PLACE OUT OF SERVICE, 20-49.9 $11,520.00 ., 4/27/2021 C -36(d) BidSync p. 532 12504-613 City of Fort Lauderdale Code: INCHES $5,760.00 Y Supplier First Offer - $57.60 100 / linear foot 12504-613-01-53 PLAN OUT OF SERVICE, CE, 50 INCHEe Bid: UTILITY PIPE, PLUG DS OR Product Code: LARGER $12$000 00 Y Supplier First Offer - $640.00 200 / each 12504613--01-54 Base Bid: STORM/SANITARY Product STRUCTURE REMOVAL (FDOT PAY Code: ITEM NUMBER NOT APPLICABLE) X1,700 Y 12504613-01 55 Base Bid: LIMEROCK REMOVAL TO A Supplier First Offer - $15.40 500 / square yard DEPTH OF 8 INCHES (FDOT PAY ITEM Product Code: NUMBER NOT APPLICABLE) $5,120.00 Y Supplier First Offer - $102.40 50 / each 12504613--01-56 Base Bid: SINGLE POST SIGN, product REMOVE Code: Base Bid: MILLING EXIST ASPH PAVT, Supplier First Offer - $9.00 2500 / square yard $22,500.00 Y 12504-613-01-57 1 INCH AVG DEPTH, AREA Product Base Bid: CONCRETE SIDEWALK AND Supplier First Offer - $69.20 1000 / square yard $69,200.00 Y 12504-613-01-58 DRIVEWAYS, 6 INCHES THICK Product Base Bid: PAVERS, ARCHITECTURAL, Supplier First Offer - $92'20 1500 / square yard $138,300.00 Y 12504613-01 59 ROADWAY Product Supplier First Offer - $80.70 1500 / square yard $121,050.00 Y 12504613--01-60 Base Bid: PAVERS, ARCHITECTURAL, SIDEWALK Product Code: 12504-613-01-61 Base Bid: REWORKING/ ADDING Supplier First Offer - $15.40 1000 / square yard $15,400.00 Y LIMEROCK BASE TO EXISTING, 3 ProductCode: INCHES $16,700.00 Y Supplier First Offer - $16.70 1000 / square yard Base Bid: REWORKING/ 12504-613-01-62 LIMEROCK BASE TO EXIST NG,, 4G Product Code: INCHES $51900 00 Y Supplier First Offer - $17.30 3000 / square yard Base Bid: NG/ 12504613-01 63 LIMEROCK BASE TO EXISTING 6G Product Code: INCHES $51,250.00 Y Supplier First Offer - $20.50 2500 / square yard 12504613--01-64 Base Bid: OPTIONAL BASE, BASE GROUP 04 (6 INCHES LIMEROCK) Product Code: — 1-65 Base Bid: TEMPORARY PATCH USING Supplier First Offer - $231.00 100 / cubic foot $23,100.00 Y 12504-613 0 COLD ASPHALTIC MIX, FURNISH AND Code: oduct INSTALL $117,500.00 Y 12504613-01-66 Base Bid: SUPERPAVE ASPHALTIC Supplier First Offer - $235.00 500 / ton CONCRETE, TRAFFIC A, B, C, D, ORE Product C -36(e) BidSync p. 53: 4/27/2021 City of Fort Lauderdale Code: 12504-613 12504-613-01-67 Base Bid: MISCELLANEOUS ASPHALT Supplier First Offer - $345.60 100 / ton PAVEMENT 560 Product y Code: 12504613--01-68 Base Bid: CONCRETE CURB & GUTTER, TYPE E Pupplier First Offer - $25.00 50 / linear foot Product $1,250.00 y Code: 12504613-01-69 Base Bid: CONCRETE CURB & GUTTER, TYPE F Pupplier First Offer - ;27.00 1000 / linear foot Product $27,000.00 y Code: 12504613--01-70 Base Bid: CONCRETE CURB, TYPE D Supplier First Offer - $24.00 2500 / linear foot #6000000 Product y Code: 12504613-01-71 Base Bid: VALLEY GUTTER - CONCRETE Supplier First Offer - $26.00 1000 / linear foot ;26 Product 000 00 y Code: 12504613.-01-72 Base Bid: DETECTABLE WARNING ON Supplier First Offer - $41.00 500 / square foot EXISTING WALKING SURFACE, Product Code: 9 $20,500.00 RETROFIT, FURNISH AND INSTALL Y 12504613-01-73 Base Bid: ADA COMPLIANT CURB Supplier First Offer - 1,024.00 RAMP (FDOT PAY ITEM NO NA) Product $ 20 /each $20,480.00 Y Code: 12504613--01-74 Base Bid: DITCH BOTTOM TYPE C Supplier First Offer - $4,285.00 100 / each (INDEX 232) LESS THAN 10 FEET Product #428,500.00 Code: 12504-613-01-75 Base Bid: DITCH BOTTOM TYPE D Supplier First Offer - $4,310.00 20 / each (INDEX 232) LESS THAN 10 FEET Product $86,200.00 y Code: 12504-613--01-76 Base Bid: DITCH BOTTOM TYPE Supplier First Offer - $4,527.00 20 / each I Ei�Yz (INDEX 232) LESS THAN 10 Product $90,540.00 FEET Y Code: 12504.613-01-77 Base Bid: DITCH BOTTOM TYPE Supplier First Offer - $5,030.00 10 / each IL'�F�Yz (INDEX 233) LESS THAN 10 Product $50,30000 FEET Code: 12504613--01-78 Base Bid: DITCH BOTTOM TYPE Supplier First Offer - $7,348.00 10 / each iZYzGi�Y4 (INDEX 233) LESS THAN 10 Product $73,480.00 FEET Y Code: 12504-613-01-79 Base Bid: TYPE CATCH BASIN Supplier First Offer- $4,177.00 30 / each 24X36 INCHES LESS THAN 10 FEET Product $125,310.00 (FDOT PAY ITEM NUMBER NOT Y Code: 12504613--01-80 4/27/2021 Base Bid: LARGE RECTANGULAR TYPE Supplier I i Cj Yz CATCH BASINS WITH TOP Product First Offer - $5,521.00 100 / each $552,100.00 y C -36(f) BidSync p. 534 12504-613 City of Fort Lauderdale SLABS 4X4 FEET OR TYPE INCHESC Code: 12504613-01-81 Base Bid: LARGE RECTANGULAR TYPE Supplier First Offer - $5,764.00 100 / each $576,400.00 Y Ig2CiLY2 CATCH BASINS WITH TOP Product SLABS 5X5 FEET OR TYPE INCHESC Code: 12504613-01-82 Base Bid: LARGE RECTANGULAR TYPE Supplier First Offer - $7,327.00 1 / each $7,327.00 Y 'Q hCiLY2 CATCH BASINS WITH TOP Product SLABS 6X6 FEET OR TYPE INCHESC Code: 12504613-01-83 Base Bid: LARGE RECTANGULAR TYPE Supplier First Offer - $9,498.00 5 / each $47,490.00 Y 'iLYzCiLY2 CATCH BASINS WITH TOP Product SLABS 8X8 FEET LESS THAN 10 FE Code: 12504613-01-84 Base Bid: LARGE RECTANGULAR TYPE Supplier First Offer - $6,229.00 5 / each $31,145.00 Y iLYzCiLYz CATCH BASINS WITH TOP Product SLABS 4X6 FEET LESS THAN 10 FE Code: 12504613-01-85 Base Bid: LARGE RECTANGULAR TYPE Supplier First Offer - $7,148.00 5 / each $35,740.00 Y 'iLYzCiLYz CATCH BASINS WITH TOP Product SLABS 4X8 FEET LESS THAN 10 FE Code: 12504613--01-86 Base Bid: STORM MANHOLE TYPE M- Supplier First Offer - $4,829.00 100 / each $482,900.00 Y 4 (48 INCHES ROUND) LESS THAN 10 Product de: ct FEET (FDOT PAY ITEM NUM 12504613-01-87 Base Bid: STORM MANHOLE TYPE M- Supplier First Offer - $5,387.00 5 / each $26,935.00 Y 5 (60 INCHES ROUND) LESS THAN 10 Product Code: FEET (FDOT PAY ITEM NUM 12504613--01-88 Base Bid: STORM MANHOLE TYPE M- Supplier First Offer - $7,116.00 5 / each $35,580.00 Y 6 (72 INCHES ROUND) LESS THAN 10 Product FEET (FDOT PAY ITEM NUM 12504613-01-89 Base Bid: STORM MANHOLE TYPE M- Supplier First Offer - $9,519.00 3 / each $28,557.00 Y 7 (84 INCHES ROUND) LESS THAN 10 product FEET (FDOT PAY ITEM NUM 12504613-01-90 Base Bid: 18 INCHES ADS DRAIN Supplier First Offer - $3,654.00 20 / each $73,080.00 Y BASIN OR APPROVED EQUAL (FDOT Product PAY ITEM NUMBER NOT APPLICAB Code: 12504613-01-91 Base Bid: 24 INCHES ADS DRAIN Supplier First Offer - $4,086.00 5 / each $20,430.00 Y BASIN OR APPROVED EQUAL (FDOT Product PAY ITEM NUMBER NOT APPLICAB Code: 12504613--01-92 Base Bid: 8 INCHESTRENCH DRAIN Supplier First Offer - $336.00 10 / linear foot S3,360.00 Y WITH GRATE 6452 OR APPROVED Product EQUAL (FDOT PAY ITEM NUMBER N Code: 12504613-01-93 Base Bid: 10 INCHES TRENCH DRAIN Supplier First Offer - $354.00 50 / linear foot $17,700.00 Y WITH GRATE 6453 OR APPROVED Product EQUAL (FDOT PAY ITEM NUMBE 12504613--01-94 Base Bid: 12 INCHES TRENCH DRAIN Supplier First Offer - $404.00 125 / linear foot $50,500.00 Y WITH GRATE 6454 OR APPROVED Product C 36(g) p. 535 BidSync 4/27/2021 City of Fort Lauderdale EQUAL (FDOT PAY ITEM NUMBER Code: 12504-613 12504613-01-95 Base Bid: 15 INCHES TRENCH DRAIN Supplier First WITH GRATE 6455 OR APPROVED Product Offer" 1 100 /linear foot EQUAL (FDOT PAY ITEM NUMBER $42Code: Y Code: 12504613--01-96 Base Bid: 18 INCHES TRENCH DRAIN Supplier First Offer - $446.00 100 / linear foot WITH GRATE 6456 OR APPROVED Product EQUAL (FDOT PAY ITEM NUMBER 'S Y Code: 12504613-01-97 Base Bid: INLETS, ADJUST Supplier First Offer - $896.00 50 / each Product $44,800.00 Y Code: 12504613--01-98 Base Bid: MANHOLE, ADJUST Supplier First Offer - $512.00 50 / each Product $25,600.00 Y Code: 12504613-01-99 Base Bid: VALVE BOXES, ADJUST Supplier PP First Offer - $256.00 50 /each Product $12,800,00 Y Code: 12504613--01-100 Base Bid: DRAINAGE STRUCTURES, Supplier First Offer -$1,024.00 50 /each $51,200.00 Y MISCELLANEOUS, ADJUST Product Code: 12504613-01-101 Base Bid: DRAINAGE STRUCTURE Supplier First MODIFY Offer - $1,792.00 100 /each Product $179,200.00 Y Code: 12504613--01-102 Base Bid: INLETS RELOCATING Supplier First Offer - $2,578.00 25 / each Product $64,450.00 Y Code: 12504613-01-103 Base Bid: MANHOLES AND INLETS Supplier First CLEANING AND SEALING, LESS THAN Product Offer- �'� 50 /each 10 FEET $44,800.00 Y Code: 12504613--01-104 Base Bid: PIPE CULVERT, RCP Supplier MATERIAL ONLY, ROUND, LESS THAN Product First Offer - $86,40 500 /linear foot 12 INCHES STORM DRAIN (INSTALL Code: "2� 12504613-01-105 Base Bid: PIPE CULVERT, OPTIONAL Supplier MATERIAL, ROUND, LESS THAN 12 First Offer- $71.20 500 /linear foot ' INCHES STORM DRAIN (INSTALL CodeProd: Code: 12504613--01-106 Base Bid: PIPE CULVERT, RCP MATERIAL ONLY, ROUND, 12 INCHES, Product er First Offer - $86,00 2000 /linear foot 15 INCHES STORM DRAIN(INSTAL $172,000.00 Code: 12504613-01-107 Base Bid: PIPE CULVERT, OPTIONAL Supplier First Offer- $78.20 2000 / linear foot $156,400.00MATERIAL, ROUND, 12 INCHES, 15 ProductNSTAL C INCHES STORM DRAIN I ( ode: 12504613--01-108 Base Bid: PIPE CULVERT, RCP uct er First Offer" $119.90 2000 /linear foot $239,800.00 MATERIAL ONLY, ROUND, 18 INCHES, Prod 4/27/2021 Y C -36(h) BidSync p. 536 12504-613 City of Fort Lauderdale 24 INCHES STORM DRAIN (INSTAL Code: Y Supplier First Offer - $104.80 2000 /linear foot $209,600.0012504613-01-109 Base Bid: PIPE CULVERT, OPTIONAL uct MATERIAL, ROUND, 18 INCHES, 24 rod INCHES STORM DRAIN (INSTAL Y 12504613-01-110 Base Bid: PIPE CULVERT, RCP Supplier First Offer - $197.50 1500 / linear foot $296,250.00 MATERIAL ONLY, ROUND, 30 INCHES, Product d uct 36 INCHES STORM DRAIN (INSTAL Y Supplier First Offer - $151.40 1500 / linear foot $227.100'00 12504613-01-111 Base Bid: PIPE CULVERT, OPTIONAL product MATERIAL ROUND, 30 INCHES, 36 Code: INCHES STORM DRAIN (INSTAL Y Supplier First Offer - $298.30 1000 / linear foot $298,300.00 12504-613-01112 MATERIAL ONLY, ROUND, 2Base Bid: PIPE CULVERT, PINCHES, Product 48 INCHES STORM DRAIN (INSTAL Code: 12504613-01-113 Base Bid: PIPE CULVERT, OPTIONAL Supplier First Offer - $214.80 1000 / linear foot $214,800.00 Y MATERIAL, ROUND, 42 INCHES, 48 Product INCHES STORM DRAIN (INSTAL Code: Supplier First Offer - $410.30 500 / linear foot $205,150.00 Y CP 12504613 01114 MATERIAL ONLY, ROUND, Base Bid: PIPE CULVERT, R54INCHES, Product 60 INCHES STORM DRAIN (INSTAL Code: 12504613-01-115 Base Bid: PIPE CULVERT, OPTIONAL Supplier First Offer - $284.10 400 / linear foot $113,640.00 Y MATERIAL ROUND, 54 INCHES, 60 Product INCHES STORM DRAIN (INSTAL Code: Y 12504613--01-116 Base Bid: PIPE CULVERT, OPTIONAL Supplier First Offer - $111.00 250 / linear foot $27,750.00 MATERIAL, OTHER SHAPE - Product ELLIP/ARCH, 15 INCHES, 18 INCHES Code: Y 12504-613-01-117 Base Bid: PIPE CULVERT, RCP Supplier First Offer - $118.30 250 / linear foot $29,575.00 MATERIAL ONLY, OTHER SHAPE - Product ELLIP/ARCH,15 INCHES, 18 INCHES Code: Y 12504613--01-118 Base Bid: PIPE CULVERT, OPTIONAL Supplier First Offer - $122.00 200 / linear foot $24,400.00 MATERIAL OTHER SHAPE - Product Code: ELLIP/ARCH, 24 INCHES Y Supplier First Offer - $154.00 200 / linear foot $30,800.00 Base Bid: PIPE CULVERT, RCP 12504613-01 119 MATERIAL ONLY, OTHER SHAPE - Product Code: ELLIP/ARCH, 24 INCHES Co Y 12504613--01-120 Base Bid: PIPE CULVERT, OPTIONAL Supplier First Offer - $190.00 150 / linear foot $28,500.00 MATERIAL OTHER SHAPE Product ELLIP/ARCH, 30 INCHES, 36 INCHES Code: Y 12504-613-01-121 Base Bid: PIPE CULVERT, RCP Supplier First Offer - $258.00 150 / linear foot $38,700.00 MATERIAL ONLY, OTHER SHAPE - Product ELLIP/ARCH, 30 INCHES, 36 INCHES Code: Supplier First Offer - $400.00 150 / each $60,000.00 Y ANING & SEALING 12504613-01 122 EXISTING PIPase Bid: E JOINT, 10 INCHES TO 24 Product p. 537 C -36(i) BidSync 4/27/2021 City of Fort Lauderdale INCHES, STORM SEWER Code: 12504-613 12504613-01-123 Base Bid: CLEANING &SEALING Supplier First EXISTING PIPE JOINT, 30 INCHES, 36 Product Offer- 50 /each INCHES, STORM SEWER $32'000.00 Code: 12504613--01-124 Base Bid: CLEANING & SEALING Supplier First Offer - $768.00 50 / each EXISTING PIPE JOINT, 42 INCHES, 48 Product INCHES, STORM SEWER $ Code: 12504613-01-125 Base Bid: CLEANING & SEALING Supplier First Offer - ;1,088.00 EXISTING PIPE JOINT, 54 INCHES, 60 Product 50/each INCHES, STORM SEWER $54,400.00 Code: 12504613--01-126 Base Bid: CLEANING &SEALING Supplier First Offer- $1,280.00 EXISTING PIPE JOINT, >60 INCHES, Product 25 /each STORM SEWER 2'� Y Code: 12504613-01-127 Base Bid: MITERED END SECTION, Supplier First Offer- $1,618.00 10 / each OPTIONAL ROUND, 12 INCHES, 15 Product INCHES, 18 INCHES $16,180.00 Y Code: 12504613-01-128 Base Bid: MITERED END SECTION, Supplier First Offer- $1,795.00 5 / each $8,975.00 y OPTIONAL ROUND, 24 INCHES Product Code: 12504613-01-129 Base Bid: MITERED END SECTION, Supplier First Offer - $3,899.00 OPTIONAL ROUND, 30 INCHE5,36 Product 5 /each INCHES $19,495.00 Y Code: 12504613--01-130 Base Bid: FRENCH DRAIN, LESS THAN Supplier First Offer- $151.20 100 / linear foot 12 INCHES Product $15,120.00 y Code: 12504613-01-131 Base Bid: FRENCH DRAIN, 12 TO 18 Supper First Offer- $156.20 3500 /li INCHES Supplier near foot #546,700,Op Product Code: 12504613--01-132 Base Bid: FRENCH DRAIN, 24 INCHES Supplier First Offer- $175.40 1000 / linear foot Product $175,400,00 Y Code: 12504-613-01-133 Base Bid: STORM SEWER INSPECTION Supplier First (VIDEO CAMERA) Offer - $6.40 5000 /linear foot Product $32,000.00 Y Code: 12504613--01-134 Base Bid: OUTFALL BARNACLE Supplier First Offer - $51.20 1000 /linear foot $51,200.00 REMOVAL FOR 0-24 INCH PIPES Code: 12504613-01-135 Base Bid: OUTFALL BARNACLE Supplier First Offer - $70.40 500 / linear foot $35,200.00 REMOVAL FOR 25-36 INCH PIPES Product Code: 12504613--01-136 Base Bid: OUTFALL BARNACLE Supplier First Offer - $76.80 500 / linear foot $38,400.00 Y REMOVAL FOR 37-48 INCH PIPES Product 4/27/2021 C -36(j) BidSync p. 538 12504-613 City of Fort Lauderdale Code: 12504-613-01-137 Base Bid: OUTFALL BARNACLE Supplier First Offer - $115.20 500 / linear foot $57,600.00 Y REMOVAL FOR 49-60 INCHES PIPES Product d uct 12504-613--01-138 Base Bid: OUTFALL BARNACLE Supplier First Offer - $128.00 250 / linear foot $32,000.00 Y REMOVAL FOR 61 INCHES AND Product GREATER PIPES Code: Y 12504-613-01-139 Base Bid: CONCRETE COLLAR AT Supplier First Offer - $1,800.00 200 / each $360,000.00 JOINTS FOR CONNECTING DISSIMILAR oe: Product TYPES OF PIPE AND CONCRETE P Y -140 Base Bid: PIPE LINER, SLIP LINER, 0-24 Supplier First Offer - $200.00 2000 / linear foot $` 00,x.00 12504613 01 product INCHES Code: -141 Base Bid: PIPE LINER, SLIP LINER, 25- Supplier First Offer - $276.00 1000 / linear foot $276,000.00 Y 12504613 01 Product 36 INCHES Code: -142 Base Bid: PIPE LINER, SLIP LINER, 37- Supplier First Offer - $397.00 500 / linear foot $198,500.00 Y 12504613 01 Product 48 INCHES Code: 12504613-01-143 Base Bid: PIPE LINER, SLIP LINER, 49- Supplier First Offer - $500.00 500 / linear foot $250,000.00 Y Product 60 INCHES Code: 12504613--01-144 Base Bid: PIPE LINER, SLIP LINER, 61 Supplier First Offer - $700.00 500 / linear foot $350,000.00 Y INCHES AND GREATER ProductCode: 12504613-01-145 Base Bid: BALLAST ROCK, FRENCH Supplier First Offer - $64.00 100 / cubic yard $6,400.00 Y DRAIN AGGREGATE, FURNISH AND Product INSTALL Code: Y 12504613--01-146 Base Bid: DEEP WELL INJECTION BOX, Supplier First Offer - $14,454.00 10 / each $144,540.00 STRUCTURE WITH NO OUTFLOW Product Code: 12504613-01-147 Base Bid: DEEP WELL INJECTION BOX, Supplier First Offer - $15,171.00 10 / each $151,710.00 Y STRUCTURE WITH OUTFLOW ProductCode: 1-148 Base Bid: DEEP WELL OPEN HOLE , 24 Supplier First Offer - $320.00 2000 / linear foot $640,000.00 Y 12504613 0 product INCHES Code: Base Bid: DEEP WELL CASING Supplier First Offer - $352.00 2000 / linear foot ;704,000.00 Y 12504613-01-149 Product Code: Y 1-150 Base Bid: (0-23 INCHES) DEEP WELL Supplier First Offer - $128.00 2000 / linear foot $256,000.0012504613 0 product CLEANING C -36(k) p. 539 BidSync 4/27/2021 City of Fort Lauderdale 12504-613 Code: 125N-613-01-151 Base Bid: (24 INCHES) DEEP WELL Supplier First Offer - $128.00 2000 / linear foot $256,000.00 CLEANING Product Y Code: 12504-613-01-152 Base Bid: (25 INCHES AND GREATER) Supplier First Offer - $128.00 2000 / linear foot $256,000.00 DEEP WELL CLEANING Product Y Code: 12504-613-01-153 Base Bid: SHEET PILING, STEEL Supplier First Offer - $35.90 1500 / square foot $53,850.00 TEMPORARY -CRITICAL Product Y Code: 12504613--01-154 Base Bid: STORM DRAINAGE Supplier First Offer - $9.00 2500 /linear foot ;22,500.00 CLEANING AND DESILTING, VIDEO & Product Y FINISHED CD OR DVD, 0-24 INCHES P Code: 12504613-01-155 Base Bid: STORM DRAINAGE Supplier First Offer- $12.80 1000 /linear foot ;12,800.00 CLEANING AND DESILTING, VIDEO & Product Y FINISHED CD OR DVD, 24-36 INCHES Code: 12504613--01-156 Base Bid: STORM DRAINAGE Supplier First Offer - $19.20 1000 / linear foot CLEANING AND DESILTING, VIDEO & Product $19 200 Y FINISHED CD OR DVD, 37-48 INCHES Code: 12504613-01-157 Base Bid: STORM DRAINAGE Supplier First Offer - $28.20 1000 / linear foot CLEANING AND DESILTING, VIDEO & Product $28•200 Y FINISHED CD OR DVD, 49-60 INCHES Code: 12504613--01-158 Base Bid: STORM DRAINAGE Supplier First Offer- $44.80 500 / linear foot CLEANING AND DESILTING, VIDEO & Product $� Y FINISHED CD OR DVD, 61 INCHES OR Code: 12504613-01-159 Base Bid: WELL POINT SYSTEM Supplier First Offer- $640.00 100 / day $64,00000 COMPLETE, 4 INCHES PUMP, FURNISH Product Y AND INSTALL (FDOT PAY ITEM Code: 12504613--01-160 Base Bid: WELL POINT SYSTEM Supplier First Offer - $672.00 40 / day $26,880.00 COMPLETE, 6 INCHES PUMP, FURNISH Product Y AND INSTALL (FDOT PAY ITEM Code: 12504613-01-161 Base Bid: WELL POINT SYSTEM Supplier First Offer -$704,00 20/day $14,080.00 COMPLETE, 8 INCHES PUMP, FURNISH Product Y AND INSTALL (FDOT PAY ITEM Code: 12504613--01-162 Base Bid: BY-PASS PUMP 4 INCHES, Supplier First Offer- $179.20 200 / day $35,840.00 FURNISH AND INSTALL (FDOT PAY Product Y ITEM NO NA) Code: 12504613-01-163 Base Bid: BY-PASS PUMP 6 INCHES, Supplier First Offer- $192.00 80 / day $15,360.00 FURNISH AND INSTALL (FDOT PAY Product Y ITEM NO NA) Code: 12504613--01-164 Base Bid: BY-PASS PUMP 8 INCHES, Supplier First Offer- $230.40 40 / day $9,21600 FURNISH AND INSTALL (FDOT PAY Product Y 4/27/2021 C -36(I) BidSync p. 540 12504-613 City of Fort Lauderdale ITEM NO NA) 12504613-01-165 Base Bid: 8 TO 12 INCHES PLUG FOR Supplier First Offer - $512.00 200 / each S102,400.00 Y BLOCKING DRAINAGE LINE WITHIN Product WATERTABLE - INCLUDES INST Code: 12504613-01-166 Base Bid: 15-24 INCHES PLUG FOR Supplier First Offer - $640.00 150 / each $96,000.00 Y BLOCKING DRAINAGE LINE WITHIN Product WATERTABLE - INCLUDES INSTAL Code: 12504-613-01-167 Base Bid: 30-42 INCHES PLUG FOR Supplier First Offer - $1,024.00 100 / each $102,400.00 Y BLOCKING DRAINAGE LINE WITHIN Product WATERTABLE-INCLUDES INSTAL Code: 12504613--01-168 Base Bid: 48-60 INCHES PLUG FOR Supplier First Offer - $1,280.00 50 / each $64,000.00 Y BLOCKING DRAINAGE LINE WITHIN Product WATERTABLE-INCLUDES INSTAL Code: 12504613-01-169 Base Bid: 60 INCHES AND ABOVE Supplier First Offer - $2,048.00 25 / each $51,200.00 Y PLUG FOR BLOCKING DRAINAGE LINE Product WITHIN WATERTABLE - INCLUDE Code: 12504613--01-170 Base Bid: RIPRAP, SAND -CEMENT Supplier First Offer - $576.00 25 / cubic yard $14,400.00 Y Product Code: Code: 12504613-01-171 Base Bid: RIPRAP- RUBBLE, BANK Supplier First Offer - $512.00 5 / ton $2,560.00 Y AND SHORE Product Code: 12504613--01-172 Base Bid: RIPRAP, RUBBLE, FURNISH Supplier First Offer - $576.00 5 / ton S2,880.00 Y AND INSTALL DITCH LINING Product Code: 12504613-01-173 Base Bid: STANDARD 6 FOOT CHAIN Supplier First Offer - $19.20 2000 / linear foot $38,400.00 Y LINK FENCE (FDOT PAY ITEM NUMBER Productde. NOT APPLICABLE) 12504613--01-174 Base Bid: STANDARD 6 FOOT CHAIN Supplier First Offer - $1,024.00 10 / each 510,240.00 Y LINK FENCE GATE OPENING, SINGLE, Product 0-612.1 (FDOT PAY ITEM NUM Code: 12504613-01-175 Base Bid: STANDARD 6 FOOT WOOD Supplier First Offer - $32.00 1000 / linear foot $32,000.00 Y PANEL PRESSURE -TREATED (FDOT PAY ITEM NUMBER NOT AP Code: 12504613--01-176 Base Bid: STANDARD 6 FOOT WOOD Supplier First Offer - $1,024.00 5 / each S5,120.00 Y PANEL PRESSURE -TREATED FENCE Product GATE OPENING, SINGLE, 0-6Q% (FD Code: 12504613-01-177 Base Bid: STANDARD 6 FOOT VINYL Supplier First Offer - $44.80 500 / linear foot $22,400.00 Y FENCE (FDOT PAY ITEM NUMBER NOT e: Product APPLICABLE) 12504613-01-178 Base Bid: STANDARD 6 FOOT VINYL Supplier First Offer - $1,024.00 5 / each $5,120.00 Y FENCE GATE OPENING, SINGLE, 0-6ILY2 Product C -36(m) p. 541 BidSync 4/27/2021 City of Fort Lauderdale (FDOT PAY ITEM NUMBER N Code: 12504-613-01-179 Base Bid: FDOT PAY ITEM NO 550-60- Supplier First Offer - $1,408.00 5 / each 211: FENCE GATE, TYPE B, SINGLE, 0- Product $7,040.00 Y 6.0 FEET OPENING Code: 12504613--01-180 Base Bid: FDOT PAY ITEM NO 550-60- Supplier First Offer- $2,176.00 2 / each 212, 550-60-213, OR 550-60-214: Product $4,352.00 FENCE GATE, TYPE B, SI Code: 12504613-01-181 Base Bid: ADDITIONAL LABORER Supplier First Offer- $16.70 5000 / hourly rate 3,g00 (FDOT PAY ITEM NUMBER NOT Product .00 Y APPLICABLE) Code: 12504-613 Y 12504613--01-182 Base Bid: MASTER ELECTRICIAN Supplier First Offer- $153.60 100 / hourly rate $15,360.00 (FDOT PAY ITEM NUMBER NOT Product Y APPLICABLE) Code: 12504-613-01-183 Base Bid: DIVER (REGULAR TIME) Supplier First Offer - $320.00 50 / hourly rate $16,000.00 (FDOT PAY ITEM NUMBER NOT Product Y APPLICABLE) Code: 12504-613--01-184 Base Bid: QUALIFIED CONSTRUCTION Supplier First Offer - $96.00 50 / hourly rate $4,800.00 TRAINING QUALIFICATION PROGRAM Product Y (CTQP) ASPHALT PAVING LEVE Code: 12504613-01-185 Base Bid: SERVICE TRUCK & uct er First Offer- $128.00 100 /hourly rate $12,800.00 � Y OPERATOR, PERSONNEL LIFT TO 35 FT Prod HIGH ACCESS, 4 HR MINIMUM CHAR Code: 12504613--01-186 Base Bid: BUCKET TRUCK & OPERATOR, 50 FT REACH, 4 HR Pupplier First Offer - $153.60 100 /hourly rate $15,360.00 Product Y MINIMUM CHARGE (FDOT PAY ITEM Code: NUMBE 12504-613-01-187 Base Bid: D3 OR D5 DOZER & Supplier First Offer - $128.00 100 / hourly rate $1 800,E OPERATOR (FDOT PAY ITEM NUMBER Product 2. Y NOT APPLICABLE) Code: 12504613--01-188 Base Bid: CRANE & OPERATOR, Supplier First Offer- $384,00 100 / hourly rate $38,400 00 INSTALLATIONS LESS THAN 85 FT Product Y HIGH AND 22 TON, 4 HR MINIMUM Code: CH 12504613-01-189 Base Bid: VAC TRUCK, 3 -PERSON Supplier First Offer- $576.00 100 / hourly rate $57,600.00 CREW, 4 HR MINIMUM CHARGE (FDOT Product Y PAY ITEM NUMBER NOTAPPLIC Code: 12504613--01-190 Base Bid: SKID STEER LOADER & Supplier First Offer- $96,00 100 / hourly rate $9,600.00 OPERATOR, 1,850 LB MINIMUM, 4 HR Product Y MINIMUM CHARGE (FDOT PAY IT Code: 12504613-01-191 Base Bid: BOAT/WATER CRAFT WITH Supplier First Offer - $512.00 100 / hourly rate $51,200.00 MOTOR, 30 FT LENGTH MAXIMUM, 4 Product Y HR MINIMUM CHARGE (FDOT PAY Code: 4/27/2021 C -36(n) BidSync p. 542 12504-613 City of Fort Lauderdale 12504-613--01-192 Base Bid: DUMP TRUCK & Supplier First Offer - $76.80 100 / hourly rate $7,680.00 Y OPERATOR, SINGLE -AXLE, 5 cubic yard Product MINIMUM CAPACITY, 4 HR MINIMUM Code: 12504-613-01-193 Base Bid: ROOT PRUNING/TREE Supplier First Offer - $384.00 24 / hourly rate $9,216.00 Y TRIMMING CREW, 3 -PERSON CREW Product (FDOT PAY ITEM NUMBER NOT APPLI Code: 12504-613-01-194 Base Bid: CERTIFIED ARBORIST (FDOT Supplier First Offer - $153.60 10 / hourly rate $1,536.00 Y PAY ITEM NUMBER NOT APPLICABLE) Product ct Code: 12504-613-01-195 Base Bid: SINGLE POST SIGN, Supplier First Offer- $576.00 50 / each $28,800.00 Y INSTALL Product Code: 12504613-01-196 Base Bid: SINGLE POST SIGN, Supplier First Offer - $192.00 50 / each $9,600.00 Y RELOCATE Product Code: 12504613-01-197 Base Bid: FIRE HYDRANT, ADJUST AND MODIFY Supplier First Offer - $1,920.00 10 / each Product Code: $19,200.00 Y 12504613-01-198 Base Bid: FIRE HYDRANT, RELOCATE Supplier First Offer - $4,480.00 10 / each $44,800.00 Y Product Code: 12504-613-01-199 Base Bid: POLLUTION RETARDANT Supplier First Offer - $384.00 50 / each $19,200.00 Y BAFFLE WITH 10 INCHES CLEANOUT Product ACCESS TO COVER 12 -INCH -15 I Code: 12504613--01-200 Base Bid: POLLUTION RETARDANT Supplier First Offer - $448.00 100 / each $44,800.00 Y BAFFLE WITH 12 INCHES CLEANOUT Product ACCESS TO COVER 12 -INCH -15 I Code: 12504613-01-201 Base Bid: POLLUTION RETARDANT Supplier First Offer - $576.00 100 / each $57,600.00 Y BAFFLE WITH 12 INCHES CLEANOUT Product ACCESS TO COVER 18 -INCH -24I Code: 12504613--01-202 Base Bid: FURNISH AND INSTALL 10 Supplier First Offer - $3,724.80 50 / each $186,240.00 Y INCHES INLINE WASTOP CHECK Product VALVES WITH ALL FITTINGS OR A Code: 12504613-01-203 Base Bid: FURNISH AND INSTALL 12 Supplier First Offer - $5,254.40 50 / each $262,720.00 Y INCHES INLINE WASTOP CHECK Product VALVES WITH ALL FITTINGS OR A Code: 12504-613-01-204 Base Bid: FURNISH AND INSTALL 15 Supplier First Offer - $8,294.40 50 / each $414,720.00 Y INCHES INLINE WASTOP CHECK Product VALVES WITH ALL FITTINGS OR A Code: 12504613-01-205 Base Bid: FURNISH AND INSTALL 18 Supplier First Offer - $10,444.80 50 / each $522,240.00 Y INCHES INLINE WASTOP CHECK Product VALVES WITH ALL FITTINGS OR A Code: C -36(o) BidSync 4/27/2021 City of Fort Lauderdale 12504-613 12504-613-01-206 Base Bid: FURNISH AND INSTALL 24 Supplier First Offer - $14,092.80 25 / each INCHES INLINE WASTOP CHECK Product $352,320.00 Y VALVES WITH ALL FITTINGS OR A Code: 12504613-01-207 Base Bid: FURNISH AND INSTALL 30 Supplier First Offer - $19,200.00 25 / each INCHES INLINE WASTOP CHECK Product Y VALVES WITH ALL FITTINGS ORA Code: 12504613--01-208 Base Bid: FURNISH AND INSTALL 36 Supplier First Offer - $24,345.60 20 / each INCHES INLINE WASTOP CHECK Product 5486.912.00 y VALVES WITH ALL FITTINGS OR A Code: 12504613-01-209 Base Bid: FURNISH AND INSTALL 42 Supplier First Offer - $33,920.00 10 / each INCHES INLINE WASTOP CHECK Product $ 9.2 Y VALVES WITH ALL FITTINGS OR A Code: 12504613--01-210 Base Bid: FURNISH AND INSTALL 48 Supplier First Offer - $51,635.20 10 / each INCHES INLINE WASTOP CHECK Product 5516,352.00 y VALVES WITH ALL FITTINGS OR A Code: 12504613-01-211 Base Bid: FURNISH AND INSTALL 54 Supplier First Offer - $74,112.00 10 / each INCHES INLINE WASTOP CHECK Product $741,120.00 y VALVES WITH ALL FITTINGS OR A Code: 12504-613--01-212 Base Bid: FURNISH AND INSTALL 60 Supplier First Offer - $97,292.80 10 / each INCHES INLINE WASTOP CHECK Product 5972,928.00 Y VALVES WITH ALL FITTINGS OR A Code: 12504613-01-213 Base Bid: FURNISH AND INSTALL Supplier First Offer- $965.20 20 / each ALUMINUM MANATEE GRATE PER Product #19• Y FDOT INDEX NO 230 WITH ALL FITTI Code: 12504613--01-214 Base Bid: FURNISH AND INSTALL Supplier First Offer- $1,244.20 10 / each ALUMINUM MANATEE GRATE PER Product 512,442.00 y FDOT INDEX NO 230 WITH ALL FITTI Code: 12504-613-01-215 Base Bid: FURNISH AND INSTALL Supplier First Offer- $1,490.00 5 / each ALUMINUM MANATEE GRATE PER Product x•450 Y FDOT INDEX NO 230 WITH ALL FITTI Code: 12504613--01-216 Base Bid: FURNISH AND INSTALL Supplier First Offer- $2,034.00 5 / each ALUMINUM MANATEE GRATE PER Product $10,170.00 y FDOT INDEX NO 230 WITH ALL FITTI Code: 12504613-01-217 Base Bid: FURNISH AND INSTALL Supplier First Offer - $2,340.00 5 / each ALUMINUM MANATEE GRATE PER Product 511,700.00 y FDOT INDEX NO 230 WITH ALL FITTI Code: 12504613--01-218 Base Bid: FURNISH AND INSTALL 8 Supplier First Offer - $1,920.00 40 / each TO 15 INCH DRAINAGE OUTFALLS BY Product Y CORE DRILLING EXISTING SEA Code: 12504613-01-219 Base Bid: FURNISH AND INSTALL 18 Supplier First Offer - $2,560.00 25 / each TO 24 INCH DRAINAGE OUTFALLS BY Product Y CORE DRILLING EXISTING SE Code: 4/27/2021 C -36(p) BidSync p. 544 12504-613 City of Fort Lauderdale 12504-613--01-220 Base Bid: FURNISH AND INSTALL 30 Supplier First Offer - $4,480.00 5 / each $22,400.00 Y TO 36 INCH DRAINAGE OUTFALLS BY Product CORE DRILLING EXISTING SE Code: 12504613-01-221 Base Bid: FURNISH AND INSTALL 42 Supplier First Offer - $5,760.00 5 / each S28,800.00 Y TO 48 INCH DRAINAGE OUTFALLS BY Product CORE DRILLING EXISTING SE Code: 12504613--01-222 Base Bid: FURNISH AND INSTALL 54 Supplier First Offer - $7,040.00 3 / each $21,120.00 Y TO 60 INCH DRAINAGE OUTFALLS BY Product CORE DRILLING EXISTING SE Code: 12504613-01-223 Base Bid: FURNISH AND INSTALL 61 Supplier First Offer - $12,800.00 3 / each $38,400.00 Y INCH AND ABOVE DRAINAGE Product OUTFALLS BY CORE DRILLING EXISTIN Code: 12504613--01-224 Base Bid: FURNISH AND INSTALL AAND E Supplier Product First Offer- $544.00 50 / linear foot $27,200.00 Y CHES BURSTING FOR PIPES UNDER (FDOT PAY ITEM Code: 12504613-01-225 Base Bid: FURNISH INSTALL PIPE Product First Offer - $576.00 500 / linear foot $288,000.00 Y BURSTING FOR 10 INCHES PIPES (FDOT PAY ITEM NUMBER NO Code: 12504613--01-226 Base Bid: FURNISH AND INSTALL PIPE Supplier First Offer - $640.00 1000 / linear foot $640,000•00 Y BURSTING FOR 12 INCHES PIPES Product (FDOT PAY ITEM NUMBER NO Code: 12504613-01-227 Base Bid: FURNISHrAC D INSTALL LPIPE Supplier Product p First Offer - $1,088.00 1500 / linear foot $1,632,000.00 Y P BURSTING FOR (FDOT PAY ITEM NUMBER NO Code: 12504613--01-228 Base Bid: FURNISINCHES AND PIPES HL PIPE Product First Offer - $1,152.00 500 / linear foot $576,000.00 Y BURSTING FOR (FDOT PAY ITEM NUMBER NO Code: 12504613-01-229 Base Bid: FURNISH AND INSTALL PP PESPIPE S pplie First Offer - $1,184.00 300 / linear foot $355,200.00 Y BURSTING FOR 24 (FDOT PAY ITEM NUMBER NO Code: 12504613--01-230 Base Bid: FURNISH AND DEI PIPES L PIPE Product ' First Offer - $1,216.00 200 / linear foot $243,200.00 Y BURSTING FOR 30 (FDOT PAY ITEM NUMBER NO Code: 12504613-01-231 Base Bid: DIRECTIONAL BORE, 10 Supplier First Offer - $112.90 500 / linear foot $56,450.00 Y INCHES OR LESS Product Code: 12504613--01-232 Base Bid: DIRECTIONAL BORE, 12 Supplier First Offer - $175.50 500 / linear foot $87,750.00 Y INCHES Product Code: 12504613-01-233 Base Bid: DIRECTIONAL BORE, 15 Supplier First Offer - $233.90 1500 / linear foot $350,850.00 Y INCHES Product Code: C -36(q) BidSync p. 545 4/27/2021 City of Fort Lauderdale 12504-613 12504-613-01-234 Base Bid: DIRECTIONAL BORE, 18 INCHES 12504-613-01-235 Base Bid: DIRECTIONAL BORE, 24 INCHES 12504613-01-236 Base Bid: DIRECTIONAL BORE, 30 INCHES 12504613-01-237 Base Bid: DIRECTIONAL BORE, 36 INCHES 12504613--01-238 Base Bid: DIRECTIONAL BORE, 42 INCHES 12504613-01-239 Base Bid: FERTILIZER 40 LB. BAG, FURNISH AND INSTALL (FDOT PAY ITEM NUMBER NOT APPLICABL 12504-613--01-240 Base Bid: ROOT BARRIER, FURNISH AND INSTALL (FDOT PAY ITEM NUMBER NOT APPLICABLE) Supplier Product Code: Supplier Product Code: Supplier Product Code: Supplier Product Code: First Offer - $289.50 1000 / linear foot $289,500.00 First Offer - $426.70 100 / linear foot $42,670.00 First Offer - $648.50 100 / linear foot $64,850.00 First Offer - $894.80 100 / linear foot $89,480.00 Supplier First Offer - $1,446.40 100 / linear foot $144,640.00 Product Code: Supplier First Offer - $102,40 5 / each Product Code: Supplier First Offer - $44.80 500 / linear foot Product Code: 12504613-01-241 Base Bid: TREE REMOVAL, 0-12 Supplier First Offer - $512.00 200 / each INCHES TRUNK DIAMETER AT BREAST Product HEIGHT (FDOT PAY ITEM NUMBE Code: 12504613--01-242 Base Bid: TREE REMOVAL, 12.1-24 Supplier First Offer - $960.00 100 / each INCHES TRUNK DIAMETER AT BREAST Product HEIGHT (FDOT PAY ITEM NU Code: 12504613-01-243 Base Bid: TREE REMOVAL, 24.1-48 Supplier First Offer - $1,920.00 50 / each INCHES TRUNK DIAMETER AT BREAST Product HEIGHT (FDOT PAY ITEM NU Code: 12504613--01-244 Base Bid: TREE REMOVAL, 48.1-60 Supplier First Offer - $3,200.00 5 / each INCHES TRUNK DIAMETER AT BREAST Product HEIGHT (FDOT PAY ITEM NU Code: 12504613-01-245 Base Bid: TREE REMOVAL, GREATER Supplier First Offer - $5,120.00 2 / each THAN 60 INCHES TRUNK DIAMETER AT Product BREAST HEIGHT (FDOT PAY I Code: 12504613-01-246 Base Bid: STUMP Supplier First Offer - $640,00 100 / each GRINDING/REMOVAL, 0-24 INCHES Product TRUNK DIAMETER AT BREAST HEIGHT Code: (FDOT PAY I 12504613-01-247 Base Bid: STUMP Supplier GRINDING/REMOVAL, 24.1-48 INCHES Product First Offer - $1,024.00 50 / each Code: 4/27/2021 C -36(r) BidSync $512.00 $22,400.00 $102,400.00 $96,000.00 $96,000.00 $16,000.00 $10,240.00 $64,000.00 Y Y Y Y Y Y Y Y Y Y Y Y Y $51,200.00 Y p. 546 12504-613 City of Fort Lauderdale TRUNK DIAMETER AT BREAST HEIGHT (FDOT PA Supplier First Offer - $1,536.00 10 / each $15,360.00 Y 12504613-01-248 Base Bid: STUMP GRINDING/REMOVAL, 48.1-60 INCHES Product TRUNK DIAMETER AT BREAST HEIGHT Code: (FDOT PA Supplier First Offer - $1,920.00 5 / each $9,600.00 Y 12504-613-01-249 Base Bid: STUMP GRINDING/REMOVAL,GREATERTHAN Code: Product 60 INCHES TRUNK DIAMETER AT BREAST HEIGHT 12504-613-01-250 Base Bid: HEDGES AND SHRUBS Supplier First Offer - $32.00 2000 / linear foot $64,000.00 Y REMOVAL (FDOT PAY ITEM NUMBER Code: Product NOT APPLICABLE) 12504613-01-251 Base Bid: BAHIA SOD (FDOT PAY ITEM Supplier First Offer - $9.00 200 / square yard $1,800.00 Y NUMBER NOT APPLICABLE) Product Code: 12504613--01-252 Base Bid: FDOT PAY ITEM NO 570-1-2: S Product First Offer - $12.80 5000 / square yard $64,000.00 Y PERFORMANCE TURF, SOD (ST Code: AUGUSTINE, CENTIPEDE, FLOR 12504613-01-253 Base Bid: FDOT PAY ITEM NO NA: Supplier First Offer - 514.10 2000 / square yard $28,200.00 Y SALT TOLERANT TURF, SOD Product (SEASHORE PASPALUM OR APPROVED Code: EQ 12504613-01-254 Base Bid: HEDGE REPLACEMENT Supplier First Offer - $38.40 500 / each $19,200.00 Y WITH COMMON NURSERY AVAILABLE Product PLANTINGS, 3 -GALLON CONTAINER (F Code: 12504-613-01-255 Base Bid: HEDGE REPLACEMENT Supplier First Offer - $51.20 500 / each $25,600.00 Y WITH COMMON NURSERY AVAILABLE Product PLANTINGS, 7 -GALLON CONTAINER (F Code: 12504613-01-256 Base Bid: COMMON PALM SPECIES Supplier First Offer - $2,304.00 50 / each $115,200.00 Y (BISMARK, DATE, SILVER, CHRISTMAS, Product ROYAL, THATCH, CABBAGE AN Code: 12504613-01-257 Base Bid: COMMON TREE SPECIES Supplier First Offer - $2,548.00 50 / each $127,400.00 Y (LIVE OAK, WILD TAMARIND, GREEN Product OR SILVER BUTTONWOOD, BALD 0 Code: Lot Total $26,310,469.00 Supplier Total $26,310,469.00 C -36(s) BidSync p. 547 4/27/2021 Annual Construction of General Stormwater Infrastructure Southeastern Engineering Contractors, Inc. Project 12220 CITY IN WITNESS OF THE FOREGOING, the Parties have set their hands and seals the day and year first above written. CITY OF FORT LAUDERDALE, a Florida municipal corporation B CH HER J. LAGERBLOOM City anager Date: J II3 Iy ? 4010,4 ATTEST: By: JEFFREY A. MODA City Clerk Approved as to Legal Form: Alain E. Boileau, City Attorney C-37 PPPPPPPPPPPPPPPPPPPPPPPP OF F® OLISHED ms's .ti,,„44u1f Nu,N,,. RHONDA (VV N±C*A H AN Assistant City Attorney • CONTRACTOR WITNESSES: Print Name Print Name (CORPORATE SEAL) STATE OF Flor COUNTY OF -a The foregoing instrument was acknowledged before me by means of 2 physical presence or 0 online notarization, this Q day of 'Tail C , 2021, by 5 '?') r Pom 11)642 as Pre 5, , for SOUTHEASTERN ENGINEERING CO TRACTORS, INC., a Florida Corkoration. SOUTHEASTERN ENGINEERING TRACTORS, INC., a Florida corpor By: Print Name: Title: ATTEST: By: tut vPILO' e (� /1,,,,, 4 J Mnr w Notary Public State of Florida ‘,401 4„; Natalia A Jofre My Commission GG 306929 ?a0,a'' Expires 03/24/2023 (Signature of No 9lic - State of Florida) (Print, Type, or Stamp Commissioned Name of Notary Public) Personally Known OR Produced Identification Type of Identification Produced: ,,/ /%a C-38 INSURANCE*, June 8, 2021 Brown & Brown of Florida, Inc. Miami Division 14900 NW 79th Court, Suite 200 Miami Lakes, FL 33016.5869 (305) 364.7800 Fax (305) 822-5687 Re: Southeastern Engineering Contractors, Inc. Ft. Lauderdale — Annual Construction of General Stormwater Infrastructure BID 12504- 613 - Project 12220 To Whom It May Concern: Per your request for evidence of bondability, this letter is to advise you that Southeastern Engineering Contractors, Inc. is set up for bonding with FCCI Insurance Company. This Surety currently has an A.M. Best Rating of A X. Southeastern Engineering Contractors, Inc.. has a goodd reputation in the construction industry. Based on their past experience, FCCI Insurance may considered single jobs of $10,000,000 with an aggregate program of $15,000,000. As this is a letter of recommendation and not a bid bond, Brown & Brown of Florida, Inc., FCCI Insurance Company , their agents and owners accept no liability for its contents. The Surety reserves the right to review each submission and base their final decision as to single job and program limits, upon normal underwriting requirements and conditions, which exist at time of the bond request. If I can be of further assistance, please feel free to call me. Sincerely, Brown & Brown of Florida, Inc., Miami Division canon a&ooc[ri,,uez Senior Vice President & Attorney -in -fact for FCCI Insurance Company F`,/ INSURANCE FCC GENERAL POWER OF ATTORNEY Know all men by these presents: That the FOCI Insurance Company, a Corporation organized and existing under the laws of the State of Florida (the "Corporation") does make, constitute and appoint: Ramon A. Rodriguez; Mayra Rodriguez; Fausto Alvarez, Jr. Each, its true and lawful Attorney -In -Fact, to make, execute, seal and deliver, for and on its behalf as surety, and as its act and deed in all bonds and undertakings provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed the sum of (not to exceed $10,000,000.00): $10,000,000.00 This Power of Attorney is made and executed by authority of a Resolution adopted by the Board of Directors. That. resolution also authorized any further action by the officers of the Company necessary to effect such transaction. The signatures below and the seal of the Corporation may be affixed by facsimile, and any such facsimile signatures or facsimile seal shall be binding upon the Corporation when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached. In witness whereof, the FOCI Insurance Company has caused these presents to be signed by its duly authorized officers and its corporate Seal to be hereunto affixed, this 25TH day of June , 2020 . s,, , ',. ( r Christina D. Welch EVP, General Counsel, Chief Audit & Compliance Officer, Secretary FCCI Insurance Company Attest: JJ ff /f i14gp'y�4", )O. Lr%atL .. Christina D. Welch, President FCCI Insurance Company 0y yo 4,» vq SEAL :�? 'N4 State of Florida County of Sarasota Before me this day personally appeared Christina D. Welch, who is personally known to me and who executed the foregoing document for the purposes expressed therein. My commission expires: 2/27/2023 Notary Public State of Florida County of Sarasota Before me this day personally appeared Christina D. Welch, who is personally known to me and who executed the foregoing document for the purposes expressed therein. My commission expires: 2/27/2023 e N ,� Notary P 6o Stet?, of Flonou 1 My Commas.. GO 7&35U5 ewlR. ovnrmv Notary Public CERTIFICATE I, the undersigned Secretary of FCCI Insurance Company, a Florida Corporation, DO HEREBY CERTIFY that the foregoing Power of Attorney remains in full force and has not been revoked; and furthermore that the February 27, 2020 Resolution of the Board of Directors, referenced in said Power of Attorney, is} June 2021 now in force. Dated this 8th day of „„(J%_ Christina D. Welch, EVP, General Counsel, Chief Audit & Compliance Officer, Secretary FOCI Insurance Company 1-1ONA- 592 -NA -04 712020 AFRO SOUTENG-01 CERTIFICATE OF LIABILITY INSURANCE SNIEDERMEYER DATE (MM/DDIYYYY) 6/16/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Collinsworth, Alter, Fowler & French, LLC 15050 NW 79th Court Suite 200 Miami Lakes, FL 33016 INSURED Southeastern Engineering Contractors, Inc. 911 NW 209th Ave, Suite 101 Pembroke Pines, FL 33029 COVERAGES CERTIFICATE NUMBER• CONTACT Susan Niedermeyer PHONE (A/c, No, Ext): E-MAILss: Sniedermeyer@caffllc.com INSURER(S) AFFORDING COVERAGE INSURERA:American Casualty Co Reading INSURER B : Continental Insurance Company INSURER C : National Union Fire Ins Co of Pittsburgh, PA 19445 INSURER D : Valley Forge Life Insurance Co INSURER E : Evanston Insurance Company INSURER F : FAX (A/C, No): NAIC # 35289 35378 ' RC111011%/111 PIuIIIIDCK: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL INSD SUBR WVD POLICY NUMBER POLICY EFF POLICY EXP (MM/DD/YYYY) (MM/DD/YYYY) LIMITS A X COMMERCIAL GENERAL LIABILITY 1,000,000 EACH OCCURRENCE $ CLAIMS -MADE X OCCUR X 6081171774 9/22/2020 9/22/2021 PREMISES Ea occurrrrence) 100,000 $ 15,000 - _ MED EXP (Any one person) $ 1,000,000 _GENT AGGREGATE LIMIT APPLIES PER: PERSONAL & ADV INJURY GENERAL AGGREGATE $ $ 2,000,000 P POLICY X Je 12e- LOC PRODUCTS - COMP/OP AGG $ 2,000,000 OTHER: j B AUTOMOBILE LIABILITY COBINEDSINGLE LIMIT accident)(Ea 1,000,000 $ X ANY AUTO OWNED SCHEDULED X BUA6081171807 9/22/2020 9/22/2021 BODILY INJURY (Per person) $ A AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ X HIRED AUTOS ONLY X E AUTOS ONNLY PROPERTY DAMAGE (Per accident) $ $ C UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 2,000,000 X EXCESS LIAB CLAIMS -MADE X I6E018034427 9/22/2020 9/22/2021 AGGREGATE 2,000,000 DED X RETENT ON $ 0 $ $ D WORKERS COMPENSATION AND EMPLOYERS' LIABILITY Y/N X PERTUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? N /A X WC681171791 9/22/2020 9/22/2021 E.L. EACH ACCIDENT $ 1,000,000 (Mandatory In (Mandatory In NH) If yes, describe under E.L. DISEASE - EA EMPLOYEE 1,000,000 $ DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ 1,000,000 E Pollution Liability X CPLMOL107068 6/14/2021 8/1/2022 Each/Aggregate 1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Project No. 12220: General Stormwater Infrastructure The City, a Florida municipal corporation, its officials, employees, and volunteers are named as Additional Insured with regard to the General Liability, Auto Liability, and Pollution Liability, as required by written contract. Waiver of Subrogation applies in favor of the certificate holder to the Workers Compensation, as required by written contract. 30 days notice of cancellation applies, with 10 days notice for non-payment, per the terms and conditions of the policies. City of Ft Lauderdale 100 N Andrews Ave Fort Lauderdale, FL 33301 ACORD 25 (2016/03) CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE alPlimmlosmommum. © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD SNIEDERMEYER CORO� EVIDENCE OF PROPERTY INSURANCE DATE (MMIDDIYYYY) 6/16/2021 THIS EVIDENCE OF PROPERTY INSURANCE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE ADDITIONAL INTEREST NAMED BELOW. THIS EVIDENCE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS EVIDENCE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE ADDITIONAL INTEREST. AGENCY PHONE (305) 822-7800 (A/C, No, Exty Collinsworth, Alter, Fowler & French, LLC 15050 NW 79th Court Suite 200 Miami Lakes, FL 33016 FAX No): (305) 362-2443 CODE: AGENCY CUSTOMER ID #: SOUTENG-01 E-MAIL ADDRESS: SUB CODE: INSURED Southeastern Engineering Contractors, Inc. 911 NW 209th Ave, Suite 101 Pembroke Pines, FL 33029 PROPERTY INFORMATION LOCATION/DESCRIPTION COMPANY Zurich/Builders Risk US Assure, Inc. On Behalf of Zurich NA P.O. Box 931794 Atlanta, GA 31193-1794 LOAN NUMBER EFFECTIVE DATE 6/16/2021 POLICY NUMBER BR73876798 EXPIRATION DATE 6/16/2022 CONTINUED UNTIL TERMINATED IF CHECKED THIS REPLACES PRIOR EVIDENCE DATED: THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS EVIDENCE OF PROPERTY INSURANCE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. COVERAGE INFORMATION PERILS INSURED BASIC COVERAGE/PERILS/FORMS Location: City of Ft. Lauderdale Project No. 12220: General Stormwater Infrastructure Limit at any one location - Builders Risk Limit per disaster Limit at temporary location Transit limit BROAD SPECIAL X Builders Risk AMOUNT OF INSURANCE 1 DEDUCTIBLE $1,000,000 $1,000,000 $50,000 $50,000 5,000 5,000 5,000 5,000 REMARKS (Including Special Conditions) CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. ADDITIONAL INTEREST NAME AND ADDRESS City of Ft Lauderdale 100 N Andrews Ave Fort Lauderdale, FL 33301 X ADDITIONAL INSURED MORTGAGEE LENDER'S LOSS PAYABLE LOSS PAYEE LOAN # AUTHORIZED REPRESENTATIVE ACORD 27 (2016/03) © 1993-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD MEMORANDUM DATE: June 17, 2021 TO: James Kelly, Sr. Claims Adjuster FROM: Maureen Lewis, Procurement Division SUBJECT: Project/Bid No. 12220; 12504-613 — Annual Construction of General Stormwater Infrastructure Please review the attachments listed below in connection with the referenced contract: Insurance certificates ® Surety Bond Capacity Letter SURETY BOND REQUIREMENT - Unit Price Contract [Southeastern Enq.2 If the City's requirements are met, please sign below and return. Thank you. By: mes Kelly Claims Adjuster c: Contract 12504-613 City of Fort Lauderdale Bid Bond from Surety Bid Bond Number Bond Type Bond Form Bid Date Bid ID Security Percent % Job Description Agency ID Name Address Phone Contact Name Bond Status Execution Date Contractor ID Name Contractor Tax ID Assigned Contractor ID Address Phone Name Address Surety ID Name NAIC Number State of Incorporation Contact BidSync p. 548 4/27/2021 Address Phone Terror Rider 4/27/2021 City of Fort Lauderdale 12504-613 BidSync p. 549 R on DeSantis, G overnor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION CONSTRUCTION INDUSTRY LICENSING BOARD CTO.R HEREIN HAS REGISTERED UNDER THE THE GENERAL CONTRA PROVISIONS OF CHAPTER 489, FLORIDA STATUTES (INDIVIDUAL MUST MEET ALL LOCAL LleEN. I AREA) REQUIREMENTS PRI OR TO CONTRACTING IN ANY DO `S INGUEZ, EDUARDO SO UTHEASTERN ENGINEERING CONTRACTORS, INC. 12054 N DNS H FL 33018 HIALEAH GARDENS Halsey Beshears, Secretary LICENSE NUMBER: RG0066528 EXPIRATION DATE: AUGUST 31, 2021021 Always verify licen ses online at MyFlorida Do no t alter this document in any form. This is your license. It is un lawful fo r anyone other than the licensee to use this d ocument City of Fort Lauderdale 12504-613 F Lo R i D A Contractor must obtain a every two years. GENERAL ENGINEERED CONSTRUCTION BUILDER 93-1360 DOMINGUEZ, EDUARDO - QUALIFYING SOUTHEASTERN ENGINEERING CONTRACTORS INC. 12054 NW 98 AVE HIALEAH GARDENS FL 33018 EXPIRES 08/31/2022 BR c WARD CERTIFICATE OF COMPETENCY Detach and SIGN the reverse side of this COUNT card IMMEDIATELY upon receipt) You should carry this card with you at all times. photo I.D. Certificate of Competency Card DOMINGUEZ, EDUARDO 8961 BAHAMAS SWALLOW WAY NAPLES FL 34120 50&207 (Rev 1/12) PC201247908 4/27/2021 BROWARD COUNTY, FLORIDA CERTIFICATE OF COMPETENCY CC# GENERAL ENGINEERED CONSTRUCTION BUILDER 93-1360 DOMINGUEZ, EDUARDO - QUALIFYING SOUTHEASTERN ENGINEERING CONTRACTORS INC. 12054 NW 98 AVE HIALEAH GARDENS FL 33018 EXPIRES 08/31/2022 BidSync p. 552 12504-613 City of Fort Lauderdale SOUTENG-01 SNIEDERMEYER DATE (MMIDDITYYYI A c RL CERTIFICATE OF LIABILITY INSURANCE 9125/2020 CEI Y AND CNFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS TIFIICATECDOES NOT AFFIRMATI ELY OR NEGAT VELYTAMEND,ION LEX ENDOOR ALTER THE COVERAGE AFFORDED BY THE POLICIES BER BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. sions or be endorsed. IMPORTANT: SUBROGATION IS WAIVED, subject toholder is n the ADDITIONAL andicond INSURED, of the policy, certain policies must have imaayNAL require an endorsement. sement. A statement on If sUeRO this certificate does not confer rights to the certificate holder in lieu of suchONTACOTSusan r (Niedermeyer NAME: FAX PHONE (NC, Na): (NC, No, Sot): E-MDRAIESS: Sniedermeyer@caffllc.com AD INSURER(S) AFFORDING COVERAGE INSURER A :American Casualty Co Reading 35289 INSURER B :Continental Insurance Company INSURER C :National Union Fire Ins Co of Pittsburgh, PA 19445925 INSURER D : Federal Insurance Company PRODUCER 8000 Governors Alter, Square French, LLC Blvd Suite 301 Miami Lakes, FL 33016 INSURED Southeastern Engineering Contractors, Inc. 12054 NW 98th Avenue Hialeah Gardens, FL 33018 INSURER E : NAIC I/ INSURER F : COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: BEEN ISSUED TO THE ISURED NAMED ABOVE FOR THE P ITHIS IS TO THAT THE POLICIES NDICATED NOTTWITH TAND NG ANY REQ� REMENTT,, TERMF INSU NCE OR STEDCONDIIT ONBELOWAOFVE ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TOLICYWHICHRIOD THIS EXCLUSIONSCERTIFICATE MAYND BE ISSUED OR CONDITIONS OF MAY O PERTAIN. LIMITS TS SHOWN MAY AFFORDED HAVE BEEN REDUCED POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, PAID CLAIMS POLICY EFF ID CL IM LIMITS INSR ADDL SUER POLICY NUMBER IMMIDDIYYYYI fMMID0IYYYYI TYPE OF INSURANCE INSP WV EACH OCCURRENCE S A X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED S PREMISES (Ea occurrence) CLAIMS -MADE X OCCUR 6081171774 9/22/2020 9)2212021 MED EXP (Any one person) $ PERSONAL 8 ADV INJURY $ GENERAL AGGREGATE S GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS - COMP/OP AGG S POLICY X jE�7 LOC S OTHER B AUTOMOBILE LIABILITY X ANY AUTO OWNED AUTOSEE��ONLY X q!111 ONLY SCHEDULED AUTOS X AUTO�yNS ONLYY 6081171807 COMBINED SINGLE LIMIT (Ea accident) 9/22/2020 9)22/2021 BODILY INJURY (Per person) S C UMBRELLA LIAR X OCCUR X EXCESS LIAB CLAIMS -MADE DED X RETENTION S 0 B N AND EMPLOYERS LABILITY Y I N OOFFICERIMEMOO RR EXCLUDED? EXECUTIVE `Mandatory In NH) If yes describe under DESCRIPTION OF OPERATIONS below D Equipment Floater NIA 5E018034427 WC681171791 45472831 BODILY INJURY (Per accident) PR OPERTY DAMAGE PS 1,000,000 100,000 15,000 1,000,000 2,000,000 2,000,000 1,000,000 EACH OCCURRENCE S 9/2212020 9/22/2021 AGGREGATE S 2,000,000 2,000,000 9/22/2020 9/22/2021 X S OTH- TATUTE E L EACH ACCIDENT ER E L DISEASE - EA EMPLOYEE S E . DISEASE - POLICY LIMIT S 9/22/2020 9/22/2021 Leased/Rented DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101, Additlanal Remarks Schedule, may be attached if more space Is required) CERTIFICATE HOLDER ACORD 25 (2016103) 1,000,000 1,000,000 1,000,000 500,000 CANCELLATION SHOULD ANY OF THE THE EXPIRATION DATEBV THEREOF, NOTICE POLICIES NOTICEWILLBEDELIVERED ELLED BEFORE ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE idEP.....ms"maiMIN1110 © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD p. 553 BidSync 4/27/2021 City of Fort Lauderdale 12504-613 CITY OF PEMBROKE PINES 601 CITY CENTER WAY, LBTR-4TH FLOOR PEMBROKE PINES, FL 33025 r EDUARDO DOMINGUEZ 911 NW 209 AVE, STE 101 PEMBROKE PINES FL 33029 LOCAL USO SS -AX RCPT ACCOUNT -NO: 20190374/01 RECEIPT -NO: 203517 BUS -NAME : SOUTHEASTERN ENGINEERING CONTRACTORS, INC. BUS-ADDR : 911 NW 209 AVE, STE 101 PEMBROKE PINES FL 33029 BUS-DESCR : ADMINISTRATION SERVICES RECEIPT -YEAR: OCTOBER 1, 2020 thru SEPTEMBER 30, 20 NOTICE d111IOIIPltllli 1111 11116 -in the event the business to which this receipt was issued changes hands, the recei will become null and void. An application for a new receipt must be made. RECEIPT -TYPE: REGULAR LICENSE 2 P BUSINESS -CLASSIFICATION INV/UNITS EFFECTIVE PERMIT-NUMBER/COMMENTS RCT-TY ADMSER ADMINISTRATIVE SERVICES 0 10/01/2020 P/Pin SIr?N BUSINESS SIGN 2020 P Pin -/97/9021 B'd$ynr P e e 12504-613 City of Fort Lauderdale CITY OF FORT LAUDERDALE PUBLIC WORKS DEPARTMENT MINORITY BUSINESS ENTERPRISE (MBE) - WOMEN BUSINESS ENTERPRISE (WBE) PRIME CONTRACTOR IDENTIFICATION FORM In order to assist us in identifying the status of those companies doing business with the City of Fort Lauderdale, this form must be completed and returned with your bid package. Name of Firm: Southeastern Engineering Contractors, Inc. Address of Firm: 911 NW 209th Ave, Suite 101 Telephone Number: 3055574226 Name of Person Completing Form: Eduardo Dominguez Title: President Signature: Eduardo Dominguez Date: 04/08/21 City Project Number: 12504-613 City Project Description: ANNUAL CONSTRUCTION OF GENERAL STORMWATER INFRASTRUCTURE Please check the item(s) which properly identify the status of your firm: 4' Our firm is not a MBE or WBE. Our firm is a MBE, as at least 51 percent is owned and operated by one or more socially and economically disadvantaged individuals. American Indian Asian Black Hispanic Our firm is a WBE, as at least 51 percent is owned and operated by one or more women. American Indian Asian Black Hispanic BidSync 4/27/2021 p. 555 City of Fort Lauderdale 12504-613 MBE/WBE CONTRACTOR INFORMATION The City, in a continuing effort, is encouraging the increased participation of minority and women -owned businesses in Public Works Department related contracts. Along those lines, we are requiring that each firm provide documentation detailing their own programs for utilizing minority and women -owned businesses. Submit this information as a part of this bid package and refer to the checklist, to ensure that all areas of concern are covered. The low responsive bidder may be contacted to schedule a meeting to discuss these objectives. It is our intention to proceed as quickly as possible with this project, so your cooperation in this matter is appreciated. CONTRACTOR CHECKLIST • List Previous City of Fort Lauderdale Contracts 1 -Annual Storm Drainage Contract 2- Sanitary Pump Station D-45 Replacement 3- Pump Stations D-10 & D-11 Flow Analysis and Redesign • Number of Employees in your firm 18 --Percent (12%) Women --Percent (100%) Minorities --Job Classifications of Women and Minorities Controller/ VP Purchasing/ Human Resource PM/Superintendent/Foreman/Operators/Pipelayers/Laborer • Use of minority and/or women subcontractors on past projects. Yes Nature of the work subcontracted to minority and/or women -owned firms. Landscaping Striping Controls and Automatization How are subcontractors notified of available opportunities with your firm? By invitation • Anticipated amount to be subcontracted on this project. TBD Anticipated amount to be subcontracted to minority and/or women -owned businesses on this project. TBD 4/27/2021 BidSync p. 556 City of Fort Lauderdale 12504-613 QUESTIONNAIRE SHEET PLEASE PRINT OR TYPE: Firm Name: Southeastern Engineering Contractors, Inc. President Eduardo Dominguez Business Address: 911 NW 209th Ave, Suite 101, Pembroke Pines, FL 33029 Telephone: 3055574226 Fax: n/a E -Mail Address: eddie@SoutheasternEng.com What was the last project of this nature which you completed? Include the year, description, and contract value. Fort Lauderdale Stormwater Construction Contract $1,125,000.00 The following are named as three corporations and representatives of those corporations for which you have performed work similar to that required by this contract, and which the City may contact as your references (include addresses, telephone numbers and e-mail addresses). Include the project name, year, description, and contract value. Katarzyna A. Kulpa, kkulpa@keybiscayne.fl.gov. Key Biscayne, 305-365-5556 "Outfall 13 at 14 Harbor Point Construction Project" Dec. 2020 $234,302 Rares Petrica, RPetrica@fortlauderdale.gov, 954-828- 6720, "Annual Storm Drainage Contract, 2017, $1,125,000.00, Carlos Acosta, AcostaC@miamilakes- fl.gov,(305) 364-6100 Ext.1129 "Miscellaneous Roadway & Drainage Services" 2018, $793,943.00 How many years has your organization been in business? 36 Have you ever failed to complete work awarded to you; if so, where and why? No The name of the qualifying agent for the firm and his position is: Eduardo Dominguez, Pres Certificate of Competency Number of Qualifying Agent: 93-1360 Effective Date: 12/01/1993Expiration Date: 08/31/2022 Licensed in: Broward / FloridaEngineering Contractor's License # RG0066528 (County/State) 4/27/2021 BidSync p. 557 City of Fort Lauderdale 12504-613 Expiration Date: 08/31/2021 NOTE: To be considered for award of this contract, the bidder must submit a financial statement upon request. NOTE: Contractor must have proper licensing and shall provide copy of same with his proposal. QUESTIONNAIRE SHEET 1. Have you personally inspected the proposed work and have you a complete plan for its performance? TBD 2. Will you sublet any part of this work? If so, list the portions or specialties of the work that you will. a) Concrete b) Directional drilling c) Asphalt d) e) f) g) 3. What equipment do you own that is available for the work? Excavators, loaders, backhoe, trucks, compactors 4. What equipment will you purchase for the proposed work? None 5. What equipment will you rent for the proposed work? None 4/27/2021 BidSync p. 558 City of Fort Lauderdale 12504-613 TRENCH SAFETY Bidder acknowledges that included in the appropriate bid items of his bid and in the Total Bid Price are costs for complying with the Florida Trench Safety Act, Florida Statutes 553.60 — 553.64. The bidder further identifies the costs of such compliance to be summarized below: Trench Safety Measure (Description) Units of Measure (LF/SF) Unit (Quantity) Unit Cost Extended Cost A. Trench Box LF 500 $5.00 $2,500.00 B. $ $ C. $ $ D. $ $ $2 otal: ,500. The bidder certifies that all trench excavation done within his control in excess of five feet (5') in depth shall be in accordance with the Occupational Safety and Health Administration's excavation safety standards, C.F.R. s. 1926.650 Subpart P., and the Florida Trench Safety Act, Florida Statutes 553.60-553.64. Failure to complete the above may result in the bid being declared non -responsive. DATE: 04/08/2021 Eduardo Dominguez (SIGNATURE) STATE OF: FloridaCOUNTY OF: Broward PERSONALLY APPEARED BEFORE ME, the undersigned authority, Eduardo Dominguez (Name of Individual Signing) Eduardo Dominguezwho, after first being duly sworn by me, Natalia Jofreaffixed his/her signature in the space provided above on this 8day of April, 2021. Natalia Jofre NOTARY PUBLIC My Commission Expires: 03/24/23 4/27/2021 BidSync p. 559 City of Fort Lauderdale 12504-613 NON -COLLUSION STATEMENT: By signing this offer, the vendor/contractor certifies that this offer is made independently and free from collusion. Vendor shall disclose below any City of Fort Lauderdale, FL officer or employee, or any relative of any such officer or employee who is an officer or director of, or has a material interest in, the vendor's business, who is in a position to influence this procurement. Any City of Fort Lauderdale, FL officer or employee who has any input into the writing of specifications or requirements, solicitation of offers, decision to award, evaluation of offers, or any other activity pertinent to this procurement is presumed, for purposes hereof, to be in a position to influence this procurement. For purposes hereof, a person has a material interest if they directly or indirectly own more than 5 percent of the total assets or capital stock of any business entity, or if they otherwise stand to personally gain if the contract is awarded to this vendor. In accordance with City of Fort Lauderdale, FL Policy and Standards Manual, 6.10.8.3, 3.3. City employees may not contract with the City through any corporation or business entity in which they or their immediate family members hold a controlling financial interest (e.g. ownership of five (5) percent or more). 3.4. Immediate family members (spouse, parents and children) are also prohibited from contracting with the City subject to the same general rules. Failure of a vendor to disclose any relationship described herein shall be reason for debarment in accordance with the provisions of the City Procurement Code. NAME RELATIONSHIPS In the event the vendor does not indicate any names, the City shall interpret this to mean that the vendor has indicated that no such relationships exist. Eduardo Dominguez President Authorized Signature Title Eduardo Dominguez 04/08/21 Name (Printed) Date 4/27/2021 BidSync p. 560 City of Fort Lauderdale 12504-613 CONTRACTOR'S CERTIFICATE OF COMPLIANCE WITH NON-DISCRIMINATION PROVISIONS OF THE CONTRACT The completed and signed form should be returned with the Contractor's submittal. If not provided with submittal, the Contractor must submit within three business days of City's request. Contractor may be deemed non -responsive for failure to fully comply within stated timeframes. Pursuant to City Ordinance Sec. 2-187(c), bidders must certify compliance with the Non -Discrimination provision of the ordinance. The Contractor shall not, in any of his/her/its activities, including employment, discriminate against any individual on the basis of race, color, national origin, religion, creed, sex, disability, sexual orientation, gender, gender identity, gender expression, or marital status. 1. The Contractor certifies and represents that he/she/it will comply with Section 2-187, Code of Ordinances of the City of Fort Lauderdale, Florida, as amended by Ordinance C-18-33 (collectively, "Section 2-187"). 2. The failure of the Contractor to comply with Section 2-187 shall be deemed to be a material breach of this Agreement, entitling the City to pursue any remedy stated below or any remedy provided under applicable law. 3. The City may terminate this Agreement if the Contractor fails to comply with Section 2-187. 4. The City may retain all monies due or to become due until the Contractor complies with Section 2-187. 5. The Contractor may be subject to debarment or suspension proceedings. Such proceedings will be consistent with the procedures in section 2-183 of the Code of Ordinances of the City of Fort Lauderdale, Florida. Eduardo Dominguez Authorized Signature 04/08/2021 Date Eduardo Dominguez President Print Name and Title 4/27/2021 BidSync p. 561 City of Fort Lauderdale 12504-613 CONTRACT PAYMENT METHOD The City of Fort Lauderdale has implemented a Procur which changes how payments are remitted to its vendors. Te City has transitioned from ent Card (P -Card traditional paper checks to credit card payments via program The MasterCardrCard or Visa as part of this This allows you as a vendor of the City of Fort Lauderdale and safely. No more waiting for checks to be printed and mailed.receiveyour a In accordance with the contract, payments fast P -Card (MasterCard or Visa). Accordingly, bidders must re payments on this contract will be made utilizing the City's these credit cards or take whatever steps necessary to implement before the start the contract term, or contract presently have the acceptance tof accept of a card All costs associated with the Contractor's award by the City. borne by the Contractor. The City reserves phelrightlto reviseon in his purchasing this program as program necessary. be By signing below you agree with these terms. Please indicate which credit card payment you prefer: MasterCard v Visa 4/27/2021 Southeastern Engineering Contractors, Inc. Company Name Eduardo Dominguez Name (Printed) Eduardo Dominguez Signature 04/08/2021 Date President Title BidSync p. 562 12504-613 City of Fort Lauderdale CONSTRUCTION BID CERTIFICATION responsibility of the bidder to ensure that ub s bid is ittals will not ite a cele d All flly through Pleas= It is toe sole rd date and time listed. Paper bid s www BidSync com prior to the bid opening I to you please note N/A in that field. accordance with Florida Statute §607.1501 (visit http:/lwww.dos.state.fl.us/). If you are a foreign corporation, you may be required to obtain a must be completed. If the field does not apply certificate of authority from the Department of State, in Company: (Legal Registration) Southeastern Engineering Contractors, Inc. Address: 911 NW 209th Ave, Suite 101 City: Pembroke PinesState: FLORIDAZIP: 33029 Telephone No.: 3055574226FAX No.: NIAEmail: eddie@SoutheasternEng.com Check box if your firm qualifies for MBE / SBE / WBE partnership, state the names of all If a corpo ration, state the name of the President, Secretary and Resident Agent. If a p partners. If a trade name, state the names of the individuals who do business under the trade name. Pa Dominguez Cindy Title Name Eduardo Dominguez Name Eduardo Dominguez Name President Title Agent Title Name Title ADDENDUM ACKNOWLEDGE MENT - Bidder acknowledges that the following addenda have been received and are included in the proposal: Addendum Date 1 03/1612021 2 4 04122/2021 term, condition, specification, or requirement in this bid you must: suchIf you take exception i th or have variances to any art of the necessary. No variances will be deemed to bepart a ' ce in the space provided below or reference in the space provided below all variances contained must specify variance pages may be attached if ne virtue of bidoider pages within youru bid. Additional provided below. The City does not, by implied that your variance, ance, submitted unless such is listed and variances. containedo in the space ace, mark N/A.pli You must necessarily accept any If no statem If you do not habelovariaw pces, simply re y P response nce, is i y compliance with this competitive solicitation. response in full also click the "Take Exception" button. NIA ro riate agencies, and permits and licenses fromthe app furnish all labor,agencies, tools, The below signatory authorized tohdt business has in or will the State all required the work agrees t t in rnis accordance withs expense incurred in doing has not that his firm is do bu � tossustain altheexp of Florida. The below l an co ry act. The below signatory material, e equipment and aupplies, an other bidder or parties to this the divulgedbe planso, and contract compareddocuments this at the unit opther bidders, indicated if not awarded ofallwith statements and answers contained in bd a to, discussed, ormre, un geewith guarantees dthe truth hand accuracy ofd any bid whatsoever. Furthermore, the undersign 9 Addendum Date Addends Date 04/02/2021 3 04/14/2021 p. 563 4/27/2021 BidSync City of Fort Lauderdale this bid. The below signatory also hereby agrees, by virtue of submitting or attempting to submit a 12504-613 the City's liability for bidder's direct, indirect, incidental, consequential, special or exempla damages, profits arising out of this competitive solicitation process, including but not limited to public advertisement, that in no event shall site visits, evaluations, oral presentations, or award proceedings exceed the amount of Five HundredDll se($50 .0, ).o lost limitation shall not apply to claims arising under any ement, bid conferences, this competitive solicitation. provision of indemnification or the City's protest ordinance 5c0onttain contained Submitted by: 4/27/2021 Eduardo Dominguez Name (printed) 04/08/2021 Date President Title Eduardo Dominguez Signature Revised 4/28/2020 BidSync p. 564 Bid 12504-613 City of Fort Lauderdale Solicitation 12504-613 of General Stormwater Infrastructure Annual Construction (P12220) Bid Designation: Public CITY OF FORT LAUDERDALE City of Fort Lauderdale 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 Bid 12504-613 Annual Construction of General Stormwater Infrastructure (P1222O) Bid Number Bid Title Bid Start Date Bid End Date Question & Answer End Date Bid Contact Bid Contact 12504-613 Annual Construction of General Stormwater Infrastructure (P12220) Mar 5, 2021 8:53:33 AM EST Apr 27, 2021 2:00:00 PM EDT Mar 25, 2021 5:00:00 PM EDT Maureen Lewis, MBA, CPPB Senior Procurement Specialist Finance 954-828-5239 maureenl@fortlauderdale.gov Jim Hemphill Sr. Procurement Specialist Procurement Department 954-828-5143 jhemphill@fortlauderdale.gov Contract Duration 2 years Contract Renewal 2 annual renewals Prices Good for 120 days Bid Comments 5/7/2021 9:40 AM The City of Fort Lauderdale, Florida (City) is seeking bids from qualified bidders, hereinafter referred to as the Contractor, to provide construction services in accordance with the terms, conditions, and specifications contained in this Invitation To Bid (ITB). Sealed bids will be received electronically until 2:00 p.m., local time, on THURSDAY, APRIL 8, 2021, and opened online immediately thereafter for BID NO.,12504-613, PROJECT NO., 12220, ANNUAL CONSTRUCTION OF GENERAL STORMWATER INFRASTRUCTURE. All openings will be held on the BIDSYNC.COM platform. Once the Procurement Specialist opens the solicitation, the bid tabulations may be viewed immediately on a computer, laptop, cell phone, or any other device with WiFi access. The opening may also be viewed in real time through a "Zoom meeting" or similar type platform by using the following information: Join Zoom Meeting Phone one-tap:US:+16692545252„1610225445#„1#,277413# or +16468287666„1610225445#„1#,277413# Meeting URL:https://fortlauderdale.zoomgov.com/j/1610225445?pwd=cmJ4emU5Mm5nSkVgQXUrY3VnR1FgZz09 Meeting ID:161 022 5445 Password:277413 Join by Telephone For higher quality, dial a number based on your current location. Dial: US: +1 669 254 5252 or +1 646 828 7666 or +1 669 216 1590 or +1 551 285 1373 p. 2 Bid 12504-613 City of Fort Lauderdale Meeting ID:161 022 5445 Password:277413 Anyone requesting assistance or having further inquiry in this matter must contact the Procurement Specialist indicated on the solicitation, via the question and Answer forum on Bidsync.com before the Last Day for Questions indicated in the Solicitation. This Project is located throughout the City of Fort Lauderdale. The work to be accomplished under this contract includes, but is not limited to, the construction and installation of various storm water infrastructure consisting of: catch basins, storm water manholes, piping, exfiltration trenches, tidal valves, swales regrades, retention area, pipe lining, pervious pavements and repair of the aforementioned. In addition to the storm water infrastructure, the contract covers restoration activated and miscellaneous utility relocations needed to execute these projects. This includes, but not limited to, landscape/hardscape removal and reinstall, pavers/pavement/asphalt removal and reinstall, relocation of various utility pipes and boxes, use of equipment for specialized work, maintenance of traffic, dewatering activities and pollution prevention items. NOTE: Payment on this contract will be made by Visa or MasterCard. Drawing Plans: There are no drawing plans for this Project. Licensing Requirements: Possession of Underground contractor's licenses is required for this Project. Pre -Bid Meeting/Site visit: There will not be a pre -bid meeting or site visit for this Invitation to Bid. However, it will be the sole responsibility of the bidder to inspect the City's locations and become familiar with the scope of the City's requirements and systems prior to submitting a proposal. No variation in price or conditions shall be permitted based upon a claim of ignorance. Submission of a proposal will be considered evidence that the proposer has familiarized himself with the nature and extent of the work, equipment, materials, and labor required. Bid Securi : A certified check, cashier's bid amount, check, made payable to the City of FortLauderdale, lorida, shall accompany each offer.r cent (10%) of the Bid Bonds: Bidders can submit bid bonds for projects four different ways. 1) BidSync allows bidders to submit bid bonds electronically directly through their system using Surety 2000. For more information on this feature and to access it, contact BIDSYNC customer care department. 2) Bidders may upload their original executed bid bond on BIDSYNC to accompany their bids with the electronic proposal, and deliver the original, signed and sealed hard copy within five (5) business days after bid opening, with the company name, bid number and title clearly indicated. 3) Bidders can hand deliver their bid bond in a sealed envelope to the Finance Department, Procurement Services Division, 100 North Andrews Avenue, Room 619, Fort Lauderdale, Florida 33301-1016, before time of bid opening, with the company name, bid number and title clearly indicated on the envelope. 4) Bidders can mail their bid bond to the Finance Department, Procurement Services Division, 100 North Andrews Avenue, Room 619, Fort Lauderdale, Florida 33301-1016, before time of bid opening, with the company name, bid number and title clearly indicated on the envelope. NOTE: Bond must be received in Procurement and time stamped before bid opening. it will be the sole responsibility of the bidder to ensure that his bid is submitted prior to the bid opening date and time listed. PAPER BID SUBMITTALS WILL NOT BE ACCEPTED. BIDS MUST BE SUBMITTED ELECTRONICALLY VIA BIDSYNC.COM Certified Checks, Cashier's Checks and Bank Drafts : These CANNOT be submitted via BIDSYNC, nor are their images allowed to be uploaded and submitted with your electronic bid. These forms of securities, as well as hard copy bid bonds, must be received on or before the Invitation to Bid (ITB) opening date and time, at the Finance Department, Procurement Services Division, 100 North Andrews Avenue, Room 619, Fort Lauderdale, Florida 33301-1016, with the bid number and title clearly indicated on the envelope. It is the bidder's sole responsibility to ensure that his bid bond or other bid security is received by the Procurement Services Division before time of bid opening. Failure to adhere to this requirement may be grounds 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 to consider the bid as non -responsive. The City of Fort Lauderdale reserves the right to waive any informality in any or all bids and to reject any or all bids. For information concerning technical specifications, please utilize the Question/Answer platform provided by BIDSYNC at www.bidsync.com. Questions of a material nature must be received prior to the cut-off date specified in the solicitation. Material changes, if any, to the scope of services or bidding procedures, will only be transmitted by written addendum. (See addendum section of BIDSYNC Site). Bidders please note: No part of your bid can be submitted via FAX. No variation in price or conditions shall be permitted based upon a claim of ignorance. Submission of a bid will be considered evidence that the bidder has familiarized himself with the nature and extent of the work, equipment, materials, and labor required. The entire bid response must be submitted in accordance with all specifications contained in this solicitation. Information on bid results and projects currently out to bid can be obtained on the City's website — http://www.fortlauderdale.gov/departments/finance/procurement-services. For general inquiries, please call (954) 828-5933. Added on Mar 16, 2021: Licensing/Certification requirement has been revised. Added on Apr 14, 2021: Bid date extended to THURSDAY, APRIL 22, 2021. Added on Apr 22, 2021: Bid due date has been extended to 4/27/21. Addendum #1 Addendum # 2 Addendum #3 Addendum #4 Item Response Form 5/7/2021 9:40 AM p. 4 City of Fort Lauderdale Bid 12504-613 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-01 - Base Bid: MOBILIZATION - NIGHT WORK Base Bid 20 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 20 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 101-1 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-02 - Base Bid: EMERGENCY MOBILIZATION - MOBILIZE WITHIN 24 HR FOR EACH PROJECT Base Bid 20 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 20 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 101-1 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-03 - Base Bid: TRAFFIC CONTROL OFFICER Base Bid 100 hourly rate City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 102-14 Item Lot Description Quantity Unit Price Delivery Location 1250413-01-04- Base Bid: WORK ZONE SIGN, FURNISH AND INSTALL Base Bid 2500 day City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2500 5/7/2021 9:40 AM p. 5 City of Fort Lauderdale Bid 12504-613 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 102-60 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-05 - Base Bid: BARRIER WALL, TEMPORARY,FURNISH AND INSTALL, CONCRETE, UP TO 30 DAYS Base Bid 1500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 102-71-11 Item 12504-613-01-06 - Base Bid: BARRIER WALL, TEMPORARY, FURNISH AND INSTALL, WATERFILLED, UP TO 30 DAYS Lot Description Base Bid Quantity 1500 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 102-71-12 Item 12504-613-01-07 - Base Bid: CHANNELIZING DEVICE, TYPES I, II, DI, VP, DRUM, OR LCD, FURNISH AND INSTALL Lot Description Base Bid Quantity 5000 day Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 102-74-1 Item 12504-613-01-08- Base Bid: CHANNELIZING DEVICE, TYPE III, 6 FEET, FURNISH AND INSTALL Lot Description Base Bid Quantity 1000 day Unit Price 5/7/2021 9:40 AM p. 6 City of Fort Lauderdale Bid 12504-613 Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 102-74-2 Item 12504-613-01-09 - Base Bid: TRAFFIC CONES, FURNISH AND INSTALL Lot Description Base Bid Quantity 5000 day Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO E102-74-9 Item 12504-613-01-10 - Base Bid: ARROW BOARD/ADVANCE WARNING ARROW PANEL, FURNISH AND INSTALL Lot Description Base Bid Quantity 50 day Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 102-76 Item 12504-613-01-11 - Base Bid: PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY, FURNISH AND INSTALL Lot Description Base Bid Quantity 50 day Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 102-99 Item Lot Description 5/7/2021 9:40 AM 12504613-01-12 - Base Bid: PORTABLE REGULATORY, SIGN, FURNISH AND INSTALL Base Bid P. 7 City of Fort Lauderdale Bid 12504-613 Quantity Unit Price Delivery Location 25 day City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 25 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 102-150-1 Item Lot Description Quantity Unit Price Delivery Location Description See description fo Item Lot Description Quantity Unit Price Delivery Location Description See description for Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-13 - Base Bid: LIGHT TOWER, AMIDA/TEREX AL4000 OR EQUIVALENT, INCLUDES POWER SOURCE (FDOT PAY I Base Bid 40 day City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 40 r Light Tower with Power Source in the specifications section 12504-613-01-14 - Base Bid: FDOT CERTIFIED FLAG PERSON (FDOT PAY ITEM NO NA) Base Bid 1000 hourly rate City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 FDOT Flag Person in the specifications section 12504-613-01-15 - Base Bid: ORANGE PLASTIC MESH AND POST(FDOT PAY ITEM NO NA) Base Bid 500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See description for Orange Plastic Mesh and Post in the specifications section 5/7/2021 9:40 AM p. 8 City of Fort Lauderdale Bid 12504-613 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-16 - Base Bid: FURNISH AND INSTALL STEEL TRAFFIC PLATES FOR 12 -FOOT LANES A DAILY RATE (FDOT P Base Bid 50 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Steel Traffic Plates for up to 12 FEET Lanes in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-17 - Base Bid: FURNISH AND INSTALL STEEL TRAFFIC PLATES FOR 12 -FOOT LANES 9 WEEKLY RATE (FDOT Base Bid 50 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Steel Traffic Plates for up to 12 FEET Lanes in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504613-01-18 - Base Bid: SEDIMENT BARRIER (SILT FENCE) Base Bid 1500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 104-10-3 Item Lot Description Quantity Unit Price 12504-613-01-19 - Base Bid: SEDIMENT BASIN/CONTANMENT SYSTEM FOR DEWATERING Base Bid 100 day Delivery Location City of Fort Lauderdale See ITB Specifications P . 9 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 104-7 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-20 - Base Bid: FLOATING TURBIDITY BARRIER Base Bid 2500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 104-11 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-21 - Base Bid: INLET PROTECTION Base Bid 500 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 104-18 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-22 - Base Bid: SURVEY FIELD WORK AS PERFORMED BY CREW (FDOT PAY ITEM NUMBER NOT APPLICABLE) Base Bid 500 hourly rate City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See description for Survey Field Work by Crew in the specifications section Item Lot Description 5/7/2021 9:40 AM 12504-613-01-23 - Base Bid: UTILITY LOCATING AND EXCAVATION TEST HOLE IN GREEN AREAS (FDOT PAY ITEM NUMBER Base Bid p. 10 City of Fort Lauderdale Bid 12504-613 Quantity Unit Price Delivery Location 50 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Utility Locating and Excavation Test Hole in Green Areas in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-24 - Base Bid: UTILITY LOCATING AND EXCAVATION TEST HOLE IN PAVEMENT AREAS (FDOT PAY ITEM NU Base Bid 50 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Utility Locating and Excavation Test Hole in Paved Areas in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-25 - Base Bid: REGULAR EXCAVATION Base Bid 1700 cubic yard City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1700 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 120-1 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-26 - Base Bid: EMBANKMENT Base Bid 500 cubic yard City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 120-6 p. 11 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-27 - Base Bid: FLOWABLE FILL Base Bid 150 cubic yard City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 150 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 121-70 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-28 - Base Bid: SELECT BEDDING MATERIAL Base Bid 50 cubic yard City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 125-3 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-29 - Base Bid: FILL SAND, FURNISH AND INSTALL Base Bid 50 cubic yard City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 142-70 Item Lot Description Quantity Unit Price Delivery Location 5/7/2021 9:40 AM 1250413-01-30 - Base Bid: FDOT PAY ITEM NO 145-1: GEOSYNTHETIC REINFORCED SOIL SLOPE Base Bid 5000 square foot City of Fort Lauderdale See ITB Specifications See ITB Specifications p. 12 Bid 12504-613 City of Fort Lauderdale Fort Lauderdale FL 33301 Qty 5000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 145-1 Item Lot Description Quantity Unit Price Delivery Location 12504613-01-31 - Base Bid: SWALE EXCAVATION/GRADING/RESTORATION (UP TO 36 INCHES DEEP WITH 1:3 SLOPES OR FL Base Bid 10000 square yard City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10000 Description See description for Utility Locating and Swale Excavation, Grading and Restoration in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504613-01-32 - Base Bid: RETRO-REFLECTIVE PAVEMENT MARKERS Base Bid 100 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 706-3 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-33 - Base Bid: PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, YELLOW, OR BLUE, SOLID, 6 INCHES Base Bid 1000 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 710-11-101, 710-11-201, OR 710-11-421 Item 12504-613-01-34- Base Bid: PAINTED PAVEMENT MARKINGS, STANDARD, WHITE OR YELLOW, SOLID FOR CROSSWALK AND RO p. 13 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 Lot Description Quantity Unit Price Delivery Location Base Bid 100 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 710-11-123 OR 710-11-22 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-35 - Base Bid: PAINTED PAVEMENT MARKINGS, STANDARD, WHITE OR YELLOW, SOLID FOR STOP LINE OR CRO Base Bid 100 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 710-11-125 OR 710-11-225 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-36 - Base Bid: PAINTED PAVEMENT MARKINGS, STANDARD, WHITE OR YELLOW, SKIP, 10-30 OR 3-9 SKIP, 6 Base Bid 100 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 710-11-131 OR 710-11-231 Item Lot Description Quantity Unit Price Delivery Location 5/7/2021 9:40 AM 12504-613-01-37 - Base Bid: PAINTED PAVEMENT MARKINGS, STANDARD, WHITE OR YELLOW, ISLAND NOSE Base Bid 100 square foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 p. 14 City of Fort Lauderdale Bid 12504-613 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 710-11-190 OR 710-11-290 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-38 - Base Bid: THERMOPLASTIC PAVEMENT MARKINGS, STANDARD, WHITE, OR YELLOW, SOLID, 6 INCHES Base Bid 1000 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 711 -1A -BCD Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-39 - Base Bid: THERMOPLASTIC PAVEMENT MARKINGS, STANDARD, WHITE, SOLID, 12 INCHES Base Bid 100 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 711-11-123 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-40 - Base Bid: THERMOPLASTIC PAVEMENT MARKINGS, STANDARD, WHITE, SOLID, 24 INCHES Base Bid 100 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 711-11-125 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-41 - Base Bid: THERMOPLASTIC, REMOVE Base Bid 1000 square foot City of Fort Lauderdale p. 15 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 711-17 Item Lot Description Quantity Unit Price Delivery Location 12504613-01-42 - Base Bid: CURB OR CURB AND GUTTER REMOVAL (FDOT PAY ITEM NUMBER NOT APPLICABLE) Base Bid 1500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1500 Description See description for Curb or Curb and Gutter Removal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-43 - Base Bid: REMOVAL OF EXISTING CONCRETE PAVEMENT Base Bid 3000 square yard City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 3000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 110-4 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-44 - Base Bid: PAVER BLOCK REMOVAL (FDOT PAY ITEM NUMBER NOT APPLICABLE) Base Bid 1500 square yard City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1500 Description See description for Paver Block Removal in the specifications section Item 5/7/2021 9:40 AM 12504-613-01-45 - Base Bid: REMOVAL AND DISPOSAL OF UNSUITABLE, NON -CONTAMINATED MATERIALS (FDOT PAY ITEM p. 16 City of Fort Lauderdale Bid 12504-613 Lot Description Quantity Unit Price Delivery Location Base Bid 150 cubic yard City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 150 Description See description for Removal and Disposal of Unsuitable Non -Contaminated Materials in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-46 - Base Bid: UTILITY PIPE, REMOVE & DISPOSE, 5-7.9 INCHES Base Bid 2000 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 1050-16-003 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-47 - Base Bid: UTILITY PIPE, REMOVE & DISPOSE, 8-19.9 INCHES Base Bid 5000 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 1050-16-004 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-48 - Base Bid: UTILITY PIPE, REMOVE & DISPOSE, 20-49.9 INCHES Base Bid 500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 1050-16-005 p. 17 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 Item 12504-613-01-49 - Base Bid: UTILITY PIPE, REMOVE & DISPOSE, 50 INCHES OR LARGER Lot Description Base Bid Quantity 100 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 1050-16-006 Item 12504-613-01-50 - Base Bid: UTILITY PIPE, PLUG AND PLACE OUT OF SERVICE, 5-7.9 INCHES Lot Description Base Bid Quantity 100 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 1050-18-003 Item 12504-613-01-51 - Base Bid: UTILITY PIPE, PLUG AND PLACE OUT OF SERVICE, 8-19.9 INCHES Lot Description Base Bid Quantity 300 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 300 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 1050-18-004 Item 12504-613-01-52 - Base Bid: UTILITY PIPE, PLUG AND PLACE OUT OF SERVICE, 20-49.9 INCHES Lot Description Base Bid Quantity 200 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications 5/7/2021 9:40 AM p. 18 City of Fort Lauderdale Bid 12504-613 Fort Lauderdale FL 33301 Qty 200 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 1050-18-005 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-53 - Base Bid: UTILITY PIPE, PLUG AND PLACE OUT OF SERVICE, 50 INCHES OR LARGER Base Bid 100 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 1050-18-006 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-54- Base Bid: STORM/SANITARY STRUCTURE REMOVAL (FDOT PAY ITEM NUMBER NOT APPLICABLE) Base Bid 200 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 200 Description See description for Storm/Sanitary Structure Removal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-55 - Base Bid: LIMEROCK REMOVAL TO A DEPTH OF 8 INCHES (FDOT PAY ITEM NUMBER NOT APPLICABLE) Base Bid 500 square yard City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See description for Limerock Removal and Disposal up to 8 INCHES in the specifications section Item Lot Description Quantity 5/7/2021 9:40 AM 12504-613-01-56 - Base Bid: SINGLE POST SIGN, REMOVE Base Bid 50 each p. 19 City of Fort Lauderdale Bid 12504-613 Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 700-1-60 Item 12504-613-01-57 - Base Bid: MILLING EXIST ASPH PAVT, 1 INCH AVG DEPTH, AREA Lot Description Base Bid Quantity 2500 square yard Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 327-70-1 Item 12504-613-01-58 - Base Bid: CONCRETE SIDEWALK AND DRIVEWAYS, 6 INCHES THICK Lot Description Base Bid Quantity 1000 square yard Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 522-2 Item 12504-613-01-59 - Base Bid: PAVERS, ARCHITECTURAL, ROADWAY Lot Description Base Bid Quantity 1500 square yard Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 526-1-1 Item 12504-613-01-60 - Base Bid: PAVERS, ARCHITECTURAL, SIDEWALK 5/7/2021 9:40 AM p. 20 City of Fort Lauderdale Bid 12504-613 Lot Description Base Bid Quantity 1500 square yard Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 526-1-2 Item 12504-613-01-61 - Base Bid: REWORKING/ ADDING LIMEROCK BASE TO EXISTING, 3 INCHES Lot Description Base Bid Quantity 1000 square yard Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 210-1-9 Item 12504-613-01-62 - Base Bid: REWORKING/ ADDING LIMEROCK BASE TO EXISTING, 4 INCHES Lot Description Base Bid Quantity 1000 square yard Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 210-1-8 Item 12504-613-01-63 - Base Bid: REWORKING/ ADDING LIMEROCK BASE TO EXISTING, 6 INCHES Lot Description Base Bid Quantity 3000 square yard Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 3000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 210-1-1 5/7/2021 9:40 AM p. 21 City of Fort Lauderdale Bid 12504-613 Item 12504-613-01-64 - Base Bid: OPTIONAL BASE, BASE GROUP 04 (6 INCHES LIMEROCK) Lot Description Base Bid Quantity 2500 square yard Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 285-704 Item 12504-613-01-65 - Base Bid: TEMPORARY PATCH USING COLD ASPHALTIC MIX, FURNISH AND INSTALL Lot Description Base Bid Quantity 100 cubic foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Temporary Cold Patch Asphalt up to 8 INCHES in the specifications section Item 12504-613-01-66 - Base Bid: SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC A, B, C, D, OR E Lot Description Base Bid Quantity 500 ton Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 334-1-11, 334-1-12, 334-1- 13, 334-1-14, OR 334-1-15 Item 12504-613-01-67 - Base Bid: MISCELLANEOUS ASPHALT PAVEMENT Lot Description Base Bid Quantity 100 ton Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications 5/7/2021 9:40 AM p. 22 City of Fort Lauderdale Bid 12504-613 Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 339-1 Item 12504-613-01-68 - Base Bid: CONCRETE CURB & GUTTER, TYPE E Lot Description Base Bid Quantity 50 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 520-1-7 Item 12504-613-01-69 - Base Bid: CONCRETE CURB & GUTTER, TYPE F Lot Description Base Bid Quantity 1000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 520-1-10 Item 12504-613-01-70 - Base Bid: CONCRETE CURB, TYPE D Lot Description Base Bid Quantity 2500 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 520-2-4 Item 12504-613-01-71 - Base Bid: VALLEY GUTTER- CONCRETE Lot Description Base Bid Quantity 1000 linear foot Unit Price 5/7/2021 9:40 AM p. 23 City of Fort Lauderdale Bid 12504-613 Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 520-3 Item 12504-613-01-72 - Base Bid: DETECTABLE WARNING ON EXISTING WALKING SURFACE, RETROFIT, FURNISH AND INSTALL Lot Description Base Bid Quantity 500 square foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 527-2 Item 12504-613-01-73 - Base Bid: ADA COMPLIANT CURB RAMP (FDOT PAY ITEM NO NA) Lot Description Base Bid Quantity 20 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 20 Description See description for ADA Ramp in the specifications section Item 12504-613-01-74 - Base Bid: DITCH BOTTOM TYPE C (INDEX 232) LESS THAN 10 FEET Lot Description Base Bid Quantity 100 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 425-1-52 Item 12504-613-01-75 - Base Bid: DITCH BOTTOM TYPE D (INDEX 232) LESS THAN 10 FEET 5/7/2021 9:40 AM p. 24 City of Fort Lauderdale Bid 12504-613 Lot Description Base Bid Quantity 20 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 20 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 425-1-54 Item 12504-613-01-76 - Base Bid: DITCH BOTTOM TYPE OEA (INDEX 232) LESS THAN 10 FEET Lot Description Base Bid Quantity 20 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 20 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 425-1-55 Item 12504-613-01-77 - Base Bid: DITCH BOTTOM TYPE AFA (INDEX 233) LESS THAN 10 FEET Lot Description Base Bid Quantity 10 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 425-1-56 Item 12504-613-01-78 - Base Bid: DITCH BOTTOM TYPE AGO (INDEX 233) LESS THAN 10 FEET Lot Description Base Bid Quantity 10 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 425-1-57 5/7/2021 9:40 AM p. 25 City of Fort Lauderdale Bid 12504-613 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-79 - Base Bid: TYPE ACA CATCH BASIN 24X36 INCHES LESS THAN 10 FEET (FDOT PAY ITEM NUMBER NOT Base Bid 30 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 30 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-80 - Base Bid: LARGE RECTANGULAR TYPE ACA CATCH BASINS WITH TOP SLABS 4X4 FEET OR TYPE INCHESC Base Bid 100 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-81 - Base Bid: LARGE RECTANGULAR TYPE ACA CATCH BASINS WITH TOP SLABS 5X5 FEET OR TYPE INCHESC Base Bid 100 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item Lot Description Quantity Unit Price 12504-613-01-82 - Base Bid: LARGE RECTANGULAR TYPE ACA CATCH BASINS WITH TOP SLABS 6X6 FEET OR TYPE INCHESC Base Bid 1 each 5/7/2021 9:40 AM p. 26 City of Fort Lauderdale Bid 12504-613 Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty1 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item 12504-613-01-83 - Base Bid: LARGE RECTANGULAR TYPE ACA CATCH BASINS WITH TOP SLABS 8X8 FEET LESS THAN 10 FE Lot Description Base Bid Quantity 5 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item 12504-613-01-84 - Base Bid: LARGE RECTANGULAR TYPE ACA CATCH BASINS WITH TOP SLABS 4X6 FEET LESS THAN 10 FE Lot Description Base Bid Quantity 5 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item 12504-613-01-85 - Base Bid: LARGE RECTANGULAR TYPE ACA CATCH BASINS WITH TOP SLABS 4X8 FEET LESS THAN 10 FE Lot Description Base Bid Quantity 5 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section 5/7/2021 9:40 AM p. 27 City of Fort Lauderdale Bid 12504-613 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-86 - Base Bid: STORM MANHOLE TYPE M-4 (48 INCHES ROUND) LESS THAN 10 FEET (FDOT PAY ITEM NUM Base Bid 100 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-87 - Base Bid: STORM MANHOLE TYPE M-5 (60 INCHES ROUND) LESS THAN 10 FEET (FDOT PAY ITEM NUM Base Bid 5 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-88 - Base Bid: STORM MANHOLE TYPE M-6 (72 INCHES ROUND) LESS THAN 10 FEET (FDOT PAY ITEM NUM Base Bid 5 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-89 - Base Bid: STORM MANHOLE TYPE M-7 (84 INCHES ROUND) LESS THAN 10 FEET (FDOT PAY ITEM NUM Base Bid 3 each City of Fort Lauderdale See ITB Specifications 5/7/2021 9:40 AM p. 28 City of Fort Lauderdale Bid 12504-613 See ITB Specifications Fort Lauderdale FL 33301 Qty3 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item 12504-613-01-90 - Base Bid: 18 INCHES ADS DRAIN BASIN OR APPROVED EQUAL (FDOT PAY ITEM NUMBER NOT APPLICAB Lot Description Base Bid Quantity 20 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 20 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item 12504-613-01-91 - Base Bid: 24 INCHES ADS DRAIN BASIN OR APPROVED EQUAL (FDOT PAY ITEM NUMBER NOT APPLICAB Lot Description Base Bid Quantity 5 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item 12504-613-01-92 - Base Bid: 8 INCHESTRENCH DRAIN WITH GRATE 6452 OR APPROVED EQUAL (FDOT PAY ITEM NUMBER N Lot Description Base Bid Quantity 10 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item 12504-613-01-93 - Base Bid: 10 INCHES TRENCH DRAIN WITH GRATE 6453 OR APPROVED EQUAL (FDOT PAY 5/7/2021 9:40 AM p. 29 City of Fort Lauderdale Bid 12504-613 ITEM NUMBE Lot Description Base Bid Quantity 50 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item 12504-613-01-94 - Base Bid: 12 INCHES TRENCH DRAIN WITH GRATE 6454 OR APPROVED EQUAL (FDOT PAY ITEM NUMBER Lot Description Base Bid Quantity 125 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 125 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item 12504-613-01-95 - Base Bid: 15 INCHES TRENCH DRAIN WITH GRATE 6455 OR APPROVED EQUAL (FDOT PAY ITEM NUMBER Lot Description Base Bid Quantity 100 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item 12504-613-01-96 - Base Bid: 18 INCHES TRENCH DRAIN WITH GRATE 6456 OR APPROVED EQUAL (FDOT PAY ITEM NUMBER Lot Description Base Bid Quantity 100 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications 5/7/2021 9:40 AM p. 30 City of Fort Lauderdale Bid 12504-613 Fort Lauderdale FL 33301 Qty 100 Description See description for Catch Basins/Manholes/ADS Drains/Trench Drains in the specifications section Item 12504-613-01-97 - Base Bid: INLETS, ADJUST Lot Description Base Bid Quantity 50 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 425-4 Item 12504-613-01-98 - Base Bid: MANHOLE, ADJUST Lot Description Base Bid Quantity 50 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 425-5 Item 12504-613-01-99 - Base Bid: VALVE BOXES, ADJUST Lot Description Base Bid Quantity 50 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 425-6 Item 12504-613-01-100 - Base Bid: DRAINAGE STRUCTURES, MISCELLANEOUS, ADJUST Lot Description Base Bid Quantity 50 each Unit Price 5/7/2021 9:40 AM p. 31 City of Fort Lauderdale Bid 12504-613 Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 425-8 Item 12504-613-01-101 - Base Bid: DRAINAGE STRUCTURE MODIFY Lot Description Base Bid Quantity 100 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 425-11 Item 12504-613-01-102 - Base Bid: INLETS RELOCATING Lot Description Base Bid Quantity 25 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 25 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 425-71 Item 12504-613-01-103 - Base Bid: MANHOLES AND INLETS CLEANING AND SEALING, LESS THAN 10 FEET Lot Description Base Bid Quantity 50 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 425-74-1 Item 12504-613-01-104 - Base Bid: PIPE CULVERT, RCP MATERIAL ONLY, ROUND, LESS THAN 12 INCHES STORM DRAIN (INSTALL 5/7/2021 9:40 AM p. 32 City of Fort Lauderdale Bid 12504-613 Lot Description Quantity Unit Price Delivery Location Base Bid 500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See description for Pipe Culvert Installation in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-105 - Base Bid: PIPE CULVERT, OPTIONAL MATERIAL, ROUND, LESS THAN 12 INCHES STORM DRAIN (INSTALL Base Bid 500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See description for Pipe Culvert Installation in the specifications section Item 12504-613-01-106 - Base Bid: PIPE CULVERT, RCP MATERIAL ONLY, ROUND, 12 INCHES, 15 INCHES STORM DRAIN (INSTAL Lot Description Base Bid Quantity 2000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-112, 430-174-115 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-107 - Base Bid: PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 12 INCHES, 15 INCHES STORM DRAIN (INSTAL Base Bid 2000 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 5/7/2021 9:40 AM p. 33 City of Fort Lauderdale Bid 12504-613 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-112, 430-174-115 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-108 - Base Bid: PIPE CULVERT, RCP MATERIAL ONLY, ROUND, 18 INCHES, 24 INCHES STORM DRAIN (INSTAL Base Bid 2000 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-118, 430-174-124 Item 12504-613-01-109- Base Bid: PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 18 INCHES, 24 INCHES STORM DRAIN (INSTAL Lot Description Base Bid Quantity 2000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-118, 430-174-124 Item 12504-613-01-110 - Base Bid: PIPE CULVERT, RCP MATERIAL ONLY, ROUND, 30 INCHES, 36 INCHES STORM DRAIN (INSTAL Lot Description Base Bid Quantity 1500 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-130, 430-174-136 Item Lot Description Quantity 12504-613-01-111 - Base Bid: PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 30 INCHES, 36 INCHES STORM DRAIN (INSTAL Base Bid 1500 linear foot 5/7/2021 9:40 AM p. 34 City of Fort Lauderdale Bid 12504-613 Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-130, 430-174-136 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-112 - Base Bid: PIPE CULVERT, RCP MATERIAL ONLY, ROUND, 42 INCHES, 48 INCHES STORM DRAIN (INSTAL Base Bid 1000 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-142, 430-174-148 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-113 - Base Bid: PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 42 INCHES, 48 INCHES STORM DRAIN (INSTAL Base Bid 1000 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-142, 430-174-148 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-114 - Base Bid: PIPE CULVERT, RCP MATERIAL ONLY, ROUND, 54 INCHES, 60 INCHES STORM DRAIN (INSTAL Base Bid 500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-154, 430-174-160 5/7/2021 9:40 AM p. 35 City of Fort Lauderdale Bid 12504-613 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-115 - Base Bid: PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 54 INCHES, 60 INCHES STORM DRAIN (INSTAL Base Bid 400 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 400 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-154, 430-174-160 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-116 - Base Bid: PIPE CULVERT, OPTIONAL MATERIAL, OTHER SHAPE - ELLIP/ARCH, 15 INCHES, 18 INCHES Base Bid 250 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 250 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-215 OR 430-174- 218 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-117 - Base Bid: PIPE CULVERT, RCP MATERIAL ONLY, OTHER SHAPE - ELLIP/ARCH, 15 INCHES, 18 INCHES Base Bid 250 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 250 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-215 OR 430-174- 218 Item Lot Description Quantity Unit Price 12504-613-01-118 - Base Bid: PIPE CULVERT, OPTIONAL MATERIAL, OTHER SHAPE - ELLIP/ARCH, 24 INCHES Base Bid 200 linear foot 5/7/2021 9:40 AM p. 36 City of Fort Lauderdale Bid 12504-613 Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 200 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-224 Item 12504-613-01-119 - Base Bid: PIPE CULVERT, RCP MATERIAL ONLY, OTHER SHAPE - ELLIP/ARCH, 24 INCHES Lot Description Base Bid Quantity 200 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 200 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-224 Item 12504-613-01-120 - Base Bid: PIPE CULVERT, OPTIONAL MATERIAL, OTHER SHAPE - ELLIP/ARCH, 30 INCHES, 36 INCHES Lot Description Base Bid Quantity 150 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 150 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-230 OR 430-174- 236 Item 12504613-01-121 - Base Bid: PIPE CULVERT, RCP MATERIAL ONLY, OTHER SHAPE - ELLIP/ARCH, 30 INCHES, 36 INCHES Lot Description Base Bid Quantity 150 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 150 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-174-230 OR 430-174- 236 5/7/2021 9:40 AM p. 37 City of Fort Lauderdale Bid 12504-613 Item 1250413-01-122 - Base Bid: CLEANING & SEALING EXISTING PIPE JOINT, 10 INCHES TO 24 INCHES, STORM SEWER Lot Description Base Bid Quantity 150 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 150 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-821-23, 430-821-25, OR 430-821-29 Item 12504-613-01-123 - Base Bid: CLEANING & SEALING EXISTING PIPE JOINT, 30 INCHES, 36 INCHES, STORM SEWER Lot Description Base Bid Quantity 50 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-821-33 OR 430-821-38 Item 12504-613-01-124 - Base Bid: CLEANING & SEALING EXISTING PIPE JOINT, 42 INCHES, 48 INCHES, STORM SEWER Lot Description Base Bid Quantity 50 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-821-40 OR 430-821-41 Item 12504-613-01-125 - Base Bid: CLEANING & SEALING EXISTING PIPE JOINT, 54 INCHES, 60 INCHES, STORM SEWER Lot Description Base Bid Quantity 50 each Unit Price 5/7/2021 9:40 AM p 38 City of Fort Lauderdale Bid 12504-613 Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-821-42 OR 430-821-43 Item 12504-613-01-126 - Base Bid: CLEANING & SEALING EXISTING PIPE JOINT, >60 INCHES, STORM SEWER Lot Description Base Bid Quantity 25 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 25 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-821-61 Item 12504-613-01-127 - Base Bid: MITERED END SECTION, OPTIONAL ROUND, 12 INCHES, 15 INCHES,18 INCHES Lot Description Base Bid Quantity 10 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-982-121, 430-982-123, OR 430-982-12 Item 12504-613-01-128 - Base Bid: MITERED END SECTION, OPTIONAL ROUND, 24 INCHES Lot Description Base Bid Quantity 5 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-982-129 Item 12504-613-01-129 - Base Bid: MITERED END SECTION, OPTIONAL ROUND, 30 INCHES,36 INCHES 5/7/2021 9:40 AM p. 39 City of Fort Lauderdale Bid 12504-613 Lot Description Base Bid Quantity 5 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-982-133 OR 430-982- 138 Item 12504-613-01-130 - Base Bid: FRENCH DRAIN, LESS THAN 12 INCHES Lot Description Base Bid Quantity 100 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for French Drain in the specifications section Item 12504-613-01-131 - Base Bid: FRENCH DRAIN, 12 TO 18 INCHES Lot Description Base Bid Quantity 3500 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 3500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 443-70-3 Item 12504-613-01-132 - Base Bid: FRENCH DRAIN, 24 INCHES Lot Description Base Bid Quantity 1000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 443-70-4 5/7/2021 9:40 AM p. 40 City of Fort Lauderdale Bid 12504-613 Item 12504-613-01-133 - Base Bid: STORM SEWER INSPECTION (VIDEO CAMERA) Lot Description Base Bid Quantity 5000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO E432-4 Item 12504-613-01-134- Base Bid: OUTFALL BARNACLE REMOVAL FOR 0-24 INCH PIPES Lot Description Base Bid Quantity 1000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-95-1 Item 12504-613-01-135 - Base Bid: OUTFALL BARNACLE REMOVAL FOR 25-36 INCH PIPES Lot Description Base Bid Quantity 500 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-95-2 Item 12504-613-01-136 - Base Bid: OUTFALL BARNACLE REMOVAL FOR 37-48 INCH PIPES Lot Description Base Bid Quantity 500 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications 5/7/2021 9:40 AM P. 41 City of Fort Lauderdale Bid 12504-613 Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-95-3 Item 12504-613-01-137 - Base Bid: OUTFALL BARNACLE REMOVAL FOR 49-60 INCHES PIPES Lot Description Base Bid Quantity 500 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-95-4 Item 12504-613-01-138 - Base Bid: OUTFALL BARNACLE REMOVAL FOR 61 INCHES AND GREATER PIPES Lot Description Base Bid Quantity 250 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 250 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-95-5 Item 12504-613-01-139- Base Bid: CONCRETE COLLAR AT JOINTS FOR CONNECTING DISSIMILAR TYPES OF PIPE AND CONCRETE P Lot Description Base Bid Quantity 200 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 200 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-96 Item 12504-613-01-140 - Base Bid: PIPE LINER, SLIP LINER, 0-24 INCHES Lot Description Base Bid Quantity 2000 linear foot Unit Price 5/7/2021 9:40 AM p. 42 City of Fort Lauderdale Bid 12504-613 Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 431-1-32 Item 12504-613-01-141 - Base Bid: PIPE LINER, SLIP LINER, 25-36 INCHES Lot Description Base Bid Quantity 1000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 431-1-33 Item 12504-613-01-142- Base Bid: PIPE LINER, SLIP LINER, 37-48 INCHES Lot Description Base Bid Quantity 500 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 431-1-34 Item 12504-613-01-143 - Base Bid: PIPE LINER, SLIP LINER, 49-60 INCHES Lot Description Base Bid Quantity 500 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 431-1-35 Item Lot Description 12504-613-01-144- Base Bid: PIPE LINER, SLIP LINER, 61 INCHES AND GREATER Base Bid 5/7/2021 9:40 AM p. 43 City of Fort Lauderdale Bid 12504-613 Quantity 500 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 431-1-36 Item 12504-613-01-145 - Base Bid: BALLAST ROCK, FRENCH DRAIN AGGREGATE, FURNISH AND INSTALL Lot Description Base Bid Quantity 100 cubic yard Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for French Drain Aggregate in the specifications section Item 12504-613-01-146 - Base Bid: DEEP WELL INJECTION BOX, STRUCTURE WITH NO OUTFLOW Lot Description Base Bid Quantity 10 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 44474-1 Item 12504-613-01-147 - Base Bid: DEEP WELL INJECTION BOX, STRUCTURE WITH OUTFLOW Lot Description Base Bid Quantity 10 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 4.44-74-1 5/7/2021 9:40 AM p. 44 City of Fort Lauderdale Bid 12504-613 Item 12504-613-01-148 - Base Bid: DEEP WELL OPEN HOLE , 24 INCHES Lot Description Base Bid Quantity 2000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 444-70-11 Item 12504-613-01-149 - Base Bid: DEEP WELL CASING Lot Description Base Bid Quantity 2000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 444-71-11 Item 12504-613-01-150 - Base Bid: (0-23 INCHES) DEEP WELL CLEANING Lot Description Base Bid Quantity 2000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 444-71-10 Item 12504-613-01-151 - Base Bid: (24 INCHES) DEEP WELL CLEANING Lot Description Base Bid Quantity 2000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 444-71-11 5/7/2021 9:40 AM p. 45 City of Fort Lauderdale Bid 12504-613 Item 12504-613-01-152 - Base Bid: (25 INCHES AND GREATER) DEEP WELL CLEANING Lot Description Base Bid Quantity 2000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 444-71-12 Item 12504-613-01-153 - Base Bid: SHEET PILING, STEEL TEMPORARY -CRITICAL Lot Description Base Bid Quantity 1500 square foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 455-133-2 Item Lot Description Quantity Unit Price Delivery Location 1250413-01-154 - Base Bid: STORM DRAINAGE CLEANING AND DESILTING, VIDEO & FINISHED CD OR DVD, 0-24 INCHES P Base Bid 2500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO E430-94-1 Item 12504-613-01-155 - Base Bid: STORM DRAINAGE CLEANING AND DESILTING, VIDEO & FINISHED CD OR DVD, 24-36 INCHES Lot Description Base Bid Quantity 1000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications 5/7/2021 9:40 AM p. 46 City of Fort Lauderdale Bid 12504-613 See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO E430-94-2 Item 12504-613-01-156 - Base Bid: STORM DRAINAGE CLEANING AND DESILTING, VIDEO & FINISHED CD OR DVD, 37-48 INCHES Lot Description Base Bid Quantity 1000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO E430-94-3 Item 12504613-01-157 - Base Bid: STORM DRAINAGE CLEANING AND DESILTING, VIDEO & FINISHED CD OR DVD, 49-60 INCHES Lot Description Base Bid Quantity 1000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO E430-94-4 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-158 - Base Bid: STORM DRAINAGE CLEANING AND DESILTING, VIDEO & FINISHED CD OR DVD, 61 INCHES OR Base Bid 500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO E430-94-5 Item 12504-613-01-159 - Base Bid: WELL POINT SYSTEM COMPLETE, 4 INCHES PUMP, FURNISH AND INSTALL 5/7/2021 9:40 AM p. 47 City of Fort Lauderdale Bid 12504-613 Lot Description Quantity Unit Price Delivery Location (FDOT PAY ITEM Base Bid 100 day City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Well Point Dewatering System in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-160 - Base Bid: WELL POINT SYSTEM COMPLETE, 6 INCHES PUMP, FURNISH AND INSTALL (FDOT PAY ITEM Base Bid 40 day City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 40 Description See description for Well Point Dewatering System in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-161 - Base Bid: WELL POINT SYSTEM COMPLETE, 8 INCHES PUMP, FURNISH AND INSTALL (FDOT PAY ITEM Base Bid 20 day City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 20 Description See description for Well Point Dewatering System in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-162 - Base Bid: BY-PASS PUMP 4 INCHES, FURNISH AND INSTALL (FDOT PAY ITEM NO NA) Base Bid 200 day City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 200 5/7/2021 9:40 AM p. 48 City of Fort Lauderdale Bid 12504-613 Description See description for By-pass Pump in the specifications section Item 12504-613-01-163 - Base Bid: BY-PASS PUMP 6 INCHES, FURNISH AND INSTALL (FDOT PAY ITEM NO NA) Lot Description Base Bid Quantity 80 day Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 80 Description See description for By-pass Pump in the specifications section Item 12504-613-01-164 - Base Bid: BY-PASS PUMP 8 INCHES, FURNISH AND INSTALL (FDOT PAY ITEM NO NA) Lot Description Base Bid Quantity 40 day Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 40 Description See description for By-pass Pump in the specifications section Item 12504-613-01-165 - Base Bid: 8 TO 12 INCHES PLUG FOR BLOCKING DRAINAGE LINE WITHIN WATERTABLE - INCLUDES INST Lot Description Base Bid Quantity 200 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 200 Description See description for Drainage Line Plugs in the specifications section Item 12504-613-01-166 - Base Bid: 15-24 INCHES PLUG FOR BLOCKING DRAINAGE LINE WITHIN WATERTABLE - INCLUDES INSTAL Lot Description Base Bid Quantity 150 each Unit Price 5/7/2021 9:40 AM p. 49 City of Fort Lauderdale Bid 12504-613 Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 150 Description See description for Drainage Line Plugs in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-167 - Base Bid: 30-42 INCHES PLUG FOR BLOCKING DRAINAGE LINE WITHIN WATERTABLE - INCLUDES INSTAL Base Bid 100 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Drainage Line Plugs in the specifications section Item 12504-613-01-168 - Base Bid: 48-60 INCHES PLUG FOR BLOCKING DRAINAGE LINE WITHIN WATERTABLE - INCLUDES INSTAL Lot Description Base Bid Quantity 50 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Drainage Line Plugs in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-169 - Base Bid: 60 INCHES AND ABOVE PLUG FOR BLOCKING DRAINAGE LINE WITHIN WATERTABLE - INCLUDE Base Bid 25 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 25 Description See description for Drainage Line Plugs in the specifications section 5/7/2021 9:40 AM p. 50 City of Fort Lauderdale Bid 12504-613 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-170 - Base Bid: RIPRAP, SAND -CEMENT Base Bid 25 cubic yard City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 25 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 530-1 Item Lot Description Quantity Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 12504-613-01-171 - Base Bid: RIPRAP- RUBBLE, BANK AND SHORE Base Bid 5 ton Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 530-3-3 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-172 - Base Bid: RIPRAP, RUBBLE, FURNISH AND INSTALL, DITCH LINING Base Bid 5 ton City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty5 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 530-3-4 Item Lot Description Quantity Unit Price Delivery Location 5/7/2021 9:40 AM 12504-613-01-173 - Base Bid: STANDARD 6 FOOT CHAIN LINK FENCE (FDOT PAY ITEM NUMBER NOT APPLICABLE) Base Bid 2000 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 p. 51 City of Fort Lauderdale Bid 12504-613 Description See description for Fencing and Gates in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-174 - Base Bid: STANDARD 6 FOOT CHAIN LINK FENCE GATE OPENING, SINGLE, 0-60 (FDOT PAY ITEM NUM Base Bid 10 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See description for Fencing and Gates in the specifications section Item 12504-613-01-175 - Base Bid: STANDARD 6 FOOT WOOD PANEL PRESSURE -TREATED FENCE (FDOT PAY ITEM NUMBER NOT AP Lot Description Base Bid Quantity 1000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See description for Fencing and Gates in the specifications section Item 12504-613-01-176 - Base Bid: STANDARD 6 FOOT WOOD PANEL PRESSURE -TREATED FENCE GATE OPENING, SINGLE, 0-60 (FD Lot Description Base Bid Quantity 5 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See description for Fencing and Gates in the specifications section Item 12504-613-01-177 - Base Bid: STANDARD 6 FOOT VINYL FENCE (FDOT PAY ITEM NUMBER NOT APPLICABLE) Lot Description Base Bid Quantity 500 linear foot Unit Price 5/7/2021 9:40 AM p. 52 City of Fort Lauderdale Bid 12504-613 Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See description for Fencing and Gates in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-178 - Base Bid: STANDARD 6 FOOT VINYL FENCE GATE OPENING, SINGLE, 0-6, (FDOT PAY ITEM NUMBER N Base Bid 5 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See description for Fencing and Gates in the specifications section Item 12504-613-01-179 - Base Bid: FDOT PAY ITEM NO 550-60-211: FENCE GATE, TYPE B, SINGLE, 0-6.0 FEET OPENING Lot Description Base Bid Quantity 5 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 550-60-211 Item 12504-613-01-180 - Base Bid: FDOT PAY ITEM NO 550-60-212, 550-60-213, OR 550-60-214: FENCE GATE, TYPE B, SI Lot Description Base Bid Quantity 2 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 550-60-212, 550-60-213, OR 550-60-214 5/7/2021 9:40 AM p. 53 City of Fort Lauderdale Bid 12504-613 Item 12504-613-01-181 - Base Bid: ADDITIONAL LABORER (FDOT PAY ITEM NUMBER NOT APPLICABLE) Lot Description Base Bid Quantity 5000 hourly rate Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5000 Description See description for Miscellaneous Hourly Rates in the specifications section Item 12504-613-01-182 - Base Bid: MASTER ELECTRICIAN (FDOT PAY ITEM NUMBER NOT APPLICABLE) Lot Description Base Bid Quantity 100 hourly rate Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Miscellaneous Hourly Rates in the specifications section Item 12504-613-01-183 - Base Bid: DIVER (REGULAR TIME) (FDOT PAY ITEM NUMBER NOT APPLICABLE) Lot Description Base Bid Quantity 50 hourly rate Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Miscellaneous Hourly Rates in the specifications section Item 12504-613-01-184 - Base Bid: QUALIFIED CONSTRUCTION TRAINING QUALIFICATION PROGRAM (CTQP) ASPHALT PAVING LEVE Lot Description Base Bid Quantity 50 hourly rate Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications 5/7/2021 9:40 AM p. 54 City of Fort Lauderdale Bid 12504-613 Fort Lauderdale FL 33301 Qty 50 Description See description for Miscellaneous Hourly Rates in the specifications section Item 12504-613-01-185 - Base Bid: SERVICE TRUCK & OPERATOR, PERSONNEL LIFT TO 35 FT HIGH ACCESS, 4 HR MINIMUM CHAR Lot Description Base Bid Quantity 100 hourly rate Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Miscellaneous Hourly Rates in the specifications section Item 12504-613-01-186 - Base Bid: BUCKET TRUCK & OPERATOR, 50 FT REACH, 4 HR MINIMUM CHARGE (FDOT PAY ITEM NUMBE Lot Description Base Bid Quantity 100 hourly rate Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Miscellaneous Hourly Rates in the specifications section Item 12504-613-01-187 - Base Bid: D3 OR D5 DOZER & OPERATOR (FDOT PAY ITEM NUMBER NOT APPLICABLE) Lot Description Base Bid Quantity 100 hourly rate Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Miscellaneous Hourly Rates in the specifications section Item 12504-613-01-188 - Base Bid: CRANE & OPERATOR, INSTALLATIONS LESS THAN 85 FT HIGH AND 22 TON, 4 HR MINIMUM CH Lot Description Base Bid 5/7/2021 9:40 AM p. 55 City of Fort Lauderdale Bid 12504-613 Quantity Unit Price Delivery Location 100 hourly rate City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Miscellaneous Hourly Rates in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-189 - Base Bid: VAC TRUCK, 3 -PERSON CREW, 4 HR MINIMUM CHARGE (FDOT PAY ITEM NUMBER NOT APPLIC Base Bid 100 hourly rate City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Miscellaneous Hourly Rates in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-190 - Base Bid: SKID STEER LOADER & OPERATOR, 1,850 LB MINIMUM, 4 HR MINIMUM CHARGE (FDOT PAY IT Base Bid 100 hourly rate City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Miscellaneous Hourly Rates in the specifications section Item Lot Description Quantity Unit Price Delivery Location Description 5/7/2021 9:40 AM 12504-613-01-191 - Base Bid: BOAT/WATER CRAFT WITH MOTOR, 30 FT LENGTH MAXIMUM, 4 HR MINIMUM CHARGE (FDOT PAY Base Bid 100 hourly rate City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 p. 56 City of Fort Lauderdale Bid 12504-613 See description for Miscellaneous Hourly Rates in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-192 - Base Bid: DUMP TRUCK & OPERATOR, SINGLE -AXLE, 5 cubic yard MINIMUM CAPACITY, 4 HR MINIMUM Base Bid 100 hourly rate City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Miscellaneous Hourly Rates in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-193 - Base Bid: ROOT PRUNING/TREE TRIMMING CREW, 3 -PERSON CREW (FDOT PAY ITEM NUMBER NOT APPLI Base Bid 24 hourly rate City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 24 Description See description for Miscellaneous Hourly Rates in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-194- Base Bid: CERTIFIED ARBORIST (FDOT PAY ITEM NUMBER NOT APPLICABLE) Base Bid 10 hourly rate City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See description for Miscellaneous Hourly Rates in the specifications section Item Lot Description Quantity Unit Price Delivery Location 5/7/2021 9:40 AM 12504-613-01-195 - Base Bid: SINGLE POST SIGN, INSTALL Base Bid 50 each City of Fort Lauderdale p. 57 City of Fort Lauderdale Bid 12504-613 See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 700-1-40 Item 12504-613-01-196 - Base Bid: SINGLE POST SIGN, RELOCATE Lot Description Base Bid Quantity 50 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 700-1-50 Item 1250413-01-197 - Base Bid: FIRE HYDRANT, ADJUST AND MODIFY Lot Description Base Bid Quantity 10 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 1644-700 Item 12504-613-01-198 - Base Bid: FIRE HYDRANT, RELOCATE Lot Description Base Bid Quantity 10 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 1644-800 Item 12504-613-01-199 - Base Bid: POLLUTION RETARDANT BAFFLE WITH 10 INCHES CLEANOUT ACCESS TO COVER 12 -INCH -15 I Lot Description Base Bid 5/7/2021 9:40 AM p. 58 City of Fort Lauderdale Bid 12504-613 Quantity Unit Price Delivery Location 50 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Pollution Retardant Baffle with Cleanout Access in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-200 - Base Bid: POLLUTION RETARDANT BAFFLE WITH 12 INCHES CLEANOUT ACCESS TO COVER 12 -INCH -15 I Base Bid 100 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Pollution Retardant Baffle with Cleanout Access in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-201 - Base Bid: POLLUTION RETARDANT BAFFLE WITH 12 INCHES CLEANOUT ACCESS TO COVER 18 -INCH -241 Base Bid 100 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Pollution Retardant Baffle with Cleanout Access in the specifications section Item Lot Description Quantity Unit Price Delivery Location Description 1250413-01-202 - Base Bid: FURNISH AND INSTALL 10 INCHES INLINE WASTOP CHECK VALVES WITH ALL FITTINGS OR A Base Bid 50 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 5/7/2021 9:40 AM p. 59 City of Fort Lauderdale Bid 12504-613 See description for Inline Tidal Check Valve: WAPRO or Approved Equal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-203 - Base Bid: FURNISH AND INSTALL 12 INCHES INLINE WASTOP CHECK VALVES WITH ALL FITTINGS OR A Base Bid 50 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Inline Tidal Check Valve: WAPRO or Approved Equal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-204- Base Bid: FURNISH AND INSTALL 15 INCHES INLINE WASTOP CHECK VALVES WITH ALL FITTINGS ORA Base Bid 50 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Inline Tidal Check Valve: WAPRO or Approved Equal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-205 - Base Bid: FURNISH AND INSTALL 18 INCHES INLINE WASTOP CHECK VALVES WITH ALL FITTINGS OR A Base Bid 50 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Inline Tidal Check Valve: WAPRO or Approved Equal in the specifications section Item Lot Description Quantity Unit Price 12504-613-01-206 - Base Bid: FURNISH AND INSTALL 24 INCHES INLINE WASTOP CHECK VALVES WITH ALL FITTINGS OR A Base Bid 25 each 5/7/2021 9:40 AM p. 60 City of Fort Lauderdale Bid 12504-613 Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 25 Description See description for Inline Tidal Check Valve: WAPRO or Approved Equal in the specifications section Item 12504613-01-207 - Base Bid: FURNISH AND INSTALL 30 INCHES INLINE WASTOP CHECK VALVES WITH ALL FITTINGS OR A Lot Description Base Bid Quantity 25 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 25 Description See description for Inline Tidal Check Valve: WAPRO or Approved Equal in the specifications section Item 12504-613-01-208 - Base Bid: FURNISH AND INSTALL 36 INCHES INLINE WASTOP CHECK VALVES WITH ALL FITTINGS OR A Lot Description Base Bid Quantity 20 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 20 Description See description for Inline Tidal Check Valve: WAPRO or Approved Equal in the specifications section Item 12504-613-01-209 - Base Bid: FURNISH AND INSTALL 42 INCHES INLINE WASTOP CHECK VALVES WITH ALL FITTINGS OR A Lot Description Base Bid Quantity 10 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See description for Inline Tidal Check Valve: WAPRO or Approved Equal in the specifications section 5/7/2021 9:40 AM p. 61 City of Fort Lauderdale Bid 12504-613 Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-210 - Base Bid: FURNISH AND INSTALL 48 INCHES INLINE WASTOP CHECK VALVES WITH ALL FITTINGS OR A Base Bid 10 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See description for Inline Tidal Check Valve: WAPRO or Approved Equal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-211 - Base Bid: FURNISH AND INSTALL 54 INCHES INLINE WASTOP CHECK VALVES WITH ALL FITTINGS OR A Base Bid 10 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See description for Inline Tidal Check Valve: WAPRO or Approved Equal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-212 - Base Bid: FURNISH AND INSTALL 60 INCHES INLINE WASTOP CHECK VALVES WITH ALL FITTINGS OR A Base Bid 10 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See description for Inline Tidal Check Valve: WAPRO or Approved Equal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 5/7/2021 9:40 AM 12504-613-01-213 - Base Bid: FURNISH AND INSTALL ALUMINUM MANATEE GRATE PER FDOT INDEX NO 230 WITH ALL FITTI Base Bid 20 each City of Fort Lauderdale See ITB Specifications p. 62 City of Fort Lauderdale Bid 12504-613 See ITB Specifications Fort Lauderdale FL 33301 Qty 20 Description See description for Aluminum Manatee Grate in the specifications section Item 12504613-01-214 - Base Bid: FURNISH AND INSTALL ALUMINUM MANATEE GRATE PER FDOT INDEX NO 230 WITH ALL FITTI Lot Description Base Bid Quantity 10 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See description for Aluminum Manatee Grate in the specifications section Item 12504-613-01-215 - Base Bid: FURNISH AND INSTALL ALUMINUM MANATEE GRATE PER FDOT INDEX NO 230 WITH ALL FITTI Lot Description Base Bid Quantity 5 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See description for Aluminum Manatee Grate in the specifications section Item 12504-613-01-216 - Base Bid: FURNISH AND INSTALL ALUMINUM MANATEE GRATE PER FDOT INDEX NO 230 WITH ALL FITTI Lot Description Base Bid Quantity 5 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See description for Aluminum Manatee Grate in the specifications section Item 12504-613-01-217 - Base Bid: FURNISH AND INSTALL ALUMINUM MANATEE GRATE PER FDOT INDEX NO p. 63 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 230 WITH ALL FITTI Lot Description Base Bid Quantity 5 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty5 Description See description for Aluminum Manatee Grate in the specifications section Item 12504-613-01-218 - Base Bid: FURNISH AND INSTALL 8 TO 15 INCH DRAINAGE OUTFALLS BY CORE DRILLING EXISTING SEA Lot Description Base Bid Quantity 40 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 40 Description See description for Core Drill Existing Seawall Outfalls in the specifications section Item 12504-613-01-219 - Base Bid: FURNISH AND INSTALL 18 TO 24 INCH DRAINAGE OUTFALLS BY CORE DRILLING EXISTING SE Lot Description Base Bid Quantity 25 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 25 Description See description for Core Drill Existing Seawall Outfalls in the specifications section Item 12504-613-01-220 - Base Bid: FURNISH AND INSTALL 30 TO 36 INCH DRAINAGE OUTFALLS BY CORE DRILLING EXISTING SE Lot Description Base Bid Quantity 5 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications 5/7/2021 9:40 AM p. 64 Bid 12504-613 City of Fort Lauderdale Fort Lauderdale FL 33301 Qty 5 Description See description for Core Drill Existing Seawall Outfalls in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-221 - Base Bid: FURNISH AND INSTALL 42 TO 48 INCH DRAINAGE OUTFALLS BY CORE DRILLING EXISTING SE Base Bid 5 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See description for Core Drill Existing Seawall Outfalls in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-222 - Base Bid: FURNISH AND INSTALL 54 TO 60 INCH DRAINAGE OUTFALLS BY CORE DRILLING EXISTING SE Base Bid 3 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 3 Description See description for Core Drill Existing Seawall Outfalls in the specifications section 12504-613-01-223 - Base Bid: FURNISH AND INSTALL 61 INCH AND ABOVE DRAINAGE OUTFALLS BY CORE DRILLING EXISTIN Base Bid 3 each Item Lot Description Quantity Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 3 Description See description for Core Drill Existing Seawall Outfalls in the specifications section Item 12504-613-01-224 - Base Bid: FURNISH AND INSTALL PIPE BURSTING FOR PIPES 8 INCHES AND UNDER (FDOT PAY ITEM p. 65 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 Lot Description Quantity Unit Price Delivery Location Base Bid 50 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Pipe Bursting in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-225 - Base Bid: FURNISH AND INSTALL PIPE BURSTING FOR 10 INCHES PIPES (FDOT PAY ITEM NUMBER NO Base Bid 500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See description for Pipe Bursting in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-226 - Base Bid: FURNISH AND INSTALL PIPE BURSTING FOR 12 INCHES PIPES (FDOT PAY ITEM NUMBER NO Base Bid 1000 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See description for Pipe Bursting in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-227 - Base Bid: FURNISH AND INSTALL PIPE BURSTING FOR 15 INCHES PIPES (FDOT PAY ITEM NUMBER NO Base Bid 1500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1500 5/7/2021 9:40 AM p. 66 City of Fort Lauderdale Bid 12504-613 Description See description for Pipe Bursting in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-228 - Base Bid: FURNISH AND INSTALL PIPE BURSTING FOR 18 INCHES PIPES (FDOT PAY ITEM NUMBER NO Base Bid 500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See description for Pipe Bursting in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-229 - Base Bid: FURNISH AND INSTALL PIPE BURSTING FOR 24 INCHES PIPES (FDOT PAY ITEM NUMBER NO Base Bid 300 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 300 Description See description for Pipe Bursting in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-230 - Base Bid: FURNISH AND INSTALL PIPE BURSTING FOR 30 INCHES PIPES (FDOT PAY ITEM NUMBER NO Base Bid 200 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 200 Description See description for Pipe Bursting in the specifications section Item Lot Description Quantity Unit Price 12504-613-01-231 - Base Bid: DIRECTIONAL BORE, 10 INCHES OR LESS Base Bid 500 linear foot 5/7/2021 9:40 AM p. 67 City of Fort Lauderdale Bid 12504-613 Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See description for Directional Bore in the specifications section Item 12504-613-01-232 - Base Bid: DIRECTIONAL BORE, 12 INCHES Lot Description Base Bid Quantity 500 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-185-112 Item 12504-613-01-233 - Base Bid: DIRECTIONAL BORE, 15 INCHES Lot Description Base Bid Quantity 1500 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1500 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-185-115 Item 12504-613-01-234- Base Bid: DIRECTIONAL BORE, 18 INCHES Lot Description Base Bid Quantity 1000 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 1000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-185-118 Item Lot Description 5/7/2021 9:40 AM 12504-613-01-235 - Base Bid: DIRECTIONAL BORE, 24 INCHES Base Bid p. 68 City of Fort Lauderdale Bid 12504-613 Quantity 100 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-185-124 Item 12504-613-01-236 - Base Bid: DIRECTIONAL BORE, 30 INCHES Lot Description Base Bid Quantity 100 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-185-130 Item 12504-613-01-237 - Base Bid: DIRECTIONAL BORE, 36 INCHES Lot Description Base Bid Quantity 100 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-185-136 Item 12504-613-01-238 - Base Bid: DIRECTIONAL BORE, 42 INCHES Lot Description Base Bid Quantity 100 linear foot Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 430-185-142 5/7/2021 9:40 AM p. 69 City of Fort Lauderdale Bid 12504-613 Item 12504-613-01-239 - Base Bid: FERTILIZER 40 LB. BAG, FURNISH AND INSTALL (FDOT PAY ITEM NUMBER NOT APPLICABL Lot Description Quantity Unit Price Delivery Location Base Bid 5 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty5 Description See description for Fertilizer in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-240 - Base Bid: ROOT BARRIER, FURNISH AND INSTALL (FDOT PAY ITEM NUMBER NOT APPLICABLE) Base Bid 500 linear foot City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See description for Root Barrier in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-241 - Base Bid: TREE REMOVAL, 0-12 INCHES TRUNK DIAMETER AT BREAST HEIGHT (FDOT PAY ITEM NUMBE Base Bid 200 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 200 Description See description for Tree Removal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 5/7/2021 9:40 AM 12504-613-01-242 - Base Bid: TREE REMOVAL, 12.1-24 INCHES TRUNK DIAMETER AT BREAST HEIGHT (FDOT PAY ITEM NU Base Bid 100 each City of Fort Lauderdale See ITB Specifications See ITB Specifications p. 70 City of Fort Lauderdale Bid 12504-613 Fort Lauderdale FL 33301 Qty 100 Description See description for Tree Removal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-243 - Base Bid: TREE REMOVAL, 24.1-48 INCHES TRUNK DIAMETER AT BREAST HEIGHT (FDOT PAY ITEM NU Base Bid 50 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Tree Removal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-244 - Base Bid: TREE REMOVAL, 48.1-60 INCHES TRUNK DIAMETER AT BREAST HEIGHT (FDOT PAY ITEM NU Base Bid 5 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 Description See description for Tree Removal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-245 - Base Bid: TREE REMOVAL, GREATER THAN 60 INCHES TRUNK DIAMETER AT BREAST HEIGHT (FDOT PAY I Base Bid 2 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty2 Description See description for Tree Removal in the specifications section Item 12504-613-01-246 - Base Bid: STUMP GRINDING/REMOVAL, 0-24 INCHES TRUNK DIAMETER AT BREAST HEIGHT (FDOT PAY I 5/7/2021 9:40 AM p. 71 City of Fort Lauderdale Bid 12504-613 Lot Description Quantity Unit Price Delivery Location Base Bid 100 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 100 Description See description for Stump Grinding -Removal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-247 - Base Bid: STUMP GRINDING/REMOVAL, 24.1-48 INCHES TRUNK DIAMETER AT BREAST HEIGHT (FDOT PA Base Bid 50 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Stump Grinding -Removal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-248 - Base Bid: STUMP GRINDING/REMOVAL, 48.1-60 INCHES TRUNK DIAMETER AT BREAST HEIGHT (FDOT PA Base Bid 10 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 10 Description See description for Stump Grinding -Removal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-249 - Base Bid: STUMP GRINDING/REMOVAL, GREATER THAN 60 INCHES TRUNK DIAMETER AT BREAST HEIGHT Base Bid 5 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5 5/7/2021 9:40 AM p. 72 City of Fort Lauderdale Bid 12504-613 Description See description for Stump Grinding -Removal in the specifications section Item Lot Description Quantity Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 12504-613-01-250 - Base Bid: HEDGES AND SHRUBS REMOVAL (FDOT PAY ITEM NUMBER NOT APPLICABLE) Base Bid 2000 linear foot Description See description for Tree Removal in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-251 - Base Bid: BAHIA SOD (FDOT PAY ITEM NUMBER NOT APPLICABLE) Base Bid 200 square yard City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 200 Description See description for Sod in the specifications section Item 12504-613-01-252 - Base Bid: FDOT PAY ITEM NO 570-1-2: PERFORMANCE TURF, SOD (ST AUGUSTINE, CENTIPEDE, FLOR Lot Description Base Bid Quantity 5000 square yard Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 5000 Description See Florida Department of Transportation (FDOT) Basis of Estimates Manual for description: FDOT Pay Item NO 570-1-2 Item 12504-613-01-253 - Base Bid: FDOT PAY ITEM NO NA: SALT TOLERANT TURF, SOD (SEASHORE PASPALUM OR APPROVED EQ Lot Description Base Bid Quantity 2000 square yard Unit Price Delivery Location City of Fort Lauderdale 5/7/2021 9:40 AM p. 73 City of Fort Lauderdale Bid 12504-613 See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 2000 Description See description for Sod in the specifications section Item 12504613-01-254- Base Bid: HEDGE REPLACEMENT WITH COMMON NURSERY AVAILABLE PLANTINGS, 3 - GALLON CONTAINER (F Lot Description Base Bid Quantity 500 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See description for Hedge -Tree -Palm Replacement in the specifications section Item Lot Description Quantity Unit Price Delivery Location 12504-613-01-255 - Base Bid: HEDGE REPLACEMENT WITH COMMON NURSERY AVAILABLE PLANTINGS, 7 - GALLON CONTAINER (F Base Bid 500 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 500 Description See description for Hedge -Tree -Palm Replacement in the specifications section Item 12504-613-01-256 - Base Bid: COMMON PALM SPECIES (BISMARK, DATE, SILVER, CHRISTMAS, ROYAL, THATCH, CABBAGE AN Lot Description Base Bid Quantity 50 each Unit Price Delivery Location City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Hedge -Tree -Palm Replacement in the specifications section 5/7/2021 9:40 AM p 74 City of Fort Lauderdale Bid 12504-613 Item 12504-613-01-257 - Base Bid: COMMON TREE SPECIES (LIVE OAK, WILD TAMARIND, GREEN OR SILVER BUTTONWOOD, BALD 0 Lot Description Quantity Unit Price Delivery Location Base Bid 50 each City of Fort Lauderdale See ITB Specifications See ITB Specifications Fort Lauderdale FL 33301 Qty 50 Description See description for Hedge -Tree -Palm Replacement in the specifications section 5/7/2021 9:40 AM p. 75 City of Fort Lauderdale Bid 12504-613 CITY OF FORT LAUDERDALE CONTRACT AND SPECIFICATIONS PACKAGE BID NO. 12504-613 PROJECT NO. 12220 ANNUAL CONSTRUCTION OF GENERAL STORMWATER INFRASTRUCTURE RARES V. PETRICA SENIOR PROJECT MANAGER MAUREEN LEWIS, MBA, CPPB SENIOR PROCUREMENT SPECIALIST Telephone: (954) 828-5239 E-mail: maureenlAfortlauderdale.gov 5/7/2021 9:40 AM p. 76 City of Fort Lauderdale Bid 12504-613 TABLE OF CONTENTS Description Pages I. BID INFORMATION Invitation to Bid ITB-1 thru ITB-3 Instruction to Bidders IB-1 thru IB-7 General Conditions GC -1 thru GC -11 Special Conditions SC -1 thru SC -8 II. CONSTRUCTION AGREEMENT (SAMPLE) C-1 thru C-38 III. DETAILED SPECIFICATIONS 16 Note: The following documents are available electronically for completion and must be returned with your bid along with your bid security, proof of insurance, and proof of required licenses/certifications. CITB Prime Contractor Identification CITB Questionnaire Sheet CITB Trench Safety Non -Collusion Statement Non -Discrimination Certification Form Contract Payment Method Construction Bid Certification Page 5/7/2021 9:40 AM p. 77 City of Fort Lauderdale Bid 12504-613 INVITATION TO BID Sealed bids will be received electronically until 2:00 p.m., local time, on THURSDAY, APRIL 8s 2021, and opened online immediately thereafter for BID NO.,12504-613, PROJECT NO., 12220, ANNUAL CONSTRUCTION OF GENERAL STORMWATER INFRASTRUCTURE. All openings will be held on the BIDSYNC.COM platform. Once the Procurement Specialist opens the solicitation, the bid tabulations may be viewed immediately on a computer, laptop, cell phone, or any other device with WiFi access. The opening may also be viewed in real time through a "Zoom meeting" or similar type platform by using the following information: Join Zoom Meeting Phone one -tap:: US: +16692545252„1610225445#„1#,277413# or +16468287666„1610225445#„1#,277413# Meeting URL https://fortlauderdalezoomgov.com,j/1610225445?pwd=cm14emU5Mm5nSkvgQXUrY3VnR1FgZz09 Meeting ID: 161 022 5445 Password: 277413 Join by Telephone For higher quality, dial a number based on your current location. Dial: US +1 669 254 5252 or +1 646 828 7666 or +1 669 216 1590 or +1 551 285 1373 Meeting ID:161 022 5445 Password:277413 Anyone requesting assistance or having further inquiry in this matter must contact the Procurement Specialist indicated on the solicitation, via the question and Answer forum on Bidsync.com before the Last Day for Questions indicated in the Solicitation. This Project is located throughout the City of Fort Lauderdale. The work to be accomplished under this contract includes, but is not limited to, the construction and installation of various storm water infrastructure consisting of: catch basins, storm water manholes, piping, exfiltration trenches, tidal valves, swales regrades, retention area, pipe lining, pervious pavements and repair of the aforementioned. In addition to the storm water infrastructure, the contract covers restoration activated and miscellaneous utility relocations needed to execute these projects. This includes, but not limited to, landscape/hardscape removal and reinstall, pavers/pavement/asphalt removal and reinstall, relocation of various utility pipes and boxes, use of equipment for specialized work, maintenance of traffic, dewatering activities and pollution prevention items. NOTE: Payment on this contract will be made by Visa or MasterCard. Drawing Plans: There are no drawing plans for this Project. Licensing Requirements: Possession of Underground contractor's licenses is required for this Project. 5/7/2021 9:40 AM p 78 City of Fort Lauderdale Bid 12504-613 Pre -Bid Meeting/Site visit: There will not be a pre -bid meeting or site visit for this Invitation to Bid. However, it will be the sole responsibility of the bidder to inspect the City's locations and become familiar with the scope of the City's requirements and systems prior to submitting a proposal. No variation in price or conditions shall be permitted based upon a claim of ignorance. Submission of a proposal will be considered evidence that the proposer has familiarized himself with the nature and extent of the work, equipment, materials, and labor required. Bid Security: A certified check, cashier's check, bank officer's check or bid bond for TEN percent (10%) of the bid amount, made payable to the City of Fort Lauderdale, Florida, shall accompany each offer. Bid Bonds: Bidders can submit bid bonds for projects four different ways. 1) BidSync allows bidders to submit bid bonds electronically directly through their system using Surety 2000. For more information on this feature and to access it, contact BIDSYNC customer care department. 2) Bidders may upload their original executed bid bond on BIDSYNC to accompany their bids with the electronic proposal, and deliver the original, signed and sealed hard copy within five (5) business days after bid opening, with the company name, bid number and title clearly indicated. 3) Bidders can hand deliver their bid bond in a sealed envelope to the Finance Department, Procurement Services Division, 100 North Andrews Avenue, Room 619, Fort Lauderdale, Florida 33301-1016, before time of bid opening, with the company name, bid number and title clearly indicated on the envelope. 4) Bidders can mail their bid bond to the Finance Department, Procurement Services Division, 100 North Andrews Avenue, Room 619, Fort Lauderdale, Florida 33301-1016, before time of bid opening, with the company name, bid number and title clearly indicated on the envelope. NOTE: Bond must be received in Procurement and time stamped before bid opening. It will be the sole responsibility of the bidder to ensure that his bid is submitted prior to the bid opening date and time listed. PAPER BID SUBMITTALS WILL NOT BE ACCEPTED. BIDS MUST BE SUBMITTED ELECTRONICALLY VIA BIDSYNC.COM Certified Checks, Cashier's Checks and Bank Drafts: These CANNOT be submitted via BIDSYNC, nor are their images allowed to be uploaded and submitted with your electronic bid. These forms of securities, as well as hard copy bid bonds, must be received on or before the Invitation to Bid (ITB) opening date and time, at the Finance Department, Procurement Services Division, 100 North Andrews Avenue, Room 619, Fort Lauderdale, Florida 33301-1016, with the bid number and title clearly indicated on the envelope. 5/7/2021 9:40 AM p. 79 City of Fort Lauderdale Bid 12504-613 It is the bidder's sole responsibility to ensure that his bid bond or other bid security is received by the Procurement Services Division before time of bid opening. Failure to adhere to this requirement may be grounds to consider the bid as non -responsive. The City of Fort Lauderdale reserves the right to waive any informality in any or all bids and to reject any or all bids. For information concerning technical specifications, please utilize the Question/Answer platform provided by BIDSYNC at www.bidsvnc.com. Questions of a material nature must be received prior to the cut-off date specified in the solicitation. Material changes, if any, to the scope of services or bidding procedures, will only be transmitted by written addendum. (See addendum section of BIDSYNC Site). Bidders please note: No part of your bid can be submitted via FAX. No variation in price or conditions shall be permitted based upon a claim of ignorance. Submission of a bid will be considered evidence that the bidder has familiarized himself with the nature and extent of the work, equipment, materials, and labor required. The entire bid response must be submitted in accordance with all specifications contained in this solicitation. Information on bid results and projects currently out to bid can be obtained on the City's website — http://www.fortlauderdale.gov/departments/finance/procurement-services. For general inquiries, please call (954) 828-5933. 5/7/2021 9:40 AM P 80 City of Fort Lauderdale Bid 12504-613 INSTRUCTIONS TO BIDDERS The following instructions are given for the purpose of guiding bidders in properly preparing their bids or proposals. These directions have equal force and weight with the specifications and strict compliance is required with all of these provisions. QUALIFICATIONS OF BIDDERS — No proposal will be accepted from, nor will any contract be awarded to, any person who is in arrears to the City of Fort Lauderdale, upon any debt or contract, or who has defaulted, as surety or otherwise, upon any obligation to the City, or who is deemed irresponsible or unreliable by the City Commission of Fort Lauderdale. CONCERNING SUB -CONTRACTORS, SUPPLIERS, AND OTHERS - The amount of work that is sublet by the Bidder shall be limited by the condition that the Bidder shall, with his own organization, perform at least forty percent (40%) of the total dollar amount of the Work to be performed under the Agreement. PERSONAL INVESTIGATION - Bidders shall satisfy themselves by personal investigation, and by such other means as they may think necessary or desirable, as to the conditions affecting the proposed work and the cost. No information derived from maps, plans, specifications, or from the Engineer, City Manager, or their assistants shall relieve the Contractor from any risk or from fulfilling all terms of the contract. INCONSISTENCIES — Any seeming inconsistency between different provisions of the plans, specifications, proposal or contract, or any point requiring explanation must be inquired into by the bidder, in writing, at least ten (10) days prior to the time set for opening proposals. After proposals are opened, the bidders shall abide by the decision of the Engineer as to such interpretation. ADDENDA AND INTERPRETATIONS - No interpretations of the meaning of the plans, specifications or other contract documents will be made orally to any bidder. Prospective bidders must request such interpretation in writing as instructed in the bid package. To be considered, such request must be received by the Questions and Answers deadline as indicated in BIDSYNC.COM. Material changes, if any, to the scope of services or bidding procedures will only be transmitted by written addendum. It is the bidder's responsibility to verify if addenda have been issued in BIDSYNC.COM. Failure of any bidder to receive any such addenda or interpretation shall not relieve any bidder from any obligation under his bid as submitted. All addenda so issued shall become a part of the contract document. Bidder shall verify in BIDSYNC.COM that he has all addenda before submitting a bid. LEGAL CONDITIONS - Bidders are notified to familiarize themselves with the provisions of the laws of the State of Florida relating to hours of labor on municipal work, and with the provisions of the laws of the State of Florida and the Charter and the ordinances of the City of Fort Lauderdale. PUBLIC ENTITY CRIMES - A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a Contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, Florida Statutes, for Category Two for a period of thirty-six (36) months from the date of being placed on the convicted vendor list. 5/7/2021 9:40 AM p. 81 City of Fort Lauderdale Bid 12504-613 FORMS OF PROPOSALS - Each proposal and its accompanying statements must be made on the blanks provided. THE FORMS MUST BE SUBMITTED ELECTRONICALLY, IN GOOD ORDER WITH ALL BLANKS COMPLETED, and must show the name of the bidder and a statement as to its contents. The proposal must be signed by one duly authorized to do so, and in case signed by a deputy or subordinate, the principal's properly written authority to such deputy or subordinate must accompany the proposal. No proposal will be accepted, for any reason whatsoever, which is not submitted to the City as stated above, within the specified time. INSURANCE - Contractor shall provide and shall require all of its sub -contractors to provide, pay for, and maintain in force at all times during the term of the Agreement, such insurance, including Property Insurance (Builder's Risk), Commercial General Liability Insurance, Business Automobile Liability Insurance, Workers' Compensation Insurance, Employer's Liability Insurance, and Umbrella/Excess Liability, as stated below. Such policy or policies shall be issued by companies authorized to do business in the State of Florida and having agents upon whom service of process may be made in the State of Florida. BID BOND - A certified check, cashier's check or bank officer's check, for the sum set forth in the advertisement, made payable to the City of Fort Lauderdale, or bid bond in such amount, shall accompany each proposal as evidence of the good faith and responsibility of the bidder. The check or bond shall be retained by the City as liquidated damages should the bidder refuse to, or fail to enter into, a contract for the execution of the work embraced in this proposal, in the event the proposal of the bidder is accepted. Retention of such amount shall not be construed as a penalty or forfeiture. The above bond or check shall be a guarantee that the bidder will, if necessary, promptly execute a satisfactory contract and furnish good and sufficient bonds. As soon as a satisfactory contract has been executed and the bonds furnished and accepted, the check or bond accompanying the proposal of the successful bidder will be returned to him. The certified or other checks or bid bonds of the unsuccessful bidders will be returned to them upon the acceptance of the bid of the successful bidder. If the successful bidder shall not enter into, execute, and deliver such a contract and furnish the required bonds within ten (10) days after receiving notice to do so, the certified or other check or bid bond shall immediately become the property of the City of Fort Lauderdale as liquidated damages. Retention of such amount shall not be construed as a penalty or forfeiture. FILLING IN BIDS - All prices must be electronically submitted in the proposal pages, and all proposals must fully cover all items for which proposals are asked and no other. Bidders are required to state the names and places of residence of all persons interested, and if no other person is interested, the bidder shall distinctly state such fact and shall state that the proposal is, in all respects, fair and without collusion or fraud. Where more than one person is interested, it is required that all persons interested or their legal representative make all verification and subscribe to the proposal. PRICES QUOTED: Deduct any discount offered and quote firm net unit prices. In the case of a discrepancy in computing the amount of the bid, the unit price quoted will govern. All prices quoted shall be F.O.B. destination, freight prepaid (Bidder pays and bears freight charges, Bidder owns goods in transit and files any claims), unless otherwise stated in Special Conditions. Each item must be bid separately. No attempt shall be made to tie any item or items contained in the ITB with any other business with the City. 5/7/2021 9:40 AM p. 82 City of Fort Lauderdale Bid 12504-613 BIDS FIRM FOR ACCEPTANCE: Bidder warrants, by virtue of bidding, that his bid and the prices quoted in his bid will be firm for acceptance by the City for a period of one hundred and twenty (120) days from the date of bid opening unless otherwise stated in the ITB. The City shall award contract within this time period or shall request to the recommended awarded vendor an extension to hold pricing, until products/services have been awarded. ADDITIONAL ITEMS OR SERVICES: The City may require additional items or services of a similar nature, but not specifically listed in the contract. The Contractor agrees to provide such items or services, and shall provide the City prices on such additional items or services. If the price(s) offered are not acceptable to the City, and the situation cannot be resolved to the satisfaction of the City, the City reserves the right to procure those items or services from other vendors, or to cancel the contract upon giving the Contractor thirty (30) days written notice. DELETION OR MODIFICATION OF SERVICES: The City reserves the right to delete any portion of the Contract at any time without cause, and if such right is exercised by the City, the total fee shall be reduced in the same ratio as the estimated cost of the work deleted bears to the estimated cost of the work originally planned. If work has already been accomplished on the portion of the Contract to be deleted, the Contractor shall be paid for the deleted portion on the basis of the estimated percentage of completion of such portion. If the Contractor and the City agree on modifications or revisions to the task elements, after the City has approved work to begin on a particular task or project, and a budget has been established for that task or project, the Contractor will submit a revised budget to the City for approval prior to proceeding with the work. CANCELLATION FOR UNAPPROPRIATED FUNDS: The obligation of the City for payment to a Contractor is limited to the availability of funds appropriated in a current fiscal period, and continuation of the contract into a subsequent fiscal period is subject to appropriation of funds, unless otherwise authorized by law. CAUSES FOR REJECTION - No proposal will be canvassed, considered or accepted which, in the opinion of the City Commission, is informal or unbalanced, or contains inadequate or unreasonable prices for any items; each item must carry its own proportion of the cost as nearly as is practicable. Any alteration, erasure, interlineation, or failure to specify bids for all items called for in the schedule shall render the proposal informal. REJECTION OF BIDS - The City reserves the right to reject any bid if the evidence submitted by the bidder, or if the investigation of such bidder, fails to satisfy the City that such bidder is properly qualified to carry out the obligations and to complete the work contemplated. Any or all proposals will be rejected, if there is reason to believe that collusion exists among bidders. A proposal will be considered irregular and may be rejected, if it shows serious omissions, alterations in form, additions not called for, conditions or unauthorized alternates, or irregularities of any kind. The City reserves the right to reject any or all proposals and to waive such technical errors as may be deemed best for the interests of the City. BID PROTEST PROCEDURE: Any proposer or bidder who is not recommended for award of a contract and who alleges a failure by the City to follow the City's procurement ordinance or any applicable law may protest to the Procurement Division — Deputy Director of Finance, by delivering a letter of protest within five (5) days after a Notice of Intent to award is posted on the City's website at the following link: http://www.fortlauderdale.gov/departments/finance/procurement-services/notices-of- intent-to-award. 5/7/2021 9:40 AM p. 83 City of Fort Lauderdale Bid 12504-613 The complete protest ordinance may be found on the City's website at the following link: https://library.municode.com/fl/fort lauderdale/codes/code of ordinances?nodeld=COOR CH2AD A RTVFI DIV2PR S2-182DIREPRAWINAW WITHDRAWALS - Any bidder may, without prejudice to himself, withdraw his proposal at any time prior to the expiration of the time during which proposals may be submitted. Such request for withdrawal must be in writing and signed in the same manner and by the same person who signed the proposal. After expiration of the period for receiving proposals, no proposal can be withdrawn, modified, or explained. CONTRACT - The bidder to whom award is made shall execute a written contract to do the work and maintain the same in good repair until final acceptance by the proper authorities, and shall furnish good and sufficient bonds as specified within ten (10) days after receiving such contract for execution. If the bidder to whom the first award is made fails to enter into a contract as provided, the award may be annulled and the contract let to the next lowest bidder who is reliable, responsible, and responsive in the opinion of the City Commission, and that bidder shall fulfill every stipulation and obligation as if such bidder were the original party to whom award was made. The contract shall provide that the Contractor agrees to correct any defective or faulty work or material, which may appear within one (1) year after completion of the work and receipt of final payment. ENFORCEMENT OF SPECIFICATIONS - Copies of the specifications will be placed in the hands of all the assistants to the Engineer and Inspectors employed on the work, who shall enforce each and every requirement of the contract. Such assistants shall have no authority to vary from such requirements. COPIES OF DRAWING PLANS - There are no drawing plans for this Project. SURETY BOND — The Contractor shall execute and record in the public records of Broward County, Florida, a payment and performance bond in an amount at least equal to the Contract Price with a surety insurer authorized to do business in the State of Florida as surety, ("Bond"), in accordance with Section 255.05, Florida Statutes (2020), as may be amended or revised, as security for the faithful performance and payment of all of the Contractor's obligations under the Contract Documents. The successful bidder shall furnish a performance and payment bond in compliance with Section 255.05, Florida Statutes (2020), written by a Corporate Surety company, holding a Certificate of Authority from the Secretary of the Treasury of the United States as acceptable sureties on federal bonds, in an amount equal to the total amount payable by the terms of the contract, executed and issued by a Resident Agent licensed by and having an office in the State of Florida, representing such Corporate Surety, conditioned for the due and faithful performance of the work, and providing in addition to all other conditions, that if the Contractor, or his or its subcontractors, fail to duly pay for any labor, materials, or other supplies used or consumed by such Contractor, or his or its subcontractor or subcontractors, in performance of the work contracted to be done, the Surety will pay the same in the amount not exceeding the sum provided in such bonds, together with interest at the rate of fifteen percent (15%) per annum, and that they shall indemnify and save harmless the City of Fort Lauderdale to the extent of any and all payments in connection with carrying out of the contract, which the City may be required to make under the law. 5/7/2021 9:40 AM p. 84 City of Fort Lauderdale Bid 12504-613 The Contractor is required at all times to have a valid surety bond in force covering the work being performed. A failure to have such bond in force at any time shall constitute a default on the part of the Contractor. A bond written by a surety, which becomes disqualified to do business in the State of Florida, shall automatically constitute a failure on the part of the Contractor to meet the above requirements. Such bond shall continue in effect for one (1) year after completion and acceptance of the work with liability equal to at least twenty-five percent (25%) of contract price, or an additional bond shall be conditioned that the Contractor will correct any defective or faulty work or material which appear within one (1) year after completion of the contract, upon notification by the City, except in contracts which are concerned solely with demolition work, in which cases twenty-five percent (25%) liability will not be applicable. AUDIT OF CONTRACTOR'S RECORDS - Upon execution of the Contract, the City reserves the right to conduct any necessary audit of the Contractor's records. Such an audit, or audits, may be conducted by the City or its representatives at any time prior to final payment, or thereafter, for a period up to three (3) years. The City may also require submittal of the records from either the Contractor, the Subcontractor, or both. For the purpose of this Section, records shall include all books of account, supporting documents and papers deemed necessary by the City to assure compliance with the contract provisions. Failure of the Contractor or Subcontractor to comply with these requirements may result in disqualification or suspension from bidding for future contracts or disapproval as a Subcontractor at the option of the City. The Contractor shall assure that each of its Subcontractors will provide access to its records pertaining to the project upon request by the City. PERIODIC ESTIMATE FOR PARTIAL PAYMENT - After the Contractor has submitted a periodic estimate for partial payment, approved and certified by the Public Works Department, the City shall make payment in the manner provided in the Contract Documents and in accordance with Florida's Prompt Payment Act, Section 218, Florida Statutes. RESERVATION FOR AWARD AND REJECTION OF BIDS - The City reserves the right to accept or reject any or all bids, part of bids, and to waive minor irregularities or variations to specifications contained in bids, and minor irregularities in the bidding process. The City also reserves the right to award the contract on a split order basis, lump sum basis, individual item basis, or such combination as shall best serve the interest of the City. The City reserves the right to make an award to the responsive and responsible bidder whose product or service meets the terms, conditions, and specifications of the ITB and whose bid is considered to best serve the City's interest. In determining the responsiveness of the offer and the responsibility of the Bidder, the following shall be considered when applicable: the ability, capacity and skill of the Bidder to perform as required; whether the Bidder can perform promptly, or within the time specified, without delay or interference; the character, integrity, reputation, judgment, experience and efficiency of the Bidder; the quality of past performance by the Bidder; the previous and existing compliance by the Bidder with related laws and ordinances; the sufficiency of the Bidder's financial resources; the availability, quality and adaptability of the Bidder's supplies or services to the required use; the ability of the Bidder to provide future maintenance, service or parts; the number and scope of conditions attached to the bid. 5/7/2021 9:40 AM P. 85 City of Fort Lauderdale Bid 12504-613 MINORITY AND WOMEN -OWNED BUSINESS ENTERPRISE PARTICIPATION AND SMALL BUSINESS - It is the desire of the City of Fort Lauderdale to increase the participation of minority (MBE) and women -owned (WBE) businesses in its contracting and procurement programs. While the City does not have any preference or set aside programs in place, it is committed to a policy of equitable participation for these firms. The City of Fort Lauderdale wants to increase the participation of Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and Small Business Enterprises (SBE) in its procurement activities. If your firm qualifies in accordance with the below definitions, please indicate in the space provided in this ITB. Minority Business Enterprise (MBE) "A Minority Business" is a business enterprise that is owned or controlled by one or more socially or economically disadvantaged persons. Such disadvantage may arise from cultural, racial, chronic economic circumstances or background or other similar cause. Such persons include, but are not limited to: Blacks, Hispanics, Asian Americans, and Native Americans. The term "Minority Business Enterprise" means a business at least fifty-one percent (51%) of which is owned by minority group members or, in the case of a publicly owned business, at least fifty-one percent (51%) of the stock of which is owned by minority group members. For the purpose of the preceding sentence, minority group members are citizens of the United States who include, but are not limited to: Blacks, Hispanics, Asian Americans, and Native Americans. Women Business Enterprise (WBE) a "Women Owned or Controlled Business" is a business enterprise at least fifty-one percent (51%) of which is owned by females or, in the case of a publicly owned business, at least fifty-one percent (51%) of the stock of which is owned by females. Small Business Enterprise (SBE) "Small Business" means a corporation, partnership, sole proprietorship, or other legal entity formed for the purpose of making a profit, which is independently owned and operated, has either fewer than 100 employees or less than $1,000,000 in annual gross receipts. BLACK includes persons having origins in any of the Black racial groups of Africa. WHITE includes persons whose origins are Anglo-Saxon and Europeans and persons of Indo-European decent including Pakistani and East Indian. HISPANIC includes persons of Mexican, Puerto Rican, Cuban, Central and South American, or other Spanish culture or origin, regardless of race. NATIVE AMERICAN includes persons whose origins are American Indians, Eskimos, Aleuts, or Native Hawaiians. ASIAN AMERICAN includes persons having origin in any of the original peoples of the Far East, Southeast Asia, the Indian subcontinent, or the Pacific Islands. DEBARRED OR SUSPENDED BIDDERS OR PROPOSERS - The bidder or proposer certifies, by submission of a response to this solicitation, that neither it nor its principals and subcontractors are presently debarred or suspended by any Federal department or agency. 5/7/2021 9:40 AM P 86 City of Fort Lauderdale Bid 12504-613 LOBBYING ACTIVITIES - ALL CONTRACTORS PLEASE NOTE: Any contractor submitting a response to this solicitation must comply, if applicable, with City of Fort Lauderdale Ordinance No. C- 11-42 & Resolution No. 07-101, Lobbying Activities. Copies of Ordinance No., C-11-42, and Resolution No. 07-101, may be obtained from the City Clerk's Office on the 7th Floor of City Hall, 100 N. Andrews Avenue, Fort Lauderdale, Florida 33301. The Ordinance may also be viewed on the City's website at https://www.fortlauderdale.gov/home/showdocument?id=6036. 5/7/2021 9:40 AM p. 87 City of Fort Lauderdale GENERAL CONDITIONS Bid 12504-613 Unless otherwise modified in the Project's Special Conditions, the following General Conditions shall be part of the Contract: GC - 01 - DEFINITIONS - The following words and expressions, or pronouns used in their stead, shall wherever they appear in the Contract and the Contract Documents, be construed as follows: "Addendum" or "Addenda" - shall mean the additional Contract provisions issued in writing, by the Engineer, prior to the receipt of bids. "Bid" — shall mean the offer or proposal of the Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. "Bidder" — shall mean any person, firm, company, corporation or entity submitting a bid for the Work. "Bonds" —shall mean bid, performance and payment bonds and other instruments of security, furnished by Contractor and his surety in accordance with the Contract Documents. "City" — shall mean the City of Fort Lauderdale, Florida, a Florida municipal corporation. In the event the City exercises its regulatory authority as a government body, the exercise of such regulatory authority and the enforcement of any rules, regulations, codes, laws and ordinances shall be deemed to have occurred pursuant to City's authority as a governmental body and shall not be attributable in any manner to the City as a party to this Contract. "Consultant" — shall mean a person, firm, company, corporation or other entity employed by the City to perform the professional services for the project. "Contractor" — shall mean the successful Bidder who has been employed by the City to perform the construction and related services for the project. "Contract Work" - shall mean everything expressed or implied to be required to be furnished and furnished by the Contractor by any one or more of the parts of the Contract Documents referred to in the Contract hereof. In the case of any inconsistency in or between any parts of this Contract, the Project Manager shall determine which shall prevail. "Design Documents" — shall mean the construction plans and specifications included as part of a Bid/Proposal Solicitation prepared either by the City or by the Consultant under a separate Agreement with the City. "Engineer" - shall include the terms "professional engineer" and "licensed engineer" and means a person who is licensed to engage in the practice of engineering under Florida Statute, Chapter 471. An Engineer may be a City employee or a consultant hired by the City. "Extra Work" - shall mean work other than that required by the Contract. "Inspector" — shall mean an authorized representative of the City assigned to make necessary inspections of materials furnished by Contractor and of the Work performed by Contractor. 5/7/2021 9:40 AM p. 88 City of Fort Lauderdale Bid 12504-613 "Notice" - shall mean written notice sent by certified United States mail, return receipt requested, or sent by commercial express carrier with acknowledgement of delivery, or via fax or email, or by hand delivery with a request for a written receipt of acknowledgment of delivery and shall be served upon the Contractor either personally or to its place of business listed in the Bid. "Owner" - shall mean the City of Fort Lauderdale. "Project Manager" - shall mean a professional designated by the City to manage the Project under the supervision and direction of the Public Works Director or designee. "Public Works Director" — shall mean the Public Works Director of the City of Fort Lauderdale. "Site" - shall mean the area upon or in which the Contractor's operations are carried out and such other areas adjacent thereto as may be designated as such by the Project Manager. "Sub -contractor" - shall mean any person, firm, company, corporation or other entity, other than employees of the Contractor, who or which contracts with the contractor, to furnish, or actually furnishes labor and materials, or labor and equipment, or labor, materials and equipment at the site. "Surety" - shall mean any corporation or entity that executes, as Surety, the Contractor's performance and payment bond securing the performance of this Contract. GC - 02 - SITE INVESTIGATION AND REPRESENTATION - The Contractor acknowledges that it has satisfied itself as to the nature and location of the Work under the Contract Documents, the general and local conditions of the Site, particularly those bearing upon availability of transportation, disposal, handling and storage of materials, availability of labor, water, electric power, and roads, field conditions, the type of equipment and facilities needed preliminary to and during the prosecution of the Work and all other matters which can in any way affect the Work or the cost thereof under the Contract Documents. The Contractor acknowledges that it has conducted extensive tests, examinations and investigations and represents and warrants a thorough familiarization with the nature and extent of the Contract Documents, the Work, locality, soil conditions, moisture conditions and all year-round local weather and climate conditions (past and present), and, in reliance on such tests, examination and investigations conducted by Contractor and the Contractor's experts, has determined that no conditions exist that would in any manner affect the Bid Price and that the project can be completed for the Bid Price submitted. Any failure by the Contractor to acquaint itself with all the Site conditions shall not relieve Contractor from responsibility for properly estimating the difficulty or cost thereof under the Contract Documents. GC - 03 - SUBSTITUTIONS - If the Contractor desires to use materials and/or products of manufacturer's names different from those specified in the Contract Documents, the Bidder requesting the substitution shall make written application as described herein. The burden of proving the equality of the proposed substitution rests on the Contractor making the request. To be acceptable, the proposed substitution shall meet or exceed all expressed requirements of the Contract Documents and shall be submitted upon the Contractor's letterhead. The following requirements shall be met in order for the substitution to be considered: 1. Requests for substitution shall be accompanied by such technical data, as the party making the request desires to submit. The Project Manager will consider reports from 5/7/2021 9:40 AM P. 89 City of Fort Lauderdale Bid 12504-613 reputable independent testing laboratories, verified experience records from previous users and other written information valid in the circumstances; and 2. Requests for substitution shall completely and clearly indicate in what respects the materials and/or products differ from those indicated in the Contract Documents; and 3. Requests for substitution shall be accompanied by the manufacturer's printed recommendations clearly describing the installation, use and care, as applicable, of the proposed substitutions; and 4. Requests for substitution shall be accompanied by a complete schedule of changes in the Contract Documents, if any, which must be made to permit the use of the proposed substitution. If a proposed substitution is approved by the Project Manager, an addendum will be issued to prospective bidders not less than three (3) working days prior to the date set for opening of bids. Unless substitutions are received and approved as described above, the successful Bidder shall be responsible for furnishing materials and products in strict accordance with the Contract Documents. GC- 04 — CONSTRUCTION RESOURCES — Contractor shall provide all labor and equipment necessary to complete the installation within a timely manner. Contractor shall provide details as to manpower and equipment to be dedicated to the project in its Work Plan. Contractor is responsible for making arrangements, obtaining and purchasing construction water services if required to complete the work. GC - 05 - CONTROL OF THE WORK - The Project Manager shall have full control and direction of the Work in all respects. The Project Manager and/or his authorized designee(s) shall, at all times, have the right to inspect the Work and materials. The Contractor shall furnish all reasonable facilities for obtaining such information, as the Project Manager may desire respecting the quality of the Work and materials and the manner of conducting the Work. Should the Contractor be permitted to perform night Work, or to vary the period which work is ordinarily carried on in the daytime, he shall give ample notice to the Project Manager so that proper and adequate inspection may be provided. Such Work shall be done only under such regulations as are furnished in writing by the Project Manager, and no extra compensation shall be allowed to the Contractor therefore. In the event of night work, the Contractor shall furnish such light, satisfactory to the Project Manager, as will ensure proper inspection. Nothing herein contained shall relieve the Contractor from compliance with any and all City ordinances relating to noise or Work during prohibited hours. GC - 06 - SUB -CONTRACTOR - The Contractor shall not sublet, in whole or any part of the Work without the written consent and approval of the Project Manager. Within ten (10) days after official notification of starting date, the Contractor must submit in writing, to the Project Manager , a list of all Sub -contractors. No Work shall be done by any sub -contractor until such Sub -contractor has been officially approved by the Project Manager . A sub -contractor not appearing on the original list will not be approved without written request submitted to the Project Manager and approved by the Public Works Director. In all cases, the Contractor shall give his personal attention to the Work of the Sub -contractors and the Sub -contractor is liable to be discharged by the Contractor, at the direction of the Project Manager , for neglect of duty, incompetence or misconduct. Acceptance of any sub -contractor, other person, or organization by the Project Manager shall not constitute a waiver of any right of Project Manager to reject defective Work or Work not in conformance with the Contract Documents. 5/7/2021 9:40 AM p. 90 City of Fort Lauderdale Bid 12504-613 Contractor shall be fully responsible for all acts and omissions of its Sub -contractors and of persons and organizations directly or indirectly employed by them and of persons and organizations for whose acts any of them may be liable to the same extent that he is responsible for the acts and omissions of persons directly employed by him. Nothing in the Contract Documents shall create any contractual relationship between City and any sub -contractor or other person or organization having a direct contract with Contractor, nor shall it create any obligation on the part of City to pay or to see to the payment of any moneys due to any sub -contractor or other person, or organization, except as may otherwise be required by law. GC - 07 - QUANTITIES - Contractor recognizes and agrees that the quantities shown on plans and Bid/Price Schedule are estimates only and may vary during actual construction. No change shall be made involving any departure from the general scheme of the Work and that no such change involving a material change in cost, either to the City or Contractor, shall be made, except upon written permission of the City. However, the Project Manager shall have the right to make minor alternations in the line, grade, plan, form or materials of the Work herein contemplated any time before the completion of the same. That if such alterations shall diminish the quantity of the Work to be done, such alterations shall not constitute a claim for damages or anticipated profits. That if such alterations increase the amount of the Work to be done, such increase shall be paid for according to the quantity actually performed and at the unit price or prices stipulated therefore in the Contract. The City shall, in all cases of dispute, determine the amount or quantity of the several kinds of Work which are to be paid for under this Contract, and shall decide all questions relative to the execution of the same, and such estimates and decisions shall be final and binding. Any Work not herein specified, which might be fairly implied as included in the Contract, of which the City shall judge, shall be done by the Contractor without extra charge. However, such cost increases shall be authorized either by the Public Works Director or designee, or the City Commission based upon the purchasing threshold amounts provided for in Chapter 2 of the City of Fort Lauderdale's Code of Ordinances. GC - 08 - NO ORAL CHANGES - Except to the extent expressly set forth in the Contract, no change in, or modification, termination or discharge of the Contract in any form whatsoever, shall be valid or enforceable unless it is in writing and signed by the parties charged, therewith or their duly authorized representative. GC - 09 - PERMITS AND PROTECTION OF PUBLIC — Permits on file with the City and/or those permits to be obtained by the Contractor, shall be considered directive in nature, and will be considered a part of this Contract. A copy of all permits shall be given to the City and become part of the Contract Documents. Terms of permits shall be met prior to acceptance of the Work and release of the final payment. Contractor shall secure all permits and licenses required for completing the Project. Contractor will obtain the necessary State, County, and City construction/work permits if required. The Contractor shall comply with all applicable Codes, Standards, Specifications, etc. related to all aspects of the Project. Where there are telephones, light or power poles, water mains, conduits, pipes or drains or other construction, either public or private, in or on the streets or alleys, the Work shall be so conducted that no interruption or delay will be caused in the operation or use of the same. Proper written notice shall be given to all affected parties prior to proceeding with the Work. 5/7/2021 9:40 AM p. 91 City of Fort Lauderdale Bid 12504-613 The Contractor shall not be permitted to interfere with public travel and convenience by grading or tearing up streets indiscriminately, but the Work of constructing the various items in this contract shall proceed in an orderly, systematic and progressive manner. GC - 10 - DISEASE REGULATIONS - The Contractor shall enforce all sanitary regulations and take all precautions against infectious diseases as the Project Manager may deem necessary. Should any infectious or contagious diseases occur among his employees, he shall arrange for the immediate removal of the employee from the Site and isolation of all persons connected with the Work. GC - 11 - CONTRACTOR TO CHECK PLANS, SPECIFICATIONS, AND DATA - The Contractor shall verify all dimensions, quantities, and details shown on the plans, supplementary drawings, schedules, and shall notify the Project Manager of all errors, omissions, conflicts and discrepancies found therein within three (3) working days of discovery. Failure to discover or correct errors, conflictions, or discrepancies shall not relieve the Contractor of full responsibility for unsatisfactory Work, faulty construction, or improper operation resulting therefrom nor from rectifying such condition at its own expense. GC - 12 - MATERIALS AND WORKMANSHIP - All material shall be new and the workmanship shall, in every respect, be in conformity with approved modern practice and with prevailing standards of performance and quality. In the event of a dispute, the Project Manager's decision shall be final. Wherever the Plans, Specifications, Contract Documents, or the directions of the Project Manager are unclear as to what is permissible and/or fail to note the quality of any Work, that interpretation will be made by the Project Manager , which is in accordance with approved modern practice, to meet the particular requirements of the Contract. Florida Power & Light Company will provide all Project conduit, conduit couplings, conduit bends, splice boxes, pull boxes, equipment pads, equipment chambers, etc. necessary for the installation of those facilities to be installed for FP&L's use. Contractor shall be responsible for obtaining materials from FP&L. Contractor shall also be responsible for the quantity and maintaining quality of the material obtained from FP&L. Contractor shall be responsible for obtaining and providing all non-FP&L provided materials including but not limited to AT&T materials and Comcast materials. Contractor shall be responsible for material storage and security. Contractor shall provide details for storage and security in Contractor's Work Plan. GC - 13 - COMPLETED WORK, INSPECTIONS AND ACCEPTANCE - Contractor shall schedule Project inspections two (2) business days in advance with FP&L and the City. Contractor shall coordinate with FP&L to have all completed work inspected and accepted in writing by the FP&L inspector. Contractor will secure such acceptance in writing for Completed tasks prior to obtaining approval and acceptance from the City, and prior to issuance of a pay request being released for progress payment. Contractor shall notify the Project Manager in advance of scheduled FP&L inspections as to the work to be inspected and the scheduled time. As -built survey, sealed and signed by the a Professional Surveyor registered in the State of Florida, for each task shall be provided by the Contractor prior to City's acceptance and final payment. GC - 14 - SAFEGUARDING MARKS - The Contractor shall safeguard all points, stakes, grade marks, monuments, and bench marks made or established on the Work, bear the cost of re- establishing same if disturbed, or bear the entire expense of rectifying Work improperly installed due to not maintaining or protecting or for removing without authorization, such established points, stakes and marks. The Contractor shall safeguard all existing and known property corners, monuments and marks not related to the Work and, if required, shall bear the cost of having them re-established by a licensed Professional surveyor registered in the State of Florida if disturbed or destroyed during the course of construction. 5/7/2021 9:40 AM p. 92 City of Fort Lauderdale Bid 12504-613 GC -15 - RESTROOM FACILITIES - Contractor shall provide portable toilet facilities for employee's use at a location within the Work site to be determined by the City. Employees shall not relieve themselves at any other place within the City Limits. GC -16 - PROGRESS MEETINGS - Weekly Status meetings will be conducted with representatives from the City, FP&L and the Contractor. Contractor shall budget time to participate in such meetings. A well -run Project should result in short meetings. GC - 17 - ISSUE RESOLUTION - Should Contractor become engaged in a dispute with a resident or a City employee, the Contractor shall report the situation to the Project Manager immediately. It shall be mandatory that the City participate in any dispute resolution. Failure of Contractor personnel to notify the City shall obligate Contractor to replace the offending employee immediately if requested by the City. GC - 18 - CITY SECURITY -CONTRACTOR AND SUBCONTRACTOR EMPLOYEE INFORMATION - Prior to commencing work, Contractor shall provide to the City a list of all personnel and sub- contractors on site. The list will include the name, address, birth date and driver's license number for all personnel. All personnel and subcontractors on site will have on their person a company photo ID during all stages of the construction. Contractor shall provide standard required personal information per current City procedures. GC -19 - POST -CONSTRUCTION SURVEY - The Contractor shall provide as -built survey, sealed and signed by a registered surveyor in the State of Florida, as a condition of final payment. GC — 20 - KEY PERSONNEL - Contractor shall provide as part of the Work Plan, resumes for all key project personnel providing supervision and project management functions. Resumes shall include work history and years of experience performing this type work. Contractor's onsite superintendent shall be knowledgeable and experienced in such overhead to underground conversion work. GC - 21 - EXISTING UTILITY SERVICE - All existing utility service shall be maintained with a minimum of interruption at the expense of the Contractor. GC - 22 - JOB DESCRIPTION SIGNS — Contractor, at Contractor's expense, shall furnish, erect, and maintain suitable weatherproof signs on jobs over $100,000 containing the following information: 1. City Seal (in colors) 2. Project or Improvement Number 3. Job Description 4. Estimated Cost 5. Completion Date Minimum size of sign shall be four feet high, eight feet wide and shall be suitably anchored. The entire sign shall be painted and present a pleasing appearance. Exact location of signs will be determined in the field. Two (2) signs will be required, one at each end of the job. All costs of this work shall be included in other parts of the work. GC - 23 - FLORIDA EAST COAST RIGHT-OF-WAY - Whenever a City contractor is constructing within the Florida East Coast Railway Company's Right -of -Way, it will be mandatory that the contractor carry bodily injury and property damage insurance in amounts satisfactory to the Florida East Coast Company. This insurance requirement shall be verified by the contractor with the Florida East Coast Company prior to commencing work, and maintained during the life of the Contract. 5/7/2021 9:40 AM p. 93 City of Fort Lauderdale Bid 12504-613 GC - 24 - ACCIDENTS - The Contractor shall provide such equipment and facilities as are necessary and/or required, in the case of accidents, for first aide services to be provided to a person who may be injured during the project duration. The Contractor shall also comply with the OSHA requirements as defined in the United States Labor Code 29 CFR 1926.50. In addition, the Contractor must report immediately to the Project Manager every accident to persons or damage to property, and shall furnish in writing full information, including testimony of witnesses regarding any and all accidents. GC - 25 - SAFETY PRECAUTIONS - Contractor must adhere to the applicable environmental protection guidelines for the duration of a project. If hazardous waste materials are used, detected or generated at any time, the Project Manager must be immediately notified of each and every occurrence. The Contractor shall comply with all codes, ordinances, rules, orders and other legal requirements of public authorities (including OSHA, EPA, DERM, the City, Broward County, State of Florida, and Florida Building Code), which bear on the performance of the Work. The Contractor shall take the responsibility to ensure that all Work is performed using adequate safeguards, including but not limited to: proper safe rigging, safety nets, fencing, scaffolding, barricades, chain link fencing, railings, barricades, steel plates, safety lights, and ladders that are necessary for the protection of its employees, as well as the public and City employees. All riggings and scaffolding shall be constructed with good sound materials, of adequate dimensions for their intended use, and substantially braced, tied or secured to ensure absolute safety for those required to use it, as well as those in the vicinity. All riggings, scaffolding, platforms, equipment guards, trenching, shoring, ladders and similar actions or equipment shall be OSHA approved, as applicable, and in accordance with all Federal, State and local regulations. GC - 26 - DUST PREVENTION - The Contractor shall, by means of a water spray, or temporary asphalt pavement, take all necessary precautions to prevent or abate a dust nuisance arising from dry weather or Work in an incomplete stage. All costs of this Work shall be included in cost of other parts of the Work. Should the Contractor fail to abate a dust nuisance the Project Manager may stop the Work until the issue is resolved to the City's satisfaction., GC - 27 - SITE CLEANUP AND RESTORATION — The Contractor shall remove all debris and unused or discarded materials from the work site daily. Contractor shall clean the work site to remove all directional drilling "Driller's Mud" materials. No "Driller's Mud" residue shall be allowed to remain in the soil or on the surface of the land or vegetation. All debris and drilling materials must be disposed of offsite at an approved location. The Contractor shall promptly restore all areas disturbed that are outside the Project limits in equal or better condition at no additional cost to the City. GC - 28 - COURTEOUS BEHAVIOR AND RESPECT FOR RESIDENTS AND PROPERTY — The Contractor and its employees, associates and sub -contractors shall maintain courteous behavior at all times and not engage in yelling, loud music, or other such activities. Contractor's employees shall not leave trash or other discarded items at the Work Site, especially on any private property. In the event complaints arise, Contractor shall immediately remove such offending employees from the project if requested to do so by the Project Manager. Contractor's employees shall not trespass on any private property unless necessary to complete the work but with prior permission from the owner. 5/7/2021 9:40 AM p. 94 City of Fort Lauderdale Bid 12504-613 Contractor shall notify and obtain permission from the residents 24 hours in advance when planning to work within the resident's property. In addition, Contractor shall notify the resident prior to entering their property to perform work or inspect/ investigate the work site. Contractor shall not block residents' driveways unnecessarily. Contractor shall not park equipment on landscaped areas when the vehicle is not needed for the current construction activities. Contractor shall be responsible for repair and/or replacement of all damaged landscaping within 48 hours including repairing vehicle wheel impressions, irrigation systems, lighting systems, structures, or any other items of resident's property. Contractor shall not destroy, damage, remove, or otherwise negatively impact any landscaping within or outside the right-of-way without prior approval from the Project Manager. GC - 29 - PLACING BARRICADES AND WARNING LIGHTS - The Contractor shall furnish and place, at his own expense, all barricades, warning lights, automatic blinker lights and such devices necessary to properly protect the work and vehicular and pedestrian traffic. Should the Contractor fail to erect or maintain such barricades, warning lights, etc., the Project Manager may, after 24 hours' notice to the Contractor, proceed to have such barricades and warning lights placed and maintained by City or other forces and all costs incurred thereof charged to the Contractor and may be retained by the City from any monies due, or to become due, to the Contractor. GC - 30 - TRAFFIC CONTROL - The Contractor shall coordinate all Work and obtain, through the City's Transportation and Mobility Department, Broward County, Florida Department of Transportation, as applicable, any permits required to detour traffic or close any street before starting to work in the road All traffic control devices, flashing lights, signs and barricades shall be maintained in working condition at all times and conform to Manual of Uniform Traffic Control Devices (MUTCD), latest edition. GC - 31 - COORDINATION - The Contractor shall notify all utilities, transportation department, etc., in writing, with a copy to the Project Manager before construction is started and shall coordinate its Work with them. The Contractor shall cooperate with the owners of any underground or overhead utility lines in their removal, construction and rearrangement operations in order that services rendered by these parties will not be unnecessarily interrupted. The Contractor shall arrange its Work and dispose of its materials so as to not interfere with the operation of other contractors engaged upon adjacent work, and to join its Work to that of others in a proper manner, and to perform its Work in the proper sequence in relation to that of other contractors as may be directed by the Project Manager . Each Contractor shall be responsible for any damage done by it or its agents to the work performed by another contractor. GC - 32 - WATER - Bulk water used for construction, flushing pipelines, and testing shall be obtained from fire hydrants. Contractor shall make payment for hydrant meter at Treasury Billing Office, 1st Floor, City Hall, 100 N. Andrews Avenue. With the paid receipt, contractor can pick up hydrant meter at the utility location office. No connection shall be made to a fire hydrant without a meter connected. 5/7/2021 9:40 AM p. 95 City of Fort Lauderdale Bid 12504-613 GC - 33 - PROHIBITION AGAINST CONTRACTING WITH SCRUTINIZED COMPANIES - As to any contract for goods or services of $1 million or more and as to the renewal of any contract for goods or services of $1 million or more, subject to Odebrecht Construction, Inc., v. Prasad, 876 F.Supp.2d 1305 (S.D. Fla. 2012), affirmed, Odebrecht Construction, Inc., v. Secretary, Florida Department of Transportation, 715 F.3d 1268 (11th Cir. 2013), with regard to the "Cuba Amendment," the Contractor certifies that it is not on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, and that it does not have business operations in Cuba or Syria, as provided in Section 287.135, Florida Statutes (2020), as may be amended or revised. As to any contract for goods or services of any amount and as to the renewal of any contract for goods or services of any amount, the Contractor certifies that it is not on the Scrutinized Companies that Boycott Israel List created pursuant to Section 215.4725, Florida Statutes (2020), as may be amended or revised, and that it is not engaged in a boycott of Israel. The City may terminate this Agreement at the City's option if the Contractor is found to have submitted a false certification as provided under subsection (5) of Section 287.135, Florida Statutes (2020), as may be amended or revised, or been placed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List or the Scrutinized Companies that Boycott Israel List created pursuant to Section 215.4725, Florida Statutes (2020), as may be amended or revised, or is engaged in a boycott of Israel or has been engaged in business operations in Cuba or Syria, as defined in Section 287.135, Florida Statutes (2020), as may be amended or revised. GC - 34 - LOCATION OF UNDERGROUND FACILITIES - If the Proposer, for the purpose of responding to this solicitation, requests the location of underground facilities through the Sunshine State One -Call of Florida, Inc. notification system or through any person or entity providing a facility locating service, and underground facilities are marked with paint, stakes or other markings within the City pursuant to such a request, then the Proposer shall be deemed non -responsive to this solicitation in accordance with Section 2-184(5) of the City of Fort Lauderdale Code of Ordinances. GC - 35 - USE OF FLORIDA LUMBER TIMBER AND OTHER FOREST PRODUCTS - In accordance with Florida Statute 255.20 (3), the City specifies that lumber, timber, and other forest products used for this Project shall be produced and manufactured in the State of Florida if such products are available and their price, fitness, and quality are equal. This requirement does not apply to plywood specified for monolithic concrete forms, if the structural or service requirements for timber for a particular job cannot be supplied by native species, or if the construction is financed in whole or in part from federal funds with the requirement that there be no restrictions as to species or place of manufacture. The Bidder affirms by submitting a bid response to this solicitation that they will comply with section 255.20 (3) Florida Statutes. GC - 36 - PUBLIC RECORDS/TRADE SECRETS/COPYRIGHT: The Proposer's response to the Solicitation is a public record pursuant to Florida law, which is subject to disclosure by the City under the State of Florida Public Records Law, Florida Statutes Chapter 119.07 ("Public Records Law"). The City shall permit public access to all documents, papers, letters or other material submitted in connection with this Solicitation and the Contract to be executed for this Solicitation, subject to the provisions of Chapter 119.07 of the Florida Statutes. 5/7/2021 9:40 AM p. 96 City of Fort Lauderdale Bid 12504-613 Any language contained in the Proposer's response to the Solicitation purporting to require confidentiality of any portion of the Proposer's response to the Solicitation, except to the extent that certain information is in the City's opinion a Trade Secret pursuant to Florida law, shall be void. If a Proposer submits any documents or other information to the City which the Proposer claims is Trade Secret information and exempt from Florida Statutes Chapter 119.07 ("Public Records Laws"), the Proposer shall clearly designate that it is a Trade Secret and that it is asserting that the document or information is exempt. The Proposer must specifically identify the exemption being claimed under Florida Statutes 119.07. The City shall be the final arbiter of whether any information contained in the Proposer's response to the Solicitation constitutes a Trade Secret. The City's determination of whether an exemption applies shall be final, and the proposer agrees to defend, indemnify, and hold harmless the City and the City's officers, employees, and agent, against any loss or damages incurred by any person or entity as a result of the City's treatment of records as public records. In addition, the proposer agrees to defend, indemnify, and hold harmless the City and the City's officers, employees, and agents, against any loss or damages incurred by any person or entity as a result of the City's treatment of records as exempt from disclosure or confidential. Proposals purporting to be subject to copyright protection in full or in part will be rejected. The proposer authorizes the City to publish, copy, and reproduce any and all documents submitted to the City bearing copyright symbols or otherwise purporting to be subject to copyright protection. EXCEPT FOR CLEARLY MARKED PORTIONS THAT ARE BONA FIDE TRADE SECRETS PURSUANT TO FLORIDA LAW, DO NOT MARK YOUR RESPONSE TO THE SOLICITATION AS PROPRIETARY OR CONFIDENTIAL. DO NOT MARK YOUR RESPONSE TO THE SOLICITATION OR ANY PART THEREOF AS COPYRIGHTED. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT: Telephone Number: (954) 828-5002 Mailing Address: City Clerk's Office 100 N. Andrews Avenue Fort Lauderdale, Florida 33301-1016 E-mail: prrcontract(fortlauderdale.gov Contractor shall: 1. Keep and maintain public records required by the City in order to perform the service. 2. Upon request from the City's custodian of public records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in Chapter 119, Florida Statutes (2020), as may be amended or revised, or as otherwise provided by law. 5/7/2021 9:40 AM P. 97 City of Fort Lauderdale Bid 12504-613 3. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of this contract if the Contractor does not transfer the records to the City. 4. Upon completion of the Contract, transfer, at no cost, to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public records to the City upon completion of this Contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of this Contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, upon request from the City's custodian of public records, in a format that is compatible with the information technology systems of the City. 5/7/2021 9:40 AM p. 98 City of Fort Lauderdale Bid 12504-613 SPECIAL CONDITIONS 01. PURPOSE The City of Fort Lauderdale, Florida (City) is seeking bids from qualified bidders, hereinafter referred to as the Contractor, to provide construction services in accordance with the terms, conditions, and specifications contained in this Invitation To Bid (ITB). 02. TRANSACTION FEES The City uses BidSync (www.bidsvnc.com) to distribute and receive bids and proposals. There is no charge to vendors/contractors to register and participate in the solicitation process, nor will any fees be charged to the awarded contractor. 03. SUBMISSION OF BIDS It is the sole responsibility of the Contractor to ensure that its bid is submitted electronically through BidSync at www.bidsvnc.com., and that any bid security not submitted via BidSync reaches the City of Fort Lauderdale, Procurement Services Division, 6th floor, Room 619, 100 N. Andrews Avenue, Fort Lauderdale, Florida 33301- 1016, in a sealed envelope marked on the outside with the ITB solicitation number and Contractor's name, no later than the time and date specified in this solicitation,- PAPER BID SUBMITALS WILL NOT BE ACCEPTED. PLEASE SUBMIT YOUR BID RESPONSE ELECTRONICALLY. 04. INFORMATION OR CLARIFICATION For information concerning procedures for responding to this solicitation, contact Maureen Lewis, Procurement Specialist, at (954) 828-5239 or email at maureenl(fortlauderdale.gov. Such contact shall be for clarification purposes only. For information concerning technical specifications please utilize the Question/Answer platform provided by BidSync at www.bidsvnc.com. Questions of a material nature must be received prior to the cut-off date specified in the solicitation. Material changes, if any, to the scope of services or bidding procedures will only be transmitted by written addendum. (See addendum section of BidSync site). Bidders please note: No part of your bid can be submitted via FAX. No variation in price or conditions shall be permitted based upon a claim of ignorance. Submission of a bid will be considered evidence that the bidder has familiarized himself with the nature and extent of the work, and the equipment, materials, and labor required. The entire bid response must be submitted in accordance with all specifications contained in this solicitation. The questions and answers submitted in BidSync shall become part of any contract that is created from this ITB. 5/7/2021 9:40 AM p. 99 City of Fort Lauderdale Bid 12504-613 05. CONTRACT TIME 5.1 The initial contract term shall commence upon the date specified in the Notice to Proceed given by the City and shall expire two (2) years from that date. The City reserves the right to extend the contract for two (2) additional one (1) year terms, providing all terms, conditions and specifications remain the same, both parties agree to the extension, and such extension is approved by the City. 5.2 The Contractor recognizes that TIME IS OF THE ESSENCE. The Work on each Task Order shall commence immediately upon the Contractor's receipt of an executed Task Order. 5.3 The Contractor shall mobilize to the project site and begin construction activities within N/A calendar days of receipt of the executed Task Order or by the specific date noted within the Task Order (whichever applies). 5.4 The Work on each Task Order shall be substantially completed within the timeframe agreed upon and noted in each executed Task Order. 5.5 The Work on each Task Order shall be finally completed on or before the Final Completion Date, and ready for final payment in accordance with Final Completion Date agreed upon and noted in each executed Task Order. 5.6 In the event services are scheduled to end because of the expiration of this contract, the Contractor shall continue the service upon the request of the City as authorized by the awarding authority. The extension period shall not extend for more than one hundred and eighty (180) days beyond the expiration date of the existing contract. The Contractor shall be compensated for the service at the rate in effect when this extension clause is invoked by the City. No new Task Orders will be assigned after the contract's expiration nor will any new work be performed after that date. 5.7 The termination date for issuance of Task Orders shall be when the funds are depleted or four (4) years from effective date of the Agreement, whichever comes first. All task orders issued before the contract termination must be completed under this C ontract even if t h e contract has expired. The City of Fort Lauderdale reserves the right to waive any informality in any bid and to reject any or all bids. The City of Fort Lauderdale reserves the right to reduce or delete any of the bid items. At the time of contract award, the City reserves the right to set a maximum dollar limit that may be expended on this Project. Contract quantities of any or all items may be increased, reduced, or eliminated to adjust the contract amount to coincide with the amount of work necessary or to bring the contract value to within the established limit. All quantities are estimated, and the City reserves the right to increase, reduce, or eliminate the contract quantities in any amount. 5/7/2021 9:40 AM p. 100 City of Fort Lauderdale Bid 12504-613 The undersigned bidder affirms that he has or will obtain all equipment necessary to complete the work described, that he has or will obtain all required permits and licenses from the appropriate agencies, and that his firm is authorized to do business in the State of Florida. 06. BID SECURITY A certified check, cashier's check, bank officer's check or bid bond for TEN percent (10%) of the bid amount, made payable to the City of Fort Lauderdale, shall accompany each offer. 07. REQUIRED LICENSES/CERTIFICATIONS Contractor must possess the following licenses/certifications to be considered for award: Underground contractor's licenses, bonded and insured. Note: Contractor must have proper licensing and shall submit evidence of same with its bid response. 08. SPECIFIC EXPERIENCE REQUIRED The following expertise is required to be considered for this Contract. Specific references attesting to this expertise must be submitted with the bid response. The contractor must have extensive experience with underground infrastructure replacement, specifically storm water pipe, structures, pavement restoration, concrete work, tidal valve installation and landscape installation and removal. Additionally, the contractor shall have previous construction experience in storm water infrastructure projects, in the State of Florida within the last ten (10) years. Bidder shall submit proof of construction experience for a minimum of three (3) storm water infrastructure projects with a construction budget of $500,000 (or larger) and shall, for each project listed, identify location; dates of construction; project name and overall scope; scope of work that was self -performed by Contractor; and client's name, address, telephone number and e-mail address. NOTE: REFERENCES SHALL NOT INCLUDE ONLY CITY OF FORT LAUDERDALE EMPLOYEES OR WORK PERFORMED FOR THE CITY. THE CITY IS ALSO INTERESTED IN WORK EXPERIENCE AND REFERENCES FROM ENTITIES OTHER THAN THE CITY OF FORT LAUDERDALE. By signing this bid solicitation, contractor is affirming that this expertise will be provided for this Contract at no additional charge. 09. BID ALLOWANCE There are no allowances for this Project. 5/7/2021 9:40 AM p. 101 City of Fort Lauderdale Bid 12504-613 10. INSURANCE REQUIREMENTS (See Article 10, Bonds and Insurance, of the Contract for details) Insurance As a condition precedent to the effectiveness of this Agreement, during the term of this Agreement and during any renewal or extension term of this Agreement, the Contractor, at its sole expense, shall provide insurance of such types and with such terms and limits as noted below. Providing proof of and maintaining adequate insurance coverage are material obligations of the Contractor. The Contractor shall provide the City a certificate of insurance evidencing such coverage. The Contractor's insurance coverage shall be primary insurance for all applicable policies. The limits of coverage under each policy maintained by the Contractor shall not be interpreted as limiting the Contractor's liability and obligations under this Agreement. All insurance policies shall be through insurers authorized or eligible to write policies in the State of Florida and possess an A.M. Best rating of A-, VII or better, subject to approval by the City's Risk Manager. The coverages, limits, and/or endorsements required herein protect the interests of the City, and these coverages, limits, and/or endorsements shall in no way be relied upon by the Contractor for assessing the extent or determining appropriate types and limits of coverage to protect the Contractor against any loss exposures, whether as a result of this Agreement or otherwise. The requirements contained herein, as well as the City's review or acknowledgement, are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by the Contractor under this Agreement. The following insurance policies and coverages are required: Commercial General Liability Coverage must be afforded under a Commercial General Liability policy with limits not less than: • $1,000,000 each occurrence and $2,000,000 aggregate for Bodily Injury, Property Damage, and Personal and Advertising Injury • $1,000,000 each occurrence and $2,000,000 aggregate for Products and Completed Operations Policy must include coverage for contractual liability and independent contractors. The City, a Florida municipal corporation, its officials, employees, and volunteers are to be covered as an additional insured with a CG 20 26 04 13 Additional Insured — Designated Person or Organization Endorsement or similar endorsement providing equal or broader Additional Insured Coverage with respect to liability arising out of activities performed by or on behalf of the Contractor. The coverage shall contain no special limitation on the scope of protection afforded to the City, its officials, employees, and volunteers. Business Automobile Liability Coverage must be afforded for all Owned, Hired, Scheduled, and Non -Owned vehicles for Bodily Injury and Property Damage in an amount not less than $1,000,000 combined single limit each accident. 5/7/2021 9:40 AM p. 102 City of Fort Lauderdale Bid 12504-613 If the Contractor does not own vehicles, the Contractor shall maintain coverage for Hired and Non -Owned Auto Liability, which may be satisfied by way of endorsement to the Commercial General Liability policy or separate Business Auto Liability policy. Contractor's Pollution Liability Coverage For sudden and gradual occurrences and in an amount not less than $1,000,000 per claim arising out of this Agreement, including but not limited to, all hazardous materials identified under the Agreement. Umbrella/Excess Liability: The Contractor shall provide umbrella/excess coverage with limits of no less than $2,000,000 excess of Commercial General Liability, Automobile Liability and Employer's Liability. Workers' Compensation and Employer's Liability Coverage must be afforded per Chapter 440, Florida Statutes. Any person or entity performing work for or on behalf of the City must provide Workers' Compensation insurance. Exceptions and exemptions will be allowed by the City's Risk Manager, if they are in accordance with Florida Statute. The Contractor waives, and the Contractor shall ensure that the Contractor's insurance carrier waives, all subrogation rights against the City, its officials, employees, and volunteers for all losses or damages. The City requires the policy to be endorsed with WC 00 03 13 Waiver of our Right to Recover from Others or equivalent. The Contractor must be in compliance with all applicable State and federal workers' compensation laws, including the U.S. Longshore Harbor Workers' Act and the Jones Act, if applicable. Property Coverage (Builder's Risk) Coverage must be afforded in an amount not less than 100% of the total project cost, including soft costs, with a deductible of no more than $25,000 each claim. Coverage form shall include, but not be limited to: • All Risk Coverage including Flood and Windstorm with no coinsurance clause • Guaranteed policy extension provision • Waiver of Occupancy Clause Endorsement, which will enable the City to occupy the facility under construction/renovation during the activity • Storage and transport of materials, equipment, supplies of any kind whatsoever to be used on or incidental to the project • Equipment Breakdown for cold testing of all mechanized, pressurized, or electrical equipment This policy shall insure the interests of the owner, contractor, and subcontractors in the property against all risk of physical loss and damage and name the City as a loss payee. This insurance shall remain in effect until the work is completed and the property has been accepted by the City. 5/7/2021 9:40 AM p. 103 City of Fort Lauderdale Bid 12504-613 Insurance Certificate Requirements a. The Contractor shall provide the City with valid Certificates of Insurance (binders are unacceptable) no later than ten (10) days prior to the start of work contemplated in this Agreement. b. The Contractor shall provide to the City a Certificate of Insurance having a thirty (30) day notice of cancellation; ten (10) days' notice if cancellation is for nonpayment of premium. c. In the event that the insurer is unable to accommodate the cancellation notice requirement, it shall be the responsibility of the Contractor to provide the proper notice. Such notification will be in writing by registered mail, return receipt requested, and addressed to the certificate holder. d. In the event the Agreement term goes beyond the expiration date of the insurance policy, the Contractor shall provide the City with an updated Certificate of Insurance no later than ten (10) days prior to the expiration of the insurance currently in effect. The City reserves the right to suspend the Agreement until this requirement is met. e. The Certificate of Insurance shall indicate whether coverage is provided under a claims -made or occurrence form. If any coverage is provided on a claims -made form, the Certificate of Insurance must show a retroactive date, which shall be the effective date of the initial contract or prior. f. The City shall be named as an Additional Insured on all liability policies, with the exception of Workers' Compensation. g. The City shall be granted a Waiver of Subrogation on the Contractor's Workers' Compensation insurance policy. h. The title of the Agreement, Bid/Contract number, event dates, or other identifying reference must be listed on the Certificate of Insurance. The Certificate Holder should read as follows: City of Fort Lauderdale 100 N. Andrews Avenue Fort Lauderdale, FL 33301 The Contractor has the sole responsibility for all insurance premiums and shall be fully and solely responsible for any costs or expenses as a result of a coverage deductible, co-insurance penalty, or self -insured retention; including any loss not covered because of the operation of such deductible, co-insurance penalty, self -insured retention, or coverage exclusion or limitation. Any costs for adding the City as an Additional Insured shall be at the Contractor's expense. If the Contractor's primary insurance policy/policies do not meet the minimum requirements, as set forth in this Agreement, the Contractor may provide evidence of an Umbrella/Excess insurance policy to comply with this requirement. The Contractor's insurance coverage shall be primary insurance as respects to the City, a Florida municipal corporation, its officials, employees, and volunteers. Any insurance or self-insurance maintained by the City, a Florida municipal corporation, its officials, employees, or volunteers shall be non-contributory. Any exclusion or provision in any insurance policy maintained by the Contractor that excludes coverage required in this Agreement shall be deemed unacceptable and shall be considered breach of contract. 5/7/2021 9:40 AM p. 104 City of Fort Lauderdale Bid 12504-613 All required insurance policies must be maintained until the contract work has been accepted by the City, or until this Agreement is terminated, whichever is later. Any lapse in coverage shall be considered breach of contract. In addition, Contractor must provide to the City confirmation of coverage renewal via an updated certificate should any policies expire prior to the expiration of this Agreement. The City reserves the right to review, at any time, coverage forms and limits of Contractor's insurance policies. The Contractor shall provide notice of any and all claims, accidents, and any other occurrences associated with this Agreement to the Contractor's insurance company or companies and the City's Risk Management office, as soon as practical. It is the Contractor's responsibility to ensure that any and all of the Contractor's independent contractors and subcontractors comply with these insurance requirements. All coverages for independent contractors and subcontractors shall be subject to all of the applicable requirements stated herein. Any and all deficiencies are the responsibility of the Contractor. NOTE: CITY PROJECT NUMBER, PROJECT NAME AND BID NUMBER MUST APPEAR ON EACH CERTIFICATE, AND THE CITY OF FORT LAUDERDALE MUST BE NAMED ON THE CERTIFICATE AS AN "ADDITIONAL INSURED" ON GENERAL LIABILITY POLICIES. A Sample Insurance Certificate shall be included with the proposal to demonstrate the firm's ability to comply with insurance requirements. Provide a previous certificate or other evidence listing the insurance companies' names for all required coverage, and the dollar amounts of the coverage. 11. PERFORMANCE AND PAYMENT BOND: 100% Number of awards anticipated: 7 The City may award up to seven (7) contracts to responsive and responsible contractors providing the lowest bid amounts in sequential order. The selected contractors will receive Task Orders during the effective term of the contract. Each Task Order shall require surety bonds equal to 100% of the Task Order total. (See complete Performance bond requirements under Article 10 of the Sample Agreement). 12. CITY PROJECT MANAGER The Project Manager is hereby designated by the City as Rares V. Petrica, whose address is 101 NE 3rd Avenue Suite 1410, Fort Lauderdale, Florida 33301-1016, telephone number: (954) 828-6720, and e-mail address is rpetrica fortlauderdale.gov. The Project Manager will assume all duties and responsibilities and will have the rights and authorities assigned to the Project Manager in the Contract Documents in connection with completion of the Work in accordance with this Agreement. 5/7/2021 9:40 AM p. 105 City of Fort Lauderdale Bid 12504-613 13. LIQUIDATED DAMAGES (See Article 16, Liquidated Damages, of the Contract for details) Upon failure of the Contractor to complete the Work of an executed task order within the agreed upon and approved time for said Task Order, the Contractor shall pay to the City the sum of Five Hundred Dollars ($500.00) for each and every calendar day that the completion of the Task Order is delayed beyond the time agreed upon for said Task Order, as fixed and agreed liquidated damages and not as a penalty, so long as the delay is caused by the Contractor. (See Article 16, Liquidated Damages Clause, of the Contract) 14. PAYMENT (See Article 7, Payment, of the Contract for other details) The City shall make payment to the Contractor through utilization of the City's P -Card Program. The City has implemented a Purchasing Card (P -Card) Program utilizing both the VISA and MASTERCARD networks. Purchases from this contract will be made utilizing the City's Purchasing Card. Contractor will receive payment from the purchasing card in the same manner as other credit card purchases. Accordingly, Contractor must presently have the ability to accept these credit cards or take whatever steps necessary to implement the ability before the start of the contract term, or contract award by the City. All costs associated with the Contractor's participation in this purchasing program shall be borne by the Contractor. The City reserves the right to revise this program as necessary. Payment Card Industry (PCI) Compliance Contractor agrees to comply with all applicable state, federal and international laws, as well as industry best practices, governing the collection, access, use, disclosure, safeguarding and destruction of Protected Information. Contractor and/or any subcontractor that handles credit card data must be, and remain, PCI compliant under the current standards and will provide documentation confirming compliance upon request by the City of Fort Lauderdale, failure to produce documentation could result in termination of the contract. 15. WORK SCHEDULE (including overtime hours): Regular work hours: 8:00 am to 5:00 pm, Monday through Friday. City Inspector Hours: 8:00 am to 4:30 pm, Monday through Friday. Any inspection requested by the contractor outside those hours will be considered overtime to be paid by the Contractor. 16. INSPECTION OVERTIME COST: $100/hr. 5/7/2021 9:40 AM p. 106 City of Fort Lauderdale Bid 12504-613 CITY OF FORT LAUDERDALE CONSTRUCTION AGREEMENT THIS Agreement made and and betweentheinto this ofhFort Lauderdale, a Florida 2021 by a Florida municipal corporation (City) and , Company/Corporation (Contractor), (Party or collectively Parties); WHEREAS, the City desires to retain a contractor for the Project as expressed in its 1 Invitation to Bid No. , Project No. , which was opened on ; and, WHEREAS, the Contractor has expressed its willingness and capability to perform the necessary work to accomplish the Project. NOW, THEREFORE, the City and the Contractor, in consideration of the mutual covenants and conditions contained herein and for other good and valuable consideration, the receipt and sufficiency is hereby acknowledged, agree as follows: ARTICLE 1 — DEFINITIONS Whenever used in this Agreement or in other Contract Documents, the following terms have the meanings indicated which are applicable to both the singular and plural forms: or 1.1 Agreement — This written Agreement other Contractween t DocumentsCity and ethat aaetattachedcovering tot oe work to be performed including incorporated in the Agreement. 1.2 Application for Payment — The form accepted by the City which is to be used by the Contractor in requesting progress or final payment and which is to include such supporting documentation as is required by the Contract Documents. 1.3 Approve — The word approve is defined to mean review of the material, equipment or methods for general compliance with design concepts and with the information given in the Contract Documents. It does not imply a responsibility on the part of the City to verify in every detail conformance with plans and specifications. 1.4 Bid — The offer or Bid of the Contractor submitted on the prescribed form setting forth the total prices for the Work to be performed. 1.5 Bid Documents — Advertisement for Invitation to Bids, the Instructions to Bidders, Forms, Bid Form (with supplemental affidavits and sample agreements), the General Conditions, the Supplementary Conditions, the Specifications, and the Plans, which documents all become an integral part of the Contract Documents. fying that all 1.6 Certificate of Substantial Completion tems, has been completed, rpletedbnspected, andovided y the City laccepted by Work, excluding the punch list the City. p. 107 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 1.7 Change Order - A change order is defined as a written order to the Contractor approved by the City, authorizing a revision of an underlying agreement between the City and the Contractor that is directly related to the original scope of work or an adjustment in the original contract price or the contract time directly related to the original scope of work, issued on or after the effective date of the contract. 1.8 City — The City of Fort Lauderdale, Florida including but not limited to its employees, agents, officials, representatives, contractors, subcontractors, volunteers, successors and assigns, with whom the Contractor has entered into the Agreement and for whom the Work is to be provided. 1.9 Contract Documents — The Contract Documents shall consist of this Agreement, Exhibits to this Agreement, Public Construction Bond, Performance Bond, Payment Bond and Certificates of Insurance, Notice of Award and Notice to Proceed, Task Orders, General Conditions, Special Conditions, Technical Specifications, Plans/Drawings, Addenda, Bid Form and supplement Affidavits and Agreements, all applicable provisions of State and Federal Law and any modification, including Change Orders or written amendments duly delivered after execution of Agreement, Invitation to Bid, Instructions to Bidders and Bid Bond, Contractor's response to the City's Invitation to Bid, Schedule of Completion, Schedule of Values, all amendments, modifications and supplements, work directive changes issued on or after the Effective Date of the Agreement, as well as any additional documents that are required to be submitted under the Agreement. Permits on file with the City and/or those permits to be obtained shall be considered directive in nature and will be considered a part of this Agreement. A copy of all permits shall be given to the City for inclusion in the Contract Documents. Terms of permits shall be met prior to acceptance of the Work and release of the final payment. 1.10 Contract Price — The monies payable to the Contractor by the City under the Contract Documents and in accordance with the line item unit prices listed in the Bid. 1.11 Contract Time — The number of calendar days stated in the Agreement for the completion of the Work. The dates on which the work shall be started and shall be completed as stated in the Notice to Proceed and each subsequent Task Order. 1.12 Contractor — The person, firm, company, or corporation with whom the City has entered into the Agreement, including but not limited to its employees, agents, representatives, contractors, subcontractors, their subcontractors and their other successors and assigns. 1.13 Day — A calendar day of twenty-four (24) hours ending at midnight. 1.14 Defective — When modifying the word "Work" refers to work that is unsatisfactory, faulty, or deficient, or does not conform to the Contract Documents or does not meet the requirements of any inspection, test or approval referred to in the Contract Documents, or has been damaged prior to the Project Manager's recommendation of final payment. 5/7/2021 9:40 AM p. 108 City of Fort Lauderdale Bid 12504-613 1.15 Effective Date of the Agreement — The effective date of the Agreement shall be the date the Contract is executed by the parties. The Contractor shall provide all required payment and performance bonds and insurances to the City within ten (10) calendar days following the City Commission approval. Upon verification of all bonds and insurances, the City will issue a written notice to proceed (NTP) to the Contractor. rk is eted, uding 1.16 Final Completionionof e Date list, and deliveThe date the red along with sk Order othose temslspecifiedI in the completion of the final punch Contract Documents and is accepted by the City. 1.17 Hazardous Materials (HAZMAT) - Any solid, liquid, or gaseous material that is toxic, flammable, radioactive, corrosive, chemically reactive, or unstable upon prolonged storage in quantities that could pose a threat to life, property, r the defined in Section 101(14) of Comprehensive Environmental Response, Compensation and Liability Act of 1980 and in 40 CFR 300.6. Also defined by 49 CFR 171.8 as a substance or material designated by the Secretary of Transportation to e capable of posing an unreasonable risk to health, safety, and whenproperty transported in commerce and which has been so designated. 1.18 Hazardous Substance - As defined by Section 101(14) of the Comprehensive Environmental Response, Compensation and Liability Act; any substance designated pursuant to Section 311(b) (2) (A) of the Clean Water Act; any element, compound, mixture, solution or substance designated pursuant to Section 102 identified under or listed pursuant to Section 3001 of the Solid Waste Disposal Act {but not including any waste listed under Section 307[a] of the Clean Water Act); any hazardous air pollutant listed under Section 112 of the Clean Air Act; and any imminently hazardous chemical substance or mixture pursuant to Section 7 of the Toxic Substances Control Act. The term does not include petroleum, including crude oil or any fraction thereof, which is not otherwise specifically listed or designated as a hazardous substance in the first sentence of this paragraph, and the term does not include natural gas, natural gas liquids, liquefied natural gas, or synthetic gas usable for fuel (or mixtures of natural gas and such synthetic gas). 1.19 Hazardous Waste - Those solid wastes designated by OSHA in accordance with 40 CFR 261 due to the properties of ignitability, corrosivity, reactivity, or toxicity. Any material that is subject to the Hazardous Waste Manifest requirements of the EPA specified in 40 CFR Part 262. 1.20 Holidays - Those designated non -work days as established by the City Commission of the City of Fort Lauderdale. 1.21 Inspection — The term "inspection" and the act of inspecting as used in this Agreement is defined to mean the exami n construction specifcafions.reThthat s termconforms notthe be design concept expressed in the plans and construed to mean supervision, superintending and/or overseeing. 1.22 Notice of Award - The written notice by City to the Contractor stating that upon compliance by the Contractor with the conditions precedent enumerated therein, within the time specified that the City will sign and deliver this Agreement. p. 109 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 1.23 Notice to Proceed — A written notice given by the City to the Contractor fixing the date on which the Contract Time will commence to run. Contractor will immediately commence work upon receipt of the Notice to Proceed. Task Orders executed under this Contract will contain set timeframes in which the Task Order work shall be started and completed. 1.24 Plans - The drawings which show the character and scope of the work to be performed and which have been prepared or approved by the City and/or are referred to in the Contract Documents and/or Task Orders. 1.25 Premises (otherwise known as Site or Work Site) — means the land, buildings, facilities, etc. upon which the Work is to be performed. 1.26 Project — The total construction of the Work to be provided as defined in the Contract Documents and each executed Task Order. 1.27 Project Manager - The employee of the City, or other designated individual who is herein referred to as the Project Manager, will assume all duties and responsibilities and will have the rights and authorities assigned to the Project Manager in the contract Documents in connection with completion of the Work in accordance with this Agreement. The Project Manager, or designee, shall be the authorized agent for the City unless otherwise specified. 1.28 Punch List - The City's list of Work yet to be done or be corrected by the Contractor, before the Final Completion date can be determined by the City. 1.29 Record Documents - A complete set of all specifications, drawings, addenda, modifications, shop drawings, submittals and samples annotated to show all changes made during the construction process. 1.30 Record Drawings or "As-Builts" - A set of drawings which show significant changes in the work made during construction and which are usually based on drawings marked up in the field and other data furnished by the contractor. These documents will be signed and sealed by a Professional Engineer or a Professional Land Surveyor licensed in the State of Florida and employed by the Contractor at no cost to the City. 1.31 Substantially Completed Date — A date when the Contractor has requested in writing, stating that the Work is substantially completed and is ready for an inspection and issuance of a final punch list for the Project. If, at the time of inspection, it is determined the project is substantially completed, the City will issue a letter of Substantial Completion along with a punch list of incomplete or deficient items to be completed prior to requesting a Final Completion inspection. 1.32 Task Order — A written agreement between the City and Contractor defining the particular scope of work to be performed under this Contract. When necessary, plans, permits and specifications may be provided by the City to clarify the requirements of the Task Order work. Each Task Order will contain a timeframe in which the work shall be completed in order for the Contractor to avoid being subjected to liquidated damages. 5/7/2021 9:40 AM p. 110 City of Fort Lauderdale Bid 12504-613 1.33 Work — The entire completed delivered product or the various separately identifiable parts thereof required to be furnished under the Contract Documents and/or Task Order. Work is the result of performing services, furnishing labor and furnishing and incorporating material and equipment into the product, all as required by the Contract Documents. ARTICLE 2 — SCOPE OF WORK 2.1 The Contractor shall complete all work as specified or indicated in the Contract Documents. The Project for which the Work under the Contract Documents may be the whole or only part is generally described as follows: ANNUAL CONSTRUCTION OF GENERAL STORMWATER INFRASTRUCTURE ITB 12504-613 PROJECT 12220 2.2 All Work for the Project shall be constructed in accordance with the approved plans and Specifications. The Work generally involves: PROJECT DESCRIPTION This project is located throughout the City of Fort Lauderdale. The work to be accomplished under this contract includes, but is not limited to, the construction and installation of various storm water infrastructure consisting of: catch basins, storm water manholes, piping, exfiltration trenches, tidal valves, swales regrades, retention area, pipe lining, pervious pavements and repair of the aforementioned. In addition to the storm water infrastructure, the contract covers restoration activated and miscellaneous utility relocations needed to execute these projects. This includes, but not limited to, landscape/hardscape removal and reinstall, pavers/pavement/asphalt removal and reinstall, relocation of various utility pipes and boxes, use of equipment for specialized work, maintenance of traffic, dewatering activities and pollution prevention items. 2.3 Within ten (10) days of a Notice to Proceed of the start date noted on each Task Order, the Contractor shall submit a Construction Schedule, Schedule of Values and a listing of all personnel employed. The general sequence of the Work shall be submitted by the Contractor and approved by the City before any work commences. The City reserves the right to issue construction directives necessary to facilitate the Work or to minimize any conflict with operations. ARTICLE 3 — PROJECT MANAGER 3.1 The Project Manager is hereby designated by the City as Rares V. Petrica, whose address is 101 NE 3rd Avenue, Suite 1410, Fort Lauderdale, FL 33301-1016, telephone number: (954) 828-6720, and email address is rpetrica(p�fortlauderdale.gov. The Project Manager will assume all duties and responsibilities and will have the rights and authorities assigned to the Project Manager in the Contract Documents in connection with completion of the Work in accordance with this Agreement. p. 111 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 ARTICLE 4 — CONTRACT DOCUMENTS The Contract Documents which comprise the entire Agreement between the City and Contractor are incorporated herein and attached to this Agreement, and consist of the following: 4.1 This Agreement. 4.2 Exhibits to this Agreement [Plans (sheets [ ] to [ ] inclusive)]. 4.3 Public Construction Bond, Performance Bond, Payment Bond and Certificates of Insurance. 4.4 Notice of Award and Notice to Proceed. 4.5 General Conditions as amended by the Special Conditions. 4.6 Technical Specifications. 4.7 Plans/Drawings. 4.8 Addenda number through , inclusive. 4.9 Bid Form and supplement Affidavits and Agreements. 4.10 All applicable provisions of State and Federal Law. 4.11 Invitation to Bid No., , Instructions to Bidders and Bid Bond. 4.12 Contractor's response to the City's Invitation to Bid No., dated 4.13 Schedule of Completion. 4.14 All amendments, modifications, supplements, Task Orders, change orders, and work directive changes, issued on or after the Effective Date of the Agreement. 4.15 Any Additional documents that are required to be submitted under the Agreement. 4.16 Permits on file with the City and or those permits to be obtained shall be considered directive in nature and will be considered a part of this Agreement. In the event of any conflict between the documents or any ambiguity or missing specification or instruction, the following priority is established: a. Agreement. b. Approved change orders, addenda or amendments. c. Specifications (quality) and Drawings (location and quantity). 5/7/2021 9:40 AM p. 112 City of Fort Lauderdale Bid 12504-613 d. Supplemental conditions or special terms. e. General Terms and Conditions. f. This Agreement dated , and any attachments. g. Invitation to Bid No., , and the specifications prepared by the City. h. Contractor's response to the City's Invitation to Bid No., dated i. Schedule of Values. j. Schedule of Completion. If during the performance of the Work, Contractor finds a conflict, error or discrepancy in the Contract Documents, Contractor shall so report to the Project Manager, in writing, within five (5) calendar days, and before proceeding with the Work affected shall obtain a written interpretation or clarification from the City. Any Work that may reasonably be inferred from the specifications or plans as being required to produce the intended result shall be supplied whether or not it is specifically called for. When words which have a well-known technical or trade meaning are used to describe Work, materials, or equipment, such works shall be interpreted in accordance with such meaning. Reference to standard specifications, manuals or codes of any technical society, organization or associations, or to the code of any governmental authority whether such reference be specific or implied, shall mean the latest standard specification, manual or code in effect as of the Effective Date of this Agreement, except as may be otherwise specifically stated. However, no provision of any referenced standard specification, manual or code (whether or not specifically incorporated by reference in the Contract Documents) shall change the duties and responsibilities of the City, the Contractor, or any of their agents or employees from those set forth in the Contract Documents. ARTICLE 5 — CONTRACT TIME 5.1 The initial contract term shall commence upon the date of award by the City and shall expire two (2) years from that date. The City reserves the right to extend the contract for two (2) additional one (1) year terms, providing all terms, conditions and specifications remain the same, both parties agree to the extension, and such extension is approved by the City. 5.2 The Contractor recognizes that TIME IS OF THE ESSENCE. The Work on each Task Order shall commence immediately upon the Contractor's receipt of an executed Task Order. ities 5.3 The Contractor shall mobilize ecceipt of the executed Task O der or by the specifitcvdate noted within NIA calendar of p days within the Task Order (whichever applies). p. 113 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 5.4 The Work on each Task Order shall be substantially completed within the timeframe agreed upon and noted in each executed Task Order. 5.5 The Work on each Task Order shall be finally completed on or before the Final Completion Date and ready for final payment in accordance with Final Completion Date agreed upon and noted in each executed Task Order. 5.6 In the event services are scheduled to end because of the expiration of this contract, the Contractor shall continue the service upon the request of the City as authorized by the awarding authority. The extension period shall not extend for more than one hundred and eighty (180) days beyond the expiration date of the existing contract. The Contractor shall be compensated for the service at the rate in effect when this extension clause is invoked by the City. No new Task Orders will be assigned after the contract's expiration nor will any new work be performed after that date. ARTICLE 6 — CONTRACT PRICE 6.1 City shall pay Contractor for performance of the Work in accordance with Article 7 based on the value of the executed Task Orders issued for this Contract. 6.2 The parties expressly agree that the Contract Price is a unit price contract, in accordance with those line item unit prices contained in the Contractor's ITB response and incorporated by reference herein. The quantities of work in the Proposal are a rough approximation only. The total quantities of work to be included in this Contract and actually performed may vary widely depending upon the work that will be authorized by the City through Task Orders, during the period of this Contract. 6.3 The Contract Price constitutes the total compensation payable to Contractor for the cumulative value of each executed Task Order. All duties, responsibilities and obligations assigned to or undertaken by Contractor shall be at Contractor's expense without change in the Contract price. ARTICLE 7 — PAYMENT PROCEDURES 7.1 Contractor shall submit Applications for Payment, for each executed Task Order, in accordance with the Contract Documents. Applications for Payment will be processed by the City as provided for in the General Conditions. 7.2 Progress Payments. City shall make progress payments on account of the Contract Price on the basis of Contractor's executed Task Order and corresponding Application for Payment, which shall be submitted by the Contractor between the first (1st) and the tenth (10th) day after the end of each calendar month for which payment is requested, or upon completion of the work of the executed Task Order. All progress payments will be made on the basis of the progress of the Work completed on the executed Task Order. 7.3 Prior to Final Completion of each Task Order, progress payments will be made in an amount equal to ninety percent (90%) of the value of Work completed less in each case the aggregate of payments previously made. 5/7/2021 9:40 AM p. 114 City of Fort Lauderdale Bid 12504-613 7.4 Final Payment: Upon final completion of the Work under each Task Order, the City shall pay Contractor an amount sufficient to increase total payments to one hundred percent (100%) of the Contract Price. 7.5 The City shall make payment to the Contractor in accordance with the Florida Prompt Payment Act, Section 218.70, Florida Statutes (2020), as amended or revised, provided however, complete and error free pay application is submitted. 7.6 The City shall make payment to the Contractor through utilization of the City's P -Card Program. The City has implemented a Purchasing Card (P -Card) Program utilizing the MASTERCARD and VISA networks. Purchases from this contract will be made utilizing the City's Purchasing Card. Contractor will receive payment from the purchasing card in the same manner as other credit card purchases. Accordingly, Contractor must presently have the ability to accept these credit cards or take whatever steps necessary to implement the ability before the start of the contract term, or contract award by the City. All costs associated with the Contractor's participation in this purchasing program shall be borne by the Contractor. The City reserves the right to revise this program as necessary. 7.7 Payment Card Industry (PCI) Compliance Contractor agrees to comply with all applicable state, federal and international laws, as well as industry best practices, governing the collection, access, use, disclosure, safeguarding and destruction of Protected Information. Contractor and/or any subcontractor that handles credit card data must be, and remain, PCI compliant under the current standards and will provide documentation confirming compliance upon request by the City of Fort Lauderdale, failure to produce documentation could result in termination of the contract. ARTICLE 8 — CONTRACTOR'S REPRESENTATIONS In order to induce the City to enter into this Agreement, and prior to agreeing to and execution of each Task Order under this Contract, Contractor makes the following representations upon which the City has relied: 8.1 Contractor is qualified in the field of public construction and in particular to perform the Work and services set forth in this Agreement. 8.2 Contractor has visited the Work Site, conducted all necessary extensive tests, examinations and investigations and represents and warrants a thorough familiarization with the nature and extent of each Task Order and associated Contract Documents, the Work, locality, soil conditions, water table condition, moisture conditions and all year-round local weather and climate conditions (past and present), and examination and investigations conducted by Contractor and the Contractor's experts, has determined that no conditions exist that would in any manner affect the Proposed Price and that the project can be completed for the Proposed Price submitted within the Contract Time as defined in each Task Order. Furthermore, Contractor warrants and confirms that it is totally familiar with, understands and obligates Contractor to comply with all federal, state and local laws, ordinances, rules, p. 115 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 regulations and all market conditions that affect or may affect the cost and price of materials and labor needed to fulfill all provisions of this Agreement or that in any manner may affect cost, progress or performance of the Work. 8.3 The Contractor has satisfied itself as to the nature and location of the Work under each Task Order, the general and local conditions of the Project, particularly those bearing upon availability of transportation, disposal, handling and storage of materials, availability of labor, water, electric power, and roads, the conformation and conditions at the ground based on City provided reports, the type of equipment and facilities needed preliminary to and during the prosecution of the Task Order and all other matters which can in any way affect the Work, schedule, or the cost thereof under the Task Order and associated Contract Documents. 8.4 The Contractor has also studied on its own, subsurface and latent physical conditions at the site or otherwise affecting cost, progress or performance of the Works, and finds and has further determined that no conditions exist that would in any manner affect the Proposed Price and that the Task Order Work can be completed for the Proposed Price submitted and within the timeframe agreed upon within each Task Order. 8.5 Contractor has made or cause to be made examinations, investigations, tests and studies of such reports and related data in addition to those referred to in Paragraphs 8.2, 8.3 and 8.4 above as it deems necessary for the performance of the Work under each Task Order at the Contract Prices, within the Contract Time of the specified Task Order and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, investigations, tests, reports or similar data are, or will be, required by Contractor for such purposes. 8.6 Contractor has correlated the results of all such observations, examinations, investigations, tests, reports and data related to each Task Order with the terms and conditions of the Contract Documents. 8.7 Contractor has given City written notice of all conflicts, errors or discrepancies that it has discovered in the Contract Documents related to each Task Order and the written resolution by City is acceptable to the Contractor. 8.8 Labor 8.8.1 The Contractor shall provide competent, suitable qualified personnel to survey and lay out the Work and perform construction as required by the Contract Documents for each Task Order. The Contractor shall at all times maintain good discipline and order at the site. 8.8.2 The Contractor shall, at all times, have a competent superintendent, capable of reading and thoroughly understanding the drawings and specifications, as the Contractor's agent on the Work, who shall, as the Contractor's agent, supervise, direct and otherwise conduct the Work under each Task Order. 8.8.3 The Contractor shall designate the superintendent on the job to the City, in writing, immediately after receipt of each Task Order. The Contractor understands and agrees that the superintendent's physical presence on the job 5/7/2021 9:40 AM p. 116 City of Fort Lauderdale Bid 12504-613 site is indispensable to the successful completion of the Work. If the superintendent is frequently absent from the job site, the Project Manager may deliver written notice to the Contractor to stop work or terminate the Agreement in accordance with Article 17. 8.8.4 Where required and necessary, the contractor shall, at all times, have a certified "competent person" assigned to the job site for each Task Order. The Contractor shall assign personnel to the job site that have successfully completed training programs related to trench safety, confined space work, and maintenance of traffic (MOT). Personnel certified by the International Municipal Signal Associations with Florida Department of Transportation qualifications are required relative to MOT. Any other certifications that may be required by applicable permitting agencies for the Work assigned under each Task Order shall also be complied with by the Contractor. Failure to pursue the Work with the properly certified supervisory staff may result in a notice to stop work on a Task Order or termination of the Agreement in accordance with Article 17. 8.9 Materials: 8.9.1 The Contractor shall furnish all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water and sanitary facilities and all other facilities and incidentals necessary for the execution, testing, initial operation and completion of Work under each Task Order. 8.9.2 All materials and equipment shall be of good quality and new, except as otherwise provided in the Contract Documents. Suppliers shall be selected and paid by the Contractor; the City reserves the right to approve all suppliers and materials. 8.10 Work Hours: Except in connection with the safety or protection of persons, or the Work, or property at the site or adjacent thereto, and except as otherwise indicated in the Supplementary Conditions, all work at the site shall be performed during regular working hours between 8 a.m. and 5:00 p.m., Monday through Friday. Unless approved by the City in advance, the Contractor will not perform work on Saturday, Sunday or any legal holiday (designated by the City of Fort Lauderdale) without the Project Manager's written consent at least seventy-two (72) hours in advance of starting such work. For any overtime inspection required by City personnel, the Contractor shall pay for the additional charges to the City with respect to such overtime work. Such additional charges shall be a subsidiary obligation of the Contractor and no extra payment shall be made to the Contractor for overtime work. It shall be noted that the City's Inspector work hours are from 8:00 a.m. to 4:30 p.m., Monday through Friday, and any work requiring inspection oversight being performed outside of this timeframe shall be paid for by the Contractor as Inspector overtime at a rate of $100.00 per hour. The cost to the Contractor to reimburse the City for overtime inspection is established at direct -labor and overtime costs for each person or inspector required. Incidental overtime costs for engineering, testing and other related services will also be charged to the Contractor at the actual rate accrued. 5/7/2021 9:40 AM p. 117 City of Fort Lauderdale Bid 12504-613 8.11 Patent Fee and Royalties: The Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work, or any invention, design, process, product or device which is the subject of patent rights or copyrights held by others. The Contractor hereby expressly binds himself or itself to indemnify and hold harmless the City from all such claims and fees and from any and all suits and action of every name and description that may be brought against City on account of any such claims, fees, royalties, or costs for any such invention or patent, and from any and all suits or actions that may be brought against said City for the infringement of any and all patents or patent rights claimed by any person, firm corporation or other entity. 8.12 Permits: The Contractor shall obtain and pay for all permits and licenses. There shall be no allowance for Contractor markup, overhead or profit for permits and licenses. The Contractor shall pay all government charges which are applicable at the time of opening of proposals. It shall be the responsibility of the Contractor to secure and pay for all necessary licenses and permits of a temporary nature necessary for the prosecution of Work. 8.13 Law and Regulations: The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations applicable to the Work. If the Contractor observes that the specifications or plans are in conflict, the Contractor shall give the Project Manager prompt written notice thereof within five (5) calendar days and any necessary changes shall be adjusted by any appropriate modifications. If the Contractor performs any work knowing or having reason to know that it is contrary to such laws, ordinances, rules, standards, specifications and regulations, and without such notice to the Project Manager, the Contractor shall bear all costs arising therefrom. 8.14 Taxes: The Contractor shall pay all sales, consumer, use and other similar taxes required to be paid by him in accordance with the laws of the City of Fort Lauderdale, County of Broward, and the State of Florida. 8.15 Contractor Use of Premises: The Contractor shall confine construction equipment, the storage of materials and equipment and the operations of workmen to areas permitted by law, ordinances, permits and/or the requirements of the Contract Documents, and shall not unreasonably encumber the premises with construction equipment or other materials or equipment. The Contractor shall not enter upon private property for any ithout first securing the permission of the property owner in writing and furnishing `the Project Manager with a copy of said permission. This requirement will be strictly enforced, particularly with regard to such vacant properties as may be utilized for storage or staging by the Contractor. The Contractor shall conduct its work in such a manner as to avoid damage to adjacent private or public property. Any damage to existing structures of work of any kind, including permanent reference markers or property corner markers, or the interruption of a utility service, shall be repaired or restored promptly at no expense to the City or property owner. 5/7/2021 9:40 AM p. 118 Bid 12504-613 City of Fort Lauderdale The Contractor will preserve and protect all existing vegetation such as trees, shrubs and grass on or adjacent to the site which does not reasonably interfere with the construction, as determined by the Project Manager. The Contractor will be responsible for repairing or replacing any trees, shrubs, lawns and landscaping that may be damaged due to careless operation of equipment, stockpiling of materials, tracking of grass by equipment or other construction activity. The Contractor will be liable for, or will be required to replace restore may be required that is the destCity royed properties and areas not protected or preserved as or damaged. During the progress of the Work, the Contractor shall keep the premises free from accumulation of waste materials, rubbish and debris resulting from the Work. At the completion of the Work, the Contractor shall remove all waste materials, consishch and d debris from and about the premises as well as all tools, appliances, equipment and machinery, and surplus materials and shall leave the site clean and ready for occupancy by the City. The Contractor shall restore to their original condition those portions of the site not designated for alteration by the Contract Documents at no cost to the City. 8.16 Proiect Coordination: The Contractor shall provide for the complete coordination of the construction effort. This shall include, but not necessarily be limited to, coordination of the following: 8.16.1 Flow of material and equipment from suppliers. 8.16.2 The interrelated work with affected utility companies. 8.16.3 The interrelated work with the City where tie-ins to existing facilities are required. 8.16.4 The effort of independent testing agencies. 8.16.5 Notice to affected property owners as may be directed by the Project Manager. 8.16.6 Coordination with and scheduling of all required inspections from all permitting agencies. 8.17 Project Record Documents and As-Builts (Record Drawings): Contractor shall be responsible for maintaining up to date redline as -built drawings, on site, at all times during construction. All as -built information shall be surveyed and verified by a professional land surveyor registered in the State of Florida. Contractor shall provide the City with a minimum of three (3) sets of signed and sealed record drawings (Final As-builts) and a CD of the electronic drawing files created in AutoCAD 2014 or later. All costs associated with survey work required for construction layout and as -built preparation shall be the responsibility of the Contractor. 8.18 Safety and Protection: 8.18.1 The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and necessary s in connection for thelth the safety of,ork. The and shall Contractor shall take all precautions provide the necessary protection to prevent damage, injury or loss to: 8.18.1.1 All employees working on the project and other persons who may be affected thereby. p. 119 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 8.18.1.2 All the Work and all materials or equipment to be incorporated therein, whether in storage on or off the site. 8.18.1.3 Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. 8.18.2 The Contractor shall comply with all applicable laws, ordinances, rules, regulations and orders of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. The Contractor shall notify owners of adjacent property and utilities when execution of the Work may affect them at least seventy-two (72) hours in advance (unless otherwise required). All damage, injury or loss to any property caused, directly or indirectly, in whole or in part by the Contractor, any subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, shall be remedied by the Contractor. The Contractor's duties and responsibilities for safety and protection of the Work shall continue until such time as all the Work is completed and accepted by the City. 8.19 Emergencies: In emergencies affecting the safety or protection of persons or the Work or property at the site or adjacent thereto, the Contractor, without special instruction or authorization from the City, is obligated to act to prevent threatened damage, injury or loss. The Contractor shall give the Project Manager prompt written notice of any significant changes in the Work or deviations from the Contract Documents caused thereby. 8.20 Risk of Loss: The risk of loss, injury or destruction shall be on the Contractor until acceptance of the Work by the City. Title to the Work shall pass to the City upon acceptance of the Work by the City. 8.21 Environmental: The Contractor has fully inspected the Premises and agrees, except as to the presence of any asbestos, to accept the Premises in an "as is" physical condition, without representation or warranty by the City of any kind, including, without limitation, any and all existing environmental claims or obligations that may arise from the presence of any "contamination" on, in or about the Premises. Further, Contractor and all entitles claiming by, through or under the Contractor, releases and discharges the City, from any claim, demand, or cause of action arising out of or relating to the Contractor's use, handling, storage, release, discharge, treatment, removal, transport, decontamination, cleanup, disposal and/or presence of any hazardous substances including asbestos on, under, from or about the Premises. The Contractor shall have no liability for any pre-existing claims or "contamination" on the Premises. The Contractor shall not use, handle, store, discharge, treat, remove, transport, or dispose of Hazardous Substances including asbestos at, in, upon, under, to or from the Premises until receipt of instructions from the City. At such time, a City approved Change Order, which shall not include any profit, shall authorize the Contractor to perform such services. 5/7/2021 9:40 AM p. 120 City of Fort Lauderdale Bid 12504-613 The Contractor shall immediately deliver to the Project Manager complete copies of all notices, demands, or other communications received by the Contractor from any governmental or quasi -governmental authority or any insurance company or board of fire underwriters or like or similar entities regarding in any way alleged violations or potential violations of any Environmental Law or otherwise asserting the existence or potential existence of any condition or activity on the Premises which is or could be dangerous to life, limb, property, or the environment. For other and additional consideration, the Contractor hereby agrees, at its sole cost and expense, to indemnify and protect, defend, and hold harmless the City and its respective employees, agents, officials, officers, representatives, contractors and subcontractors, successors, and assigns (hereafter the "City") from and against any and all claims, demands, losses, damages, costs, expenses, including but not limited to mitigation, restoration, and natural restoration expenses, liabilities, assessments, fines, penalties charges, administrative and judicial proceedings and orders, judgments, causes of action, in law or in equity, remedial action requirements and/or enforcement actions of any kind (including, without limitation, attorneys' fees and costs) directly or indirectly arising out of or attributable to, in whole or in part, the Contractor's use, handling, storage, release, threatened release, discharge, treatment, removal, transport, decontamination, cleanup, disposal and/or presence of a Hazardous Substance (excluding asbestos) on, under, from, to or about the Premises or any other activity carried on or undertaken on or off the Premises by the Contractor or its employees, agents or subcontractors, in connection with the use, handling, storage, release, threatened release, discharge, treatment, mitigation, natural resource restoration, removal, transport, decontamination, cleanup, disposal and/or presence or any Hazardous Substance including asbestos located, transported, or present on, undue, from, to, or about the Premises. This indemnity is intended to be operable under 42 U.S.C. sections 9607, as amended or revised, and any successor section. The scope of the indemnity obligations includes, but is not limited to: (a) all consequential damages; (b) the cost of any required or necessary repair, cleanup, or detoxification of the applicable real estate and the preparation and implementation of any closure, remedial or other required plan, including without limitation; (i) the costs of removal or remedial action incurred by the United States government or the State of Florida or response costs incurred by any other person, or damages from injury to destruction of, or loss of, natural resources, including the cost of assessing such injury, destruction, or loss, incurred pursuant to the Comprehensive Environmental Response, Compensation and Liability Act, as amended; (ii) the clean-up costs, fines, damages, or penalties incurred pursuant to any applicable provisions of Florida law; and (iii) the cost and expenses of abatement, correction or cleanup, fines, damages, response costs, or penalties which arise from the provisions of any other statute, law, regulation, code ordinance, or legal requirement state or federal; and (c) liability for personal injury or property damage arising under any statutory or common law tort theory, including damages assessed for the maintenance of a public private nuisance, response costs, or for the carrying on of an abnormally dangerous activity. 8.22 No Extended Damages : For other and additional good and valuable consideration the receipt and sufficiency of which is hereby acknowledged, the Contractor covenants and agrees that in the event of any delay of construction or for any other reason or allegation or claim, and notwithstanding the reason of the delay, reason, claim or allegation or who caused them or the construction delay or whether they were caused 5/7/2021 9:40 AM p. 121 City of Fort Lauderdale Bid 12504-613 by the City, that there will be no entitlement to Contractor to or for any direct or indirect financial damages or losses for extended corporate overhead impact, extended project overhead impacts, project support services, mobilization or demobilization or by whatever other label or legal concept or theory and types of names or labels or basis such claims may have, or any business damages or losses of whatever type or nature, and Contractor hereby waives any right to make any such claim or claims. This provision will have application and effect when construction delays are anticipated and agreed upon by both the City and the Contractor. 8.23 No Liens: If any Subcontractor, supplier, laborer, or materialmen of Contractor or any other person directly or indirectly acting for or through Contractor files or attempts to file a mechanic's or construction lien against the real property on which the Work is performed or any part or against any personal property or improvements or claim against any monies due or to become due from the City to Contractor or from Contractor to a Subcontractor, for or on account of any work, labor, services, material, equipment, or other items furnished in connection with the Work or any Change Order, Contractor agrees to satisfy, remove, or discharge such lien or claim at its own expense by bond, payment, or otherwise within twenty (20) days of the filing or from receipt of written notice from the City. Additionally, until such time as such lien or claim is satisfied, removed or discharged by Contractor, all monies due to Contractor, or that become due to Contractor before the lien or claim is satisfied, removed or otherwise discharged, shall be held by City as security for the satisfaction, removal and discharge of such lien and any expense that may be incurred while obtaining such. If Contractor shall fail to do so, City shall have the right, in addition to all other rights and remedies provided by this Agreement or by law, to satisfy, remove, or discharge such lien or claim by whatever means City chooses at the entire and sole cost and expense of Contractor which costs and expenses shall, without limitation, include attorney's fees, litigation costs, fees and expenses and all court costs and assessments. 8.24 Weather Emergencies: Upon issuance of a Hurricane Watch by the National Weather Service, the Contractor shall submit to the City a plan to secure the work area in the event a Hurricane Warning is issued. The plan shall detail how the Contractor will secure the Premises, equipment and materials in a manner as to prevent damage to the Work and prevent materials and equipment from becoming a hazard to persons and property on and around the Premises. The plan shall include a time schedule required to accomplish the hurricane preparations and a list of emergency contacts that will be available and in the City before, during and immediately after the storm. Upon issuance of a Hurricane Warning by the National Weather Service, if the Contractor has not already done so, the Contractor shall implement its hurricane preparedness plan. Cost of development and implementation of the hurricane preparedness plan shall be considered as incidental to construction. Cost of any clean up and rework required after the storm will be considered normal construction risk within Florida and shall not entitle the Contractor to any additional compensation. Contractor shall be entitled to request an extension in time for completion of the Work, in accordance with the provisions of Article 15 of this Agreement, equal to the time it is shut down for implementation of the preparedness plan, the duration of the storm and a reasonable period to restore the Premises. 5/7/2021 9:40 AM p. 122 City of Fort Lauderdale Bid 12504-613 8.25 Force Majeure: No Party shall hold the other responsible for damages or for delays in performance caused by force majeure, acts of God, or other acts or circumstances beyond the control of the other party or that could not have been reasonably foreseen and prevented. For this purpose, such acts or circumstances shall include, but not be limited to weather conditions affecting performance, floods, epidemics, pandemics, war, act of Governmental Authority, state of emergency, riots, strikes, lockouts, or other industrial disturbances, or protest demonstrations. Should such acts or circumstances occur, the parties shall use their best efforts to overcome the difficulties arising therefrom and to resume the Work as soon as reasonably possible with the normal pursuit of the Work. Inclement weather, continuous rain for less than three (3) days or the acts or omissions of subcontractors, third -party contractors, materialmen, suppliers, or their subcontractors, shall not be considered acts of force majeure. No Party shall be liable for its failure to carry out its obligations under the Agreement during a period when such Party is rendered unable by force majeure to carry out its obligation, but the obligation of the Party or Parties relying on such force majeure shall be suspended only during the continuance of the inability and for no longer period than the unexpected or uncontrollable event. The Contractor further agrees and stipulates, that its right to excuse its failure to perform by reason of force majeure shall be conditioned upon giving written notice of its assertion that a Force Majeure delay has commenced within 96 hours after such an occurrence. The Contractor shall use its reasonable efforts to minimize such delays. The Contractor shall promptly provide an estimate of the anticipated additional time required to complete the Project. 8.26 Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assisted Contracts: The recipient shall not discriminate on the basis of race, color, national origin, or sex in the award and performance of any DOT -assisted contract or in the administration of its DBE program or the requirements of 49 CFR Part 26. The recipient shall take all necessary and reasonable steps under 49 CFR Part 26 to ensure nondiscrimination in the award and administration of DOT -assisted contracts. The recipient's DBE program, as required by 49 CFR Part 26 and as approved by DOT, is incorporated by reference in this Agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as a violation of this Agreement. Upon notification to the recipient of its failure to carry out its approved program, the Department may impose sanctions as provided for under Part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 et seq.). Additionally, the Contractor assures that it, the sub recipient or its subcontractors shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The Contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT -assisted contracts. Failure by the Contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this Agreement or such other remedy as the recipient deems appropriate. This additional language must be included in each subcontract the prime contractor signs with a subcontractor. p. 123 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 ARTICLE 9 — CITY'S RESPONSIBILITIES 9.1 The City shall furnish the data required of the City under the Contract Documents promptly and shall make payments to the Contractor promptly after they are due as provided in Article 7. 9.2 The City shall provide public rights -of -way and easement, where available, for the installation of conduits, transformers pads and related appurtenances only. 9.3 Technical Clarifications and Interpretations: 9.3.1 The City shall issue, with reasonable promptness, such written clarifications or interpretations of the Contract Documents as it may determine necessary, which shall be consistent with or reasonably inferable from the overall intent of the Contract Documents. Should the Contractor fail to request interpretation of questionable items in the Contract Documents, the City shall not entertain any excuse for failure to execute the Work in a satisfactory manner. 9.3.2 The City shall interpret and decide matters concerning performance under the requirements of the Contract Documents, and shall make decisions on all claims, disputes or other matters in question. Written notice of each claim, dispute or other matter will be delivered by claimant to the other Party but in no event later than five (5) days after the occurrence of event, and written supporting date will be submitted to the other Party within five (5) days after such occurrence. All written decisions of the City on any claim or dispute will be final and binding. 9.4 The Contractor shall perform all Work to the reasonable satisfaction of the City in accordance with the Contract Documents. In cases of disagreement or ambiguity, the City shall decide all questions, difficulties, and disputes of whatever nature, which may arise under or by reason of this Agreement or the quality, amount and value of the Work, and the City's decisions on all claims, questions and determination are final. 9.5 Cancellation For Unappropriated Funds: The obligation of the City for payment to a Contractor is limited to the availability of funds appropriated in a current fiscal period, and continuation of the contract into a subsequent fiscal period is subject to appropriation of funds, unless otherwise authorized by law. ARTICLE 10 — BONDS AND INSURANCE 10.1 Public Construction and Other Bonds: The Contractor shall furnish Public Construction or Performance and Payment Bonds ("Bond"), in an amount equal to 100% of the value of each Task Order issued as security for the faithful performance and payment of all the Contractor's obligations under the Contract Documents. These Bonds shall remain in effect until at least one (1) year after the date of final payment, except as otherwise provided by law. All Bonds shall be furnished and provided by the surety and shall be in substantially the same form as prescribed by the Contract Documents and be executed by such sureties as (i) are licensed to conduct business in the State of Florida, and (ii) are named in the current list of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable 5/7/2021 9:40 AM p. 124 City of Fort Lauderdale Bid 12504-613 Reinsuring Companies as published in Circular 570 (amended) by the Audit Staff Bureau of Accounts, U.S. Treasury Department and (iii) otherwise meet the requirements set forth herein that apply to sureties. All Bonds signed by an agent must be accompanied by a certified copy of the authority to act. 10.1.1 Performance Bond: The Contractor shall execute and record in the public records of Broward County, Florida, a payment and performance bond in an amount at least equal to the Contract Price with a surety insurer authorized to do business in the State of Florida as surety, ("Bond"), in accordance with Section 255.05, Florida Statutes (2020), as may be amended or revised, as security for the faithful performance and payment of all of the Contractor's obligations under the Contract Documents. A Corporate Surety Bond legally issued, meeting the approval of, and running to the City in an amount not less than the Contract Price of such improvements, conditioned that the Contractor shall maintain and make all repairs to the improvements constructed by the Contractor at their own expense and free of charge to the City, for the period of one (1) year after the date of acceptance of the Work within such period by reason of any imperfection of the material used or by reason of any defective workmanship, or any improper, imperfect or defective preparation of the base upon which any such improvement shall be laid. 10.2 Disqualification of Surety: If the Surety on any Bond furnished by the Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Florida or it ceases to meet the requirements of clauses (i) and (ii) of Paragraph 10.1, the Contractor shall within five (5) days thereafter substitute another Bond and Surety, both of which shall be acceptable to the City. 10.3 Insurance As a condition precedent to the effectiveness of this Agreement, during the term of this Agreement and during any renewal or extension term of this Agreement, the Contractor, at its sole expense, shall provide insurance of such types and with such terms and limits as noted below. Providing proof of and maintaining adequate insurance coverage are material obligations of the Contractor. The Contractor shall provide the City a certificate of insurance evidencing such coverage. The Contractor's insurance coverage shall be primary insurance for all applicable policies. The limits of coverage under each policy maintained by the Contractor shall not be interpreted as limiting the Contractor's liability and obligations under this Agreement. All insurance policies shall be through insurers authorized or eligible to write policies in the State of Florida and possess an A.M. Best rating of A-, VII or better, subject to approval by the City's Risk Manager. The coverages, limits, and/or endorsements required herein protect the interests of the City, and these coverages, limits, and/or endorsements shall in no way be relied upon by the Contractor for assessing the extent or determining appropriate types and limits of coverage to protect the Contractor against any loss exposures, whether as a result 5/7/2021 9:40 AM p. 125 City of Fort Lauderdale Bid 12504-613 of this Agreement or otherwise. The requirements contained herein, as well as the City's review or acknowledgement, are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by the Contractor under this Agreement. The following insurance policies and coverages are required: Commercial General Liability Coverage must be afforded under a Commercial General Liability policy with limits not less than: • $1,000,000 each occurrence and $2,000,000 aggregate for Bodily Injury, Property Damage, and Personal and Advertising Injury • $1,000,000 each occurrence and $2,000,000 aggregate for Products and Completed Operations Policy must include coverage for contractual liability and independent contractors. The City, a Florida municipal corporation, its officials, employees, and volunteers are to be covered as an additional insured with a CG 20 26 04 13 Additional Insured — Designated Person or Organization Endorsement or similar endorsement providing equal or broader Additional Insured Coverage with respect to liability arising out of activities performed by or on behalf of the Contractor. The coverage shall contain no special limitation on the scope of protection afforded to the City, its officials, employees, and volunteers. Business Automobile Liability Coverage must be afforded for all Owned, Hired, Scheduled, and Non -Owned vehicles for Bodily Injury and Property Damage in an amount not less than $1,000,000 combined single limit each accident. If the Contractor does not own vehicles, the Contractor shall maintain coverage for Hired and Non -Owned Auto Liability, which may be satisfied by way of endorsement to the Commercial General Liability policy or separate Business Auto Liability policy. Contractor's Pollution Liability Coverage For sudden and gradual occurrences and in an amount not less than $1,000,000 per claim arising out of this Agreement, including but not limited to, all hazardous materials identified under the Agreement. Umbrella/Excess Liability: The Contractor shall provide umbrella/excess coverage with limits of no less than $2,000,000 excess of Commercial General Liability, Automobile Liability and Employer's Liability. Workers' Compensation and Employer's Liability Coverage must be afforded per Chapter 440, Florida Statutes. Any person or entity performing work for or on behalf of the City must provide Workers' Compensation insurance. Exceptions and exemptions will be allowed by the City's Risk Manager, if they are in accordance with Florida Statute. 5/7/2021 9:40 AM p. 126 City of Fort Lauderdale Bid 12504-613 The Contractor waives, and the Contractor shall ensure that the Contractor's insurance carrier waives, all subrogation rights against the City, its officials, employees, and volunteers for all losses or damages. The City requires the policy to be endorsed with WC 00 03 13 Waiver of our Right to Recover from Others or equivalent. The Contractor must be in compliance with all applicable State and federal workers' compensation laws, including the U.S. Longshore Harbor Workers' Act and the Jones Act, if applicable. Property Coverage (Builder's Risk) Coverage must be afforded in an amount not less than 100% of the total project cost, including soft costs, with a deductible of no more than $25,000 each claim. Coverage form shall include, but not be limited to: • All Risk Coverage including Flood and Windstorm with no coinsurance clause • Guaranteed policy extension provision • Waiver of Occupancy Clause Endorsement, which will enable the City to occupy the facility under construction/renovation during the activity • Storage and transport of materials, equipment, supplies of any kind whatsoever to be used on or incidental to the project • Equipment Breakdown for cold testing of all mechanized, pressurized, or electrical equipment This policy shall insure the interests of the owner, contractor, and subcontractors in the property against all risk of physical loss and damage, and name the City as a loss payee. This insurance shall remain in effect until the work is completed and the property has been accepted by the City. Insurance Certificate Requirements a. The Contractor shall provide the City with valid Certificates of Insurance (binders are unacceptable) no later than ten (10) days prior to the start of work contemplated in this Agreement. b. The Contractor shall provide to the City a Certificate of Insurance having a thirty (30) day notice of cancellation; ten (10) days' notice if cancellation is for nonpayment of premium. c. In the event that the insurer is unable to accommodate the cancellation notice requirement, it shall be the responsibility of the Contractor to provide the proper notice. Such notification will be in writing by registered mail, return receipt requested, and addressed to the certificate holder. d. In the event the Agreement term goes beyond the expiration date of the insurance policy, the Contractor shall provide the City with an updated Certificate of Insurance no later than ten (10) days prior to the expiration of the insurance currently in effect. The City reserves the right to suspend the Agreement until this requirement is met. e. The Certificate of Insurance shall indicate whether coverage is provided under a claims -made or occurrence form. If any coverage is provided on a claims -made form, the Certificate of Insurance must show a retroactive date, which shall be the effective date of the initial contract or prior. f. The City shall be named as an Additional Insured on all liability policies, with the exception of Workers' Compensation. 5/7/2021 9:40 AM p. 127 City of Fort Lauderdale Bid 12504-613 g. The City shall be granted a Waiver of Subrogation on the Contractor's Workers' Compensation insurance policy. h. The title of the Agreement, Bid/Contract number, event dates, or other identifying reference must be listed on the Certificate of Insurance. The Certificate Holder should read as follows: City of Fort Lauderdale 100 N. Andrews Avenue Fort Lauderdale, FL 33301 The Contractor has the sole responsibility for all insurance premiums and shall be fully and solely responsible for any costs or expenses as a result of a coverage deductible, co-insurance penalty, or self -insured retention; including any loss not covered because of the operation of such deductible, co-insurance penalty, self -insured retention, or coverage exclusion or limitation. Any costs for adding the City as an Additional Insured shall be at the Contractor's expense. If the Contractor's primary insurance policy/policies do not meet the minimum requirements, as set forth in this Agreement, the Contractor may provide evidence of an Umbrella/Excess insurance policy to comply with this requirement. The Contractor's insurance coverage shall be primary insurance as respects to the City, a Florida municipal corporation, its officials, employees, and volunteers. Any insurance or self-insurance maintained by the City, a Florida municipal corporation, its officials, employees, or volunteers shall be non-contributory. Any exclusion or provision in any insurance policy maintained by the Contractor that excludes coverage required in this Agreement shall be deemed unacceptable and shall be considered breach of contract. All required insurance policies must be maintained until the contract work has been accepted by the City, or until this Agreement is terminated, whichever is later. Any lapse in coverage shall be considered breach of contract. In addition, Contractor must provide to the City confirmation of coverage renewal via an updated certificate should any policies expire prior to the expiration of this Agreement. The City reserves the right to review, at any time, coverage forms and limits of Contractor's insurance policies. The Contractor shall provide notice of any and all claims, accidents, and any other occurrences associated with this Agreement to the Contractor's insurance company or companies and the City's Risk Management office, as soon as practical. It is the Contractor's responsibility to ensure that any and all of the Contractor's independent contractors and subcontractors comply with these insurance requirements. All coverages for independent contractors and subcontractors shall be subject to all of the applicable requirements stated herein. Any and all deficiencies are the responsibility of the Contractor. 5/7/2021 9:40 AM p. 128 City of Fort Lauderdale Bid 12504-613 NOTE: CITY PROJECT NUMBER, PROJECT NAME AND BID NUMBER MUST APPEAR ON EACH CERTIFICATE, AND THE CITY OF FORT LAUDERDALE MUST BE NAMED ON THE CERTIFICATE AS AN "ADDITIONAL INSURED" ON GENERAL LIABILITY POLICIES. A Sample Insurance Certificate shall be included with the proposal to demonstrate the firm's ability to comply with insurance requirements. Provide a previous certificate or other evidence listing the insurance companies' names for all required coverage, and the dollar amounts of the coverage. ARTICLE 11- WARRANTY AND GUARANTEE, TESTS AND INSPECTIONS, CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.1 Warranty: The Contractor warrants and guarantees to the City that all Work will be in accordance with the Contract Documents and will not be defective. Prompt notice of all defects shall be given to the Contractor. All defective work, whether or not in place, may be rejected, corrected or accepted as provided in this Article. 11.1.1 Warranty of Title: The Contractor warrants to the City that it possesses good, clear and marketable title to all equipment and materials provided and that there are no pending liens, claims or encumbrances against the equipment and materials. 11.1.2 Warranty of Specifications: The Contractor warrants that all equipment, materials and workmanship furnished, whether furnished by the Contractor, its subcontractors or suppliers, will comply with the specifications, drawings and other descriptions supplied or adopted and that all services will be performed in a workmanlike manner. 11.1.3 Warranty of Merchantability: The Contractor warrants that any and all equipment to be supplied pursuant to this Agreement is merchantable, free from defects, whether patent or latent in material or workmanship, and fit for the ordinary purposes for which it is intended. 11.2 Tests and Inspections: Contractor shall retain the services of an independent, certified, testing lab to perform all testing as required by the specifications, Contract drawings, and any applicable permitting agency. Contractor shall provide evidence of certification to the City before the work and testing is done. Testing results shall be submitted to the Project Manager for review and approval at the time the results are provided to the Contractor. The Contractor shall give the Project Manager and City Inspector a minimum of twenty-four (24) hours' advanced notice of readiness of the Work for all required inspections, tests, or approvals and shall notify all applicable permitting agencies in a timely manner based on requirements set forth in the permit documents. 11.2.1 Neither observations by the Project Manager nor inspections, tests or approvals by others shall relieve the Contractor from its obligations to perform the Work in accordance with the Contract Documents. 5/7/2021 9:40 AM p. 129 City of Fort Lauderdale Bid 12504-613 11.3 Uncovering Work: If any work that is to be inspected, tested or approved is covered without approval or consent of the Project Manager, it must, if requested by the Project Manager, be uncovered for observation and/or testing. Such uncovering and replacement shall be at the Contractor's sole expense unless the Contractor has given the Project Manager timely notice of the Contractor's intention to cover such Work and the Project Manager has not acted with reasonable promptness in response to such notice. 11.3.1 If the Project Manager considers it necessary or advisable that Work covered in accordance with Paragraphs 11.2.1, 11.2.2 and 11.2.3 be observed by the City or inspected or tested by others, the Contractor at the City's request, shall uncover, expose or otherwise make available for observation, inspection or testing as the Project Manager may require, that portion of the Work in question, furnishing all necessary labor, material and equipment. If it is found that such Work is defective, the Contractor shall bear all the expenses of such uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction, including compensation for additional professional services, and an appropriate deductive Change Order shall be issued. If, however, such work is not found to be defective, the Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection testing and reconstruction if it makes a claim therefore as provided in Articles 14 and 15. 11.4 City May Stop the Work: If the Work is defective, or the Contractor fails to supply sufficient skilled supervisory personnel or workmen or suitable materials or equipment or the work area is deemed unsafe, the City may order the Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of the City to stop the Work shall not give rise to any duty on the part of the City to exercise this right for the benefit of the Contractor or any other Party. The City will not award any increase in Contract Price or Contract Time if the Work is stopped due to the circumstances described herein. 11.5 Correction or Removal of Defective Work Before Final Payment: If required by the Project Manager, the Contractor shall promptly, without cost to the City and as specified by the Project Manager, either correct any defective Work, whether or not fabricated, installed or completed, or if the Work has been rejected by the City, remove it from the site and replace it with non -defective Work. 11.6 One Year Correction Period After Final Payment: If, within one (1) year after the date of final acceptance of work on each Task Order, or such longer period of time as may be prescribed by law or by the terms of any applicable special guarantee required by the Contract Documents, any work is found to be defective, the Contractor shall promptly, without cost to the City and in accordance with the City's written instructions, either correct such defective Work, or, if it has been rejected by the City, remove it from the site and replace it with non -defective Work. If The Contractor does not promptly comply with the terms of such instructions or in an emergency where delay would cause serious risk of loss or damage, the City may have the defective Work corrected or the rejected Work removed and replaced, and all direct and indirect costs for such removal and replacement, including compensation for additional professional services, shall be paid by the Contractor. 5/7/2021 9:40 AM p. 130 City of Fort Lauderdale Bid 12504-613 11.7 Acceptance of Defective Work, Deductions: If, instead of requiring correction or removal and replacement of defective Work, the City, at the City's sole option, prefers to accept it, the City may do so. In such a case, if acceptance occurs prior to the Project Manager's recommendation of final payments, a Change Order shall be issued incorporating the necessary revisions in the Contracts Documents, including appropriate reduction in the Contract Price; or if the acceptance occurs after such recommendation, an appropriate amount shall be paid by the Contractor to the City. 11.8 City May Correct Defective Work: If the Contractor fails within a reasonable time after written notice of the Project Manager to proceed to correct defective Work or to remove and replace rejected Work as required by the Project Manager in accordance with Paragraph 11.5, or if the Contractor fails to perform the Work in accordance with the Contract Documents, the City may, after seven (7) days' written notice to the Contractor, correct and remedy any such deficiency. In exercising its rights under this paragraph, the City shall proceed expeditiously. To the extent necessary to complete corrective and remedial action, the City may exclude the Contractor from all or part of the site, take possession of all or part of the Work, suspend the Contractor's services related thereto and take possession of the Contractor's tools, construction equipment and materials stored at the site or elsewhere. The Contractor shall allow the City's representative agents and employees such access to the site as may be necessary to enable the City to exercise its rights under this paragraph. All direct and indirect costs of the City in exercising such rights shall be charged against the Contractor in an amount verified by the Project Manager, and a Change Order shall be issued incorporating the necessary revisions in the Contract Documents and a reduction in the Contract Price. Such direct and indirect costs shall include, in particular but without limitation, compensation for additional professional services required and costs of repair and replacement of work of others destroyed or damaged by correction, removal or replacement of the Contractor's defective Work. The Contractor shall not be allowed an extension of the Contract Time because of any delay in performance of the Work attributable to the exercise by the City of the City's right hereunder. ARTICLE 12 — INDEMNIFICATION 12.1 Disclaimer of Liability: The City shall not at any time, be liable for injury or damage occurring to any person or property from any cause, whatsoever, arising out of Contractor's construction and fulfillment of this Agreement. 12.2 Indemnification: For other, additional good valuable consideration, the receipt and sufficiency of which is hereby acknowledged: 12.2.1 Contractor shall, at its sole cost and expense, indemnify and hold harmless the City, its representatives, employees and elected and appointed officials from or on account of all claims, damages, losses, liabilities and expenses, direct, indirect or consequential including but not limited to fees and charges of engineers, architects, attorneys, consultants and other professionals and court costs arising out of or in consequence of the performance of this Agreement at all trial and appellate levels. Indemnification shall specifically include but not be limited to claims, damages, losses, liabilities and expenses arising out of or from (a) the negligent or defective design of the project and Work of this Agreement; (b) any act, omission or default of the Contractor, its Subcontractors, agents, suppliers, employees, or laborers; (c) any and all bodily 5/7/2021 9:40 AM p. 131 City of Fort Lauderdale Bid 12504-613 injuries, sickness, disease or death; (d) injury to or destruction of tangible property, including any resulting loss of use; (e) other such damages, liabilities, or losses received or sustained by any person or persons during or on account of any operations connected with the construction of this Project including the warranty period; (f) the use of any improper materials; (g) any construction defect including both patent and latent defects; (h) failure to timely complete the work; (i) the violation of any federal, state, county or City laws, ordinances or regulations by Contractor, its subcontractors, agents, servants, independent contractors or employees; (j) the breach or alleged breach by Contractor of any term of the Agreement, including the breach or alleged breach of any warranty or guarantee. 12.2.2 Contractor agrees to indemnify, defend, and hold harmless the City, its officers, agents and employees, from all damages, liabilities, losses, claims, fines and fees, and from any and all suits and actions of every name and description that may be brought against City, its officers, agents and employees, on account of any claims, fees, royalties, or costs for any invention or patent and/or for the infringement of any and all copyrights or patent rights claimed by any person, firm, or corporation. 12.2.3 Contractor shall pay all claims, losses, liens, settlements or judgments of any nature in connection with the foregoing indemnifications including, but not limited to, reasonable attorney's fees and costs for trials and appeals. 12.2.4 If any Subcontractor, supplier, laborer, or materialmen of Contractor or any other person directly or indirectly acting for or through Contractor files or attempts to file a mechanic's or construction lien against the real property on which the work is performed or any part or against any personal property or improvements thereon or make a claim against any monies due or to become due from the City to Contractor or from Contractor to a Subcontractor, for or on account of any work, labor, services, material, equipment, or other items furnished in connection with the Work or any change order, Contractor agrees to satisfy, remove, or discharge such lien or claim at its own expense by bond, payment, or otherwise within five (5) days of the filing or from receipt of written notice from the City. Additionally, until such time as such lien or claim is satisfied, removed or discharged by Contractor, all monies due to Contractor, or that become due to Contractor before the lien or claim is satisfied, removed or otherwise discharged, shall be held by City as security for the satisfaction, removal and discharge of such lien and any expense that may be incurred while obtaining the discharge. If Contractor shall fail to do so, City shall have the right, in addition to all other rights and remedies provided by this Agreement or by law, to satisfy, remove, or discharge such lien or claim by whatever means City chooses at the entire and sole cost and expense of Contractor which costs and expenses shall, without limitation, include attorney's fees, litigation costs, fees and expenses and all court costs and assessments, and which shall be deducted from any amount owing to Contractor. In the event the amount due Contractor is less than the amount required to satisfy Contractor's obligation under this, or any other article, paragraph or section of this Agreement, the Contractor shall be liable for the deficiency due the City. 5/7/2021 9:40 AM p. 132 City of Fort Lauderdale Bid 12504-613 12.2.5The Contractor and the City agree that Section 725.06(2), Florida Statutes(2020), as may be amended or revised, controls the extent and limits of the indemnification and hold harmless provisions of this Agreement, if any, and that the Parties waive any defects in the wording of this Article that runs afoul of said statutory section. ARTICLE 13 — CHANGES IN THE WORK 13.1 Without invalidating this Agreement, the City may, from time to time order additions, deletions or revisions in the Work through the issuance of Task Order Amendments. Upon receipt of a Task Order Amendment, the Contractor shall proceed with the Work involved. All Work shall be executed under the applicable conditions of the Contract Documents. The City reserves the right to add, delete or modify any or all pay items and/or quantities. All adjustments shall be made on the per unit price basis where unit prices are quoted. Other adjustments, if any, shall be based on a fair and equitable manner per the Contract Documents or mutually negotiated price between the Contractor and City. In the event the Contractor and City cannot come to an agreement on a price or price adjustment, the City shall have the right to complete that item or work by other means without invalidating the Contract. No claim of loss of profit shall be made against the City. 13.2 The Project Manager may authorize minor changes in the Work not involving an adjustment in the Contract Price or the Contract Time, which are consistent with the overall intent of the Contract Documents. Such changes must be in writing and signed by the City and the Contractor. 13.3 If notice of any change affecting the general scope of the Work or change in the Contract Price is required by the provisions of any Bond to be given to the Surety, it will be the Contractor's responsibility to so notify the Surety, and the amount of each applicable Bond shall be adjusted accordingly. The Contractor shall furnish proof of such adjustment to the City. ARTICLE 14 — CHANGE OF CONTRACT PRICE Contract Price shall not exceed that which is agreed to in this Agreement. Any increase to the Contract Price shall be executed through an Amendment to this Agreement and approved by the City Commission. 14.1 Time for the City to Approve Contract Amendment: Should the cumulative amount of the executed Task Orders exceed the Contract Price, a Contract Amendment must be approved by the City Commission authorizing additional funding for this Contract if it exceeds the threshold established in the City Code. ARTICLE 15 — CHANGE OF THE CONTRACT TIME 15.1 The Contract Time shall be for two (2) years from the date of Commission award subject to two (2) one (1) year renewal terms. 15.2 All time limits stated in the Contract Documents and within each executed Task Order are of the essence. The provisions of this Article 15 shall not exclude recovery for damages for delay by the Contractor. 5/7/2021 9:40 AM p. 133 City of Fort Lauderdale Bid 12504-613 15.3 Delays caused by or resulting from entities contractors or subcontractors who not affiliated with the Contractor (non-affiliated Contractors) shall not give rise to a claim by the Contractor for damages for increases in material and/or labor costs. Such entities, contractors and subcontractors include, but are not limited to, the City's contractors and subcontractors, Florida Power and Light Company, AT&T and Florida East Coast Railway, LLC. 15.4 Rights of Various Interests: Whenever work being done by City's forces or by other contractors is contiguous to or within the limits of work covered by this Contract, the respective rights of the various interests involved shall be established by the Project Manager to secure the completion of the various portions of the Work in general harmony. ARTICLE 16 — LIQUIDATED DAMAGES 16.1 Upon failure of the Contractor to complete the Work of an executed Task Order within the agreed upon and approved time for said Task Order, the Contractor shall pay to the City the sum of Five Hundred Dollars ($500.00) for each and every calendar day that the completion of the Task Order is delayed beyond the time agreed upon for said Task Order, as fixed and agreed liquidated damages and not as a penalty, so long as the delay is caused by the Contractor. Should an act of God or the acts or omissions of the City, its agents or representatives, in derogation to the terms of this Agreement cause the delay, the Contractor shall not be responsible for the delay nor liquidated damages. Liquidated damages are fixed and agreed upon between the Parties, recognizing the impossibility of precisely ascertaining the amount of damages that will be sustained by the City as a consequence of such delay and both Parties desiring to obviate any question of dispute concerning the amount of damages and the cost and effect of the failure of the Contractor to complete the Work on time. Liquidated damages shall apply separately to each Task Order for which a time of completion is given. The City shall have the right to deduct from or retain any compensation which may be due or which may become due and payable to the Contractor the amount of liquidated damages, and if the amount retained by the City is insufficient to pay in full such liquidated damages, the Contractor shall pay all liquidated damages in full. The Contractor shall be responsible for reimbursing the City, in addition to liquidated damages or other damages for delay, for all costs of engineering, architectural fees, and inspection and other costs incurred in administering the construction of the Project beyond the completion date specified or beyond an approved extension of time granted to the Contractor whichever is later. Delays caused by or resulting from entities, contractors or subcontractors who are not affiliated with the Contractor shall not give rise to a claim by Contractor for damages for increase in material and/or labor costs. Such entities, contractors and subcontractors include, but are not limited to, the City's contractors and subcontractors, Florida Power and Light Company, AT&T, and Florida East Coast Railway, LLC. 16.2 No Extended Damages: For other and additional good and valuable consideration the receipt and sufficiency of which is hereby acknowledged, the Contractor covenants and agrees that in the event of any delay of construction or for any reason, allegation or claim, and notwithstanding the reason of the delay, reason, claim or allegation or who caused them or the construction delay or whether they were caused by the City, that there will be no entitlement to Contractor to or for any direct or indirect financial damages or losses for extended corporate overhead impact, extended project 5/7/2021 9:40 AM p. 134 City of Fort Lauderdale Bid 12504-613 overhead impacts, project support services, mobilization or demobilization or by whatever other label or legal concept or theory and types of names or labels or basis such claims may have, or any business damages or losses of whatever type or nature, and Contractor hereby waives any right to make any such claim or claims. This provision will have application and effect when construction delays are anticipated and agreed upon by both the City and the Contractor. ARTICLE 17 — SUSPENSION OF WORK AND TERMINATION 17.1 City May Suspend Work: The City may, at any time and without cause, suspend the Work or any portion of the Work for a period of not more than ninety (90) days by notice in writing to the Contractor which shall fix the date on which Work shall be resumed. The Contractor shall resume the Work on the date fixed. The Contractor will be allowed an increaseinthe any Contract f the Contractor makesaclaim as r � Contract Time, or both, directly attributable Y provided in Articles 14 and 15. 17.2 City May Terminate Work: The City retains the right to terminate this Agreement as well as any task order, with thirty (30) days prior written notice. Additionally, the City may also terminate this Agreement l any order fifteen events5) calendar days' notice upon theoccurrence of any oneor more ofthe following 17.2.1 If the Contractor makes a general assignment for the benefit of creditors. 17.2.2 If a trustee, receiver, custodian or agent of the Contractor is appointed under applicable law or under Contract, whose appointment or authority to take charge of property of the Contractor is for the purpose of enforcing a lien against such property or for the purpose of general administration of such property for the benefit of the Contractor's creditors. 17.2.3 If Contractor fails to begin the Work within fifteen (15) calendar days after the Project Initiation Date, or fails to perform the Work with sufficient workers and equipment or with sufficient materials to ensure the prompt completion of the Work, or shall perform the Work unsuitably, or cause it to be rejected as defective and unsuitable, or shall discontinue the prosecution of the Work pursuant to the accepted schedule or if Contractor shall fail to perform any material term set forth in the Contract Documents, or from any other cause whatsoever shall not carry on the Work in an acceptable manner, Project Manager may give notice in writing to Contractor and its Surety of such delay, neglect or default, specifying the same. 17.2.4 If the Contractor repeatedly fails to make prompt payments to subcontractors or for labor, material or equipment. 17.2.5 If the Contractor repeatedly disregards proper safety procedures. 17.2.6 If the Contractor disregards any local, state or federal laws or regulations. 17.2.7 If the Contractor otherwise violates any provisions of this Agreement. p. 135 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 17.3 If Contractor, within a period of ten (10) calendar days after such notice, shall not proceed in accordance therewith, the City may exclude the Contractor from the Work site and take the prosecution of the Work out of the hands of the Contractor, and take possession of the Work and all of the Contractor's tools, appliances, construction equipment and machinery at the site and use them without liability to the City for trespass or conversion, incorporate in the Work all materials and equipment stored at the site or for which the City has paid the Contractor but which are stored elsewhere, and finish the Work as the City may deem expedient. In this instance, the Contractor shall not be entitled to receive any further compensation until the Work is finished. 17.3.1 If after notice of termination of Contractor's right to proceed, it is determined for any reason that Contractor was not in default, the rights and obligations of City and Contractor shall be the same as if the notice of termination had been issued pursuant to the Termination for Convenience clause as set forth in Section 17.5 below. 17.3.2 Upon receipt of Notice of Termination pursuant to Sections 17.2 or 17.5, Contractor shall promptly discontinue all affected work unless the Notice of Termination directs otherwise and deliver or otherwise make available to City all data, drawings, specifications, reports, estimates, summaries and such other information as may have been required by the Contract Documents whether completed or in process. 17.4 If the Contractor commits a default due to its insolvency or bankruptcy, the following shall apply: 17.4.1 Should this Agreement be entered into and fully executed by the Parties, funds released and the Contractor (Debtor) files for bankruptcy, the following shall occur: 17.4.1.1 In the event the Contractor files a voluntary petition under 11 U.S.C. 301 or 302, or an order for relief is entered under 11 U.S.C. 303, the Contractor shall acknowledge the extent, validity, and priority of the lien recorded in favor of the City. The Contractor further agrees that in the event of this default, the City shall, at its option, be entitled to seek relief from the automatic stay pursuant to 11 U.S.C. 362. The City shall be entitled to relief from the automatic stay pursuant to 11 U.S.C. 362(d) (1) or (d) (2), and the Contractor agrees to waive the notice provisions in effect pursuant to 11 U.S.C. 362 and any applicable Local Rules of the United States Bankruptcy Court. The Contractor acknowledges that such waiver is done knowingly and voluntarily. 17.4.1.2 Alternatively, in the event the City does not seek stay relief, or if stay relief is denied, the City shall be entitled to monthly adequate protection payments within the meaning of 11 U.S.C. 361. The monthly adequate protection payments shall each be in an amount determined in accordance with the Note and Mortgage executed by the Contractor in favor of the City. 5/7/2021 9:40 AM p. 136 City of Fort Lauderdale Bid 12504-613 17.4.1.3 In the event the Contractor files for bankruptcy under Chapter 13 of Title 11, United States Code in addition to the foregoing provisions, the Contractor agrees to cure any amounts in arrears over a period not to exceed twenty-four (24) months from the date of the confirmation order, and such payments shall be made in addition to the regular monthly payments required by the Note and mortgage. Additionally, the Contractor shall agree that the City is over secured and, therefore, entitled to interest and attorney's fees pursuant to 11 U.S.C. 506(b). Such fees shall be allowed and payable as an administrative expense. Further, in the event the Contractor has less than five (5) years of payments remaining on the Note, the Contractor agrees that the treatment afforded to the claim of the City under any confirmed plan of reorganization shall provide that the remaining payments shall be satisfied in accordance with the Note, and that the remaining payments or claim shall not be extended or amortized over a longer period than the time remaining under the Note. 17.4.2 Should this Agreement forwarded to Contractor,tered into and y executed by the the following shall occur:' and the funds have not been 17.4.2.1 In the event the Contractor files a voluntary petition pursuant to 11 U.S.C. 301 or 302, or an order for relief is entered under 11 U.S.C. 303., the Contractor acknowledges that the commencement of a bankruptcy proceeding constitutes an event of default under the terms of this Agreement. Further, the Contractor acknowledges that this Agreement constitutes an executory contract within the meaning of 11 U.S.C. 365. The Contractor acknowledges that this Agreement is not capable of being assumed pursuant to 11 U.S.C. 365(c)(2), unless the City expressly consents in writing to the assumption. In the event the City consents to the assumption, the Contractor agrees to file a motion to assume this Agreement within ten (10) days after receipt of written consent from the City, regardless of whether the bankruptcy proceeding is pending under Chapter 7, 11, or 13 of Title 11 of the United States Code. The Contractor further acknowledges that this Agreement is not capable of being assigned pursuant to 11 U.S.C. 365(b)(1). 17.5 Termination for Convenience: This Contract may be terminated for convenience in writing by City upon thirty (30) days' written notice to Contractor (delivered by certified mail, return receipt requested) of intent to terminate and the date on which such termination becomes effective. In such case, Contractor shall be paid for all work executed and expenses incurred prior to termination in addition to termination settlement costs reasonably incurred by Contractor relating to commitments which had become firm prior to the termination. Payment shall include reasonable profit for work/services satisfactorily performed. No payment shall be made for profit for work/services which have not been performed. 17.6 Where the Contractor's service has been so terminated by the City, the termination shall not affect any rights of the City against the Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due the Contractor by the City will not release the Contractor from liability. p. 137 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 17.7 The Contractor has no right, authority or ability to terminate the Work except for the wrongful withholding of any payments due the Contractor from the City. ARTICLE 18 — DISPUTE RESOLUTION 18.1 Resolution of Disputes: Questions, claims, difficulties and disputes of whatever nature which may arise relative to the technical interpretation of the Contract Documents and fulfillment of this Agreement as to the character, quality, amount and value of any work done and materials furnished, or proposed to be done or furnished under or, by reason of, the Contract Documents which cannot be resolved by mutual agreement of Contract Administrator and Contractor shall be submitted to the Consultant for resolution. When either party has determined that a disputed question, claim, difficulty or dispute, is at an impasse, that party shall notify the other party in writing and submit the question, claim, difficulty or dispute to the Consultant for resolution. The Parties may agree to a proposed resolution at any time without the involvement and determination of the consultant. 18.1.1 Consultant shall notify Contract Administrator and Contractor in writing of Consultant's decision within twenty-one (21) calendar days from the date of the submission of the question, claim, difficulty or dispute, unless Consultant requires time to gather information or allow the parties to provide additional information. 5/7/2021 9:40 AM 18.1.2 In the event the determination of a dispute by the Consultant under this Article is unacceptable to any of the Parties hereto, the Party objecting to the determination must notify the other Party and the City Manager, in writing within ten (10) days after receipt of the determination. The notice must state the basis of the objection and the proposed resolution. Final resolution of such dispute shall be made by the City Manager. The City Manager's decision shall be final and binding on the Parties. 18.1.3 All non -technical administrative disputes (such as billing and payment) shall be determined by Contract Administrator. 18.1.4 During the pendency of any dispute and after a determination thereof, Contractor and Contract Administrator shall act in good faith to mitigate any potential damages including utilization of construction schedule changes and alternate means of construction. During the pendency of any dispute arising under this Agreement, other than termination herein, Contractor shall carry on the Work and adhere to the progress schedule. The Work shall not be delayed or postponed pending resolution of any disputes or disagreements. 18.1.5 For any disputes which remain unsolved, within sixty (60) calendar days after Final Completion of the Work, the Parties shall participate in mediation to address all unresolved disputes. A mediator shall be mutually agreed upon by the Parties. Should any objection not be resolved in mediation, the Parties retain all their legal rights and remedies under applicable law. If a Party objecting to a determination, fails to comply in strict accordance with the requirements of this Article, said Party specifically waives all of its rights provided hereunder, including its rights and remedies under applicable law. p. 138 City of Fort Lauderdale Bid 12504-613 ARTICLE 19 — NOTICES 19.1 All notices required by any of the Contract Documents shall be in writing and shall be deemed delivered upon mailing by certified mail, return receipt requested to the following: To the City: City Manager City of Fort Lauderdale 100 North Andrews Avenue Fort Lauderdale, Florida 33301-1016 with copies to: Project Manager and City Attorney City of Fort Lauderdale 100 North Andrews Avenue Fort Lauderdale, Florida 33301-1016 To the Contractor: ARTICLE 20 — LIMITATION OF LIABILITY 20.1 The City desires to enter into this Agreement only if in so doing the City can place a limit on the City's liability for any cause of action arising out of this Agreement, so that the City's liability for any breach never exceeds the sum of $1,000. For other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Contractor expresses its willingness to enter into this Agreement with the knowledge that the Contractor's recovery from the City to any action or claim arising from the Agreement is limited to a maximum amount of $1,000, which amount shall be reduced by the amount actually paid by the City to the Contractor pursuant to this Agreement, for any action or claim arising out of this Agreement. Nothing contained in this paragraph or elsewhere in this Agreement is in any way intended either to be a waiver of the limitation placed upon the City's liability as set forth in Section 768.28, Florida Statutes (2020), as may be amended or revised , or to extend the City's liability beyond the limits established in said Section 768.28 (2020), as may be amended or revised; and no claim or award against the City shall include attorney's fees, investigative costs, expert fees, suit costs or pre -judgment interest. 20.2 No Extended Damages: For other and additional good and valuable consideration the receipt and sufficiency of which is hereby acknowledged, the Contractor covenants and agrees that in the event of any delay of construction or for any reason, allegation or claim, and notwithstanding the reason of the delay, reason, claim or allegation or who caused them or the construction delay or whether they were caused by the City, that there will be no entitlement to Contractor to or for any direct or indirect financial damages or losses for extended corporate overhead impact, extended project overhead impacts, project t or theory and types of names orse ices, mobilization or blabels or basis or by whatever other label or gal conce P p. 139 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 such claims may have, or any business damages or losses of whatever type or nature, and Contractor hereby waives any right to make any such claim or claims. This provision will have application and effect when construction delays are anticipated and agreed upon by both the City and the Contractor. ARTICLE 21 — GOVERNING LAW; WAIVER OF JURY TRIAL 21.1 This Agreement shall be governed by the laws of the State of Florida. Both Parties agree that the courts of the State of Florida shall have jurisdiction of any claim arising in connection with this Agreement. Venue for any claim, objection or dispute arising out of this Agreement shall be in Broward County, Florida. By entering into this Contract, Contractor and City hereby expressly waive any rights either Party may have to a trial by jury in any civil litigation related to, or arising out of the Project. Contractor shall specifically bind all subcontractors to the provisions of this Contract. ARTICLE 22 — MISCELLANEOUS 22.1 The duties and obligations imposed by this Agreement and the rights and remedies available to the Parties and, in particular but without limitation, the warranties, guaranties and obligations imposed upon the Contractor and all of the rights and remedies available to the City, are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by laws or regulations, by special warranty or guarantee or by other provisions of the Contract Documents, and the provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents, and the provisions of this Paragraph will survive final payment and termination or completion of this Agreement. 22.2 The Contractor shall not assign or transfer this Agreement or its rights, title or interests. The obligations undertaken by the Contractor pursuant to this Agreement shall not be delegated or assigned to any other person or firm. Violation of the terms of this Paragraph shall constitute a material breach of Agreement by the Contractor and the City any, at its discretion, cancel this Agreement and all rights, title and interest of the Contractor which shall immediately cease and terminate. 22.3 The Contractor and its employees, volunteers and agents shall be and remain an independent contractor and not agents or employees of the City with respect to all of the acts and services performed by and under the terms of this Agreement. This Agreement shall not in any way be constructed to create a partnership, association or any other kind of joint undertaking or venture between the Parties. 22.4 The City reserves the right to audit the records of the Contractor relating in any way to the Work to be performed pursuant to this Agreement at any time during the performance and term of this Agreement and for a period of three (3) years after completion and acceptance by the City. If required by the City, the Contractor agrees to submit to an audit by an independent certified public accountant selected by the City. The Contractor shall allow the City to inspect, examine and review the records of the Contractor at any and all times during normal business hours during the term of this Agreement. 5/7/2021 9:40 AM p. 140 City of Fort Lauderdale Bid 12504-613 22.5 The remedies expressly provided in this Agreement to the City shall not be deemed to be exclusive but shall be cumulative and in addition to all other remedies in favor of the City now or later existing at law or in equity. 22.6 Should any part, term or provisions of this Agreement be decided by the courts to be invalid, illegal or in conflict with any state or federal law, the validity of the remaining portion or provision shall not be affected. 22.7 Prohibition Against Contracting With Scrutinized Companies: As to any contract for goods or services of $1 million or more and as to the renewal of any contract for goods or services of $1 million or more, subject to Odebrecht Construction, Inc., v. Prasad, 876 F.Supp.2d 1305 (S.D. Fla. 2012), affirmed, Odebrecht Construction, Inc., v. Secretary, Florida Department of Transportation, 715 F.3d 1268 (11th Cir. 2013), with regard to the "Cuba Amendment," the Contractor certifies that it is not on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, and that it does not have business operations in Cuba or Syria, as provided in Section 287.135, Florida Statutes (2020), as may be amended or revised. As to any contract for goods or services of any amount and as to the renewal of any contract for goods or services of any amount, the Contractor certifies that it is not on the Scrutinized Companies that Boycott Israel List created pursuant to Section 215.4725, Florida Statutes (2020), as may be amended or revised, and that it is not engaged in a boycott of Israel. The City may terminate this Agreement at the City's option if the Contractor is found to have submitted a false certification as provided under subsection (5) of Section 287.135, Florida Statutes (2020), as may be amended or revised, or been placed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List or the Scrutinized Companies that Boycott Israel List created pursuant to Section 215.4725, Florida Statutes (2020), as may be amended or revised, or is engaged in a boycott of Israel or has been engaged in business operations in Cuba or Syria, as defined in Section 287.135, Florida Statutes (2020), as may be amended or revised. 22.8 Public Entity Crimes: In accordance with the Public Crimes Act, Section 287.133, Florida Statutes (2020), as may be amended or revised, a person or affiliate who is a contractor, consultant or other provider, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City, may not submit a bid on a contract with the City for the construction or repair of a public building or public work, may not submit bids on leases of real property to the City, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with the City, and may not transact any business with the City in excess of the threshold amount provided in Section 287.017, Florida Statutes (2020), as may be amended or revised, , for category two purchases for a period of thirty-six (36) months from the date of being placed on the convicted vendor list. Violation of this section by Contractor shall result in cancellation of the City purchase and may result in Contractor debarment. 22.9 Attorney Fees: If City or Contractor incurs any expense in enforcing the terms of this Agreement through litigation, the prevailing Party in that litigation shall be reimbursed for all such costs and expenses, including but not limited to court costs, and reasonable attorney fees incurred during litigation. 5/7/2021 9:40 AM p. 141 City of Fort Lauderdale Bid 12504-613 22.10 Public Records IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT PRRCONTRACT FORTLAUDERDALE.GOV 954-828-5002, CITY CLERK'S OFFICE, 100 N. ANDREWS AVENUE, FORT LAUDERDALE, FLORIDA 33301. Contractor shall: 1. Keep and maintain public records required by the City in order to perform the service. 2. Upon request from the City's custodian of public records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in Chapter 119, Florida Statutes (2020), as may be amended or revised, or as otherwise provided by law. 3. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of this contract if the Contractor does not transfer the records to the City. 4. Upon completion of the Contract, transfer, at no cost, to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public records to the City upon completion of this Contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of this Contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, upon request from the City's custodian of public records, in a format that is compatible with the information technology systems of the City. 5/7/2021 9:40 AM p. 142 Bid 12504-613 City of Fort Lauderdale Annual Construction of General Stormwater I Contractu e ) Project 12220 CITY IN WITNESS OF THE FOREGOING, the Parties have set their hands and seals the day and year first above written. CITY OF FORT LAUDERDALE, a Florida municipal corporation By: CHRISTOPHER J. LAGERBLOOM City Manager ATTEST: By: JEFFREY A. MODARELLI City Clerk Approved as to Legal Form: Alain E. Boileau, City Attorney By: RHONDA MONTOYA HASAN Assistant City Attorney p. 143 5/7/2021 9:40 AM City of Fort Lauderdale CONTRACTOR Bid 12504-613 WITNESSES: CONTRACTOR., a Florida company/corporation. Print Name Print Name STATE OF COUNTY OF By: Print Name: Title: ATTEST: By: Secretary The foregoing instrument was acknowledged before me by means of ❑ physical presence or ❑ online notarization, this day of 2021, by AUTHORIZED OFFICER), as (NAME OF (TITLE OF AUTHORIZED OFFICER,) for (NAME OF COMPANY), a Florida (TYPE OF COMPANY). (Signature of Notary Public - State of Florida) (Print, Type, or Stamp Commissioned Name of Notary Public) Personally Known OR Produced Identification Type of Identification Produced: 5/7/2021 9:40 AM p. 144 City of Fort Lauderdale Bid 12504-613 DETAILED SPECIFICATIONS p. 145 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 SPECIFICATIONS GENERAL STORMWATER ANNUAL CONSTRUCTION CONTRACT For all pay items not detailed below, please reference the FDOT Basis of Estimate, latest edition, for descriptions. http://www.fdot.gov/programmanagement/Estimates/BasisofEstimates/BOEManual/BOEOnline .shtm • FDOT PAY ITEM # 101-1 / MOBILIZATION — NIGHT WORK / UNIT EA • Description Unit price of the item listed above includes full compensation for all work described in the referenced FDOT pay item for projects where the Contractor needs to be mobilized at nighttime, 8 p.m. to 5 a.m., as requested by the City Project Manager or his designee. FDOT PAY ITEM # 101-1 / MOBILIZATION - MOBILIZE WITHIN 24 HOURS FOR EACH PROJECT / UNIT EA Description Unit price of the item listed above includes full compensation for all work described in the referenced FDOT pay item for projects where the Contractor needs to be mobilized within twenty-four (24) hours after requested by the City Project Manager or his designee. mobilization. • LIGHT TOWER WITH POWER SOURCE, AMIDA /TEREX AL4000 OR EQUIVALENT, F&I / UNIT ED Description Unit price of the item listed above includes full compensation for all labor and material necessary to properly furnish a light source, operate as needed, and remove after use. • FDOT CERTIFIED FLAG PERSON / UNIT HR Description Unit price of this item includes full compensation for worked performed by a FDOT certified flagman. Proof of certification must be provided to City Project Manager. • ORANGE PLASTIC MESH AND POST/ UNIT LF Description Unit price of the item listed above includes full compensation for all labor and material necessary to properly complete the work. • STEEL TRAFFIC PLATES FOR UP TO 12' LANES/ UNIT DAILY/WEEKLY RATES Description Unit price of the item listed above includes full compensation for all labor and material necessary to properly complete the work. Reimbursement of this pay item will be based on the daily/weekly rates specified. The steel traffic plates must be able to withstand H-20 traffic loads, meet ASTM A36 steel requirements, and when installed, must extend a minimum of 12 -inches beyond the edges of the excavation. 5/7/2021 9:40 AM p. 146 City of Fort Lauderdale Bid 12504-613 This item includes steel pins and temporary asphalt/plastic transition ramps • SURVEY FIELD WORK BY CREW / UNIT HR Description Unit price of this item includes full compensation for all work performed by a survey crew. This includes boundary and topographic surveys, staking out utility locations and/or as-builts. It shall be noted that layout, staking, construction surveying, data collection, and as -built drawing preparation and certification is required on all pipe and structure installation work and is considered incidental to the work being performed under each Task Order and no other payment will be made for such incidental work. This pay item is intended for survey work and drawings that are outside the scope of work of an approved Task Order. • UTILITY LOCATING AND EXCAVATION TEST HOLE IN GREEN AREAS/ UNIT EA Description Unit price of the item listed above includes full compensation for all labor and material necessary to properly complete the work. The whole excavation may be hand dug, or equipment may be used to ascertain the horizontal and vertical locations of utility. UTILITY LOCATING AND EXCAVATION TEST HOLE IN PAVEMENT AREAS/ UNIT EA Description Unit price of the item listed above includes full compensation for all labor and material necessary to properly complete the work. The whole excavation may be hand dug, or equipment may be used to ascertain the horizontal and vertical locations of utility. • SWALE EXCAVATION, GRADING AND RESTORATION/ UNIT SY Description Unit price of the item listed above includes full compensation for all labor and material necessary to properly complete the swale work per the geometry depicted in engineering plans and specifications. The maximum depth of the swale cannot exceed 36" with side slopes 3:1 or less. This bid item includes the shaping of the swale area and the sod, but does not include additional items like washed rock trench, filter fabric or slope stabilization. Reimbursement of this item will be based on surface area of the finished swale (SY). • PAVEMENT MARKINGS PAINTED/THERMOPLASTIC / UNIT LF/SF Description Unit price of these items include full compensation for all work described in the referenced FDOT pay items. In addition to the FDOT pay item scope, temporary pavement tape/paint shall be included as part of this bid item until the permanent markings are applied. • CURB OR CURB AND GUTTER REMOVAL / UNIT LF Description Unit price of this item includes full compensation for performing and completing all the work of removal and legal disposal of concrete curb or curb and gutter and the underlying limerock layer, if present. 5/7/2021 9:40 AM p. 147 City of Fort Lauderdale Bid 12504-613 • PAVER BLOCK REMOVAL / UNIT SF Description Unit price of this item includes full compensation for performing and completing all the work of removal and legal disposal of pavers and the underlying support layer. Concrete paver band removal shall be invoiced as curb and gutter removal. • REMOVAL AND DISPOSAL OF UNSUITABLE, NON -CONTAMINATED MATERIALS/ UNIT CY Description Unit price of this item includes full compensation for all work necessary for the proper removal and legal disposal of unsuitable materials not covered under other pay items. This pay item also includes the removal and legal disposal of miscellaneous utility infrastructure items which are not specifically addressed in the line items of this contract. • UTILITY PIPE REMOVAL AND DISPOSAL / UNIT LF Description Unit price of these items include full compensation for all work described in the referenced FDOT pay items. In addition to the pipe itself, this item shall include the removal and disposal of all valves, fittings and appurtenances that are part of the utility pipe. are not specifically addressed in the line items of this contract. • STORM/SANITARY STRUCTURE REMOVAL / UNIT EA Description Unit price of these items include full compensation for removal and disposal of structure less than 7' in diameter or square equivalent. In addition to the structure itself, this item shall include the removal and disposal of all bedding, frames, grates appurtenances that are part of the structure. For larger structure, the pass thru item may be used. • LIMEROCK REMOVAL AND DISPOSAL UP TO A MAXIMUM DEPTH OF 8"/ UNIT SY Description Unit price of these items include full compensation for removal and disposal of limerock up to 8" thick. This item does not include the removal of asphalt or other substrate layers. If the limerock thickness being removed exceeds 8", the remaining material removal shall be invoiced on a prorated basis. • TEMPORARY COLD PATCH ASPHALT/ UNIT CF Description Unit price of these items include full compensation for placement and removal of cold patch asphalt for temporary applications. • FDOT PAY ITEM # 522-2 / CONCRETE SIDEWALK, 6" THICK / UNIT SY 5/7/2021 9:40 AM p. 148 City of Fort Lauderdale Bid 12504-613 Description Unit price of the item listed above includes full compensation for all work described in the referenced FDOT pay item. ADA ramps and detectable warning installation are not covered under this line item. . FDOT PAY ITEM # 527-2 / DETECTABLE WARNING ON EXISTING WALKING SURFACE, RETROFIT, F&I / UNIT SF Description Unit price of the item listed above includes full compensation for all work described in the referenced FDOT pay item; however the unit of measurement is square feet of installed detectable warning. • ADA RAMP / UNIT EA Description Unit price of the item listed above includes full compensation for: - Item includes detectable warning surface. - Ramp must conform to FDOT Design Standards Index #300 and #304 or variation approved by the City Project Manager. - Ramp size area shall not exceed 100 SF. Any area beyond the 100 SF, will be invoiced per the 6" thick concrete sidewalk pay item (FDOT #522-2) • CATH BASINS/MANHOLES/ADS DRAINS/TRENCH DRAINS / UNIT EA/LF Description Unit price of this item includes full compensation for all the work described under the referenced pay item regardless of the type of structure. Unit price of the items listed above include full compensation for all work necessary to place the structure in the ground, this includes gravel for the base, frame and grates and the usage of a trench box, sheeting and/or dewatering pumps during the installation. Sodding, landscaping and pavement restoration will be paid under separate items. ***The manhole frames and covers must have the City of Fort Lauderdale Logo embossed, per the detail below. 5/7/2021 9:40 AM p. 149 City of Fort Lauderdale Salado Ii• NON.a.r AW.° COM Mac Murry a.:ox1 Bid 12504-613 NOTES: 1. MATERIAL: ASTM-A48 GRAY IRON CLASS 35B. 2. ADDITIONAL GRADE RINGS MAY BE USED TO ELEVATE EXISTING MANHOLE FRAMES TO RESURFACED GRADE (MAX 4" HEIGHT). 3. OPTIONAL: HINGED FRAME AND COVER AS SPECIFIED. 4. LOAD RATING: AASHTO H-20 LETTERING SHALL BE "STORMWATER", OR "TIDAL VALVE" AS INDICATED BY THE SERVICE SHOWN ON PLANS COVER 2 NON -PENETRATING PICK HOLES US FOUNDRY PLAN 420 FRAME AND M (V GL COVER 3/4"--•-1 r 24 3/4" L-224 1 24 1 /2" /2" 36" FRAME NOTES: MANHOLE FRAME & COVER -PAVED AREAS 1. MATERIAL: ASTM-A48 GRAY IRON CLASS 35B. 2. ADDITIONAL GRADE RINGS MAY BE USED TO ELEVATE EXISTING MANHOLE FRAMES TO RESURFACED GRADE (MAX 4" HEIGHT). 3. OPTIONAL: HINGED FRAME AND COVER AS SPECIFIED, 4. LOAD RATING: AASHTO H-20 LETTERING SHALL BE "STORMWATER", OR "TIDAL VALVE" AS INDICATED BY THE SERVICE SHOWN ON PLANS MACHINED SURFACES MACHINED SURFACES (2) 1" 0 ANCHOR HOLES (2) NON -PENETRATING PICK HOLES US FOUNDRY 465 FRAME AND ty GL COVER r— 22 3/4" ---� PLAN COVER 25" 23"---6-1 t-'-- 20 1/4"—.-I 32 3/4" FRAME MANHOLE FRAME & COVER -UNPAVED AREAS DOVETAIL GROOVE & GASKET CITY OF FORT LAUDERDALE PUBLIC WORKS DEPARTMENT ENGINEERING DETAILS 1011 N", Avc,nI-, I.,,rl Li„ b:v.141e, I' I,,rlda .till,:, MANHOLE FRAME AND COVER 5/7/2021 9:40 AM OHM STRM 017 JOITHE 2017,12/22 p. 150 City of Fort Lauderdale • FDOT PAY ITEM # 425-11: DRAINAGE STRUCTURE MODIFY / UNIT EA Bid 12504-613 Description Unit price for this item shall include core drilling a new opening for a pipe into an existing structure, enlarging or reducing and existing structure opening to accommodate a new pipe and filling in an existing invert opening. . PIPE CULVERT INSTALLATION / UNIT LF Description Unit price of the items listed above include full compensation for all work described in the referenced FDOT pay items. Pipe material is to be selected by the City Project Manager depending on the field conditions. Unit price of the items listed above include full compensation for all work described in the referenced FDOT pay items, this includes pipe bedding, and the usage of a trench box, sheeting and backfilling the trench. Dewatering activities, sodding, landscaping and asphalt/concrete/paver pavement restoration will be paid under separate items. • FDOT PAY ITEM 443-70-3/4: FRENCH DRAIN / UNIT LF Description Unit price of the items listed above include full compensation for all work and materials needed to install the French drain system per the specifications described in the referenced FDOT pay items (#433-70-3/4). This price must include the perforated/slotted pipe, RCP or optional material, filter fabric, #57 washed rock trench not to exceed maximum 5' width and 6' depth. . FRENCH DRAIN AGGREGATE/ UNIT CY Description Unit price of the items listed above include full compensation for all work and materials needed to install additional French drain aggregate consisting of #57 washed rock. . FDOT PAY ITEM E430-94-1/2/3/4/5: DESILTING AND CLEANING OF DRAINAGE PIPE/ UNIT LF Description Unit price of the item listed above includes full compensation for all labor and material necessary to properly complete the work per the FDOT pay items (#430-94-1/2/3/4/5). In addition to the scope of work outlined above, a video taping of the pipe afterwards will be required for approval by the City Project Manager. . WELL POINT DEWATERING SYSTEM / UNIT ED Description Unit price of the item listed above includes full compensation for all labor and material necessary to install and successfully operate the well point dewatering system, including sheet pilling, well points, pump and settlement box if necessary. The line item must cover different sized pit excavations as required to install the stormwater infrastructure. p. 151 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 • BY-PASS PUMP / UNIT ED Description Unit price of the item listed above includes full compensation for all labor and material necessary to install and successfully operate the by-pass pump for dewatering purposes. • DRAINAGE LINE PLUGS / UNIT EA Description Unit price of the item listed above includes full compensation for all labor and material necessary to install and remove a drainage line plug. The type of plug and material will be left to the Contractor's discretion as long as it provides a proper seal with no leaks and as approved by the City Project Manager. • FENCING AND GATES / UNIT FL Description Unit price of the item listed above includes full compensation for all labor and material necessary to install standard fence types per the local building department codes of municipalities. This line item does not cover removal of the old fence, landscape and hardscape elements, these can be invoiced as their respective line items. • MISCELLANEOUS HOURLY RATES / UNIT HR Description Unit price of the item listed above includes full compensation for all labor and equipment specified in the bid items. This is only for work to be performed in above and beyond the scope specified in each bid item of this contract. • POLLUTION RETARDANT BAFFLE WITH CLEANOUT ACCESS FOR / UNIT EA Description Unit price of the item listed above includes full compensation for all labor and material necessary to install the skimmer per the City standard detail below. 5/7/2021 9:40 AM p. 152 City of Fort Lauderdale Bid 12504-613 BASIN WALL A OUTLET PIPE NEOPRENE GASKET z FRONT ELEVATION 2 kr 3" SIDE ELEVATION 3" 3/4" BASIN FLOOR 1 3/4" -.1,1/e" ANGLE DETAIL ANGLES ON OTHER SIDE OF SKIMMER ARE MIRROR IMAGE CENTERLINE SEE ANGLE DETAIL TYPE 1 SKIMMER DIMENSION TABLE OUTLET PIPE A B 18" 12" 42" 24" 15" 48" 30" 18" 54" 36" 21" 60" CITY OF FORT LAUDERDALE PUBLIC WORKS DEPARTMENT ENGINEERING DETAILS 100 North Antra % Ava+uq Fort IAudrd.M Fb1IS StlO+ SKIMMER FOR EXFILTRATION TRENCH OUTLET TYPE 1 • SHEET 1 OM STRM 005 / t zo+6r�n+ p. 153 5/7/2021 9:40 AM aaaenil:waa O...1.1KATNl{l1 U.111Gr- Mit nonyBNb.+”, City of Fort Lauderdale Bid 12504-613 FLANGE OUTLET PIPE SIDE ELEVATION 10" ROUND CLEANOUT PORT W f NEOPRENE GASKET es • LOSS PREVENTION DEVICE NEOPRENE GASKET It 11 FRONT ELEVATION CENTERLINE TEN 1/4" f21 x 2" STUDS W/ NUTS AND WASHERS 1/2" DIA HOLE (TYP.) CITYo FORT LAUDERDALE PUBLIC WORKS DEPARTMENT ENGINEERING DETAILS ICO rim Avt.:Y.\ Pins I.w:kiudr. Flu:llu ii;L1 SKIMMER FOR EXFILTRATION TRENCH OUTLET TYPE 2 ma. STRM 007 1i17tl1 2.010021 5/7/2021 9:40 AM p. 154 City of Fort Lauderdale aaw. :wu11s cui.a.,na a+.xcv �xrl�r-.w:ncr. Bid 12504-613 NOTES: 1. THE SKIMMER IS A HOODED COVER, MOUNTED OVER AN OUTLET IN A CATCHBASIN, THAT PREVENTS OIL AND FLOATING DEBRIS FROM EXITING THE BASIN. USE THIS SKIMMER IN CATCHBASINS WHERE THERE IS A NEED TO PREVENT OIL, DEBRIS OR OTHER FLOATING CONTAMINANTS FROM EXITING CATCHBASINS THROUGH OUTLET PIPES. 2. PLACE NEOPRENE GASKET MATERIAL BETWEEN THE SKIMMER AND THE CATCHBASIN AT ALL POINTS OF CONTACT. TRIM THE GASKET NEATLY TO EXTEND 1/2 INCH BEYOND THE JOINT ON ALL SIDES_ 3. SKIMMER BAFFLE, CLEANOUT PIPE AND ANGLES SHALL BE PRIMARILY CONSTRUCTED OF EITHER GALVANIZED STEEL, ALUMINUM, POLYVINYL CHLORIDE, POLYETHYLENE, FIBERGLASS OR ACRYLONITRITE BUTADIENE STYRENE. ALL STEEL COMPONENTS, OTHER THAN STAINLESS STEEL, SHALL BE HOT -DIP GALVANIZED. 4. MOUNTING HARDWARE, HINGES AND LATCHES SHALL ALL BE 316 STAINLESS STEEL. LOSS PREVENTION DEVICE SHALL BE EITHER 316 STAINLESS STEEL CHAIN OR RIVETED NYLON STRAP. 5. MATERIAL USED IN CONSTRUCTION OF SKIMMER BODIES (BAFFLES) AND CLEANOUT PIPE SHALL COMPLY WITH FDOT STANDARD SPECIFICATION 943 FOR STEEL, 945 FOR ALUMINUM OR 948 FOR PLASTICS. 6. ALL COST FOR FURNISHING AND INSTALLING A SKIMMER SHALL BE INCLUDED IN THE COST OF THE BASIN IN WHICH IT IS INSTALLED. 7. PLASTIC SKIMMER SHALL CONTAIN A MINIMUM OF 1.5% BY WEIGHT OF CARBON BLACK FOR UV PROTECTION. 8. THE BACKS OF SKIMMERS MUST CONFORM TO THE SHAPE OF THE BASIN WALLS ON WHICH THEY ARE MOUNTED. 9. THE CLEANOUT PORT FOR THE TYPE 2 SKIMMER SHALL BE GASKETED, WITH EITHER A THREADED SCREW -IN LID OR A UD SECURED BY FOUR STAINLESS STEEL QUICK -RELEASE LATCHES. 10. TYPE II SKIMMER ARE TO BE USED ONLY WITH OUTLET PIPE DIAMETERS OF 15", 18" AND 24'. CITYar FORT LAUDERDALE PUBLIC WORKS DEPARTMENT ENGINEERING DETAILS IGl Km II, AinllcK, Aon:un I'' l 41II:kI ,Ir. Flu: Au •:,[i)1. SKIMMER FOR EXFILTRATION TRENCH OUTLET NOTES Waft STRM 008 5/7/2021 9:40 AM p. 155 City of Fort Lauderdale Bid 12504-613 • INLINE TIDAL CHECK VALVE: WASTOP OT APPROVED EQUAL / UNIT EA Description Contractors working on City projects will receive special pricing from the supplier of Wapro Wastop tidal valves. Pricing shown reflects pre -negotiated sale prices that will be honored for the City's Contractors. For the purpose of this item, "Furnish" includes purchasing the valve at City pricing and delivering the valve with all fittings, accessories and appurtenances to the Project site. "Install" includes labor, tools and equipment to install a Wastop check valve with all fittings; including excavation, grading, removal, and disposal of soil and debris and all other necessary appurtenances per City and manufacturer's specifications. See www.wapro.com for latest Wastop inline valve details and specifications. • ALUMINUM MANATEE GRATE / UNIT EA Description Unit price of the item listed above includes full compensation for all labor and material necessary to install the manatee grate, per the detail below. 5/7/2021 9:40 AM p. 156 Bid 12504-613 City of Fort Lauderdale IrS 6'" STD 1 t12" NI 1" MILE SECTION - STEEL PLATE 12" x14" BOLT WITH NUT AND WASHERS w rE STEEL PLATE BARS 8" CTRS. EACH WAY 12" BARS, PIPES < 30"O 5/8' BARS, PIPE >_ 30" 0 CLIP ANGLE SEE DETAIL STEEL PLATE: 3'-6" FOR 18" PIPE 4'-0" FOR 24" & 30" PIPE 4'-6" FOR 30" PIPE 5'-0" FOR 36" PIPE 5-6" FOR 42" PIPE 1" HOLE STEEL PLATE 'U4 CLIP DETAIL 112" PVC PIPE SLEEVE SIDE VIEW L 6x4x3/8x4 314" 0 ANCHOR WITH NUTS AND WASHERS 61/2" MINIMUM IMBEDMENT: HEX BOLT: CAST -IN -PLACE ADHESIVE -BONDED ANCHOR: FULLY THREADED ROD INSTALLED IN ACCORDANCE WITH SPECIFICATION SECTION 416 L 2x2x3116 2'4" FOR 18" PIPE 3'-0" FOR 24" & 30" PIPE 3'-8" FOR 36" PIPE 4'-4" FOR 42" PIPE VERT BARS & PLATE HOLES SYMMETRICAL ABOUT QPIPE: 4 FOR 18" PIPE 5 FOR 24" & 30" PIPE 6 FOR 36" PIPE 7 FOR 42" PIPE rRA E (LBS). 48 158 174 1 90 1 111 I FRONT VIEW NOTE: GUARDS TO BE CONSTRUCTED ONLY AT LOCATIONS SPECIFICALLY CALLED FOR IN PLANS. 0 C:::T : ALE14n Nm tl�.M :A%)7l C 'GRS DEPARTMENT G EEING DETAILS MANATEE GRATE i MIA STRM 013 AMA 2017 0)70 p. 157 5/7/2021 9:40 AM City of Fort Lauderdale • CORE DRILL EXISTING SEWALL OUTFALLS/ UNIT EA Bid 12504-613 Description Unit price of the item listed above includes full compensation for all labor and material necessary to core drill new drainage outfalls in existing seawalls. This item also covers enlarging existing outfalls to accommodate larger diameter pipes and grouting associated with the work to ensure a watertight seal between the pipe and the seawall. • PIPE BURSTING / UNIT LF Description Unit price of the item listed above includes full compensation for all labor and material necessary to properly complete the work. • Furnish all materials, labor, and equipment necessary to install new HDPE pipe by pipe bursting mechanism replacing existing broken pipe, including, but not limited to, contractor to perform CCTV of existing piping condition and post -construction condition, soil boring tests to find out the soil conditions, selection of machinery, unloading, stringing, excavating, dewatering, removal and disposal of unsuitable materials, bedding, pipe laying, core drilling concrete seawalls or catch basins, connecting new pipe to existing catch basins, backfilling, compacting, restoring project area back to original condition or better, including adjustments of valves, rims, covers, compliance with Florida Safety Act (90-96, Laws of Florida), and all other necessary appurtenances. • DIRECTIONAL BORE / UNIT LF Description Unit price of the item listed above includes full compensation for all labor and material necessary to properly complete the work. Furnish all materials, labor, and equipment necessary to install new HDPE pipe by directional boring mechanism replacing existing broken pipe, including, but not limited to, contractor to perform CCTV of existing piping condition and post -construction condition, soil boring tests to find out the soil conditions, selection of machinery, unloading, stringing, excavating, dewatering, removal and disposal of unsuitable materials, bedding, pipe laying, core drilling concrete seawalls or catch basins, connecting new pipe to existing catch basins, backfilling, compacting, restoring project area back to original condition or better, including adjustments of valves, rims, covers, compliance with Florida Safety Act (90-96, Laws of Florida), and all other necessary appurtenances. • FERTILIZER, F&I / UNIT EA Description Unit price of this item includes full compensation for all work, labor, material, and equipment necessary for placement of fertilizer in compliance with Section 982 of the FDOT Standard Specifications. • ROOT BARRIER, F&I / UNIT LF Description 5/7/2021 9:40 AM p. 158 City of Fort Lauderdale Bid 12504-613 Unit price of the item listed above includes full compensation for work, labor, material, and equipment required to furnish and install a 2 -foot tall, high density polyethylene root barrier. Trench work must also be included in the unit price for this item. • TREE REMOVAL / UNIT EA Description Unit price of the items listed above include full compensation for all work, labor, equipment, and material required for the tree removal in its entirety. Unit price also must include: - Any required excavation activities. - Daily clean up and disposal of the plant material and any other incidental materials created during the plant removal operation such as, all tree trunks, limbs, leaves, twigs, sawdust and chips. Street and sidewalk areas shall be swept and all other areas shall be raked clean of debris generated through removal operations. - Removal and/or treatment of any existing bee hives, wasps, hornets, or other hazardous pests within the tree. - Utility location. - Stumps and all visible surface roots shall be mechanically ground out to a minimum depth of 8 inches below the surrounding grade. For locations where sidewalk and curb exist, the surrounding grade shall be established by means of an imaginary line extending from the top of the curb to the street side edge. All excess stump chips shall be physically removed from the sites. Sufficient stump chips shall be left on site to fill the resulting depression slightly above the surrounding grade (to allow for some settlement). All work shall be in compliance with ANSI A300 and Z133.1 Standards, city ordinances, and permit requirements. . STUMP GRINDING/REMOVAL I UNIT EA Description Unit price of the items listed above include full compensation for work, labor, material, and equipment required to remove the tree stump in its entirety either by pulling or grinding it out. Unit price also must include: - Any required excavation activities. - Daily clean up and disposal of the plant material and any other incidental materials created during the stump removal operation. Street and sidewalk areas shall be swept and all other areas shall be raked clean of debris generated through removal operations. - Grading of the landscaping area from which the stump was removed. - Utility location. All work shall be in compliance with ANSI A300 and Z133.1 Standards, city ordinances, and permit requirements. p. 159 5/7/2021 9:40 AM City of Fort Lauderdale Bid 12504-613 • SOD / UNIT SY Description Unit price of the items listed above include full compensation for work, labor, material, and equipment required to install sod, level it and water it for 2 weeks as needed. • HEDGE -TREE -PALM REPLACEMENT / UNIT SY Description Unit price of the items listed above include full compensation for work, labor, material, and equipment required to install the landscape bid item, species and height. The price must include 2 weeks of watering as need. For exotic species replacement not covered under these bid items, the landscape pass thru item may be used. PASS-THRU ITEMS • PASS-THRU COST — IRRIGATION SYSTEM AND LANDSCAPING / UNIT ALLOWANCE Description This item includes full compensation for all labor, materials and equipment needed to install, repair and/or replace sprinkler systems, and landscape not specifically covered in the bid items of this contract. Contractor shall provide the City's Project Manager with receipts for all materials purchased and used to complete this work. • PASS-THRU COST — UNFORESEEN UNDERGROUND CONDITION / UNIT ALLOWANCE Description This item includes full compensation for all labor, materials and equipment needed to install, repair and/or replace underground infrastructure encountered during construction activities, which was not specifically covered in the bid items of this contract and it was not identified by utility locators. Contractor shall provide the City's Project Manager with receipts for all materials purchased and used to complete this work. • PASS-THRU COST — PARTS, MATERIALS, AND MISCELLANEOUS ITEMS / UNIT ALLOWANCE Description This item includes full compensation for miscellaneous materials needed during construction, which was not specifically covered in the bid items of this contract, including precast structures of large sizes and irregular shapes and replacement of restoration items. Contractor shall provide the City's Project Manager with receipts for all materials purchased and used to complete this work. • PASS-THRU COST — SPECIALIZED CONSTRUCTION ACTIVITIES / UNIT ALLOWANCE Description This item includes full compensation for miscellaneous labor and equipment needed during construction, which was not specifically covered in the bid items of this contract. Contractor 5/7/2021 9:40 AM p. 160 City of Fort Lauderdale Bid 12504-613 shall provide the City's Project Manager with receipts for all materials purchased and used to complete this work. PASS-THRU COST — PERMIT AND CONSTRUCTION TESTING / UNIT ALLOWANCE Description This item includes full compensation for miscellaneous permit and geotechnical testing fees needed during construction, which was not specifically covered in the bid items of this contract. Contractor shall provide the City's Project Manager with receipts for all permits or testing needed to complete this work Overall Description of the Pass-thru allowances The purpose of the Pass-thru allowance items listed above is to provide a means of covering the direct cost of the Contractor for any items not contained within the contract documents. Pass- thru items include construction activities for irrigation system and landscaping; unforeseen underground condition; parts, materials, and miscellaneous items; specialized construction activities; and permit fees. The City Project Manager or his designee must approve use of Pass-thru items. The City reserves the opinion to purchase and furnish materials or services if the City determines that the prices submitted by the Contractor are not fair and reasonable. The Contractor is not allowed to markup cost of the Pass-thru items. Copy of the Contractor's invoices for materials and services from the supplier(s) or subcontractor(s) will be required before invoice approval. In cases where the Contractor manufactures its own parts or directly provide the required service, it will charge the City a price within a competitive range. The City reserves the right to request verification or additional quotes. Should the Contractor elect to subcontract any portion of an individual project, the Contractor must first check with the City Project Manager or his designee to identify if any City contracts can be utilized for the required services. If not available, the Contractor shall obtain a minimum of three (3) quotes and the cost of the "Pass-thru" shall be the lowest of the provided quotes, subject to approval of the City Project Manager or his designee. Parts provided by the subcontractor(s) must also be on a "Pass-Thru" basis. 5/7/2021 9:40 AM p. 161 City of Fort Lauderdale Bid 12504-613 CITY OF FORT LAUDERDALE PUBLIC WORKS DEPARTMENT MINORITY BUSINESS ENTERPRISE (MBE) - WOMEN BUSINESS ENTERPRISE (WBE) PRIME CONTRACTOR IDENTIFICATION FORM In order to assist us in identifying the status of those companies doing business with the City of Fort Lauderdale, this form must be completed and returned with your bid package. Name of Firm: Address of Firm: Telephone Number: Name of Person Completing Form: Title: Signature: Date: City Project Number: City Project Description: Please check the item(s) which properly identify the status of your firm: Our firm is not a MBE or WBE. Our firm is a MBE, as at least 51 percent is owned and operated by one or more socially and economically disadvantaged individuals. American Indian Asian Black Hispanic Our firm is a WBE, as at least 51 percent is owned and operated by one or more women. American Indian Asian Black Hispanic 5/7/2021 9:40 AM p. 162 City of Fort Lauderdale Bid 12504-613 MBE/WBE CONTRACTOR INFORMATION The City, in a continuing effort, is encouraging the increased participation of minority and women -owned businesses in Public Works Department related contracts. Along those lines, we are requiring that each firm provide documentation detailing their own programs for utilizing minority and women -owned businesses. Submit this information as a part of this bid package and refer to the checklist, to ensure that all areas of concern are covered. The low responsive bidder may be contacted to schedule a meeting to discuss these objectives. It is our intention to proceed as quickly as possible with this project, so your cooperation in this matter is appreciated. CONTRACTOR CHECKLIST List Previous City of Fort Lauderdale Contracts l Number of Employees in your firm - -Percent ( %) Women - -Percent ( %) Minorities --Job Classifications of Women and Minorities Use of minority and/or women subcontractors on past projects. Nature of the work subcontracted to minority and/or women -owned firms. How are subcontractors notified of available opportunities with your firm? 5/7/2021 9:40 AM p. 163 City of Fort Lauderdale Bid 12504-613 Anticipated amount to be subcontracted on this project. Anticipated amount to be subcontracted to minority and/or women -owned businesses on this project. i 5/7/2021 9:40 AM p. 164 City of Fort Lauderdale Bid 12504-613 QUESTIONNAIRE SHEET PLEASE PRINT OR TYPE: Firm Name: President Business Address: Telephone: E -Mail Address: Fax: What was the last project of this nature which you completed? Include the year, description, and contract value. The following are named as three corporations and representatives of those corporations for which you have performed work similar to that required by this contract, and which the City may contact as your references (include addresses, telephone numbers and e-mail addresses). Include the project name, year, description, and contract value. How many years has your organization been in business? Have you ever failed to complete work awarded to you; if so, where and why? The name of the qualifying agent for the firm and his position is: Certificate of Competency Number of Qualifying Agent: Effective Date: Expiration Date: Licensed in: Engineering Contractor's License # (County/State) Expiration Date: 5/7/2021 9:40 AM p. 165 vliy vi I vll LauU clualc DIU I L"vv'4-O Iv NOTE: To be considered for award of this contract, the bidder must submit a financial statement upon request. NOTE: Contractor must have proper licensing and shall provide copy of same with his proposal. QUESTIONNAIRE SHEET 1. Have you personally inspected the proposed work and have you a complete plan for its performance? 2. Will you sublet any part of this work? If so, list the portions or specialties of the work that you will. a) b) c) d) e) f) g) 3. What equipment do you own that is available for the work? 4. What equipment will you purchase for the proposed work? 5. What equipment will you rent for the proposed work? 5/7/2021 9:40 AM p. 166 City of Fort Lauderdale Bid 12504-613 TRENCH SAFETY Bidder acknowledges that included in the appropriate bid items of his bid and in the Total Bid Price are costs for complying with the Florida Trench Safety Act, Florida Statutes 553.60 — 553.64. The bidder further identifies the costs of such compliance to be summarized below: Trench Safety Measure (Description) Units of Measure (LF/SF) Unit (Quantity) Unit Cost Extended Cost A. $ $ B. $ $ C. $ $ D. $ $ Total: $ The bidder certifies that all trench excavation done within his control in excess of five feet (5') in depth shall be in accordance with the Occupational Safety and Health Administration's excavation safety standards, C.F.R. s. 1926.650 Subpart P., and the Florida Trench Safety Act, Florida Statutes 553.60-553.64. Failure to complete the above may result in the bid being declared non -responsive. DATE: (SIGNATURE) STATE OF: COUNTY OF: PERSONALLY APPEARED BEFORE ME, the undersigned authority, (Name of Individual Signing) day of who, after first being duly sworn by me, affixed his/her signature in the space provided above on this , 20 My Commission Expires: NOTARY PUBLIC 5/7/2021 9:40 AM p. 167 i,iry or rorr Lauaeraaie Bid 12504-613 NON -COLLUSION STATEMENT: By signing this offer, the vendor/contractor certifies that this offer is made independently and free from collusion. Vendor shall disclose below any City of Fort Lauderdale, FL officer or employee, or any relative of any such officer or employee who is an officer or director of, or has a material interest in, the vendor's business, who is in a position to influence this procurement. Any City of Fort Lauderdale, FL officer or employee who has any input into the writing of specifications or requirements, solicitation of offers, decision to award, evaluation of offers, or any other activity pertinent to this procurement is presumed, for purposes hereof, to be in a position to influence this procurement. For purposes hereof, a person has a material interest if they directly or indirectly own more than 5 percent of the total assets or capital stock of any business entity, or if they otherwise stand to personally gain if the contract is awarded to this vendor. In accordance with City of Fort Lauderdale, FL Policy and Standards Manual, 6.10.8.3, 3.3. City employees may not contract with the City through any corporation or business entity in which they or their immediate family members hold a controlling financial interest (e.g. ownership of five (5) percent or more). 3.4. Immediate family members (spouse, parents and children) are also prohibited from contracting with the City subject to the same general rules. Failure of a vendor to disclose any relationship described herein shall be reason for debarment in accordance with the provisions of the City Procurement Code. NAME RELATIONSHIPS In the event the vendor does not indicate any names, the City shall interpret this to mean that the vendor has indicated that no such relationships exist. Authorized Signature Title Name (Printed) Date 5/7/2021 9:40 AM p. 168 City of Fort Lauderdale Bid 12504-613 CONTRACTOR'S CERTIFICATE OF COMPLIANCE WITH NON-DISCRIMINATION PROVISIONS OF THE CONTRACT The completed and signed form should be returned with the Contractor's submittal. If not provided with submittal, the Contractor must submit within three business days of City's request. Contractor may be deemed non -responsive for failure to fully comply within stated timeframes. Pursuant to City Ordinance Sec. 2-187(c), bidders must certify compliance with the Non -Discrimination provision of the ordinance. The Contractor shall not, in any of his/her/its activities, including employment, discriminate against any individual on the basis of race, color, national origin, religion, creed, sex, disability, sexual orientation, gender, gender identity, gender expression, or marital status. 1. The Contractor certifies and represents that he/she/it will comply with Section 2-187, Code of Ordinances of the City of Fort Lauderdale, Florida, as amended by Ordinance C-18-33 (collectively, "Section 2-187"). 2. The failure of the Contractor to comply with Section 2-187 shall be deemed to be a material breach of this Agreement, entitling the City to pursue any remedy stated below or any remedy provided under applicable law. 3. The City may terminate this Agreement if the Contractor fails to comply with Section 2-187. 4. The City may retain all monies due or to become due until the Contractor complies with Section 2-187. 5. The Contractor may be subject to debarment or suspension proceedings. Such proceedings will be consistent with the procedures in section 2-183 of the Code of Ordinances of the City of Fort Lauderdale, Florida. Authorized Signature Print Name and Title Date 5/7/2021 9:40 AM p. 169 UM! ILUV'1-U IJ CONTRACT PAYMENT METHOD The City of Fort Lauderdale has implemented a Procurement Card (P -Card) program which changes how payments are remitted to its vendors. The City has transitioned from traditional paper checks to credit card payments via MasterCard or Visa as part of this program. This allows you as a vendor of the City of Fort Lauderdale to receive your payments fast and safely. No more waiting for checks to be printed and mailed. In accordance with the contract, payments on this contract will be made utilizing the City's P -Card (MasterCard or Visa). Accordingly, bidders must presently have the ability to accept these credit cards or take whatever steps necessary to implement acceptance of a card before the start of the contract term, or contract award by the City. All costs associated with the Contractor's participation in this purchasing program shall be borne by the Contractor. The City reserves the right to revise this program as necessary. By signing below you agree with these terms. Please indicate which credit card payment you prefer: MasterCard Visa Company Name Name (Printed) Signature Date Title 5/7/2021 9:40 AM p. 170 City of Fort Lauderdale Bid 12504-613 CONSTRUCTION BID CERTIFICATION Please Note: It is the sole responsibility of the bidder to ensure that his bid is submitted electronically through www.BidSync.com prior to the bid opening date and time listed. Paper bid submittals will not be accepted. All fields below must be completed. If the field does not apply to you, please note N/A in that field. If you are a foreign corporation, you may be required to obtain a certificate of authority from the Department of State, in accordance with Florida Statute §607.1501 (visit http://www.dos.state.fl.us/). Company: (Legal Registration) Address: City: State: Zip: Telephone No.: FAX No.: Email: Check box if your firm qualifies for MBE / SBE / WBE: If a corporation, state the name of the President, Secretary and Resident Agent. If a partnership, state the names of all partners. If a trade name, state the names of the individuals who do business under the trade name. Name Title Name Title Name Title Name Title ADDENDUM ACKNOWLEDGEMENT - Bidder acknowledges that the following addenda have been received and are included in the proposal: Addendum No. Date Issued Addendum No. Date Issued Addendum No. Date Issued VARIANCES: If you take exception or have variances to any term, condition, specification, or requirement in this bid you must specify such variance in the space provided below or reference in the space provided below all variances contained on other pages within your bid. Additional pages may be attached if necessary. No variances will be deemed to be part of the bid submitted unless such is listed and contained in the space provided below. The City does not, by virtue of submitting a variance, necessarily accept any variances. If no statement is contained in the below space, it is hereby implied that your response is in full compliance with this competitive solicitation. If you do not have variances, simply mark N/A. You must also click the "Take Exception" button. The below signatory affirms that he has or will obtain all required permits and licenses from the appropriate agencies, and that his firm is authorized to do business in the State of Florida. The below signatory agrees to furnish all labor, tools, material, equipment and supplies, and to sustain all the expense incurred in doing the work set forth in strict accordance with the bid plans and contract documents at the unit prices indicated if awarded a contract. The below signatory has not divulged to, discussed, or compared this bid with other bidders, and has not colluded with any other bidder or parties to this bid whatsoever. Furthermore, the undersigned guarantees the truth and accuracy of all statements and answers contained in this bid. The below signatory also hereby agrees, by virtue of submitting or attempting to submit a bid, that in no event shall the City's liability for bidder's direct, indirect, incidental, consequential, special or exemplary damages, expenses, or lost profits arising out of this competitive solicitation process, including but not limited to public advertisement, bid conferences, site visits, evaluations, oral presentations, or award proceedings exceed the amount of Five Hundred Dollars ($500.00). This limitation shall not apply to claims arising under any provision of indemnification or the City's protest ordinance contained in this competitive solicitation. Submitted by: Name (printed) Date Signature Title 5/7/2021 9:40 AM p. 171 , ulu ILJVY-W IJ 5/7/2021 9:40 AM Revised 4/28/2020 p. 172 City ot Fort Lauoeraale CHO I LOU4-O I a BID NO. 12504-613 ANNUAL CONSTRUCTION OF GENERAL STORMWATER INFRASTRUCTURE (P12220) ADDENDUM NO. 1 ISSUED: March 16, 2021 This Addendum is being issued to provide the following information. It is hereby made a part of the Plans and Specifications and shall be included with all contract documents. Acknowledge receipt of this Addendum by inserting its number and date on the CITB Construction Bid Certification Page. The following requirement listed in the Invitation to Bid and the Special Conditions has been revised as follows: Required Licenses/Certifications: Possession of a State of Florida General Contractor (GC) License OR an Underground Contractor's License is required for this Project. All other terms, conditions, and specifications remain unchanged. .Adaureen &:ewis Senior Procurement Specialist Company Name: (please print) Bidder's Signature: Date: 5/7/2021 9:40 AM p. 173 BID NO. 12504-613 ANNUAL CONSTRUCTION OF GENERAL STORMWATER INFRASTRUCTURE (P12220) ADDENDUM NO. 2 ISSUED: April 2, 2021 This Addendum is being issued to provide the following information. It is hereby made a part of the Plans and Specifications and shall be included with all contract documents. Acknowledge receipt of this Addendum by inserting its number and date on the CITB Construction Bid Certification Page. The following requirement listed in the Invitation to Bid and the Special Conditions has been revised as follows: (1.)The following is added to SPECIAL CONDITIONS item 09. BID ALLOWANCE Pass-Thru Allowance Item for (Landscape, Irrigation, Unforeseen Underground Conditions, Miscellaneous Structures/Materials, Specialized Construction Activities and Permit Allowances) Description This item includes full compensation for the miscellaneous labor and materials outlined above, which was not specifically covered in the bid items of this contract. Contractor shall provide the City's Project Manager with receipts for all permits or testing needed to complete this work Overall Description of the Pass-thru allowances The purpose of the Pass-thru allowance item listed above is to provide a means of covering the direct cost of the Contractor for any items not contained within the contract documents. Pass-thru items include construction activities for irrigation system and landscaping; unforeseen underground condition; parts, materials, and miscellaneous items; specialized construction activities; and permit fees. The City Project Manager or his designee must approve use of Pass-thru items. The City reserves the opinion to purchase and furnish materials or services if the 5/7/2021 9:40 AM p. 174 city or i-ort t_auaeraaie City determines that the prices submitted by the Contractor are not fair and reasonable. The Contractor is not allowed to markup cost of the Pass-thru items. Copy of the Contractor's invoices for materials and services from the supplier(s) or subcontractor(s) will be required before invoice approval. In cases where the Contractor manufactures its own parts or directly provide the required service, it will charge the City a price within a competitive range. The City reserves the right to request verification or additional quotes. Should the Contractor elect to subcontract any portion of an individual project, the Contractor must first check with the City Project Manager or his designee to identify if any City contracts can be utilized for the required services. If not available, the Contractor shall obtain a minimum of three (3) quotes and the cost of the "Pass-thru" shall be the lowest of the provided quotes, subject to approval of the City Project Manager or his designee. Parts provided by the subcontractor(s) must also be on a "Pass-Thru" basis. The calculated cost for the Pass -through allowances will be $500,000.00 for the first 2 year contract, and $250,000 for each additional 1 -year renewals. (2). The following lines Items are deleted from the bid 12504-613--01-258 12504-613--01-259 12504-613--01-260 12504-613--01-261 12504-613--01-262 PASS-THRU IRRIGATION AND LANDSCAPE ALLOWANCE (FDOT PAY ITEM NUMBER NOT APPLICABLE PASS-THRU UNFORSEEN UNDERGROUND CONDITIONS ALLOWANCE (FDOT PAY ITEM NUMBER NOT APPLICABLE PASS-THRU PARTS, STRUCTURES, MATERIALS, AND MISCELLANEOUS ITEMS ALLOWANCE (FDOT PAY ITEM NUMBER NOT APPLICABLE) PASS-THRU SPECIALIZED CONSTRUCTION ACTIVITIES ALLOWANCE (FDOT PAY ITEM NUMBER NOT APPLICABLE) PASS-THRU PERMIT ALLOWANCE (FDOT PAY ITEM NUMBER NOT APPLICABLE) (3). Bid Due Date Extension The Bid Due date has been extended to April 15th, 2021 2:00 EDT 5/7/2021 9:40 AM p. 175 All other terms, conditions, and specifications remain unchanged. amps Ci'eemphill Assistant Manager Procurement and Contracts Company Name: (please print) Bidder's Signature: Date: 5/7/2021 9:40 AM p. 176 City of Fort Lauderdale 010 l LOU4-Ol Question and Answers for Bid #12504-613 - Annual Construction of General Stormwater Infrastructure (P12220) Overall Bid Questions Question 1 Please provide the Engineer's Estimate for this bid. Thank you, (Submitted: Mar 8, 2021 10:45:14AM EST) Answer - This is a unit price contract. The estimated cost for the next 2 years is $9,000,000, to be distributed among the selected contractors. Estimated cost is based on historical pricing and projections. (Answered: Mar 10, 2021 2:35:17 PM EST) Question 2 Please advise if "Installation Floater" will be sufficient insurance coverage instead of "Property Coverage (Builder's Risk)" as noted in section 10 of the special conditions. (Submitted: Mar 9, 2021 9:29:15 AM EST) Answer - Yes, we will accept an installation floater. (Answered: Mar 11, 2021 9:59:46 AM EST) Question 3 What is the anticipated average dollar amount of work to be issued for a task order from this contract? (Submitted: Mar 9, 2021 9:31:55 AM EST) Answer - The issued construction task orders will vary from $50,000 to $500,0000. (Answered: Mar 10, 2021 2:35:17 PM EST) Question 4 As per Invitation to Contract and Specifications Package, Section 07 Required Licenses and Certifications: Contractor must possess the following licenses/certifications to be considered for award: Underground contractor's licenses, bonded and insured. Can a State of Florida General Contractor's License and a Broward County "General Engineered Construction Builders" participate on this Bid Solicitation? (Submitted: Mar 16, 2021 10:44:19 AM EDT) Answer - A GC License is acceptable in lieu of an Underground Contractor's license. Please see Addendum 1. (Answered: Mar 16, 2021 11:36:44 AM EDT) Question 5 For bid bond purposes, what contract amount does the Surety have to bond? (Submitted: Mar 16, 2021 3:1215 PM EDT) Answer 5/7/2021 9:40 AM p. 177 - The question is not clear; it is asking about bid bond but also tied to Surety bond. However, per the bid documents as it relates to Bid Bond: Bid Security: A certified check, cashier's check, bank officer's check or bid bond for TEN percent (10%) of the bid amount, made payable to the City of Fort Lauderdale, Florida, shall accompany each offer. Please refer to the Bid Comments and the Instructions to Bidders section for more information regarding the bid bond. (Answered: Mar 16, 2021 4:12:52 PM EDT) Question 6 How many contracts\contractors does the City intend to award\award to? (Submitted: Mar 16, 2021 3:13:13 PM EDT) Answer - About 7. Please refer to the Special Conditions Section of the solicitation. Bidders are strongly encouraged to read the solicitation in its entirety to fully understand the requirements as well as locate pertinent information. (Answered: Mar 16, 2021 4:19:37 PM EDT) Question 7 Is there a goal for small business participation? Thank you for your help! Melanie Pistiner Designer Pavers, Inc. 954-921-5555 designerpavers@yahoo.com (Submitted: Mar 17, 2021 9:08:17 AM EDT) Answer - No. (Answered: Mar 17, 2021 9:51:08 AM EDT) Question 8 Are bidders required to bid all 262 line items? (Submitted: Mar 20, 2021 1:27:54 PM EDT) Answer - Yes. Please refer to the Instructions to Bidders section. (Answered: Mar 22, 2021 11:50:54 AM EDT) Question 9 What is the minimum dollar amount per task order issued? (Submitted: Mar 24, 202110:08:49 AM EDT) Answer - There is no minimum amount. The maximum is -$100,000. (Answered: Mar 24, 2021 2:14:37 PM EDT) Question 10 Do you confirm to e -verify and supply their inspectors with an employee roster to verify field staff has accurately been verified as required by Florida statute. (Submitted: Mar25, 2021 11:34:17 AM EDT) Answer 5/7/2021 9:40 AM p. 178 city ot Tort Lauaeroaie Isla lzourt-o"13 - By responding to this Solicitation, the vendor affirms that it has utilized E -Verify. (Answered: Mar 31, 2021 4:20:15 PM EDT) 5/7/2021 9:40 AM p. 179 CITY OF OPA-LOCKA AGREEMENT FOR DRAINAGE IMPROVEMENTS (Push Button Intersections Improvement -South Piggyback Competitive Award) This Agreement is made this day of , 2022, between the City of Opa-Locka, a municipal corporation organized and existing under the laws of the State of Florida and whose address is 780 Fisherman Street, Opa-Locka, Florida 33054 (the "City"), and H&R Paving, Inc. whose address is 911 NW 209th Avenue Suite 101 Pembroke Pines, FL 33029 (the "Contractor"). WITNESSETH WHEREAS, the Contractor desires to enter into this Agreement ("Agreement") with City to provide Drainage Installation services to the City (Project No. 2022-09-024 for Drainage Installation along NW 147th Street) (the "Project"); and WHEREAS, the parties desire to incorporate the terms and conditions of the solicitation and contractual arrangement between the City of Fort Lauderdale and the Contractor, as set forth in the City of Fort Lauderdale Invitation To Bid No.12504-613 ("the ITB"); and WHEREAS, the City Code provides authority for the City to select and contract through the use of the competitive bid process of another government entity as an exception to the otherwise required formal bidding process. NOW THEREFORE, in consideration of the mutual covenants set forth in this Agreement, the receipt and sufficiency of which is acknowledged, the parties agree as follows: Section 1. Term. The term of this Agreement commences upon fully execution of this agreement and continues through May 31, 2023, unless terminated earlier by its terms. 1 Section 2. Contract Terms. The Contractor agrees to provide the City with drainage improvement services in accordance with the City's requirements as set forth herein and the Standard Contract between the City of Fort Lauderdale and the Contractor dated on or about June 01, 2021 (the "City of Fort Lauderdale Agreement"), attached hereto and incorporated herein as Exhibit "A". The exhibits are incorporated into this Agreement for all purposes and are collectively referred to as the "Contract Documents" and represent the entire agreement between the parties. In the event of a conflict between or among the Contract Documents, the order of priority shall be: this Agreement, the City of Fort Lauderdale Agreement, and the Contractor's accepted proposal. Section 3. Some of Work The following provisions are included: The City shall pay Contractor no more than the unit prices set forth in the Contract Documents and in accordance with the provisions of the Contract Documents. If the City requires services not covered by unit prices already made a part of the Contract Documents, the Contractor shall submit a detailed written proposal to the authorized City representative before providing any such services. For these purposes, Adelina Gross, as CIP Manager, shall be the City Representative and may be reached at (305)953- 2868 Ext. 3001. B. If permits are required, Contractor shall submit complete and accurate permit applications to all applicable permitting agencies within ten workdays of receiving from the City all documents necessary to file such permit applications. The City shall pay all permit and related fees directly to the permitting agencies, including any permit fees charged by the City. C. The City of Opa-Locka shall be substituted for the City of Fort Lauderdale with regard to any and all provisions of the City of Fort Lauderdale Agreement, the ITB, and the Contractor's bid, including by example and not limitation, with regard to bond requirements, insurance, indemnification, licensing, termination, default and ownership of documents. All recitals, representations, and warranties of Contractor made in those documents Page 2 of 7 are restated as if set forth fully herein,made for the benefit of the City, and incorporated herein. D. Contractor shall not commence work on the Project unless and until the requirements for insurance have been fully met by Contractor and appropriateevidence thereof, in the City's sole discretion, has been provided to and approved by the City. Section 4. Assignment. Neither party may assign its rights or obligations under this Agreement without the consent of the other. Section 5. Notice. Notice hereunder shall be provided in writing by certified mail, return receipt requested, or customarily used overnight transmission with proof of delivery, to the following parties, with mandatory copies, as provided below: For City: Copy lo: For Contractor: Darvin Williams, Interim City Manager City of Opa-Locka 780 Fisherman Street Opa-Locka, Florida, Florida 33054 Burnadette Norris -Weeks, Esq. City Attorney Burnadette Norris -Weeks, P.A. 401 NW 7th Avenue Fort Lauderdale, Florida 33311 Eduardo Dominguez 911 NW 209th Avenue Suite 101 Pembroke Pines, FL 33029 Section 5. Severability This Agreement sets forth the entire agreement between Contractor and City with respect to the subject matter of this Agreement. This Agreement supersedes all prior and contemporaneous negotiations, understandings and agreements, written or oral, between the parties. This Agreement may not be modified except by the parties' mutual agreement set forth in writing and signed by the parties. Page 3 of 7 E -VERIFY FORM Definitions: "Contractor" means a person or entity that has entered or is attempting to enter into a contract with a public employer to provide labor, supplies, or services to such employer in exchange for salary, wages, or other remuneration. "Subcontractor" means a person or entity that provides labor, supplies, or services to or for a contractor or another subcontractor in exchange for salary, wages, or other remuneration. Effective January 1, 2021, public and private employers, contractors and subcontractors will begin required registration with, and use of the E -verify system in order to verify the work authorization status of all newly hired employees. Vendor/Consultant/Contractor acknowledges and agrees to utilize the U.S. Department of Homeland Security's E - Verify System to verify the employment eligibility of: a) All persons employed by Vendor/Consultant/Contractor to perform employment duties within Florida during the term of the contract; and b) All persons (including sub-vendors/subconsultants/subcontractors) assigned by Vendor/Consultant/Contractor to perform work pursuant to the contract with the Department. The Vendor/Consultant/Contractor acknowledges and agrees that use of the U.S. Department of Homeland Security's E -Verify System during the term of the contract is a condition of the contract with the City of Opa-locka; and Should vendor become successful Contractor awarded for the above -named project, by entering into this Contract, the Contractor becomes obligated to comply with the provisions of Section 448.095, Fla. Stat., "Employment Eligibility," as amended from time to time. This includes but is not limited to utilization of the E -Verify System to verify the work authorization status of all newly hired employees, and requiring all subcontractors to provide an affidavit attesting that the subcontractor does not employ, contract with, or subcontract with, an unauthorized alien. The contractor shall maintain a copy of such affidavit for the duration of the contract. Failure to comply will lead to termination of this Contract, or if a subcontractor knowingly violates the statute, the subcontract must be terminated immediately. If this contract is terminated for a violation of the statute by the Contractor, the Contractor may not be awarded a public contract for a period of 1 year after the date of termination. Page 4 of 7 IN WITNESS WHEREOF, the parties hereto have accepted, made, and executed this Agreement upon the terms and conditions above stated on the day and year first above written. CITY: City of Opa-Locka Date: By: Darvin Williams, Interim City Manager APPROVED AS TO FORM AND LEGAL SUFFICIENCYFOR THE USE OF AND RELIANCE BY THE CITY OF OPA-LOCKA ONLY: By: City Attorney Burnadette Norris -Weeks, P.A. By: Joanna Flores, City Clerk Page 5 of 7 CONTRACTOR: Southeastern Engineering Contractors, Inc. By: Witness: PRINT NAME Date: TITLE Date: Page 6 of 7 EXHIBIT "A" City of Fort Lauderdale Invitation to Bid No. 12504-613 Project 12220 ("the ITB"); and Southeastern Engineering Contractors, Inc, Proposal quote No. 1 dated 08/09/2022 provided to the City for Drainage Improvement Services along NW 147th Street (Capital Improvement Project No. 2022-09-024) Page 7 of 7