HomeMy Public PortalAboutPCC Texas Parkway and Phillips Drive ImprovementsSign:
PENSACOLA CONCRETE CONSTRUCTION CO. INC.
FL License # CUC1224436 • AL License # 12750
City of Crestview
198 North Wilson Street
Crestview, FI 32536
Attn: Allen Hallford
Job Name: 42in CIPP
Item
1
2
3
4
tits Pkw(../ ZitniirS St ►br0.10 .,
Description
Mobilization 1 Freight
Pre -Clean Host Pipe
Install 42" dia CIPP Liner
Post Lining Video Inspection
Unit
LS
LS
LF
LS
P.O. Box 2787
Pensacola, FL 32513
1-850-476-0026
www.pectrenchless.com
Date: March 30, 2022
Quantity Unit Price Amount
1 $2,500.00 $2,500.00
1 $1,500.00 $1,500.00
204 $321.52 $65,590.08
1 $750.00 $750.00
TOTAL: $70,340.08
Notes:
1) Site shall be suitable for PCC and the CIPP Installation
2) Anything not specifically listed above is excluded.
3) Water via fire hydrant to be done by others.
4) Host pipes shall be suitable for lining, price excludes point repairs.
5) This proposal is a unit price proposal and final payment shall be made based on actual quanities preformed.
6) All MOT shall be done by others.
7) Dewatering and Diversion of water shall be done by others.
8) Any inlet/manhole tops that may need to be removed for CIPP installation shall be done by others.
If accepting this proposal, sign below and retum original signed copy to Pensacola Concrete Construction Company.
Date: of//'ZZ
If there are any questions concerning this proposal, please feel free to call me at (850) 476 - 0026.
Respectfully Submitted by,
Drew w Matthe s, Estimator
Pensacola Concrete Construction Company, Inc.
i�r • •
PENSACOLA CONCRETE CONSTRUCTION CO. INC.
FL License # CUC1224436 • AL License # 12750
City of Crestview
198 N Wilson St
Crestview, FL 32536
Job Name: Phillips Dr CIPP
Item
1 Mobilization / Freight
2 Install CIPP Liner (48"
3 Post Lining Video
Description
Diameter)
P.O. Box 278
Pensacola, FL 3251
1-850-476-002
www.pcctrenchless.cor
Date: March 23, 20
i Unit Quantity Unit Price Amount
LS 1 $7,500.00 $7,500.00
LF 90 $444.44 $39,999.60
EA 1 $500.00 $500.00
TOTAL: $47,999.60
Notes:
1) Site shall be suitable for PCC and the CIPP Installation
2) Anything not specifically listed above is excluded.
3) Water via fire hydrant to be done by others.
4) This proposal is a unit price proposal and final payment shall be made based on actual quantities preformed.
5) All MOT shall be done by others.
6) Dewatering and Diversion of water shall be done by others.
7) Pricing exludes any point repairs needed. Any point repairs needed shall be done by others.
If accepting this proposal, sign below and return original signed copy to Pensacola Concrete Construction Company.
Sign:
Date: ydf /22
If there are any questions concerning this proposal, please feel free to call me at (850) 476 - 0026.
Respectfully Submitted by,
Drew Matthews, Estimator
Pensacola Concrete Construction Company, Inc.