Loading...
HomeMy Public PortalAboutPCC Texas Parkway and Phillips Drive ImprovementsSign: PENSACOLA CONCRETE CONSTRUCTION CO. INC. FL License # CUC1224436 • AL License # 12750 City of Crestview 198 North Wilson Street Crestview, FI 32536 Attn: Allen Hallford Job Name: 42in CIPP Item 1 2 3 4 tits Pkw(../ ZitniirS St ►br0.10 ., Description Mobilization 1 Freight Pre -Clean Host Pipe Install 42" dia CIPP Liner Post Lining Video Inspection Unit LS LS LF LS P.O. Box 2787 Pensacola, FL 32513 1-850-476-0026 www.pectrenchless.com Date: March 30, 2022 Quantity Unit Price Amount 1 $2,500.00 $2,500.00 1 $1,500.00 $1,500.00 204 $321.52 $65,590.08 1 $750.00 $750.00 TOTAL: $70,340.08 Notes: 1) Site shall be suitable for PCC and the CIPP Installation 2) Anything not specifically listed above is excluded. 3) Water via fire hydrant to be done by others. 4) Host pipes shall be suitable for lining, price excludes point repairs. 5) This proposal is a unit price proposal and final payment shall be made based on actual quanities preformed. 6) All MOT shall be done by others. 7) Dewatering and Diversion of water shall be done by others. 8) Any inlet/manhole tops that may need to be removed for CIPP installation shall be done by others. If accepting this proposal, sign below and retum original signed copy to Pensacola Concrete Construction Company. Date: of//'ZZ If there are any questions concerning this proposal, please feel free to call me at (850) 476 - 0026. Respectfully Submitted by, Drew w Matthe s, Estimator Pensacola Concrete Construction Company, Inc. i�r • • PENSACOLA CONCRETE CONSTRUCTION CO. INC. FL License # CUC1224436 • AL License # 12750 City of Crestview 198 N Wilson St Crestview, FL 32536 Job Name: Phillips Dr CIPP Item 1 Mobilization / Freight 2 Install CIPP Liner (48" 3 Post Lining Video Description Diameter) P.O. Box 278 Pensacola, FL 3251 1-850-476-002 www.pcctrenchless.cor Date: March 23, 20 i Unit Quantity Unit Price Amount LS 1 $7,500.00 $7,500.00 LF 90 $444.44 $39,999.60 EA 1 $500.00 $500.00 TOTAL: $47,999.60 Notes: 1) Site shall be suitable for PCC and the CIPP Installation 2) Anything not specifically listed above is excluded. 3) Water via fire hydrant to be done by others. 4) This proposal is a unit price proposal and final payment shall be made based on actual quantities preformed. 5) All MOT shall be done by others. 6) Dewatering and Diversion of water shall be done by others. 7) Pricing exludes any point repairs needed. Any point repairs needed shall be done by others. If accepting this proposal, sign below and return original signed copy to Pensacola Concrete Construction Company. Sign: Date: ydf /22 If there are any questions concerning this proposal, please feel free to call me at (850) 476 - 0026. Respectfully Submitted by, Drew Matthews, Estimator Pensacola Concrete Construction Company, Inc.