HomeMy Public PortalAboutConstantine Constructor, LLC - Blackwater Golf Lift StationSECTION 00500
AGREEMENT
THIS AGREEMENT made and entered into this(9*day ofVQ\pt 2022, by
and between the CITY OF CRESTVIEW, FLORIDA, a municipality organized abd existing
under the laws of the State of Florida, hereinafter called the OWNER, and
Constantine Constructors. LLC hereinafter called CONTRACTOR;
WITNESSETH:
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
ARTICLE I - SCOPE OF WORK
CONTRACTOR shall complete all work as specified or indicated in the Contract
Documents. The Work is generally described as follows:
Blackwater Golf Club Lift Station and Force Main Project
BID # 21-10-00
All work for the Project shall be constructed in accordance with the Drawings and
Specifications prepared by Tetra Tech and the proposed improvements will be awarded and
constructed, if award is made, under one Contract. Bids shall be submitted for furnishing,
delivering, and installing all materials, equipment and services, including labor, for the Work
described.
This project is to provide the City with a new wastewater lift station and force
main at Blackwater Golf Club along with the required utility improvements
associated with the revitalization of the Golf Club. The project generally includes
miscellaneous site work, installation of a fiberglass wetwell and pumps furnished
by the owner, installation of sanitary sewer force main and connection to an
existing force main within the system, installation of a sanitary sewer gravity
collection system, electrical work including site lighting and controls, and site
restoration. The contractor shall provide and install the new lift station, force main,
and utility improvements in accordance with the plans and specifications and shall
include all materials and labor to provide a fully functioning and reliable
wastewater conveyance system.
ARTICLE II - ENGINEER
The Engineer, Scott L Jerniaan. P.E. (Jacobs), whose address is 25 West Cedar Street,
Suite 350. Pensacola FL 32501 hereinafter referred to as ENGINEER and who will assume all
duties and responsibilities and will have the rights and authority assigned to the Engineer in the
Contract Documents in connection with completion of the Work in accordance with the Contract
Documents.
P W1DEN00110001811Crestv iewFoxwoodL S
00500-1
ARTICLE III - CONTRACT TIME
3.1 The Work will be substantially completed within 180 days after the date when the
Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions, and
completed and ready for final payment in accordance with Paragraph 14.07 of the General
Conditions within 210 days after the date when the Contract Time commences to run.
3.2 Damages for Delay. OWNER and CONTRACTOR recognize that TIME IS OF
THE ESSENCE in this Agreement and that the OWNER will suffer financial loss if the Work is
not completed within the time specified in Paragraph 3.1 above, plus any extensions thereof
allowed in accordance with Article 12 of the General Conditions.
3.2.1 Uniqueness of the Work. The OWNER and the CONTRACTOR
expressly acknowledge the unique characteristics of the Work, which cause time to be of
the essence in this contract.
3.2.2 Liquidated Damages. OWNER and CONTRACTOR recognize that
TIME IS OF THE ESSENCE in this Agreement and that Owner will suffer financial
loss if the work is not substantially complete in the time specified in Paragraph 3.1 above.
The parties also recognize the delays, expense and difficulties involved in proving in a
legal proceeding the actual loss suffered by the OWNER if the Work is not substantially
complete on time. Accordingly, instead of requiring any such proof, OWNER and
CON TRACTOR agree that as liquidated damages for delay (but not as a penalty)
CONTRACTOR shall pay OWNER $1,000.00 (One Thousand Dollars) for each day that
expires after the time specified in Paragraph 3.1 for Substantial Completion until the
Work is substantially complete, and that the liquidated damages set forth herein bear a
reasonable relationship to the estimated actual damages that the OWNER would suffer.
ARTICLE IV - CONTRACT PRICE
4.1 OWNER shall pay CONTRACTOR for performance of the Work in accordance
with the Contract Documents in current funds at the lump sum or unit prices as presented in the
Bid Form, which is incorporated herein and made a part hereof by this reference.
4.2 OWNER shall pay CONTRACTOR for completion of the work in accordance
with the Contract Documents an amount in correct funds equal to the amount below:
Bid Total: FOUR HUNDRED FOURTEEN THOUSAND NINE HUNDRED
NINETY FOUR DOLLARS
(use words)
Bid Total: $ 414.994.00
(use figures)
4.3 The parties expressly agree that the Contract Price is a stipulated sum, except with
regard to those items in the Bid which are subject to unit prices.
ARTICLE V - PAYMENT PROCEDURES
5.1 CONTRACTOR shall submit Applications for Payment in accordance with the
Contract Documents. Applications for Payment will be processed by ENGINEER as provided in
the General Conditions.
Pw\DEN001 \000181 \CrestviewFoxwoodLS
00500-2
5.2 OWNER shall make progress payments on account of the Contract Price on the
basis of CONTRACTOR'S monthly Applications for Payment, as approved by the ENGINEER,
which shall be submitted by the CONTRACTOR on or before the l Oth day after the end of each
calendar month for which payment is requested.
5.3
manner:
Progress payments prior to Substantial Completion will be made in the following
5.3.1 Prior to Substantial Completion and prior to fifty percent (50%) of the
Work being completed, progress payments shall be ninety percent (90%) of the value of
Work complete and ninety percent (90%) of the value of materials and equipment not
incorporated into the Work, but delivered and suitably stored, less in each case the
aggregate of payments previously made.
5.3.2 After fifty percent (50%) of the Work has been completed as determined
by the ENGINEER, and if the character and progress has been satisfactory to the
OWNER and ENGINEER, OWNER, on the recommendation of ENGINEER, may
determine that as long as the character and progress of the Work remain satisfactory to
them, there will be no retainage on account of subsequent Work and materials and
equipment not incorporated into the Work, but delivered and suitably stored, which
results in the Owner withholding a retainage equal to five percent (5%) of the Contract
Price until Substantial Completion. However, OWNER shall reserve the right to reinstate
withholding a retainage of ten percent (10%) if OWNER, on the recommendation of
ENGINEER, determines that the progress or character of the Work is not satisfactory.
5.3.3 Upon Substantial Completion of the Work, OWNER shall pay an amount
sufficient to increase total payments to the CONTRACTOR to ninety-five percent (95%)
of the Contract Price, less such amounts as ENGINEER shall determine in accordance
with Article 14 of the General Conditions."
5.4 Final Payment. Upon final completion of the Work in accordance with the
Contract Documents, OWNER shall pay CONTRACTOR an amount sufficient to increase total
payments to ninety-eight percent (98%) of the Contract Price. However, not less than two
percent (2%) of the Contract Price shall be retained until Record Drawings, specifications,
addenda, modifications and shop drawings, including all manufacturers instructional and parts
manuals are delivered to and accepted by the ENGINEER.
ARTICLE VI - CONTRACTOR'S REPRESENTATIONS
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the
following representations:
6.1 CONTRACTOR has visited the work site and familiarized himself with the nature
and extent of the Contract Documents, Work, locality, and all local conditions and federal, state
and local laws, ordinances, rules and regulations that in any manner may affect cost, progress or
performance of the Work.
6.2 CONTRACTOR has studied carefully all reports of investigations and tests of
subsurface and latent physical conditions at the site or otherwise affecting cost, progress or
performance of the Work which were relied upon by the ENGINEER in the preparation of the
Drawings and Specifications, and which have been identified in the General and Supplementary
Conditions of the Contract Documents.
PW\D EN001 \000181 \CrestviewFoxwoodLS
00500-3
6.3 CONTRACTOR has made or caused to be made examinations, investigations,
tests and studies of such reports and related data in addition to those referred to in Paragraph 6.2
above as he deems necessary for the performance of the Work at the Contract Price, within the
Contract Time and in accordance with the other terms and conditions of the Contract Documents;
and no additional examinations, investigations, tests, reports or similar data are, or will be,
required by CONTRACTOR for such purposes.
6.4 CONTRACTOR has correlated the results of all such observations, examinations,
investigations, tests, reports and data with the terms and conditions of the Contract Documents.
6.5 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or
discrepancies that he has discovered in the Contract Documents and the written resolution
thereof by ENGINEER is acceptable to the CONTRACTOR.
ARTICLE VII - CONTRACT DOCUMENTS
The Contract Documents which comprise the entire Agreement between the OWNER
and CONTRACTOR are attached to this Agreement, are made a part hereof and consist of the
following:
7.1 This Agreement (Section 00500) (pages 1 to 6, inclusive).
7.2 Exhibits to this Agreement (sheets _ to , inclusive). N/A
7.3 Performance Bond, Payment Bond and Certificates of Insurance.
7.4 Notice of Award and Notice to Proceed.
7.5 General Conditions (Section 00700) as amended by the Supplementary
Conditions.
7.6 Supplementary Conditions (Section 00800).
7.8 Project Manual bearing the general title: "BLACKWATER GOLF CLUB LIFT
STATION AND FORCE MAIN PROJECT" and consisting of Divisions 0 through 16 as listed
in the table of contents.
7.9 Drawings bearing the following general title: "BLACKWATER GOLF CLUB
LIFT STATION AND FORCE MAIN PROJECT" and consisting of the sheets as listed in the
Drawings Index.
7.10 Addenda Numbers through _, inclusive.
7.11 Bid Form (Section 00300) (Pages 1 to 11, inclusive).
7.12 All applicable provisions of State and Federal Law and any modification,
including Change Orders or written amendments duly delivered after execution of Agreement.
7.13 Advertisement for Bids, Instructions to Bidders, Bid Bond, Noncollusion
Affidavit, General Requirements, Field Orders and State of Florida Contract Provisions.
There are no Contract Documents other than those listed above in this Article VII. The
Contract Documents may only be altered, amended, or repealed in accordance with Article 3 of
the General Conditions as modified in the Supplementary Conditions.
PW\DEN001 \000181 \Crestvie WFoxwoodLS
00500-4
ARTICLE VIII - MISCELLANEOUS
8.1 No assignment by the parties hereto of any rights under, or interest in, the
Contract Documents will be binding on another party hereto without the written consent of the
party sought to be bound; and specifically, but without limitation, monies that may become due
and monies that are due may not be assigned without such consent (except to the extent that the
effect of this restriction may be limited by law), and unless specifically stated to the contrary in
any written consent of an assignment, no assignment will release or discharge the assignor from
any duty or responsibility under the Contract Documents.
8.2 OWNER and CONTRACTOR each binds himself, his partners, successors,
assigns and legal representatives to the other party hereto, his partners, successors, assigns or
legal representatives in respect to all covenants, agreements and obligations contained in the
Contract Documents.
8.3 Terms used in this Agreement, which are defined in Article 1 of the General
Conditions, shall have the meanings indicated in the General Conditions, as modified in the
Supplementary Conditions.
ARTICLE IX - GOVERNING LAW
This Agreement shall be governed by the laws of the State of Florida. Both parties agree
that the courts of the State of Florida shall have jurisdiction of any claim arising in connection
with this Agreement. In the event of litigation arising out of this Agreement, the prevailing party
shall be entitled to the award of attorney's fees and costs at both the trial and appellate level.
Venue for any litigation arising out of this agreement shall be in Orange County, Florida.
PW\DEN00 1\000181 \CrestviewFoxwoodLS
00500-5
•
•
•
•
•
IN WITNESS WHEREOF, the parties hereto have signed this Agreement in triplicate.
One (1) counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER. All
portions of the Contract Documents have been signed or identified by OWNER and
CONTRACTOR or by ENGINEER on their behalf.
reement will be effective on aig , 2022.
CITY OF CRESTVIEW, FLORIDA
•
•
•
•
•
•
CITY CLERK
By:
APPROVED AS TO FORM AND CORRECTNE
CONTRACTOR:
(CORPORATE SEAL)
ATTEST:
SECRETARY
rt is ecs-lF "17 e9n413 tY�--
PW\DEN0011000181 \CrestviewFoxwoodLS
By:
Title: � ��� � 2
END OF SECTION
00500-6
VIii, /111--v %9
United®
Rentals
Construction Notice Dept.
PO Box 1389, Simi Valley, CA 93062
Address Service Requested
9314 8898 8030 0062 7655 44
6/24/2022 UNR704 8963356
CITY OF CRESTVIEW, FLORIDA
198 N WILSON ST
CRESTVIEW, FL 32536
Enclosed you will find a notice that is being sent to you on behalf of United Rentals (North America), Inc. in
regards to the construction project known as BLACKWATER GOLF CLUB 17 and located at 4927
ANTIOCH RD , CRESTVIEW, FL 32536-8416. The name and address of the person who contracted for the
furnishing of equipment is CONSTANTINE CONSTRUCTORS,-LLC 1988 LEWIS TURNER BLVD-UNIT
3 , FT WALTON BCH, FL 32547-5262. Thank you for taking the time to read this letter.
This is NOT a Lien or Bond Claim and does not necessarily indicate any
amounts are currently overdue
This notice is being sent to make you aware we have provided services to someone contributing to this
construction project. This is a common procedure required by statute in many states. This notice is not
recorded and is not public information.
This notice should not reflect in any way on the integrity or credit standing of any parties associated
with this job.
Answers to a few common questions regarding the enclosed notice:
How do I obtain invoice copies, make payments, or request a lien release/waiver?
Customers may access all of the above via UR Control at www.unitedrentals.com (click on Online Services,
then UR Control), or by calling 888-481-2660. Lien releases requested via UR Control will be provided within
24 hours. Those requested via email (lienreleases@ur.com) or by phone will be provided within 72 hours.
Our records indicate the following parties are associated with this job:
Owner: CITY OF CRESTVIEW, FLORIDA, CRESTVIEW, FL
General/Direct/Original Contractor: CONSTANTINE CONSTRUCTORS LLC, FORT WALTON BEACH, FL
Lender/Surety:ATLANTIC SPECIALTY INSURANCE COMPANY
What do I do if this notice contains inaccurate information?
We attempted to verify all information before sending this notice. If any of the construction parties listed on
the document are incorrectly referenced or you discover any other inaccuracy in the information, please contact
our third party provider at 800-522-3858 ext. 4 (Client Service) or email united@crfsolutions.com.
NOTICE TO OWNER/NOTICE TO CONTRACTOR
(Preliminary Notice, Notice Of Intent To Claim Against Bond)
WARNING! FLORIDA'S CONSTRUCTION LIEN LAW ALLOWS SOME UNPAID CONTRACTORS,
SUBCONTRACTORS, AND MATERIAL SUPPLIERS TO FILE LIENS AGAINST YOUR PROPERTY EVEN IF YOU
HAVE MADE PAYMENT IN FULL.
UNDER FLORIDA LAW, YOUR FAILURE TO MAKE SURE THAT WE ARE PAID MAY RESULT IN A LIEN AGAINST
YOUR PROPERTY AND YOU PAYING TWICE.
TO AVOID A LIEN AND PAYING TWICE, YOU MUST OBTAIN A WRITTEN RELEASE FROM US EVERY TIME
YOU PAY YOUR CONTRACTOR.
TO THE OWNER:
CITY OF CRESTVIEW, FLORIDA
198 N WILSON ST
CRESTVIEW, FL 32536
CUSTOMER:
CONSTANTINE CONSTRUCTORS, LLC
1988 LEWIS TURNER BLVD UNIT 3,
FT WALTON BCH, FL 32547-5262
The undersigned hereby informs you that he has furnished or is furnishing services or materials as follows: Various Construction
Equipment Rentals, for the improvement of real property identified as: BLACKWATER GOLF CLUB 17. The property is located
at: 4927 ANTIOCH RD, , CRESTVIEW, FL 32536-8416, APN#: . Under an order given by: CONSTANTINE CONSTRUCTORS,
LLC, 1988 LEWIS TURNER BLVD UNIT 3, , FT WALTON BCH, FL 32547-5262
A demand is made for a copy of the Notice of Commencement to be faxed to 805-522-7171, or email to
myjobinfo@crfsolutions.com. Any demand made pursuant to Section 713.16(2) or Section 713.16(4) or Section 255.05, Florida
Statutes, must- be served as- follows: -
Name of Lienor:United Rentals (North America), Inc.
10330 David Taylor Drive
Charlotte, NC 28262 800-522-3858
FLORIDA LAW PRESCRIBES THE SERVING OF THIS NOTICE AND RESTRICTS YOUR RIGHT TO MAKE PAYMENTS UNDER
YOUR CONTRACT 1N ACCORDANCE WITH SECTION 713.06, FLORIDA STATUTES. IF JOB IS BONDED UNDER SECTION
713.23 FLORIDA STATUTES, SECTION 255.05 FLORIDA STATUTES OR 270 U.S.C. THE FIRM SENDING THIS NOTICE WILL
LOOK TO THE BOND (SURETY CO.) FOR PROTECTION IF NOT PAID. IF PAYMENT BOND EXISTS, FURNISH A COPY TO
THE UNDERSIGNED. PROVIDE NAME AND ADDRESS OF BONDING COMPANY. FAILURE TO PROVIDE THIS
INFORMATION MAY RENDER YOU LIABLE FOR DAMAGES. PLEASE REFER TO THE CRF NUMBER LISTED BELOW WHEN
RESPONDING. IF THERE IS MORE THAN ONE CONTRACTOR ON THE ENTIRE PROJECT, PLEASE FURNISH THE
UNDERSIGNED WITH A COPY OF EACH CONTRACT.
IMPORTANT INFORMATION FOR YOUR PROTECTION
Under Florida's Laws, those who work on your property or provide materials who are not paid have a right to enforce their claim for
payment against your property. This claim is known as a Construction Lien. If your contractor fails to pay subcontractors or materials
suppliers or neglects to make other legally required payments, the people who are owed money may look to your property for payment,
EVEN IF YOU HAVE PAID YOUR CONTRACTOR IN FULL.
PROTECT YOURSELF - RECOGNIZE that this Notice to Owner may result in a lien against your property unless all those supplying a
Notice to Owner have been paid.
LEARN more about the Construction Lien Law, Chapter 713, Part I, and Chapter 255, Florida Statutes and the meaning of this Notice by
contacting an attorney or the Florida Dept. of Business and Professional Regulation.
I declare that I am authorized to file this claim on behalf of the claimant. I have read the foregoing document and know the contents thereof;
the same is true of my own knowledge. I declare under penalty of perjury that the foregoing is true and correct. Executed at Simi Valley, CA
on 6/24/2022 for United Rentals (North America), Inc. .
By:
Laura Pavey
CC: TO ORIGINAL CONTRACTOR
CONSTANTINE CONSTRUCTORS LLC
1988 LEWIS TURNER BLVD UNIT 3
FORT WALTON BEACH FL 32547
Cert #: 9314 8898 8030 0062 7655 44
CRF#: 8963356
See Exhibit B for Additional Legal Parties
/ Authorized Agent for United Rentals (North America), Inc.
CC: TO LENDER, SURETY OR BONDING COMPANY
ATLANTIC SPECIALTY INSURANCE COMPANY
605 HIGHWAY 169 NORTH SUITE 800
PLYMOUTH MN 55441
Bond/Loan # 800081933
EXHIBIT B - OTHER LEGAL PARTIES
PROJECT: BLACKWATER GOLF CLUB
FILE #: 8963356
Other Lender/Surety
MARSH MCLENNAN AGENCY
10 INVERNESS CENTER PKWY SUITE-400
BIRMINGHAM AL 35242
Constructors, llc
June 21, 2022
Seth Tatman, EIT
Jacobs
25 W. Cedar Street, Suite 350
Pensacola, FL 32502
RE: Project No. D3553000 Blackwater Golf Club Lift Station and Force
1988 Lewis Turner Blvd. Main Project Additional Excavation and Boring for Water Main
Unit #3 Installation
xt Walton Beach, FL 32547
A
850-833-6978
Dear Mr. Tatman:
The City of Crestview requested the following pricing for labor and a
portion of the materials required to install a new 6" water main as
shown in the Foxwood Estates Water System Conversion drawings.
Scope of work and pricing as follows:
• Tapping Saddles, Valves, Fittings, etc. (Fortiline)- $ 9,519.79
• Labor & Material for Directional Bore 12" HDPE
under Antioch Rd. (Cinch) - $ 10,000.00
• Labor & Material for Directional Bore 6" HDPE
under Gully Branch. (Cinch) - $ 9,000.00
• CCL Labor to excavate and install water main pipe
& Appurtenances. Repair Additional Asphalt.- $ 34,000.00
• CCL Mark Up (15%) $ 9, 377.97
Total - $ 71,897.76
To secure these prices from our vendors, please approve these costs as
soon as possible.
Should you have any questions, please call me at 850.797.1511
Page 2 of 2
June 20, 2022
Sincerely,
Constantine Constructors, LLC.
Chad Eckhart
Construction Manager
Cc: Dave Marshall/CCL
Kory Carter/Account Manager
Cinch Underground Inc.
P. O. Box 690
Chipley, FL 32428 US
(850)415-6416
jcookcinchug@gmail.co
m
Estimate
ADDRESS
David G. Marshall
Constantine Constructors,
Inc.
1988 Lewis Turner Blvd
Fort Walton Beach, FL
32547
United States
PROJECT NAME
Foxwood Estates
ACTivii
Directional Bore 12 In. HDPE
Directional Bore 12 in. HDPE Casing Under Antioch
Rd at Fox Chase Way Estimated 60 LF would utilize
80 LF to meet required Depths
2-12" MJ Adapters
If this is a bore under a State Road there will be an
adder of $2000 to cover depth and off -duty law
enforcement.
Directional Bore 6 in HDPE
Directional Bore 6" HDPE Water Line under Gully
Branch would require 120 LF to accomplish
2- 6" MJ Adapters
HDPE Fusion
Fuse 12" HDPE to include MJ Adapters
HDPE Fusion
Fuse 6" HDPE to include MJ Adapters
CINCH will provide the following:
Labor
Material
Equipment
MOT for CINCH Crews
CINCH will NOT provide the following:
Permitting of any kind
Survey/Survey AsBuilts
Updated 6/20 to reflect 6" waterline instead of 6"
SSFM.
ESTIMATE # 3090
DATE 06/03/2022
EXPIRATION 07/01/2022
DATE
1 8,500.00 8,500.00
1 7,500.00 7,500.00
1 1,500.00 1,500.00
1 1,500.00 1,500.00
Thank you for choosing to accept a quote from Cinch Underground Inc.
We look forward to making your project a CINCH Project!
Accepted B
TOTAL
Accepted Date
$19,000.00
QUOTE
FORTILINE ;
WATERWORKS
a MORSCO brand
CUSTOMER NO
Due to the continued cost and supply challenges in the DUCTILE IRON PIPE, PVC and HDPE markets, the
pricing of these products will be based solely on the availability at the time of shipment. Also, given the
volatility in these markets we will not be responsible for product availability and shipment delays, as they are
I out of our control. Bid prices should be considered an estimate, materials will only be priced at time of
shipment until the current supply chain challenges are resolved. These terms are in leu of our standard terms.
i We appreciate your partnership.
t_
QUOTING BRANCH
225710 FORTILINE PANAMA CITY
CUSTOMER
CONSTANTINE CONSTRUCTORS LLC
1988 LEWIS TURNER BLVD
UNIT 3
FORT WALTON BEACH, FL 32547
20
30
40
50
60
70
100
110
120
130
140
150
170
180
190
210
220
230
QTY
QUOTE NO
6203466
QUOTE DATE
5/17/22
PROJECT INFORMATION
FOXWOOD ESTATES
UOM
DESCRIPTION
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
3
3 EA
3 EA
2
2 EA
4 EA
******************************
GIVEN THE CURRENT PRICING AND
SUPPLY CHAIN CHALLENGES ALL
MATERIAL WILL BE PRICED AT
TIME OF SHIPMENT AND THE
PRICES BELOW ARE TO BE USED AS
AN ESTIMATE FOR BID PURPOSES
ONLY
******************************
10"X6" TAP
10X6 662 TAP SLV 10.73-11.13
662-10750600-000 SMB
6" MJXF GV O/L A2361-19 L/ACC
461S VB COMP SCREW 18"X24"
VLV BOX PROTECTOR RING ROUND
CONCRETE
6" FLG KIT FF 1/8" RR 304SS
6" STAR GRIP PVC W/ACC 4000HDP
Package Sub -total:
6"X6" TAP
6X6 662 TAP SLV 6.59-6.99
662-06630600-200 SMB
6" MJXF GV O/L A2361-19 L/ACC
461S VB COMP SCREW 18"X24"
VLV BOX PROTECTOR RING ROUND
CONCRETE
6" FLG KIT FF 1/8" RR 304SS
6" STAR GRIP PVC W/ACC 4000HDP
Package Sub -total:
6" CAP
6" MJ CAP C153
6" STAR GRIP PVC W/ACC 4000HDP
Package Sub -total:
6" 45
6" MJ 45 C153
6" STAR GRIP PVC W/ACC 4000HDP
Package Sub -total:
UNIT PRICE TOTAL PRICE
552.0000
650.0000
55.0000
25.0000
34.0000
72.0000
523.0000
650.0000
55.0000
25.0000
34.0000
72.0000
52.0000
72.0000
124.00
103.0000
72.0000
552.00
650.00
55.00
25.00
34.00
72.00
1,388.00
523.00
1,359.00
372.00
650.00
55.00
25.00
247.00 494.00
34.00
72.00
156.00
216.00
206.00
288.00
AL STOCK DELIVERIES ARE SUBJECT TO SHIPPING CHARGES
All PVC and HDPE materia is quoted for shipment within 7 days of quote/bid date. All other material is quoted for shipment within 30 days of quote/bid date.
After 7 days for PV and HDPE or 30 days for all other material. ALL quoted prices are subiect to review based on current market conditions.
BIDCNEW
CUSTOMER NO
?25710 IFOXWOOD ESTATES
6203466 5/17/22
LINE QTY UOM
DESCRIPTION
250 2 6" TEE
260 2 EA 6" MJ TEE C153
270 6 EA 6" STAR GRIP PVC W/ACC 4000HDP
Package Sub -total:
290 2 6" GATE VALVE
300 2 EA 6" MJ GV 0/L A2361-23 L/ACC
310 2 EA 461S VB COMP SCREW 18"X24"
320 2 EA VLV BOX PROTECTOR RING ROUND
CONCRETE
330 4 EA 6" STAR GRIP PVC W/ACC 4000HDP
Package Sub -total:
6" EOL HYDRANT
360 2 EA 6" STAR GRIP PVC W/ACC 4000HDP
370 1 EA 6" MJ GV 0/L A2361-23 L/ACC
380 1 EA 461S VB COMP SCREW 18"X24"
390 1 EA VLV BOX PROTECTOR RING ROUND
CONCRETE
400 1 EA 6X13 MJ ANC CPLG SWVXSOL C153
410 3 EA 6" MJ REGULAR ACC LESS GLAND
420 1 EA 5-1/4V0 HYD 3'6" 6MJ 0/L A423
RED L/ACC A423-502235
UNIT PRICE
TOTAL PRICE
182.0000
72.0000
398.00 796.00
650.0000
55.0000
25.0000
72.0000
364.00
432.00
1,300.00
110.00
50.00
288.00
874.00 1,748.00
72.0000
650.0000
55.0000
25.0000
207.0000
28.0000
1,575.0000
144.00
650.00
55.00
25.00
207.00
84.00
1,575.00
Package Sub -total: 2,740.00
Subtotal:
Tax:
3id Total:
8,897.00
622.79
9,519.79
ALL STOCK DELIVERIES ARE SUBJECT TO SHIPPING CHARGES
All PVC and HDPE material is quoted for shipment within 7 days of quote/bid date. All other material is quoted for shipment within 30 days of quote/bid date.
After 7 days for PVC and HDPE or 30 days for all other material. ALL ouoted prices are subiect to review based on current market conditions.
Ent By TMP 5/17/22 18:52:07
BIDCNEW