Loading...
HomeMy Public PortalAboutConstantine Constructor, LLC - Blackwater Golf Lift StationSECTION 00500 AGREEMENT THIS AGREEMENT made and entered into this(9*day ofVQ\pt 2022, by and between the CITY OF CRESTVIEW, FLORIDA, a municipality organized abd existing under the laws of the State of Florida, hereinafter called the OWNER, and Constantine Constructors. LLC hereinafter called CONTRACTOR; WITNESSETH: OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE I - SCOPE OF WORK CONTRACTOR shall complete all work as specified or indicated in the Contract Documents. The Work is generally described as follows: Blackwater Golf Club Lift Station and Force Main Project BID # 21-10-00 All work for the Project shall be constructed in accordance with the Drawings and Specifications prepared by Tetra Tech and the proposed improvements will be awarded and constructed, if award is made, under one Contract. Bids shall be submitted for furnishing, delivering, and installing all materials, equipment and services, including labor, for the Work described. This project is to provide the City with a new wastewater lift station and force main at Blackwater Golf Club along with the required utility improvements associated with the revitalization of the Golf Club. The project generally includes miscellaneous site work, installation of a fiberglass wetwell and pumps furnished by the owner, installation of sanitary sewer force main and connection to an existing force main within the system, installation of a sanitary sewer gravity collection system, electrical work including site lighting and controls, and site restoration. The contractor shall provide and install the new lift station, force main, and utility improvements in accordance with the plans and specifications and shall include all materials and labor to provide a fully functioning and reliable wastewater conveyance system. ARTICLE II - ENGINEER The Engineer, Scott L Jerniaan. P.E. (Jacobs), whose address is 25 West Cedar Street, Suite 350. Pensacola FL 32501 hereinafter referred to as ENGINEER and who will assume all duties and responsibilities and will have the rights and authority assigned to the Engineer in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. P W1DEN00110001811Crestv iewFoxwoodL S 00500-1 ARTICLE III - CONTRACT TIME 3.1 The Work will be substantially completed within 180 days after the date when the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 210 days after the date when the Contract Time commences to run. 3.2 Damages for Delay. OWNER and CONTRACTOR recognize that TIME IS OF THE ESSENCE in this Agreement and that the OWNER will suffer financial loss if the Work is not completed within the time specified in Paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. 3.2.1 Uniqueness of the Work. The OWNER and the CONTRACTOR expressly acknowledge the unique characteristics of the Work, which cause time to be of the essence in this contract. 3.2.2 Liquidated Damages. OWNER and CONTRACTOR recognize that TIME IS OF THE ESSENCE in this Agreement and that Owner will suffer financial loss if the work is not substantially complete in the time specified in Paragraph 3.1 above. The parties also recognize the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the OWNER if the Work is not substantially complete on time. Accordingly, instead of requiring any such proof, OWNER and CON TRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER $1,000.00 (One Thousand Dollars) for each day that expires after the time specified in Paragraph 3.1 for Substantial Completion until the Work is substantially complete, and that the liquidated damages set forth herein bear a reasonable relationship to the estimated actual damages that the OWNER would suffer. ARTICLE IV - CONTRACT PRICE 4.1 OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents in current funds at the lump sum or unit prices as presented in the Bid Form, which is incorporated herein and made a part hereof by this reference. 4.2 OWNER shall pay CONTRACTOR for completion of the work in accordance with the Contract Documents an amount in correct funds equal to the amount below: Bid Total: FOUR HUNDRED FOURTEEN THOUSAND NINE HUNDRED NINETY FOUR DOLLARS (use words) Bid Total: $ 414.994.00 (use figures) 4.3 The parties expressly agree that the Contract Price is a stipulated sum, except with regard to those items in the Bid which are subject to unit prices. ARTICLE V - PAYMENT PROCEDURES 5.1 CONTRACTOR shall submit Applications for Payment in accordance with the Contract Documents. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. Pw\DEN001 \000181 \CrestviewFoxwoodLS 00500-2 5.2 OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR'S monthly Applications for Payment, as approved by the ENGINEER, which shall be submitted by the CONTRACTOR on or before the l Oth day after the end of each calendar month for which payment is requested. 5.3 manner: Progress payments prior to Substantial Completion will be made in the following 5.3.1 Prior to Substantial Completion and prior to fifty percent (50%) of the Work being completed, progress payments shall be ninety percent (90%) of the value of Work complete and ninety percent (90%) of the value of materials and equipment not incorporated into the Work, but delivered and suitably stored, less in each case the aggregate of payments previously made. 5.3.2 After fifty percent (50%) of the Work has been completed as determined by the ENGINEER, and if the character and progress has been satisfactory to the OWNER and ENGINEER, OWNER, on the recommendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no retainage on account of subsequent Work and materials and equipment not incorporated into the Work, but delivered and suitably stored, which results in the Owner withholding a retainage equal to five percent (5%) of the Contract Price until Substantial Completion. However, OWNER shall reserve the right to reinstate withholding a retainage of ten percent (10%) if OWNER, on the recommendation of ENGINEER, determines that the progress or character of the Work is not satisfactory. 5.3.3 Upon Substantial Completion of the Work, OWNER shall pay an amount sufficient to increase total payments to the CONTRACTOR to ninety-five percent (95%) of the Contract Price, less such amounts as ENGINEER shall determine in accordance with Article 14 of the General Conditions." 5.4 Final Payment. Upon final completion of the Work in accordance with the Contract Documents, OWNER shall pay CONTRACTOR an amount sufficient to increase total payments to ninety-eight percent (98%) of the Contract Price. However, not less than two percent (2%) of the Contract Price shall be retained until Record Drawings, specifications, addenda, modifications and shop drawings, including all manufacturers instructional and parts manuals are delivered to and accepted by the ENGINEER. ARTICLE VI - CONTRACTOR'S REPRESENTATIONS In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1 CONTRACTOR has visited the work site and familiarized himself with the nature and extent of the Contract Documents, Work, locality, and all local conditions and federal, state and local laws, ordinances, rules and regulations that in any manner may affect cost, progress or performance of the Work. 6.2 CONTRACTOR has studied carefully all reports of investigations and tests of subsurface and latent physical conditions at the site or otherwise affecting cost, progress or performance of the Work which were relied upon by the ENGINEER in the preparation of the Drawings and Specifications, and which have been identified in the General and Supplementary Conditions of the Contract Documents. PW\D EN001 \000181 \CrestviewFoxwoodLS 00500-3 6.3 CONTRACTOR has made or caused to be made examinations, investigations, tests and studies of such reports and related data in addition to those referred to in Paragraph 6.2 above as he deems necessary for the performance of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, investigations, tests, reports or similar data are, or will be, required by CONTRACTOR for such purposes. 6.4 CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.5 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to the CONTRACTOR. ARTICLE VII - CONTRACT DOCUMENTS The Contract Documents which comprise the entire Agreement between the OWNER and CONTRACTOR are attached to this Agreement, are made a part hereof and consist of the following: 7.1 This Agreement (Section 00500) (pages 1 to 6, inclusive). 7.2 Exhibits to this Agreement (sheets _ to , inclusive). N/A 7.3 Performance Bond, Payment Bond and Certificates of Insurance. 7.4 Notice of Award and Notice to Proceed. 7.5 General Conditions (Section 00700) as amended by the Supplementary Conditions. 7.6 Supplementary Conditions (Section 00800). 7.8 Project Manual bearing the general title: "BLACKWATER GOLF CLUB LIFT STATION AND FORCE MAIN PROJECT" and consisting of Divisions 0 through 16 as listed in the table of contents. 7.9 Drawings bearing the following general title: "BLACKWATER GOLF CLUB LIFT STATION AND FORCE MAIN PROJECT" and consisting of the sheets as listed in the Drawings Index. 7.10 Addenda Numbers through _, inclusive. 7.11 Bid Form (Section 00300) (Pages 1 to 11, inclusive). 7.12 All applicable provisions of State and Federal Law and any modification, including Change Orders or written amendments duly delivered after execution of Agreement. 7.13 Advertisement for Bids, Instructions to Bidders, Bid Bond, Noncollusion Affidavit, General Requirements, Field Orders and State of Florida Contract Provisions. There are no Contract Documents other than those listed above in this Article VII. The Contract Documents may only be altered, amended, or repealed in accordance with Article 3 of the General Conditions as modified in the Supplementary Conditions. PW\DEN001 \000181 \Crestvie WFoxwoodLS 00500-4 ARTICLE VIII - MISCELLANEOUS 8.1 No assignment by the parties hereto of any rights under, or interest in, the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically, but without limitation, monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent of an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.2 OWNER and CONTRACTOR each binds himself, his partners, successors, assigns and legal representatives to the other party hereto, his partners, successors, assigns or legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 8.3 Terms used in this Agreement, which are defined in Article 1 of the General Conditions, shall have the meanings indicated in the General Conditions, as modified in the Supplementary Conditions. ARTICLE IX - GOVERNING LAW This Agreement shall be governed by the laws of the State of Florida. Both parties agree that the courts of the State of Florida shall have jurisdiction of any claim arising in connection with this Agreement. In the event of litigation arising out of this Agreement, the prevailing party shall be entitled to the award of attorney's fees and costs at both the trial and appellate level. Venue for any litigation arising out of this agreement shall be in Orange County, Florida. PW\DEN00 1\000181 \CrestviewFoxwoodLS 00500-5 • • • • • IN WITNESS WHEREOF, the parties hereto have signed this Agreement in triplicate. One (1) counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER. All portions of the Contract Documents have been signed or identified by OWNER and CONTRACTOR or by ENGINEER on their behalf. reement will be effective on aig , 2022. CITY OF CRESTVIEW, FLORIDA • • • • • • CITY CLERK By: APPROVED AS TO FORM AND CORRECTNE CONTRACTOR: (CORPORATE SEAL) ATTEST: SECRETARY rt is ecs-lF "17 e9n413 tY�-- PW\DEN0011000181 \CrestviewFoxwoodLS By: Title: � ��� � 2 END OF SECTION 00500-6 VIii, /111--v %9 United® Rentals Construction Notice Dept. PO Box 1389, Simi Valley, CA 93062 Address Service Requested 9314 8898 8030 0062 7655 44 6/24/2022 UNR704 8963356 CITY OF CRESTVIEW, FLORIDA 198 N WILSON ST CRESTVIEW, FL 32536 Enclosed you will find a notice that is being sent to you on behalf of United Rentals (North America), Inc. in regards to the construction project known as BLACKWATER GOLF CLUB 17 and located at 4927 ANTIOCH RD , CRESTVIEW, FL 32536-8416. The name and address of the person who contracted for the furnishing of equipment is CONSTANTINE CONSTRUCTORS,-LLC 1988 LEWIS TURNER BLVD-UNIT 3 , FT WALTON BCH, FL 32547-5262. Thank you for taking the time to read this letter. This is NOT a Lien or Bond Claim and does not necessarily indicate any amounts are currently overdue This notice is being sent to make you aware we have provided services to someone contributing to this construction project. This is a common procedure required by statute in many states. This notice is not recorded and is not public information. This notice should not reflect in any way on the integrity or credit standing of any parties associated with this job. Answers to a few common questions regarding the enclosed notice: How do I obtain invoice copies, make payments, or request a lien release/waiver? Customers may access all of the above via UR Control at www.unitedrentals.com (click on Online Services, then UR Control), or by calling 888-481-2660. Lien releases requested via UR Control will be provided within 24 hours. Those requested via email (lienreleases@ur.com) or by phone will be provided within 72 hours. Our records indicate the following parties are associated with this job: Owner: CITY OF CRESTVIEW, FLORIDA, CRESTVIEW, FL General/Direct/Original Contractor: CONSTANTINE CONSTRUCTORS LLC, FORT WALTON BEACH, FL Lender/Surety:ATLANTIC SPECIALTY INSURANCE COMPANY What do I do if this notice contains inaccurate information? We attempted to verify all information before sending this notice. If any of the construction parties listed on the document are incorrectly referenced or you discover any other inaccuracy in the information, please contact our third party provider at 800-522-3858 ext. 4 (Client Service) or email united@crfsolutions.com. NOTICE TO OWNER/NOTICE TO CONTRACTOR (Preliminary Notice, Notice Of Intent To Claim Against Bond) WARNING! FLORIDA'S CONSTRUCTION LIEN LAW ALLOWS SOME UNPAID CONTRACTORS, SUBCONTRACTORS, AND MATERIAL SUPPLIERS TO FILE LIENS AGAINST YOUR PROPERTY EVEN IF YOU HAVE MADE PAYMENT IN FULL. UNDER FLORIDA LAW, YOUR FAILURE TO MAKE SURE THAT WE ARE PAID MAY RESULT IN A LIEN AGAINST YOUR PROPERTY AND YOU PAYING TWICE. TO AVOID A LIEN AND PAYING TWICE, YOU MUST OBTAIN A WRITTEN RELEASE FROM US EVERY TIME YOU PAY YOUR CONTRACTOR. TO THE OWNER: CITY OF CRESTVIEW, FLORIDA 198 N WILSON ST CRESTVIEW, FL 32536 CUSTOMER: CONSTANTINE CONSTRUCTORS, LLC 1988 LEWIS TURNER BLVD UNIT 3, FT WALTON BCH, FL 32547-5262 The undersigned hereby informs you that he has furnished or is furnishing services or materials as follows: Various Construction Equipment Rentals, for the improvement of real property identified as: BLACKWATER GOLF CLUB 17. The property is located at: 4927 ANTIOCH RD, , CRESTVIEW, FL 32536-8416, APN#: . Under an order given by: CONSTANTINE CONSTRUCTORS, LLC, 1988 LEWIS TURNER BLVD UNIT 3, , FT WALTON BCH, FL 32547-5262 A demand is made for a copy of the Notice of Commencement to be faxed to 805-522-7171, or email to myjobinfo@crfsolutions.com. Any demand made pursuant to Section 713.16(2) or Section 713.16(4) or Section 255.05, Florida Statutes, must- be served as- follows: - Name of Lienor:United Rentals (North America), Inc. 10330 David Taylor Drive Charlotte, NC 28262 800-522-3858 FLORIDA LAW PRESCRIBES THE SERVING OF THIS NOTICE AND RESTRICTS YOUR RIGHT TO MAKE PAYMENTS UNDER YOUR CONTRACT 1N ACCORDANCE WITH SECTION 713.06, FLORIDA STATUTES. IF JOB IS BONDED UNDER SECTION 713.23 FLORIDA STATUTES, SECTION 255.05 FLORIDA STATUTES OR 270 U.S.C. THE FIRM SENDING THIS NOTICE WILL LOOK TO THE BOND (SURETY CO.) FOR PROTECTION IF NOT PAID. IF PAYMENT BOND EXISTS, FURNISH A COPY TO THE UNDERSIGNED. PROVIDE NAME AND ADDRESS OF BONDING COMPANY. FAILURE TO PROVIDE THIS INFORMATION MAY RENDER YOU LIABLE FOR DAMAGES. PLEASE REFER TO THE CRF NUMBER LISTED BELOW WHEN RESPONDING. IF THERE IS MORE THAN ONE CONTRACTOR ON THE ENTIRE PROJECT, PLEASE FURNISH THE UNDERSIGNED WITH A COPY OF EACH CONTRACT. IMPORTANT INFORMATION FOR YOUR PROTECTION Under Florida's Laws, those who work on your property or provide materials who are not paid have a right to enforce their claim for payment against your property. This claim is known as a Construction Lien. If your contractor fails to pay subcontractors or materials suppliers or neglects to make other legally required payments, the people who are owed money may look to your property for payment, EVEN IF YOU HAVE PAID YOUR CONTRACTOR IN FULL. PROTECT YOURSELF - RECOGNIZE that this Notice to Owner may result in a lien against your property unless all those supplying a Notice to Owner have been paid. LEARN more about the Construction Lien Law, Chapter 713, Part I, and Chapter 255, Florida Statutes and the meaning of this Notice by contacting an attorney or the Florida Dept. of Business and Professional Regulation. I declare that I am authorized to file this claim on behalf of the claimant. I have read the foregoing document and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the foregoing is true and correct. Executed at Simi Valley, CA on 6/24/2022 for United Rentals (North America), Inc. . By: Laura Pavey CC: TO ORIGINAL CONTRACTOR CONSTANTINE CONSTRUCTORS LLC 1988 LEWIS TURNER BLVD UNIT 3 FORT WALTON BEACH FL 32547 Cert #: 9314 8898 8030 0062 7655 44 CRF#: 8963356 See Exhibit B for Additional Legal Parties / Authorized Agent for United Rentals (North America), Inc. CC: TO LENDER, SURETY OR BONDING COMPANY ATLANTIC SPECIALTY INSURANCE COMPANY 605 HIGHWAY 169 NORTH SUITE 800 PLYMOUTH MN 55441 Bond/Loan # 800081933 EXHIBIT B - OTHER LEGAL PARTIES PROJECT: BLACKWATER GOLF CLUB FILE #: 8963356 Other Lender/Surety MARSH MCLENNAN AGENCY 10 INVERNESS CENTER PKWY SUITE-400 BIRMINGHAM AL 35242 Constructors, llc June 21, 2022 Seth Tatman, EIT Jacobs 25 W. Cedar Street, Suite 350 Pensacola, FL 32502 RE: Project No. D3553000 Blackwater Golf Club Lift Station and Force 1988 Lewis Turner Blvd. Main Project Additional Excavation and Boring for Water Main Unit #3 Installation xt Walton Beach, FL 32547 A 850-833-6978 Dear Mr. Tatman: The City of Crestview requested the following pricing for labor and a portion of the materials required to install a new 6" water main as shown in the Foxwood Estates Water System Conversion drawings. Scope of work and pricing as follows: • Tapping Saddles, Valves, Fittings, etc. (Fortiline)- $ 9,519.79 • Labor & Material for Directional Bore 12" HDPE under Antioch Rd. (Cinch) - $ 10,000.00 • Labor & Material for Directional Bore 6" HDPE under Gully Branch. (Cinch) - $ 9,000.00 • CCL Labor to excavate and install water main pipe & Appurtenances. Repair Additional Asphalt.- $ 34,000.00 • CCL Mark Up (15%) $ 9, 377.97 Total - $ 71,897.76 To secure these prices from our vendors, please approve these costs as soon as possible. Should you have any questions, please call me at 850.797.1511 Page 2 of 2 June 20, 2022 Sincerely, Constantine Constructors, LLC. Chad Eckhart Construction Manager Cc: Dave Marshall/CCL Kory Carter/Account Manager Cinch Underground Inc. P. O. Box 690 Chipley, FL 32428 US (850)415-6416 jcookcinchug@gmail.co m Estimate ADDRESS David G. Marshall Constantine Constructors, Inc. 1988 Lewis Turner Blvd Fort Walton Beach, FL 32547 United States PROJECT NAME Foxwood Estates ACTivii Directional Bore 12 In. HDPE Directional Bore 12 in. HDPE Casing Under Antioch Rd at Fox Chase Way Estimated 60 LF would utilize 80 LF to meet required Depths 2-12" MJ Adapters If this is a bore under a State Road there will be an adder of $2000 to cover depth and off -duty law enforcement. Directional Bore 6 in HDPE Directional Bore 6" HDPE Water Line under Gully Branch would require 120 LF to accomplish 2- 6" MJ Adapters HDPE Fusion Fuse 12" HDPE to include MJ Adapters HDPE Fusion Fuse 6" HDPE to include MJ Adapters CINCH will provide the following: Labor Material Equipment MOT for CINCH Crews CINCH will NOT provide the following: Permitting of any kind Survey/Survey AsBuilts Updated 6/20 to reflect 6" waterline instead of 6" SSFM. ESTIMATE # 3090 DATE 06/03/2022 EXPIRATION 07/01/2022 DATE 1 8,500.00 8,500.00 1 7,500.00 7,500.00 1 1,500.00 1,500.00 1 1,500.00 1,500.00 Thank you for choosing to accept a quote from Cinch Underground Inc. We look forward to making your project a CINCH Project! Accepted B TOTAL Accepted Date $19,000.00 QUOTE FORTILINE ; WATERWORKS a MORSCO brand CUSTOMER NO Due to the continued cost and supply challenges in the DUCTILE IRON PIPE, PVC and HDPE markets, the pricing of these products will be based solely on the availability at the time of shipment. Also, given the volatility in these markets we will not be responsible for product availability and shipment delays, as they are I out of our control. Bid prices should be considered an estimate, materials will only be priced at time of shipment until the current supply chain challenges are resolved. These terms are in leu of our standard terms. i We appreciate your partnership. t_ QUOTING BRANCH 225710 FORTILINE PANAMA CITY CUSTOMER CONSTANTINE CONSTRUCTORS LLC 1988 LEWIS TURNER BLVD UNIT 3 FORT WALTON BEACH, FL 32547 20 30 40 50 60 70 100 110 120 130 140 150 170 180 190 210 220 230 QTY QUOTE NO 6203466 QUOTE DATE 5/17/22 PROJECT INFORMATION FOXWOOD ESTATES UOM DESCRIPTION 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 3 3 EA 3 EA 2 2 EA 4 EA ****************************** GIVEN THE CURRENT PRICING AND SUPPLY CHAIN CHALLENGES ALL MATERIAL WILL BE PRICED AT TIME OF SHIPMENT AND THE PRICES BELOW ARE TO BE USED AS AN ESTIMATE FOR BID PURPOSES ONLY ****************************** 10"X6" TAP 10X6 662 TAP SLV 10.73-11.13 662-10750600-000 SMB 6" MJXF GV O/L A2361-19 L/ACC 461S VB COMP SCREW 18"X24" VLV BOX PROTECTOR RING ROUND CONCRETE 6" FLG KIT FF 1/8" RR 304SS 6" STAR GRIP PVC W/ACC 4000HDP Package Sub -total: 6"X6" TAP 6X6 662 TAP SLV 6.59-6.99 662-06630600-200 SMB 6" MJXF GV O/L A2361-19 L/ACC 461S VB COMP SCREW 18"X24" VLV BOX PROTECTOR RING ROUND CONCRETE 6" FLG KIT FF 1/8" RR 304SS 6" STAR GRIP PVC W/ACC 4000HDP Package Sub -total: 6" CAP 6" MJ CAP C153 6" STAR GRIP PVC W/ACC 4000HDP Package Sub -total: 6" 45 6" MJ 45 C153 6" STAR GRIP PVC W/ACC 4000HDP Package Sub -total: UNIT PRICE TOTAL PRICE 552.0000 650.0000 55.0000 25.0000 34.0000 72.0000 523.0000 650.0000 55.0000 25.0000 34.0000 72.0000 52.0000 72.0000 124.00 103.0000 72.0000 552.00 650.00 55.00 25.00 34.00 72.00 1,388.00 523.00 1,359.00 372.00 650.00 55.00 25.00 247.00 494.00 34.00 72.00 156.00 216.00 206.00 288.00 AL STOCK DELIVERIES ARE SUBJECT TO SHIPPING CHARGES All PVC and HDPE materia is quoted for shipment within 7 days of quote/bid date. All other material is quoted for shipment within 30 days of quote/bid date. After 7 days for PV and HDPE or 30 days for all other material. ALL quoted prices are subiect to review based on current market conditions. BIDCNEW CUSTOMER NO ?25710 IFOXWOOD ESTATES 6203466 5/17/22 LINE QTY UOM DESCRIPTION 250 2 6" TEE 260 2 EA 6" MJ TEE C153 270 6 EA 6" STAR GRIP PVC W/ACC 4000HDP Package Sub -total: 290 2 6" GATE VALVE 300 2 EA 6" MJ GV 0/L A2361-23 L/ACC 310 2 EA 461S VB COMP SCREW 18"X24" 320 2 EA VLV BOX PROTECTOR RING ROUND CONCRETE 330 4 EA 6" STAR GRIP PVC W/ACC 4000HDP Package Sub -total: 6" EOL HYDRANT 360 2 EA 6" STAR GRIP PVC W/ACC 4000HDP 370 1 EA 6" MJ GV 0/L A2361-23 L/ACC 380 1 EA 461S VB COMP SCREW 18"X24" 390 1 EA VLV BOX PROTECTOR RING ROUND CONCRETE 400 1 EA 6X13 MJ ANC CPLG SWVXSOL C153 410 3 EA 6" MJ REGULAR ACC LESS GLAND 420 1 EA 5-1/4V0 HYD 3'6" 6MJ 0/L A423 RED L/ACC A423-502235 UNIT PRICE TOTAL PRICE 182.0000 72.0000 398.00 796.00 650.0000 55.0000 25.0000 72.0000 364.00 432.00 1,300.00 110.00 50.00 288.00 874.00 1,748.00 72.0000 650.0000 55.0000 25.0000 207.0000 28.0000 1,575.0000 144.00 650.00 55.00 25.00 207.00 84.00 1,575.00 Package Sub -total: 2,740.00 Subtotal: Tax: 3id Total: 8,897.00 622.79 9,519.79 ALL STOCK DELIVERIES ARE SUBJECT TO SHIPPING CHARGES All PVC and HDPE material is quoted for shipment within 7 days of quote/bid date. All other material is quoted for shipment within 30 days of quote/bid date. After 7 days for PVC and HDPE or 30 days for all other material. ALL ouoted prices are subiect to review based on current market conditions. Ent By TMP 5/17/22 18:52:07 BIDCNEW