Loading...
HomeMy Public PortalAbout07 July 2, 1997 Budget & Finance" " 040913 RIVERSIDE COUNTY TRA NSPOR TA T/ON COMM/SS/ON BUDGET AND FINANCE COMMITTEE (COMMISSIONERS MICHAEL BARRY, WILLIAM KLEINDIENST, JACK VAN HAASTER) RIVERSIDE COUNTY TRANSPORTATION COMMISSION 3560 UNIVERSITY AVENUE, SUITE 100 " RIVERSIDE, CALIFORNIA 92501 12:30 P.M. WEDNESDAY, July 2, 1997 AGENDA File 1. CALL TO ORDER. 2. APPROVAL OF MINUTES. 3. PUBLIC COMMENTS. 4. ADDITIONS/REVISIONS. 5. ADMINISTRATIVE ITEMS/FINANCIAL ITEMS. 5A. Monthly Cost and Schedule Reports. Overview The presented material depicts the current costs and schedule status of contracts reported by routes, commitments, and cooperative agreements executed by the Commission. For each contract and agreement, the report lists the authorized value approved by the Commission, percentage of contract amount expended to date, and the project expenditures by route with status for the month ending May 31, 1997. Detailed supporting material for all schedules, contracts and cooperative agreement is available from Bechtel staff. 6. HIGHWAYS/LOCAL STREETS AND ROADS. 6A. FY 1998-2002 Measure `A" Five Year Capital Improvement Program for Local Streets and Roads Overview The Measure "A" Ordinance requires each recipient of streets and roads monies to annually provide to the Commission a five year plan of how those funds are to be expended in order to receive disbursements for local streets and roads. Any subsequent additions, deletions, or substitutions to the approved Plan must also be approved by the Commission. 00 00 Page 2 Agenda - Budget/Finance Committee July 2, 1997 • 6B. Direction to Advertise Soundwall #35 on State Route 91 between Van Buren and Tyler. Overview Staff is requesting permission to advertise soundwall #35 for Construction subject to obtaining encroachment permits from both the City of Riverside and Caltrans. Soundwall #35 is one of the Phase I soundwalls identified by both the City of Riverside and RCTC. Caltrans has offered to contribute $300,000 toward the construction of this wall and is requesting that construction begin at the earliest possible date. 6C. Adoption of Resolution 97-12 for Funding Support by RCTC for the SR 60 Retrofit Soundwall Program. 7. RAIL. Overview The California Transportation Commission is requesting that all agencies, that are proposing a local match to advance their soundwall projects in the 1998 STIP, submit a resolution adopted by the local agency to the CTC by August 22, 1997. • 7A. Selection Process to Design Pedestrian Overcrossing and Station Electronic Surveillance Systems at the La Sierra and West Corona Metrolink rail stations. Overview That the Commission direct Staff to advertise the availability of the new request for proposals (RFP), organize a selection panel to evaluate the proposals received, interview the top firms, and bring back to the Commission the recommended top ranked firm to prepare the design for new pedestrian overcrossing and station security systems for the La Sierra and West Corona Metrolink Rail Stations. 8. TRANSIT/RIDESHARE/BICYCLE 8A. FY 1997-98 Local Transportation Fund Allocations for Transit Overview In order for the public transit operators to claim Local Transportation Funds (LTF) for operating and capital purposes, the Commission must allocate FY 1997-98 LTF funds to support the transit services and capital projects contained in the approved FY 1998 Short Range Transit Plan (SRTP). • 0 J.J=002 " " " Page 3 Agenda - Budget/Finance Committee July 2, 1997 8B. Revision of City of Corona's Vehicle Replacement Plans Overview We have received a request from the City of Corona to revise their vehicle replacement schedule for FY 1997 and FY 1998. Approval of this revision requires an additional allocation of $8,000 in local transit funds and $32,000 in federal transit funds for FY 1997 and a reduction of $24,000 in Measure A Specialized Transit funds and $98,000 in federal transit funds for FY 1998. 9. ADJOURNMENT. AGENDA ITEM 2 00n004 " Riverside County Transportation Commission 97-06 BUDGET AND FINANCE COMMITTEE JUNE 4, 1997 MINUTES 1. CALL TO ORDER Commissioner Will Kleindienst called the meeting of the Budget/Finance Committee to order at 12:30 p.m. at the Riverside County Transportation Commission, 3560 University, Suite 100, Riverside, California 92501. Members Present Michael Barry Will Kleindienst APPROVAL OF MINUTES M/S/C (Barry/Kleindienst) to approve the meeting minutes of May 7, 1997. 3. PUBLIC COMMENTS There were no public comments. 4. Additions/Revision 5. ADMINISTRATIVE/FINANCIAL ITEMS 5A. Proposed FY 1997/98 Budget Louie Martin presented the revised 1997/98 Fiscal Year Budget, explaining that changes requested by Commissioners have been made and are in bold for easier comparison and any text that will be deleted is underlined. He then reviewed each section of the budget and highlighted changes made. Commissioner Kleindienst requested that the word "anticipated reauthorization" be substituted for "imminent' in reference to ISTEA. He also requested that a typo be fixed on Page 12. He stated that he enjoyed this budget because of its clarity and the background given within the document. 00;1005 Jack Reagan, Executive Director, explained that the budget is a "fluid document" and is a snapshot of what will be happening in fiscal 1997/98 but there may be some changes or amendments. M/S/C (Barry/Kleindienst) that the Commission approve the FY 1997/98 budget. 58. UCR Audit Study In the absence of Dr. Eric Rollands, Jack Reagan presented the study regarding the audit process used by RCTC. He discussed the methodology used and conclusions and recommendations. Dr. Rollands then arrived and distributed a handout that outlined the process used to complete the study and the conclusions and recommendations that were reached once the study was completed. He stated that the main recommendation was to make the audit process more "customer friendly'. M/S/C (Bar y/Kleindienst) that the UCR Audit Study be forwarded to the Commission for review and comment. 5C. Measure A Loan to City of Perris Louie Martin presented the request from the City of Perris for a loan of 1.9 million dollars to perform street improvements. He distributed a list of proposed projects submitted by the City of Perris. Jack Reagan explained that the Commission has a policy that allows local governments to access street funding early. Louie Martin said that this request was anticipated and is included in the budget. M/S/C (Bar y/Kleindienst) that the Commission approve the loan request from the City of Perris in the amount of 1.9 million dollars and authorize staff to negotiate the details of the agreement with Perris, subject to Legal Counsel and final Commission review. 5D. Measure A Loan to City of San Jacinto Louie Martin presented the request from the City of San Jacinto for a loan in the amount of 1.3 million dollars and distributed a list of proposed projects. M/S/C (Barry/Kleindienst) that the Commission approve the loan request from the City of Perris in the amount of 1.3 million dollars and authorize staff to negotiate the details of the • 000003 " " agreement with San Jacinto, subject to Legal Counsel and final Commission review. 5E. Quarterly Financial and Cost/Schedule Reports Louie Martin reviewed the summary of the Quarterly Financial and Cost/Schedule Reports. Commissioner Kleindienst request clarification on the 1993 Bonds mentioned in the report. Staff will clarify this item at a Later time. M/S/C (Barry/Kleindienst) that the Commission receive and file: 1) Combining Statements of Revenues and Expenditures and Changes in Fund Balances (unaudited) and the Highway and Rail Projects quarterly budget report for quarter ending March 31, 1997; and, 2) Cost and Schedule status of measure A. Contracts through the month ending April 30, 1997. 6. HIGHWAYS/LOCAL STREETS AND ROADS 6A. State Route 79 (Lamb Canyon) Repair of Distressed Fill Slopes M/S/C (Barry/Kleindienst) that the Commission approve amending the agreement with Converse Consultants for geotechnical support and the County of Riverside for survey support services. 6B. Award Amendment 3 to URS Greiner for Landscaping Design for the Yuma Interchange M/S/C (Barry/Kleindienst) that the Commission award a contract to URS Greiner to prepare the PS & E for the landscaping design for the Yuma Interchange project to restore landscaping that existed prior to the construction of the project. 7 TRANSIT/RIDESHARE/BICYCLE AND PEDESTRIAN 7A. FY 1998-2004 Short Range Transit Plans Cathy Bechtel, Program Manager, presented the short range transit plan to the committee. The major changes in requested Western Riverside County are due to the relocation of Riverside General Hospital to Moreno Valley. RTA has planned a direct route to the hospital from the Riverside Plaza and two direct bus routes in Moreno Valley. These changes are timed to begin when the hospital is scheduled to open in March 1998. The Dial -A -Ride Program will also provide direct service to the hospital also. The City of Beaumont will be moving to a fixed route which will be approved by the Commission. The RTA will be expanding routes 35 and 36 from three days a week to six. She expressed staffs concern that this route did not generate ridership to make it productive before the expansion so the RTA was asked to report back to the Commission on this route in six months. The RTA is making changes in their dispatch services to centralize the system to provide more consistent training for the dispatchers and facilitate coordination. Staff is requesting a report back from RTA on the effectiveness of their dispatching services because the whole point of the improvements was to save money. The Coachella Valley_ Sunline Transit Agency will be expanding in the upcoming year and the changes are clearly outlined. Sunline will be requesting an amendment to the Short Range Transit Plan in the Fall to make improvements in their system. The Rancho Mirage Dial - A -Cab system will be discontinued as of June 30, 1996 and the funding will be made available to Sunline Transit to make improvements. At the Palo Verde Valley Public Hearing several requests were made to make revisions in scheduling and these have been handled. M/S/C (Bany/Kleindienst) that the Commission review and approve the Short Range Transit Plan for FY 1998-2004 requesting reports from the RTA on routes 35 and 36 and improvements made to their dispatch system. 78. FY 97/98 Measure A Commuter Assistance Buspool Subsidy Funding Continuation Requests. Marilyn Williams, Program Manager, presented requests from three existing, operating buspools to renew their subsidy for the upcoming fiscal year. The total request is for $1,175 per month per buspool and funding set aside for a new buspool in the upcoming year. This request is already included in the upcoming fiscal year. M/S/C (Bary/Kleindienst) that the Commission approve, pursuant to its existing Measure A Commuter Assistance Buspool Subsidy: 1) payment of $1,175/month for the period July 1, 1997 to June 30, 1998 to the existing Riverside/Fullerton, Riverside/EI Segundo, and Moreno Valley/EI Segundo buspools, and one additional buspool upon receipt of a written request for subsidy support; and, 2) continuation of the existing monthly and semi- annual buspool reporting requirement as support documentation to monthly subsidy payment. • • e0 0 00 " " " 7C. San Bernardino Associated Governments FY 97/98 Commuter Assistance Program Contract Marilyn Williams explained that this request is being made to additional funding provided by SANBAG to current reoccurring projects for the FY 97/98 Commuter Assistance Program Contract and to execute a contract with SANBAG for the FY 97/98 workplan and budget. M/S/C (Barry/Kleindienst) that the Commission approve the execution of a contract with SANBAG for the FY 97/98 workplan and budget. 8. ADJOURNMENT There being no further business to come before the Budget/Finance Committee, the meeting was adjourned at 2:00 p.m. Respectfully submitted, Naty Kopenhaver Clerk of the Commission AGENDA ITEM 5A • 000010 " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION DATE: July 2, 1997 TO: Budget and Finance Review FROM: William Hughes, Measure A Project Manager Louis Martin, Project Controls Manager THROUGH: Jack Reagan, Executive Director SUBJECT: Monthly Cost and Schedule Reports The attached material depicts the current costs and schedule status of contracts reported by routes, commitments, and cooperative agreements executed by the Commission. For each contract and agreement, the report lists the authorized value approved by the Commission, percentage of contract amount expended to date, and the project expenditures by route with status for the month ending May 31, 1997. Detailed supporting material for all schedules, contracts and cooperative agreements is available from Bechtel staff. STAFF COMMENDATION: That the Commission receive and file. Attachments PROJECT DESCRIPTION 1-216 PROJECTS Preliminary Engrg/Environ. (R09008, 9018) CECERT (R09627) Right -of -Way (RO 9004,9009 ) SUBTOTAL I-215 INTERCHANGE IMPROV. PROGRAM Yuma IC Final Design (PSBE) (R09428) Yuma IC Constr. Mgmt (R09631) Yuma IC Construction (R09636) SUBTOTAL INTERCHANGE BECHTEL PROJECT MGMT SERV. (R08900 thru R09700) SUBTOTAL ¢EG.NTEL PROGRAM PLAN d, SERVICES Program Studies (R09006,9119,9307) Mapping Control/QA (R09007) Special Study (ITS Plan - R09727) SUBTOTAL PROGRAM PLAN & SVCS. PARK-N-RIDE/INCENT. PROGRAM (RO 9418, 9526, 9528, 9601 - 9613, Impress) (9701-9712) SUBTOTAL PARK-N-RIDE COMMUTER RAIL Studies/Engineering (RO 9323, 9324, 9420,9430,9731) Station/Site Acq/OP Costs/Maint. Costs (R09424, 9521/27/31/32,9620/26/37,0000, 9720) SUBTOTAL COMMUTER RAIL TOTALS RCTC MEASURE A HIGHWAY PROJECTS BUDGET REPORT BY ROUTE COMMISSION CONTRACTURAL AUTHORIZED 'COMMITMENTS ALLOCATION TO DATE $6,726,504 $50,000 $34,468,328 $41,244,832 $1,257,000 $1,023,500 $6,600,000 $8,880,500 $12,329,736 $12,329,736 $5,275,161 $2,683,729 $450,000 49,408,890 $7,529,966 47,529,966 $5,564,413 $92,776,388 $08,340,001 $262,310,289 $5,878,173 $50,000 $34,468,328 $40,396,501 $1,257,000 $890,000 $6,100,175 $8,247,175 $12,031,436 $12,031,438 $5,275,161 $2,683,729 $450,000 $8,408,090 $7,529,966 $7,529,966 $5,564,413 $92,548,805 498,113,219 $255,366,747 Page 2 of 3 % COMMITTED EXPENDITURE FOR AGAINST AUTH. MONTH ENDED ALLOCATION May31, 1997 87.4% 100.0% 100.0% 97.9% 100.0% 87.0% 92.4% 92.9% 97.6% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 99.8% 99,8% 97.4% $0 $60,357 $228,105 $288,462 $0 $24,920 $24,920 $115,948 $115,948 $238,276 $71,547 $309,823 $878,208 % EXPENDITURES EXPENDITURES TO -DATE AGAINST TO DATE COMMITMNTS TO DATE $5,683,900 $48,035 $34,468,328 $40,200,209 $1,204,153 $602,133 $4,133,094 0,939,300 $11,241,423 $1.1,241,423 $3,201,593 $2,638,945 $170,051 • $0,010,589 $7,175,437 $7,175,437 $5,119,016 $90,653,091 $95,772,107 $240,279,835 96.7% 96.1 % 100.0% 99.5% 95.8% 67.7% 67.8% 72.0% 93.4% 93.4% 60.7% 98.3% 37.8% 71.5% 95.3% 95.3% 92.0% 98.0% 97.6% 94.1%i PROJECT DESCRIPTION RCTC MEASURE A HIGHWAY/RAI ECTS BUDGET REPORT BY ROUT COMMISSION CONTRACTURAL % COMMITTED EXPENDITURE FOR AUTHORIZED COMMITMENTS AGAINST AUTH. MONTH ENDED EXPENDITURES ALLOCATION TO DATE ALLOCATION May 31, 1997 TO DATE • % EXPENDITURES TO -DATE AGAINST COMMITMNTS TO DATE ROUTE 60 PROJECTS Park'n' Ride Lot Final Design (R09738) SUBTOTAL ROUTE 60 ROUTE 74 PROJECTS Cooperative Agreement - City of Perris Construction & ROW (R09012) SUBTOTAL ROUTE 74 ROUTE 79 PROJECTS Engineering/Environ./ROW (R09111,9301,9302, 9306,9337) Lambs Canyon Proj. (R09423,9429,9522,9730, 9732) Winchester Rd Widening (R09728) SUBTOTAL ROUTE 79 ROUTE 86 PROJECTS Construction & Mitigation (RO 9213) SUBTOTAL ROl1TE 86 ROUTE 111 PROJECTS (R09219, 9227,9234,9523,9525,9530,9537,9538) 9635 SUBTOTAL ROUTE 111 ROUTE 91 PROJECTS Mag. to Mary HOV/ Sndwls & Serfas club Sndwls (R09101, 9308, 9415, 9524,9726) McKinley Undercrossing (R09326) Van Buren Blvd. Frwy Hook Ramp (R09535) SUBTOTAL ROUTE 91 $34,040 $34,040 $8,183,914 $8,183,914 $9,096,360 $23,752,638 $3,000,000 935,90090 $20,115,078 $20,115,078 $6,700,115 $6,700,1.15 $10,812,508 $1,614,951 $2,300,000 $14,727,469.00 $34,040 $34,040 100.0% 100.0% $8,183,914 100.0% $8,251,994 100.8% $9,096,360 100.0% $23,224,744 97.8% $3,000,000 100.0% $35,321,104 98.6% $16,182,436 80.4% $16,182,436 80.4% $6,438,616 96.1 % $6,438,616 96.1% $10,530,460 97.4% $1,614,951 100.0% $2,300,000 100.0% $14,446,411.00 98.1% $61,656 $43,534 $105,1.90 $1,914 $1,914 $31,951 $31,951 $7,553,278 $7,653,278 $8,801,326 $22,808,278 $2,784,522 $34,994,126 $15,927,436 315,927,436 $4,639,223 $4,939,223 $8,840,101 $1,425,897 $1,160,575 $11,426,573 0.0% 0.0% 92.3% 91.9% 96.8% 98.2% 92.8% 97.4% 98.4% 9.8.4% 72.1 % 72.19E 83.9% 88.3% 50.5% 79.1% Page 1 of 3 co) C;. r� C) PROJECT DESCRIPTION CITY OF MURRIETA Loan Agreement 1-15/1-215 (1) Interchange improvements (R09334) (Loan Agreement is Terminated) SUBTOTAL MURRIETA LOAN CITY OF CANYON LAKE Final Design and Construction of Railroad Canyon Rd Improvements (R09422) SUBTOTAL, CANYON LAME LOAN RCTC MEASURE A HIGHWAY/LOCAL STREETS & ROADS PROJECTS BUDGET REPORT BY PROJECT EXPENDITURE FOR APPROVED MONTH ENDED COMMITMENT May 31 1997 $17,000,000 $17,000,000 $1,600,000 $1,600,000 $0 TOTAL OUTSTANDING MEASURE A LOAN ADVANCES BALANCE $1,377,000 $1,377,000 $1,600,000 $1,600,000 CITY OF CORONA Smith, Maple & Lincoln Interchanges & (1) $5,212,623 Storm drainage structure $5,212,623 SUBTOTAL. CITY OF CORONA $5,212,623 $0 $5,212,623 TOTALS 923,812,623 NOTE: (1) Loan against interchange improvement programs. s0 $$,169,623 All values are for total Project/Contract and not related to fiscal year budgets. Page 3 of 3 • $0 $1,457,148 S1,457,148 $4,588,984 $4,588,984 $6,046,132 % EXPENDITURES OUTSTANDING TO -DATE AGAINST COMMITMENT APPROVED COMMIT. $15,623,000 $15,623,000 $0 $15,623,000 8.1 % 8.1 % 100.0% 100.0% 100.0% 100.096 34.4% Status Mo Ending 05/31/97 " AGENDA ITEM 6A " " 000015. RIVERSIDE COUNTY TRANSPORTATION COMMISSION DATE: July 2, 1997 TO: Budget and Finance Committee FROM: Dean Martin, Chief Financial Officer Jerry Rivera, Program Manager THROUGH: Jack Reagan, Executive Director SUBJECT: FY 1998-2002 Measure "A" Five Year Capital Improvement Program for Local Streets and Roads The Measure "A" Ordinance requires each recipient of streets and roads monies to annually provide to the Commission a five year plan on how those funds are to be expended in order to receive disbursements for local streets and roads. In addition, the cities in the Coachella Valley and the County must be participating in CVAG's Transportation Uniform Mitigation Fee (TUMF) program. The agencies are also required to submit the annual certification of Maintenance of Effort (MOE) accompanied by documentation supporting the calculation. To date, thirteen cities and the county have submitted the required Plan, MOE certification and supporting documentation and staff request the Commission approve the following programs: Western Riverside: * Banning Calimesa Corona Hemet Lake Elsinore Moreno Valley Murrieta Perris Riverside Riverside County San Jacinto Temecula Coachella Valley: ** Palo Verde Valley: Indian Wells Palm Desert None * Canyon Lake is not required to submit a Five Year Plan because of a prior loan agreement with the Commission. ** Coachella, Desert Hot Springs, and La Quinta do not receive Measure "A" funds because they do not participate in CVAG's TUMF program. Staff has informed the other seven cities (Beaumont, Blythe, Cathedral City, Indio, Norco, Palm Springs, and Rancho Mirage) that no disbursement of Measure "A" funds for local streets and roads will be made until all of the required documents are received and approved by the Commission. 0a01 cJ Financial Assessment Project Cost Source of Funds .:.n:.^..q.x:•:w::R.}i'r'is4}:•J::::::::::.v::',::•:::::::::::i:::::.v..; •nhv}..vy.}•.; y}{. ................:r::.. .. .. .,..... .,.. h.....:.v... .w ..:..:, .,rYc, ..... ... .......:.w:::: n. ..v:: •:. s. s.......:v s............ .... .....v .,{ :.:'•}r.}..: s+..v, ; ..:•,:J:4Yi:•.{ri.•Y.4r}n:vh •:}}:•}}J:;:;:;:; ;:•}:•}:•JJ:;J}:•J:i}}:s:: •; y .v. ,¢J.v:. :v, v • v:•::•::::•:....:,r ••{{•:: •%� v:. svh, " ••. •. .................... r:.v r................. ,h..x::: rJ ...M.. ....:...... v: r: ^::::.�: {::: s:•:{:::.}w::r:;•,{.{{.•:.}�•.�::?•.::v.,•ih.;�}..s%•........s...... ....:.:.n - - •-•�.: .. co :... •. • '• .rr. •;.;:: , • m:: •... fi.•sJi•:........Y......... .. , • J•{:,'.'rr':ry >.'4iiiiiii::irii':i ::•'�'i'::ii:•:{T..ri>i:�i:�:4}};:;{: .d:.. :G'•:....,,..::::{:•: J: �.,,.. , -.; ....:...;. ..... ...•••::•::::::.;JJ•{.: ...`v..x..vv .. .J ....v.. ..,•.f, ,. .h .... v.:... .; :{::::�x; •: ;:::.w:n::::::::::::::: h.......:::: v; }:v:h }w{v:4Sk�A..r•}.`•,�.•r, �ti:�?.:.v:........: x:: s. •�v4'iw£J: v.'••{•.•.v:::::::::::::•::;.:::::•:j;:;}:vvY:}:•}4:•}:J •v.. ..., vx.:%'•... }... . " •r...., ... ' . r��•.s• .......... ..4v:::::::{:•}v:::>.f •:.•{: v.}:iii'r':"v:: }v::::.:: i::.};.y::: .....{.:... i..v ,ter... :s.....;::. .... s.. ........ ... ... 'r.•:•i}:'i •;{{•::0:::.v •:{v: v: •:•:t;:{;:.;:;:• v: {•i:{{:•}:::v{.::: ... .: .. ...... Included in Fiscal Year Budget Year Included in Program Budget Year Programmed Approved Allocation Year of Allocation Budget Adjustment Required Financial Impact Not Applicable STAFF RECOMMENDATION: That the Commission approve the FY 1998-2002 Measure "A" Five Year Capital Improvement Plans for the above mentioned agencies as submitted. " " WESTERN RIVERSIDE COUNTY " RIVERSIDE COUNTY TRANSPORTATION COl\'IlVIISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEAR 1997 - 1998 Agency: City of Banning Prepared By: Kahono Oei Amended: April 1997 ITEM NO rie:WAKaliono\A-doc PROJECT NAMES / LRAMS Page 1 TOTAL CONST MEASURE "A" (S1,000) FUND S1,000 L1 fjaon RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEAR 1997 - 1998 Agency: City of Banning Prepared By: Kahono Oei Amended: April1997 ITEM NO 24 PROTECT NAMES / LIMITS 12th St - Wilson to George TOTAL CONST MEASURE "A" ($1,000) FUND (S 1,000) 11 11 25 10th St - Nicolet to Williams 7 7 26 Hays St - 8th to 12th St 18 18 Page 2 sie:w:\ada 0000.E " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEAR 1999 - 2002 Agency: City of Banning Prepared By: Kahono Oei Amended: Jan. 19, 1996 ITEM NO PROJECT NAMES / LIMITS Ramsey - 3559 W. Ramsey to Highland Home North Side Ramsey - 3559 W. Ramsey to Highland Home South Side Evelyn Drive - Marian Way to Leslie Ct rie: WAKana,ow.aoc Page 3 TOTAL CONST MEASURE "A" (S1,000) FUND (S1,000) E !1 21 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEAR 1999 - 2002 Agency: City of Banning Prepared By: Kahono Oei Amended: Jan. 19, 1996 ITEM NO PROJECT NAMES / LIMITS TOTAL CONST MEASURE "A" a1,000) FUND 23 Sunset - RR X-ing to Westward 30 (S 1,ww 30 24 Cherokee - North of Jefferson 6 6 25 Sioux - North of Jefferson 6 6 26 Soboba - Mohawk to Jefferson 6 6 27 Jefferson - Sunset to Navajo 17 17 28 Cheyenne - N/O Jefferson 5 5 29 Navajo - Lincoln to Jefferson 6 6 30 Mohawk - Saboba to Navajo 17 17 31 Woodland - Lincoln to Westward 18 18 32 Westward - Sunset to 22nd 30 30 33 Rarhnur - 1 lth to Art, e...m« _ _ . 34 35 36 37 38 39 40 41 13 12th St - Westward to Barbour 10 10 42 43 44 45 16th - Lincoln to Barbour 4th St - Westward to N/O Lincoln Barbour - 8th St to E/O 4th St Florida - Lincoln to Barbour 5 5 31 31 8 8 Hermosa - Lincoln to Barbour Alola - Livingston to Ramsey 11 11 11 11 San Gorgonio - Lincoln to S/City Limits 5 6 San Gorgonio - N/Summit to North City Limits Lincoln - Florida to Hathaway Westward - East of Hathaway 101 101 200 200 60 60 San Gorgonio - Ramsey to Wilson 20 20 50 50 Page 4 file: W:1Kahono1A-doc • • • 00 022 " " RIVERSIDE COUNTY TRANSPORTATION COMA'IISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEAR 1999 - 2002 Agency: City of Banning Prepared By: Kahono Oei Amended: Jan. 19, 1996 ITEM NO PROJECT NAMES / LIMITS Via Panorama - Wilson to North of Hoffer rie:w:vA-aa Page 5 TOTAL CONST MEASURE "A" (S1,000) FUND S 1,000 `' 3 Agency: City of Calimesa Prepared by: Duane Fessenden Date: June 5, 1997 , ITEM NO. 2. 3. 4. RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 1997 - 1998 PROJECT NAME / LIMITS Cherry Valley Boulevard - Calimesa Boulevard to City limit (north side only) - joint project with County Transportation Department Calimesa Boulevard (east side) from Avenue L to County Line Road Calimesa Boulevard - Sandalwood Drive intersection Various Streets Four Freeway Overcrossings masa-97.wpd PROJECT TYPE Pavement Rehabilitation - Cold recycle with 2 in overlay TEA Project to provide sidewalk, street lighting and landscaping Signalization of intersection with minimum asphalt repair. Remove and Repair, Crack Fill, Slurry Seal, Overlay, as Required Repair Expansion Joints per Caltrans Pag 1 of 1 TOTAL COST ($000's) 25 Calimesa portion 130 150 70.5 MEASURE "A" FUNDS ($000's) 12.5 (12.5 defered to FY 1998-99) 10 70.5 111111111111 • • MEASURE "A" LOC L FUNDS PROGRAM FY 1998 - 1999 Agency: City of Calimesa Prepared by: Duane Fessenden Date: June 5, 1997 • Pag 1 of 1 ITEM NO. PROJECT NAME / LIMITS 1. Cherry Valley Boulevard - Calimesa Boulevard to City limit (north side only) - joint project with County Transportation Department 2. County Line Road/Calimesa Boulevard 3. County Line Road/I-10 Interchange 4. Various Streets in City 1r) C.1 r� U PROJECT TYPE Remove TOTAL COST • ($000's) MEASURE "A" FUNDS Pavement Rehabilitation - Cold recycle with 2 in Overlay 25 Calimesa portion p ($000's) 12.5 (12.5 paid in FY 1997-98) Intersection widening, Drainage improvements & Jew Traffic Signal (joint project with Yucaipa) 3esign Only 20 10 'roject Study Report for Interchange Improvements 250 30 and Repair, Crack Fill, Slurry Seal, Overlay s Required 45 45 Agency: City of Calimesa Prepared by: Duane Fessenden Date: June 5, 1997 ITEM NO. PROJECT NAME / LIMITS MEASURE "A" LOCAL FUNDS PROGRAM FY 1999 - 2000 County Line Road - Calimesa Blvd to I-10 Freeway Singleton Road Interchange on I-10 Various Streets in City PROJECT TYPE Widen South Side of County Line Road and Intersection - Phase I Joint Project with City of Yucaipa Project Study Report on Upgrading Interchange to Full Diamond Configuration Remove and Repair, Crack Fill, Slurry Seal, Overlay as Required Pag 1 of 1 TOTAL COST ($000's) 60 Calimesa Portion 250 MEASURE "A„ FUNDS ($000's) 10 30 111111111 • • MEASURE "A" LOAP FU NDS PROGRAZVI FY 2000 - 2001 Agency: City of Calimesa Prepared by: Duane Fessenden Date: June 5, 1997 Pag 1 of 1 ITEM NO. PROJECT NAME / LIMITS PROJECT TYPE 1. County Line Road - Calimesa Blvd to I-10 Freeway 2. Various Streets in City Widen South Side of County Line Road and Intersection - Phase II (Widen South Side - Calimesa portion) Joint Project with City of Yucaipa Remove and Repair, Crack Fill, Slurry Seal, Overlay as Required TOTAL COST ($000's) 200 Calimesa Portion MEASURE "A" FUNDS ($000's) 75 45 45 Agency: City of Calimesa Prepared by: Duane Fessenden Date: June 5, 1997 ITEM NO. me..-.97.wpd PROJECT NAME / LIMITS County Line Road - Bryant Street to Various Streets in City • MEASURE "A" LOCAL FUNDS PROGRAM FY 2001 - 2002 PROJECT TYPE Reconstruction - Cold Recycle with 2 in overlay (Joint project with City of Yucaipa) Remove and Repair, Crack Fill, Slurry Seal, Overlay as Required • Pag 1 of 1 TOTAL COST ($000's) 80 Calimesa Portion C.;) G) MEASURE "A„ FUNDS ($000's) 80 11111111 • LIGHTING & SIGNALS Project Name and Description Traffic Signal Modification (L-2) Main & Grand, Magnolia & McKinley Completion expected Dec 98 Project No. 7297 STP Reimbursement $44K Traffic Signal Interconnect (L-3) Lincoln (Citron-Rincon) Joy & Parkridge. Programmed reimburse- ments by STP. Completion expected Dec 98 Project No. 7298 Traffic Signal Upgrade (L-4) Retrofit signals with emergency vehicle reemption devices at Various locations along Sixth, Lincoln, E. Grand & Border and at Magnolia & 1-15 Freeway Ongoing Project No. 7300 Emergency Flashers for Fire Station No. 3 (L-5) Flashing lights to stop traffic on Smith Ave. for emergency vehicles Comp exp Dec 98 Project No. 7303 Form BB (fb-Isr2) ............... CITY OF CORONA FY 1997-2001 PROJECT COST LISTING Prior FY Fund Approp. Source Carryover $80, 733 $48,000 $10,004 $49, 739 • 1997-98 1998-99 1999-2000 FY FY FY $32,500 $32,500 CAPITAL IMPROVEMENT PROGRAM 2000-01 2001-2002 FY FY $32,500 Future Total FY Cost $80,733 $48,000 $32,500 $205,004 $59, 739 Page 1 06/04/97 CITY OF CORONA FY 1997-2001 LIGHTING & SIGNALS Project Name and Description Traffic Signal Modification (L-13) Convert traffic signal operation from split phase to eight phase at Magnolia & Rimpau and provide dual right turn lanes for northbound • traffic. Project funding subject to RCTC approval. Project No. 7315 STP Reimbursement $32K Completion expected June 98 Traffic Channelization Modificatio (L-14) Restripe roadway for southbound right turn including median and signal head modifications at Main St. & 6th St. Funding subject to RCTC approval. Project No. 7312 STP Reimbursement $28K In cooperation with downtown specific plan Completion expected June 98 Traffic Signal Modifications (L-15) Convert traffic signal operation from split phase to eight phase operation at Magnolia & El Sobrante, including channelization modifications. Project funding subject to RCTC approval. STP Reimbursement $44K Project No. 7313 Completion expected June 98 C4 Fn BB (fb-isill Cid t� Fund Source PROJECT COST LISTING Prior FY Approp. Carryover $33,086 $32,257 $48,992 ..................... . CAPITAL IMPROVEMENT PROGRAM 1997-98 1998-99 1999-2000 2000-01 2001-2002 Future Total FY FY FY FY FY FY Cost $20,000 • $53,086 $32,257 $48,992 06/04/97 " ( L-16) Channelization modifications to provide free right for northbound traffic and dual lefts for westbound traffic @ Magnolia Ave. 8 6th. Project funding subject to RCTC approval. Project No. 7311 STP Reimbursement $48K Completion expected June 98 Traffic Signal interconnect on Magnolia, Sixth to 1-15 (L-20) Traffic signal interconnect on Magnolia, Sixth to 1-15 Completion expected June 98 Traffic Signal Installation at Tenth and West Grand (L-21) Traffic signal installation at Tenth 8 West Grand. Project No. 7314 Completion expected June 98 Traffic Signal Upgrade - Provide le turn phasing at Sixth 8 El Sobrant Traffic signal upgrade, provide left tum phasing at 6th 8 El Sobrante Completion expected June 98 I c�� C.0 . FopziaB (fb-Isr2) CITY OF CORONA FY 1997-2001 LIGHTING & SIGNALS Project Name and Description Fund p Source Traffic Channelization Modificatio MEM A PROJECT COST LISTING Prior FY APprop" 1997-98 Carryover FY $52,334 $102,272 1998-99 1999-2000 FY FY CAPITAL IMPROVEMENT PROGRAM 2000-01 2001-2002 FY FY Future FY Total Cost $84,334 $30,000 $112,272 $30,000 Page 3 06/04/97 CITY OF CORONA FY 1997-2001 PROJECT COST LISTING LIGHTING & SIGNALS Project Name and Description Traffic Signal Installation (L-23) Ramps at I-15 & Ontario Avenue in conjunction with widening of Ontario east of Compton & signal at Compton. Completion expected June 98 Traffic Signal Modifications/ Upgrades _ _ (L-24) Various locations including Magnolia/Ontario, Joy/E. Grand, Joy/Parkridge Installation of CCTV for Traffic Monitoring (L-25) Install cameras to monitor traffic conditions from a central location. McKinley/Ranch Vista Fire Station Flasher (L-27) Improve Fire Department response for emergency vehicles by installing flashing lights to warn motorists of existing vehicles from side street Completion expected June 98 Comprehensive Traffic Improvem Need Plan (L-28) Incorporate existing CIP projects & generate a long range CIP program. Completion expected June 98 TOTALS - Fin BB (fb-Is 110 C.V (J Fund Source MEAS A' MEAS A MEAS A, tit MEAS A Prior FY Approp. 1997-98 Carryover FY $457,417 $35,000 $15,000 $20,000 $45,000 1998-99 FY $130,000 $55,000 $35,000 $279,500 $252,500 CAPITAL IMPROVEMENT PROGRAM 1999-2000 2000-01 2001-2002 Future FY FY FY FY $32,500 $32,500 $32,500 Total Cost $130,000 $90,000 $50,000 $20,000 $45,000 $32,500 $1,119,417 • 66/04/97 L 6/b0/90 09P' l£$ 000'00 L$ 005'Ll$ 009'Z$ ljdtla 096101.$ 009'3 OSL'Zl$ 00L'£l$ I09V9$ 009'9$ i ( 000'9$ i 000'9$ ' i 000 5$ i i i 009'3 1009'3 lsoo Ad Ad Ad lelol annlnd ZO-LOOZ 10-000Z WVZIJOad 1N3W3A021dWI 1V11dV0 i OOL'£L$ 009'S$ 00019$ l a6ed 009'Zl$ 000'9$ 000'9$ 009'Z$ 009'n i Ad 000Z-666 L OOS'ZZ$ 009'L9$ 000'0 L$ 000'0 L $ 009'Z$ 000'99$ 009'Z$ Ad Ad Ianotineo 66-8661 86-L661 .doiddy Ad Jopd ONUS',1S03133rObd aamoS pund r7 PMAA'ZadQII13d G C.7.) S1b101 ZOOZ Peloadxa uollaidwoo lwei6oid 810 6uosixa puedxa of luauidoianap suolleNdde g uolsianuoo amp 'asemps pue aiempiey jo uolllslnboy (eve) uollewewaldwl uolleollddd SIJ apiM /G!3 980L 'oN peroid loafoid 6uio6u0 •walsAs Malls apron APO ayl col (SID) walsAs uoneuuoltui leoiydel6oa0 We) welsiig lams SIJ L80L 'oN loafad loafad 6up6u0 dew aseq (SIJ) wapAs uopeuuolui leoiydei6oa0 6ugsixa ay) afepdri (£•81 elepdfl dew ese8 SIJ� uonduosap pue awe N loafad i S3W1I0V3'9 omaiIne 1.00Z-166L Ad VN0k103 d0 A113 • , L6/b0/90 • 04'6 ZL8'6LZ$ 000'03 ZL8'6LZ$ iso3 000'0£$ 000'01$ 000'0£$ le1ol Ad ein)nd 000'0£$ 000'0£$ 000'0£$ 000'0£$ 000'0£$ 000'0£$ 000'O9$ 000'09$ Ad Ad Ad Ad Ad ZOOZ-LOOZ LOOZ-000Z OOOZ-666L 66-9661. 96-L661. WVtiOO21d 1N311113AONdWI 1V11dVo ZL8'6$ ZL8'6$ V SV3W leN/AVld0Z-83 .10 tnt te) S1V101 PZ69 'ON Pafoid perwd 6wo6u0 An ay) u Inn suoneool snouen �e eoueuemew pue �ledeJ upa mom (6-0) tuepAS a6euleiO Aenny61H oslW Janoti.1e0 aomoS AwddV pund Ad Loud 9NI1S111S03 133r021d uogduosea pue eweN Loafad sainfovJ aovNivtia 100r 166L Ad VN0k103 d0 Allo " CITY OF CORONA FY 1997-2001 " PROJECT COST LISTING ROADS, BRIDGES & FREEWAYS Project Name and Description Curb -Gutter and Sidewalk Replacement Program (R-3) This is anticipated to be an annual program. Project No. 8027 Striping Rehab (R-7) Upgrade and maintenance of striping. Ongoing project Project No. 7292 Major Pavement Rehab (R-8) 1. Prior FY Locations: Main St. (8th St. north to Grand Blvd.) Auburndale St. (River Rd. to Palos Verdes Dr.) Partridge Avenue (Joy St. to Cota St ) Citron St. (Lincoln Ave. to Main St.) E. Grand Blvd. (Fullerton Ave. north to Main St.) W. Grand Blvd. (N. Main westerly to 6th St.) Circle City Drive (El Sobrante to Main St. Channel) Estimated completion date is December, 1997 C) s.-. CL.) C- I Form BB (fb-rbr2) Prior FY Fund Approp. Source Carryover $45,000 $1,320 $631,403 1997-98 1998-99 1999-2000 FY FY FY $75,000 CAPITAL IMPROVEMENT PROGRAM 2000-01 2000-02 Future FY FY FY $85,000 RAFT Total Cost $115,000 $411,320 $631,403 Page 1 06/04/97 CITY OF CORONA FY 1997-2001 PROJECT COST LISTING ROADS, BRIDGES & FREEWAYS Project Name and Description 2. FY 1997-98 Locations: Third Street (E. Grand to W. Grand) Victoria Ave. (E. Grand to Third) Harrison St. (Main to Parkridge) McKinley St. (Promenade to Magnolia) . . Sampson St. (Teller to Corporate and Buchanan to Benjamin Ct.) Estimated completion date is June '98' Fund Source 3. FY 1998-99 Locations: Cota St. (Parkridge to Railroad) - Rincon St. (Alcoa Circle to Joy St.) Pomona Rd. (Lincoln to Auto Ctr Dr.)' Railroad St. (Airport Cir. to Sherman) Buena Vista (Ontario to 91 Fwy) Rimpau Ave. (Magnolia to Sixth St.) Sampson St. (Teller to Corporate and !.' Buchanan to Benjamin Ct./overlay) Estimated completion date is June '99 4. Future FY's: Streets to be determined based upon the pavement evaulation and management program and as determined by City staff. Arterial Widening (R-10) MEM A Widen various sections to match existing lanes. Estimated SLTPP reimbursement for . Smith St. -Sixth St. to Sherman $2,000. _ .... Ongoing Project No. 7081 _.. Form BB pie CO C.) Prior FY Approp. Carryover $107,828 CAPITAL IMPROVEMENT PROGRAM 1997-98 1998-99 1999-2000 2000-01 2000-02 FY FY FY FY FY $141,000 $100,000 102 $100,000 $100,000 Future FY $860,000 Total Cost $1,508,828 • 06/04/97 " CITY OF CORONA FY 1087-2001 ROADS, BRIDGES & FREEWAYS Project Name and Description Compton 3 Ontario Realignment (R-11) Traffic study and environmental review for Compton Avenue at Ontario Avenue street alignment Expected completion by July 1998 Project No. 7293 Pomona Road Pavement (R-13) Resurfacing, Maple to Business Ctr. Completion expected by Sept 98 Project No. 7085 Palisades Flood Damage Mitigation (R-14) Reconstruction of embankments, erosion control, drainage imprv't, etc. Expected completion June 98 Project No. 6923 Pavement Rehabilitation for Local Streets (R-16) Various locations within the City Ongoing project Project No. 6921 Misc. Resurfacing b Pavement Maintenance (R-17) Various locations within the City Project ongoing Project No. 6922 L J c.) Aihn BB (fb-rbr2) ca Fund Source PROJECT COST LISTING Prior FY Approp. Carryover $269,000 $139,541 $42,000 $190,742 $55,250 1997-98 1998-99 1999-2000 FY FY FY $210,000 $80,000 Page 3 CAPITAL IMPROVEMENT PROGRAM 2000-01 2000-02 Future FY FY FY $200,000 $200,000 $80,000 $80,000 $80,000 $200,000 $80,000 Total Cost $269,000 $139,541 $42,000 $1,500,742 $535,250 06/04/97 CITY OF CORONA FY 1997-2001 ROADS, BRIDGES & FREEWAYS Project Name and Description Magnolia Ave. Pvmt Rehab (R-18) Ontario Avenue to Sixth St. Initial allocation for street improvements to Railroad crossing near Compton Avenue Completion expected May 98 Project No. 6920 Freeway Bridges, including Smith Storm Drain (R-19) Maple, Smith.and Lincoln bridges over the 91 Freeway. City's cost share. Ongoing project No. 7277 1-15 Magnolia Off -Ramp Modification (R-20) 500' of new off -ramp at I-15 (s/b) near Circle City Completion expected Dec. 98 Yuma Avenue Interchange (R-21) On and Off Ramps constructed at Yuma and the 1-15 Freeway Completion expected in cooperation with the City of Norco Project No. 6925 C) Ca C�) C40 Form BB (fb-rbe PROJECT COST LISTING Prior FY Fund Approp. 1997-98 1998-99 Source Carryover FY FY MEAS A MEAS A MEAS A MEAS A $127,362 $26,592 $733,354 $565,000 $50,000 $787,000 $565,000 CAPITAL IMPROVEMENT PROGRAM 1999-2000 2000-01 2000-02 Future Total FY FY Cost $565,000 FY FY $1,810,000 $127,362 $4,070,000 $76,592 $1,520,354 • 06/04/97' " ROADS, BRIDGES & FREEWAYS Project Name and Description Chase Drive Public Improvements (R-27) Chase Drive alignment & cross section construction various locations from Future/Foothill to west of Main St. Completion expected June 98 Overlook Street Work (R-32) Add street name signs & other street work to add Police & Fire in emergency response. Ongoing project Local Streets Widening/Curb b Gutter Improvements (R-33) Local streets widening and addition of curb & gutter, driveways, sidewalks & related work (W. 9th. Street, Vicentia to Buena Vista) and Howard Street Park, Barth, Pine, Cedar Neighborhood Improvements (R-35) Rehabilitation street work, curb & gutter, sidewalks Completion expected June 2000 TOTALS 4:1 Ea Fbr4ti BB (fb-rbr2) CITY OF CORONA FY 1997-Y001 - - PROJECT COST LISTING CAPITAL IMPROVEMENT PROGRAM Prior FY Fund Approp, 1997-98 1998-99 1999-2000 Source Carryover FY FY 2000-01 2000-02 Future FY FY FY FY Total Cost $15,000 $100,000 $75,000 $2,369,392 $2,188,000 $1,220,000 $1,115,000 $1,045,000 Page 5 $15,000 $15,000 $15,000 $60,000 $80,000 $125,000 $180,000 $490,000 $2,965,000 $11,392,392 06/04/97 Agency: City of Hemet Prepared by: Roland D. Trietsch Date: May 13, 1997 ITEM NO. RIVERSIDE COUNTY TRANSPORTATION COMMISSIO• N y MEASURE "A" LOCAL FUNDS PROGRAM FY 1997/1998 PROJECT NAME/LIMITS Pavement Rehabilitation Project (City -Wide) Stetson Avenue Bridge Replacement Sanderson Avenue Bike Lanes Stetson Avenue Resurface/Sanderson to Palm Sanderson Avenue Intersection Widening 98/99 Pavement Rehab (City-Wde) Sanderson Ave. Reconstruction/RR tracts to Stetson Sanderson Ave. Widening/Florida to Menlo Kirby/Fruitvale Intersection Improvement Street Sign Upgrade, Phase II Raised Pmt. Markers - Various Locations PROJECT TYPE Pavement Management Replace Timber Bridge Widen Arterial to Provide Bikelanes Arterial Reconstruction Congestion Management Preliminary Soils Engineering/Surveying Arterial Reconstruction 8 wdening Widen Northbound Lanes Congestion Management Traffic Safety Traffic Safety TOTAL TOTAL COST ($000's) 435 310 98 485 90 15 490 275 85 10 85 15 15 245 " Agency: City of Hemet Prepared by: Roland D. Trietsch Date: May 13, 1997 ITEM NO. ' RIVERSIDE COUNTY T SPORTATION COMMISSION N..& MEASURE "A" LOCAL FUNDS PROGRAM FY 1997/1998 PROJECT NAME/LIMITS PRIOR YEAR PROJECTS 91/92 Gilmore/Florida/Kirby Improvements 94/95 Weston Park Infrastructure " 95/96 Hemet St./Charlton Ave. Reconst. 95/96 Eastside Reservoir Access Study 96/97 Stetson Ave./Santa Fe to State 96/97 PMS Link to GIS PROJECT TYPE Street Widening Street Widening Eliminate Dip Crossing Traffic Circulation Arterial Reconstruction Pavement Management TOTAL M . TOTAL COST ($000's) 116.6 150 405 2.5 452 12 3,298.6 . " Pagel of k MEASURE A FUNDS 0000) 116.6 150 230 7.5 129.5 12 1,590.6 Agency: City of Hemet Prepared by: Roland D. Trietsch Date: May 13, 1997 ITEM NO, RIVERSIDE COUNTY TRANSPORTATION COMMISSION , M MEASURE "A" LOCAL FUNDS PROGRAM FY 1998/1999 PROJECT NAME/LIMITS City -Wide Pavement Rehabilitation Program City -Wide Surface Seal Program Latham Avenue Widening/State to Carmalita Stetson Avenue Reconstruction: State Street to Palm Avenue 1999/2000 Pavement Rehabilitation Chambers Avenue Widening/Palm to Lyon PROJECT TYPE Pavement Management Pavement Management Street Widening Arterial Reconstruction Preliminary Soils Engineering/Surveying Street Widening - Add East Bound Lanes TOTAL TOTAL COST ($000's) 330 208.7 110 300 330 208.7 110 150 • " Agency: City of Hemet Prepared by: Roland D. Trietsch Date: May 13, 1997 ITEM NO. 1. 2. 3. 4. 5. RIVERSIDE COUNTY TRA SPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 1999/2000 PROJECT NAME/LIMITS City -ode Pavement Rehabilitation Program City -Wide Surface Seal Program Sidewalk/Curb and Gutter/Street Infill (Various Locations) FY 2000/2001 Pavement Rehab Cross Gutter City -Wide Improvements PROJECT TYPE Pavement Management Pavement Management Street Construction Infill Preliminary Soils Engineering/Surveying Intersection Reconstruction for Better Ride TOTAL 1999/2000 TOTAL COST ($000's) 650 350 200 20 71.9 1,291.9 " P-0 C") Page � of MEASURE A FUNDS ($000) 375 350 200 20 71.9 1,016.9 Agency: City of Hemet Prepared by: Roland D. Trietsch Date: May 13, 1997 ITEM NO. RIVERSIDE COUNTY TRANSPORTATION COMMISSION " MEASURE "A" LOCAL FUNDS PROGRAM FY 2000/2001 PROJECT NAME/LIMITS City -ode pavement Rehabilitation Program City -ode Surface Seal Program Sidewalk/Curb and Gutter/Street Infill (various locations) FY 2001/2002 Pavement Rehab Cross Gutter City-VVide Improvements Stetson avenue Reconstruction Cawston to Sanderson PROJECT TYPE Pavement Management Pavement Management Street Construction Infill Preliminary Soils Engineering/Surveying Intersection Reconstruction for Better Ride Arterial reconstruction TOTAL 2000/2001 TOTAL COST ($000's) 600 270 200 25 72 450 260.6 250 200 25 72 300 1,107.6 • " Agency: City of Hemet Prepared by: Roland D. Trietsch Date: May 13, 1997 ITEM NO. 1. 2. 3. 4. 5. 6. .1.y RIVERSIDE COUNTY TRORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 2001 /2002 " i.7. c) . C'D v Page 6 of 6 PROJECT NAME/LIMITS PROJECT TYPE City-YVide Pavement Rehabilitation Program City -ode Surface Seal Program Sidewalk/Curb and Gutter/Street Infill (Various Locations) FY 2002/2003 Pavement Rehab Cross Gutter City -Wide Improvements Stetson Avenue Reconstruction Warren to Cawston Pavement Management Pavement Management Street Construction Infill Preliminary Soils Engineering/Surveying Intersection Reconstruction for Better Ride Arterial Reconstruction TOTAL 2001/2002 TOTAL COST ($000's) 650 270 200 28 80 480 1,708 MEASURE A FUNDS ($000) 300.3 243 200 28 80 350 1,201.3 Agency: Date: Item # 1. 2. 3. 4. 5. 6. • RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE 'A' LOCAL FUNDS PROGRAM . FY 1998 - 2002 City of Lake Elsinore June 9, 1997 Project Name/Limits Main Street/Sulphur St. Casino Drive/Diamond Dr. C.I.P. Projects/City Street Maintenance Administrative Services: Various Locations/ Projects Mission Trail: Diamond Dr. - Malaga Road Lakeshore Drive: Main St. - Country Club Blvd. (Lakepoint Park Entrance) Spring Street: Lakeshore Dr. - Collier Avenue Casino Drive Bridge Project Type Decontamination Traffic Signal Mast -Arm Replacement Public Works/ Engineering Admin./ Construction Mgmt. (Payroll/Supplies) FY Total (5000' 97/98 25 97/98 97/98 98/99 99/00 00/01 01/02 Street Rehabilitation 97/98 Street Improvements/ 97/98 Realignment Pavement Overlay/ Resurfacing Deck Pavement Rehabilitation 97/98 25 50 50 50 50 50 450 158 175 97/98 135 Measure A Eurdusu) 25 25 50 50 50 50 50 52 25 175 40 • " 8. Chaney Street: Lakeshore Dr. - Pavement Overlay/ 97/98 100 100 Collier Avenue Resurfacing 98/99 150 150 9" Misc. Street Repairs/ Slurry Seal 97/98 80 Maint.: Various Locations 80 98/99 80 50 99/00 80 80 00/01 50 50 01/02 50 50 10. Misc. Street Restoration Pavement Rehabilitation/ 97/98 120 120 Various Locations Overlay " 98/99 150 100 99/00 150 150 00/01 100 100 01/02 100 100 11. Curb and Sidewalk New Curb & Gutter/ Replacement Program: 97/98 100 100 8 Sidewalk; R & R Existing 98/99 100 100 Various Locations Sidewalk 99/00 100 100 00/01 100 100 01/02 100 100 12. Collier Ave.: Wasson Creek Pavement Rehab./ to Central St. O99/00 50 50 Overlay 00/01 175 175 13. Lakeshore Drive: Terra Cotta Street Widening 99/00 250 Road - Dryden Street 75 00/01 250 200 14. Lakeshore Drive: Jernigan Street Widening 99/00 St. - 200' East of Machado St. 400 80 01/02 400 150 15. Main Street: Heald Avenue Pavement Rehab/Overlay 98/99 136 I-15 136 J *4 CD 16. Sumner Ave: Main St. To Pavement Rehab./ 99/00 Chaney St. Overlay SO SO r O1/02 400 200 , uhusan/meas-a98.prg TOTALS: 97/98 98/99 792 99/00 586 00/01 635 01/02 675 650 • • Agency: Prepared by: Date: 1996/97 1996/97 1996/97 1996/97 2 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" STREETS AND ROADS FIVE YEAR PROJECTIONS FY 1997-2002 City of Moreno Valley John T. Hogard, Senior Engineer 1997 Perris Boulevard/Hemlock Avenue to Ironwood Avenue Perris Boulevard/Cactus Avenue to Alessandro Boulevard Perris Boulevard/Dracaea Avenue to Webster Avenue Indian/Hemlock Ave to Ironwood Rehab Sidewalks Improvements completed. Improvements completed. Improvements completed. Construction complete. ISTEA funding approved $300,000, Measure A $60,000 ISTEA funding approved$400,000, Measure A $95,000 ISTEA funding approved $830,000; RCFCaWCO $315,000; MEASUR p,000 S1,175,000 Page 1 of 6 Pages S30,000' S25,000 :, CZ " 7 PROJECT FUNDING YEAR(S) PROJECT NAME/LIMITS PROJECT TYPE PROJECT STATUS` TOTAL COST MEASURI +.A.. P,U . 1996/98 Heacock Street/Cactus Avenue to Alessandro Boulevard Rehab/Widen Will be constructed in three phases: Phase I - Cactus box structure con- structed. Phase II - Street $1,552,000 Improvements/Cactus-Brodiaea being constructed Phase III-Heacock- Alessandro Inter -section improvements . Advertise for Bids August'97. 1996/98 Frederick Street/Centerpoint Drive to Sunnymead Right turn Consolidated funds being used for Boulevard lane/Rehab construction. Tentative completion is July'97. $265 000 $115,000. 1996/02 Ironwood Avenue/Heacock Street to Perris Boulevard, Rehab/Reconst Ironwood/Heacock Intersection Phase I & ruction Improve- ments have been completed $930,000 $120,000�� Phase !I (Phase I Storm Drain, Phase II Street). Phase III eliminated from the City's budget to consolidate funds for construction of other projects. Survey complete, requires utility relocation and R/W. 1996/02 1997/98 Surface Recycling Graham Street/Cactus Avenue to Alessandro Boulevard Rehab Rehab Ongoing annual maintenance. . Consolidated funds are being used for design/construction. Design 85% complete. Advertise for bids September $500,000 S320 000 $500,000 S320,000 '97. Complete construction February '98. 4 ISTEA funding approved $500,000; CMAQ funding approved $90,000; Measure A $962,000 s ISTEA fundlnp approved if 50,000; Measure A $115,000 6 ISTEA funding approved $710,000; Measure A 5120.000 ITEM NO. 1997/98 1997/98 1997/98 1997/98 1997/99 1997/99 1997/99 1997/99 7 Barrier Rail Replacement Program Hemlock Avenue/Pigeon Pass Road to Rte 60 Exit Nason Street/Eucalyptus Avenue to Elder Avenue Locust Avenue East of Redlands Boulevard Route 60/Pigeon Pass Road Route 60/Perris Boulevard Redlands Boulevard Storm Drain Line F Nason Street/Alessandro Boulevard to Rte 60 Widen Sidewalks Widen/Rehab Park n Ride Facilities Rehab/Widen H6RR/ISTEA Funding $26,000; Measure •A' S14,000 Developer S100,000; Measure A $200,000 9 LOW wale Cr ossing g Program (ISTEA) $240,000; Measure •A• M10,000 40 10 ISTEA future funding request i1• ,7®0,000; Maaaure A i740,000 Estimated completion by May'98 installation of barrier rail for Cactus Ave./Storm Channel Line "F" and Heacock St/Oleander Storm Drain. Complete construction June'97. Project dropped. Did not receive TEA funding. Start design June'97. Advertise January'98. Start construction March '98. Project dropped. Caltrans will construct. RCFC & WCD will joint venture with the City by designing the reinforced box structure. Consultant retained May'97 for design. Estimated start of construction April'98. S2,500,000 Page 3 of 6 Pages $550,000 S740,000" PROJECT FUNDING YEAR(S) 1997/99 1997/01 1997/02 1997/02 1997/02 1998/00 PROJECT NAME/LIMITS Route 60/Nason Street Central Moreno Valley Improvements; Indian Street/Atwood Avenue/Myers Avenue & Dracaea Avenue Annual Pavement Resurfacing Slurry Seal Program Sidewalks State Rte. 60 Soundwalls 11 12 13 14 PROJECT TYPE Interchange Improv. HOV Lanes East and Westbound Rehab/Widen Rehab/Overlay Resurface Sidewalks Soundwalls PROJECT STATUS Consultant retained May `97 for design. Requires utility relocation and R/W. Estimated start of construction October `98. Eliminated from City's budget to consolidate funds for construction of other projects. Design 0%. 96/97 Overlay Phase I complete (ongoing annual contracts). 96/97 Overlay Phase 11 design 90% complete, advertise July '97. Start construction September `97. Design complete October '97. (Ongoing annual contracts.) Advertise December '97. Begin construction March `98. Annual Program Submitted to California Transportation . Commission for inclusion in 1998 STIP ISTEA future Funding Request $1,000,000; CMAQ $700,000; Measure A $4,200,000 RDA/CD130 $3,150,000; Measure A $50,000 S9821 $120,000; Measure A $220,000 Soundwal Program Special Fundkq $1,250.,000; Measure A $625,000 TOTAL COST' S6,000,000 S3,200,000 $2,500,000 51,500,000 S340,000 51,875,000 P• age 4 of 6 Pages S4,200,000" 550,000" S2,500,000 • S1,500,000 S220,000'3 S625,000" f�7 Cf, ITEM NO. 1998/01 1999/O1 1999/O1 1999/02 2001/02 PROJECT NA141E/LIMITS Ironwood Avenue/Graham Street to Heacock Street Indian Street/Fir Avenue to Sunnymead Boulevard, Phase II Hemlock Avenue/Westbound 60 exit to David Lane, Phase II Route 60/Moreno Beach Drive PROJECT TYPE Rehab/Widen Rehab Rehab Eliminated from City's budget to consolidate funds for construction of other projects. Ironwood/Heacock Intersection Improvements have been completed (Phase I Storm Drain, Phase II Street). (Phase III Street Improvements between Graham and Kristen. Design survey complete.) Eliminated from City's budget to consolidate funds for construction of other projects. Design 80% complete. Eliminated from City's budget to consolidate funds for construction of other projects. Eliminated from City's budget. Funds shifted to Route 60/Nason Interchange Project. Eliminated from City's budget to consolidate funds for construction of other projects. Design is 70% complete, R/W needed, utility relocation. Page 5 of 6 Pages S327,000 S500,000 f t-1) r -'s 4P • " PROJECT FUNDING YEAR(S) PROJECT NAME/LIMITS PROJECT TYPE PROJECT STATUS TOTAL COST MEASURE "A" FUNDS 2001/02 2001/02 2001/02 JFK Drive/Heacock Street to Perris Boulevard Heacock Street/Hemlock Avenue to Gregory Lane Ironwood Avenue/Lasselle Street to Steeplechase Street Rehab Rehab Widen north side Eliminated from City's budget to consolidate funds for construction of other projects. Design 40% complete. Heacock/lronwood Intersection Improve- ments complete (Phase I Storm Drain, Phase II Street). Phase III eliminated from City's budget to consolidate funds for construction of other projects. Design 85% complete, R/W needed. Eliminated from the City's budget. Street improvements 50% designed. Awaiting private development to install storm drain. 5800 000 S300+�� S250 000 ����'�� S100,000" 5150,00016 _ TOTALS --- $28,891,000 S15,6881000�� 15 16 ISTE.A Raiding approved $200,000; Meatus A $100,000 Developer $100.00; Measure A $150,000 s Aver: City of Nurrieta Prepared by: Dan Clark Date: flay 27, 1997 ITEM NO. 1 2 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE 'A- LOCAL FUNDS PROGRAM FY 199 7— no 8 PROJECT NAME / UMITS Murrieta Hot Springs Rd. from S'ly City Limits to I-15, and I-215 Interchange Asphalt Capping, Slurry Seat and misc pavement repairs Citywide PROJECT TYPE Design and Construction of Roadway and Drainage Impvts Pavement Repairs Citywide 11,350 Page of MEASURE sr FUIUD 335 .193 193 " " Agency: City of Murrieta Prepared by: Dan Clark Dale: Nay 27, 1997 " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE 'A' LOCAL FUNDS PROGRAM FY 1998 - 1999 PROJECT NAME / LIMITS Murrieta Hot Springs Rd. from S'ly City Limits to I-15, and I-215 Interchange Asphalt Capping, Slurry Seal and misc pavement repairs Citywide PROJECT TYPE Design and Construction of Roadway and Drainage Impvts Pavement Repairs Citywide. �%ID Pelle Z ni s TOTAL COST (i000'sl 11,350 227 MEASURE 'A FUNDS ($0011') 335 227 Agency: City of Murrieta Prepared by: Dan Clark Dale: May 27, 1997 ITEM NO. 1 2 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE 'A' LOCAL FUNDS PROGRAM FY 1999 — 2000 PROJECT NAME / LIMITS Murrieta Hot Springs Rd. from S'ly City Limits to I-15, and I-215 Interchange Asphalt Capping, Slurry Seat and misc pavement repairs Citywide PROJECT TYPE Design and Construction of Roadway and Drainage Impvts Pavement Repairs Citywide TOTAL COST 000'a Page _ of _ MEASURE 'A FUNDS tsooa�, 11,350 335 ' 275 275 " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE 'V LOCAL FUNDS PROGRAM FY 2000 - 2001 Agency: City of Murrieta Prepared by: Dan Clark Date: May 27, 1997 PROJECT NAME / LIMITS Murrieta Hot Springs Rd. from S'ly City Limits to I-15, and I-215 Interchange Asphalt Capping, Slurry Seat and �%isc pavement' repairs Citywide PROjECT TYPE Design and Construction of Roadway and Drainage Impvts Pavement Repairs Citywide TOTAL COST R000'sl 11,350 329 c. C- C. Page -4- MEASURE " A' FUNDS ( 00% 335 329 Agency: City of Murrieta Prepared by: Dan Clark Date: May 27, 1997 ITEM NO. 1 2 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE 'A' LOCAL FUNDS PROGRAM Fir 2001 — ,2002 PROJECT NAME / LIMITS Murrieta Hot Springs Rd. from S'ly City Limits to I-15, and I-215 Interchange Asphalt Capping, Slurry Seal and misc pavement repairs Citywide PROjECT TYPE Design and Construction of Roadway and Drainage impvts Pavement Repairs Citywide TOTAL COST 000's Pao, _.5_ MEASURE 'A' FUNDS Ii000'r 11,350 335 386 386 Agency: City of Perris Prepared by: Habib Motlagh Date: May, 1997. ITEM NO. 1 2 3 4 6 7 8 9 10 • RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 97-98 PROJECT NAMES/LIMITS Nuevo Rd. from Perris Blvd. to Wilson Ave. Downtown Rehab (2nd Phase) Miscellaneous Pavement Rehab and Pothole Repair *Ramona Expressway (2nd phase) *Evans Road *Goetz Road *Enchanted Heights & Indian Hills area *Perris Blvd. from Nuevo to I-215 *Rider St. from Evans . Rd. to Perris Blvd. *Mountain Ave. from River Road to Sunny Sands Rd. and minor improvements to Sun Park and Sunny Sands Rd *Pending funding availability from other sources and Measure "A" loan. Should this loan not come to fruition this project will be schedulfor future years. PROJECT TYPE Pavement Rehab Pavement Rehab Pavement Rehab Pavement Rehab New Pavement TOTAL COST ($1,000'S) 200 350 20 450 300 Pavement Rehab 300 Pavement Rehab . 400 Pavement Rehab 250 Pavement Rehab New Pavement 250 150 Page 1 of 5 MEASURE "A" FUNDS ($1,000'S) 200 200 20 450 300 70 400 250 250 150 " Agency: City of Perris Prepared by: Habib MoClagh Date: May, 1997 RIVERSIDE COUNTY RANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 98-99 " Page 2 of 5 ITEM NO. PROJECT NAMES/LIMITS PROJECT TYPE TOTAL COST ($1,000'S) MEASURE "A" FUNDS ($1,000'S) Ramona Expressway Enchanted Heights and Indian Hills Area Miscellaneous Pavement and Pothole Repair Pavement Rehab Pavement Rehab Pavement Rehab 300 400 20 300 200 20 Agency: City of Perris Prepared by: Habib Motlagh Date: May, 1997 ITEM NO. 1 2 3 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 99-2000 PROJECT NAMES/LIMITS Ramona Expressway Goetz Road Miscellaneous Pavement Projects TOTAL COST ($1,000'S) Pavement Rehab 200 200 Pavement Rehab 300 200 Pavement Rehab 170 170 00 C° - Page 3 of 5 • " Agency: City of Perris Prepared by: Habib Mot'lagh Date: May, 1997 ' RIVERSIDE COUNTY OANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 2000-2001 " C: C- C- C', Page 4 of 5 ITEM NO. PROJECT NAMES/LIMITS PROJECT TYPE TOTAL COST ($1, 000' S) 1 2 3 Case Road Rider St. From Evans Rd. to Perris Blvd. Miscellaneous Pavement Projects Pavement Rehab Pavement Rehab Pavement Rehab 400 250 120 MEASURE "A" FUNDS ($1,000'S) 300 250 120 Agency: City of Perris Prepared by: Habib Moilagh Date: May, 1997 ITEM NO. 1 2 3 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 2001-2002 PROJECT NAMES/LIMITS Placentia Ave. From 8arratt St. To I-215 Sunnysands, Sunpark, Mountain and Mapes.Rd. Miscellaneous Rehab PROJECT TYPE TOTAL COST ($1,000'S) New Pavement New Pavement Rehab co CD c� CD Page 5 of 5 300 300 250 250 •120 120 Agency: City of Riverside Prepared By: Rick McGrath Date May 19, 1997 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 1998-2002 FY 1998 ITEM PROJECT NAMES/LIMITS NO. 1. Arlington Avenue Underpass A.T. & S.F. Crossing 2. Van Buren Blvd. Widening Magnolia to 91 Freeway 3• Major Street Rehabilitation 4. Jurupa Ave -Van Buren to Crest 5. CADME - Street Plan Data 6. Tyler St - Arlington to Well 7. Arlington Ave - Murray to Neil 8. Indiana Ave - Monroe to Doyle 9• Indiana Ave - McKinley to Mary PROJECT TYPE Street Underpass TOTAL COST ($1;000's) Page 1 of 5 MEASURE "A" FUNDS ($1, 000's) .$ Street Widening $ 6,000 $ 3,000 Street Resurfacing $ 400 $ 12,000 Street Widening(Eng)$ 100 1,600 Data Updates $ 100 Street Widening(Eng)$ 50 Street Widening Street Widening Street Widening Sub -Total 1,200 $ 100 $ 1,600 $ 50 $ $ 275 $ 275 $ 300 $ 300 $ 85 $ 85 $ 21,610 $ 5,910 ,n CD r.) c: • " " 4? e"..) RIVERSIDE COUNTY TRANSPORTATION COMMISSION r~ MEASURE "A" LOCAL FUNDS PROGRAM FY 1998-2002 FY 1999 Agency: City of Riverside Prepared By: Rick McGrath Date: May 20, 1997 Page 2 of 5 ITEM PROJECT NAMES/LIMITS MEASURE "A" NO. PROJECT TYPE TOTAL COST FUNDS ($1,000's) ($1,000's) 2. Tyler street Widening - Street R/W Wells to Eureka $ 1,100 $ 1,100 3. Jurupa Ave. Extension - Van Buren Blvd.. To Crest Ave. Street Extension $ 2,000 $ 2,000 4" CADME Street Plan Data Updates $ 1,600 $ 100 1" Major Street Rehabilitation Street. Resurfacing $ 2,500 $ 700 Sub -Total $ 7,200 $ 3,900 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 1998-2002 Agency: City of Riverside =00 Prepared By: Rick McGrath Date: May 20, 1997 Page 3 of 5 ITEM PROJECT NAMES/LIMITS NO. PROJECT TYPE MEASURE "A"TOTAL COST FUNDS ($1, 000's) ($1, 000's) 1• Central Avenue Van Buren to Adams Street Widening $ 900 $ 900 2. Traffic Signal Improvements 3. Tyler Street - Wells to Arlington 4. Major Street Rehabilitation Street Resurfacing $ 2,200 $ 2,200 5• CADME Street Plan Traffic Signals $ 150 $ 150 Street Widening $ 2,600 $ 2,600 Data Updates $ 1,600 $ 100 Sub -Total 7,450 $ 5,950 • Agency: City of Riverside Prepared By: Rick McGrath Date: May 20, 1997 ITEM PROJECT NAMES/LIMITS NO. • RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "Jr LOCAL FUNDS PROGRAM FY 1998-2002 FY 2001 PROJECT TYPE TOTAL COST ($1,000's) • nO Cr.; r� C' r'1 Page 4 of 5 MEASURE "A" FUNDS ($1,000's) 1. Traffic Signal Improvements 2. University Ave - Ottawa to to Eucalyptus 3. Major Street Rehabilitation 4. SPRR Crossing ® Marlborough 5. SPRR Crossing ® Rustin 6. CADME Street Plan Traffic Signals Medians/Widening Street Resurfacing RR -Xing RR -Xing Data Updates Sub -Total 150 150 $ 2,000 $ 1,600 $ 2,200 $ 1,000 $ 1,000 $ 1,600 $ 2,200 $ 120 • $ 100 $ 100 7,950 $ 4,270 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL, FUNDS PROGRAM FY 1998-2002 FY 2002 Agency: City of Riverside Prepared By: Rick McGrath Date: May 20, 1997 ITEM PROJECT NAMES/LIMITS NO. 1• Traffic Signal Improvements 2• 91 Freeway/La Sierra Ave Interchange 3. Major Street Rehabilitation 4. CADME Street Plan PROJECT TYPE TOTAL COST ($1,000's) Page 5 of 5 MEASURE "A" FUNDS ($1,000's) Traffic Signals $ 150 $ 150 Replace/Widen $ 14,000 $ 2,500 Street Resurfacing $ 2,200 $ 2,200 Data Updates $ 1,600 'Sub -Total $ TOTAL $ $ 100 17,950 $ 4,950 62,160 $ 24,980 • • RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM City of San Jacinto Habib Motlagh May, 1997 ITEM NO. PROJECT NAMES/LIMITS PROJECT TYPE IS1,000's) TOTAL COST MEASURE "A" ($1,000's) FUNDS ($1,000N 1. 2. 3. Agency: Prepared by: Date: Ramona Expressway Mountain Avenue Main Street 4• Victoria Avenue 5. 6. Esplanade Avenue Misc. Pothole Repair 7• Misc. Road Improvements Throughout Older Sections Of The City 8. Shaver Street fraz:28 Pavement Rehab 500 et SO el IPS .. .. .. • .. 120 172 200 250 10 Page 1 of 4 160 120 172 50 250 10 350 Street Widening 125 125 350 " " Agency: Prepared by: Date: ITEM NO. RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM City of San Jacinto Habib Motlagh May, 1997 PROJECT NAMES/LIMITS Page 2 of 4 PROJECT TYPE ($1,000's) TOTAL COST ($1,000's) MEASURE "A" FUNDS ($1, 0' 1. 2. 3. 4. ** State Street Sanderson Avenue Misc. Road Improvements Throughout Older Sections Of The City Ramona Expressway 5. Misc. Pothole Repairs FY 98-99 Pavement Rehab 9. 81 18 11 Pavement Rehab .9  200 350 250 250 10 200 350 250 250 10 Agency: Prepared by: Date: ITEM NO. 1. 2. 1. 2. 3. RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM City of San Jacinto Habib Motlagh May, 1997 • PROJECT NAMES/LIMITS PROJECT TYPE (51,000's) Misc. Pothole Repair Warren Road Lyon Avenue Ramona Blvd. Misc. Pothole Repair - 0 0 Pavement Rehab 1. Eu om Pavement Rehab .. ell 19 Page 3 of 4 TOTAL COST MEASURE "A" ($1,000's) FUNDS ($1,000's) 15 350 250 100 20 15 350 250 150 20 • (7) * M rr.5 C-: r RIVERSIDE COUNTY TRANSPORTATION COMMISSION • MEASURE "A" LOCAL FUNDS PROGRAM Agency: City of San Jacinto Prepared by: Habib Motlagh Date: May, 1997 ITEM NO. PROJECT NAMES/LIMITS PROJECT TYPE ($1,000's) Page 4 of 4 TOTAL COST ($1,000's) MEASURE "A" FUNDS ($1,000's) 1. 2. 3. .. Ramona Exp. San Jacinto Avenue Cottonwood Avenue FY 2001-02 Pavement Rehab .. .. .. .. Pending Measure "A" Loan Approval, a portion or all of this project will be implemented. Same as above. Also, pending Highway 79 Realignment 250 150 150 150 150 150 Agency: City of Temecula Prepared by: Joe Kicak, Director Date: May 27, 1997 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE 6A6 LOCAL FUNDS PROGRAM FY 1997 — 199 g of Public Works/City Engineer PROJECT NAME / LIMITS Design and construction of pavement rehabilitation and reconstuction of major street Rancho California Road Interchange Improvements/Bridge Widening • Temecula Valley High School Frontage Street Improvement Project at Rancho Vista andMargarita Roads. Ynez Road Improvements between Rancho Californi Road and Tierra Vista Road PROJECT TYPE Street reconstruction and . rehabilitation. Construction of loop on -ramp (northbound) and associated bridge widening. Design and construct medians along frontage of High School. Acquire right-of-way, design, construct ultimate road improvements. TOTAL COST Z000's Page 1 d 5 MEASURE •A• FUNDS $000's Agency: Prepared by: Date: ITEM NO. • City of Temecula Joe Kicak, Director of Public Works/City Engineer May 27, 1997 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE •A• LOCAL FUNDS PROGRAM FY 199 — MIS 1998-1999 PROJECT NAME / LIMITS Design and construction of pavement rehabilitation and reconstruction of major streets. Ynez Road Improvements between Rancho California Road and Tierra Vista Road. Street reconstruction and rehabilitation. Acquire right-of-way, design, construct ultimate road improvements. • Page 2 of 5 MEASURE •A• FUNDS =ppp's 975 65 Agency: Prepared by: Date: City of Temecula Joe Kicak, Director of Public Works/City Engineer May 27, 1997 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE •A• LOCAL FUNDS PROGRAM FY Mx — 409 1999-2000 PROJECT NAME / LIMITS Design and construction of pavement rehabilitation and reconstruction of major streets. Ynez Road Improvements between Rancho Road and Tierra Vista Road. California PROJECT TYPE Street reconstruction and rehabilitation. Acquire right-of-way, design and construct ultimate road improvements. TOTAL COST $000's 600 605 co CZ) Page 3 of 5 MEASURE •A' FUNDS $000's 600 325 Agency: Prepared by: Date: ITEM NO. City of Temecula Joe Kicak, Director of May 7, 1997 . • RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE •A• LOCAL FUNDS PROGRAM FY Mgr — ygg 2000-2001 Public Works/City Engineer PROJECT NAME / LIMITS Design and construction of pavement rehabilitation and reconstruction of major streets. Street reconstruction and rehabilitation. • Page y_ 01.5._ MEASURE 'V FUNDS $000's 501 Agency: Prepared by: Date: RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE •A' LOCAL FUNDS PROGRAM • FY 199 — A9� 2001-2002 Joe Kicak, Director of Public Works/City Engineer May 27, 1997. City of Temecula PROJECT NAME / LIMITS Design and construction of pavement rehabilitation and reconstruction of major streets. 1; . C} Ca Page 5_ of 5 MEASURE •A' FUNDS $000's RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 1 May 23, 1997 EW (ft)/PW (ft) 06th Ave C & D Blvd to Intake Blvd (MI 95) 1.00 (mi) 26 (ft)/ 26 (ft) Resurface AC Paved Road 07th St Date Palm St 0.25 (mi) Resurface Paved Road to Dale Kiler Rd 20 (ft)/ 20 (ft) 08th Ave SH95 to Ely 1.00 (mi) 26 (ft)/ 26 (ft) Resurf 26',0.21'RMS 55th Ave Calhoun St to Coachella CL 0.50 (mi) 22 (ft)/ 22 (ft) Resurface 0.21', 22, RMS Coordinate with City of Coachella for part of the project. 66th Ave SH195 3.94 (mi) Resurf 0.21'AC to SN86 26 (ft)/ 32 (ft) 69th Ave Costa Mesa Dr to Vander Veer Way 0.25 (mi) 20 (ft)/ 20 (ft) Resurface 0.21', 20' RMS 84th Ave Rte 86 to Johnson St 0.80 (mi) 24 (ft)/ 24 (ft) Resurface 0.21', 24' RMS Fund Source Total 302 other Total 301 other Total 302 other Total 301 other Total 301 Other Total 301 other Total 301 other Total 103 152 25 Find Source Amount x S1000 54 154 208 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 9 /98 1 98/99 ; 99/00 i 00/01 ; 01/02 Di 201 0; 0; 0, Ei 21 0; 0; Oj 0 R, 01 0; 0; 0, C1 01 321 0; 0: 0 302 Measure A/Palo Verde 25 D1 01 01 0' i 2 Ei 0; 0; 0; 0' 1 R, 01 01 0' 01 0 C, 01 Of Oi 0: 22 301 Measure A/Coachella Valley 152 — D1 0; Oj 01 11 E; 0: 01 01 11 0 O C1 0; 01 0; 1501 0 302 Measure A/Palo Verde 33 Di 2; 0; , El 11 0� O� Oi 0 14 R 30: Oi 01. Oi 0 0, Or 0f 0 301 Measure A/Coachella Valley 47 483 489 E; pi 01 0; 01 0 Rf 01 1 0, 01 C; 0; 0; 0, 0; 0 301 Measure A/Coachella Valley 19 DI 0; 0: 1: 0' El R; 01 0; 1; 01 0 O C1 Oi 01 1701 1 0f 0 301 Measure A/Coachella Valley 19 103 D; 21 , El RI 11 01 Oi Oi 0 0, 01 01 O CI 1001 0f 01 01 0 301 Measure A/Coachella Valley RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Acacia Ave Hemet CL to 100' east of Columbia 0.72 (mi) 38 (ft)/ 38 (ft) Reconstruct 38'paved road Drainage problems; Do Not raise crown elevation of street. Admiralty Way Vander Veer Rd to Wly 0.25 0.25 (mi) 35 (ft)/ 35 (ft) Resurface 0.21', 35' RMS Airport Blvd Jackson St to SN 86 2.00 (mi) 36 (ft)/ 36 (ft) Resurface 0.21', 36 A/C Coordinate with City of Coachella for 1/3 of the project cost. Fund Source Fund Source Amount x S1000 Page 2 11111 May 23, 199 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction Total 300 other Total 97/98 1 98/99 ; 99/00 ; 00/01 ; 01/02 15 DI 15: 0; 0; 01 0 El 0; 0; 0; 01 0 R; 0; 0; 0; 0; 0 285 C; 0; 0; 0; 0; 0 300 300 Measure A/Western 301 other 33 D; 0; 0; 2; 0; 0 El 0; 0; 1; 0; 0 R; Oi 0; 0; 0; 0 0 C; 01 0: 301 0; 0 301 Measure A/Coachella Valley Total 33 Airport Blvd Jackson St to Wly 0.5 mi from Monroe 1.50 (mi) 38 (ft)/ 38 (ft) Resurface 0.21', 38' A/C Coordinate with City of La Guinta for 15% of .project Akipa Ct Wanki Ave 0.08 (mi) Slurry Seal Slurry Seal Type II 301 other Total 57 261 318 D; 201 0; 0; 0; 0 El 11 Oi 0; 01 0 R1 01 Oi 0; 01 0 C; 361 0; 0; Oj 0 301.Measure A/Coachella Valley 301 other Total 193 D1 1; 21 01 0; 0 El 0i 1i Oi 01 0 R1 0; 0; 0; 0; 0 35 C1 0; 189i 0; 0; 0 301 Measure A/Coachella Valley 228 to E'ly 0.08 mi 0 (ft)/ 33 (ft) Akwo Cir Woshka Ln 0.03 (mi) Slurry Seal Slurry Seal Type II to E'ly 0.03 mi 0 (ft)/ 33 (ft) Albatross Way Vander Veer Rd. 0.24 (mi) Resurface 0.21', 24' RMS 300 Other Total 300 other Total 1 0 1 DI 0; 01 0; 01 0 E; 01 01 01 Oj O R1 0; . 0; 01 01 0 Ci 11 01 01 01 0 300 Measure A/Western 1 0 1 D; 0; Oj 0; 01 0 El . 01 0; 0; 0: 0 RI Oj 01 0: 01 0 C1 11 01 01 01 0 300 Measure A/Western 24 (ft)/ 24 (ft) 301 other Total 23 0 23 01 01 01 0; 21 0 E; 0; Oi Oi 11 0 R1 01 0; 01 01 0 C1 01 01 0; 201 0 301 Measure A/Coachella Valley 0"n�,., • RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Alberta Ave Swingle Ave to Wly 0.15 mi 0.15 (mi) 35 (ft)/ 35 (ft) Resurface 0.21', 35' RMS Algonquin Pl Chiricahua Dr to Desert Moon Dr 0.23 (mi) • 31 (ft)/ 31 (ft) Resurf 31',0.21'AC Petromat • SB 300 cycle 8 Andrea Ave Hemet St 0.10 (mi) Resurf 24', 0.25' AC to Stardust St 24 (ft)/ 24 (ft) Antelope Rd Ellis Ave to Watson Rd 1.52 (mi) 24 (ft)/ 26 (ft) Widen 8 Reconstruct 26', 0.21' RMS, 0.5' AB Antelope Rd —' McCall Blvd 0.27 (mi) Slurry Seal Slurry Seal Type Il • April Drive e Four Seasons Rd 0.31 (mi) Slurry Seal Slurry Seal Type II to S'ly 0.04 mi Grand Ave 0 (ft)/ 36 (ft) to S'ly 0.31 mi 0 (ft)/ 36 (ft) Arapahoe Vista Elkhorn Tr to Ely 0.06 (mi) 18 (ft)/ 18 (ft) Recon 18' 0.21'AC, 0.5'AB Desert Tortoise and Fringe Toed Lizard SB 300 cycle 8 other Total 301 other other RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT 'Fund 'Fund 'Source; Source 'Amount x 81000 Total Page 3 May 23, 1997 Measure A Funds by Fiscal Year Amount x 81000 i D = Design R = Right of Way Acquisition] E = Environmental C = Construction• 97/98 ; 98/99 ; 99/00 ; 00/01 ' 01/02 301 21 D1 ' E' 'R1 iCi 'Total]— 21 —i i 301 ; 38 SDI El ' R' other 0 'C' Total ; 38 300 other Total ; 27 300 other Total ; 252 300 other Total ; 5 300 !— 5 101 'E1 iRi 0 iCi 0'' 0' i 0' 0: 0; 01 21 0' 01 1: 0' 0: 01 Di 0: 18' 301 Measure A/Coachella Valley 2' 01 01 01 11 01 0: Oj 0' 0' Oi 0' 35' 01 01 01 301 Measure A/Coachella Valley 27 TiD1 0' 0' 0: iEi 0' 01 O iRi 0' 0: 0 0 �C1 0' 0' 01 300 Measure A/Western 252 iDI 0 1' 1 � 1E: 11 0' 01 ;RI Oi 0' 0f 0 �C1 2501 0: 0' 300 Measure A/Western 5 �0; 11 0' 0' 1E1 Oi 0' 01 0 �C1 41 01 0' 01 01 300 Measure A/Western 01 0' 0' 01 01 01 01 01 0' 51 01 Oj 5 300 Measure A/Western i 29 SDI 61 01 iEi 51 01 'RI 0' 01 0 �C1 181 01 Total ; 29 0; 0' i 0' 01 301 Measure A/Coachella Valley 2' i 1' 0' 24 01 -0' i 0' i 01 01 0' 01 01 0' i 0' 01 01 0' i 01 0' 01 0 0' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O. r)0R A RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 4 May 23, 1997 Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Fund Source Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction Total 97/98 1 98/99 1 99/00 ; 00/01 1 01/02 Ari Cir Woshka Ln 0.02 (mi) Slurry Seal Slurry Seal Type I1 to E'ly 0.02 mi 0 (ft)/ 41 (ft) 300 other Total 1 0 1 D1 01 01 01 01 0 E1 01 01 01 01 0 R1 01 01 01 01 0 C1 11 01 01 01 0 300 Measure A/Western Armstrong Rd 34th Street 0.50 (mi) Resurf AC paved road Arrowhead Blvd 18th Ave 1.00 (mi) Resurf 26',0.21'RMS Arrowheaf Circle Coffee Berry Circle 0.07 (mi) Slurry Seat Slurry Seal Type lI Aruba Ct Port Royal Ave 0.02 (mi) Reconstruct Surface Aster Drive Trillium Dr 0.20 (mi) Slurry Seal Slurry Seal Type II Atupa Ave Navut Ave 0.13 (mi) Slurry Seal Slurry Seal Type I1 to Sierra Ave 46 (ft)/ 46 (ft) 300 other Total 34 D1 01 01 01 151 0 E1 01 01 01 21 0 R1 01 01 01 01 0 79 C1 01 01 01 01 17 300 Measure A/Western 113 to 20th Ave 26 (ft)/ 26 (ft) 302 other Total 152 D1 01 01 01 11 0 E1 01 01 01 11 • 0 R1 01 01 01 01 0 0 C1 01 01 01 1501 0 152 302 Measure A/Palo Verde to Ply 0.07 mi 0 (ft)/ 36 (ft) 300 other Total 1 •0 1 01 01 E1 01 R1 01 c1 11 01 01 01 0 01 01 01 0 01 01 01 0 01 01 01 0 300 Measure A/Western to Sly Port Royal 0.02 mi 32 (ft)/ 32 (ft) 301 other Total 8 D1 01 01 01 01 2 E1 01 01 01 01 1 Ri 01 01 01 01 0 0 C1 01 01 01 01 5 301 Measure A/Coachella Valley 8 to Twinflower Ave 0 (ft)/ 36 (ft) 300 other Total 2 D1 01 01 01 01 0 E1 01 01 01 01 0 R1 01 01 01 01 0 '0 C1 21 01 01 01 0 300 Measure A/Western 2 to hornet Ave 0 (ft)/ 36 (ft) 300 other Total 2 D1 01 01 01 01 0 E1 01 01 01 01 0 R1 01 01 01 01 0 0 C1 21 01 01 01 0 300 Measure A/Western 2 00008 " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 5 May 23, 1997 August Circle July Drive 0.21 (mi) Slurry Seal Slurry Seal Type 11 EW (ft)/PW (ft) to SE'ly 0.21 mi 0 (ft)/ 36 (ft) Avenida Atezada Camino Silvoso to Camino Idilo 0.25 (mi) 35 (ft)/ 35 (ft) Recon 35',0.511)G,0.21'RMS Desert Tortoise Area Avenida Nalago Via Real 0.22 (mi) Slurry Seal Slurry Seal Type Il Avenida Intern� Via Real 0.18 (mi) Slurry Seal Slurry Seat Type II to Chambers 0 (ft)/ 36 (ft) to N'ly 0.18 mi 0 (ft)/ 32 (ft) Avenida Miravilla Avenida San Timoteo to 1.50 mi Nly 1.50 (mi) 24 (ft)/ 24 (ft) Resurf 24' 0.17AC W/AC dike Avenida Mirola Camino Silvoso to Camino Wit() 0.25 (mi) 35 (ft)/ 35 (ft) Recon 35',0.5'DG,0.21'RMS Desert Tortoise Area Avenida Mirola Camino Camperino to N'ly End 0.25 (mi) 35 (ft)/ 35 (ft) Reconst RMS paved road Fund Source Total " 300 other Total 301 other Total 300 other Total 300 other Total 300 other Total 301 other Total 301 other Total 2 129 0 129 52 Fund Source Amount x S1000 3 0" 3 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 1 98/99 1 99/00 1 00/01 1 01/02 D1 E' i RI Cl 0; 01 0; 0' 01 0; 0; 01 0; Of 01 0 31 01 01 0 300 Measure A/Western 0 0 0 0 52 Di 0' 1' ' : 0; 0 Ei 0; 11 Oi 0' 0 111 0; 0' 0' 01 0 Cl 0' 501 01 01 0 301 Measure A/Coachella Valley 52 3 DI 0' 0; 01 0' 0 El Oi 0f 0: i 0 R1 0; 0; 01 0; 0 l 31 0, 0; 0; 0 300. Measure A/Western 3 2 E1 0; 0; 0; 0f 0 O C1 01 01 Oi 0; 0 21 Oi 0; 0; 0 300 Measure A/Western E1 01 O1 21 01 0 R1 01 01 Of Of 0 C' 01 01 126; 01 0 300 Measure A/Western D' E' i RI CI 11 01 01 0; 11 0' 01 01 0 01 01 01 O' 501 01 01 01 0 301 Measure A/Coachella Valley 5 58 Di 0' 21 01 0' El ' 1 01 1; 01 01 0 R1 01 0; 01 01 0 0 Cl 01 551 01 01 0 301 Measure A/Coachella Valley 58 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Avida Drive Pelion Rd 0.43 (mi) Slurry Seal Slurry Seal Type II to Cateno Rd 0 (ft)/ 36 (ft) Awa Cir Hunwut Dr 0.02 (mi) Slurry Seal Slurry Seal Type II Balsam St Twinflower Ave 0.20 (mi) Slurry Seal Slurry Seal Type II to Wily 0.02 mi 0 (ft)/ 36 (ft) to Trillium Dr 0 (ft)/ 36 (ft) Banning Bench Guardrail 3 locations 0.00 (mi) 0 (ft)/ 0 (ft) install guardrail HES funds approved = S60k. Coordinate with project A6-0280. Barhes Ct Oakmount Blvd 0.03 (mi) Cape Seal Slurry Seal 1 Bellegrave Ave. Harmer Ave 2.13 (mi) Reconstruct AC surface Berea Rd Samar Rd 0.42 (mi) Slurry Seal Slurry Seal Type II to'E'ly 0.08 mi 0 (ft)/ 30 (ft) to Etiwanda Ave 40 (ft)/ 40 (ft) to Newport Rd 0 (ft)/ 36 (ft) Fund Source Fund Source Amount x S1000 Page 6 May Pa 1997el Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction Total • 300 6 other 0 Total 6 300 1 other 0 Total 1 300 2 other 0 Total 2 300 5 other 41 Total. 46 301 2 other 0 Total 2 300 192 other 556 Total 748 300 6 other 0 Total 6 97/98 1 98/99 ; 99/00 1 00/01 1 01/02 D1 11' 0; 01 01 0 E; 01 0; . 0; Oi 0 R1 01 0; 0; 0; 0 Cl 5; 0; 0; 0; 0 300 Measure A/Western D; 01 01 0; 0; 0 E; 01 0; 0; 0; 0 R1 0; 01 0; 0; 0 C1 1: 0; 0: 0: 0 300 Measure A/Western D1 0; 0; 0; 0; 0 E; 01 0; 0; 0; 0 R; 01 0; 0; 0; 0 C; 21 0; 0; 0; 0 300 Measure A/Western • DI 2; 01 01 01 0 El 01 Oi 01 0: 0 R; 0; 0; 01 0; 0 Cl 3; 0; 0; 0; 0 300 Measure A/Western D1 0; 01 0: 01 0 El 01 01 01 01 0 R1 0; 0; 0; 0; 0 Cl 2i 01 01 01 0 301 Measure A/Coachella Valley D: 551 0; 0; 0; 0 El 51 01 01 01 0 R1 01 01 01 01 0 Cl 01 1321 Oi Oi 0 300 Measure A/Western D1 01 0; 0; 01 0 E; 01 0: 01 01 0 R1 01 01 01 0; 0 Cl 61 01 0: 01 0 300 Measure A/Western RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description ( comments ) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 7 May 23, 1997 Big Pine St Jeffery Pine Rd 0.20 (mi) Resurf 26',0.17'AC Billie Ann Rd Gierson Ave 0.19 (mi) Slurry Seal Slurry Seal Type II EW (ft)/PW (ft) to Silver Fir Dr 26 (ft)/ 26 (ft) to Nly 0.09 mi Sly .10 mi 0 (ft)/ 37 (ft) Blackfoot Dr Elkhorne Tr to Warner Tr 0.17 (mi) 35 (ft)/ 35 (ft) Recon 351, 0.21'AC, 0.5'AB Desert Tortoise and Fringe Toed Lizard area SB 300 cycle 8 Blueberry Lane Billie Ann Rd 0.10 (mi) Slurry Seal Slurry Seal Type Il to Ruth Ave 0 (ft)/ 33 (ft) Bohlen Rd Mitchell Rd Nly 0.50 (mi) 20 (ft)/ 26 (ft) Widen, Const 26',0.59OG,0.21'RMS w/Berns Boros Ct Oakmount Blvd 0.04 (mi) Cape Seal Slurry Seal Type I to E'ly 0.04 mi 0 (ft)/ 30 (ft) Bounty Ave' Vander VeerRd• to Windward Dr 0.51 (mi) 29 (ft)/ 29 (ft) Resurface 0.21', 29' RMS Road width varies from 20' to 40' Fund Source Total 300 other Total 300 other Total 301 other Total 300 other Total 300 other Total 301 other Total 301 other Total 103 1 0 1 53 2 Fund Source Amount x $1000 20 0 20 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 1 98/99 ; 99/00 ; 00/01 ; 01/02 0I Ef R1 Cl 01. 0; 0; 0: 0; 0; 0: 0; 300 Measure A/Western 0; 0; 0; 0; 2 Di 01 01 01 El 01 01 0; RI 0f 01 0; 0 Cl 21 • Oi 01 300 Measure A/Western 107 D; 151 0' El 51 01 RI 01 01 0 Cl 871 01 0' i 0' 0' i 0; 301 Measure A/Coachella Valley 107 1 0 1 0I E' i RI i Cl 01 0' i 01 11 01 0' i 0' 0; 300 Measure A/Western 103 D1 01 01 El 01 Oi RI 01 01 0 Cl Oi Oi 300 Measure A/Western 0' 0' i 0' i 01- 01 0' i 01 0{ 0; 01 01 0; 0' 0' 0' i 01 0: 0' -0' 0; DI 01 0' 01 01 E' 01 01 0' Oi R' C' 01 01 01 Oi 1I 01 01 01 301 Measure A/Coachella Valley • DI Oi 01 El 01 0, RI 01 01 0 C1 01 01 53 0' 01 i 0' i Oj 2' i 1; 0' 501 301 Measure A/Coachella Valley 2 1 0 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .00 S:3 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 8 11111 May 23, 1997 Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Boxwood Court Larkspur Dr 0.03 (mi) Slurry Seal Slurry Seal Type I1 to N'ty 0.03 mi 0 (ft)/ 29 (ft) Brookside Ave Cherry Ave 1.00 (mi) Resurf 30,,0.17'AC to Highland Springs Ave 30 (ft)/ 30 (ft) Bundy Canyon Rd Harvest Wy 1.93 (mi) Resurf AC paved road to Murrieta Rd 25 (ft)/ 25 (ft) Bundy Canyon Rd a Sellers Rd 0.25 (mi) 24 (ft)/ 0 (ft) Widen roadway for left turn lanes for East bound traffic Bundy Canyon Rd Oak Circle Dr 0.00 MO 24 (ft)/ 0 (ft) Widen roadway for left turn pocket for west bound traffic Bundy Canyon Rd 1-15 to The Farm 2.30 (mi) 25 (ft)/ 32 (ft) Resurf. and widen AC paved road Burke Ct Oakmount Blvd 0.03 (mi) Cape Seal Slurry Seal Type I to E'ly 0.03 mi 0 (ft)/ 30 (ft) Fund Source Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 301 other Total 97/98 1 98/99 i 99/00 ; 00/01 ; 01/02 1 D1 0; Oi 0; 0; 0 El Oi Oj 0; 0; 0 R; 0; 0; 0; 0; 0 0 Cl 1; 0; 0; 0; 0 300 Measure A/Western 1 108 D; 01 2; 0: 0; 0 El 0; 11 0; 0; 0 RI 01 0; 0; 0; 0 0 Cl 01 1051 01 0: 0 108 300 Measure A/Western 241 D; 0; 31 0; 0; 0 E; 0; 1; 0; 0; 0 R; 0; 0; 0; 0; 0 0 Cl 01 2371 01 0: 0 241 300•Measure A/Western 120 D; 0: 12: 01 01 0 E; 01 11 01 0; 0 R: 01 01 01 0: 0 0 Cl 0f 107: 0: 01 0 300 Measure A/Western 120 73 D1 0; 8 El 0l 1 al Oi 0 0 Cl 0f 64 300 Measure A/Western 0: 01 0 01 0; 0 Oj 0; 0 0; 0; 0 73 113 D; 0; 01 1101 01 0 El 01 01 3; 0: 0 R; 01 01 01 0: 0 720 Cl 0: 0: 01 01 0 833 2 0 300 Measure A/Western 2 D1 01 01 Oi 01 0 El 0: 0: 0: 01 0 R1 0f Oj 01 01 0 Ci 2i 01 01 01 0 301 Measure A/Coachella Valley • n 9 s3 " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) Burning Wood Dr Stone Canyon Dr 0.08 (mi) Slurry Seal Slurry Seal Type II RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT EW (ft)/PW (ft) Butler Bay Nevis Pl 0.10 (mi) Resurface Paved Road Cactus Flower Dr Grand Ave 0.21 (mi) Slurry Seal Slurry Seal Type II to Palm Canyon Dr 0 (ft)/ 36 (ft) to Trinity Cir 35 (ft)/ 35 (ft) to Moon Ridge Dr 0 (ft)/ 35 (ft) Cajalco Rd Various intersections 0.00 (mi) 26 (ft)/ 40 (ft) Widen and resurf 750' Ely/Wly for turn pockets Intersections a Kirkpatrick, Archer. Cajalco Rd Seaton Ave to Clark St 1.50 (mi) 28 (ft)/ 40 (ft) Widen and recon 40', 0.5'AB, 0.25'AC Cajalco Rd Various intersections 0.00 (mi) 26 (ft)/ 40 (ft) Widen and resurf 750' Ely/Wly for turn pockets Intersections 0 La Sierra and Lake Mathews. " Cajalco Rd Harley John to Clark St 3.00 (mi) 26 (ft)/ 32 (ft) Recon 0.23'AC, 0.65'AB Drainage Problem at Brown St. Fund Source Total 300 other Total 301 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total Fund Source Amount Page 9 May 23, 1997 Measure A Funds by Fiscal Year Amount x S1000 x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction- 97/98 1 98/99 1 99/00 1 00/01 1 01/02 1 01 01 Oi 01 01 0 R i 01 0f Oi 01 0- 0 R1 01 OI 01 01 0 i 11 0, 01 01 0 300 Measure A/Western 130 323 1434 1757 1 18 - DI 01 DI 0�� Ei 01 , 01 �� �� 0, 2 Ri Oi 01 1 0 Cl 01 01 01 01 15 301 Measure A/Coachella Valley 3 DI Oi 01 0; 0; El 01 0; 01 01 0 0 Ci 31 Oi 01 0: 0 300 Measure A/Western 130  DI 01 101 01 0' ElI 01 201 01 01 0 RI 01 01 OI 01 0 1 0 0 C, 01 01 1001 01 0 300 Measure A/Western 18 3 130 209 610 819 DI 641 01 01 0' " REl I 151 01 01 01 0 i 01 01 01 0' Cl 01 1301 01 01 0 300 Measure A/Western 130  DI 01 0' 101 0 El 01 0 01 1 01 2 01 R1 0 0i 0 Cli 01 01 01 100 300 Measure A/Western 0 0 0 0 D' 201 01 OI 0' El RI 01 01 01 01 0 CI 01 01 01 01 0 3031 01 01 01 0 300 Measure A/Western I RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 10 11111 Nay 23, 1997 Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Cambridge Ave 42nd Ave to Jamaica Sands Dr 0.31 (mi) 35 (ft)/ 35 (ft) Resurf 35',0.21'AC W/Petromat SB 300 Cycle 8. Camino Aventura Avenida Descanso to Bubbling Wells 0.75 (mi) 30 (ft)/ 32 (ft) Reconstruct 0.50'AB, 0.21'AC Camino Bella Avenida Nalageo 0.18 (mi) Slurry Seal Slurry Seal Type I1 Fund Source Total 301 other Total Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 198/99 199/00 100/01 101/02 50 DI 21 OI 0; 0; 0 EI 11 OI 0; 0; 0 RI OI 0; 0; 0; 0 0 CI 47I OI OI OI 0 301 Measure A/Coachella Valley 301 other Total 50 27 305 to Camino Claraboya 0 (ft)/ 32 (ft) 300 other Total 332 2 0 DI 27; OI OI OI 0 El OI OI 0; OI 0 RI OI OI OI OI 0 CI OI OI OI OI 0 301 Measure A/Coachella Valley 2 Camino Campesino Ave Descanso to Ave Florencita 0.80 (mi) 36 (ft)/ 36 (ft) Recon 36',0.5'0G,0.21'RMS Camino Claraboya Avenida Interno 0.14 (mi) Slurry Seal Slurry Seal Type II Camino Donaire Camino Claraboya 0.14 (mi) Slurry Seal Slurry Seal Type II 301 other Total DI OI OI 0; OI 0 El OI OI OI OI b RI OI OI OI OI 0 CI 21 OI OI OI 0 300 Measure A/Western 127 DI 01 0I 01 1I 0 EI Oi Oi Oi 11 0 0 CI OI OI OI 125; 0 301 Measure A/Coachella Valley 127 to Camino Bella 0 (ft)/ 32 (ft) 300 other Total to Via Real 0 (ft)/ 35 (ft) Camino Wilio Avenida Gracia to Bubbling Wells Rd 0.30 (mi) 35 (ft)/ 35 (ft) Recon 35',0.5'DG,0.21'RMS 300 other Total 2 DI OI OI OI OI 0 El OI OI OI OI 0 RI OI OI OI OI 0 0 CI 21 OI OI OI 0 300 Measure A/Western 2 2 0 301 other Total 2 67 0 DI OI OI OI OI 0 El OI OI OI OI 0 RI OI OI OI OI 0 C1 21 OI OI OI 0 300 Measure A/Western 67 DI OI 11 OI OI 0 El OI 11 OI OI 0 RI OI 10I OI OI 0 CI OI OI 551 OI 0 301 Measure A/Coachella Valley • " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) Cannon Drive Hub Cir 0.43 (mi) Slurry Seal Slurry Seal Type II Canyon Dr Idyllbrook Dr Sly 0.19 (mi) Resurf 24',0.17'AC Canyon Estates Dr Canyon Shadow Place 0.10 (mi) Slurry Seat Slurry Seal Type II Canyon Hills Rd Canyon Pines Place 0.17 (mi) Slurry Seal Slurry Seat Type II Canyon Pines Pi Knabe Rd 0.30 (mi) Slurry Seal Slurry Seal Type I1 Canyon Shadows ws Pi Canyon Estates Dr 0.05 (mi) Slurry Seal Slurry Seat Type II Captains Walk Spinnaker Wy 0.14 (mi) Resurface Paved Road EW (ft)/PW (ft) to Cloud Dance Ct 0 (ft)/ 30 (ft) 24 (ft)/ 24 (ft) to S'ly 0.10 mi 0 (ft)/ 36 (ft) to SE'ly 0 (ft)/ 36 (ft) to Stone Canyon Rd 0 (ft)/ 36" (ftl to Claystone Ave 0 (ft)/ 36 (ft) to Nallyard Dr 30 (ft)/ 30 (ft) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT 'Fund 'Fund Source Source 'Amount i x S1000 Total " 300 5 i other 0 . i Total ' 5 300 other Total 21 ' 300 1 'other 0 ;Total ' 1 300 2 iDI El RI other other 0 'C' i i Total ; 2 300 other Total 5 300 1 r , I , other 0 Total 1 301 other Total 23 Page 11 May 23, 1997 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 ' 98/99 ' 99/00 ' 00/01 ' 01/02 DI 1E1 1E1 iR1 CI 01 0' 0' 0' 0' 0' 5i ' 01 , 300 Measure A/Western 0' i .0' i 0' i 0' 21 iDI 0' 0' 0; 1E1 0' 0' 01 0 'R' Of 0' 0' i I Oi 0' 0' 300 Measure A/Western D' ' i �� 'E' 'R1 C1 Of 0' 0' 0' 0; 0' 0' 0' 0' 1' 0; 0' 300 Measure A/Western 0' 01 0, 0' 01 01 2' 0: 0' 300 Measure A/Western 5 SDI 0' 0' 01 1E1 0' 0' 0' 0 ��R�� 0' 0' Of ��C1 5' 01 01 300 Measure A/Western SDI 0' 0' 0: 1E1 0' 0' 0; Ri 0; 01 0' IC 1 0, 0' I 300 Measure A/Western 0' i 0' 0' 0' 0 0 0 0 0' 2 0' 1 0' 0 0' 18 0' 0' i 0' 0' 0' 0' i 0' 0' 0' i 0' i 0' i 0' -0' 0' 0' 0' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 Ei 001 01 Of 0' 2 01 01 01 1 0 'C' 0; Oi 0' 0' 0 i Oi 0' 0' 0' 20 301 Measure A/Coachella Valley 0;^r) 9 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT May 23, 1997 Page 1212 40 EW (ft)/PW (ft) Fund Source Total Fund Source Amount x $1000 Measure A Funds by Fiscal Year Amount x $1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 1 98/99 ; 99/00 ; 00/01 ; 01/02 Carmen Ave Broadway to Almond St 0.50 (mi) 24 (ft)/ 26 (ft) Widen, resurf 0.21'RMS Case St Mayes Ave to Grand Ave 0.30 (mi) 24 (ft)/ 26 (ft) Recon 261,0.211RMS on 0.5'DG Catano Rd Luxor Rd 0.27 (mi) Slurry Seal Slurry Seat Type I1 to Geisler 0 (ft)/ 39 (ft) Center St SP RR Xing BJ542.4 0.10 (mi) 0 (ft)/ 0 (ft) Widen RR X-ing, install x-ing gates Center St Storm Drain 0.00 (mi) 0 (ft)/ 0 (ft) This project completes the storm drain for project A2-0231 Cervera Road • Central St 0.34 (mi) Slurry Seal Slurry Seal Type II Chambers Ave Murrieta Rd 0.40 (mi) Resurf AC paved road to Pashal Pl 0 (ft)/ 41 (ft) to Bradley Rd 60 (ft)/ 60 (ft) '300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 62 0 62 DI EI RI CI 01' 01 0; 0; 0; 1 0; 1 0; 0 0; 60 300 Measure A/Western 102 D; 0; 0; 0; 1; 0 EI 0; 0; 0; 11 0 R; 01 0; 01 0; 0 0 CI 01 0; 0; 100: 0 102 5 0 300 Measure A/Western 5 76 450 DI 0; 0; 0; 0; 0 EI 01 01 01 0: 0 R; 0; Oi 0; 0; 0 • CI 5; 0; 0; 0; 0 300 Measure A/Western 526 D' EI RI C: 0; 0; 0; 101 0 Oi 01 Oi 11 0 0; 0; 0; 0; 0 01 01 01 651 0 300 Measure A/Western 8 D; 01 01 Oj 01 0 EI 01 01 01 01 0 RI 0; 01 01 0; 0 0 CI 81 0; 01 01 0 8 300 Measure A/Western 5 5 182 0 D; 0; 01 0; 01 0 EI 01 0; 01 0; 0 RI Oj 01 01 01 0 CI 5; 01 01 01 0 300 Measure A/Western 182 D; 01 01 01 7: 0 EI Oi Oi Oi 1I 0 R; 01 01 01 01 0 CI 01 01 01 01 174 300 Measure A/Western i • RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 13 May 23, 1997 Chambers Ave Sherman Rd 0.26 (mi) Slurry Seal Slurry Seal Type II Charles St Woshka Ln 0.09 (mi) Slurry Seal Slurry Seal Type II EW (ft)/PW (ft) to E'.ly 0.26 mi 0 (ft)/ 26 (ft) to Ruth Ave 0 (ft)/ 32 (ft) Cherry Mills Blvd Murrieta Blvd to Valley Blvd 0.42 (mi) 62 (ft)/ 0 (ft) Resurf 62',0.25'AC with Petromat Cherry Valley Blvd Edgar Canyon Channel 0.01 (mi) 26 (ft)/ 32 (ft) Construct Box Culvert Construct box culvert w/headwalls & wingwalls, riprap streambed & slopes a minimum of 200' upstream & downstream. Cherry Valley Blvd Calimesa CL to Beaumont Ave 3.00 (mi) 38 (ft)/ 38 (ft) Resurface 38', 0.21' AC Do not construct until electrical is underground Construct Box Culvert Construct box culvert w/headwalls & wingwalls riprap the streambed & slopes for a minin m 200' upstream & downstream Chickadee Way, Robin Dr NEIy 0.05 (mi) 26 (ft)/ 26 (ft) Resurf 26',0.17'AC Cherry Valley Blvd Noble Creek Storm Chnl 0.01 (mi) 26 (ft)/ 32 (ft) Fund Source Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 12 451 403 10 448 458 Fund Source Amount x S1000 3 0 3 1 0 1 11 157 168 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 198/99 199/00 100/01 101/02 DI 0I 01 01 0' . El m p 1 0 g 001 : 0: 0 I 0I 00 CI 3' 01 01 Oi 0 300 Measure A/Western DI 0I 01 01 0' ElI 01 01 0I 0I RI 0I 01 0I 0I C' 1I Oi 01 0: 300 Measure A/Western 0 0 0 0 DI 111 0I 01 0I 0 El Ri 0I 0: Oi 0I 0 CI Om 0' 0I Oi 0 300 Measure A/Western 403 DI 01 52' 01 01 0 Rl 01 201 0f 01 0 01 01 1 01 0 0 Ci 0I 0; 331: 01 0 300 Measure A/Western DI 101 01 01 01 ElI 01 01 01 0I 0 0 RI 01 01 0' ofI cm 0' . 01 01. 01 0 300 Measure A/Western 451 DI 01 601 Of El Oi 201 01 001 0 RI 01 01 0I 01 0 0 Cm 01 01 371E 01 0 300 Measure A/Western ' 12 DI Of 2I 01 Om RI l 00 1 CI 01 Oi 0 0 Ci Oi 91 01 01 0 300 Measure A/Western 9.' 009i RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Chiwi Cir Navut Ave 0.02 (mi) Slurry Seal Slurry Seal Type II to S'ly 0.02 mi 0 (ft)/ 33 (ft) Churchill St Hayes Ave to Nly 0.46 (mi) 24 (ft)/ 26 (ft) Recon 26',0.21'RMS on 0.5'DG Clay Canyon Dr Knabe Rd 0.58 (mi) Slurry Seal Slurry Seal Type II Claystone Ave Canyon Pines Pl 0.31 (mi) Slurry Seat Slurry Seal Type I1 Clift Top Ct Cannon Dr 0.12 (mi) Slurry Seal Slurry Seal Type II Clinton St Miles Ave 0.25 (mi) Resurface 0.21', 56' RMS to Brown Canyon Channel 0 (ft)/ 40 (ft) to N'ly 0.31 mi 0 (ft)/ 36 (ft) to E'ly 0.12 mi 0 (ft)/ 36 (ft) to Sly to CL 0 (ft)/ 0 (ft) Coordinate with City of Indio for 1/2 of project. Cloud Dance Court Hillpointe Dr - 0.11 (mi) Slurry Seal Slurry Seal Type I1 to Cannon Dr 0 (ft)/ 32 (ft) Fund Source Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 Page 14 40 May 23, 1997 D = Design R = Right of Way Acquisition E = Environmental C = Construction Total 300 1 other 0 Total 1 300 127 other 0 Total 127 300 8 other 0 Total 8 300 4 other 0 Total 4 300 2 other 0 Total 2 301 25 other 22 Total 47 300 1 other 0 Total 1 97/98 1 98/99 1 99/00 1 00/01 1 01/02 D1. E1 R1 C1 01. 01 01 11 01 01 01 01 300 Measure A/Western 01 01 01 01 01 01 01 01 0 0 0 0 D1 E1 R1 C1 01 01 01 01 01 01 01 01 01 01 01 01 300 Measure A/Western 11 0 11 0 01 0 1251 0 D1 01 01 01 E1 01 01 01 R1 01 01 01 C1 81 01 01 300.Measure A/Western 01 0 01 0 01 0 01 0 D1 01 01 01 E1 01 01 01 R1 01 01 01 C1 41 01- 01 300 Measure A/Western 01 01 i •01 01 0 0 0 0 01 01 01 01. E1 01 01 01 R1 01 .01 01 C1 21 01 01 300 Measure A/Western 01 0 i 01 0 01 0 D1 2 01 01 E1 1 01 01 R1 0 01 01 Cl 22 01 01 01 01 i 0' 01 301 Measure A/Coachella Valley 0 0 0 0 D1 01 01 01 E1 01 01 01 R1 01 01 01 Cl 11 01 01 300 Measure A/Western 01 0 01 0 01 0 01 0 • t, el o ri.jl#�!t,.,_ RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) Coffee Berry Cir. Sunrose St 0.19 (mi) Slurry Seal Slurry Seal Type 11 EW (ft)/PW (ft) to S'ly 0.19 mi 0 (ft)/ 36 (ft) Total ; 3 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT 'Fund 1Fund Source Source i Amount x S1000 Page 15 May 23, 1997 Measure A Funds by Fiscal Year ' Amount x S1000 i D = Design R = Right of Way Acquisition E a Environmental C = Construction • Total 97/98 j 98/99 ; 99/00 ; 00/01 ; 01/02 300 3 iDi 01 Oi Oi 01 0 i 1E 01 0; 0; 01 O. other 0 iC1 3; 0; 0; 0; 0 300 Measure A/Western i Compass Dr � 72nd Ave to Windlass Dr i 301 i 20 �pS pi 0' p� , 0.16 (mi) i ' 1, 0 Resurface 0.21', 33' RMS 33 (ft)/ 33 (ft) i 1E1 Oi Oi 01 11 0 other ; 0 �C1 0; 0; Of 0; 0 ' 1 01 18; 0 Total ; 20 301 Measure A/Coachella Valley Contour Ave Hansen Ave to Ely i 300 202 iDI 1; 0' 0' 0.66 (mi) 26 (ft)/ 26 (ft) i iEi 11 0; 0; 0, 0 Recon RMS paved road ' O, 0 Construct in summer when school is out. other 0 �C1 2001 01 0: Oi 0 i 300 Measure A/Western Corydon St Grand Ave to Mission Tr i 300 �— 149 �Oi 01 01 91 0' 1.56 (mi) 26 (ft)/ 26 (ft) 1E1 Oi 01 101 Oi 0 Resurf AC paved road , '1121 O, Oi 0' 0 1/2 in the City of Lake Elsinore. Pursue coop ;other ; 130 iC1 0; 0; 0, 130, 0 w/City. Funds represent full width improvements. Cotton Ct Inglewood Ave to E'l 0.02 mi i 301 j 2 iDI 11 01 01 0.02 (mi) Y Cape Seal 0 (ft)/ 32 (ft) �. igi Oi Oi Oi Oi 0 Slurry Seal Type 1 iother i 0 �R1 Oi 01 Of Oi 0 i : 11 01 01 Oi 0 Total ,' 202 300 Measure A/Western Cougar Rd Howland Rd SEIy• 300 43 i0i 01 , 01 01 2 Resurf 26',0.17'AC 26 (ft)/ 26 (ft) i ;Ei O; Oi Oj 01 1 iother i 0 'R; Oi 0, 01 Oi 0 i 1 0, 0' Oj Oi 40 Total ! 279 Country Club Dr _ Portola Ave ' to Wly 301 111 iDI 2, , 0.65 (mi) 30 (ft)/ 32 (ft) i 1E1 101 01 0, Of 0 Resurf west bound lane, 0.211AC w/petromat ; ' ' 1 Oi 01 0 South half of road in the city of Palm Desert other 0 iC1 991 0; 0j Oi 0 Pursue coop w/City. SB 300 Cycle 8. 0, 0� Oi 0 Total ; 2 301 Measure A/Coachella Valley 300 Measure A/Western Total 43 Total 111 301 Measure A/Coachella Valley 0' G. a g 3 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Pape 16 May 23, 1997 Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Fund Source Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction Total 97/98 ; 98/99 ; 99/00 ; 00/01 ; 01/02 Country Club Dr SH243 to Lake Ln 0.40 (mi) 24 (ft)/ 24 (ft) Resurf 24',0.17'AC Cutter Way Bounty Way to Beachcomber Way 0.17 (mi) 35 (ft)/ 35 (ft) Resurface 0.21', 35' RMS 300 other Total 37 DI 0; 2 E; 0; 1 Ri 0; 0 0 C; 0; 34 37 300 Measure A/Western 0: 0: 0 01 01 0 0; 0; 0 0; 0; 0 Dakota Tr Miles Ave to Arapahoe Vista 0.31 (mi) 35 (ft)/ 35 (ft) Recon 35', 0.21'AC, 0.5'AB Env concerns: Desert Tortoise area, Fringe Toed Lizard and Whitewater River. SB 300 Cycle 8. De Frain Blvd 28th Ave 1.00 (mi) Resurf 0.25' RMS 301 other Total 301 23 DI Oi Oi 21 0; 0 El Oi Oi 1i Oi 0 Ri Oi 01 01 01 0 0 C; 0; 0: 201 0: 0 301 Measure A/Coachella Valley 23 other Total 101 0 101 D; 1 E; 5 111 0 C1 95 Oi 0; 0; 0 0; 0; 01 0 01 0; 0; 0 0; 0; Oj p 301 Measure A/Coachella Valley De Frain Blvd 14th Ave 0.26 (mi) Resurface AC Paved Road to Nly 26 (ft)/ 26 (ft) 302 other Total 178 0 178 D1 01 1 0: 01 0 E; 0; 2 0; 01 0 R; 0; 0 0; 0; 0 C1 0; 175 0; • 01 0 302 Measure A/Palo Verde to I-10 34 (ft)/ 34 (ft) De Portola Rd Pauba Rd to Glen Oaks Rd 4.12 (mi) 26 (ft)/ 26 (ft) Recon and elevate road 0.50'AB, 0.21'AC Deer Foot Ln Double View Dr Sly 0.20 (mi) Resurf 24',0.17'AC 302 other Total 34 50 84 DI 201 01 0j 01 0 El 21 01 0f 0f 0 R1 01 0; 01 0; 0 C; 0; 121 0; 01 0 302 Measure A/Palo Verde 300 other 1355 D; 1351 0 0 E; 201 0 0 R1 Oi 0 0 0 C1 01 625 575 Total 1355 300 Measure A/Western 0; 0 0f 0 0: 0 01 0 24 (ft)/ 24 (ft) 300 other Total 20 0 20 D: 01 21 Oi 01 0 E: 01 1i Oi Oi 0 R1 Of 01 01 01 0 CI 01 171 01 0: 0 300 Measure A/Western " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 17 May 23, 1997 Deerskin Drive Cannon Dr 0.07 (mi) Slurry Seal Slurry Seal Type II Deerweed Circle Clay Canyon Dr 0.15 (mi) Slurry Seal Slurry Seal Type I1 Delano Dr Toll Gate Rd 0.27 (mi) " Resurf 24',0.17'AC Devine Cir Lyon Ave 0.15 (mi) Slurry Seal Slurry Seal Type II Dickenson Rd Fern Valley Rd 0.17 (mi) Resurf 24',0.17'AC Dillon Rd Worsley 1.00 (mi) Overlay with RMS Coordinate with City share of project EW (ft)/PW (ft) to Hillpointe Dr 0 (ft)/ 33 (ft) to E'ly 0.15 mi 0 (ft)/ 36 (ft) to Nly 24 (ft)/ 24 (ft) to NW'ly 0.15 mi 0 (ft)/ 40 (ft) to Glen Rd 24 (ft)/ 24 (ft) to Diablo Rd 25 (ft)/ 25 (ft) of Palm.Springs for 10% Dillon Rd 48th Ave to SH 86 0.67 (mi) 30 (ft)/ 30 (ft) Resurface 30', 0.21' AC Fund Source Total . 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 301 other Total 301 other Total 19 85 10 95 Fund Source Amount x S1000 1 0. 1 2 0 2 26 0 26 3 0 3 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 1 98/99 1 99/00 1 00/01 1 01/02 D1 E1 R1 Cl D1 E1 R' c1 01 E1 R1 c1 D' i E1 RI C1 01 01 01 11 01 01 01 01 300 Measure A/Western 01 01 0' i 21 01 01 01 01 01 01 01 01 01 01 01 01 300 Measure A/Western 01 ��1 01 01 11 01 01 01 01 01 231 01 300 Measure A/Western 01 01 01 31 01 01 01 01 01 01 01 01 300 Measure A/Western 19 DI 01 Oi 01 El 01 O1 01 R1 01 O1 01 0 Cl 01 01 01 300 Measure A/Western 01 01 01 01 01 01 01 01 01 i 01 01 01 0 0 0 0 0 0 0 0 01 2 01 1 01 0 01 16 D1 01 01 01 01 El R1 Oi 0; 01 Of 1 1 0; 01 01 01 Cl 01 01 01 Of 82 301 Measure A/Coachella Valley 81 DI 01 2 El 01 1 0 Cl 01 78 81 01 i 01 01 01 301 Measure A/Coachella Valley 0' 01 0' 01 0 0 0 0 0 0 0 0 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Name Limits Length (mi) Description (comments) Dillon Rd Palm Dr 2.50 (mi) Resurf AC paved road EW (ft)/PW (ft) Fund Source Total Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 Page 18 May 23, 1997 "Ail D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 1 98/99 ; 99/00 ; 00/01 ; 01/02 to Long Canyon Rd 50 (ft)/ 0 (ft) Dolphin Dr Vander Veer Rd to Sea View Way 0.50 (mi) 30 (ft)/ 30 (ft) Resurface 0.21', 30' RMS Dorval Ct Gifhorn Ct 0.39 (mi) Slurry Seal Slurry Seal Type II .301 other Total 25 501 526 0; 251' 0; 0; 01 0 E; 0; 01 0; 0; 0 R1 0; 0; 0; 0; 0 Cl 0; 0; 0; 0; 0 301 Measure A/Coachella Valley 301 other Total 54 0 54 D; 0; 0; 2; 0; 0 E; 0; 0; 1; 0; 0 R1 01 0; 0; 01 0 C1 01 01 511 0: 0 301 Measure A/Coachella Valley Double View Dr Middle Ridge Dr SWIy 1.66 (mi) Resurf 24',0.17'AC to W'ly 0.39 mi 0 (ft)/ 32 (ft) 300 other Total 4 D; 0; 0; 0; 0; 0 El 0; 0; 0; 0; 0 R1 01 01 01 01 0 C; 4; 0l 0l 0; 0 4 300 Measure A/Western 24 (ft)/ 24 (ft) Dowman St Broomall Ave to brand Ave 0.23 (mi) 24 (ft)/ 26 (ft) Recon 26',0.21'RMS on 0.5'OG 300 other Total 143 0 143 D' El R1 C1 01 0: 2: 0; Oi 1; 0; 0; 0; 01 01 1401 300 Measure A/Western Ebb Dr Schoal Dr to Rocky Point Dr 0.12 (mi) 30 (ft)/ 30 (ft) Resurface 0.21', 30' RMS Egan Ct Oakmount Blvd 0.04 (mi) Cape Seal Slurry Seal Type I 300 other Total 301 other Total 77 0 77 D; 0; 0; 0; 1 El 0: 0; 0: 1 R; Oi 01 01 0 Cl 0; 01 0; 75 300 Measure A/Western 0 0 0 0 14 D; 01 01 0; 11 0 El 0; 0: 01 11 0 R; Oj 01 0: 01 0 0 Cl 01 01 01 121 0 301 Measure A/Coachella Valley' • 14 to E'ly 0.04 mi 0 (ft)/ 30 (ft) 301 other Total 1 0 1 D1 0; 01 01 01 0 El 0: 01 0: 01 0 R1 01 01 01 01 0 C: 11 01 01 01 0 301 Measure A/Coachella Valley • " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 19 May 23, 1997 Ethers Blvd 1Oth Ave 1.00 (mi) Resurf 26',0.21'RMS EW (ft)/PW (ft) to Riverside Dr 26 (ft)/ 26 (ft) Ellis Ave Theda St to Post Rd 1.09 (mi) 26 (ft)/ 26 (ft) Recon 26',0.5'0G,0.21'RMS Encino Rd Fern Valley Rd Ely 0.12 (mi) Resurf 24',0.17'AC 24 (ft)/ 24 (ft) Esplanade Ave Sanderson Ave to Cawston Ave 0.46 (mi) 26 (ft)/ 26 (ft) Recon 26',0.5'0G,0.21'RMS Estate Dr Toll Gate Rd 0.12 (mi) Resurf 24',0.17'AC Fallbrook Cyn Dr Sand Canyon Circle 0.14 (mi) Slurry Seal Slurry Seal Type II Farbo Ct - . Pelion Rd 0.10 (mi) Slurry Seat Slurry Seat Type II to Meadow Dr 24 (ft)/ 24 (ft) to Stone Canyon Rd 0 (ft)/ 36 (ft) to N'ly 0 (ft)/ 32 (ft) Fund Source Total 302 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 2 1 0 1 13 152 14 252 142 Fund Source Amount x 81000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 98/99 199/00 100/01 101/02 142 DI. Of. 02 12 O, El 02 02 12 Of RI 02 02 02 02 0 C; 01 02 " 140: 02 302 Measure A/Palo Verde 0 0 0 0 252 DI 02 12 02 0: El R: D I 01 01 01 0 f �� 01 02 0 0 CI 02 2501 02 02 0 300 Measure A/Western 14 DI 02 Of 02 02 2 Ei 02 02 Oi 02 1 RI Of 0: 01 01 0 CI 02 02 Oi 02 11 300 Measure A/Western 152 DI 0; 02 12 0' 0 El 02 01 11 02 0 RIi I 0f 01 02 " 02 0 0 CI 01 02 1501 02 0 300 Measure A/Western 13  DI 02 2' 2 02 01 0 El Of 11 001 RI Of 02 OI Of 0 0 CI 01 101 02 02 0 300 Measure A/Western 2 DI 02 02 Of Of ElI 02 02 Of Of 0 RI Of 01 Of Of 0 I 0 0 CI 21 0i 02 Of 0 300 Measure A/Western DI EI R' CI Of Of 02 ' 0 Oi 01 Of 0i 0 01 Of Of 0i 0 1: 02 Of 02 0 300 Measure A/Western 0 0��,.., ' T RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) February Drive Somerdale St 0.23 (mi) Slurry Seal Slurry Seal Type II to March Wy 0 (ft)/.36 (ft) Flamingo Dr Vander Veer Rd to Harbor 0.43 (mi) 40 (ft)/ 40 (ft) Resurface 0.21', 40' RMS Fore Dr New Chicago Ave NEIy 0.17 (mi) Resurf 261,0.21'AC SB 300 cycle 7 Forest Dr Fern Valley Rd SEIy 0.24 (mi) Resurf 24',0.17'AC Four Chimneys Rd Delano Dr 0.10 (mi) Resurf 24',0.17'AC SB 300 cycle 8 26 (ft)/ 26 (ft) 24 (ft)/ 24 (ft) Four Seasons Rd April Dr 0.03 (mi) Slurry Seal Slurry Seal Type 11 Frederick St - Momat Ave 0.50 (mi) Slurry Seal Slurry Seal Type II to Wly 24 (ft)/ 24 (ft) to Indiana Ave 0 (ft)/ 36 (ft) to S'ly 0.50 mi 0 (ft)/ 37 (ft) Fund Source Furl Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 Page 20 May 23, 1997 11111 0 = Design R = Right of Way Acquisition E = Environmental C = Construction Total 300 3 other 0 Total 3 301 58 other 0 Total 58 300 19 other 0 Total 19 300 26 other 0 Total 26 300 13 other 0 Total 13 300 1 other 0 Total 1 300 6 other 0 Total 6 97/98 ; 98/99 ; 99/00 ; 00/01 ; 01/02 D;• 01. 0; 0; 0; 0 E; 0; 0; 0; 0; 0 R 1 0; 0; 0; 0; 0 C; 3; 0; 0; 0; 0 300 Measure A/Western D1 Oi 0: 2: 0; 0 E; 0; 0; 1; 01 0 R; ' 01 01 0; 0; 0 CI 01 01 551 0; 0 301 Measure A/Coachella Valley D i 1; 0; 0; 0; 0 El Oi 0; 0; 0; 0 R; 0; 0; 0; 0; 0 C; 18: Oi 0; 0; 0 300 Measure A/Western D' El R1 C1 0; 0; 0; 0: 2 01 01 0; 0; 1 0; 0; 0; 0; O. 0; 0; 0; 0; 23 300 Measure A/Western D1 2; 01 0; 0; 0 El 11 01 01 01 0 R; Oj 01 01 01 0 C1 101 .• 0; 01 01 0 300 Measure A/Western D; 0; 01 0; 0: 0 E; 0: 0: Oi 01 0 R; 01 0; 01 01 0 CI 11 01 01 01 0 300 Measure A/Western D; 11 01 01 0: 0 El 01 01 0; 01 0 R; 01 01 01 01 0 C; 5; 0; 01 01 0 300 Measure A/Western fv993 • " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 21 May 23, 1997 EW (ft)/PW (ft) Frontage Rd Surfas Club Dr to Corona CL 0.46 (mi) 32 (ft)/ 32 (ft) Resurf 32',0.21'AC Co-op project w/City of Corona Gabbert Ln Fillmore St 0.05 (mi) Slurry Seal Slurry Seat Type II " Gatu Ct Navut Ave 0.05 (mi) Slurry Seal Slurry Seal Type Il Gavilan Rd Lake Mathews Dr 1.50 (mi) Reconst paved road Geisler Road Catano Rd 0.06 (mi) Slurry Seal Slurry Seal Type II Gierson Ave Wanki Ave 0.45 (mi) Slurry Seal Slurry Seal Type II Gifhorn Ct. Harzburg Rd 0.27 (mi) Slurry Seal Slurry Seal Type II to Shugart Wy 0 (ft)/ 40 (ft) to N'ly 0.05 mi 0 (ft)/ 34 (ft) to N'ly 1.5 mi 20 (ft)/ 0 (ft) to Avida Dr 0 (ft)/ 39 (ft) to Wily 0.26 mi 0 (ft)/ 39 (ft) to N'ly 0 (ft)/ 35 (ft) Fund Source Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 5 5 475 1 0 1 Fund Source Amount x 81000 177 0 177 1 0 1 1 0 1 Measure A Funds by Fiscal Year Amount x 81000 D = Design R = Right of Way Acquisition E = Environmental C = Construction. 97/98 98/99 ; 99/00 ; 00/01 ; 01/02 0; 2 E{ 0 R1 0 C1 175 0; 0: 01 0 0; 01 01 0 Oj Oi 01 0 01 0; 0; 0 300 Measure A/Western D1 01 0: 0: 0, E1 01 01 0: 01 0 R1 01 01 01 Oi 0 C1 11 01 Oi 01 0 300 Measure A/Western D1 Oi Oi Oi Oj 0 R; 0; 01 0' 01 0 C1 11 Oi Oi 01 0 300 Measure A/Western 475 D: 01 0, E01 01 50 l 0, 01 R1 01 01 01 01 0 1 5 0 C1 0' 0: Oi 01 420 300 Measure A/Western DI 01 0; Oi 01 .0 Ei 01 Oj Oi 01 0 RI C I 0; 0; 01 01 0 ' : 01 01 0 300 Measure A/Western " 5 El Oi 01 01 0; 0 0 C1 5: 01 Oi 01 0 300 Measure A/Western 5 D1 0: 0; 01 i 0 Rl 01 01 01 Oi 0 01 01 0 0 C1 5: 01 0: 01 0 300 Measure A/Western 0Q 0����:�� RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Gilman Springs Rd SE'ly Jack Rabbit Tr to NW'ly Bridge St 1.80 (mi) 26 (ft)/ 32 (ft) Reconst and widen AC Paved Road Coordinate w/project A2-0433 in Supv. Dist. 3. Gilman Springs Rd SE'ly Bridge St 1.00 (mi) Reconst AC Paved Rd Fund Source Total Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 Page 22 May 23, 1997 11111 0 = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 198/99 199/00 100/01 101/02 300 other Total 490 DI 30I 301 0; 0; 0 El 51 0; 0; 0; 0- RI 141 OI OI 0; 0 1827 CI 0; 4111 0; 0; 0 2317 300 Measure A/Western Glenoaks Rd Rancho California Rd 2.76 (mi) Resurf 26',0.21'AC Golden Hill Ct Cannon Dr 0.10 (mi) Slurry Seat Slurry Seat Type II Goldfield Street Trillium Dr 0.02 (mi) Slurry Seal Slurry Seal Type II Grand Ave Hill Pointe Or 0.22 (mi) Slurry Seal Slurry Seat Type II to SE'ly 26 (ft)/ 32 (ft) 300 other Total ' 105 1217 1322 DI OI 0; 0; 801 15 EI OI OI OI 101 0 RI OI OI OI OI 0 CI OI OI OI OI 0 300 Measure A/Western to Ely 26 (ft)/ 26 (ft) 300 other Total 354 DI OI OI OI OI 3 El OI OI OI OI 1 RI OI OI OI OI 0 0 CI OI OI OI OI 350 354 300 Measure A/Western to Ply 0.11 mi 0 (ft)/ 36 (ft) 300 other Total 1 0 1 DI oI oI oI oI 0 EI OI OI OI OI 0 RI OI OI OI OI 0 C1 1i Oi OI OI 0 300 Measure A/Western to Nil), 0.02 mi 0 (ft)/ 36 (ft) 300 other Total 1 0 1 DI OI OI OI OI 0 El OI OI OI OI 0 RI OI OI OI 01 0 C1 11 OI OI OI 0 300 Measure A/Western to Antelope Rd 0 (ft)/ 26 (ft) Granda Way Costa Mesa Or to Beach Comber Way 0.16 (mi) 35 (ft)/ 35 (ft) Resurface 0.21', 35' RMS 300 other Total 2 DI OI OI OI OI 0 El OI OI OI OI 0 RI OI OI OI OI 0 '0 CI 21 OI OI OI 0 300 Measure A/Western 2 301 other Total 22 DI OI OI 1I OI 0 El OI OI 11 OI 0 RI oI oI oI oI 0 0 CI OI OI 20I OI 0 301 Measure A/Coachella Valley 22 0l0z0) " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 23 May 23, 1997 Gretna Rd Park City Ave 0.06 (mi) Slurry Seal Slurry Seal Type II EW (ft)/PW (ft) Hallyard Dr Regatta Dr 0.23 (mi) Resurface Paved Road to Avida Dr 0 (ft)/ 39 (ft) to Sly Regaata Dr 0.23 mi 30 (ft)/ 30 (ft) Hansen Ave 10th St to Montgomery Ave 1.00 (mi) 26 (ft)/ 26 (ft) Recon 26',0.5'DG,0.21'RMS w/berms Harzburg Rd Gifhorn Ct 0.10 (mi) Slurry Seal Slurry Seal Type I1 to Wily 0 (ft)/ 36 (ft) Helen Ave Clinton Ave to Wly 0.4 mi 0.40 (mi) 35 (ft)/ 35 (ft) Resurface 0.21', 35' RMS Helm Cir�� Beacon Dr 0.30 (mi) Resurface Paved Road Hillpointe pr McCall Blvd 0.25 (mi) Slurry Seal Slurry Seal Type II to Wily Beacon Dr 0.3 mi 30 (ft)/ 30 (ft) to Grand Ave 0 (ft)/ 36 (ft) Fund Source Total " 300 other Total 301 other Total 300 other Total 300 other Total 301 other Total. 301 other Total. 300 other Total 203 1 0 1 50 0 50 7 0 Fund Source Amount x S1000 1 0. 1 34 0 34 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 i 98/99 ; 99/00 ; 00/01 ; 01/02 DI El R Cl Oi 01 0: Oj 0; Oi 01 0; 01 1; 0; 01 300 Measure A/Western 0; 0: 0; 0; 0 0 0 0 D1 01 01 0; 0; El 0: 0; 01 0; 2 R1 0; 0; 01 0: 1 1 Cl 0' 0; Oi 0f 31 301 Measure A/Coachella Valley 203  01 0f Of E; 01 01 0 Cl 0; 0; 300.Measure A/Western 0' m 0' 0' m 0; D1 0; 01 01 El 0; 0; 0; Rm 0; 01 01 Cl 11 01 01 300 Measure A/Western DI El Rj Cl D1 El Rm m Cl 2; 11 0' 200; 0' m 0' m 0 01 01 Oi 01 2m Oj Of 01 11 Om 01 01 Or 0' Of 0; 47: 0 0 0 0 0 0 0 0 0 0 0 0 301 Measure A/Coachella Valley Oi Om 01 Oi 2 0, 0: 0; 01 Oi Om 01 Of 0 Or Oj Oi 01 4 301 Measure A/Coachella Valley' 7 3 0 3 01 El R1 Cl 0; 01 0f 3; 0; 01 01 Of 300 Measure A/Western 01 01 0' r -01 01 0 01 0 01 0 01 0 G (,) 01 I. RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Hobsonway 3.0 mi west of SH78 to westerly 1.0 mi 1.00 (mi) 30 (ft)/ 30 (ft) Resurface 30,, 0.21' RMS Holland Rd Bradley Rd to Murrieta Rd 1.00 (mi) 24 (ft)/ 26 (ft) Const 26, wide RMS road Hot Springs Rd Stone Canyon Rd 0.20 (mi) Slurry Seat Slurry Seal Type II Hoylake Rd Oakmount Blvd 0.28 (mi) Cape Seal Slurry Seal Type I to Burning Wood Dr 0 (ft)/ 36 (ft) Nub Cir Cannon Dr 0.10 (mi) Slurry Seal Slurry Seal Type II Hunwut Dr Cevere Dr 0.24 (mi) Slurry Seal Slurry Seal Type II Idylibrook Dr Canyon Dr 0.69 (mi) Resurf 24',0.17'AC SB 300 cycle 8 to Oakmount Blvd 0 (ft)/ 33 (ft) to'E'ly 0.10 mi 0 (ft)/ 28 (ft) to N'ly 0.24 mi 0 (ft)/ 33 (ft) to NEIy 24 (ft)/ 24 (ft) Fund Source Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 Page 24 May 23, 199111/1 7 D = Design R = Right of Way Acquisition E = Environmental C = Construction Total ' 302 180 other 0 Total 180 300 217 other 0 Total 217 300 3 other 0 Total 3 301 2 other 0 Total 2 300 1 other 0 Total 1 300 3 other 0 Total 3 300 66 other 0 Total 66 97/98 198/99 199/00 100/01 101/02 DI 2IOI 0; OI 0 El 21 0; 0; 0; 0 RI OI 0; 0; OI 0 CI 1761 Oi Oi OI 0 302 Measure A/Palo Verde DI OI 0; 0; 0; 10 El OI 0; 0; 0; 2 RI OI 0; 0; 0; 0 CI OI 0; 0; OI 205 300 Measure A/Western DI 0; 0; Of 0; 0 El OI 0; 0; OI 0 RI 0; 0; OI 0; O. CI 31 OI OI 0; 0 300 Measure A/Western DI i E' RI CI 1I OI OI OI 0 OI 0; 0; 0; 0 0; OI 0; OI 0 11 0; 0; 0; 0 301 Measure A/Coachella Valley DI OI OI OI OI 0 El Of OI OI 0; 0 RI 0; 0; OI OI 0 Cl 11 OI OI OI 0 300 Measure A/Western DI OI OI 0; 0; 0 El OI OI OI OI 0 RI OI OI OI OI 0 CI 3I OI OI OI 0 300 Measure A/Western DI 2 OI OI OI 0 El 1 OI OI 0' 0 RI 0 OI OI OI 0 Cl 63 OI OI OI 0 300 Measure A/Western • • i� �L '1:1.:. " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 25 May 23, 1997 Idyllmont Rd Apela Dr 0.38 (mi) Resurf 24i3O.171AC SB 300 cycle 8 Inglewood Ave Noylake Rd 0.15 (mi) Cape Seal Slurry Seal Type I EW (ft)/PW (ft) to Suly 24 (ft)/'24 (ft) January Court March Wy 0.31 (mi) Slurry Seal Slurry Seal Type II Jasmine Ave Frederick St 0.05 (mi) Slurry Seal Slurry Seal Type II John Muir Rd Fern Valley Rd 0.27 (mi) Resurf 24i3O.171AC July Drive June Ct 0.13 (mi) Slurry Seat Slurry Seal Type II June Court April Dr 0.12 (mi) Slurry Seal Slurry Seal Type II to Leith Ave 0 (ft)/ 30 (ft) to Wily 0.31 mi 0 (ft)/ 36 (ft) to Balsam St 0 (ft)/ 36 (ft) to Seneca Dr 24 (ft)/ 24 (ft) to August Circle 0 (ft)/ 36 (ft) to Slly 0.12 mi 0 (ft)/ 36 (ft) Fund Source Total 300 other Total 301 other Total 300 other Total 300 other Total 300 Other Total 300 other Total 300 other Total Fund Source Amount x S1000 38 0 38 2 0 2 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 01 E' i R; Cl D1 El R' i CI 97/98 ; 98/99 99/00 ; 00/01 ; 01/02 2; 1' i 0' 35 0; 0' 0' i 0; 300 Measure A/Western 1; 0' i 0' 11 0; 0' i 0' 0; 0; Oj 0; 0; 0; 0; 0' 01 301 Measure A/Coachella Valley 5 Di 01 El 01 01 0; 0 Ci 51 5 1 0 1 30 0 30 2 0 2 2 0 2 D' E' RI C1 DI E' i R1 C1 DI El R' i C1 D1 E' Rf C1 0; 0' i 0' i 0; 300 Measure A/Western 300 Measure A/Western 300 Measure A/Western 01 0' i 01 21 01 01 0' 0j 300 Measure A/Western 01 0' i 0' 2; o; 01 01 0; 300 Measure A/Western 0; 0' i 0; 0 0' i 0' i 0' 0; 0; 0; 0' i 0; 0' 0; 0' i 0; 0; 0; 0' 0; 0' 0' 0; 0; 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 Oi 2 Oj Oi 1 01 91 0 0l Oi 27 0; 0; 01 01 0f 0' i 0' i 01 01 0' i 0' 01 0 0 0 0 01 0 0; 0 01 0 0, 0 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description ( comments ) Page 26 May 23, 1997 al RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT EW (ft)/PW (ft) Juniper Fats Rd Juniper Springs to Sly 1.61 (mi) 22 (ft)/ 26 (ft) Recon 26',0.5'0G,0.21'RMS W/Berms Jura Ct Melitta Rd 0.16 (mi) Slurry Seal Slurry Seat Type II to NE'ly 0.16 mi 0 (ft)/ 35 (ft) Jurupa Rd Etiwanda Ave to Van Buren Blvd 3.28 (mi) 26 (ft)/ 32 (ft) Resurf and widen AC paved road Killen Tr 3 locations 0.25 (mi) Slope stabilization Killen Tr Guardrail 0 (ft)/ 0 (ft) 0.00 (mi) 0 (ft)/ 0 (ft) install guardrail HES funds Approved = 107k. Coordinate with project A6-0279. Kish Cir Temet St 0.04 (mi) Slurry Seal Slurry Seal Type I1 to N'ly 0.04 mi 0 (ft)/ 34 (ft) Knabe Rd N'ly 0.29 mi Hunt Rd to Clay Canyon Dr 0.41 (mi) 0 (ft)/ 37 (ft) Slurry Seal Slurry Seal Type II Fund Source Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction Total 300 202 other 0 Total 202 300 2 other 0 Total 2 300 163 other 0 Total 163 300 59 other 255 Total 314 300 7 other 69 Total 76 300 1 other 0 Total 1 300 7 other 0 Total 7 97/98 198/99 ; 99/00 100/01 101/02 DI 01 02 02 02 1 El 02 02 02 02 1 RI 02 02 02 02 0 CI 02 02 02 02 200 300 Measure A/Western DI 02 02 02 02 0 El 02 02 02 02 0 RI 02 02 02 02 0 CI 22 of of of 0 300 Measure A/Western DI 02 02 02 02 160 El 02 02 02 02 3 RI ' 02 02 02 02 0 CI 02 02 02 02 0 300 Measure A/Western DI El R' CI 42 02 02 02 0 02 02 02 02 0 02 02 02 • 02 0 551 02 02 02 0 300 Measure A/Western DI 32 02 02 02 0 El 02 02 02 02 0 RI 02 . 02 02 02 0 CI 42 02 02 02 0 300 Measure A/Western DI 02 02 02 02 0 EI . 02 02 02 02 0 RI 02 02 02 02 0 CI 1i 02 02 02 0 300 Measure A/Western DI 11 Oi 02 02 0 El 02 02 02 02 0 RI 02 02 02 02 0 CI 62 02 02 02 0 300 Measure A/Western n " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 27 May 23, 1997 Kolo Cir Woshka Ln 0.04 (mi) Slurry Seal Slurry Seal Type II Kuka Cir Woshka Ln 0.05 (mi) Slurry Seal Slurry Seal Type II Kuna Ct Atupa Ave 0.04 (mi) Slurry Seal Slurry Seal Type II Kure Ct Farbo Ct 0.05 (mi) Slurry Seal Slurry Seal Type II EW (ft)/PW (ft) to N'ly 0.04 mi 0 (ft)/ 33 (ft) to W'ly 0.05 mi 0 (ft)/ 33 (ft) to N'ly 0.04 mi 0 (ft)/ 33 (ft) to Wily End 0 (ft)/ 32 (ft) La Casa Way Schooner Way to Cutter Way 0.11 (mi) 35 (ft)/ 35 (ft) Resurface 0.21', 35' RMS Lake In Idyllbrook Dr 0.22 (mi) Resurf 24',0.17'AC to Marian View Dr 24 (ft)/ 24 (ft) Lake Mathews Dr Gavilan Rd to Wly 1.25 Mi. 1.25 (mi) 26 (ft)/ 26 (ft) Recon 26',0.21'RMS on 0.72'A8 Fund Source Total 300 other Total 300 other Total 300- other Total 300 other Total 301 other Total 300 other Total 300 other Total 550 25 Fund Source Amount x $1000 1 1 1 0 1 1 0 1 1 0 1 15 0 Measure A Funds by Fiscal Year Amount x $1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 01 E; R Cl 97/98 1 98/99 ; 99/00 ; 00/01 ; 01/02 Oi 0{ 0; 1; 0; 0; 0; 0; 300 Measure A/Western 0; 0; 0; 0; D' 01 0; 0' E; 01 0; 0 R; 0; 0; 0; Cl 11 01 0; 300 Measure A/Western DI El RI C( D' i E' i RI Cl D; E' R' i Cl 0; 0; 0; 1; 0; 0; 0; 0; 300 Measure A/Western 0; 0; 01 0; 0; 0; 0; 0; 0 0 0 0 0; 0 Of 0 0; 0 01 0 0; 0; 0; 0; 01 0; 01 01 01 01 01 0' 0; 01 0; 0; 1; 0; 01 Of 300 Measure A/Western 0; 0' 0' 0; 01 0' i 01 01 11 1' i 0' 131 301 Measure A/Coachella Valley 15 " 25 D1 0{ 0' El 01 0; RI 01 01 0 Cl 01 01 300 Measure A/Western 0; 0' i 01 01 550 DI 0; 48' 1 El 01 11 001 R' Of 01 176' 0 Cl 01 01 01 300 Measure A/Western 0' 01 0' 01 0 0 0 0 0 0 0 0 .0 0 0 0 01 0' i 01 3251 0 0 0 0 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL TEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 28 May 23, 1997 Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Lake Mathews Dr 1.25 Mi Wly Gavilan Rd to 2.25 Mi Wly Gavilan Rd 1.00 (mi) 26 (ft)/ 26 (ft) Recon 26,,0.21'RMS on 0.72,AB Lake St Acacia Ave 1.00 (mi) Resurf AC paved road Fund Source Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction Total 97/98 ; 98/99 j 99/00 ; 00/01 1 01/02 300 other Total 347 D1 0; 32: 0; 0; 0 El 01 1; 0; 0; 0 R1 0; 0; 0; 0; 0 0 C1 0; 0; 3141 Oj 0 347 300 Measure A/Western to Stetson Ave 21 (ft)/ 26 (ft) Lakeside Ct Fairway Rd to Nly 0.07 (mi) 35 (ft)/ 35 (ft) Resurf 35',0.21'AC Petromat Lakeview Ave Ramona Expressway 3.05 (mi) Resurf 30', 0.25' AC 300 other " 11 0 Total 11 01 0; 0; 0; 0; 10 E; 01 0; 0; 0; 1 R; 0; 0; 0; 0; 0 C1 01 01 01 01 0 300 Measure A/Western 301 other Total 18 0 18 bi 21 Oi Oi Oi 0 El 1; 01 01 0: .0 R; 01 0; 0; 0; 0 C; 151 0; 01 0; 0 301 Measure A/Coachella Valley to Nuevo Rd 30 (ft)/ 30 (ft) Verify overlay thickness prior to construction Lambert Dr Moulton Dr 0.13 (mi) Slurry Seal Slurry Seal Type I1 Larkspur Dr Trillium Dr 0.23 (mi) Slurry Seal Slurry Seal Type II 300 other 114 D: 01 201 01 0: 0 E; 0; 2; 0; 0; 0 Ri 01 01 01 01 0 442 Ci Oi Oi 921 01 0 300 Measure A/Western Total 556 to Watte Ave 0 (ft)/ 24 (ft) 300 other Total 1 0 1 D; 01 01 0: 01 0 El 01 0; 01 01 O R; 0; 0; 01 01 0 C1 11 Oi 01 0: 0 300 Measure A/Western to Twinflower Ave 0 (ft)/ 36 (ft) Laura Dr Boca Chica Tr to Broadmoor Dr 0.42 (mi) 33 (ft)/ 33 (ft) Resurf 33',0.21 AC Petromat 300 other Total 3 DI 01 01 01 01 0 El 01 0; 0; 01 0 RI 01 01 Oj 01 0 0 CI 31 01 01 01 0 300 Measure A/Western 3 301 other 73 0 Total 73 Oi 2 01 01 01 0 El 1 0: 01 01 0 R; 0 01 01 01 0 Ci 70 Oj 01 0: 0 301 Measure A/Coachella Valley • " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 29 May 23, 1997 Lazy Creek Rd Murrieta Rd 0.15 (mi) Slurry Seal Slurry Seal Type II EW (ft)/PW (ft) to Whom Ct 0 (ft)/ 40 (ft) Leeward Dr 72nd Ave to Sly 0.34 mi 0.34 (mi) 30 (ft)/ 30 (ft) Resurface 0.21', 30' RMS Leith Ave Oakmount Blvd 0.09 (mi) .Cape Seal Slurry Seal Type I to Little Morongo Rd 0 (ft)/ 30 (ft) Leon Rd (3 segments) Benton Rd to Keller Rd to Olive Rd to Simpson Rd 5.10 (mi) 0 (ft)/ 32 (ft) Construct 32' AC paved road on 40' graded Third segment Scott Rd to Holland Rd. CMAO funds app'd = S2,282,950. Leonard Ct Oakmount Blvd 0.04 (mi) Cape Seal Slurry Seal Type I to Ply 0.40 mi 0 (ft)/ 30 (ft) Limonite Ave Etiwanda Ave to I-15 1.25 (mi) 48 (ft)/ 48 (ft) Resurf 0.21'AC, grind Exist R/W is 85-160 ft. Limonite Ave Etiwanda Ave to Beach St 1..65 (mi) 40 (ft)/ 40 (ft) Resurface 40', 0.17' AC w/Fabric Fund Source Total . 300 other Total 301 other Total 301 other Total 300 other Total 301 other Total 300 other Total 300 other Total Fund Source Amount x S1000 2 0. 2 38 0 38 2 0 2 524 1816 2340 Measure A Funds by Fiscal Year Amount x S1000 0 = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 ; 98/99 ; 99/00 ; 00/01 ; 01/02 DI Ef R' C; 01 0; 01 01 0; 0f 2; 0; 300 Measure A/Western 0; 0' i 0' i 0; 0; 0' i 0' 0; 0 0 0 0 D; 0: 01 0: 0, El 01 01 0; 0f 2 R, 01 01 0: 01 1 C1 0' 01 Oi 0: 35 301 Measure A/Coachella Valley DI 11 0: 0: 01 Ri 01 01 01 01 0 01 01 0f 01 C: 1: 01 0: Of 00 301 Measure A/Coachella Valley D' E' i R' i C1 991 30 201 0 Oi 0 0; 375 300 Measure A/Western 01 0-- ; 0 01 Oi 0 Oj Oi 0 01 Oi 0 1 E1 p0 i 01 01 Oi 0 01 01 0 0RI CI 101 " 001 0; Oi 0 i 01 01 0 301 Measure A/Coachella Valley 62 Di 0' 01 Oi 20' El Oi 01 01 21R1 01 01 01 01 0 0 194 C1 Oi 01 01 01 40 300 Measure A/Western 1 256 97 435 532 DI 8i 0l O; 0' El Rl 01 Of 01 01 0 Ci 01 01 Oi 01 0 i 89; 01 01 0; 0 300 Measure A/Western RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 30 May 23, 1997 Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Lindenberger Rd Newport Rd to Simpson Rd 1.52 (mi) 26 (ft)/ 26 (ft) Recon 26',0.5'0G,0.21'RMS Lindsay Ave 25th Ave 0.20 (mi) Resurf 0.21'AC Fund Source Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 0 = Design R = Right of Way Acquisition E = Environmental C = Construction Total 97/98 1 98/99 1 99/00 ; 00/01 ; 01/02 .300 other Total 235 0 235 0; 01 ' 31 0; 0; 0 E1 01 2; 0; 0; 0 R: 01 0; • 0; 0; 0 C1 0; 230: 0; 0; 0 300 Measure A/Western Little Ct Inglewood Ave 0.02 (mi) Cape Seal Slurry Seal Type I to Warmington 28 (ft)/ 26 (ft) 302 other 85 D1 0; 21 0; 0; 0 E1 0; 2; 0; 0; 0 R� Oi 01 Oi 0; 0 0 C1 Oi 811 0; 0; 0 Total 85 302 Measure A/Palo Verde Live Oak Canyon Rd San Timoteo Cyn Rd 2.15 (mi) Resurf AC paved road Lodge Rd San Jacinto Rd 0.28 (mi) Resurf 24',0.17'AC to Ply 0.02 mi 0 (ft)/ 30 (ft) 301 other Total 0 1 D; 0; 0; 0; 0; 0 E; 0; 0; 0; 0; 0 R; 0; 01 0; 0; 0 C1 11 0: 0; 01 0 301 Measure A/Coachella Valley to S.B. County Line 24 (ft)/ 26 (ft) 300 other Total 240 0 240 D' E' R: C; 01 01 01 10; 0 0; 0; Oi 21 0 0; 01 0; 0; 0 Oi Oi Oi 2281 0 300 Measure A/Western Lookout Dr Vanderveer Rd 0.45 (mi) Resurface Paved Road to•Dickenson Rd 24 (ft)/ 24 (ft) 300 other Total 31 0 31 D; 01 01 01 01 2 El 01 01 01 01 1 Ill 01 01 01 0: 0 C1 01 01 0; 0; 28 300 Measure A/Western to Seaview Wy 40 (ft)/ 40 (ft) Los Caballos Pauba Ave to SN79 1.34 (mi) 24 (ft)/ 26 (ft) Recon 261,0.21'RMS on 0.5'DG 301 other Total 80 0 80 D1 01 01 0; 01 2 E; 0; 01 01 01 1 Ill 0f 01 01 Oj 0 C1 01 01 01 01 77 301 Measure A/Coachella Valley 300 other Total 202 D; 0; 0; 01 11 0 El 0: 01 01 11 0 RI 0: 01 0; 01 0 0 C; 01 Oj 0: 2001 0 300 Measure A/Western 202 • • �► j 103 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 31 May 23, 1997 Lovekin (South) 23rd Ave 2.00 (mi) Resurf AC paved road Luxor Rd Park City Ave 0.11 (mi) Slurry Seal Slurry Seal Type II Lyon Ave Victoria Ave 0.26 (mi) Slurry Seat Slurry Seal Type II Malaga Rd Mission Tr 0.35 (mi) Resurf 26',0.17'AC March Way Somerdale St 0.36 (mi) Slurry Seal Slurry Seal Type II Marian View Dr SH243 Wly 0.40 (mi) Resurf 24',0.17'AC EW (ft)/PW (ft) to 28th Ave 26 (ft)/ 28 (ft) to Catano Rd 0 (ft)/ 39 (ft) to Dufferin Ave 0 (ft)/ 22 (ft) to Ely 26 (ft)/ 26 (ft) to Wily 0.36 mi 0 (ft)/ 36 (ft) 24 (ft)/ 24 (ft) Markham St - Day St 1.02 •• to Seaton St (mi) 24 (ft)/ 32 (ft) Widen and recon 32', 1.0'AB, 0.25 RMS, grade 40' Fund Source Total 302 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 40 2 2 515 Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 1 98/99 1 99/00 1 00/01 1 01/02 35 — DI 301 01 01 0, El 51 01 01 01 480 R, 0, 01 01 0, CI 01 01 01 OI 302 Measure A/Palo Verde 2 01 01 01 01 0: El 01 01 01 0 R, 01 01 0' 0' 0 CI 21 01 01 01 300 Measure A/Western 0 0 0 0 0 0 0 0 2 01 01 01 0I 01 Ei 01 01 01 01 0 0 CI 21 Oi 01 01 0 300 Measure A/Western 40 DI 0' 0i 01 01 2 1 0, 0' 0 C1 01 01 Oi. 01 37 300 Measure A/Western 6 D' 01 01 01 01 RI l 01 01 01 01 0 01 0 0 CI 61 01 011 01 01 0 300 Measure A/Western 6 42 — D' 01 01 01 0' El RI 01 Of1 01 01 01 1 01 01 0 0 CI 01 01 01 01 39 300 Measure A/Western 42 190 0 190 DI EI R' i CI 01 11 01 01 0 01 �1 01 01 0 01 01 01 0' 01 1871 01 01 0 300 Measure A/Western Z r1; RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Mauna Loa Dr Mojave Nly 0.31 (mi) Recon 321,0.5q4,0.21'RMS 32 (ft)/ 32 (ft) May Court Four Season Rd 0.07 (mi) Slurry Seal Slurry Seal Type II Mayberry Ave Columbia St 0.50 (mi) Recon AC paved road to E'ly 0.07 mi 0 (ft)/ 36 (ft) Mc Call Blvd Sun City Blvd 1.14 (mi) Resurf 72', 0.25' AC to Dartmouth St 40 (ft)/ 0 (ft) to Valley Blvd 72 (ft)/ 0 (ft) McAllister St Riverside CL 1.00 (mi) Realign and recon McKinney Ln Canyon Dr Wly 0.13 (mi) Resurf 26',0.17'AC Meadow Dr Idyllbrook Dr 0.15 (mi) Resurf 24',0.17'AC S8 300 cycle 8 to Sly 26 (ft)/ 30 (ft) 26 (ft)/ 26 (ft) to Estate Dr 24 (ft)/ 24 (ft) Fund Source Fund Source Amount x S1000 Page 32 1110 May 23, 1997 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction Total 301 78 other 0 Total 78 300 1 other 0 Total 1 300 52 other 219 Total 271 300 38 other 360 Total 398 300 550 other 0 Total 550 300 17 other 0 Total 17 300 17 other 0 Total 17 97/98 1 98/99 1 99/00 1 00/01 1 01/02 D1 01 01 01 01 2 E 1 01 01 01 01 1 R1 01 01 01 01 0 C1 01 01 01 01 75 301 Measure A/Coachella Valley D1 01 01 01 01 0 E1 01 01 01 01 0 R1 01 01 01 01 0 C1 11 . 01 01 01 0 300 Measure A/Western D1 01 01 501 01 0 E1 01 01 21 01 0 R1 01 01 01 01 0 C1 01 01 01 01 0 300 Measure A/Western D' E1 R' c1 01 351 01 01 0 01 11 01 01 0 01 01 01 01 0 01 21 01 01 0 300 Measure A/Western D1 01 01 601 01 0 E1 01 01 501 01 0 R1 01 01 01 1001 0 C1 01 • 01 01 01 340 300 Measure A/Western D1 01 21 01 01 0 E1 . 01 11 01 01 0 R1 01 01 01 01 0 C1 01 141 - 01 01 0 300 Measure A/Western DI 21 01 01 01 0 El 11 01 01 01 0 RI 01 01 01 01 0 CI 141 01 01 01 0 300 Measure A/Western • 0 ."-) t � " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) Meadow Glen Dr Double Glen Dr to Idyllbrook Dr 300 35 ��D1 21 ' 0f 0; 0; 0 0.34 (mi) 24 (ft)/ 24 (ft) i 1E1 1, 0, 0; 0; 0 , Resurf 24 ,0.17 AC other ,R, 01 0; 0 SB 300 cycle 8 b0 ��C1 32; 0; 0; Oj 0 300 Measure A/Western EW (ft)/PW (ft) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Fund ;Fund ; Measure A Funds by Fiscal Year Source ;Amount Amount x 51000 x S1000 D = �� �� Design R = Right of Way Acquisition E = Environmental C = Construction. Page 33 May 23, 1997 Total 97/98 ; 98/99 ; 99/00 ; 00/01 ; 01/02 Total ; 35 Melitta Rd i Park City Ave to Jura Ct ; 300 i 3 SDI 0; 0; 0, 01 0 0.19(mi) 0 (ft)/ 39 (ft) i 1RE; 0( Oj Oi 0: 0 SlurrySeal i 0, 0 Slurry Seal Type II other 0 iRi 01 0 0' ' 1 31 0: 0; Oi 0 300 Measure A/Western Total ; 3 Menifee Rd San Jacinto Ave to 1.0 mi Sly 300 95 ��D1 10: 0' 0' 1.00 (mi) 26 (ft)/ 32 (ft) i iEi 0: 0; 0; 0, 0 1 0Widen & reconstruct 32'' 0.21' AC , 389 iR' 0 i 0' ' 0 1 0; 0 other ' ' IC1 85: 0; 0; 0; 0 300 Measure A/Western Total ; 484 Menifee Rd 1 mi Sly San Jacinto to 2 mi Sly San Jacinto i , i 300 1.00 (mi) , 193 ��D: 151 0; 0; 0: 0 26 (ft)/ 32 (ft) ' i 'Ei Oi 01 0; 0, Widen & reconstruct 32', 0.21' AC w/bed 'other iRi 87' 0' 01 0; 0 401 :C, 911 0: 0; Oi 0 Menifee Rd SN74 to Sly 300 90 i01 15' 26 (ft)/ 32 (ft) i iEi 11 01 01 0; 0 Widen & reconstruct 32', 0.21' AC w/berms 'other iRi 0' 1 0 334 ;C, 741 0; 01 01 0 300 Measure A/Western 300 Measure A/Western Middle Ridge Dr _ Idyllmont Rd to Mc Mahon Rd 300 100 iD; 2 1.07 (mi) 24 (ft)/ 24 (ft) ; iEi 1 Oi Oi 01 0 Resurf 24',0,17'AC 'RI 0, 0�� 0�� 0 SB 300 cycle 8 ;other 0 iC1 97 O' 01 0, O1 0 ' ' 0i O Total 594 Middleborough h Rd  Lyon Ave 0.13 (mi) Slurry Seal Slurry Seal Type II to La Sierra Ave 0 (ft)/ 40 (ft) Total ', 424 " Total ; 100 300 Measure A/Western 300 i SDI 0; Oi Oi Oi 0 iRi -01 Oi 01 01 other i 0 ��C1 21 01 01 01 0 Oi 0' 0: Oi 0 Total 2 300 Measure A/Western /10 el RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Name Limits Length (mi) Description (comments) EW (ft)/PW (ft) Fund Source Fund Source Amount x 81000 Measure A Finds by Fiscal Year Amount x 81000 Page 97 • May 23, 1997 D = Design R = Right of Way Acquisition E = Environmental C = Construction Total 97/98 1 98/99 ; 99/00 ; 00/01 ; 01/02 Midland Rd Portions North 1.00 (mi) Resurf 26',0.21'RMS Mission Blvd SH60 1.80 (mi) Resurf 0.25'AC 26 (ft)/ 26 (ft) 302 other Total 152 152 D1 01 0; 11 0; 0 El 0: 0; 1; 0; 0 RI 01 0; 0; 01 0 Cl 0; 0; 1501 01 0 302 Measure A/Palo Verde to Milliken 64 (ft)/ 64 (ft) Mission Blvd SH 60 to Pedley Rd 1.96 (mi) 57 (ft)/ 57 (ft) Resurf 0.25'AC W/Petromat Misty Way Hemet St 0.10 (mi) Resurf 30', 0.25 AC Momat Ave Pashal Pl 0.25 (mi) Slurry Seal Slurry Seal Type 11 Monte Vista Dr Baxter Rd 1.23 (mi) Resurf 281,0.21'AC 300 other 112 479 Total 591 DI 15 E; 2 R: 0 Cl 95 0; 0; 0; 0 0; 0; 0: 0 0; 0; 01 0 01 0: 01 0 300 Measure A/Western 300 other Total 118 482 600 D; 20 E; 2 R; 0 Cl 96 01 0; 0; 0 0; 0; 0; 0 0; 0; 0; 0 0; 0; 0; 0 300 Measure A/Western to Stardust St 30 (ft)/ 30 (ft) 300 other Total 29 •0 29 D' El R' i Cl 01 01 0i 21 0 0; 0; 01 11 0 0; 0; 0; 01 0 01 Oi 0; 261 0 300 Measure A/Western to Frederick St 0 (ft)/ 41 (ft) 300 other Total 5 D; 0; 01 01 Oi 0 E; 01 01 01 01 0 R; 01 0; 01 0; 0 0 Cl 5j Oj 0; 01 0 300 Measure A/Western 5 Moonridge Drive Antelope Rd 0.36 (mi) Slurry Seal Slurry Seal Type II to Bundy Canyon Rd 36 (ft)/ 36 (ft) 300 other Total 174 D; Oj 0; 01 01 3 El 0; 01 0: 0; 1 R; 01 0: 0; Oi 0 •0 Cl 01 01 01 01 170 300 Measure A/Western 174 to Wily 0.36 mi 0 (ft)/ 32 (ft) 300 other Total 5 D1 01 01 01 01 0 El 0; 01 01 0: 0 RI 01 01 0; 01 0 0 Cl 51 01 01 01 0 300 Measure A/Western 5 • • a ti 1 " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 35 May 23, 1997 Moulton Dr Victoria Ave 0.13 (mi) Slurry Seal Slurry Seal Type II Murrieta Rd McCall Blvd 1.58 (mi) Recon AC paved road Naki Cir Woshka Ln 0.03 (mi) Slurry Seal Slurry Seal Type II Navut Ave Wanki Ave 0.21 (mi) Slurry Seal Slurry Seal Type II Neighbours Blvd 36th Ave 1.00 (mi) Resurf 261,0.21'RMS EW (ft)/PW (ft) to Shugart Wy 0 (ft)/ 40 (ft) to Rouse Rd 32 (ft)/ 32 (ft) to E'ly 0.03 mi 0 (ft)/ 33 (ft) to Frederick St 0 (ft)/ 36 (ft) to 38th Ave 26 (ft)/ 26 (ft) Newport Rd Goetz Rd to Murrieta Rd 1.70 (mi) 26 (ft)/ 26 (ft) Resurface exist. AC pavement, 0.21'AC 990 Misc. funds (S10k) are from EKG. Nubs Ct Edina Rd 0.03 (mi) Slurry Seat Slurry Seal Type II to E'ly End 0 (ft)/ 32 (ft) fund Source Total " 300 other Total 300 other Total 300 other Total 300 other Total 302 other Total. 300 other Total 300 other Total 243 1 0 1 202 3 267 1 0 1 Fund Source Amount x S1000 2 0 2 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction D�� E; RI CI 97/98 ; 98/99 99/00 ; 00/01 ; 01/02 01 0; 01 01 0; 01 . 2' 0' 300 Measure A/Western 0; 0' 0' 0; 0; 0' 0; 01 0 0 0 0 10 D; 101 01 0: 0, Et 01 01 0; 01 0 257 RI 01 Oi 0i 01 0 CI 0' 01 Oj Oi 0 300 Measure A/Western DI D( 01 Oi 0' 0 Ei 01 01 Oi Oi 0 RI 01 01 01 01 CI 11 Oi 0i 01 0 300. Measure A/Western 3 Ei 0; 01 01 01 0 RI Oi 0: 01 Oi 0 0 CI 31 01 01 01 0 300 Measure A/Western 202 DI 01 01 0�� , El Oj 01 01 01 1 01 1 0 RI 0; 01 Oi 01 O 0 01 01 Oj 200 302 Measure A/Palo Verde 233 DI 3' 01 , El Oi 01 01 01 0 01 Oi 0 10 RI Oi 01 01 01 0 i 2301 01 01 01 0 300 Measure A/Western DI 01 El 01 01 0; 01 0 01 01 0 RI 01 01 01 01 0 Cl 11 01 01 Oi 0 300 Measure A/Western n'; A. �� A. RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Oakmont Dr Bradley Rd 0.50 (mi) Resurf 36',0.17' AC Oakmount Blvd Noylake Rd 0.77 (mi) Cape Seal Slurry Seal Type I EW (ft)/PW (ft) Fund Source Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 Page 36 May 23, 1997 11111 D = Design R = Right of Way Acquisition E = Environmental C = Construction Total 97/98 ; 98/99 ; 99/00 ; 00/01 ; 01/02 to Thornhill Dr 36 (ft)/ 36 (ft) •300 other Total 65 D; 01 0; 0; 0; 1 E; 0; 0; 0; 0; 1 R; 0; 0; 0; 0; 0 0 C; 0; 0; 0; 01 63 65 300 Measure A/Western October Court September Wy 0.04 (mi) Slurry Seal Slurry Seal Type II Palm Canyon Dr Canyon Pines Pl 0.37 (mi) Slurry Seal Slurry Seal Type II to Augusta Rd 0 (ft)/ 34 (ft) 301 other 5 0 Total 5 D; 11 0; 0; 0; 0 E; 0; 0; 0; 0; 0 R; 0; 0; 0; 0; 0 C; 4; 0; 0; 0; 0 301 Measure A/Coachella Valley to S'ly 0.04 mi 0 (ft)/ 36 (ft) 300 other Total 1 0 1 D; 0; 0; 0; 0; 0 E; Oi 0; 0; 0; 0 R; 0; 0; 0; 0; 0 CI 11 0; 0; 0; 0 300 Measure A/Western to Stone Canyon Rd 0 (ft)/ 36 (ft) Palomar St Mission Tr to Torydon St 0.85 (mi) 26 (ft)/ 32 (ft) Widen & Resurface 32,, 0.21, AC Palomar St Clinton Kieth to Central 1.60 (mi,) 26 (ft)/ 26 (ft) Resurface 26', 0.21' AC Segment is planned for widening by RBBD in future years. SB 300 cycle 8 Palomar St Central Ave to Mission Trl 1.20 (mi) 21 (ft)/ 32 (ft) Resurf, and widen AC paved road 300 other Total 1 0 1 DI i E' i R; C; 0; 0; 0; 0; 0; 0; 0; 0; 0; 1; 0; 0; 300 Measure A/Western 0; o 0; 0 0; 0 0; 0 300 other Total 5 D; 5; 0; 0; 0; 0 E; 0; 0; 0; 0; 0 RI 01 01 01 01 0 76 C; 0; 0; 0; 0: 0 300 Measure A/Western 81 300 other Total 145 145 D; 5; 0; 0; 0; 0 E; 11 Oi 0; 0; 0 R; 0f 0; 01 Of 0 0 C; 0; 1391 • 01 01 0 300 Measure A/Western 300 other Total 57 0 57 D; E' i RI i C; 0; Oi 0; 0; 55 0; Oi O; O; 2 0; 0; 01 • 0f 0 0; 0; O; O; 0 300 Measure A/Western • .r`Si1I � " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 37 May 23, 1997 EW (ft)/PW (ft) Par Dr Thornhill Dr to Olympia Way 0.26 (mi) 32 (ft)/ 32 (ft) Resurf 32',0.21' AC Petromat Park City Avenue Murrieta Rd 0.36 (mi) Slurry Seal Slurry Seal Type 11 Pashal PI Wanki Ave 0.25 (mi) Slurry Seal Slurry Seal Type II Pavia Ct Temet St 0.06 (mi) Slurry Seal Slurry Seal Type II Pawi Ct Frederick St 0.04 (mi) Slurry Seal Slurry Seal Type it to Pelion Rd 0 (ft)/ 44 (ft) to Momat Ave 0 (ft)/ 41 (ft) to Wily 0.06 mi 0 (ft)/ 35 (ft) to W'ly 0.06 mi 0 (ft)/ 33 (ft) Pederson St Hayes Ave to Grand Ave 0.30 (mi) 24 (ft)/ 26 (ft) Recon 26',0.21'RMS on 0.5'DG Pelion Rd Berea Rd 0.33 (mi) Slurry Seal Slurry Seal Type II to E'ly 0.33 mi 0 (ft)/ 36 (ft) Fund Source Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 6 103 5 1 0 1 1 0 1 6 Fund Source Amount x S1000 38 0 38 Measure A Funds by Fiscal Year Amount x $1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 ; 98/99 ; 99/00 ; 00/01 ; 01/02 01 Di Oi 1 El Di 01 1 RI Oi 01 0 CI Di 0j 36 300 Measure A/Western 0' 0' i 0' i 0; 0 0 0 0 6 DI 1; 0; 0; Ei 01 01 Oi 0' 0 R, 0, 01 0; 01 0 CI 51 01 Oi 01 0 300 Measure A/Western 5 DI 0; 0; Oi 01 0 El 01 0f 01 01 R, 0; 01 01 i 0 0 CI 5; Oi 0; 01 0 300 Measure A/Western Di 0, 0; Oi 0; 0 g l pi 01 01 01 0 0, 01 CI 11 01 01 Oi 0 300 Measure A/Western DI 01 01 Oi 0' RI E pi 01 01 Oi 0 CI 11 01 Oi 01 0 300 Measure A/Western 103 DI 0' 0; i El 0i 01 RI 0; 01 2 0 CI 01 Oi Oj 01 0 I 01 01 Oi 01 100 300 Measure A/Western 6 DI 01 01 01 01 El RIi Oi 0, 01 0; 0 01 01 01 0 0 CI 61 Oj 01 01 0 300 Measure A/Western Of 1ii5 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 38 May 23, 1997 EW (ft)/PW (ft) Peralta Pl Riverview Dr to Limonite Ave 0.69 (mi) 40 (ft)/ 40 (ft) Resurf AC Paved Rd Do not start without STIP Approval. Pigeon Pass Rd Moreno Valley C.L. 0.70 (mi) Resurf,0.25' AC Fund Source Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction Total 97/98 ; 98/99 ; 99/00 ; 00/01 ; 01/02 300 other Total 47 01 18: 0; 0; 0; 0 El 2; 0; 0; 0; 0 i i i R, 0; 0' 0' 0' 0 115 C; 271 0; 0; 0; 0 162 300 Measure A/Western to 0.7 mite North M.V.C.L 18 (ft)/ 18 (ft) Coordinate with the City of Moreno Valley Pilot Dr Galley Dr 0.03 (mi) Reconstruct Surface 300 other Total 111 0 111 DI 01 01 01 01 2 El 01 0; 0; 0; 1 R j 0; 0; 0; 0; 0 CI 01 • 01 0; 01 108 300 Measure A/Western to N'ly Galley Dr 0.03 mi 33 (ft)/ 33 (ft) Pine Crest Ave SN243 to Riv.Co.Playground Rd 0.72 (mi) 24 (ft)/ 24 (ft) Resurf 24' 0.17AC SB 300 cycle 8 portion of total length Pleasant View Dr Vander Veer Rd to Sea View Way 0.58 (mi) 24 (ft)/ 24 (ft) Resurface 0.21', 24, RMS 301 other Total 11 0 300 other Total 11 69 0 01 01 01 01 0: 2 El 0; 0; 0; 0; 1 R; 0; 0; 0; 0; 0 C; 0; 0; 0; 01 8 301 Measure A/Coachella Valley 69 D; 2 El 1 R; 0 C1 66 0; 0; 01 0 01 01 01 0 Oi Oi - 01 0 01 01 01 0 300 Measure A/Western Port Cir Barnacle Dr to Wly 0.1 mi 0.10 (mi) 30 (ft)/ 30 (ft) Resurface 0.21', 30' RMS Post Rd Ellis Ave to Santa Rosa Rd 0.46 (mi) 26 (ft)/ 26 (ft) Recon 261,0.5'06,0.211RMS 301 Other Total 301 other Total 50 0 50 D1 Oi Oi 21 Oi 0 El 01 01 11 01 0 R; 0; .01 Oj 01 0 C1 01 0; 471 01 0 301 Measure A/Coachella Valley 12 01 01 01 01 0; 0 El 0; 0; 01 11 0 R; 01 01 01 11 0 0 CI 01 01 01 101 0 12 301 Measure A/Coachella Valley 300 other Total 102 D; 0; 0; 11 01 0 El 01 0; 11 01 0 R; 01 01 Oj 01 0 0 C1 01 0: 1001 01 0 300 Measure A/Western 102 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 39 May 23, 1997 EW (ft)/PW (ft) Putters Ln New Chicago Ave to Fore Ln 0.08 (mi) 26 (ft)/ 26 (ft) Resurf 26',0.21'AC petromat S8 300 cycle 7 Ouai Cir Frederick St 0.03 (mi) Slurry Seal Slurry Seal Type II Oueensbury Court Billie Ann Rd 0.05 (mi) Slurry Seal Slurry Seal Type II to Wily 0.03 mi 0 (ft)/ 33 (ft) to E'ly 0.05 mi 0 (ft)/ 33 (ft) Rafael St Carmen Ave to Bonita Ave 0.25 (mi) 20 (ft)/ 26 (ft) Widen, resurf 26',0.21'RMS Rain Dance Ct Cactus Flower Dr 0.05 (mi) Slurry Seal Slurry Seal Type II to Red Dawn Dr 0 (ft)/ 32 (ft) Ramon Rd 0.75 mi Wly Bob Hope to 0.75 mi Wly 0.75 (mi) 40 (ft)/ 40 (ft) Resurf 40', 0.21'AC w/petromat Resurface only County 1/2 of road. City of Rancho Mirage does not wish to resurface south 1/2. Ramon Rd Varner Rd to RR X-ing 0.15 (mi) 42 (ft)/ 42 (ft) Resurf AC paved road and control drainage Heavy truck traffic and water deterioration. See Varner Rd project A7-0333. Fund Source Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 301 other Total 301 other Total 112 57 1 0 1 Fund Source Amount x S1000 11 11 1 0 1 1 0 1 Measure A Funds by Fiscal Year Amount x $1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction• 97/98 98/99 ; 99/00 ; 00/01 ; 01/02 D; 1 : • 0: 01 01 Ef Of 0; 0; Of 0 RI 0; 01 0; Of 0 C, 101 0; 0; 0; 0 300 Measure A/Western DI 01 0; 0; 0' 0 El 0 0� RI 0, 0, : 0 � , 0 0 C, 1' 01 Of 0f 0 300 Measure A/Western D1 0; 01 01 Oi 0 E, 0; 0f 0; 01 RI 01 0; 0; 1 0 CI 11 01 Of • 0: 0 300 Measure A/Western 57 D1 0; 1; 0, 0' El 0, 1, , 0 D RI Oi 151 0f 01 0 i Oi 0, 401 0; 0 300 Measure A/Western • DI Of 01 Oi 01 . 0 Ei Of 0f Of 0' 0 Ri Of Of Oi Oj 0 C, 1' 01 Oi Oi 0 300 Measure A/Western 112 Of 101 i E; 2� 0� O; 0� O f 0, 0 RI Of 01 01 01 0 O C1 1001 0f Of 0f 0 301 Measure A/Coachella Valley • 198 01 14 Oi 0: 0f 0 El 1 Oi 0' 01 R: 0 Of 0' f 0 D C1 183 0; 0f 0f 0 301 Measure A/Coachella Valley 198 t ,y RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Limits Length (mi) Description (comments) Ramona Expy Perris C.L. 5.21 (mi) Reconst AC surface Ray Ct Oakmount Blvd 0.05 (mi) Cape Seal Slurry Seal Type I EW (ft)/PW (ft) Fund Source Total Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 Page 40 May 23, 19911111 7 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 198/99 199/00 100/01 101/02 to 5th Ave 0 (ft)/ 0 (ft) 300 other Total 76 1952 2028 DI OI OI OI OI 0 EI OI OI OI OI 0 RI DI OI OI pI 0 CI 76I OI OI OI 0 300 Measure A/Western to E'ly 0.05 mi 0 (ft)/ 30 (ft) Reche Canyon Rd Arroyo Dr to N'ly 1 mile 0.60 (mi) 22 (ft)/ 32 (ft) realign and widen road NES award deadline 6/30/97. Construct only from 2000' N'ly of Arroyo Dr to 5200' N'ly Reche Canyon Rd Arroyo Dr to N'ly 0.4 mi 0.40 (mi) 0 (ft)/ 0 (ft) Widen road Design was done with A6-0277 301 other Total 1 0 1 DI OI OI OI OI 0 EI OI OI OI OI 0 RI OI OI OI OI 0 CI 1; Of Oi OI 0 •301 Measure A/Coachella Valley 300 other Total 322 bj 151 OI pI 01 0 EI OI OI OI OI 0 i 360 C; 307: 0: Oi OI 0 300 Measure A/Western 682 Reche Canyon Rd (segment 3) Reche Vista Dr to San Bernadino Co Line 3.60 (mi) 26 (ft)/ 26 (ft) Recon 26',AC and improve drainage problems 300 other Total 418 DI 01 EI oI RI OI 0 CI OI 418 OI 151 OI 0 Oi 21 0{ 0 OI 1001 OI 0 OI 3011 OI 0 300 Measure A/Western Reche Canyon Rd (segment 4) Reche Vista Dr to San Bernardino Co Line 3.60 (mi) 26 (ft)/ 26 (ft) Recon road and improve drainage Red Dawn Dr Rain Dance Ct 0.11 (mi) Slurry Seal Slurry Seal Type II to Grand Ave 0 (ft)/ 32 (ft) 300 other Total 300 other Total 300 other Total 1300 0 1300 180 '0 180 1 0 1 DI 01 OI OI 285I 0 EI Oi OI OI 15I 0 RI 01 Oi Oi 01 0 CI OI OI OI OI 1000 300 Measure A/Western DI EI RI CI 01 Oi Oi OI 170 01 Oi OI OI 10 01 01 Oi OI 0 01 01. Oi OI 0 300 Measure A/Western DI 01 Oi Oi OI 0 EI 01 Oi Oi 01 0 RI pI 01 01 01 0 CI 11 Oi Oi OI 0 300 Measure A/Western • RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 41 May 23, 1997 Regatta Dr Spinnaker Wy 0.13 (mi) Resurface Paved Road EW (ft)/PW (ft) to Nallyard Or 30 (ft)/ 30 (ft) River Rd Bridge Santa Ana River 0.12 (mi) 0 (ft)/ 0 (ft) Investigation for bridge replacement RCTD Br.a S8002, State Bray. 56C 017 Riverside Ave Defrain Blvd 0.50 (mi) Reconst AC Paved Road to Ehiers Blvd 28 (ft)/ 28 (ft) Riverside County Playground Rd SN243 to Park Entrance 0.57 (mi) 24 (ft)/ 24 (ft) Resurf 24',0.17'AC SB 300 cycle 8 Riverview Dr Limonite Ave to Ave Juan Diaz 1.87 (mi) 25 (ft)/ 32 (ft) Reconstruct surface and widen Robin Dr West Ridge Rd Sly 0.24 (mi) Resurf 26',0.17'AC 26 (ft)/ 26 (ft) Rocky Point Dr Club View Dr to Ebb Dr 0.36 (mi) 35 (ft)/ 35 (ft) Resurface 0.21', 35' RMS Fund Source Total 301 other Total 300 other Total 302 other Total 300 other Total 300 other Total. 300 other Total 301 other Total 1244 56 232 9930 Fund Source Amount x S1000 20 0• 20 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction D1 E1 R1 C1 97/98 198/99 199/00 1 00/01 ; 01/02 01 01 01 01 01 01 01 OI 01 01 01 0; 0; 01 0; 01 301 Measure A/Coachella Valley 2 1 0 17 2265 D1 30I 801 301 5: El 501 201 51 51 0 R1 01 Oi 201 201 0 7665 C1 01 01 01 20001 0 300 Measure A/Western 85 DI 471 01 01 0; El 21 01 01 01 0 147 CI 01 361 01 01 0 302 Measure A/Palo Verde 56 D1 21 01 01 01 0 El i 0 RI p1 p; � 1 01 0 i � 0 01 0 0 C; 531 01 01 01 0 300 Measure A/Western 304 01 0' 951 0 E1 01 51 0 940 CI 01 01 204 300 Measure A/Western 01 0 01 0 Oi 0 01 0 29 D1 01 21 01 01 E; 01 11 01 01 0 R1 0; 01 01 01 0 1 0 0 C1 01 261 01 01 0 300 Measure A/Western 29 46 0 46 D1 E' i R1 C1 0: 01 �1 01 0 01 01 11 01 0 01 01 01 01 0 01 01 431 01 0 301 Measure A/Coachella Valley iY1 a J RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) Page 42 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT May 23, 1997 EW (ft)/PW (ft) Fund Source Total Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction Rosilla Court Sunrose St 0.02 (mi) Slurry Seal Slurry Seal Type II to E'ly 0.02 mi 0 (ft)/ 36 (ft) Rouse Rd Bottlebrush Rd to Bradley Rd 0.40 (mi) 28 (ft)/ 28 (ft) Resurf 28' AC paved road Russel Ave Hibiscus Ave to Gentian Ave 0.31 (mi) 22 (ft)/ 26 (ft) Recon 26',0.21'RMS on 0.60'DG Ruth Ave Charles St 0.18 (mi) Slurry Seal Slurry Seal Type I1 Rutile St Van Buren Blvd 0.25 (mi) Reconst AC surface • 300 other Total 1 0 1 97/98 1 98/99 1 99/00 1 00/01 1 01/02 D1 0101 01 01 0 E1 01 01 01 01 0 R1 01 01 01 01 0 C1 11 01 01 01 0 300 Measure A/Western 300 other Total 78 0 78 D1 01 01 01 61 0 E1 01 01 01 11 0 R1 01 01 01 01 0 C1 01 01 01 01 71 300 Measure A/Western 300 other Total 84 0 84 D1 01 11 01 01 0 E1 01 11 01 01 0 R1 01 01 01 01 0 C1 01 821 01 01 0 300 Measure A/Western to Gierson Ave 0 (ft)/ 36 (ft) 300 other Total 2 0 2 to•Bellegrave Ave 35 (ft)/ 0 (ft) Sage Rd • Sly 1 mi Cactus Valley to Sly 2 mi Cactus Valley 1.00 (mi) 22 (ft)/ 26 (ft) Widen, Recon 26' RMS road Stockpile vertical excess 1 mi Sly Recon 0.42 mi. Flatten 3 vert: i 2 horiz. curves Sage Rd Sly 2 mi Cactus Valley to Sly 3 mi Cactus Valley 1.00 (mi) 22 (ft)/ 26 (ft) Widen, Recon 26' RMS Road Use A7-0318 excess for fill. Recon 0.33 mi. Raise 2 low areas. 300 other Total 45 90 135 D1 i E' i R' i C1 01 01 01 01 p 01 01 01 01 0 01 01 01 01 0 �1 01 01 Oi 0 300 Measure A/Western 01 241 01 01 01 0 E1 11 01 01 01 0 R1 01 01 01 01 0 C1 201 01 01 01 0 300 Measure A/Western 300 other Total 275 386 661 D1 01 0 01 01 0 El 01 0 01 01 0 R1 01 0 01 01 0 CI 01 275 01 01 0 300 Measure A/Western 300 other Total 450 88 538 D1 01 01 01 01 0 E1 01 01 01 01 0 R1 01 01 01 01 0 C1 01 4501 01 01 0 300 Measure A/Western 11 re 4 1 ,1 • • " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 43 May 23, 1997 EW (ft)/PW (ft) Sage Rd Sty 3 mi Cactus Valley to Sly 4 mi Cactus Valley 1.00 (mi) 22 (ft)/ 26 (ft) Widen, Recon 26' RMS Road Recon 0.17 mi. Resurface remainder. Sage Rd Nly .35 mi Red Mtn Rd to Sly .65 mi Red Mtn Rd 1.00 (mi) 22 (ft)/ 26 (ft) Widen, Recon 26' RMS Road Sage Rd Sly .65 mi Red Mtn Rd to Sty 1.65 mi Red Mtn Rd 1.00 (mi) 22 (ft)/ 26 (ft) Widen, Recon 26' RMS Road Recon 0.4 mi. Resurface remainder. Sage Rd Sly 1.65 mi Red Mtn Rd to East Benton Rd 0.60 (mi) 22 (ft)/ 26 (ft) Widen, Resurf 26' RMS Road Samar Rd Avida Dr 0.06 (mi) Slurry Seal Slurry Seal Type II San Felipe Dr San Mateo Way 0.11 (mi) Resurf 26',paved road San Jacinto Rd Fern Valley Rd 0.38 (mi) Resurf 24',0.17'AC to Berea Rd 0 (ft)/ 36 (ft) to San Marcos Pl 26 (ft)/ 26 (ft) to Glen Rd 24 (ft)/ 24 (ft) Fund Source Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 38 13 1 0 1 286 265 Fund Source' Amount x S1000 295 0 295 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C =.Construction 97/98 198/99 1 99/00 100/01 101/02 DI 51. 01 0i 0: 0 E, 131 01 12: 01 0 RI 01 0: 0i 0: 0 C1 01 01 2651 01 0 300 Measure A/Western 265 D1 51 OI 01 01 El 51 01 01 51 0 RI 01 0' 01 01 0 0 C: 01 01 01 2501 0 300 Measure A/Western 286 DI 101 01 01 01 0 El 151 01 01 0, 0 CI RI 01 01 01 01 10 01 01 01 01 246 300 Measure A/Western 13 DI 5' 01 01 01 0 Ei 81 0: 01 01 0 RI 01 01 01 01 0 CI 01 01 01 0i 0 300 Measure A/Western DI 01 01 01 01 0 Ei 01 01 01 01 0 R{ OfI Of 01 .01 0 CI 11 01 Of 01 0 300 Measure A/Western 18 DI 11 01 01 1 0 El 01 01 1 01 0 01 01 01 01 0 C1 171 01 01 01 0 300 Measure A/Western 18 38 D1 0' 01 01 El 01 01 01 01 1 RI 01 01 01 01 0 01 2 O C1 01 01 01 01 35 300 Measure A/Western 0001 1 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT EW (ft)/PW (ft) San Jacinto St Stetson Ave to N'ly to Hemet C.L. 1.00 (mi) 38 (ft)/ 38 (ft) Resurf 0.21'AC w/petromat, grind Partial width in the City of Hemet. Pursue Coop with City of Hemet. San Leandro Ct San Mateo Way 0.03 (mi) Resurf 26',paved road Fund Source Total Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x $1000 Page 44 II) May 23, 1997 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 ; 98/99 ; 99/00 ; 00/01 ; 01/02 300 other Total 30 DI 01. 01 121 01 0 E1 01 01 • 21 01 0 R; 0; 01 0; 0; 0 174 C; 0; 0; 0; 161 0 204 300 Measure A/Western to End Sly 26 (ft)/ 26 (ft) San Marcos Pl Pleasant St to San Felipe Dr 0.21 (mi) 26 (ft)/ 26 (ft) Resurf 26',0.21'AC petromat S8 300 cycle 7 San Marino Ln San Marcos Pl to End Sly 0.11 (mi) 26 (ft)/ 26 (ft) Resurf 26',0.21'AC petromat San Mateo Way San Marino Ln to San Felipe Dr 0.17 (mi) 26 (ft)/ 26 (ft) Resurf 261,0.21'AC petromat SB 300 cycle 7 San Miguel Way New Chicago Ave to San Marcos Pl 0.15 (mi) 26 (ft)/ 26 (ft) Resurf 26',0.21'AC petromat S6 300 cycle 7 Sand Canyon Cir Fallbrook Canyon Dr 0.12 (mi) Slurry Seal Slurry Seal Type I1 300 other Total 5 DI 11 Oi 01 01 0 EI 0; 01 0; 0; 0 R; 0; 01 0; 0; 0 0 C; 41 01 0; 0; 0 300 Measure A/Western 5 300 other Total 23 0 23 DI 11 0: 0: 01 0 E; 0; 0; 0; 0; 0 RI 01 01 0: 01 0 CI 221 01 01 0i 0 300.Measure A/Western 300 other Total 15 0 15 DI E' R' CI 11 0j 01 Oj 0 0; 01 01 DI 0 0; 01 01 0; 0 141 01 0; 0; 0 300 Measure A/Western to Wily 0.12 mi 0 (ft)/ 36 (ft) 300 other Total 300 other Total 300 other Total 22 21 0 21 DI 11 01 01 QI 0 Ej 01 01 01 0' 0 RI 01 01 01 01 0 C1 201 01 01 Oj 0 300 Measure A/Western 22 DI 11 0' 0' 0; 0 EI 01 Oi 01 0' 0 RI 01 01 01 01 0 0 CI 211 01 01 Of 0 300 Measure A/Western 2 DI 0f 0f Of Of 0 El Of Of Of 0' 0 R' 01 Oi Of 0' 0 0 Cl 21 01 0f 01 0 300 Measure A/Western 2 • • ` 4.. " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 45 May 23, 1997 EW (ft)/PW (ft) Scenic Dr Daryll Dr to Wayne Dr 0.30 (mi) 24 (ft)/ 24 (ft) Resurf 24',0.17'AC Schooner Way La Casa Wy 0.20 (el) . Resurface Scott Rd Briggs Rd 2.10 (mi) Resurf 26', 0.25' RMS Scott Rd Antelope Rd 2.00 (mi) Resurf 26', 0.25' RMS to 69th Ave 35 (ft)/ 35 (ft) to 1.1 mi west of SH 79 26 (ft)/ 26 (ft) to Briggs Rd 26 (ft)/ 26 (ft) Sea Gull Dr Via Costa Brova to Flamingo Or 0.57 MO 24 (ft)/ 24 (ft) Resurface 0.21', 24' RMS Sea View Way 72nd Ave 1.00 (mi) Resurface Paved Road to 70th Ave" 36 (ft)/ 36 (ft) Seascape Ave Vander Veer Rd to Windward Dr 0.51 (mi) 40 (ft)/ 40 (ft) Resurface 0.21', 40' RMS Fund Source Total 300 other Total 301 other Total 300 other Total 300 other Total 301 other Total 301 other Total 301 other Total 49 149 0 149 73 0 73 207 207 26 Fund Source Amount x $1000 30 0 30 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction DI El R' m CI 97/98 198/99 199/00 100/01 101/02 oI 0' m 0' m oI 2I 0' m 0' m 28I 300 Measure A/Western 0 0�� 0 0 26 DI Of Oi 1i OI 0 El 01 01 11 01 0 RI OI OI 01 01 0 CI 0i OI 241 OI 0 301 Measure A/Coachella Valley 207 DI 2 OI 01 01 El 1 01 0I oI 0 RI 0 0i 0I 01 0 I 0 O Cm 204 01 01 OI 0 300 Measure A/Western 207 El 01 2 01 OI 0 OI 1 0i OI 0 Ri I 01 0 01 0' 0 Cm 01 204 0i 01 0 300 Measure A/Western 49 DI 01 OI Oi OI . 2 RI OI 01 Of OI 1 m Om Om 01 01 0 CI 01 01 01 01 46 301 Measure A/Coachella Valley DI E' m R' m CI D' m E' m RI CI 01 01 0f 00 1 01 2 01 1 OI OI Oi 01 0 Om OI 01 01 146 301 Measure A/Coachella Valley ' OI OI 01 2 OI OI 01 1 OI 01 01 0 OI Oi 01 70 301 Measure A/Coachella Valley 0 0 0 0 0 ,, 0 I 2 ,3 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 46 May 23, 1997 Limits Length (mi) Description (comments) September Way April Dr 0.22 (mi) Slurry Seal Slurry Seal Type II EW (ft)/PW (ft) Fund Source Total Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 ; 98/99 ; 99/00 ; 00/01 ; 01/02 Shell Dr Leeward Dr 0.37 (mi) Resurface Paved Road to August Cir 0 (ft)/ 36 (ft) 300 other Total 3 3 D; 0; 0; 0; 0; 0 El 01 0; 0; 0; 0 R1 0; 0; 01 0; 0 Cl 31 01 01 0: 0 300 Measure A/Western to Rocky Point Dr 18 (ft)/ 18 (ft) Sherman Rd Watson Rd to Mapes Rd 0.50 (mi) 26 (ft)/ 26 (ft) Const 26', 0.5'0G, 0.25' RMS Remove trees, move ditch & construct on centerline. Sherman Road Chambers Ave 0.12 (mi) Slurry Seat Slurry Seal Type I1 301 other Total 30 D1 Oi 01 Oi Oi 2 E; 0; 0; 0; 0; 1 0 Cl 0; 01 0; 0; 27 301 Measure A/Coachella Valley 30 300 other Total 210 210 D1 0: 01 Oi 01 5 El 01 01 0: 01 5 R' 01 01 Oi 01 0 0 Cl 01 Oj 0; 0; 200 300 Measure A/Western to Shadel Rd 0 (ft)/ 31 (ft) Shoal Dr Beacon Dr to Rocky Point Dr 0.22 (mi) 33 (ft)/ 33 (ft) Resurface 0.21', 33' RMS Showut Ave Woshka Ln 0.18 (mi) Slurry Seal Slurry Seal Type II Shugart Way Moulton Dr 0.16 (mi) Slurry Seal Slurry Seal Type II 300 other Total 1 '0 1 D' 01 01 Oi 01 0 El 01 0i Oi 0' 0 R1 01 0: 01 01 0 Cl 11 01 01 01 0 300 Measure A/Western to Frederick St 0 (ft)/ 37 (ft) to SE'ly 0.16 mi 0 (ft)/ 40 (ft) 301 other Total 300 other Total 300 other 2 28 0 28 D1 0: Oi Oi 01 2 El 01 01 Oi 01 1 R1 01 01 01 01 0 Cl Oi 01 Oi Oi 25 301 Measure A/Coachella Valley 2 DI 01 01 Oi 0' 0 El 01 01 01 01 0 R' 01 01 01 01 0 0 Cl 21 01 Oi 01 0 300 Measure A/Western 3 Dj 01 01 Oi 01 0 E; 0; 0: 01 01 0 Ill 0: 0: 01 0' 0 0 Cl 31 0: 01 01 0 300 Measure A/Western Total 3 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 67 May 23, 1997 Shuis Cir Navut Ave 0.05 (mi) Slurry Seal Slurry Seal Type II Silver Tip Ln Glen Rd 0.07 (mi) Resurf 26',0.17'AC SB 300 cycle 7 EW (ft)/PW (ft) to N'ly 0.05 mi 0 (ft)/ 33 (ft) Simpson Rd Briggs Rd 3.00 (mi) Reconst AC Paved Rd Skeen Ct Hub Cir 0.03 (mi) Slurry Seal Slurry Seat Type II Smith Ct Oakmount Blvd 0.03 (mi) Cape Seal Slurry Seal Type I Somerdale St Indiana Ave 0.15 (mi) Slurry Seal Slurry Seal Type II to Cougar Rd 26 (ft)/ 26 (ft) to Rte 79 0 (ft)/ 26 (ft) to N'ty 0.03 mi 0 (ft)/ 36 (ft) to E'ly 0.03 mi 0 (ft)/ 30 (ft) to March Wy 0 (ft)/ 36 (ft) Spalding Dr Cambridge Ave to Hopewell Ave 0.25 (mi) 35 (ft)/ 35 (ft) Resurface 0.21', 35, RMS Fund Source Total 300 other Total 300 other Total 300 other Total 300 other Total 301 other Total 300 other Total 301 other Total 2 33 0 33 12 100 0 100 1 0 1 1 0 1 Fund Source Amount x S1000 1 0. 1 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction DI E; RI Cl 97/98 ; 98/99 ; 99/00 ; 00/01 ; 01/02 0; 0; 01 11 0; 0 0 0; 300 Measure A/Western 12 D1 1: 0; E; 01 01 R; 0; 01 0 Cl 111 01 300 Measure A/Western D; El RI Cl DI El R1 Cl DI El R1 Cl 0; 0; 0; 0; 01 01 0; 0; 300 Measure A/Western 01 01 0; 11 0; 0; 01 0; 300 Measure A/Western 01 0; 0; 0; 0' 0' i 0' 0; 01 0 0; 0; 0; 0; 0; 0; 01 Oi 01 01 01 01 01 0; 01 1; 01 0 301 Measure A/Coachella Valley 2 D1 01 01 0, El 01 01 of R1 01 01 Oj 0 Cl 21 01 01 300 Measure A/Western D' i E' i RI Cl 0; 0; 0; 0; 0; 95 Oi 5 0; 0 Oi 0 0; 01 01 01 0; 01 01 0; Oi 0' 2; Oi 0 Oi 01 11 Oi 0 Oi 01 01 Oi 0 01 01 301 01 0 301 Measure A/Coachella Valley 0 0 0 0 0 0 0 0 0 0 0 0 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 48 May 23, 1997 EW (ft)/PW (ft) Fund Source Total Fund Source Amount x $1000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction Spar Cir. Galley Dr 0.04 (mi) Resurface Paved Road Spinnaker Way Admiralty Way 0.22 (mi) Resurface Paved Road Spring Creek Way April Dr 0.05 (mi) Slurry Seal Slurry Seal Type II Spring Meadow Ct Moonridge Dr 0.06 (mi) Slurry Seal Slurry Seal Type II to NWIy Galley Dr 0.07 mi 30 (ft)/ 30 (ft) •301 other Total 13 0 13 97/98 198/99 199/00 100/01 101/02 DI 0; ' 0; 0; 01 2 El OI 0; • 0; 01 1 RI 0; OI 0; 0; 0 Cl OI 0; 0; 0; 10 301 Measure A/Coachella Valley to 68th Ave 38 (ft)/ 38 (ft) 301 other Total 39 39 DI OI OI 0; 0; 2 El OI 0; 0; 01 1 RI 0; OI OI 0; 0 0 CI OI OI 0; 0; 36 301 Measure A/Coachella Valley to Indiana Ave 0 (ft)/ 36 (ft) 300 other Total 1 0 1 DI OI 0; OI 0; 0 El 0; 0; 0; 0; 0 RI OI OI OI OI 0 • Cl 11 01 01 01 0 300•Measure A/Western Stardust St Andrea Ave . 0.14 (mi) Resurf 33', 0.25' AC. to S'ly 0.06 mi 0 (ft)/ 24 (ft) 300 other Total 1 0 1 DI OI OI OI pI 0 El OI Oi Oi Oi 0 RI OI OI OI OI 0 Cl 1I 01 01 Oi 0 300 Measure A/Western to Misty Wy 33 (ft)/ 33 (ft) State St 0.4 Mi N. Menlo to 0.69 Mi N. Menlo 0.29 (mi) 62 (ft)/ 62 (ft) Resurface 62', 0.21' AC SB 300 cycle 7 Stetson Ave Santa Fe St to Windsor Ct 0.97 (mi) 40 (ft)/ 40 (ft) Resurface 40', 0.21' AC 300 other Total 35 0 35 DI 01 01 Oi 21 0 El OI Oi Oi 1i 0 RI OI OI OI OI 0 Cl 0I 01 Oi 321 0 300 Measure A/Western 300 other Total 300 other Total 135 DI 6 OI OI 0' 0 El 0 OI OI 0' 0 RI 0 Oi OI 0' 0 0 CI 129 OI OI oI 0 300 Measure A/Western 135 53 223 276 oI E' i R' i Cl 61 OI OI OI 0 OI Oi Oi Oi 0 471 OI Oi Oi 0 300 Measure A/Western " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description ( comments ) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 49 May 23, 1997 EW (ft)/PW (ft) Stetson Ave Warren Rd to Ply of Cawston to C.L 1.20 (mi) 27 (ft)/ 32 (ft) Resurf 30',AC Need to coordinate with the City of Hemet. Verify that reconstruction is not needed. Stokes Cir Shugart Wy 0.10 (mi) Slurry Seal Slurry Seal Type II Stone Canyon Rd Sand Canyon Cir 0.53 (mi) Slurry Seal Slurry Seal Type 11 Summerglen Drive Indiana Ave 0.05 (mi) Slurry Seat Slurry Seal Type II to S'ly 0.10 mi 0 (ft)/ 36 (ft) to Palm Canyon Dr 0 (ft)/ 36 (ft) to January Ct 0 (ft)/ 36 (ft) Sun City Blvd Cherry Hills Blvd to Valley Blvd 0.42 (mi) 62 (ft)/ 62 (ft) Resurface AC paving with fabric Sunfish Ln Barnacle Dr 0.11 (mi) Reconstruct Surface Sunrose Str e eL Clay Canyon Dr 0.22 (mi) Slurry Seal Slurry Seal Type II to Shell Dr 35 (ft)/ 35 (ft) to Coffee Berry Cir 0 (ft)/ 36 (ft) Fund Source Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 301 other Total 300 other Total 3 8 1 1 23 324 347 228 1 0 1 Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 1 98/99 ; 99/00 ; 00/01 ; 01/02 114 DI 01 B: 0l 0' El 01 11 01 01 R; 01 0; 01 01 114 C1 01 0; 1051 0; 300 Measure A/Western 0 0 0 0 D; Oi 0; 01 0; Ei 0' 0; Oi 0; 0 RI 0; 0; 01 Cm 1: 01 Oi 0: 0 300 Measure A/Western 8 Oi 11 01 0; 0' Ei 0; 0; Oi 0; 0 R1 01 0' 0' 01 0 C1 71 Oi 0; 0; 0 300 Measure A/Western El 01 0; 01 01 0 00 RI 01 01 0{ 1 1 0 Cm 11 0' 01Oi 0 300 Measure A/Western D1 211 01 01 01 0 El 21 01 0; 0' R: 01 0I 01 0' 0 Cm 0' 01 Oi 01 0 300 Measure A/Western 33 D; 0; 0' E1 01 01 0: 01 2 R1 01 01 01 01 0 0 C1 Oi 01 01 01 30 301 Measure A/Coachella Valley . 33 3 El Oi 0; 01 Oi 0 m m 0 C1 31 01 01 01 0 300 Measure A/Western 00r)��, . RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Sunset View Dr Shady View Dr 0.20 (mi) Resurf 26',0.17'AC SB 300 cycle 7 Sunshine Ct Fore Dr 0.02 (mi) Resurf 261,0.21'AC SB 300 cycle 7 EW (ft)/PW (ft) Fund Source Total Fund Source Amount x S1000 Page 50 III May 23, 1997 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 198/99 199/00 100/01 101/02 to 0.20 mi NWIy 26 (ft)/ 26 (ft) 300 other Total 33 DI 21 0; 0; 0; 0 Et Or 01 0; 0; 0 RI 0; 0; Of 0; 0 0 CI 311 Oi Oi OI 0 33 300 Measure A/Western Supa Ct Wanki Ave 0.05 (mi) Slurry Seal Slurry Seal Type II to Ely 26 (ft)/ 26 (ft) 300 other Total 4 DI 11 0; 0; 0; 0 EI OI 0; 0; 0; 0 RI OI Of 0; 0; 0 0 CI 3I OI 0; 0; 0 4 300 Measure A/Western to E'ly .05 mi 0 (ft)/ 33 (ft) Surfside Ave Vander Veer Rd to Windward Dr 0.51 (mi) 40 (ft)/ 40 (ft) Resurface 0.21', 40' RMS Sylvester Rd Mission Tr 0.21 (mi) Resurf 26',0.17'AC Tahquitz Rd San Jacinto Rd 0.25 (mi) Resurf 24',0.17'AC SB 300 cycle 7 Temet St 300 other Total 1 0 301 other Total 1 73 0 01 0; 01 0; 0; 0 EI 0; 0; Of 0; 0 RI 01 0; 0; 0; 0 CI 11 OI OI OI 0 300 Measure A/Western 73 oI oI oI oI 2 EI 01 01 01 1 RI OI OI OI 0 CI Of OI OI 70 301 Measure A/Coachella Valley 0 0 0 0 to Lakeview Terrace 26 (ft)/ 26 (ft) 300 Other Total 25 DI OI OI OI 01 2 EI OI OI OI OI 1 RI OI . OI OI OI 0 0 CI OI OI OI OI 22 25 300 Measure A/Western to Dickenson Rd 24 (ft)/ 24 (ft) 300 other Total 8 DI 1I Oi Oi Oi 0 EI . OI OI OI OI 0 RI oI oI oI oI 0 0 CI 71 OI OI pI 0 300 Measure A/Western 8 Wanki Ave - 0.17 (mi) Slurry Seal Slurry Seal Type II to Woshka Ln 0 (ft)/ 33 (ft) 300 other Total 2 DI OI OI OI OI 0 EI oI oI oI oI 0 RI oI 01 01 OI 0 0 CI 21 Oi Oi Oi 0 300 Measure A/Western 2 • " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 51 May 23, 1997 EW (ft)/PW (ft) Tetterington St Hayes Ave to Grand Ave 0.30 (mi) 24 (ft)/ 26 (ft) Recon 26',0.21'RMS on 0.5'DG Tioga In Via Real 0.03 (mi) Slurry Seal Slurry Seal Type II Trillium Dr Balsam St 0.23 (mi) Slurry Seal Slurry Seat Type II Trumpets Court Sunrose St 0.03 (mi) Slurry Seal Slurry Seal Type II to Ply 0.03 mi 0 (ft)/ 31 (ft) to E'ly 0.23 mi 0 (ft)/ 36 (ft) to E'ly 0.03 mi 0 (ft)/ 36 (ft) Turner St Grand Ave Sally 0.29 (mi) 26 (ft)/ 26 (ft) Recon 26',0.21'RMS on 1.0'OG Twinflower Ave Frederick St 0.18 (mi) Slurry Seal Slurry Seal Type II Tyler St 48th Ave 0.25 (mi) Resurface 0.21', 22' RMS to E'ly 0.18 mi 0 (ft)/ 36 (ft) to Coachella CL 22 (ft)/ 22 (ft) Coordinate with City of Coachella for paving of west half. Fund Source Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 301 other Total 2 12 10 22 103 Fund Source Amount x $1000 103 103 1 0 1 3 0 3 1 0 1 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction- D: E' R' C; 97/98 1 98/99 ; 99/00 ; 00/01 ; 01/02 01 0' i 0' 0; 0; 0' 0' 0: 300 Measure A/Western 0; 0; 01 01 D; 01 01 01 E; 0f Of 0: R; 01 Of 01 C; 11 Of Of 300 Measure A/Western DI E' R; CI D' E' i RI C: 0; 01 0: Of 01 01 0f 01 01 1 Oi 0{ 300 Measure A/Western 0; 01 Of 0f 01 Of 0; 01 01 11 0: 0: 300 Measure A/Western 103 DI 01 0f 21 Ef Of 01 1J RI Of Of Of 0 C1 Oi 0f 1001 300 Measure A/Western " 2 DI Of Of 01 Ef 01 Of Of RI Oi 0f 01 0 CI 21 0f Of 300 Measure A/Western DI E' i RI C 2; 1' 0; 1001 0' 0' 0' i 0f 0' 0' i 0f 0f 1: Oi 01 0' 1: Of Of Of 0, Of 01 O, 101 0f Of Of 301 Measure A/Coachella Valley 0 0 0 0 -0 0 0 0 0 0 0 0 0 0 0 0 0 0- 0 0 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 52 May 23, 1997 Unga Cir Hunwut Dr 0.02 (mi) Slurry Seal Slurry Seal Type II EW (ft)/PW (ft) Fund Source Total Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 ; 98/99 ; 99/00 1 00/01 ; 01/02 to N'ly 0.02 mi 0 (ft)/ 37 (ft) Valley Way SH60 to 34th St 0.42 (mi) 36 (ft)/ 36 (ft) Resurf AC paved road Van Buren Blvd (Northside) West of Regency Ranch to W'ly 0.5 mi 0.50 (mi) 0 (ft)/ 0 (ft) Const concrete V ditch Van Buren St 52th Ave to 55th Ave 1.51 (mi) 24 (ft)/ 24 (ft) Resurface 0.21', 24' A/C Coordinate with City of Coachella for 1/2 of project. 300 other Total 1 0 300 other Total 1 34 79 DI 01 01 01 01 0 E; 0; 0; 0; 0; 0 R; 0; 0; 0; 0; 0 Cl 11 0: 0: 01 0 300 Measure A/Western 113 D; 0; 0; 0; 151 0 E; Oi 0; 0; 2; 0 R{ 01 01 0: 01 0 C; 0; 0; 0; 0; 17 300 Measure A/Western 300 other Total 126 D; 2; 30 E; 0; 1 R1 0; 0 0 C; 0; 93 126 300 Measure A/Western Oi 0; 0 0; 0; -0 0; 01 0 Oi 0: 0 Varner Rd Ramon Rd to NWIy past Flying J 0.15 (mi) 42 (ft)/ 42 (ft) Resurf AC paved road and control drainage Heavy truck traffic and water deterioration Via Costa Brava Vanderveer Rd 0.57 (mi) Resurface Paved Road 301 other Total 67 DI 11 31 Oi Oi 0 E: 01 1: Oi Oj 0 R1 01 Oi Oi 01 0 : 62 Cl 01 621 01 01 0 301 Measure A/Coachella Valley 129 301 other Total 286 D: 141 01 01 01 0 El 11 01 Oi Oi 0 RI 01 Oi Oi Of 0 0 Cl 2711 01 01 Of 0 301 Measure A/Coachella Valley 286 to Seaview Wy 24 (ft)/ 24 (ft) Via El Rancho Camino Aventura to Camino Milio 0.25 (mi) 34 (ft)/ 34 (ft) Recon 34',0.5'DG,0.211RMS 301 other Total 60 DI Oi Oi 0; 0: 2 E; 0; 0; 01 01 1 Ri 01 01 Oi 01 0 '0 CI 0: 01 01 01 57 301 Measure A/Coachella Valley 60 301 other Total 47 DI 11 Oi Oi Oi 0 El 11 Oi Oi 01 0 i i i 01 0 0 Cl 451 01 01 01 0 301 Measure A/Coachella Valley 47 d t+ti 711 30 • • " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 53 May 23, 1997 Via Entrada Via Real 0.05 (mi) Slurry Seal Slurry Seal Type II EW (ft)/PW (ft) to McCall Blvd 0 (ft)/ 37 (ft) Via Montana Camino Aventura to Camino Campanero 0.50 (mi) 32 (ft)/ 32 (ft) Recon 32',0.5'DG,0.21'RMS Via Clued� Camino Aventura" to Camino Campanero 0.50 (mi) 36 (ft)/ 36 (ft) Recon 361,0.5'DG,0.21'RMS Via Real Avenida Intern� 0.36 (mi) Slurry Seal Slurry Seal Type II Vineland St Edgar Canyon Channel 0.01 (mi) Construct box culvert Waite Ave Devine Cir 0.08 (mi) Slurry Seal Slurry Seal Type II Wander Lust 0r Misty Wy 0.14 (mi) Resurf 33', 0.25' AC to Camino Donaire 0 (ft)/ 37 (ft) 26 (ft)/ 26 (ft) to S'ly 0.08 mi 0 (ft)/ 40 (ft) to Andrea Ave 33 (ft)/ 33 (ft) Fund Source Total 300 other Total 301 other Total 301 other Total 300 other Total 300 other Total 300 other Total 300 other Total 35 6 72 0 72 1 1 103 102 Fund Source Amount x S1000 1 0" 1 Measure A Funds by Fiscal Year Amount x S1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 198/99 199/00 100/01 101/02 0I 0' OI Oi OI 0 El 0' OI Oi OI 0 RI 0' OI Oi OI 0 C' 1' OI Oi OI 0 300 Measure A/Western 102 DI 1�� 0' 0' 1 ' �� 0 EI OI OI 1I OI 0 RI 0' OI OI Oi 0 0 C1 OI 01 1001 OI 0 301 Measure A/Coachella Valley 103 DI OI OI 0' 01 2 Ei OI OI Oi 0' 1 RI 0 CI OI 01 Oi OI 0 i 01 01 Oi OI 100 301 Measure A/Coachella Valley 6 DI 0; OI 0; 01 0 El RI OI 01 Oi OI 0 0 CI 6' 01 01 01 0 300 Measure A/Western DI El 01 0' 01 01 52 RI 0I 01 OI 01 20 01 01 0 CI 0' OI Oi OI 0 300 Measure A/Western DI Oi OI 0' 01 RI Oi OI OI 01 0 CI 1' OI 01 01 0 300 Measure A/Western 35 0' 01 OI OI 21 0 El Oi OI OI 11 0 RI I 01 01 pI 01 0 CI Oi OI 01 321 0 300 Measure A/Western 0 _ I 3 1 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 54 May 23, 1997 EW (ft)/PW (ft) Fund Source Total Fund Source Amount x S1000 Measure A Funds Amount x D = Design R = Righ E = Environmental C by Fiscal Year $1000 t of Way Acquisition = Construction Wanki Ave Woshka Ln 0.43 (mi) Slurry Seat Slurry Seal Type II to Nayut Ln 0 (ft)/ 36 (ft) Warner Tr Miles Ave to Sly 0.33 (mi) 28 (ft)/ 28 (ft) Reconstruct 28', 0.21' AC SB 300 cycle 8 Warren Rd Stetson Ave 0.40 (mi) Resurf AC paved road 300 other Total 6 0 6 97/98 ; 98/99 ; 99/00 ; 00/01 ; 01/02 D1 E R' i Cl 0: ' 0; 0; 6; 0; 0; . 0; 0 300 Measure A/Western 0; 0; 0; 0 301 other Total 251 251 D; 201 0; 01 0: E; 1; 0; 0: 01 R; 01 01 0; 01 0 Cl 2301 0f 0; 0; 301 Measure A/Coachella Valley 0 0 0 0 to N'ly 0.4 mi 28 (ft)/ 28 (ft) Washington St Bridge French Valley Stream 0.01 (mi) 0 (ft)/ 0 (ft) Realign and replace existing bridge Waterman Cyn Way Canyon Estates Dr 0.04 (mi) Slurry Seal Slurry Seal Type II Weatherly Court Billie Ann Ct 0.13 (mi) Slurry Seal Slurry Seal Type II 300 other Total 7 0 7 D1 El RI Cl 01 01 0; 0; 0; 0; 0; 0; 0; 0; 0; 0; 300 Measure A/Western • 0; 0' 0; Oj 6 1 0 0 300 other Total 58 152 210 D1 E' i R' Cl 3; 0; 0: 0; 5; 0; 50: 01 300 Measure A/Western 0; 0' 0' 0 0; 0; 0' 0; 0 0 0 0 to'Claystone Ave 0 (ft)/ 36 (ft) 300 other Total 1 0 1 DI Oj 0f El 01 01 R; 01 0f Cl 1; Oj 300 Measure A/Western 01 0' 0' 01 01 0' 01 01 0 0 0 0 to Ely 0.06 mi Wly .07 mi 0 (ft)/ 37 (ft) Wellman Rd Terwilliger Rd to Kirby St 1.00 (mi) 24 (ft)/ 26 (ft) Widen North side,0.5'0G; Resurf 26',0.21'RMS 300 other Total 300 other Total 103 2 2 D; , Oi 0; 0; El Oi Oi O R; 01 01 01 0 Cl 21 01 01 300 Measure A/Western 103 DI 01 01 El 01 01 RI 01 01 0 Cl 01 01 300 Measure A/Western 0j 0' i 01 01 0 0 0 0 01 0' i 01 i 01 2 1 0 100 0 0 0 0 • • RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE °A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 55 May 23, 1997 Weimar Rd Pelion Rd 0.05 (mi) Slurry Seal Slurry Seat Type II Wild Sage Ct Cannon Dr 0.10 (mi) Slurry Seal Slurry Seal Type II EW (ft)/PW (ft) to Dorval Ct 0 (ft)/ 32 (ft) to E'ly 0.10 mi 0 (ft)/ 36 (ft) Wildcat Ln N'ly 0.09 mi Victoria to S'ly 0.09 mi Victoria 0.18 (mi) 0 (ft)/ 34 (ft) Slurry Seat Slurry Seal Type II Wildwood Dr S Circle Dr 0.19 (mi) Resurf 24',0.17'AC SB 300 cycle 7 to Nemstreet Pl 24 (ft)/ 24 (ft) Wood Rd Van Buren Blvd to Sly 1.02 (mi) 26 (ft)/ 26 (ft) Resurf 13, westside, 0.17'AC East side is in the City of Riverside Pursue coop w/City SB 300 cycle 8 Wood Rd Markham St 1.50 (mi) Resurf to Cajalco Rd 26 (ft)/ 26 (ft) Wood St Grand Ave to Sly 0.28 (mi) 24 (ft)/ 26 (ft) Recon 261,0.21'RMS on 0.5'DG Fund Source Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 300 other Total 252 77 0 n 2 11 0 11 48 0 48 Fund Source Amount x S1000 1 0 1 1 0 Measure A Funds by Fiscal Year Amount x $1000 0 = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 ; 98/99 ; 99/00 ; 00/01 ; 01/02 DI 0; 0; 0: 0; E; 01 01 01 0; R; 0: 01 0: 01 C; 1; 0: 01 01 300 Measure A/Western 0 0 0 0 D; 0; 01 Oi 01 0 1 01 01 0 RI 0: Oj 0; 0: 0 CI 1; 01 0; 0; 0 300 Measure A/Western 2 DI 0: 0; 0; 0� Ei 01 0: Of 01 0 RI Of 01 0' i O CI 21 0i 0i 0: 0 300 Measure A/Western DI 11 0i 01 01 0 Ei 01 0: 0i 01 0 RI 0' 01 0; 0' 0 CI 10: 01 01 0i 0 300 Measure A/Western DI 01 0' 01 01 Ei 11 01 01 0f 0 RI Oj 0; 01 C; 47: • 01 0; 01 0 300 Measure A/Western 252 DI 0; 0; 1' El 01 01 1: 01 0 0 RI 01 01 0: 01 0 CI 0f 01 2501 01 0 300 Measure A/Western DI El 01 01 0i 01 1 01 01 01 01 RI 01 01 Ol 01 0 Of 01 01 Of 01 75 300 Measure A/Western �* •i of y) RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998-2002 Name Limits Length (mi) Description (comments) Page 56 RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT May 23, 1997 Woshka Ln Charles St 0.45 (mi) Slurry Seal Slurry Seal Type II EW (ft)/PW (ft) Fund Source Total Fund Source Amount x S1000 Measure A Funds by Fiscal Year Amount x $1000 D = Design R = Right of Way Acquisition E = Environmental C = Construction 97/98 ; 98/99 1 99/00 ; 00/01 ; 01/02 to Frederick St 0 (ft)/ 37 (ft) Yawl Ave Vander Veer Rd to Windward Dr 0.51 (mi) 40 (ft)/ 40 (ft) Resurface 0.21', 40' RMS * Future Projects District 3 Only 0.00 (mi) 300 other Total 301 other Total 7 DI 11• 0; 0: 0; 0 E; 0; 0; 0; 0; 0 R; 01 0; 0; 0; 0 0 C1 61 Oi Oi Oi 0 300 Measure A/Western 7 73 0 73 D; El R; C1 0; 0; 0; 2 0; 0: 0; 1 0; 0; 0; 0 01 0; 0; 70 301 Measure A/Coachella Valley 0 0 0 0 0 (ft)/ 0 (ft) These funds have not been assigned to specific projects but are available in the years shorn. * Future Projects District 4 Only 0.00 (mi) 300 other Total 1200 140 1340 DI 0; 01 0: 01 0 E; 0; 0; 0; 01 0 RI 01 0; 0; 0; 0 C1 0; 0; 6001 6001 0 300.Measure A/Western 0 (ft)/ 0 (ft) These funds have not been assigned to specific projects but are available in the years shown. 302 other Total 200 3985 4185 D1 0; 50: 50: 50; 50 E; 0; . 0; 0; Oi 0 121 0; Oi Oi Oi 0 C1 0; Oi Oi Oi 0 302 Measure A/Palo Verde • • f'4! .y Y " " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FISCAL YEARS 1998.2002 Fund Source Summary RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Page 57 May 23, 1997 Fund Fund Source Source Name 300 Measure A/Western 301 Measure A/Coachella Valley 302 Measure A/Palo Verde * Grand Totals * Fiscal Year (Amt x S1000) Fund Source 97/98 98/99 99/00 00/01 01/02 Total (AmtExx i 000)re 4563 4965 4977 5376 4990 24871 1786 501 576 579 971 4413 308 353 304 314 212 1491 6657 5819 5857 6269 6173 30775 0 00I3 " COACHELLA VALLEY " 0 o 13 6. " " " UPDATED PLAN RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 1997-98 Agency: The City of Indian Wells Prepared by: Timothy T. Wassil, P.E., Assistant Public Works Director Date: May 19, 1997 Item No. Project Name/Limits 1 93-48 Miscellaneous Repairs / Citywide 2 93-70 Citywide Pavement Overlay TOTAL FATIMIMISCIRCTCMSA.DOC Project Type Maintenance. Road Maintenance Page 1 of 5 Total Cost Measure "A" ($000's) Funds ($000's) $120,000 $78,000.00 $482,500 $41,276.84 $119,276.84 ,�� (-1 1  ) . Agency: Prepared by: Date: Item No. 1 2 UPDATED PLAN RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 1998-99 The City of Indian Wells Timothy T. Wassil, P.E., Assistant Public Works Director May 19, 1997 Project Name/Limits 93-48 Miscellaneous Repairs / Citywide Project Type Maintenance. Total Cost ($000's) $120,000 Measure "A" Funds ($ 000's) $ 30,000.00 TOTAL 93-70 Citywide pavement overlay Road Maintenance $43,000 $ 97,006.40 F ATIMMISCIRCTCMSA.DOC Page 2 of 5 $127,006.40 Pi el " " " Agency: Prepared by: Date: Item No. TOTAL FATIMIMISCACTCMSA.DOC UPDATED PLAN RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE 'A' LOCAL FUNDS PROGRAM FY 1999-2000 The City of Indian Wells Timothy T. Wassil, P.E., Assistant Public Works Director May 19, 1997 Project Project Type Total Cost Measure "A" Name/Limits $000's Funds $000's 3-48 $70,000 9 Miscellaneous Repairs / Cit ide 93-70 Citywide Pavement Overla Maintenance. Page 3 of 5 $128,500 $ 70,000.00 $ 67, 881.14 $137,881.14 ,�� tt ,a C �� r) 3 ,_) Agency: Prepared by: Date: UPDATED PLAN RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 2000-2001 The City of Indian Wells Timothy T. Wassil, P.E., Assistant Public Works Director May 19, 1997. Item No. Project Name/Limits Project Type Total Cost ($000's) $43,000 Measure "A" Funds ($000's) $ 43,000.00 1 . , 93-48 Miscellaneous Repairs / Citywide Maintenance. 2 93-70 Citywide Pavement $250,500 $107,171.06 TOTAL $150,171.06 FATIMIMISCACTCMSA.DOC Page 4 of 5 " " " Agency: Prepared by: Date: UPDATED PLAN RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM FY 2001-2002 The City of Indian Wells Timothy T. Wassil, P.E., Assistant Public Works Director May 19, 1997' Item No. Project Project Type Total Cost Measure "A" Name/Limits 1 ($000's) Funds ($000's) 93-48 Maintenance. $130,000 $130,000.00 Miscellaneous Repairs / Citywide 2 93-70 Citywide Road $33,000 Pavement Maintenance $ 32,883.96 Overla FATIMIMISCURCTCMSA.DOC Page 5 of 5 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM YEAR 1 - FY 1997-1998 Agency: CITY OF PALM DESERT Prepared By: Richard J. Folkers Date: May 28, 1997 ITEM NO. 4. v 6. PROJECT NAME/LIMITS San Pablo Ave. N/O Royal Palms Dr. Northeast Corner of Fred Waring Drive and Portola Avenue El Paseo Overlay: Hwy 11 I (West) to Hwy 111 (East) Highway 111 & Portola Avenue Gerald Ford Drive from Cook Street to Portola Avenue Deep Canyon Road: Fred Waring Drive to Whitewater Channel PROJECT TYPE Street Widening Widening of Corner Overlay Widening & Traffic Signal Water, Sewer, and Tragic Signal Storm Drain and Street Work TOTAL COST ($000's) $100 $200 $400 $500 $1,450 $1,400 MEASURE "A" FUNDS ($000's) $100 $200 $400 $500 $500 $200 • • " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM YEAR 2 - FY 1998-1999 Agency: CITY OF PALM DESERT Prepared By: Richard J. Folkers Date: May 28, 1997 ITEM NO. 1. 2. PROJECT NAME/LIMITS Cook Street and 42nd Avenue/ Mayfair San Pablo Avenue - YMCA/COD Driveway to Magnesia Falls PROJECT TYPE Traffic Signal and Street Extension Street Widening TOTAL COST I MEASURE "A" " ($000's) FUNDS ($000's) $500 $275 $500 $275 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM YEAR 3 - FY 1999-2000 Agency: CITY OF PALM DESERT Prepared By: Richard J. Folkers Date: May 28, 1997 Cook Street - Country Club Drive to Fred Waring Drive Portola Avenue - Alessandro Drive to Fred Waring Drive Fred Waring Drive Bridge Widening at the Palm Valley Channel San Pablo Avenue - Highway 111 to Fred Waring Drive Bridge Widening & Bike/Golf Sidewalk " " RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM YEAR 4 - FY 2000-2001 Agency: CITY OF PALM DESERT Prepared By: Richard J. Folkers Date: May 28, 1997 ITEM NO. PROJECT NAME/LIMITS PROJECT TYPE I TOTAL COST ($000's) MEASURE "A" FUNDS ($000's) 1. Frank Sinatra Drive from Cook Street to Gerald Ford Drive Street Widening, Median, Curb and Gutter $850 $850 RIVERSIDE COUNTY TRANSPORTATION COMMISSION MEASURE "A" LOCAL FUNDS PROGRAM YEAR 5 - FY 2001-2002 Agency: CITY OF PALM DESERT Prepared By: Richard J. Folkers Date: May 28, 1997 ITEM NO. PROJECT NAME/LIMITS Highway 111 From Highway 74 to Deep Canyon Road PROJECT TYPE Street Widening NOTE: Measure A 20 year life July 1989 - July 2009 . TOTAL COST ($000's) $6,000 MEASURE "A" FUNDS ($000's) $6,000 • • AGENDA ITEM 6B " " RIVERS/DE COUNTY TRANSPORTATION COMM/SS/ON I DATE: July 9, 1997 TO: Budget and Finance Committee FROM: Bill Hughes, Bechtel Project Manager THROUGH: Paul Blackwelder, Deputy Executive Director SUBJECT: Direction to Advertise Wall #35 on State Route 91 between Van Buren and Tyler. In April and May of 1996, both the City of Riverside and RCTC agreed on the selection of the Phase I noise walls between Magnolia to Mary streets. At the September 1996 Commission meeting, the Commission approved Amendment 4 to agreement RO 9101 with URS Greiner to prepare the plans, specifications and construction estimate (PS&E) for the Phase I noise walls. Wall #35 between Van Buren and Tyler streets on the northerly side of the freeway was included in the Phase I list. At the May 21, 1997 (special meeting) of RCTC, the Commission and Caltrans agreed to advance the delivery of noise wall #35. Through this agreement, Caltrans has agreed to provide $300,000 of funding to assist RCTC in making an early delivery of this wall. The remaining walls will all require the acquisition of temporary construction easements and so the construction cannot begin for another six to nine months on the remaining walls included in Phase I. The plans for Wall #35 are now complete with the exception of some landscaping details and maintenance issues that are yet to be finalized. These issues are lagging the rest of the design as a result of continued discussions with the City of Riverside and Caltrans to resolve how many trees will be planted and where they will be located, where vines will be planted to cover the walls after construction and who will maintain the walls on the City side after the walls have been constructed. Pending approval of both the City of Riverside and Caltrans and receipt of encroachment permits from both parties, Staff is seeking authorization to advertise this project for construction. This project will take approximately 3 months to construct after notice to proceed.. Staff will bring back the results of the bidding for the Commission to award the project to the lowest responsive bidder. Project Cost Financial Assessment $1,000,000 Source of Funds first $300,000 from Caltrans and the remainder from the $3,000,000 Phase I noise wall budget 000143 Financial Assessment " :v.a..v:: ::v:•:4..x..:.•n%.• :.:w.....v....: .:..�.:....::..:....:...:...:.:..:.:..:..:..:..:..:..:...n..w:...:.:: ••: n•.;v....:v :•: .• .}}:w.:v.:.:,„:..::: nxn: x::.: 4r.; .:w••..n.vw.{ v.... .ti.ni:F.S . ..•}.9.. ..:r•.:: r ??•n•S•.:.}.•:S: ::^.:.. F 'n•:..iv:•Yv.v. LI: /. ..:..r, h xnF h..v.r .... h n: }:•} r}r:::.{.h•..:}.}:•^.::' }}:.}:; xnv$ :..::iv.2::•.:}•.i.m..,.4::n:::•}:hh•.:.vT•.:+:•..v.:... :h:wnw:}5:h\n4nv xv:w::.w•.:ti'i•.....i...::.^ rn:.::v.}:.x}4: ::..:..:.l:.::.nv..•:vx}:F;•v;:.v:x<:�: + :y.,.v•...i::..kS:?: ... Included in Fiscal Year Budget y Year Included in Program Budget y Year Programmed Approved Allocation na Year of Allocation Budget Adjustment Required n Financial Impact Not Applicable STAFF RECOMMENDATION: That the Commission authorize Staff to advertise Wall #35 between Van Buren and Tyler on the northerly side of the freeway subject to obtaining encroachment permits from both the City of Riverside and Caltrans and direct Staff to bring back the results of the bidding process for the Commission to award the project to the lowest responsive bidder. 000143 " AGENDA ITEM 6C C00150 " " " RIVERS/DE COUNTY TRANSPORTATION COMM/SS/ON DATE: July 2, 1997 TO: Budget and Finance Committee FROM: Bill Hughes, Bechtel Project Manager THROUGH: Paul Blackwelder, Deputy Executive Director SUBJECT: SR 60 Retrofit Soundwall Program Approval of Resolution 97-12 for Funding Support by RCTC At the April Commission meeting, Staff was directed to submit the Riverside County candidate list of Retrofit Soundwalls to the CTC so that they might be considered to compete for a portion of the $50 million dollars that will be available in the 1998 STIP. Staff in conjunction with Caltrans and the City of Moreno Valley had identified five (5) locations of candidate soundwall projects adjacent to State Route 60 to submit as part of the Retrofit Soundwall Element of the 1998 STIP. Staff is of the opinion that all of these walls would have to be constructed when the Measure A project was constructed. By advancing the noise wall portion of the project, Riverside County can attract two thirds of the construction value of these walls. Since the Retrofit Soundwall Program is separate from the remaining STIP allocations, this will bring more money into Riverside County and make the future Measure A project less expensive. The proposed locations of the walls would allow the Measure A project to be constructed without having to reconstruct the soundwalls. Following is a list of the proposed candidate retrofit soundwall projects: SR 60 Candidate Soundwalls for 1998 STIP Retrofit Soundwall Program i Wall NO. Location Cost Local Match provided by Local Match 1 126 + 60 to 142 + 45 (North) $500,000 RCTC $166,667 2 151 + 91 to 167 + 35 (North) $ 500,000 RCTC $166,667 Subtotal RCTC $333,000 3 154 + 57 to 158 + 63 (South) $150,000 Moreno Valley $50,000 4 162 + 64 to 164 + 58 (South) $125,000 Moreno Valley $41,667 5 180 + 00 to 193 + 50 (South $600,000 Moreno Valley $200,000 Subtotal MV $292,000 5 _t SR 60 Candidate Soundwalls for 1998 STIP Retrofit Soundwall Program Total Construction $1,875,000 Total Match $625,000 In order for the Riverside County proposed sound wall list to be considered in the final list of the Retrofit Soundwall Program, resolutions of intent guaranteeing the local match must be submitted to Ca!trans to be included in August 22, 1997 final submittal to the CTC. Attached is Resolution 97-12 indicating the intent of RCTC to provide $333,000 of local match for the Retrofit Soundwall Program on SR 60. It is Staff's understanding the City of Moreno Valley is currently processing their resolution of intent to fund the remaining $292,000. Financial Assessment Project Cost $333,000+ $292,000 (City of Moreno Valley Source of Funds Measure A & City of Moreno Valley :.::::::::::::.:v:::::::::::::::.:.:•J:{•}vr:.J;•}:::::::::.y4J'{•J::.v:. , }:J:•:4}:•}:'fJ:•::J:•}:•JJ;•}:•JJ:{•J'•J;.}:•}: •:v:::::::; nv:::: J:•JJ'•i {"•• .....: .: ....:v;; .•..; ....v................ ... y...:::r::.....4. :::............ }:::vi;{:{vnv:•::4.}bJ:4}};{•J:•:{•}:•Ji}:•:{{J}:4:{•::nv.;�•:{::n::::•�....:....:{{:{::{.:5:::......:....................: .: '•JJJ.::'n J, S:: ' .;,�4:... ..:ti•'•. tiv:•'?.i'•i: r ti•...n {: •; n.v . r.�.r:. r............. n.. ...�?.r.:.v.•.: •..:4::{ :•: }.•: }.•J: J::: ?v:.+.v::::::.:v::: }:.;r..........?.w:. .. .. ` ,:., .i'::h''•.•}:::}}}J:• tin........ JJ:• .... .., ,r Included in Fiscal Year Budget y Year Included in Program Budget y Year Programmed 1997 Approved Allocation Year of Allocation Budget Adjustment Required n Financial Impact Not Applicable STAFF RECOMMENDATION: That the Commission adopt Resolution 97-12 to provide $333,000 of local match for the retrofit soundwall program for the soundwalls identified above on State Route 60. • • Cn1.5) " RESOLUTION NO. 9 9  Z A RESOLUTION OF THE RIVERSIDE COUNTY TRANSPORTATION COMMISSION INDICATING ITS INTENT TO PROVIDE MATCH FUNDS FOR SOUND WALL RETROFIT PROJECTS WHEREAS, the California Transportation Commission has indicated its intent to fund through the 1998 State Transportation Improvement Program (STIP) the construction of five (5) sound wall projects within Riverside County. The Sound Wall Project ("Projects") are as follows: " and; " and; Soundwall No. Location 1 126 + 60 to 142 + 45 (North) 2 151 + 91 to 167 + 35 (North) 3 154 + 57 to 158 + 63 (South) 4 162 + 64 to 164 + 58 (South) 5 180 + 00 to 193 + 50 (South) WHEREAS, the Commission intends to provide $330,000 as local match for the Projects, WHEREAS, the City of Moreno Valley has adopted a Resolution showing its intent to provide funding in the amount of $292,000 for the Projects, NOW, THEREFORE, the Riverside County Transportation Commission hereby resolves to commit $333,000 as local matching funds for the Projects. RVPUB\SCD\24166 r1 1 l ��' _L 5 3 APPROVED AND ADOPTED this 8 th day of July, 1997. ATTEST: Clerk of the Riverside County Transportation Commission AYES: NOES: ABSENT: ABSTAIN: RVPUB\SCD\24166 Bob Buster, Chair Riverside County Transportation Commission 2 Ca01J-4 ftiW E,VISt �,�, State of California t� Business, Transportation and Housing Agency ^ ?' lUi1.'a 036738 t,��k'� Memorandum emit ��p � iVtifi° To: DISTRICT DIRECTORS Date: June 2, 1997 • Attention: District Division Chiefs for Planning File No.: From: DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL PROGRAM E-204 Subject: Retrofit Soundwall Program Update The California Transportation Commission has deferred the development of the 1998 State Transportation.Improvement Program (STIP) until the statutorily required schedule, beginning in July. Commensurate with this delay and to assure that proposed candidate projects are adequately scoped and that estimates are complete and reliable, I am extending the deadline for both the draft and final tiered district lists of retrofit soundwall candidate projects. The draft lists, to be used in generating the 1998 Fund Estimate, are due in this office by the close -of -business on June 16, 1997. The final list, with final and approved NBSSRs must be received by COB August.22, 1997, to be considered for the 1998 STIP. We still expect the Commission to program approximately S50 million of retrofit soundwail projects. Each project will be presented by priority index number (PIN) within each tier. We will also be presenting the constituent elements of the PIN for each project, including: achievable reduction, measured noise level, number of living units attenuated, and the current inclusive cost. Several Districts have proposed candidate projects with a 33 percent local match (projects in tiers I & II). These projects must be identified as such in the June submittal. The August 22, 1997, final submittal must include a resolution of intent to provide the match funds from the sponsoring local agency. Please work with your agencies to ensure your final District list is complete and is reflective of our funding partners direction. The Districts() draft and final list should present, at minimum, the following information: Tier, District, County, Route, Beginning and Ending KP, length, PPO number, general location (if tier I or II the match agency), specific location description (include direction(s) of wall), achievable reduction in noise, measured noise level, number of living units attenuated, current inclusive cost, PIN, if area pre -dated the freeway, and any special notes e.g. payback or other pertinent information. fli I.55 Questions should be directed to Keith Jones by telephone at (916) 653-2351, ATSS 453-2351, or by groupwise to ddkjones@TRMAIL46. Sincerely, BRIAN J. SMITH Program Manager Environmental Program • i 1.53 AGENDA ITEM 7A e)015 " " " RIVERS/DE COUNTY TRANSPORTATION COMM/SS/ON DATE: July 2, 1997 TO: Budget and Finance Committee FROM: Bill Hughes, Bechtel Project Manager THROUGH: Paul. Blackwelder, Deputy Executive Director SUBJECT: Selection Process to Design Pedestrian Overcrossings and Station Electronic Surveillance Systems at the La Sierra and West Corona Metrolink rail stations. At the April Commission meeting of this year, RCTC adopted a plan for the expenditure of the remaining Proposition 108 and 116 funds that will expire in July of 1999 and under a separate item directed Staff to proceed with the phased implementation of electronic surveillance systems at the Riverside County rail stations. Included in the funding plan for the Proposition 108 and 116 funds was the construction of pedestrian overcrossings and rail station security systems at the La Sierra and West Corona Metrolink rail stations. The pedestrian overcrossings will be required prior to the BN&SF expanding their system to three (3) tracks through the stations. Having pedestrians crossing three active tracks is too great a safety concern to be adequately addressed by the existing at grade rubberized crossing that is protected only by flashing lights. If Proposition 108 and 116 funds are to be used to construct the overcrossings and satisfy the future requirement that we construct these overcrossings, then they must be constructed prior to July of 1999 when the funds will expire. The current selection list for consultants performing rail station related work is now exhausted. Staff is therefore recommending that RCTC advertise a new Request for Proposals (RFP) from qualified consultants to design the pedestrian overcrossing and optional station security surveillance system. A copy of the invitation to bidders is attached for your review. The selection panel will include representatives from the Cities of Corona and Riverside, SCRRA, and RCTC Staff. The results of the selection panel will be brought back to the Commission for award of a new contract to perform the design work. The calendar of .events is proposed as follows: Calendar of Events: Distribution of RFP Proposals are delivered to RCTC prior to 4 PM Interviews of firms on short list RCTC awards Contract Notice to Proceed Anticipated July 14, 1997 August 5, 1997 August 19, 1997 September 10, 1997 September 22, 1997 Crj;"` 53 RCTC awards Contract September 10, 1997 Notice to Proceed Anticipated September 22, 1997 Financial Assessment Project Cost $300,000 (estimated for design services) Source of Funds Proposition 116 and 108 }:k .. •.}:p..v r: , v r .v{3:5.;{:'j}}v{}: "':;{??r::.. ••''i''::}..v.v v:{;{;;''{ :{{.••{ ...i•.{F.'{'{•�tij;??: . A.v . :.: t;. v. ..; x.,.K:S•.; i}}.Z$,.. .t;.};.:. ' v3:i•]: l •{'v+•:^ :h'{; :.: rr. FF S%•i•v;,:•:::�;•}n �v:}. ... j v:k+•: {•;.{y;`t., ..x.}•`�:'i'.{f �:.:r:::. �::t}.•.s •; }},,'' Q:i• by}.:$$nv .vviv • v k1 4{•iC•: }. ...}:•Y.L.. r.:.........ri}. �vrt ..:. h{h.}:{::?.;.;:?r ,: {Y,•:;{?:`;hv h\} v }\}..... h`:• ... .... :..:::.. :.v:.:'C,{..ry::...............n........ rr...v..: }:'h::::::::: r: i,:{i:: v}:i���'r�•,:}ST' .................... ................... � a'<'}'';'<•:' 'N'.:Y' #'"<'�#.{if:;}:r^,t' "•>}F••i �::#t} }' ' "`::�t tom•: i . v{ .. r:}... .q..... :'}ti... ?..: \.. :.}}}:.\:,'':,'�:{v,{{•.^.�. •t�. •b: i:;•'•:.;.. ;..,�i,..{•;, .:: Kt•:�`.'•k.•:'M1,+i:: ••.vie.`•:. v..{... ;•}}:.,. ..:}r•''' :Gi },..,+.. .:!'.:..,.:v.}• •.d��;^S '•..., ;::iti vY: 2:. •{: {; {iti �•y;: i•:�. . . vA:?•:i::::: .t?v } tv{v;j;f.:.•: h•S}n vv'.<: n''J. \''�.\vh4 i}'k:':: �:•.:: �•�v:7i•. }}}.J.'h... }.::.. }}n 4•}}5:.....:..v:•I?n.f.:...x v \•..... .:�� v'}'f•.:::::::.............. r} •.. v....,'4vv v.F'�•. '. •:•.�.�5::::}}•::;:.;x{{^}'•}}:r{:?{p:•Y•.: �. ..........::�:�i�••••:•............:: ,q� 4�SP}}}% `.'.:� ktt:.. y, vy:•: )� *l. �v '. \ .. v \:\.; i?•..v,'�??... Included in Fiscal Year Budget y Year Included in Program Budget y Year Programmed Approved Allocation na Year of Allocation Budget Adjustment Required n Financial Impact Not Applicable STAFF RECOMMENDATION: That the Commission direct Staff to advertise the availability of the new request for proposals, organize a selection panel to evaluate the proposals received, interview the top firms, and bring back to the Commission the recommended top ranked firm to prepare the design for new pedestrian overcrossing and station security systems for the La Sierra and West Corona Metrolink Rail Stations. Cy) 5 RIVERSIDE COUNTY TRANSPORTATION COMMISSION July 14, 1997 Subject: Request for Proposal(RFP) to provide Engineering and Design Services for a pedestrian overcrossing and new electronic station security system at both the Riverside La Sierra and the West Corona Metrolink Stations. Dear Engineering Professionals: The Riverside County Transportation Commission (RCTC) is seeking proposals from qualified engineering professionals to provide Engineering and Design Services. The selected firm will assist RCTC with the design and agency coordination efforts required to retrofit a pedestrian overhead crossing that will link the existing platforms currently located on both sides of the BN&SF mainline tracks, at both the Riverside La Siena and West Corona Metrolink Stations (the Project). The new pedestrian overcrossings will replace existing at -grade crossings, over two sets of existing tracks, that currently link the existing platforms. The proposed new pedestrian overcrossings will also span over an area set -aside for a future third set of tracks. The selected firm will also assist RCTC with the design and agency coordination efforts required to install a new electronic station security system that will be monitored at the Riverside Downtown station. The engineering services will include the preparation of two sets of geometric approval drawings (GAD), one for each station, using conceptual alternatives derived from previous studies as a starting point. The GAD drawings will be used to obtain conceptual approval of the proposed pedestrian overcrossings and station security system from the various agencies that will have an interest in either project. A list of the interested agencies will include RCTC, BN&SF, Southern California Regional Rail Authority (SCRRA), the City of Corona, and the City of Riverside. Following the approval of the GAD drawings, the selected finn will prepare the construction plans for both the pedestrian overcrossing and the station security system that will include final plans, specifications and cost estimates (PS&E), for each station site. 1 _ 3560 University Avenue, Suite 100 • Riverside, California 92501 (909) 787-7141 • FAX (909) 787-7920 RFP for Pedestrian Overcrossings and Security System Upgrades at the Riverside La Sierra and West Corona Metrolink Stations July 14, 1997 The pedestrian overcrossing portion of the Project will, for the most part, be constructed in the existing railroad right of way where RCTC has an existing agreement with the BN&SF Rail Road.. The electronic surveillance system will also impact the station parking lot that is outside the rail road right-of-way but is either owned or leased by RCTC. It may be assumed that a Categorical Exemption (CE) will be filed by RCTC to clear the project environmentally. If any other unforseen right of way or environmental issues arise they will be addressed during the design phase of the project. The progress of work will be coordinated with all interested agencies through regularly held project development team meetings (PDT). The Project Manager of the selected firm will be expected to schedule, administer and document the proceedings of each of these meetings and coordinate the progress of work with each of the impacted agencies under the direction of RCTC Staff. In the design of the pedestrian overcrossings the selected firm must demonstrate that the approved plan will work seamlessly with future station expansion efforts to accommodate the BN&SF third track, with minimal through -a -way construction. Construction will include the following items: 1. Pedestrian Bridge at each station site (with an estimated cost of $1,300,000 each) 2. Electronic Station Security Surveillance System at each station site that is monitored at the Riverside Downtown Station. A detailed description of the scope of services that will be required of the selected firm is attached for your information along with several other project documents that will assist in your understanding the scope of services that is required of the selected firm. In addition to the attached technical requirements, you should also be aware of the following requirements: 2 C 12. " " RFP for Pedestrian Overcrossings and Security System Upgrades at the Riverside La Sierra and West Corona Metrolink Stations July 14, 1997 " Technical Proposals must be received prior to 4: 00 P.M. on the designated date below in the Calendar of Events. " Eight (8) Copies of your Technical Proposal shall be submitted. " In addition to the Technical Proposal, each firm shall submit one (1) copy of your cost proposal in a separate sealed, self-addressed envelope. Cost proposals submitted by firms unsuccessful in this selection process will be returned unopened to the respective firms. " The Technical portion of the Proposal will be considered to be Public Information. " If your proposal is accepted, RCTC intends to enter into a contractual agreement with your firm to provide the engineering services for the Project. The content of the your proposal will become an integral part of the contract documents. " Any contract to be awarded as a result of this RFP, will be awarded without discrimination based on race, color, religion, sex or national origin. " RCTC's M/W/DVBE Contract Participation Program affirms the utilization and participation of qualified minority, women and disabled veteran firms in its contracting and procurement activities. RCTC encourages candidate firms to afford competitive subcontracting opportunities to minority, women and disabled veteran firms, where possible, in their contracting and procurement activities with the Riverside County Transportation Commission. " Based on the evaluation of the submitted proposals, a short list of firms will be established to be interviewed by a Selection Committee. Ater hearing the responses of the interviewed firms, the Committee will select one firm and negotiations will begin immediately to finalize the personnel, hours, hourly rates, use of subconsultants, and other direct costs that will be required to complete the agreement between RCTC and the selected firm. If agreement can not be reached with the selected firm, the Selection Committee will identify the next most responsive and qualified interviewed firm and the negotiation phase will be repeated. This process will be continued until agreement is 3 RFP for Pedestrian Overcrossings and Security System Upgrades at the Riverside La Sierra and West Corona Metrolink Stations July 14, 1997 reached with a qualified firm that can provide the required services. Calendar of Events: Distribution of RFP July 14, 1997 Proposals are delivered to RCTC prior to 4 PM August 5, 1997 Interviews of firms on short list August 19, 1997 RCTC awards Contract September 10, 1997 Notice to Proceed Anticipated September 22, 1997 Prospective firms are encouraged to promptly notify the Riverside County Transportation Commission of any apparent major inconsistencies, problems or ambiguities in the Scope of Services. All inquires and responses to this request for proposals should be submitted to: Riverside County Transportation Commission 3560 University Ave, Suite 100 Riverside, CA 92501 Attention: Bill Hughes (909) 787-7141 Sincerely, Jack Reagan, Executive Director Riverside County Transportation Commission Exhibits: A. RFP Submission Requirements B. Scope of Work C. Model Agreement D. Site Drawings showing proposed plans 4 • • " " " RFP for Pedestrian Overcrossing and Security System Upgrades at the Riverside La Sierra and West Corona Metrolink Stations July 14, 1997 EXHIBIT A-- PROPOSAL SUBMISSION REQUIREMENTS: 1. Technical Proposals must not be more than 25 single sided 8.5 x 11 pages in length -- not counting the front and back covers of the proposal. Foldouts will be counted for the equivalent 8.5 x 11 pages that they represent (i.e. single sided 11 x 17 would count for 2 pages, duplex 11 x 17 will count 4 pages, and so on.). All fonts shall be 10 point or larger. 2. Name the prime and subconsultants that will comprise the team and identify the executive officer of each company. Provide legal form and ownership disclosure for the prime. 3. Describe the prime work backlog and the percent of total work backlog that this project would represent in terms of staff hours. Identify the proposed Project Manager for the team who will be the sole point of contact for RCTC for day to day operations. Provide a list of the past projects managed by the proposed Project Manager and provide a reference contact (name and phone number) for the relevant projects managed within the last three years. 5. List the key personnel who will participate in performing the scope of work. Provide a resume for each listed team member. (Includes subconsultants key personnel who will be completing a portion of the scope of work.) 6. Provide an organizational chart depicting the relationships between the team members and the participating agencies. 7 List recently performed, relevant projects that indicate the past performances and abilities of the proposed team. Include a key client contact person with current phone number. 8. Provide a description of your team's understanding of the Project and your team's project approach. Provide a list of recommended tasks and milestones to address the provided scope of work. 9. Provide a project flow chart depicting key task activities and sequence. 10. Provide a proposed project schedule that includes the key task activities, durations and milestones that will complete the scope of work in the shortest time frame that is A -1 030164 RFP for Pedestrian Overcrossing and Security System Upgrades at the Riverside La Sierra and West Corona Metrolink Stations July 14, 1997 EXHIBIT A-- PROPOSAL SUBMISSION REQUIREMENTS: responsive to the required review process. 11. Identify M/W/DVBE firms and percentage of work that they will perform. 12. The technical proposal shall include a cost proposal provided in a separate sealed envelope. The cost proposal shall include a cost analysis for the entire project and for each phase 'identified in item 7 above. A manpower analysis table will also be included that lists the job classifications, compensation level, and proposed hours of personnel assigned to the various Project tasks. A -2 • • CCu165 AGENDA ITEM 8A • RIVERSIDE COUNTY TRANSPORTATION COMMISSION DATE: July 2, 1997 TO: Budget and Finance Committee FROM: Jerry Rivera, Program Manager THROUGH: Jack Reagan, Executive Director SUBJECT: FY 1997-98 Local Transportation Fund Allocations for Transit In order for the public transit operators to claim Local Transportation Fund (LTF) money for operating and capital purposes, the Commission must allocate funds to support the transit services and capital projects contained in the approved FY 1998-2004 Short Range Transit Plan (SRTP). The Riverside County SRTP for all public transit operators in Riverside County (including Commuter Rail) was reviewed and approved by the Commission at their meeting on June 11, 1997. At the February 13, 1997 Commission meeting, the FY 1997-98 Local Transportation Funds were apportioned to the three apportionment areas: Western Riverside, Coachella Valley, and the Palo Verde Valley area. The apportionments for the three areas were $21,373,972; $6,184,139, and $473,417, respectively. In addition, an estimated $1,257,000 in apportioned but unclaimed funds are available in the Western County area for transit services. The FY 1998 LTF allocations for the transit operators are consistent with the approved SRTP. Carry-over funds used in these calculations are preliminary estimates and may change. Any modifications in fare box revenue, federal grants, Measure A funding, or carry-over funds may require the operator(s) to revise their services to operate within the LTF funding limitations. Financial Assessment I Project Cost See attached schedule Source of Funds LTF A v n•{.s:?:?:'S'6• ti:: �:;.{::,�1 ....:.?•.. _{':•,•r f:...:f: y::: •i.. •..• . • iu` .: $n.:. +.r�Y.:k.::::h �•�v�xS•.i..}n.��iu ..,:}'•'x.. •<:. •y �}. ...??::i\ 7 .•+..5$;:: ;{.0•!•v{>iiYf'S`.k�•Y3`i.••.•.'�.•..+. ;::£:i '.i'�F' •},i qti ii?is::?�:•i::::,?,.xl?}Y.?•ii:':.•l G}{:�Y :???•}:•iti• ..::........::::::::::: ,`.':i:}::::::::. •$ti?,::•.y''�+••�{' • •++•C'S3::• A.:... �'• ::::. ,v,..v;$ . ?, , ?•�' %�2•'.'v+c.'••.?f;;; Vv'.i^• .:: :..?};4!. 'n '.• •.v... 1... .?4?'i:'r,'G?`.�:7 .Z:: r.�,i. • r... •.::::i?:';::a •'•: vr} :: �}' ':'•:>':• f � ti'?••:: •: v.v.. . .. A�..'.• 1Yr �.%iiN/•::ti+ �•:%.•'.{• :':.}" ,},. }.•?it•• .\:.�. +tik ":.:•:i ...•S .+:/. '• SL.:.",y+{. , .+;'', �v.,. \ .yam:\. r; •.'\i£ ,v4 •.. t •{' '. �:i'. •,:.hy. •p? �?.• v S•}}. •• •v`i' . {:tii: • ry,.;. ' .:.{:$•�? ti ., :•:•::::.•.i`n:: i.iv'`::1:.�5:�'.i���•;':S•''�•,'..•,..•?;:::i?;ti�,?•�•j•',•••,•.••'};::.v.:i'.ffr+j:,W;;'iv:;{.:�;:;.N...>.j�,4}�y.;••�,•1. {••: L�+}:::::�i,•;>.�v.� Included in Fiscal Year Budget N/A ::ii.?:tl Year Included in Program Budget Year Programmed Approved Allocation Year of Allocation Budget Adjustment Required Financial Impact Not Applicable • '4 STAFF RECOMMENDATION: That the Commission approve the FY 1997-98 LTF Allocations for Transit in Riverside County as shown on the attached table. • • C 63 TRANSIT OPERATOR BANNING BEAUMONT CORONA RIVERSIDE SPECIAL SERVICES' RIVERSIDE TRANSIT AGENCY METROLINK WESTERN COUNTY TOTAL FY 1997-98 LOCAL TRANSPORTATION FUND ALLOCATIONS FOR TRANSIT ESTIMATED OPERATING COSTS $533,600 $510,200 $525,600 $1,399,400 $20,468,583 $3,183.000 $26,620,383 ESTIMATED CAPITAL COSTS $513,000 $190,000 $395,000 $50,000 $11,969,300 $10 922.434 $24,039,734 ESTIMATED TOTAL COSTS $1,046,600 $700,200 $920,600 $1,449,400 $32,437,883 S14.105,434 $50,660,117 ESTIMATED CARRYOVER FUNDS ESTIMATED NON LTF REVENUES $636,1135 $133,100 $500,120 $195,369 $16,843,117 $9.981,000 $189,928 $28,288,891 $15,000 $115,000 $30,000 $0 $29,928 RECOMMENDED LTF TRANSIT ALLOCATION $395,415 $452,100 $390,480 $1,254,031 $15,564,838 14.124-411 $22,181,298 SUNLINE TRANSIT AGENCY COACHELLA VALLEY TOTAL $9.700.000 $8,700,000 $3.476.000 $3,476,000 $13,176,000 $13,176,000 1190,214 $90,000 $7,266.0001 $7,266,000 i $5,820.000 $5,820,000 PALO VERDE VALLEY T.A. PALO VERDE VALLEY TOTAL COUNTY TOTAL $120,911 $120,811 $36,441,294 $150.000 $150,000 $27,665,734 $270.911 $270,811 $64,107,028 115.1V2 $15,300 $285,228 • Includes $100,000 for Transportation Terminal funded through STA funds. JR: 06/24/97 $12.500 S12,500 $35,567,3911 $243.111 $243,111 $28,244,409 • AGENDA ITEM 8B tr frn, 1 7 " " " RIVERS/DE COUNTY TRANSPORTATION COMM/SS/ON DATE: July 9, 1997 TO: Budget and Finance Committee FROM: Cathy Bechtel, Program Manager THROUGH: Jack Reagan, Executive Director SUBJECT: Revision of City of Corona's Vehicle Replacement Plans We have received a request from the City of Corona to revise their vehicle replacement plans. The City currently has a FY 1997 Federal grant pending for $1 12,000 in Federal Section 5307 funds (matched by $28,000 in Local Transit Funds) for the purchase of two replacement vans. The City requires an additional $40,000 to purchase the two vehicles since they desire to buy slightly larger vans. The FTA has agreed to increase their funding by $32,000 (80% of amount needed) with the stipulation that both RCTC and SCAG agree with the increase and can provide the additional local funds of $8,000. There are sufficient local transportation funds available in the Western County apportioned but unclaimed pot for this purchase and staff would support this request. Additionally, in the City's FY 1998 Short Range Transit Plan they have identified the replacement of five vans. They are now requesting to purchase a total of three larger CNG vehicles with a total cost of $270,000, instead of the five vans. The plan assumed a total cost of $392,000 ($314,000 FTA, $78,000 Measure A) so this would be a reduction in the amount of federal and local funds needed. If this request is approved, the Section 5307 Program of Projects would need to be amended to show the City of Corona's project as three vehicles instead of five. Financial Assessment Project Cost Included in Fiscal Year Budget + $8,000 in LTF for FY 1997 program. -$24,000 in Measure A Specialized Transit for FY 1998 ��i:" {i'+^'" ''"':.n��k'::" r.:v��}:'" .:����'��..^ui {tiff i{i:?" " :" '" iii: f;.{:: ': {: ....ky.4 " p:'{:y; �� Year Included in Program Budget Year Programmed Approved Allocation Year of Allocation Budget Adjustment Required Financial Impact Not Applicable t n r1 f _�� 't' STAFF RECOMMENDATION: That the Commission: 1) Approve the City of Corona's request to adjust their FY 1997 vehicle replacement program as stated above and support the $32,000 increase in federal transit funds for Corona's FY 1997 Program; 2) Allocate an additional $8,000 in Local Transportation Funds for use in completing their FY 1997 program; and 3) Approve the amendment to their FY 1998 vehicle replacement plan. • • • CCC172