Loading...
HomeMy Public PortalAboutResolution 2022-22 Engineering Standards Manual AmendmentRESOLUTION 2022 - 22 A RESOLUTION OF THE CITY OF CRESTVIEW, FLORIDA, PROVIDING FOR THE AMENDMENT OF PORTIONS OF SECTIONS OF THE ENGINEERING STANDARDS MANUAL; PROVIDING FOR AUTHORITY; PROVIDING FOR SEVERABILITY; PROVIDING FOR SCRIVENER'S ERRORS; PROVIDING FOR LIBERAL INTERPRETATION; PROVIDING FOR REPEAL OF CONFLICTING CODES AND ORDINANCES; AND PROVIDING FOR AN EFFECTIVE DATE WHEREAS, the City is authorized and empowered to adopt and enforce ordinances, resolutions and codes, not inconsistent with state law that are necessary to regulate development; and WHEREAS, staff has determined that various Engineering Standards Manual amendments would positively impact the capacity for both developers and citizens to develop their property in a way that is within their rights and with respect to the rights of other citizens. BE IT ORDAINED BY THE CITY COUNCIL OF CRESTVIEW, FLORIDA, AS FOLLOWS: SECTION 1— ENGINEERING STANDARDS MANUAL AMENDMENTS. Multiple sections of the Engineering Standards Manual are amended to revise various elements of the Code to make the code more cohesive, logical, and beneficial for both developers and citizens, as attached to this resolution (Attachment 1). SECTION 2 — AUTHORITY. The authority for enactment of this resolution is Section 166.041, Florida Statutes and The City of Crestview Engineering Standards Manual. SECTION 3 — SEVERABILITY. If any word, phrase, sentence, paragraph or provision of this ordinance or the application thereof to any person or circumstance is held invalid or unconstitutional, such finding shall not affect the other provisions or applications of this resolution which can be given effect without the invalid or unconstitutional provision or application, and to this end the provisions of this ordinance are declared severable. SECTION 4 — SCRIVENER'S ERRORS. The correction of typographical errors which do not affect the intent of this resolution may be authorized by the City Manager or the City Manager's designee, without public hearing, by filing a corrected or re -codified copy with the City Clerk. SECTION 5 — RESOLUTION TO BE LIBERALLY CONSTRUED. This resolution shall be liberally construed in order to effectively carry out the purposes hereof which are deemed not to adversely affect public health, safety, or welfare. SECTION 6 — REPEAL OF CONFLICTING CODES, ORDINANCES, AND RESOLUTIONS. All Charter provisions, codes, ordinances and resolutions or parts of charter provisions, codes, ordinances and resolutions or portions thereof of the City of Crestview, in conflict with the provisions of this resolution are hereby repealed to the extent of such conflict. SECTION 7 — EFFECTIVE DATE. This resolution shall take effect immediately upon its adoption. NOW THEREFORE BE IT RESOLVED that the City of Crestview approve the amendment of ions of sections of the Engineering Standards Manual. ADOPT I5 this 2nd day.of August 2022. WhittA,u, May i Awl �.,,,\p r `Pi` 0-- -"\--.Q,, 41i\ ATTEST: `%++++H;;g. %, ORESr e4I :. 0AVORAreV420. • E U .i• s s • A� en t 1�.,-: ., •_ do• ne . rader, City Clerk __________________________________ CITY OF CRESTVIEW DEPARTMENT OF PUBLIC SERVICES __________________________________ Adopted February 2021 Michael J. Criddle Director of Public Services Marc D. Bonifay, P.E. City Engineer Latest Revisions: August 2022 City of Crestview Engineering Standards Manual August 2022 i TABLE OF CONTENTS 1.0 INTRODUCTION ………………………………………….………………………………………………………………. 1 2.0 POLICY ……………………………………………………………………….………………………………………………. 1 3.0 EROSION & SEDIMENTATION CONTROL ……………..…………….…………………………………………. 1 4.0 STORMWATER MANAGEMENT ………………………………………………………………….……………….. 2 4.1 Retention/Detention Basins ………………………………………………………………………………….. 2 4.2 Stormwater Conveyances ……………………………………………………………………………………... 3 5.0 ROADS & STREETS …………………….…………………………………………………………………….……….…. 4 5.1 Traffic Study ………………………………………………………………………………………………………….. 4 5.2 Street Layout ……………………………….………………………………………………………………………... 5 5.3 Roadway Design ……………………………………………………………………………………………………. 6 5.4 Testing ………………………………………………………………………………………………………………….. 8 6.0 DRIVEWAYS, PARKING & VEHICULAR ACCESSABILITY ………………………………………………….. 8 6.1 Driveways ……………………………………………………………………………………………………………... 8 6.2 Parking ………………………………………………………………………………………………………………….. 9 7.0 SIDEWALKS & MULTI-USE PATHS …………………………………………………………….………………... 10 7.1 Sidewalk Standards ………………………………………………………………….………………………….. 10 7.2 Multi-Use Paths …………………………………………………………………………………………………... 10 8.0 POTABLE WATER DISTRIBUTION ……………………………………………………………………………….. 11 8.1 Purpose ……………………………………………………………………………………………………………….. 11 8.2 General Description of Work ……………………………………………………………………………….. 11 8.3 Regulations …………………………………………………………………………………………………………. 11 8.4 Design Standards …………………………………………………………………………………………………. 12 9.0 SANITARY WASTEWATER COLLECTION ………………………………………………………………………. 17 9.1 Purpose ……………………………………………………………………………………………………………….. 17 9.2 General Description of Work ……………………………………………………………………………….. 17 9.3 Regulations …………………………………………………………………………………………………………. 17 9.4 Design Standards …………………………………………………………………………………………………. 18 City of Crestview Engineering Standards Manual August 2022 ii TABLE OF CONTENTS 10.0 CLOSEOUT & FINAL ACCEPTANCE ………………………………………………………………………………. 23 10.1 General Requirements …………………………………………………………………………………………. 23 10.2 As-Built Record Drawings …………………………………………………………………………………….. 23 10.3 Closeout Checklist ……………………………………………………………………………………………….. 24 10.4 2-Year Warranty Period ………………………………………………………………………………..……….25 APPENDIX A – CITY OF CRESTVIEW – STANDARD UTILITY SPECIFICATIONS SECTION TITLE PAGES 12 Trench Excavation, Backfill & Compaction ……………….…..……………………….……. 5 13 Pipe Boring, Drilling & Jacking …………………….…..……………………………………….... 5 14 Water Mains & Wastewater Force Mains ………..………..……………………………… 12 15 Sanitary Sewer Specifications ………………………………..…………………………………... 9 16 Lift Station Specifications ………………………………..……………………………………….. 15 City of Crestview Engineering Standards Manual August 2022 1 1.0 INTRODUCTION The 2021 City of Crestview Land Development Code was adopted on February 8, 2021 and became effective on February 24, 2021. Many requirements contained in the previous Land Development Code will now be located in the Engineering Standards Manual (ESM) of Crestview. The ESM is referenced throughout the Land Development Code, containing uniform minimum standards for the design and construction of required improvements acceptable within the City of Crestview. 2.0 POLICY The Engineering Standards Manual shall serve as the official document that contains the minimum standards for design and construction of required improvements throughout the City of Crestview. The Public Services Director shall establish and maintain the Engineering Standards Manual and such other standards for work within the public rights of way. 3.0 EROSION & SEDIMENTATION CONTROL Erosion and sedimentation control measures shall be installed around the perimeter of all construction sites that disturb the existing topography. Unless otherwise noted by City standards, all erosion control measures shall comply with the latest version of the Florida Department of Transportation’s (FDOT) Design Standards and the Florida Department of Environmental Protection’s (FDEP) Florida Stormwater Erosion and Sedimentation Control Inspector’s Manual. All development shall provide for erosion and sedimentation control as follows: A. An erosion control plan is required as part of the Stormwater Management Plan. B. The plan shall show the location of all erosion control measures, provide details of each and list the construction sequences. C. Before the commencement of construction activity, erosion control measures must be installed. D. Silt fencing shall be installed around the perimeter of the site to provide for erosion control and define the limits of construction activity. E. On site and downstream inlets shall be protected by temporary inlet protection. F. All soil stockpiles shall be protected against dusting and erosion. G. At all times during and after construction, disturbed areas shall be stabilized. Final stabilized areas shall be sodded/seeded and established prior to project closeout. City of Crestview Engineering Standards Manual August 2022 2 4.0 STORMWATER MANAGEMENT 4.1 Retention/Detention Basins In order to ensure the objectives and performance standards of this article will be met, the design, construction and maintenance of stormwater management facilities and drainage systems shall be consistent with the following standards: A. Stormwater management plans must be prepared, signed and sealed by a professional engineer registered in the state of Florida. This plan must include a drainage map delineating the watersheds of all onsite and offsite runoff. B. All developments shall treat the first flush of runoff on-site and assure that the post development runoff conditions will not exceed the predevelopment conditions for the critical duration 25-year storm event up to and including the 24-hour duration. This will include the subject site and any offsite contributing areas. C. The required treatment volume (first flush) shall be the runoff from one inch of rainfall with a minimum volume of one-half inch of runoff. This volume shall be retained or detained onsite to meet stormwater quality compliance. The volume calculation is: Area x Runoff Coefficient x 1” or Area x ½” whichever is greater. D. Runoff from impervious surfaces shall be treated to remove oil and sediment before it enters receiving waters. A skimmer shall be installed on all retention/detention basin overflow devices for this purpose. The skimmer shall be hydraulically designed to accommodate the required flow around the skimmer and into the overflow structure without overtopping the skimmer. Detailed dimensions and calculations shall be provided. E. The treatment volume retained in retention basins must be recovered through percolation within 72 hours following a storm event using a factor of safety of 2. Only the bottoms and applicable sides slopes can be used in recovery calculations. For wet detention ponds, the bleed down orifice must be properly sized to drawdown one-half the treatment volume between 48 and 60 hours. F. Percolation rates utilized in recovery calculations shall be obtained from a signed and sealed geotechnical report. In any circumstance, the maximum design percolation rate is not to exceed 2.5 feet per hour. G. For the purpose of stormwater quantity/flood control the post development discharge rate must not exceed predevelopment discharge rate for the 25-year storm event. The published FDOT 25-year/1-hour, 2-hour, 4-hour, 8-hour, and 24-hour rainfall distributions shall be analyzed to determine the critical duration and demonstrate compliance. In lieu of the FDOT rainfall distributions, the NRCS Type III distribution may be used for the 25- year storm. H. Developments that discharge directly into tidally influenced surface waters of the state must still meet treatment volume requirements but are not required to provide attenuation. City of Crestview Engineering Standards Manual August 2022 3 I. In areas where there is no legal or positive outfall for stormwater from the development site, the 100 year/critical duration storm event will be retained on site with no discharge. This volume must be recovered within 15 days. J. For ponds with a berm higher than 18 inches, a minimum freeboard of 20% of the total depth shall be provided during the 100-year/critical duration storm, with a maximum freeboard depth of one foot. K. All pond berms higher than 3 feet must have a clay core compacted to 95% and keyed into the natural grade. The minimum top width of the berm must be equal to the height of the berm with 3 feet as a minimum. L. The banks of detention and retention areas shall slope at a gentle grade into the water to a minimum depth of 2 feet below the water control elevation as safeguard against drowning, personal injury or other accidents, to encourage the growth of vegetation and to allow the alternate flooding and exposure of areas along the shore as water levels periodically rise and fall. All slopes steeper than 4:1 with a depth greater than 2 feet shall be fenced. The minimum height of the fence is 6 feet. M. Maintenance access must be provided to all stormwater management facilities. N. The City reserves the right to require compliance to higher standards for stormwater quantity and quality in areas of special concern as designated by the City. O. Runoff coefficients (“C”) used in design calculations shall not exceed the following: Wetland 0.15 Max. Wooded 0.20 Max. Undeveloped 0.25 Max. Vegetated 0.25 Min. Single-Family Residential 0.40 Min. Multi-Family Residential 0.70 Min. Commercial & Industrial 0.80 Min. Gravel & Pervious Parking 0.60 Min. Impervious 0.90 Min. 4.2 Stormwater Conveyances Drainage calculations are required for all stormwater conveyances including but not limited to pipes, inlets, curb & gutter, and open channels/swales within city rights of way and easements. Calculations must demonstrate capacity for the 25-year/critical duration storm as follows: A. A drainage map with delineated watersheds for each conveyance is required. B. The minimum allowable pipe diameter is 15 inches. Accepted pipe materials are Reinforced Concrete, Corrugated Polyvinyl Chloride, Polypropylene, and High-Density Polyethylene. High-Density Polyethylene is not permitted under streets. C. All pipes and storm sewers must be shown in profile view and have a continuous descending slope of 0.2% minimum to the discharge point. Head driven/bubble-up systems are prohibited. Where pipe sizes increase, crowns will be matched. Maximum pipe lengths between drainage structures is 400 feet. City of Crestview Engineering Standards Manual August 2022 4 D. All pipe calculations must use the slope of the hydraulic grade line not the pipe slope and account for any tailwater conditions. Systems discharging into ponds must use the discharge elevation of the pond as a minimum tailwater condition. The hydraulic grade line cannot exceed the grate top, slot, or throat elevation of any inlet within the system. E. The minimum allowable grate area for inlets without slots or throats is 12 square feet. Ditch bottom inlets not in vehicular use areas shall have grate tops a minimum of 6 inches above grade with a slot at grade. F. Flows from the design storm cannot exceed the published capacities for each inlet. Inlets in a sag curve must account for bypass flows from any upstream inlets on slope. G. The minimum slope for gutters is 0.3% and gutter spread calculations cannot exceed the top of curb. H. All open channels/swales shall be fully stabilized, have a minimum slope of 0.3% and require both capacity and velocity calculations. Any channel/swale with a velocity greater than 3 feet/second must be concrete. A channel/swale with a velocity greater than 6 feet/second requires energy dissipaters. Side slopes shall be 6 to 1 or flatter for grass and 3 to 1 or flatter for concrete. I. Open channels/swales in road rights-of-way shall have minimal depth, 6 to 1 or flatter side slopes and a 4-foot shoulder with a maximum cross slope of 6%. J. Drainage easements must have a minimum width of 20 feet. Easements for open channels shall provide 10-foot for maintenance access in addition to the top width of the channel. Wider easements will be required for deep and/or large pipes. 5.0 ROADS & STREETS All streets within the City of Crestview shall be designed and constructed to accommodate vehicles, bicycles and pedestrians. The construction shall be in accordance with the Florida Department of Transportation’s (FDOT) - Standard Specifications for Road and Bridge Construction; Roadway and Traffic Design Standards; and Manual of Uniform Minimum Standards for Design, Construction and Maintenance for Streets and Highways (known as the “Florida Greenbook”); latest editions. The standards of this chapter apply to both public and private streets. Streets are classified below by vehicles per day (VPD): Classification Trips (VPD) Arterial Streets > 9000 Major Streets 5001 – 9000 Collector Streets 2500 – 5000 Residential Streets < 2500 City of Crestview Engineering Standards Manual August 2022 5 5.1 Traffic Study A traffic study is required for all developments to estimate trip generation, internal traffic volumes and circulation, and projected traffic volumes and distributions at external access points and the surrounding roadway network. The study will address capacity issues of all existing roads in the area. This study shall utilize the latest edition of the Institute of Transportation Engineers (ITE) Trip Generation manual. Any development that generates significant capacity impacts to the surrounding roadway network, the developer will be required to provide additional roadway improvements deemed necessary by the City to mitigate impacts. 5.2 Street Layout Streets will intersect at angles no less than 60 degrees. Unaligned intersections shall be separated by a minimum of 150 feet between centerlines. Intersections involving more than four basic street approaches are prohibited. Streets will be laid out to avoid environmentally sensitive areas. A. Right-of-way minimum requirements: 1. Arterial streets: 100 feet. 2. Major streets: 80 feet. 3. Collector streets: 66 feet. 4. Commercial/Industrial/Institutional streets: 60 feet. 5. Residential streets 600 feet or more in length or more than 30 DU’s: 60 feet, 50 feet w/curb & gutter. 6. Residential streets less than 600 feet in length and 30 or less DU’s: 40 feet w/curb & gutter. 7. Cul-de-sacs: 100 feet in diameter. 8. Alleys and service drives: 30 feet. B. Access points: 1. Access points onto or from arterial, major, or collector roadways to commercial, industrial and/or other roadways shall have a minimum spacing measured centerline to centerline as follows: Classification Spacing (ft) Principal arterials 300 Minor arterials 250 Major streets 185 Collectors 140 City of Crestview Engineering Standards Manual August 2022 6 2. The limits listed above apply to all roadways within the City except those designated limited access roads. Roads with this designation are as follows: Name Sections Redstone Ave. Brookmeade Dr. intersection to the east The following “limited access” standards apply to the roadways listed above: a. Access points shall be located no closer than 500 feet apart regardless of which side of the street the access point is located. b. Median cuts shall be located no closer than 500 feet. c. Deceleration, acceleration, stacking lanes and median cuts shall be installed and constructed per FDOT standards. d. Other than existing driveways, no access will be allowed requiring a backing maneuver into the right of way. e. Other than heretofore platted lots of record, no access will be allowed serving individual private residential driveways. f. Residential developments contiguous to limited access roads shall be accessed by collector streets at a minimum distance of 500 feet apart. g. New connections to one side of the limited access road shall, were possible, coincide with existing intersections on the opposite side. h. This section is not intended to deny access to any existing lot, parcel, or tract of land for which the only means of access to the same would be by the limited access road, but is intended to limit any further divisions into parcels or lots unless compliance herewith is accomplished. C. Clear visibility triangle: In order to provide the motorist with a clear view of intersecting streets and driveway connections, there shall be a triangular area of clear visibility formed by two intersecting streets or the intersection of a driveway and a street. The following standards shall be met: 1. Nothing shall be erected, placed, parked, planted or allowed to grow in such a manner as to materially impede vision between a height of two feet and ten feet above grade, measured at the centerline of the intersection. 2. The clear visibility triangle shall be formed as specified in the “Florida Greenbook”. 3. Clear visibility triangles shall be provided at all intersections and driveways regardless of the direction of travel. For example, clear vision triangles shall be provided for both directions at an intersection even though one or both streets are one way only. Likewise, clear vision triangles shall be provided in both directions at a driveway connection even if the driveway is one way in only. D. Dead-end streets: All permanent dead-end streets require a cul-de-sac at the end. All dead-end streets that stub-out to undeveloped adjacent parcels or future phases of City of Crestview Engineering Standards Manual August 2022 7 development shall have a temporary turning circle with a minimum diameter of 60 feet. A dead-end street shall not exceed 1320 feet in length. 5.3 Roadway Design All roads shall, to the extent practicable, conform to the natural topography of the site preserving existing hydrology and vegetative patterns while minimizing erosion potential, runoff and the need for site alteration. All roads must have a centerline crown section with a minimum 2% slope to the sides. Inverted crown sections are not allowed. A. Subgrade: Unsuitable material such as stumps, roots, muck, etc., shall be removed to at least a depth of 2 feet below the subgrade. The subgrade shall be stabilized to a depth of 12 inches and a width of 3 feet beyond the edge of pavement. The subgrade shall be stabilized to obtain a minimum Limerock Bearing Ratio (LBR) of 40 and compacted to 98 percent of the maximum density as determined by modified AASHTO 180. B. Pavement minimum width, thickness, and base: All asphalt shall be tested per FDOT standard requirements. Structural course shall be SP-12.5 Superpave. Surface course shall be SP-9.5 Superpave. The base shall be stabilized to obtain a minimum Limerock Bearing Ratio (LBR) of 100 and compacted to 98 percent of the maximum density as determined by modified AASHTO 180. 1. Major streets: 26 feet, 3 inches, Optional Base Group 9. 2. Collector streets: 26 feet, 2 inches, Optional Base Group 6. 3. Commercial/Industrial/Institutional streets: 24 feet, 2 inches, Optional Base Group 6. 4. Residential streets 600 feet or more in length or more than 30 DU’s: 24 feet, 1-½ inches, Optional Base Group 4. 5. Residential streets less than 600 feet in length and 30 or less DU’s: 22 feet, 1-½ inches, Optional Base Group 4. 6. Alleys and service drives: 20 feet, 1-½ inches, Optional Base Group 4. 7. Intersections: 25-foot minimum radii, 2-inch thickness. 8. Cul-de-sacs: 80 feet in diameter, 25-foot return radii, 2-inch thickness. 9. One-way lanes: 16 feet in width. C. Curb and gutter: Concrete curb and gutter is required on all residential streets unless lot widths are 110 feet in width or greater. On streets where curb and gutter is not required, ribbon curb is required. All curb and gutter and ribbon curb shall be as follows: 1. Curb and gutter shall be a minimum of 18 inches wide by 8 inc hes deep and be of a barrier, mountable or header type. 2. Forms may be wood or metal and shall be set using sufficient supports to hold the concrete without moving. 3. Contraction joints shall be constructed every 10 feet, but no section shall be less than 4 feet. Steel templates shall be used for these joints and withdrawn after initial set. At intervals not to exceed 50 feet and at all structures, inlets and radius points, a ½ inch full-depth expansion joint shall be constructed of an approved material. City of Crestview Engineering Standards Manual August 2022 8 Expansion joints shall be constructed with preformed materials cut and shaped to the cross-section of the curb. 4. Compressive strength of the concrete shall not be less than 2500 psi at the end of 28 days. No concrete shall be placed when air temperature is 40 degrees Fahrenheit and falling. 5. Ribbon curb will be a minimum 12 inches wide by 8 inches deep with one reinforcing bar or wire mesh with 3000 psi concrete and a minimum 3-inch cover. Maximum street grade for ribbon curb is 5 percent. D. Shoulders: Shoulders are required on all streets not requiring curb and gutter and must have a minimum width of 4 feet. All shoulders shall have a cross slope of 6% or less and be stabilized with sod or other turf material approved by the City. E. Geometric design: All geometric design shall be per the “Florida Greenbook” and use a design speed of no less than 25 mph. The minimum vertical grade for any street is 0.3 percent. 5.4 Testing It is the contractor’s responsibility to provide the City all roadway test results which will include compaction tests for the subgrade, compaction and thickness of the base, and core samples of the asphalt. All tests are to be taken immediately before the next layer of the road cross section is installed. Any deficiencies must be corrected and retested before proceeding. Testing must be performed by a qualified geotechnical firm. Frequencies are as follows: A. Curb-pad: Test at 300-foot intervals, alternating from left side to right side and any other locations as directed by the City. B. Subgrade: Test at 300-foot intervals, alternating from left side to centerline to right side with additional tests at all intersections, cul-de-sacs, manholes, inlets, drainage structures and any other locations as directed by the City. C. Base: Test at 200-foot intervals, alternating from left side to centerline to right side with additional tests at all intersections, cul-de-sacs, and other locations as directed by the City. D. Asphalt: Test at 300-foot intervals, alternating from left side to centerline to right side with additional tests at all intersections, cul-de-sacs, and other locations as directed by the City. The City has the authority to require additional testing due to weather conditions. 6.0 DRIVEWAYS, PARKING & VEHICULAR ACCESSABILITY 6.1 Driveways All driveways constructed within the City of Crestview shall be paved from the edge of pavement to the right-of-way line. Driveways shall be constructed of a minimum of 3000 psi concrete or City of Crestview Engineering Standards Manual August 2022 9 asphalt pavement. Driveways shall have a minimum thickness of 5 inches for reinforced concrete pavement or 1 ½ inches of asphalt pavement. Driveways connecting to state roads shall be in accordance with FDOT Standards. The City reserves the right to require additional paving or reinforcement depending upon the type and amount of expected vehicular traffic. Construction of city street driveways shall conform to the following guidelines: A. Residential: Minimum width 10 feet and maximum width 24 feet with radii or flares of 5 feet. B. Commercial/Industrial/Institutional: Minimum width 16 feet for one-way operation and 24 feet for two-way with minimum right turn radii of 25 feet. Maximum width is 36 feet. A 24-inch thermoplastic stop bar and stop sign are required at all street connections. C. Minimum angle: Minimum acute angle measured from the edge of pavement is 45 degrees for one-way operation and 60 degrees for two-way. D. All driveways crossing drainage swales shall have a culvert with a minimum diameter of 15 inches. E. For driveways that intersect City sidewalks, the cross slope of a 5-foot wide section is to not exceed 1:50 (2%). Longitudinal slope is not to exceed 1:20 (5%). This section shall be striped as a crosswalk. F. Concrete shall be cured a minimum of 24 hours after pouring. G. Expansion joints shall be provided where concrete is placed adjacent to the existing curb, driveways, buildings and walkways. H. All driveways shall meet the clear visibility triangle and spacing requirements of Chapter 5. I. Grades shall follow the FDOT Standard Index. Residential driveways shall not exceed an algebraic difference in grades greater than 15% and no grade shall exceed 25%. 6.2 Parking Parking facilities shall be provided for all development s within the City unless located in the downtown or C2 parking districts. On-street parking is prohibited except in the downtown or C2 districts. The facilities shall be maintained for as long as the use exists. Parking lots shall be surfaced with gravel, asphalt, concrete, brick pavers or pervious pavers. Signage and striping are required on all parking lots. The City reserves the right to require additional signage, paving, or reinforcement depending upon the type and amount of expected vehicular traffic. A. Parking spaces: Parking spaces and access drive aisles shall be sized in conformance with the following: Parking Angle (degrees) Stall Width (ft) Stall Depth (ft) Aisle Width 1-way/2-way (ft) Parallel 9.0 24.0 16.0/24.0 30 9.0 18.0 16.0/24.0 45 9.0 20.5 16.0/24.0 City of Crestview Engineering Standards Manual August 2022 10 60 9.0 22.0 18.0/24.0 90 9.0 20.0 Na/24.0 Spaces in areas surfaced with asphalt or concrete shall be demarcated with a 6-inch white stripe. Areas with other surfaces shall provide some form of demarcation. The proper number of handicapped spaces shall be provided in accordance with ADA standards and these spaces must be surfaced with asphalt or concrete. B. Loading spaces: The standard loading space shall be 10 feet wide, 50 feet long, and provide a minimum clearance of 13 feet. The City reserves the right to require longer spaces depending upon the type and amount of expected loading vehicles. Adequate area shall be provided for maneuvering, ingress and egress. C. Wheel stops, bumper guards & fencing: Wheel stops, bumper guards & fencing are required along streets, property lines and sidewalks to avoid the chance of encroachment. D. Drive aisles: Drive aisles shall have a minimum width of 16 feet for one-way circulation and 24 feet for two-way circulation. Signs and arrows are to be used to indicate the direction of circulation. The minimum interior turn radius is 10 feet. 7.0 SIDEWALKS & MULTI-USE PATHS 7.1 Sidewalk Standards Sidewalks are required on City streets per the LDC. All Sidewalks constructed within the City of Crestview shall meet all current ADA requirements and be constructed of a minimum of 3,000 psi concrete and with a thickness no less than 4 inches. Where sidewalks cross driveways the minimum concrete thickness shall be 6 inches with fiber mesh reinforcing. The width of sidewalks shall be per the LDC but in no case less than 5 feet. Sidewalks located in state road right-or-way shall be in accordance with the Florida Department of Transportation’s (FDOT) Standard Specifications for Road and Bridge Construction and FDOT Design Standards, latest edition. The City reserves the right to require a pedestrian/access easement in order to accommodate sidewalks. Construction of City sidewalks shall meet the following requirements: A. Subgrade shall be firm and unyielding. B. The cross slope for all sidewalks shall not exceed 1:50 (2%). C. The longitudinal slope shall not exceed 1:20 (5%). D. When longitudinal slopes exceed 1:20 it is considered a ramp. Ramps must have appropriate landings at each end and can have a longitudinal slope no greater than 1:12 (8.33%) for a maximum rise of 6 inches or 30 inches with ADA approved hand rails. E. Minimum clear width around obstacles shall be 36 inches. F. Concrete shall be cured a minimum of 24 hours after pouring. G. Tooled control joints ½ inch deep shall be provided at a maximum of every 5 feet. H. Expansion joints shall be provided at a maximum of every 50 feet and where concrete is placed adjacent to existing curbs, driveways, buildings and walkways. City of Crestview Engineering Standards Manual August 2022 11 7.2 Multi-Use Paths The construction of multi-use paths is encouraged on City streets where bike lanes are not feasible. Multi-use paths shall be designed and constructed to accommodate both pedestrians and cyclists. Multi-use paths constructed within the City shall be constructed of a minimum of 3,000 psi concrete or asphalt. Multi-use paths shall have a minimum concrete thickness of 4 inches. One inch of asphalt may be used as an acceptable alternative to concrete. Construction of City multi-use paths shall conform to the following guidelines: A. Subgrade shall be firm and unyielding. B. The minimum width for all multi-use paths shall be 8 feet. C. The cross slope for all multi-use paths shall not exceed 1:50 (2%). D. The longitudinal slope shall not exceed 1:20 (5%). E. Minimum clear width around obstacles shall be 36 inches. F. Concrete shall be cured a minimum of 24 hours after pouring. G. Tooled control joints ½ inch deep shall be provided at a maximum of every 8 feet. H. Expansion joints shall be provided at a maximum of every 50 feet and where concrete is placed adjacent to existing curbs, driveways, buildings and walkways. 8.0 POTABLE WATER DISTRIBUTION 8.1 Purpose The following standards are intended as a guide to the design engineer in the preparation of plans for potable water improvements. While the design standards given are intended as minimum design criteria, it is recognized there may be individual instances where a less stringent criteria may be approved without affecting the integrity of the system. All potable water distribution systems shall be designed and constructed in accordance with the City of Crestview’s Standard Utility Specifications located in Appendix A of this manual. 8.2 General Description of Work The following minimum requirements are considered acceptable to the City of Crestview in the distribution of water for domestic consumption. Deviations from these standards may be allowed by the City only upon a finding that, in accordance with sound engineering standards, the granting of the deviation will not work to increase the likelihood of a system failure. No deviation will be allowed unless it is clearly noted on the approved construction plans. A. All expansion shall conform to the City’s Utility Master Plan for water maintained and amended by the City. B. When these standards differ from Local, State and/or Federal requirements, the more stringent requirement shall apply. City of Crestview Engineering Standards Manual August 2022 12 C. The distribution system of a waterworks includes the mains, valves, hydrants, consumer service pipes and meters, and other appurtenances. The system shall be designed to provide an adequate supply of water to the consumers for fire protection at all times. 8.3 Regulations The following agency regulations shall apply when applicable: A. Environmental Protection Agency and U.S. Public Health Service: The governing standards of these agencies will be followed when appliable. B. Florida Department of Environmental Protection: The water distribution system shall conform to the applicable State of Florida Department of Environmental Protection laws, policies, standards and rules and regulations for public water systems. C. Plumbing Codes: The provisions of the Plumbing Code of the City of Crestview and the Florida Building Code as it pertains to water supply and distribution, service line locations and materials, and backflow prevention devices, except as provided for elsewhere in these criteria, shall apply. D. Fire Codes: All aspects of the National Fire Protection Association (NFPA) code, latest edition shall apply to water distribution mains, fire service lines and fire hydrants. E. City of Crestview Public Services Department: All water distribution systems, that are to become a part of the City system shall be designed and constructed in accordance with these standards. Water system materials, installation of materials, and construction methods and procedures shall be in accordance with the current material and in stallation specifications in this manual. 8.4 Design Standards All water distribution system plans must be prepared, signed and sealed by a professional engineer registered in the state of Florida and shall meet the following standards: A. Flow Requirements: In sizing the distribution system water mains, the required design flow shall be the sum of the required fire flow and two-thirds (2/3) of the required domestic flow as contained below: 1. Required Domestic Flow (Residential): Required flow for domestic use in residential areas shall be in accordance with the following table: Maximum No. of Dwelling Units Minimum Supply per Unit (GPM) 50 4.0 100 3.0 200 2.0 >200 1.5 City of Crestview Engineering Standards Manual August 2022 13 2. Required Domestic Flow (Nonresidential): The required flow for commercial, institutional, industrial and other nonresidential facilities shall be determined by the Engineer of Record and approved by the City for each specific instance. Documentation with references will be required for the method used to determine the capacity. 3. Required Fire Flow (Single Family Dwelling Areas): Required fire flow for single family dwelling areas shall be 600 gpm per hydrant. 4. Required Fire Flow (Other Areas): Required fire flow for areas other than those occupied by single family dwellings shall be as determined by the governing authority. No pumping stations shall be used to meet fire flows unless written approval is provided by the City. All fire hydrants installed shall be capable of supplying 600 gpm. 5. Single Connection: A subdivision or development to be supplied by the City’s public water system and having a flow requirement as determined herein of not more than 1500 gpm may have a single connection to the distribution system. 6. Multiple Connections: A subdivision or development to be supplied by the City’s public water system and having a flow requirement as determined herein of more than 1500 gpm minute shall have 2 or more connections to the distribution system. A single connection may be made by using a pipe diameter sufficient enough to provide 1 ½ times the required flow with provisions for future connections, provided approval by the City. B. Grid System: All mains shall be interconnected to form a grid system. 1. Interconnections between 6-inch mains shall not be more than 1000 feet apart unless so authorized by the City. When greater separation of interconnecting mains is necessary, larger diameter pipes will be used. 2. If the installation of a "dead-end" main cannot be avoided, its dead-end length shall not exceed 600 feet unless authorized by the City and shall be 8-inch minimum. All dead-end mains of less than 8" shall have a permanent 2-inch blow-off (a post hydrant is acceptable). Dead-end mains of 8" or larger shall have provisions for a 4-inch blow- off mechanism (fire hydrant is acceptable). C. Distribution Mains: Distribution mains shall be of sufficient size to furnish the required flow at pressures and velocities as herein provided. Mains shall be located to provide service to each lot within a subdivision and to form a looped network as herein provided. All mains shall be installed only in dedicated streets, alleys, public rights-of-way or utility easements, in favor of the City for the use and benefit of the City. Utility easements must have a minimum width of 10 feet if adjacent to a right -of-way or 15 feet if not. All main locations and sizes shall be in accordance with the City's current “Utility Master Plan” and the approved subdivision master development plan and utility layout. 1. Required Pressure: Water pressure in the distribution system shall be not less than 35 psi with no fire hydrants in use. When fire hydrants are in use, water pressure in the main at sidewalk level shall not be less than 20 psi. When water pressure normally exceeds 100 psi, there shall be an approved type pressure regulator installed on the property side of the water meter in conformance with the Plumbing Code. City of Crestview Engineering Standards Manual August 2022 14 2. Minimum Size: Minimum distribution main diameter shall be 6 inches in single family residential areas and 8 inches in all other areas. 3. Standard Size: Standard sizes of mains used shall have nominal diameters of 4, 6, 8, 12, 16, 20 and 24 inches. 4. Velocity: Velocities in the mains shall not exceed 6 fps for non-fire flow conditions. 5. Cover: A minimum cover of 30 inches must be provided. At road crossings, a minimum separation distance of 24 inches shall be maintained from the bottom of the base to the top of the pipe or the top of the casing when provided. At strea m crossings, a minimum cover of 36 inches is required unless ball-joint ductile iron pipe is specified. 6. Crossings: a. Minor stream crossings: Crossings, where maximum stream width exceeds 25 feet and velocity at flood stage is between 5 and 9 fps, shall be encased in steel casing if buried or made with ductile iron pipe if elevated. This protection shall extend 5 feet beyond the bank and the pipe or casing shall be anchored to prevent shifting. b. Major stream crossings: Crossings, where stream width of surface water exceeds 99 feet, shall be encased in steel casing. This protection shall extend 20 feet beyond the bank and the casing shall be anchored to prevent shifting. c. Major road crossings shall be steel encased. Any additional requirements of the regulator agency responsible for the road shall be met. d. When crossing under pipes, conduits, or other structures greater than 24 inches in diameter, and a 6-inch separation distance cannot be maintained, the pipe shall be encased in steel casing for a minimum of 5 feet distance on either side of the crossed pipe. 7. Air Release Valves: Design of distribution system mains shall provide for the installation of adequately sized air release valves at appropriately selected locations. 8. Future Interconnections: Provisions for future connecting mains shall be made by extending construction of all water mains to the exterior boundaries of the property wherever future connections to adjacent properties are anticipated or are required to form an interconnected grid system as described above. 9. Valves: On distribution system mains up to 16 inches in diameter, a sufficient number of valves shall be installed so that no single case of accident, breakage, or repair to the water system will necessitate the shutdown of a length of pipe greater than 1000 feet. Valve spacing on 16-inch and larger distribution mains or transmission mains will vary depending on engineering design considerations. All valves shall be in accordance with the City Standard Specifications: 12 inch and smaller will be resilient seat gate valves, which may be direct buried with valve box; 16 inch and larger will be butterfly valves and installed in a vault. D. Fire Hydrants: Fire hydrants shall be located along public rights-of-way, preferably at street intersections. A 6-inch gate valve shall be installed between the water main and each fire hydrant. Fire hydrants shall be the dry barrel, breakaway traffic type. Fire City of Crestview Engineering Standards Manual August 2022 15 hydrants shall meet all requirements of the NFPA Code, latest edition and be provided as follows: 1. Spacing shall not exceed 500 feet (hose laid length) between hydrants in residential areas. New commercial buildings shall not be located over 300 feet (hose laid length) from a hydrant. 2. Distance from roadway or access area to fire hydrant and clearance around the hydrant shall be accordance with the NFPA Code. 3. Minimum clearance from the 4 ½-inch hydrant outlet to grade level shall be 12 - 18 inches as per NFPA. 4. Placement of the 4 ½-inch hydrant outlet normally shall be on side facing the street or access area; however, the outlet can be located facing any direction at the discretion of the Fire Department in accordance with NFPA. 5. All fire hydrants shall be fitted with a Hydra Storz with built -in check valve as per manufacture’s specifications. 6. A blue AA-ARC Long-Life Reflector with Type DB/AA2B two-way blue lens shall be placed on the edge-of-pavement directly in front of all fire hydrants. E. Water Services & Meters: Customer service lines shall be provided to all lots within a subdivision in accordance with the City Regulations. Customer service connections to industrial or commercial lots may be omitted provided approval of the City is obtained prior to plan approval. 1. Polyethylene tubing (200 psi rating) shall be used for 3/4 inch and 1-inch services. PVC pipe or ductile iron pipe may be used for 1½ inch and larger services. 2. When services must cross under existing City paved streets, boring will be required and complete details must be provided. If the street is in poor condition, open cut may be approved by the City. 3. All meters shall be adjacent to the property line and readily accessible to meter readers of the City; service lines shall terminate at the property line to facilitate the meter installation at or within 12 inches of the property line. It is the responsibility of the Developer/Contractor to locate the property line during construction so that service lines are terminated correctly. 4. A water meter of size required to satisfy design criteria contained herein shall be installed by the City at each connection point to the City distribution system. The Developer/Contractor shall pay for the meter. 5. All subdivisions to be supplied by the City’s water system shall require a double service connection to each lot to provide for irrigation. F. Water Taps & Connections: The City will install and make all taps and connections to the existing City mains. The Developer/Contractor shall pay for the taps and connection. 1. Service Saddles: a. For 3/4 inch and 1-inch taps on PVC pipe, a service saddle with a single 2-inch wide stainless-steel band or a double strap shall be furnished. The saddle shall be of cast or ductile iron and shall be epoxy, nylon or PE coated (10 mil minimum) approved styles as Ford F202 or Rockwell. City of Crestview Engineering Standards Manual August 2022 16 b. For 1½ inch and 2-inch taps on PVC pipe, a more stable saddle is required. Saddles for these taps shall have either two each stainless steel 2 -inch straps or a single stainless strap a minimum of 3¼ inches wide. The saddle body shall be cast or ductile iron and shall be coated with epoxy or nylon, approved styles as Ford F202 and Rockwell. 2. Tapping & Sleeve Valves: a. All tapping sleeves for use on water mains 12 inches or less in diameter shall be constructed of 18-8 stainless steel for corrosion resistance. The leg of the tapping sleeve may be either extruded or welded to the tapping sleeve. All welds on the sleeve shall be fully passivated to restore stainless steel characteristics. The flange shall be stainless steel with recess to accept standard tapping valves. The flange shall conform to AWWA C207 Class D-ANSI 150 lb. drilling. Bolt holes shall straddle the pipe center line. The sleeve will be equipped with a 3/4-inch NPT 18-89 stainless steel plug with a standard square head for testing. The gasket shall be of a 360-degree design and manufactured of gridded virgin GPR compounded for water service and complying with ASTM D2000-80M-4AA607. An 18-10 stainless steel armor shall be vulcanized to the gasket to bridge the gap between securing lugs. All bolts and nuts shall be 18-8 stainless steel with 5/8-inch NC threads. The lifter bar shall be of adequate design to provide a heavy bearing surface for all nuts. Bolt threads shall be fluorocarbon coated to prevent galling. Nyla Tron GS washers shall be provided for lubrication. Approved Ford - Fast Model. b. All valves used will be resilient wedge type and design ed for use with tapping equipment. They will have a non-rising stem and be of the resilient wedge type. All tapping valves will have an alignment ring to prevent misalignment with tapping sleeves. Valves will close clockwise (right), open counterclockwise (left) and be equipped with a standard 2-inch square operating nut. Valve outlets will have a flanged mechanical joint. Valves will meet or exceed provisions of AWWA Standard C509. G. Backflow Preventers: Backflow preventers (BFP’s) are required on all service lines, irrigation lines and private fire lines to prevent contaminated water from flowing back into the potable water distribution system. 1. BFP’s for commercial, industrial and institution use shall consist of reduced pressure devices. BFP’s for fire lines can have a double check valve assembly device unless chemicals are used then a reduced pressure device shall be installed. BFP’s for residential use shall consist of dual check valves for the potable line. Double check or pressure vacuum breaker devices installed at least 12 inches above ground shall be used on irrigation lines. The devices must be tested by the City annually. 2. BFP’s on metered lines will be located on the customer’s side of the meter and on fire lines located on the customer’s side of the right-of-way. 3. All BFP devices shall meet or exceed the tests and requirements specified in the AWWA Standard Code, latest edition, and shall further be certified by Underwriter's Laboratories or Associated Factory Mutual Fire Insurance Companies. City of Crestview Engineering Standards Manual August 2022 17 4. All BFP devices shall be presently approved and certified by the university of Southern California Foundation for Cross-Connection Control. 5. BFP devices shall consist of 2 independently acting check valves internally force loaded in a normally closed position with resilient seat gate valves or ball valve located on the inlet and outlet of the BFP assembly. The 2 check valves shall be separated by an intermediate chamber in which there is an automatic relief method for venting to the atmosphere, internally force loaded in a normally open position. 6. All BFP devices shall be delivered, assembled with resilient seat gate valves for BFP devices greater than or equal to 3 inches and shall be delivered, assembled with ball valves for BFP devices less than 3". All valves shall be the same size or greater than the BFP device to which the valves are assembled. 7. Resilient Seat Gate Valves: a. All resilient seat gate valves shall comply with the requirements of AWWA Standard, latest edition and the City of Crestview Utility Specifications. b. All valves shall be Class B gray iron body, open stem and yoke, water valves suitable for buried vertical mounting. Stem nuts shall be independent of w edge and shall be of solid bronze conforming to ASTM B62. c. All valves shall be open by turning a hand-wheel clockwise (to the right). d. All valves shall have flange joints which conform to AWWA Standard C-110, latest edition. Flange joint accessories shall not be furnished with the valves. 8. Ball Valves: a. All ball valves shall be brass or stainless-steel body with a chrome plated brass or stainless-steel ball. b. Ball valves shall have reinforced Teflon sheets and stuffing box seals. c. Ball valves shall have inside iron pipe threads on the connection ends of the valves. 9.0 SANITARY WASTEWATER COLLECTION 9.1 Purpose The following standards are intended as a guide to the design engineer in the preparation of plans for sanitary wastewater improvements. While the design standards given are intended as minimum design criteria, it is recognized there may be individual instances where a less stringent criteria may be approved without affecting the integrity of the system. All sanitary wastewater collection systems shall be designed and constructed in accordance with the City of Crestview’s Standard Utility Specifications located in Appendix A of this manual. 9.2 General Description of Work The following minimum requirements are considered acceptable to the City of Crestview in the collection of sanitary wastewater from domestic and commercial customers. Deviations from City of Crestview Engineering Standards Manual August 2022 18 these standards may be allowed by the City only upon a finding that, in accordance with sound engineering standards, the granting of the deviation will not work to increase the likelihood of a system failure. No deviation will be allowed unless it is clearly noted on the approved construction plans. A. All expansion shall conform to the City’s Utility Master Plan for wastewater maintained and amended by the City. B. When these standards differ from Local, State and/or Federal requirements, the more stringent requirement shall apply. C. The collection system for sanitary wastewater includes the gravity mains, manholes, consumer service pipes, lift stations, force mains, and other appurtenances. The system should be designed to provide the collection of sanitary wastewater from the customers and for the safe and economical transport to the treatment plant. 9.3 Regulations The following agency regulations shall apply when applicable: A. Environmental Protection Agency and U.S. Public Health Service: The governing standards of these agencies will be followed when appliable. B. Florida Department of Environmental Protection: The wastewater collection shall conform to the applicable State of Florida Department of Environmental Protection laws, policies, standards and rules and regulations for public wastewater collection systems. C. Plumbing Codes: The provisions of the Plumbing Code of the City of Crest view and the Florida Building Code as it pertains to sanitary wastewater collection, service line locations and materials, except as provided for elsewhere in these criteria, shall apply. D. City of Crestview Public Services Department: All wastewater collection systems, that are to become a part of the City system shall be designed and constructed in accordance with these standards. Wastewater system materials, installation of materials, and construction methods and procedures shall be in accordance with th e current material and installation specifications in this manual. 9.4 Design Standards All wastewater collection system plans must be prepared, signed and sealed by a professional engineer registered in the state of Florida and shall meet the following standards: A. Flow Requirements: In sizing the collection system gravity mains, the required design flow shall be the sum of the required sanitary flow as contained below, plus allowance for infiltration and inflow. 1. Required Sanitary Flow (Residential): Required average daily flow for sanitary use in residential areas shall be based on 350 gallons per day per unit (100 gpcd x 3.5 persons) or as approved by the City. 2. Required Sanitary Flow (Nonresidential): The required flow for commercial, institutional, industrial and other nonresidential facilities shall be determined by the City of Crestview Engineering Standards Manual August 2022 19 Engineer of Record and approved by the City for each specific instance. Documentation with references will be required for the method used to determine the capacity. 3. Required Infiltration Flow: Required infiltration and inflow for developed areas shall be in accordance with the table (based on 100 gal/inch-dia./mile/day for new construction) depicted below. Pipe Diameter (in) Minimum I&I Flow (GPD/1000 ft) 8 150 10 190 12 225 15 300 Note: I & I may be neglected in sizing pipes but needs to be included for lift station flows. If existing lines are included, provide measured flows at maximum I & I time or basis for proposed flow allowance. B. Collection System: All gravity mains shall be connected at manholes. Provisions for future connecting mains shall be made by providing appropriate easement and/or extending construction of all wastewater mains to the exterior boundaries of the subdivision wherever future connections to adjacent subdivisions or lots are anticipated. C. Gravity Mains: Gravity mains shall be of sufficient size to carry the required flow at velocities as herein provided. Mains shall be located to provide service to each lot within a subdivision. All mains shall be installed only in dedicated streets, alleys, public right s- of-way or utility easements, in favor of the City for the use and benefit of the City. Utility easements must have a minimum width of 10 feet if adjacent to a right-of-way or 15 feet if not. All main locations and sizes shall be in accordance with the Cit y's current "Utility Master Plan" and the approved subdivision master development plan and utility layout. 1. Main Size: Minimum diameter shall be 8 inches in all areas. Standard sizes of gravity mains used shall have nominal diameters of 8, 10, 12, 15, 18, 21, 24, 30 and 36 inches. 2. Slopes: Slopes shall be designed with a hydraulic gradient sufficient to prevent deposition of solids, by developing a minimum velocity of 2.0 f ps as computed using Manning's formula and an "n" value of not less than 0.013 while flowing full (will have same velocity at 1/2 full). The following table establishes the minimum allowable slopes for various size pipes and indicates their approximate carrying capacity when flowing full at the minimum slope. Pipe Size (in) Minimum Slope (%) Capacity Full (MGD +/-) 8 0.40 0.5 10 0.28 0.7 City of Crestview Engineering Standards Manual August 2022 20 12 0.22 1.0 15 0.15 1.6 18 0.14 1.8 a. In the case where the slope and volume are such that velocities exceeding 10 fps will be realized at average flow, special provision shall be made to protect against erosion. This protection may be secured utilizing cast iron, ductile iron, steel pipe or equivalent. b. Where velocities greater than 15 fps are attained or slopes are 20 percent or greater, special provision shall be made to protect against displacement by erosion and shock. This will be obtained by anchoring the sewer securely with concrete anchors or equal, with a minimum center to center spacing as follows: Slope (%) Minimum Spacing (ft) 20 - 35 36 36 - 50 24 > 50 16 c. Full advantage of suitable topography and paralleling of ground slopes shall be made. Minimum slopes should only be used when necessary, particularly with 8- inch pipe. d. Sewers shall be designed and laid with a uniform slope between manholes. 3. Change in pipe size: Change in pipe size shall not occur between manholes. a. Increasing Size: When a smaller sewer joins a larger one, the invert of the larger sewer shall be lowered sufficiently to maintain the same hydraulic gradient (i.e. match the crowns). b. Decreasing Size: At times, due to increasing sewer slopes, a reduction in the size of the outgoing sewer from a manhole may be justified. Such a reduction shall not be permitted on sewers 24 inches in diameter or under but may be permitted on larger sewers. 4. Cover: A minimum cover of 30 inches must be provided. a. At road crossings, a minimum separation distance of 24 inches shall be maintained from the bottom of the base to the top of the pipe or the top of the casing when provided. b. At buried stream crossings, a minimum cover of 36 inches is required. 5. Crossings: a. Major road crossings shall be steel encased. Any additional requirements of the regulator agency responsible for the road shall be met. b. Buried stream crossing shall be steel encased. This protection shall extend 10 feet beyond the bank and the pipe or casing shall be anchored to prevent shifting. City of Crestview Engineering Standards Manual August 2022 21 c. Aerial stream crossings shall be made with ductile iron pipe. This protection shall extend until 30 inches of cover is provided. d. When crossing under pipes, conduits, or other structures greater than 24 inches in diameter, and a 60-inch separation distance cannot be maintained, the pipe shall be encased in steel casing for a minimum of 5 feet on either side of the crossed pipe. 6. Manholes: Manholes shall be installed at the end of each sewer line, at all junctions, at all changes in grade, size or alignment; with the following requirements: a. Maximum spacing shall be 400 feet up to and including 36-inch pipe. Spacing for pipes larger than 36-inch may be increased up to, but not to exceed 1000 feet. b. Lamp holes may be substituted at the ends of short lines, not to exceed 150 feet in length. c. A drop manhole shall be provided when a sewer enters a manhole at an elevation of 2 feet or more above the manhole invert. Where the difference in elevation is less than 2 feet, the invert shall be filleted to prevent solids deposition. Drop manholes shall use an outside drop connection, except inside drops may be approved for building services and laterals. Inside drops shall be secured to the interior wall of the manhole and provide access for cleaning. d. The inside diameter of manholes shall be a minimum of 48 inches up to and including 24-inch pipe. For pipes larger than 24 inches, the inside diameter of the manhole shall be increased to provide at least a 12-inch space to each side of the pipe. e. Manholes shall be reinforced concrete and coated with corrosion resistant “Spectra-Shield” coating to the interior. Only special conditions would dictate a cast in place or other type. f. The manhole flow channel or invert shall be constructed in the field to ensure a smooth flow line from all incoming lines to the outgoing. All channels must provide a smooth transition to the outgoing line with the maximum possible radius on all curves. 7. Inverted Siphons: Inverted siphons shall be avoided whenever possible; however, if used, shall have not less than 2 barrels, with a minimum pipe size of 6 inches and shall be provided with necessary appurtenances for convenient flushing and maintenance. The manholes shall have adequate clearance for rodding and provide sufficient head and pipe sizes to secure velocities of at least 3.0 feet per second for average flows. The inlet and outlet details shall be arranged so that the normal flow is diverted to one barrel, and either barrel may be taken out of service for cleaning. D. Lift Stations: All components of a lift stations shall be designed to operate effectively at existing flows as well as all future projected flows. Stations shall contain a minimum of 2 pumps with each pump capable of pumping at the ultimate peak hour flow. Peak hour flows shall be determined using a peaking factor of 4. 1. Wet wells: Wet wells shall be fiberglass (preferred) or concrete with Spectra-Shield corrosion resistant coating. Wet well volume shall be calculated based on the City of Crestview Engineering Standards Manual August 2022 22 ultimate peak flow with consideration for initial peak flow and meet the following requirements: a. Minimum liquid level in the well shall be 2 feet above the bottom or in accordance with the manufacture’s requirements for the pumps specified, whichever is greater. b. Cycle time, to pump down and refill, shall be not less than 10 minutes nor more than 15 minutes at ½ peak flow. c. The spacing between ‘lead pump on’ and ‘lag pump on’ shall be a minimum of 1 foot. d. The high-level alarm shall be set not less than 1 foot above the ‘lag pump on’ and at a sufficient depth to provide a minimum of 30 minutes storage calculated at the average flow, below the lowest influent line. 2. Bypass: Lift stations shall have the necessary apparatuses to accommodate the City’s emergency pumping equipment to operate a bypass of the station pumps and transmit the flow through the station force main downstream. 3. Standby Emergency Power: All stations shall be equipped with a manual transfer switch for connecting a portable generator. Larger stations require an on-site emergency generator suitably located and wired for automatic transfer as follows: a. Lift stations which serve as “Master Lift Stations”, i.e. stations that receive pumped flow from one or more other lift stations. b. Lift stations with a design peak flow over 100 gpm. c. Lift stations with a large design head such that the pump power requirements are 7.5 HP are greater. Generators will be of sufficient size and power to run all the station equipment. E. Wastewater Force Mains: Wastewater force mains shall meet the following: 1. Force mains shall not be less than 4 inches in diameter except for private force mains which can be smaller. 2. Force main flow velocity at the initial pumping rate shall not be less than 2.0 fps using the Hazen-Williams equation for pressure lines. The velocity at the design pumping rate shall not exceed 6 fps 3. There shall be an air relief valve installed at each intermediate high point, if that high point could collect air/gases sufficient to block the line. 4. Force mains shall never enter a gravity manhole from a direction contrary to the direction of flow out of the manhole. Entry shall be made to ensure a good flow transition. 5. When a force main will manifold into an existing force main the impact on that line and all pump stations that utilize that line must be evaluated. 6. All private force mains entering public rights-of-way shall be built to City standards past that point, and a valve shall be placed there to delineate the change in maintenance responsibility and to enable flow control. Any private force main running parallel down a public right-of-way that doesn’t serve any other properties City of Crestview Engineering Standards Manual August 2022 23 other than the development shall remain private and be maintained by the development. F. Wastewater Service Lines: Customer service lines shall be provided to all lots within a subdivision in accordance with City regulations. Customer service connections to industrial or commercial lots may be omitted provided approval of the City is obtained prior to plan approval. 1. Pipe Material: PVC pipe SDR35 will be utilized for gravity service lines. 2. Cleanouts: A sewer cleanout shall be installed on all gravity service lines at the right- of-way or easement line, defining the limit of City maintenance. Cleanouts shall be constructed to provide access at finished grade. 3. Cover: A 30-inch minimum cover is required on all services and gravity services must meet the minimum slope requirements of the Plumbing Code. If gravity service is not feasible a privately maintained lift station and force main will be required. 4. Street Crossings: When services must cross under existing City paved streets, boring will be required and complete details must be provided. If the street is in poor condition, open cut may be approved by the Cit y. 5. Flow Measurement: The City may require flow measuring devices where flows in excess of 50,000 gpd can be expected. This includes apartment complexes, trailer or mobile home parks, shopping centers, etc. The City must approve the method and location of flow measurements. Acceptable methods will include partial flume with totalizer, pipe meters, and hour meters on private lift stations. G. Large Developments: Developments the city deems to produce a significant amount of wastewater flow that could potentially exceed the capacity of downstream components of the City’s wastewater collection system shall be subject to the following: 1. The engineer of record shall provide an analysis of all downstream wastewater components and design upgrades to any components that exceed capacity. 2. The Developer will construct and pay for all required upgrades. 10.0 CLOSEOUT & FINAL ACCEPTANCE 10.1 General Requirements In order for a development to be accepted by the Public Services Department the following criteria must be met: A. The engineer of record shall provide a signed & sealed letter certifying that all development improvements are complete and constructed per plans, that all required local, state & federal permits were obtained, and notes any deviations from the approved plans with explanations. All deviations shall be shown on the as-built drawings and may require backup calculations and documentation. B. All infrastructure improvements (streets, water, sewer, stormwater, etc.) to be accepted by the City for perpetual maintenance shall meet the testing requirements called for in City of Crestview Engineering Standards Manual August 2022 24 this manual, the City’s Standard Utility Specifications, and any other specifications and standards referenced in the manual. C. Roadway test results are required for both public and private streets. D. All underground utilities to be accepted by the City for perpetual maintenance shall be inspected by the City prior to burial. E. Water and sewer lines must be cleared for use by the Florida Department of Environmental Protection. F. Gravity sewer lines to be accepted by the City for perpetual maintenance shall be inspected by Video camera and one copy of the video record provided to the Public Services Department. Any problems revealed by the video shall be corrected by the Contractor/Developer, to the satisfaction of the Public Services Department. 10.2 As-Built Record Drawings Upon completion of a development, the Contractor shall produce and submit a signed and sealed set of as-built record drawings prepared by a Florida Registered Land Surveyor or Engineer of Record. The amount of detail on the record drawings shall include but is not limited to graphic scale, building footprints, grades and contours, streets and parking lots, stormwater management systems, underground and overhead utilites, appurtenances, and any other information deemed necessary by the City. The acceptance of the record drawings by the City does not release the Contractor from the liability of the construction. The City reserves the right to verify the record drawings prior to acceptance. A. One hard copy and one electronic copy in the latest AutoCAD format of the as -built drawings shall be provided to the Public Services Department. B. As-built drawings for utilities (stormwater, water and sewer) to be accepted by the City for perpetual maintenance shall contain the following: 1. Pipe sizes, materials, locations, slopes and inverts. 2. Manholes and drainage structures (inlets, risers, junction boxes, MES’s, etc.) locations along with top and invert elevations. 3. Water and sewer service line locations with a measurement for each off a known location. 4. Locations of fire hydrants, valves, meters, backflow preventers, and any other appurtenances. An ESRI comparable Shapefile is also required for the above-mentioned utilities. Shapefiles should include horizontal and vertical datum information. 10.3 Closeout Checklist Before any Certificate of Occupancy (C.O.) can be issued or Final Plat recorded the City must receive the following items (if applicable): 1. Engineer of Record’s Certification of Improvements and Permits. 2. As-Built Record Drawings. City of Crestview Engineering Standards Manual August 2022 25 3. Roadway Test Results. 4. Video Record of Sewer Lines. 5. FDEP Clearance Letters for both Water & Sewer. 6. Written Acknowledgement from FDOT that all Permit Conditions (Driveway, Drainage, Utility) have been met and accepted. 7. Copy of the ERP Certification and Request for Conversion to Operation to NWFWMD. 8. Written Acknowledgement from all Jurisdictional Agencies that all Wetland Permit Conditions have been met and accepted. 9. Signed 2-Year Warranty Agreement. Written explanations are required for the above items that are not applicable. Items 1 through 4 must be received prior to requesting a final inspection. Upon request the City will conduct a final inspection and any deficiencies must be corrected before acceptance. 10.4 2-Year Warranty Period All streets, water and sewer facilities, and drainage systems to be accepted by the City for perpetual maintenance are subject to a 2-Year Warranty Period. A. During this period the Owner/Developer warrants that it shall, for a period of 2 years from the date of acceptance, perform all necessary work and repair to correct any defective condition arising by reasons of workmanship, materials, labor, or damage which may be discovered during the Warranty Period. B. If in the judgement of the City, repairs to the Improvements become necessary, then upon notice from the City, at any time during the Warranty Period, said repairs shall be promptly made, at the sole expense of the Owner/Developer, who shall correct and repair all unacceptable conditions as may be necessary to bring the warranted improvements into compliance. City of Crestview Engineering Standards Manual August 2022 APPENDIX A CITY OF CRESTVIEW DEPARTMENT OF PUBLIC SERVICES Table of Contents SECTION TITLE PAGES 12 Trench Excavation, Backfill & Compaction ……….………….………..……………………….……. 5 13 Pipe Boring, Drilling & Jacking ……………….………..……….……………………………………….... 5 14 Water Mains & Wastewater Force Mains ………..………..….…………………………………… 12 15 Sanitary Sewer Specifications ………………………………..…….……………………………………... 9 16 Lift Station Specifications ………………………………..……………….……………………………….. 15