HomeMy Public PortalAboutRE_ Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3
IPM.Note
RE: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3
RE:
John Zoerhof
SMTP
jzoerhof@HYPOWERINC.COM
Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3
Received: from [10.114.3.11] (helo=smtp.maileig.com)
by walmailscan15.yourhostingaccount.com with esmtp (Exim)
id 1ZDZoL-0006HN-8V
for dbrannon@bngengineers.com; Fri, 10 Jul 2015 11:01:57 -0400
Received: from na01-bn1-obe.outbound.protection.outlook.com ([157.56.110.62])
by walimpinc11 with bizsmtp
id qf1v1q03i1Lp7TR01f1wKl; Fri, 10 Jul 2015 11:01:57 -0400
Received: from DM2PR07MB416.namprd07.prod.outlook.com (10.141.104.156) by
DM2PR07MB351.namprd07.prod.outlook.com (10.141.101.148) with Microsoft SMTP
Server (TLS) id 15.1.207.19; Fri, 10 Jul 2015 15:01:54 +0000
Received: from DM2PR07MB416.namprd07.prod.outlook.com (10.141.104.156) by
DM2PR07MB416.namprd07.prod.outlook.com (10.141.104.156) with Microsoft SMTP
Server (TLS) id 15.1.213.14; Fri, 10 Jul 2015 15:01:52 +0000
Received: from DM2PR07MB416.namprd07.prod.outlook.com ([169.254.16.35]) by
DM2PR07MB416.namprd07.prod.outlook.com ([169.254.16.35]) with mapi id
15.01.0213.000; Fri, 10 Jul 2015 15:01:52 +0000
From: John Zoerhof <jzoerhof@HYPOWERINC.COM>
To: Danny Brannon <DBrannon@BnGEngineers.com>
Subject: RE: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions
- 1 of 3
Thread-Topic: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions
- 1 of 3
Thread-Index: AQLibLYtlQnF2XejrLUbcTzBlgdx3wKZ9dI0Abbb9Wg=
X-MS-Exchange-MessageSentRepresentingType: 1
Date: Fri, 10 Jul 2015 15:01:52 +0000
Message-ID:
<DM2PR07MB4162643B136657AA5E6E3CAB69F0@DM2PR07MB416.namprd07.prod.outlook.com>
References: <940049D1B55A954F9E32D19A1B5402356FD27C7E@GOXSA1808.fplu.fpl.com>
<005301d0b5af$49e05fd0$dda11f70$@BnGEngineers.com>
In-Reply-To: <005301d0b5af$49e05fd0$dda11f70$@BnGEngineers.com>
Content-Language: en-US
X-MS-Has-Attach:
X-MS-TNEF-Correlator:
x-en-origip: 157.56.110.62
Content-Type: multipart/alternative;
boundary="_000_DM2PR07MB4162643B136657AA5E6E3CAB69F0DM2PR07MB416namprd_"
MIME-Version: 1.0
John Zoerhof
SMTP
jzoerhof@HYPOWERINC.COM
Danny Brannon
Other
Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3
Fixture is being given to Brian @ Public Works right now.
Regards,
John Zoerhof
Hypower, Inc.
Division Manager – Power Services
From: Danny Brannon [mailto:DBrannon@BnGEngineers.com]
Sent: Friday, July 03, 2015 12:43 PM
To: Bill Thrasher; rwganger
Cc: John Zoerhof; Tony Plonner
Subject: FW: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3
On 6/26 I finally received the marked up plans from FPL reflecting the needed changes they need to make based on the problems in their original designs I had reported. They are in the
process of revising the attached circuit overview sheets that are attached here. But are also having to revise the 30+ additional detail construction drawings. The drafting department
at FPL is working to make the changes now. Our supplemental plans are ready and are used by the contractors to install the conduit systems.
Hypower will remove the street light fixture and deliver it to the utility dept behind Town Hall. Tony Plonner will pick it up and transport it to Tampa to have the LED array replaced
with a warmer color array, and to have frosted lens installed. I will notify Tony when the fixture is ready for pickup.
Monday AT&T will meet with me in my office to review the final AT&T requirements. AT&T plans can be finalized quickly after this meeting. AT&T has indicated that Fiber optics availability
may have changed. Previously they has indicated that fiber was not an option in a developed area. Their engineer indicated that may have changed. I will keep you posted.
Comcast construction plans are ready.
Street Light plans will be finalized when we select the final fixture configuration. At this time, the softening the light source is the only issue with the fixtures in the neighborhoods.
Easements are still in process. IF we get the critical easements, we will proceed providing option exist for any easements that cannot be secured later.
Danny P. Brannon, P.E.
Brannon & Gillespie, LLC
Consulting Engineers
631 US Highway One, Suite 301
North Palm Beach, Florida 33408
Off: (561) 847-4435 Cell: (561) 307-9454
Website: www.BnGEngineers.com<http://www.bngengineers.com/>
From: Lehr, John [mailto:John.Lehr@fpl.com]
Sent: Friday, June 26, 2015 9:38 AM
To: Danny Brannon (DBrannon@BnGEngineers.com<mailto:DBrannon@BnGEngineers.com>)
Subject: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3
Danny,
FYI …………….. Attached are the “Red-lines” following the review by Chico. There are six files, so I’ll forward them in three emails. Note, I have submitted these to drafting for the
updates/revisions.
Thanks!
John C. Lehr, Jr.
Project Manager
FPL
(561)-845-4624
________________________________
[Avast logo]<https://www.avast.com/antivirus>
This email has been checked for viruses by Avast antivirus software.
www.avast.com<https://www.avast.com/antivirus>
E44508A44C55A547816DD55B42A9DF56@namprd09.prod.outlook.com
<DM2PR07MB4162643B136657AA5E6E3CAB69F0@DM2PR07MB416.namprd07.prod.outlook.com>
<940049D1B55A954F9E32D19A1B5402356FD27C7E@GOXSA1808.fplu.fpl.com> <005301d0b5af$49e05fd0$dda11f70$@BnGEngineers.com>
<005301d0b5af$49e05fd0$dda11f70$@BnGEngineers.com>
Renee Basel
Renee Basel
EX
/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL
EX
/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL
John Zoerhof
John Zoerhof
Renee Basel
Renee Basel
jzoerhof@HYPOWERINC.COM
jzoerhof@HYPOWERINC.COM
rbasel@gulf-stream.org
rbasel@gulf-stream.org
II=[CID=d9c50995-a377-b5ac-1b71-3cc1960771df;IDXHEAD=02E26CB62D;IDXCOUNT=3];SBMID=4;S1=<940049D1B55A954F9E32D19A1B5402356FD27C7E@GOXSA1808.fplu.fpl.com>;RTP=Related;TDN=Mismatch;TP=Removed;TFR=Partic
ipantChanged;Version=Version 15.20 (Build 2157.0), Stage=H1, TC, REF;UP=50;DP=5
en
B5BDF6F652869483
RBasel@gulf-stream.org
00000002/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=3baa9f04d837426b9ed16b03ec111b7b-rbasel
Danny Brannon
SMTP
DBrannon@BnGEngineers.com
DBrannon@BnGEngineers.com
Danny Brannon
[if !mso]><style>v\:* {behavior:url(#default#VML);} o\:* {behavior:url(#default#VML);} w\:* {behavior:url(#default#VML);} .shape {behavior:url(#default#VML);} </style><![endif]
Fixture is being given to Brian @ Public Works right now.
Regards,
John Zoerhof
Hypower, Inc.
Division Manager – Power Services
From: Danny Brannon [mailto:DBrannon@BnGEngineers.com]
Sent: Friday, July 03, 2015 12:43 PM
To: Bill Thrasher; rwganger
Cc: John Zoerhof; Tony Plonner
Subject: FW: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3
On 6/26 I finally received the marked up plans from FPL reflecting the needed changes they need to make based on the problems in their original designs I had reported. They are in the
process of revising the attached circuit overview sheets that are attached here. But are also having to revise the 30+ additional detail construction drawings. The drafting department
at FPL is working to make the changes now. Our supplemental plans are ready and are used by the contractors to install the conduit systems.
Hypower will remove the street light fixture and deliver it to the utility dept behind Town Hall. Tony Plonner will pick it up and transport it to Tampa to have the LED array replaced
with a warmer color array, and to have frosted lens installed. I will notify Tony when the fixture is ready for pickup.
Monday AT&T will meet with me in my office to review the final AT&T requirements. AT&T plans can be finalized quickly after this meeting. AT&T has indicated that Fiber optics availability
may have changed. Previously they has indicated that fiber was not an option in a developed area. Their engineer indicated that may have changed. I will keep you posted.
Comcast construction plans are ready.
Street Light plans will be finalized when we select the final fixture configuration. At this time, the softening the light source is the only issue with the fixtures in the neighborhoods.
Easements are still in process. IF we get the critical easements, we will proceed providing option exist for any easements that cannot be secured later.
Danny P. Brannon, P.E.
Brannon & Gillespie, LLC
Consulting Engineers
631 US Highway One, Suite 301
North Palm Beach, Florida 33408
Off: (561) 847-4435 Cell: (561) 307-9454
Website:
http://www.bngengineers.com/www.BnGEngineers.com
From: Lehr, John [
mailto:John.Lehr@fpl.commailto:John.Lehr@fpl.com]
Sent: Friday, June 26, 2015 9:38 AM
To: Danny Brannon (
mailto:DBrannon@BnGEngineers.comDBrannon@BnGEngineers.com)
Subject: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3
Danny,
FYI …………….. Attached are the “Red-lines” following the review by Chico. There are six files, so I’ll forward them in three emails. Note, I have submitted these to drafting for the
updates/revisions.
Thanks!
John C. Lehr, Jr.
Project Manager
FPL
(561)-845-4624
https://www.avast.com/antivirus
Avast logo
http://static.avast.com/emails/avast-mail-stamp.png
This email has been checked for viruses by Avast antivirus software.
https://www.avast.com/antiviruswww.avast.com