Loading...
HomeMy Public PortalAboutRE_ Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3 IPM.Note RE: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3 RE: John Zoerhof SMTP jzoerhof@HYPOWERINC.COM Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3 Received: from [10.114.3.11] (helo=smtp.maileig.com) by walmailscan15.yourhostingaccount.com with esmtp (Exim) id 1ZDZoL-0006HN-8V for dbrannon@bngengineers.com; Fri, 10 Jul 2015 11:01:57 -0400 Received: from na01-bn1-obe.outbound.protection.outlook.com ([157.56.110.62]) by walimpinc11 with bizsmtp id qf1v1q03i1Lp7TR01f1wKl; Fri, 10 Jul 2015 11:01:57 -0400 Received: from DM2PR07MB416.namprd07.prod.outlook.com (10.141.104.156) by DM2PR07MB351.namprd07.prod.outlook.com (10.141.101.148) with Microsoft SMTP Server (TLS) id 15.1.207.19; Fri, 10 Jul 2015 15:01:54 +0000 Received: from DM2PR07MB416.namprd07.prod.outlook.com (10.141.104.156) by DM2PR07MB416.namprd07.prod.outlook.com (10.141.104.156) with Microsoft SMTP Server (TLS) id 15.1.213.14; Fri, 10 Jul 2015 15:01:52 +0000 Received: from DM2PR07MB416.namprd07.prod.outlook.com ([169.254.16.35]) by DM2PR07MB416.namprd07.prod.outlook.com ([169.254.16.35]) with mapi id 15.01.0213.000; Fri, 10 Jul 2015 15:01:52 +0000 From: John Zoerhof <jzoerhof@HYPOWERINC.COM> To: Danny Brannon <DBrannon@BnGEngineers.com> Subject: RE: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3 Thread-Topic: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3 Thread-Index: AQLibLYtlQnF2XejrLUbcTzBlgdx3wKZ9dI0Abbb9Wg= X-MS-Exchange-MessageSentRepresentingType: 1 Date: Fri, 10 Jul 2015 15:01:52 +0000 Message-ID: <DM2PR07MB4162643B136657AA5E6E3CAB69F0@DM2PR07MB416.namprd07.prod.outlook.com> References: <940049D1B55A954F9E32D19A1B5402356FD27C7E@GOXSA1808.fplu.fpl.com> <005301d0b5af$49e05fd0$dda11f70$@BnGEngineers.com> In-Reply-To: <005301d0b5af$49e05fd0$dda11f70$@BnGEngineers.com> Content-Language: en-US X-MS-Has-Attach: X-MS-TNEF-Correlator: x-en-origip: 157.56.110.62 Content-Type: multipart/alternative; boundary="_000_DM2PR07MB4162643B136657AA5E6E3CAB69F0DM2PR07MB416namprd_" MIME-Version: 1.0 John Zoerhof SMTP jzoerhof@HYPOWERINC.COM Danny Brannon Other Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3 Fixture is being given to Brian @ Public Works right now. Regards, John Zoerhof Hypower, Inc. Division Manager – Power Services From: Danny Brannon [mailto:DBrannon@BnGEngineers.com] Sent: Friday, July 03, 2015 12:43 PM To: Bill Thrasher; rwganger Cc: John Zoerhof; Tony Plonner Subject: FW: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3 On 6/26 I finally received the marked up plans from FPL reflecting the needed changes they need to make based on the problems in their original designs I had reported. They are in the process of revising the attached circuit overview sheets that are attached here. But are also having to revise the 30+ additional detail construction drawings. The drafting department at FPL is working to make the changes now. Our supplemental plans are ready and are used by the contractors to install the conduit systems. Hypower will remove the street light fixture and deliver it to the utility dept behind Town Hall. Tony Plonner will pick it up and transport it to Tampa to have the LED array replaced with a warmer color array, and to have frosted lens installed. I will notify Tony when the fixture is ready for pickup. Monday AT&T will meet with me in my office to review the final AT&T requirements. AT&T plans can be finalized quickly after this meeting. AT&T has indicated that Fiber optics availability may have changed. Previously they has indicated that fiber was not an option in a developed area. Their engineer indicated that may have changed. I will keep you posted. Comcast construction plans are ready. Street Light plans will be finalized when we select the final fixture configuration. At this time, the softening the light source is the only issue with the fixtures in the neighborhoods. Easements are still in process. IF we get the critical easements, we will proceed providing option exist for any easements that cannot be secured later. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com<http://www.bngengineers.com/> From: Lehr, John [mailto:John.Lehr@fpl.com] Sent: Friday, June 26, 2015 9:38 AM To: Danny Brannon (DBrannon@BnGEngineers.com<mailto:DBrannon@BnGEngineers.com>) Subject: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3 Danny, FYI …………….. Attached are the “Red-lines” following the review by Chico. There are six files, so I’ll forward them in three emails. Note, I have submitted these to drafting for the updates/revisions. Thanks! John C. Lehr, Jr. Project Manager FPL (561)-845-4624 ________________________________ [Avast logo]<https://www.avast.com/antivirus> This email has been checked for viruses by Avast antivirus software. www.avast.com<https://www.avast.com/antivirus> E44508A44C55A547816DD55B42A9DF56@namprd09.prod.outlook.com <DM2PR07MB4162643B136657AA5E6E3CAB69F0@DM2PR07MB416.namprd07.prod.outlook.com> <940049D1B55A954F9E32D19A1B5402356FD27C7E@GOXSA1808.fplu.fpl.com> <005301d0b5af$49e05fd0$dda11f70$@BnGEngineers.com> <005301d0b5af$49e05fd0$dda11f70$@BnGEngineers.com> Renee Basel Renee Basel EX /O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL EX /O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL John Zoerhof John Zoerhof Renee Basel Renee Basel jzoerhof@HYPOWERINC.COM jzoerhof@HYPOWERINC.COM rbasel@gulf-stream.org rbasel@gulf-stream.org II=[CID=d9c50995-a377-b5ac-1b71-3cc1960771df;IDXHEAD=02E26CB62D;IDXCOUNT=3];SBMID=4;S1=<940049D1B55A954F9E32D19A1B5402356FD27C7E@GOXSA1808.fplu.fpl.com>;RTP=Related;TDN=Mismatch;TP=Removed;TFR=Partic ipantChanged;Version=Version 15.20 (Build 2157.0), Stage=H1, TC, REF;UP=50;DP=5 en B5BDF6F652869483 RBasel@gulf-stream.org 00000002/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=3baa9f04d837426b9ed16b03ec111b7b-rbasel Danny Brannon SMTP DBrannon@BnGEngineers.com DBrannon@BnGEngineers.com Danny Brannon [if !mso]><style>v\:* {behavior:url(#default#VML);} o\:* {behavior:url(#default#VML);} w\:* {behavior:url(#default#VML);} .shape {behavior:url(#default#VML);} </style><![endif] Fixture is being given to Brian @ Public Works right now. Regards, John Zoerhof Hypower, Inc. Division Manager – Power Services From: Danny Brannon [mailto:DBrannon@BnGEngineers.com] Sent: Friday, July 03, 2015 12:43 PM To: Bill Thrasher; rwganger Cc: John Zoerhof; Tony Plonner Subject: FW: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3 On 6/26 I finally received the marked up plans from FPL reflecting the needed changes they need to make based on the problems in their original designs I had reported. They are in the process of revising the attached circuit overview sheets that are attached here. But are also having to revise the 30+ additional detail construction drawings. The drafting department at FPL is working to make the changes now. Our supplemental plans are ready and are used by the contractors to install the conduit systems. Hypower will remove the street light fixture and deliver it to the utility dept behind Town Hall. Tony Plonner will pick it up and transport it to Tampa to have the LED array replaced with a warmer color array, and to have frosted lens installed. I will notify Tony when the fixture is ready for pickup. Monday AT&T will meet with me in my office to review the final AT&T requirements. AT&T plans can be finalized quickly after this meeting. AT&T has indicated that Fiber optics availability may have changed. Previously they has indicated that fiber was not an option in a developed area. Their engineer indicated that may have changed. I will keep you posted. Comcast construction plans are ready. Street Light plans will be finalized when we select the final fixture configuration. At this time, the softening the light source is the only issue with the fixtures in the neighborhoods.   Easements are still in process. IF we get the critical easements, we will proceed providing option exist for any easements that cannot be secured later. Danny P. Brannon, P.E. Brannon & Gillespie, LLC        Consulting Engineers      631 US Highway One, Suite 301     North Palm Beach, Florida 33408 Off: (561) 847-4435  Cell: (561) 307-9454     Website: http://www.bngengineers.com/www.BnGEngineers.com From: Lehr, John [ mailto:John.Lehr@fpl.commailto:John.Lehr@fpl.com] Sent: Friday, June 26, 2015 9:38 AM To: Danny Brannon ( mailto:DBrannon@BnGEngineers.comDBrannon@BnGEngineers.com) Subject: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions - 1 of 3 Danny, FYI  ……………..  Attached are the “Red-lines” following the review by Chico.   There are six files, so I’ll forward them in three emails.  Note, I have submitted these to drafting for the updates/revisions. Thanks! John C. Lehr, Jr. Project Manager FPL (561)-845-4624 https://www.avast.com/antivirus Avast logo http://static.avast.com/emails/avast-mail-stamp.png This email has been checked for viruses by Avast antivirus software. https://www.avast.com/antiviruswww.avast.com