HomeMy Public PortalAbout22-059 - Accept grant funding from Miami-Dade County for Historic City Hall renovationsSponsored by: Interim City Manager RESOLUTION NO. 22-059 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA- LOCKA, FLORIDA, AUTHORIZING THE INTERIM CITY MANAGER TO ACCEPT GRANT FUNDING FROM THE MIAMI-DADE COUNTY BUILDING BETTER COMMUNITIES' GENERAL OBLIGATION BOND PROGRAM INTERLOCAL AGREEMENT GRANT PROGRAM, IN THE AMOUNT OF SIX HUNDRED THOUSAND DOLLARS ($600,000.00), FOR THE RENOVATION/REHABILITATION OF THE OPA-LOCKA ADMINISTRATIVE BUILDING (HISTORIC CITY HALL), WITHIN THE CITY; FURTHER AUTHORIZING THE INTERIM CITY MANAGER TO EXECUTE THE NECESSARY GRANT AGREEMENT; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE WHEREAS, on August 31, 2020, the Miami -Dade Board of County Commissioners authorized Six Hundred Thousand Dollars ($600,000.00) from the Building Better Communities General Obligation Bond ("GOB") Fund to be expended to assist the City of Opa-Locka ("City") in restoring the Opa-Locka Administrative Building (Historic City Hall), WHEREAS, following communications with Miami -Dade County, the funds have been determined to be available for the Fiscal Year 2022- 23 Funding Cycle, identified as BBC -GOB Project Number 382-2000001557; and WHEREAS, the City is committed to completing the project described herein; and WHEREAS, the City Commission finds it to be in the best interest of the City and its residents to re -accept the funds of the Miami -Dade County Building Better Communities' General Obligation Bond Program Interlocal Agreement Grant Program, totaling Six Hundred Thousand Dollars ($600,000.00) from the Building Better Communities General Obligation Bond ("GOB") Fund and execute the corresponding Grant Agreement. NOW THEREFORE, BE IT RESOLVED THAT THE CITY COMMISSION OF THE CITY OF OPA LOCKA, FLORIDA: Section 1. Adoptions of Representations. The foregoing "Whereas" clauses are hereby ratified and confirmed as being true, and the same are hereby made a specific part of this Resolution. Section 2. Authorizing Execution of Agreement. The City Commission of the City of Opa-Locka, Florida hereby authorizes the Interim City Manager to accept funding from the Miami -Dade County Building Better Communities' General Obligation Bond Program Interlocal Agreement Grant Program, in an amount totaling Six Hundred Resolution No. 22-059 Thousand Dollars ($600,000.00), for the restoration of the Opa-Locka Administrative Building (Historic City Hall), within the City; further authorize the Interim City Manager to execute the attached corresponding Grant Agreement, and provide operating, maintenance, and programming funds upon completion of the Opa-Locka Administrative Building, to the extent allowed by law and by necessary oversight authorities. Section 3. Scrivener's Errors Sections of this Resolution may be renumbered or re -lettered and corrections of typographical errors, which do not affect the intent of this Resolution may be authorized by the City Manager, following review by the City Attorney, without need of public hearing, by filing a corrected copy of same with the City Clerk. Section 4. Effective Date. This Resolution shall take effect immediately upon adoption, and is subject to the approval of the Governor of the State of Florida or his designee. PASSED AND ADOPTED this 14th day of November, 2022. ATTEST: anna Flores, City Clerk APPROVED AS TO FORM AND LEGAL SUFFICIENCY: Burnadette Norris -Weeks, P.A. City Attorney Veronica Williams, ay or 2 Resolution No. 22-059 Moved by: Commissioner Bass Seconded by: Commissioner Davis VOTE: 4-0 Commissioner Bass YES Commissioner Davis YES Commissioner Dominguez YES Vice -Mayor Taylor ABSENT Mayor Williams YES 3 DocuSign Envelope ID: FB4E55A4-SAAB-42C5-BC16-2A9274D3BC59 City of Opa-locka Agenda Cover Memo Department Manager: Adelina Gross Department Manager Signature: oo��s City Manager: Darvin Williams CM Signature: ��aIMS `—C46Co7C 1 E80E492... Commission Meeting Date: 11/09/2022 Item Type: (EnterX in box) Resolution Ordinance Other X Fiscal Impact: (EnterX in box) Yes No Ordinance Reading: (Enter X in box) 1st Reading 2nd Reading x Public Hearing: (EnterX in box) Yes No Yes No X X Funding Source: Account# : (Enter Fund & Dept.) Ex: Advertising Requirement: (Enter X in box) Yes No x Contract/P.O. Required: (EnterX in box) Yes No RFP/RFQ/Bid#: N/A X Strategic Plan Related (Enter X in box) Yes No Strategic Plan Priority Area: Enhance Organizational IN Bus. & Economic Dev IN Public Safety fl Quality of Education NI Qual. of Life & City Image • Communication III Strategic Plan Obj./Strategy: (list the specific objective/strategy this item will address) X Sponsor Name City Manager Department: Capital Improvements Program Short Title: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA AUTHORIZING THE INTERIM CITY MANAGER TO ACCEPT A MIAMI-DADE COUNTY BUILDING BETTER COMMUNITIES' GENERAL OBLIGATION BOND PROGRAM INTERLOCAL AGREEMENT GRANT FOR THE AMOUNT OF SIX HUNDRED THOUSAND (600,000.00) DOLLARS FOR THE RENOVATION/REHABILITATION OF THE OPA-LOCKA ADMINISTRATIVE BUILDING (HISTORIC CITY HALL) Staff Summary: On August 31, 2020, the Miami -Dade Board of County Commissioners authorized Six Hundred Thousand (600,000) dollars from the Building Better Communities General Obligation Bond ("GOB") fund to be expended to assist the City in restoring Opa-Locka Administrative Building (Historic City Hall) for the Fiscal Year 2022- 23 Funding Cycle, identified as BBC -GOB Project Number 382-2000001557. DocuSign Envelope ID: FB4E55A4-5AAB-42C5-BC16-2A9274D3BC59 Financial Impact This $600,000 grant is included in the approved FY 23 budget for restoration of the Historic City Hall. It is currently anticipated that restoration of the Historic City Hall will be in the range of $1.2 million. When this cost is finalized, renovation of this building will be presented to Commission for approval, including identification of an additional funding source to cover the remainder of the renovation cost. It should be noted that the City has previously received a $500,000 grant for construction of a Cultural Center within the Historic City Hall, which is in addition to the $1.2 million cost noted above. Proposed Action: Staff recommends the approval of the item. Attachment: 1. Miami -Dade County Resolution No. R-830-20 "Building Better Communities General Obligation Bond Program Approving Significant Modifications and Deletions to Close Multiple Projects, Reallocating Funding and Establishing Multiple New Projects" OFFICIAL FILE COPY CLERIC OF THE BO.kRD OF COUNTY COMMISSIONERS MIAMI-DADE COUNTY, FLORIDA MEMORANDUM Agenda Item No. 5(P) TO: Honorable Chairwoman Audrey M. Edmonson DATE: August 31, 2020 and Members, Board of County Commissioners FROM: Abigail Price -Williams County Attorney SUBJECT: Resolution approving, after a public hearing, significant modifications and deletions of multiple projects in and additions of multiple projects to Building Better Communities General Obligation Bond Program contained in Appendix A to each Resolution Nos. R-912-04, R-913-04, R-914-04, R-915-04, R-916-04, R-917-04, R-918-04 and R-919-04; and approving the use of surplus funds Resolution No. R-830-20 The accompanying resolution was prepared by the Office of Management and Budget and placed on the agenda at the request of Prime Sponsor Transportation and Finance Committee. APW/smm Abi -Williams County A rney 1 IAM Memorandum Mco�NnFDADE Date: August 31, 2020 To: and Members, Board of Coun C issioners Honorable Chairwoman Audrey M. Edmonson From: Carlos A. Gimenez Mayor Subject: Building Better Communities I1' eral Obligation Bond Program Approving Significant Modifications and Deletions to Close Multiple Projects, Reallocating Funding and Establishing Multiple New Projects Recommendation It is recommended that the Board of County Commissioners (Board) adopt the attached resolution approving significant project modifications, deletions and additions of new projects to the Building Better Communities General Obligation Bond Program (Bond Program) that are required to close out completed projects, delete projects that are no longer needed and reallocate unspent funds to existing or new projects, following a public hearing, to Appendix A of Resolution Nos. R-912-04, R-913-04, R-914-04, R-915-04, R-916-04, R-917-04, R-918-04 and R-919-04 (Authorizing Resolutions), as more fully set forth below. Scope The scope of this item is countywide and includes projects across all County Commission Districts. Fiscal Impact/Funding Source The Bond Program funds transferred from completed, deleted or existing projects to new or existing projects listed will address extensive capital upgrades and modernization needs of existing County, Municipal and County grantee facilities, roadways and rights -of -way countywide. There is no fiscal impact to the County resulting from the reallocation of funds. None of these modifications exceed original allocations that were approved by the voters in 2004. Track Record/Monitor The Office of Management and Budget is responsible for the management of the Bond Program and there are several County Departments, Municipal governments and County grantee agencies that are or will be responsible for implementing the capital improvements resulting from projects affected or created by this item. David Clodfelter from the Office of Management and Budget is the Bond Program Coordinator. Background On November 2, 2004, voters approved eight referendum questions, authorized by the Authorizing Resolutions, authorizing the issuance of $2,925,750,000 to fund more than 300 capital improvement projects throughout the County over 15 to 20 years. • Question 1, approved by Resolution No. R-912-04, authorized the issuance of $378,183,000 to fund the protection of natural resources through improved distribution of clean water, safe sewage and waste disposal, improved flood control and drainage (Water and Sewer Resolution). • Question 2, approved by Resolution No. R-913-04, authorized the issuance of $680,258,000 to fund the construction and improvement of neighborhood and regional parks and other recreational areas to include athletic fields and gymnasiums, courts, pools, playgrounds and marinas, the restoration of beaches and the preservation of endangered lands (Parks Resolution). • Question 3, approved by Resolution No. R-914-04, authorized the issuance of $352,182,000 to fund the construction and improvement of walkways, bikeways, bridges and access to the Seaport and other municipal and neighborhood infrastructure improvements to enhance quality of life (Public Infrastructure Resolution). 2 Honorable Chairwoman Audrey M. Edmonson and Members, Board of County Commissioners Page 2 • Question 4, approved by Resolution No. R-915-04, authorized the issuance of $341,087,000 to promote public safety by funding the construction and improvement of detention centers, justice centers, courthouses, police, fire and lifeguard stations and new animal care and control facilities (Public Safety Resolution). • Question 5, approved by Resolution No. R-916-04, authorized the issuance of $171,281,000 to fund the construction and improvement of emergency healthcare facilities at Jackson Memorial Hospital and Jackson South to promote accessibility to quality healthcare services (Healthcare Resolution). • Question 6, approved by Resolution No. R-917-04, authorized the issuance of $255,070,000 to fund the construction and improvement of public service outreach facilities to meet code and service requirements and to increase neighborhood and community access to services (Public Service Outreach Resolution). • Question 7, approved by Resolution No. R-918-04, authorized the issuance of $194,997,000 to fund the construction and improvement of affordable housing for the elderly and families to encourage home ownership through the acquisition, construction and renovation of residential units (Affordable Housing Resolution). • Question 8, approved by Resolution No. R-919-04, authorized the issuance of $552,692,000 to construct and improve libraries, cultural facilities and Head Start learning centers for pre-school children to offer multicultural educational opportunities and activities (Cultural Facilities Resolution). Appendix A to each of the Authorizing Resolutions listed projects eligible for funding from the Bond Program by number, name and project description. All additions, deletions and significant modifications to individual projects require a majority vote of the Board following a public hearing. Funding may only be reallocated within each question. At this point in the Bond Program, 171 projects (67 percent of funding) have been completed and funding may be allocated to other projects. When the Bond program was first outlined, twenty percent of the total allocation was allocated in each question to cover financing costs. Subsequent to the approval of the Program, a financing structure was developed which enabled the program to be funded, but at much lower financing cost. Therefore, the majority of funds set aside for this cost may also be reallocated to projects. With the adoption of the FY 2019-20 Budget, the Board supported the Administration's effort to address much needed infrastructure and life safety improvements at County owned and operated facilities. The Countywide Infrastructure Investment Program (CIIP) was developed and funding was identified through a number of sources, including Bond Program funding, to bring our facilities up to code, renovate the exteriors and interiors of our buildings, replace elevators and building management systems, renew parks and cultural centers, improve security throughout our facilities and do many other needed upgrades and improvements to make our buildings and other assets more efficient, safer and more comfortable places to visit, work and conduct business. For those departments participating in the CIIP Program, projects are identified as "Infrastructure Improvement" projects in the FY 2019-20 Budget. Funding to support these efforts has been identified by redirecting funds that had been initially earmarked for emergency repairs or intended to supplement projects for which other funding had not been identified. As additional funding is required, items requesting financing will be brought to the Board for approval. With the CIIP in place, County departments are less dependent on emergency repairs and can address capital needs in a proactive 3 Honorable Chairwoman Audrey M. Edmonson and Members, Board of County Commissioners Page 3 manner, saving considerable taxpayer dollars. The Bond Program projects that are identified in this item are for the purpose of performing these upgrades and improvements that have been identified in the CIIP Program. Attachment 1 includes all the significant modifications, deletions and additions to the Bond Program projects and Appendix A to each of the Authorizing Resolutions. The shaded projects are those that have received additional funding. The majority of the projects are to be used to support the CIIP. Other projects that have received additional funding include, but are not limited to: projects for North Miami, Bal Harbour, Pinecrest and Opa Locka; the Miami River Greenway and Ludlam Trail; the Mental Health facility and other court facility needs; funding for detention facilities repairs and renovations; and improvements to Jackson Health System facilities including the addition of SMART rooms for patients. Allocations in this item are to existing BBC GOB projects or related projects. For each question, unallocated funding has been accumulated for future allocations. The Building Better Communities General Obligation Bond Program Citizens' Advisory Committee considered this item at its meeting on June 10, 2020 and gave a favorable recommendation. Jennifer Moon Deputy Mayor Attachment Mayor02720 4 Attachme nt 1 Buildi ng Better Comm unities Ge ner al Obligation Bo nd Program Proposed Project Sig nifica nt Modifications, Deletio ns and Additio ns BBC -G OB Project No . Mun icipal Project Location BCC District Project Name Pr oject Description Str eet Address Total E xisti ng Allocation Modification/ Deleti on/ Addition Amo unt Balance Rem aining Pr oject Recipient Descriptio n of Action and Justificatio n for Actio n Bon d Program Qu estion N o. 1 - Water & Sewer Resolutio n 912-04 335 N /A N/A Bond Issuan ce Cost To Construct and Improv e Water, Sewer and Flood Control Systems The costs to issue bonds for water, sewer and flo od co ntrol systems. N/A $ 19,389,000 $ (15,000,000) $ 4,389,000 17 This significant modification reduces total existing allocation by $15M and m oves the fu nds to existi ng pr oject 17. Based on historical sp ending, modificati on that will increase total allocati on to existing project is required to advance the program . Modification will also assign a project number to this project for identification purposes as pr oject no. 335. 17 CW CW Countywide Water and Sewe r System En han cements Co nstruct main, pipeli ne and other enhancements to water delivery systems and to sewer collection systems to incre ase efficiency, capacity, q uality of service, public health or fire protection. Various $ 222,000,000 $ 15,000,000 $ 237,000,000 17 S urpl us funds are allocated to fund impro vement of additional sites . CJ1 311 UMSA 6 D ra in age improvements Construct stormwater dr ainage improvements in District 6. Various $ 1,000,000 $ (1,129) $ 998,871 1 Based on completed pr oje ct status, a sig nificant modificati on to reduce the tot al allocation is required th at will increase total allocation to e xisting project no . 1 to adv ance the pr ogram 1 CW CW Local D rainage Improvemen ts Construct stormwater drainage improv ements in various locations across the county. Various S 95,175,000 $ 1,129 S 95,176,129 1 S urpl us funds are alloc ated to f und improvement of additional sites . Total Mo dification Amo unt for Questi on 1 S 15,001,129 Bon d Program Qu estion N o. 2 - Parka R esolu tion 913-04 336 N /A N/A Bond Issuance Cost To Construc t an d Impro ve Park and Recrea tiona l Facilities The co sts to issu e bon ds for park an d recreationa l facilitie s. N/A $ 34,877,000 $ (20,000,000) $ 14,877,000 369, 370 & 371 Based on hist oric al spendi ng, a sig nifica nt modification to red uce the total allocatio n for this project and use the f unds to create three new municipal and CW projects is required to advance the program. Modification will also assign a project number to this project for identification purposes as project n o. 336. 108 UMSA 9 Sgt Jo seph Delaney Park Lo cal park improv ements include pool renovation and expansion and irrigation. 14450 Boggs D r, Miami FL $ 1,256,587 $ (3,896) $ 1,252,691 369, 370 & 371 Based on completed project status, a significant m odification is required to reduce the total all oc atio n for this project and to create three new municipal and CW pr ojects is to advance the pr ogram 109 U MSA 9 Go ulds Park Local park improvements include po ol renovation and expansion , irrigation an d ve hicular circulation . 11350 SW 216th St, Miami FL $ 1,243,000 $ (101) $ 1,242,899 369, 370 & 371 Bas ed on completed project st atus, a significa nt modification is req uired to red uce the total allocation for this project a nd to create three new municipal and CW projects is to adva nce the pr ogram BBC -GOB Project No. Municipal Project Location BC C District Project Name Project Description Street Address Tot al Existing Allocatio n M odification/Deletion/ Additio n Amount Bala nce Remaini ng Project Recipie nt Descriptio n of Action a nd J ustificatio n f or Actio n 119. 1 UMSA 11 SW 157th Aven ue Linear Geenway Developme nt of linear gre enway for passive park p urposes SW 157th Ave Miami FL $ 835,000 $ (8,578) $ 826,422 369, 370 & 371 Based on completed project status, a sig nificant modification is required to red uce the total all ocatio n for this project and to create three new muni cipal and CW pr ojects is to advance the program 122 UMSA 13 Un in corporated Mu nicipal Service Area - Ferri Pr operty Local park improveme nts include buildi ng co nstruction and vehicle and pedestria n circulation improvements. North Pointe Community Center, 7351 NW 186 ° Street, Miami FL $ 2,100,000 $ (1,982) $ 2,098,018 369, 370 & 371 Based on completed project status, a significa nt modification is required to reduce the total allocation for this project a nd to create three new municipal and CW projects is to advanc e the program 306 UMSA 9 Colonial Drive Park Loc al park improveme nts include building re novati ons, athletic field upgrades, irrigation upgrades, a nd a playground. 10750 SW 156th Terrace , Miami, FL $ 1,325,000 $ (687) $ 1,324,313 369, 370 & 371 Based on completed project status, a significa nt m odification is required to reduce the total alloc ati on for this project and to create three new mu nicipal a nd CW projects is to advance the program 316 U MSA 8 Unincorporated Municipal Service Area - Briar Bay Park Gener al impr oveme nts to existing l oc al parks i nclude renov ation, and upgrades. 9000 SW 128th St, Miami, FL $ 250,000 $ (6,522) $ 243,478 369, 370 & 371 Based on complet ed project status, a sig nifica nt modificati on is req uired to reduce the total alloc ati on for this pr oj ect a nd to create three new municipal and CW projects is to adva nce the program 363 CW 8 Improvemen ts to Coun ty -owned parks in District 8 General impr ovements to existing County- own ed parks including renovation and upgrades Various $ 250,000 $ (15,337) $ 234,663 369, 370 & 371 Based on completed project status, a sig nificant modificati on is required to reduce the tot al allocation for this project and to create three new m unicipal and CW projects is to ad vance the program a) 118 UMSA 11 Unincorporated Mun icipal Service A rea - Internationa l Gardens Park Local park impro vements include completion of pedestrian circulati on. 1898 SW 123rd Ct, Miami, FL $ 100,000 $ (253) $ 99,747 369, 370 & 371 Based on completed project status, a sig nificant modification is required to reduce the total allocation for this project and to create three new municipal and CW projects is to adva nce the progr am 104 UMSA 8 Unincorporated Municipal Service A rca - Contin ental Park Local park improve ments include building expansion and playgrou nd replacement. 10000 SW 82nd Ave, Miami FL $ 325,000 $ (6,988) $ 318,012 369, 370 & 371 Based on complet ed pr oject st atus, a significant modificati on is required to reduce the total allocation for this project and to create three new municipal and CW projects is to advance the program 369 N orth Miami Beach 2 Con stru ct Washington Pa rk and Community C enter Construct Washin gton Park an d Commun ity Center TBD S - S 750,000 S 750,000 369 S urplus f unds a re used to complete funding f or project 370 Bel Harbour 4 Hau lover Jetty/C utwa1W96tb Street Plaza Reconstru ction of existing Jetty that will enhan ce the aesthetics as a public space; which also Inclu des the area un der the Haulover Bridge. Variou s S - S 7,500,000 S 7,500,000 370 Surplus funds are used to complete funding for project 371 CW and UMSA Var iou s Miami -Dade County Park Facilities Upgrades & Improv emen ts Perform Upgrades and Improvements to existing Miami -Dade Coun ty Parks facilities that are required to address life safety, bu ilding code and other man da tor y requ iremen ts Various S - S 11,794,344 S 11,794,344 371 Surplus f unds are all oc ated to f und improvement of additional sites. Total Modification Amoun t for Question 2 $ 20,044,344 Bond Program Qu estion N o. 3 - Infra structu re Resolu tion 914-04 152 Islandia N/A Islan dia - Did No t Submit a Requ est. Islandia did not submit a request. TBD $ 1,000 $ (1,000) $ - 126 Based on m unicipal stat us cha nge, this project is being deleted . The surpl us f unds from this deleted project will be used to increase all ocations of existi ng Project No. 126 is required to advance the program BBC -GO B Project No. M unicipal Project Locatio n BCC District Project Name Pr oject Descriptio n Street Address T otal Existi ng Allocation Modificati on/ Deletion/ Addition Amount B al ance Remaini ng Project Recipie nt Descriptio n of Actio n a nd Justification for Actio n 130 U MSA CW Demolish the E xisting Bear Cut Fishing Catwalk Demolish the Existing Bear C ut Fishi ng Catwalk. Ricke nbacker Causeway $ 2,500,000 $ (99,259) $ 2,400,741 126 Based on completed project st atus, a significa nt m odificatio n is required to reduce the total all ocati on f or this project and to increase allocation of e xisting Project No. 126 to advance the pr ogram 138 Miami CW Tamiami Swi ng Bridge Repair existing swing bridge and/or replace with a si ngle leaf bascule bridge. 3101 NW S River Dr, Miami, FL $ 15,135,870 $ (195,377) $ 14,940,493 126 Based on completed project status, a significa nt modification is req uired to reduce the tot al allocation for this project and to increase allocation of existing Project No . 126 to adv ance the program 126 Miami 5 Miami River Gree nway GOB fu nds will compliment other funding sources to complete the Miami River Greenway. Various S 7,500,000 S 295,636 S 7,795,636 126 Significant Modificatio n increases total for existi ng project usi ng s urplus funds from c ompleted prot ects . 337 N /A N/A Bond Issuance Cost To Con struct and Improv e Bridges, Public Infrastructu re, and Neighborhood Improv emen ts Estimated costs to iss ue bo nds for bridg es, public infr astr ucture, and neighborh ood impro vements. N/A $ 18,056,000 $ (12,000,000) $ 6,056,000 127, 373,374, 144 & 375 Based on historical spending, a significant modificati on to reduce the tot al all ocation for this proj ect and us e the fu nds to create three new m unicipal and two existi ng proje cts is required to advance the program. M odification will also assign a project number to this project for identification p urposes as project no . 337 . 348 Miami 3 West Venetian Bascule Bridge Re placement Venetian Causeway $ 13,964,130 $ (1,682,677) $ 12,281,453 127, 373,374, 144 & 375 Based on completed project status, a significa nt modificatio n is req uired to reduce the tot al allocation to this project and use the surplus f unds to create three new municip al projects and add alloc atio n to two existing projects, to advance the progr am 142 Miami 3 & 5 Bikeway Bike Path Various $ 1,000,000 $ (9,820) $ 990,180 127, 373,374, 144 & 375 Based on completed project status, a significant modification is required to reduce the t otal allocatio n to this project and use the surplus f unds to create three new mu nicipal projects and add allocation to two existing projects, to ad vance the program 163 U MSA 7 UMSA Infrastructure Improvements Various $ 5,851,000 $ (1,000,000) $ 4,851,000 127, 373,374, 144 & 375 Sig nificant modifi cati on is nec essary to decreas e the t ot al pr oject all oc atio n by $1M to create two new m unicipal projects in Pinecrest and South Miami using surplus f unds. 127 Coral G ables 7 Improve and Extend the Commodore Bike Trail Improv ement and exten sion of existin g pa ved pa th from Co coplum Circle to Edgewa ter Dr , D ouglas Road, Main H ighwa y, a nd Ba yshore D r. Includes pedestria n bridge ov er Cora l Ga bles Wa terway. Various S 1,000,000 S 728,000 S 1,728,000 127 This significant modification Increases th e t otal allocati on using s urpl us funds a nd adds the City of Miami as a project locati on in order to contin ue the improvements to the Commodore Bike Trail through the City of MiamL 373 South Miami 7 South Mia mi Infrastructure Improv ements Variou s in frastructure improvements to include but n ot limited to ; sidewalks, resurfacin g an d gua rdrails in the City of South Miami. Variou s S - S 500,000 S 500,000 373 Significant Modification establishes new Municipal Project using surplus fu nds and assig ns the new project a Project no. 373 374 Pinecrest 7 Pinecrest In frastructure Improvemen ts Va rious infrastr uc ture improv ements to inclu de but not limited to; sidewa lks, resurfacin g an d guardrails in the City of Pinecrest. Various S - S 500,000 S 500,000 374 Significant Modificatio n establishes new Mu nicipal Project usi ng surplus f unds and assigns the new project a Project no. 374 BBC -GO B Pro ject No. Municipal Project Location BCC District Project Name Project Descripti on Stre et Address Total E xisting Allocatio n Modific ation/Deletio n/ Additio n Amount Bal anc e Remai ni ng Project Recipie nt Descriptio n of Acti on and J ustificatio n for Action 144 Various 6 & 7 Ludlam Bike Trail Right-of-way acquisiti on and development of paved path along forme r Florida East Coast Railro ad. FEC railroad from D adela nd North Statio n to NW 12 Street S 1,735,000 S 5,000,000 S 6,735,000 144 Significant modific ati on increases total protect allocation for existing Project No. 144, revises the project descriptio n to re ad as f ollows: "Right-of-way acquisition a nd development of paved path along former Florida E ast Coast Rail road and other privately -owned prope rty," and re vises the street address as follows: "FEC railr oad and private property from Dadeland North Station to Mi ami International Airport" 375 CW CW and UMSA In fra str ucture Improvements f or C ounty ma intain ed R lghtof Ways I nfrastr uct ure Impro vements for Co unty mai ntained right-of-ways to i nclude roads, sidewalks and bridges . Various S - S 7,964,497 $ 7,964,497 375 Surplus fu nds are allocated to fund improvement of additi onal sites. Total Modificatio n Amo unt for Questio n 3 $ 14,692,497 Bon d Progra m Qu estion No. 4- Public Safety R esolution 915-04 338 N/A N/A Bon d Issuan ce Cost To Construct an d Improve Public Safety Facilities The costs to issue bonds for public safety facilities. N/A $ 17 ,487,000 $ (12,000,000) $ 5,487,000 376 & 377 Based on historical spending, a significant modification to reduce the total allocation for this pr oject and use the f unds to create two new countywide and UMSA projects . M odification will also assig n a pr oject number to this project for ide ntific ati on p urposes as project no . 338. CO 174 Miami CW Downtown Government Facilities Fire Alarm System Replace the fire a larm systems in down to wn Cou nty buildings at the Plaza Center, Ma in Libra ry, Miami Art Museum and Central Su pport Facility. Vario us $ 2,200,000 $ (51,029) $ 2,148,971 376 & 377 Based on compl et ed pr oject status, a sig nificant modific ation is req uired to reduce the tot al all ocatio n for this pr oject and to create two new countywide projects is to advance the program 177 V ariou s CW Fire Code Requirements in GSA Buildings Remove all non plenu m -rated cables in the Courthou ses, Libraries, County Hall and Co mmission Chambers. N ational Fire Protection codes and the N atio na l Fire Protectio n A ssocia tion codes require that all data, electrical, television, and telephone cabling that is not plenu m -rated are safety hazards du e to their flammability an d toxicity. A ll such c ables must be removed. Variou s $ 1,400,000 S (1,400,000) $ - 376 & 377 This project is bei ng deleted as a res ult of the limited pr oject scope, and the surplus funds are being used to create two new co untywide projects to advance the pr ogram. 178 Miami CW Abatemen t of Hazardou s Materials In County Buildings A batement of lead, asbesto s and other hazardous ma teria ls in mecha nica l an d common areas in buildings older than fifteen years, such as the Dade Co unty Cou rtho use, Criminal Courthouse, Community Action Agency and others. V ariou s $ 1,200,000 $ (174,720) $ 1,025,280 376 & 377 Based on the limited project scope, a significa nt modificatio n is required to reduce the t otal allocation for this project and to create two new countywide projects to adva nce the progr am BBC -G OB Project No. M unicipal Project Locatio n BCC District Project Name Project Descriptio n Street Address Total Existi ng Allocatio n Modificatio n/Deletion/ Additi on Amo unt Bala nce Remaining Project Recipie nt Description of Action and J ustific ation for Actio n 179 Miami CW Miami -Dad e Plaza S ecurity Operatio ns Enhancement Replace security infrastructure in the "Security Operations Center ." Includes recorders, alarm monitoring and reporting equipment, cameras, fib er connections and s oftware necessary to monitor alarms and dispatch security forces. Improvements will also provide remote cap ability to allow monitori ng from remote l ocatio ns partic ularly duri ng disaster response. NW 1st St, Miami, FL 33128 $ 600,000 $ (600,000) $ - 376 & 377 This project is being deleted as a res ult of the limited project sc ope, a nd the surpl us fords are bei ng used to create two new cou ntywide projects to ad vanc e th e pr ogram. 181.1 Mia mi CW Miami -Da de Coun ty Courthouse Facade Restoration Project Restoration of the Miami -Dade County Courthouse Facade to i nclude replacement of the Courthouse windows and restoration of the Courthouse Plaza Project 181.1, includi ng $18,100 all ocatio n, added by BCC on 7-21-09 via Reso. N o. R-945.09. 175 W Flagler St. Miami FL $ 18,100,000 $ (5,379,275) $ 12,720,725 376 & 377 Based on completed project status, a significant modification is required to reduce the total allocation of the project and use the surplus funds to create two new CW projects, to advance the pr ogram CD 182 CW CW Gerstein Justice Building HVAC Repairs Modernize electronic controls, retrofit lighti ng, and upgrade restroom ventilation . Replace interlocking c eili ng tile system. This is the main Criminal and Traffic Courthouse. The Richard E. Gerstei n building is a nine -story b uilding employi ng over 2,000 and servici ng o ver 10,000 daily visitors. Replace or refurbish mec hanicaVH VAC systems, in order to improve air qua lity and red uce operati ng co sts. 1351 NW 12th St, Miami, FL $ 3,900,000 $ (2,193,397) $ 1,706,603 376 & 377 Based on the limited pr oject scope, a significa nt modification is required to reduce the t otal allocation for this project and to create two new cou ntywide projects to advance the program 203 UMSA UMSA Un incorporated Mun icipal Service Are a - Emergency Gen erato rs For District Stations Replace old emergency generators at district police stations. Various $ 890,000 S (571) $ 889,429 376 & 377 Based on c ompleted project status, a sig nificant modificati on is required to reduce the total allocation of the project and use the surplus f unds to cre ate two new CW projects, to advance the program 205 UMSA U MSA Un inc orpora ted Mu nicipal Serv ice A rea - Homeland Security - Buildin g En hancements Increase homeland security stru ctu ra l defense at the Police Headquarters Complex and district stations. N/A $ 860,000 S (8,535) $ 851,465 376 & 377 Based on completed project st atus, a significant modificati on is req uired to reduce the total allocati on of the pr oj ect and us e the surplus f unds to create two new CW projects, to adva nce the program 322 UMSA UMSA Northside Police Sta tion Ex pansio n and renov ation of the N orthside police sta tion. 799 NW 81st St, Miami, FL $ 11,020,000 $ (147,308) $ 10,872,692 376 & 377 Based on c ompleted pr oject status, a sig nificant modification is required to reduce the total allocation of the project and use the s urplus funds to create two new CW projects, to advance the program 362 CW 8 Homelan d Security Marin e Patrol Vessel To acquire an d equ ip a Marine Patrol Vessel in order to enhance homeland security and waterborne police respon se. N/A $ 405,830 $ (18,868) $ 386,962 376 & 377 Based on completed project st at us, a significa nt modification is required to reduce the total allocation of the project and use the surplus funds to create two new CW pr ojects, to ad va nce the pr ogram 345 Do ral 12 A mmunition /H azMat Stora ge Building To purchase and/or construct a storage facility suitable for the storage of ammunition , che mica l agents, gas can isters, and other poten tially hazardou s materials 9601 NW 58th St, Dora l, FL 33178 $ 865,000 $ (1,109) $ 863,891 376 & 377 Based on compl eted project status, a significant modificatio n is req uired to reduce the total allocation of the project and use the surplus f unds to create two new CW projects, to advanc e the program BBC -GO B Project No. Municipal Project Location BCC District Project Name Project Descripti on Street Address Total Existi ng All ocati on Modification/ Deletion/ Additio n Amount Balance Remai ning Pr oject Recipie nt Descriptio n of Acti on a nd J ustificati on for Action 183 Miami CW Gerstein Justice Building Modernization of Sec urity and Ele vator Systems Ref urbish and modernize this facility, upd ati ng ele vator controls to increase efficiency, as well as card access systems, security cameras and recorders . This is the mai n Crimin al a nd Traffic Courtho use. The Richard E. Gerstein b uildi ng is a nin e story building employing over 2,000 and servicing over 10,000 daily visitors . 1351 NW 12th St, Miami, FL $ 1,800,000 $ (1,227,301) $ 572,699 376 & 377 Based on the limited pr oject sc ope, a significant modificati on is req uired to reduce the total allocatio n for this project and to create two new cou ntywide projects to advance the program 187 Miami CW G erstein Justice Buildi ng Elevator Addition Add elevator and provide various upgrades to the building to improve the movement of the public within the building. The Richard E. Gerstein b uilding is a nine story buildi ng employing over 2,000 employees and ser vicing over 10,000 d aily visitors. 1352 NW 12th St, Miami, FL $ 3,000,000 $ (2,986,130) $ 13,870 376 & 377 Based on the limited project scope, a significant modification is req uired to reduce the total allocatio n for this project and to create two new countywide projects to advance th e program 190 Miami CW G raham Buildin g Exterior Repai rs Exterior repairs, sealing, grouting and painting to protect deteriorating se als and finish of facade. 1350 NW 12th A ve, Miami, FL $ 500,000 $ (311,610) $ 188,390 376 & 377 Based on the limit ed pr oj ect sc ope, a significant m odification is required to reduc e the total allocation for this project and to create two new countywide pr oje cts to advance the program —1 191 Miami CW Dade Coun ty Courthouse Facility Refurbishment Refurbish dec ades -old courtrooms, upd ate electronics, and replace cracked and broken sidewalk pavers. This is the mai n Ci vil Courthouse built in 1925 a nd registered as a historical site. The Dade County Co urthouse is a 27 story buildi ng emplo yin g ov er 700 employees and servicing ov er 1,200 visitors daily. 175 W Flagler St. Miami FL $ 800,000 $ (692,493) $ 107,507 376 & 377 Based on the limited project scope, a significant modificatio n is req uired to reduce the tot al allocatio n f or this project and to create two new co untywide pr oje cts to ad vance the program 0 192 No rth Miami CW North Dade Justice Center Facility Refurbishment Repair/replace building equipment, refurbish and modern ize facility, includi ng exterior pain ting, limited window replacement, sealing of exterior, carpet replacemen t, coo lin g towe r re placement, and installation of Closed Circuit Telev ision System (CCTV). There is a lso a Division of Motor V ehicles office located in the bu ilding allowing residents to renew their driver's licenses. The North Dade Ju stice Center provides services to over 3,000 daily customers. 15555 Biscayne Bl vd, North Miami Beach, FL 33160 $ 500,000 $ (281,500) $ 218,500 376 & 377 Based on the limited project scope, a significant modification is required to red uce the t otal allocation for this project and to cr eate two new countywide projects to advance the program 351 Miami CW Emergen cy C apital R epairs to the Miami- Dade Cou nty Courthouse Emergency capita l re pairs to the Miami - Dade Coun ty Courthouse to correct or repair hazardous conditions tha t ma y a ffect the life, health and safety of judges, employees, v isitors or users of the courthouse 175 W Flagler St. Miami FL $ 30,000,000 S (23,727,975) $ 6,272,025 376 & 377 Based on the limited pr oject scope, a significant modification is req uired to reduce the total allocation for this project and to create two new countywide projects to advance the program 376 CW & U MSA CW Miami -Dade Coun ty C our t Facilities Upgrades & Improvements C apital upgrades and improv ements to in clude but are n ot limited to life safety, HVAC a nd ele ctrical improv ements V arious S - S 36,799,681 S 36,799,681 376 Surpl us funds are allocated to fu nd impr ovement of additional sites . 377 CW & UMSA CW Miami -Dade County Pu blic Sa fety Facilities Upgrades & Improv ements C apital upgra des an d improv ements to include but ar e n ot limited to life sa fety, HVAC and electrical impro vements Various S - S 14,402,140 S 14,402,140 377 Surpl us fonds a re allo cated to fu nd improv ement of additional sites . BBC -GOB Project No. Mu ni cip al Project Location BC C District Project Name Project Descriptio n Street Address Total E xisti ng Allocation Modificatio n/Deletion/ Additio n Amo unt Bala nce Remai ni ng Project Recipie nt Description of Actio n a nd J ustific ation f or Action 194 UMSA CW Constr uct a New Dete ntion Ce nter Construct a dete ntion center with 2,000 new jail beds and support facilities. TBD $ 60,750,000 $ (58,597,925) $ 2,152,075 193 & 365 Based on the project scope, a significant modification is required to reduce the total allocation for this project and to all ocate the surplus fu nds to two existi ng projects to advance the program 195 CW CW Pre -Trial Detention Ce nter (Pl DC) and Tu rner Guilford K night Corr ection al Center (TGK) Renovatio ns Renov ate the Pre -Trial Detenti on Center (PTDC) to comply with its 40 -year recertification requirement including improvements to the medical clinic, exp anding its support of the criminal co urthouse, and complete major re novati ons at the correctional fa cilities . 1321 NW 13th St, Miami, FL $ 47,000,000 $ (29,302,931) $ 17,697,069 193 & 365 Based on the limited pr oject scope, a sig nific ant modific ation is req uired to reduce the total all ocation for this project a nd to allocate the surplus funds to two existing projects to advance the program 347 U MSA 12 Retro fit of Hou sing U nits at Turner Guilfo rd Kn ight Co rrectiona l Center Retrofit housi ng u nits at the Turner Guilford K night C orrectional Center to provide suitable housi ng that will include clinical, psychological, and security modificati ons to safely a nd humanely meet the needs of our ment al he alth populatio n. 7000 NW 41st St, Miami, FL $ 2,500,000 $ (114,073) $ 2,385,927 193 & 365 Based on the completed project status, a sig nificant modification is required to red uce the total allocation for this project a nd to allocate the surplus f unds to two existing projects to advance the program 193 Miami CW Mental Health Facility To free up jail space a nd provide a nd effective and coat efficie nt alternative facility to ho use the mentally ill as they await a trial date . 2200 NW Seve nth Ave . Mi ami FL $ 34,100,000 $ 9,000,000 S 43 ,100,000 193 Significant m odification increases total allocatio n usi ng surplus funds for this existing project 365 UMSA 12 D etention Facilities — In fra stru cture Repairs an d R enovations To perform the required repla cement of roofs a nd expansion joints, bo ilers, air con ditioning systems, elevators, generators, fuel tanks, mechanical doors, recreation yard doors a nd the renov atio n of bathrooms at the Me tro West Detention Center a nd the Turner Guilford Knight C orrectio nal Cen te r to provide suita ble housin g fo r inma tes Various S 14,750,000 S 79,014,929 S 93,764,929 365 The significa nt modification i ncreases total allocation for this existing project to address upgrades & improvements at all detention facilities, revises the project description as follows: "To perform the req uired replacement of roofs and expansio n joints, boilers, air conditio ning systems, elevator, generators, f uel tanks, mecha nical doors, recreation y ard doors, the renovation of bathrooms, a nd other renovatio ns and capital improvements at the Metro West Detentio n Center, the Turner Guilford Knight Corre ctio nal Center, and the Pre - Trial Detention Center to pro vide suitable housing for inmates," a nd cha nging the mu nicipal project location to "CW and UMS A" . To ta l Modification Amoun t for Qu estion 4 $ 139,216,750 Bond Program Qu estion N o. 5- Healthcare Resolution 916-04 208 Miami CW Con struct and Expan d The Emergen cy D epartment at Jackson Memo ria l Hospita l (JMH) Constru ct and ex pand JMH Eme rgen cy Department to prov ide improv ed access to emergency services and su bsequen t treatment. 1611 NW 12th Ave, Miami, FL $ 15,072,955 $ (223,869) $ 14,849,086 310, 378 & 379 Based on c ompleted pr oject status, a significa nt m odificati on is required to reduce the total allocation of the project and use the surplus fu nds to increase the allocation to an existi ng project and to create two new CW pr ojects, to advance the program . BBC -GOB Project No. Municipal Project Location BCC Dist rict Project Name Project Descriptio n Street Address Total Existi ng Allocatio n Modific ation/Deletion/ Additio n Amount B alance Remaining Project Recipient Description of Action a nd J ustificatio n for Actio n 210-R N /A N/A Ren ovati on and E xpansion of Jackson So uth Community Hospital Ren ovat e and/ or e xp and Emergency Department, operating rooms, end oscopy facilities and catherizatio n treatment lab to impro ve acc ess . 9333 SW 152nd St, Miami, FL $ 77,193,429 S (610) S 77,192,819 310, 378 & 379 Based on completed project status, a sig nificant m odification is req uired to reduce the total allocation of the pr oject and use the surplus fiords to i ncrease the allocation to an existing project a nd to create two n ew CW projects, to ad vance the progr am . 212 Miami CW Unive rsity of Miami (UM)/Jacks on Memo rial Ho spital (MID Center Of Excellen ce For Heari ng And Communication Disorders BBC GOB Program fu nding will complement other fundi ng in order to acquire, construct, equip, rehabilitate and enhance the University of Miami (UM)/Jackson Memorial Hospital (JM H) Center of Excellence for the Diag nosis of Communicati on Disord ers. 1611 NW 12th Ave, Miami, FL $ 5,000,000 $ (1,500,000) S 3,500,000 310, 378 & 379 Based on completed project st atus, a significant modification is req uired to reduce the total allocation of the project and use the surplus finds to i ncrease the allocatio n to an existing pr oj ect and to create two new CW pr oj ects, to ad vance the progr am . 339 N/A N/A Bond Issuance Cost To Constru ct an d Impro ve Healthcare Facilities The c osts to iss ue bo nds f or emergency and healthcare facilities . N/A $ 8,781,000 S (7,788,809) S 992,191 310, 378 & 379 Based on historical spending, a significant m odification is req uired to reduce the total allocatio n for this project a nd use the surpl us funds to i ncrease th e t otal allocation for one e xisting project a nd create two new CW projects, to ad vance the program. This significant modification also assigns this project as Project No. 339. Na 310 Miami 5 & 6 Jackson Health Center Pa rtne r with JMH to pro vide healthcare oppor tu nities. 1475 NW 14th Ave, Miami, FL S 7,500,000 $ 200,000 $ 7,700,000 310 A significant modification is required to increase the existing tot al allocation for the pr oject to add ress upgrades & impr ovements to healthcare facilities to incl ude b ut not limited to H VAC repai rs a nd to add District 5 to the B CC Dist rict served . 378 CW CW SMART Rooms at Jackson Memoria l Facilities Constr uct Smart Rooms at Jackson Memo ria l Facilities Vario us $ - $ 5,000,000 $ 5,000,000 378 Surplus funds are used to create a new co untywide project to address upgrades & improvements to Jackson Memorial he althc are facilities. The new proje ct is assigned protect no.378 . 379 CW CW Jackson Memorial Facilities Upgrades and Improvements Capital upgr ades and improv ements to include but no t limited to life safety, HVAC and electrical improvemen ts V arious $ - $ 4,313,288 $ 4,313,288 379 Surplus f unds are used to create a new countywide proje ct to address upgrades & impro vements to Jackson Memorial healthc are facilities. The new proje ct is assigned project no. 379 . Total Modificatio n Amou nt for Qu estion 5 $ 9,513,288 Bond Program Question N o. 6- Public Service Resolu tion 917-04 224 Miami CW Buildin g/Energy Man agemen t System For Gov ernmen t Facilities and Cou rthou ses This project includes mo re than 30 buildings tota ling in ex cess of 4,000,000 square feet employing 11,000 and providin g serv ices to over 29,000 daily v isitors thro ughout Miami -Dade County. Replace existing Building/Energy Management System (BMS), and expand it to mon itor all GSA man aged buildings. BMS reduces operating costs, while providing remote automated control of HVA C, lights, alarms, card access, fire systems an d o ther bu ilding equipment. V arious $ 8,200,000 $ (36,572) $ 8,163,428 380 Based on completed project status, a significa nt modification is required to reduce the tot al allocati on of the project a nd use the surplus fu nds to create one new CW project to ad vance the pr ogram. BBC -GO B Project N o. M unicipal Project Locatio n BCC District Project 'larne I Project Description Street Address Total Existi ng Allocatio n Modification/Deleti on/ Additio n Amo unt Bala nce Remai ni ng Pr oject Recipie nt Description of Actio n a nd J ustificatio n for Action 225 Mia mi CW C ooling Capacity Enhancement at the Ce ntral Support Facility Refurbish existing chilled water facility and add chilled water capacity to meet the space c onditioning needs of two new b uildi ngs planned for c ompletion by 2010. 50 NW 2nd Ave, Miami, FL $ 3,500,000 $ (1,357,143) $ 2,142,857 380 Based on current project scope, a sig nificant modification is required to reduce the project's total allocation to use the surpl us f unds to create one new CW proje ct to advance the program. 226 Miami CW SPCC Facility R efurbishment (I ncludes H VAC and Communications Systems) Ref urbish HVA C systems; moder niz e elevator c ontrols; replace fire drain li nes, fire alarm system and rotted window sills; repair limestone; and expa nd emergency communications systems. The Stephen P. Clark Center (SPCC) is the main County building pr oviding space for most Cou nty dep artments and is the seat of C ounty Go ver nment. 111 NW First St , Miami FL $ 3,400,000 $ (90,033) $ 3,309,967 380 Based on completed project stat us, a sig nificant modific ati on is req uired to red uc e the total allocatio n of the project a nd use the surplus funds to create one new CW project to advance the program . C,A% 227 UMSA CW Data Processing Center Facility R efurbishment Repair/replace buildi ng equipment, refurbish and modernize facility. Impro veme nts include remediating serious building settleme nt problem, adding a parking str uct ure to provide need ed additional parki ng capacity, and refi nishing building exterior. This is a critical facility providin g County departments with all in formation technology needs . The Data Processing Center is the mai n hub for data routing and storage for Miami -Dade Cou nty operations. 5680 SW 87th A ve, Miami, FL $ 2,900,000 $ (36,209) $ 2,863,791 380 Based on completed project st at us, a significant modificati on is requir ed to reduce the t otal allocation of th e project and use the s urplus f unds to create o ne new CW project to advance the program. 228.1 Miami CW West Lot Multi -Use Facility Construct 45,000 Sq. Ft. of office space destined to house the Tax Collector's Office curren tly located at the Metro Fla gler Bu ilding. In addition, an 810 parking space - garage facility will be constructed to replace the existin g parking lo t lo cated no rth of the Stephen P. Clark Cen ter that will giv e way to the future Children's Courtho use. Project 228. 1 added by BCC on 7-21-09 via Reso. No. R-946-09. 232 NW 2nd St, Miami, FL $ 2,700,000 $ (148,543) S 2,551,457 380 Based on completed pr oject status , a significant modification is required to reduce the total allocation of the project and use the s urplus funds to create one new CW project to advance the program. 230 UMSA CW South Dade G overnment Center Facility Refu rbishment Repair/replace bu ilding equ ipment, refu rbish and modernize facility. This site provides space for several pu blic o rie nted government service s including the Courthouse. The So uth Dade Gov ern ment Center Co mplex employees 140 an d provides daily services to over 2,100 customers. 10710 SW 211 St, Cutler Bay, FL $ 800,000 $ (1,621) $ 798,379 380 Based on c ompleted project stat us, a sig nificant modific ation is required to reduce the total allocation of the project and use the surplus fu nds to create o ne new CW project to advance the program. 231 UMSA CW Co nstruct Additional Parking and Provide Facility Improve ments At The Caleb Center Construct additional parking and provide needed facility improvements to the Caleb Center. 5400 NW 22nd Ave, Miami, FL 33142 $ 13,000,000 $ (491,630) $ 12,508,370 380 Based on c ompleted project stat us, a significant modification is required to reduce the total allocation of the project and use the surplus funds to creat e one new CW pr oj ect to ad vance the progr am . BBC -G OB Project N o. Mu nicipal Project Location BCC District Project Name Project Descriptio n Street Address Total Existi ng Allocation Modification/ Deletion/ Additio n Amo unt Bal ance Remai ni ng Project Recipient Descriptio n of Actio n a nd Justificati on for Actio n 354 UMSA CW Data Processi ng and Communicatio ns Center/Annex Buildings Replacement of four outdated UPS units to gu arantee co ntinuity of critical operations at the Data Processing a nd Communicati ons Center 5400 NW 22nd A ve, Miami , FL $ 1,000,000 $ (I) $ 999,999 380 Based on c omplet ed project status, a significant modification is req uired to reduce the t otal allocatio n of the project and use the surplus fu nds to create one new CW project to advance the program . 213 Miami Gardens 1 Colonial Zubkoff/lves Dairy C omprehensi ve Center Renovations and impr ovements to Community Actio n Agency (CAA) permanent facility. Ives Dairy Rd, Mi ami FL $ 100,000 $ (18,942) $ 81,058 380 teased on completed project stat us, a sig nificant modification is required to reduce the total allocation of the project and use the s urpl us funds to create o ne new CW project to 218 UMSA 3 Mary McCloud Bethune Enrichment Center Ren ovati ons and improvements to Community Action Agency (CAA) perm anent facility. 2900 NW 43rd Terrace 84414, Miami, FL $ 580,000 $ (63,487) $ 516,513 380 Based on completed project status, a significant modificati on is required to reduce the tot al all ocatio n of the project and use the surplus funds to create o ne new CW project to advance the program . 221 UMSA 9 Isaac A. Withers Enrichment Center Renovatio ns and improvements to Community Action Age ncy (CA A) permanent facility . 21300 SW 122nd Ave, Mi ami, FL $ 260,000 $ (46,092) $ 213,908 380 Based on complet ed project st at us, a significant modification is required to reduc e the total allocatio n of the pr oject and use the surplus fu nds to create one new CW project to advance the program. 325 UMSA 9 West Perrin e Senior Citizen Cen ter Renovate, upgrade or expand the existing West Perrine senior center . 17801 Homestead Ave, Miami, FL $ 11,000 $ (832) $ 10,168 380 Based on project On -Hold status for this project as the current allocation is insufficie nt , a significa nt modification is required to reduce this project's total allocation and create one new CW pr oject to advance the program . 340 N/A N/A Bo nd Issuance Cost To Construct and Improve Public Services Outreach Fa cilities The costs to issue bonds for public s ervic es outreach facilities. N/A $ 13,077,000 $ (8,000,000) $ 5,077,000 380 Based on historical spendi ng, a sig nifica nt modification is req uired to reduce the t ot al allocation for this project and use the s urplus funds to create o ne new CW project, to adva nce the program . This significant modification also assign this project the following project no . 340 . 380 CW CW Miami -D ade County Maintained Government Facilities Upgrades & Improve ments Miami -D ade Gov ern ment Fa cilities Upgrades & Improvements V arious $ - $ 10,291,105 $ 10,291,105 380 Surplus f unds are allocated to fund improvement of additio nal sites. Total Modification A mount for Questio n 6 $ 10,291,105 Bond Program Qu estion No. 7- Hou sin g Resolu tion 918-04 341 N /A N/A Bond Issu ance Cost To Construct and Improve Housing For The Elde rly And Families The costs to issue bonds to improve ho using for the elderly and families. N/A $ 9,997,000 $ (6,000,000) $ 3,997,000 381 Based on historical spending, m odificatio n is required, that will create one new CW project, to advance the pr ogram and assign project no . 341 381 CW CW Miami -Dade County Maintained Hou sing Facilities U pgrades a nd Impro vements Miami -D ade County Maintain ed Hou sin g Facilities Upgrades and Improvements Variou s 5 - $ 6,000,000 $ 6,000,000 381 Surplus fu nds are allocated to fund impro vement of additio nal sites . Tota l Modifica tion Amount for Question 7 S 6,000,000 Bon d Program Question No. 8- Cu ltu ral Resolu tion 919-04 BBC -GOB Project No. M unicipal Proj ect Location BCC District Project N ame Project Descriptio n Street Address Total Existi ng Allocati on Modificatio n/Deletion/ Addition Amo unt Bala nce Remai ning Project Recipient Descriptio n of Actio n a nd Justificatio n for Actio n 300 UMSA CW Regi onal He ad St art Center Constr uct a regional multi -purpose Head Start Ed ucatio n a nd Training Center in ce ntral Miami - Dade to provide ser vices to 200 eligible children that are currently n ot served. 6125 SW 68th St, South Miami, FL $ 7,515,846 $ (68,279) $ 7,447,567 290 Based on completed project status, a significant modificatio n is req uired to reduce the pr oject's total all ocatio n a nd use the s urplus fu nds to increase the alloc ation to an existi ng cultur al pr oject, to advance the program. 290 Miami CW V izcaya's Restoration of Main House and Gardens and Creatio n of N ew Educational Cen ter at Viz caya Village x estore a na impr ov e its mstoncatty Iandmarked mai n h ouse a nd gard ens to make them more accessible and enjoyable for future generations . Vizcaya will restore the endangered historic buildings of the Vizc aya Vill age a nd open them to th e public for the first time, cre ating an e xtr aordi nary new cult ur al and educational ce nter for Miami -Dade residents and visitors. Vizcaya will demolish the non - historic b uilding to be vacated by the Museum of Science and utilize the site to advance the estate as a p ubli c ass et consistent with the restrictions contai ned in the Warranty De eds. 3251 S Mi ami Ave, Miami, FL $ 50,000,000 $ 68,279 $ 50,068,279 290 Sig nifica nt Modificatio n increases tot al allocatio n for this existi ng project usi ng surpl us funds . 279 UMSA 8 R edlan d Farm Life Schoo l Co mplete restoration work th at is currently underway through the Office of Hist oric Preservation. Once completed, the building will be leased to an entity that will complete the interior build -out a nd assume responsibility for the operation of community an d educational acti vities . Bu ilt in 1916, it was designed by Aug ust Geige r, on e of the mo st promine nt architects in the early decades of South Florida's dev elopment. Once the second largest consolidated school in the nation, this historic building was dev astated by Hurricane Andrew. 17411 SW 200th St, Miami, FL $ 500,000 $ (14,312) $ 485,688 382 & 383 Based on completed pr oje ct status, a sig nificant modification is req uired to reduce the total allocation of the project and use the surplus funds to create one new mu nicipal project and one new CW project to advance the program . 303 Miami Beach 4 & 5 Miami Beach - Mon ument Island Restoration of Monu ment Islan d (in addition to Emergency Stabiliza tion fun ds already gran ted). Miami Beach, FL 33139 $ 750,000 $ (8,527) $ 741,473 382 & 383 Based on completed project status, a significant m odificatio n is req uired to reduce the total allocati on of the project and use the surplus f unds to create o ne new mu nicipal project and one new CW project to adva nce the program. 342 N/A N/A Bond Issuan ce Cost To Construct an d Improve Cultural, Library An d Multicultural Edu cation al Facilities The costs to issue bonds for cultu ral, libra ry an d multicultural edu catio nal facilities. N/A $ 28,336,000 $ (25,831,509) $ 2,504,491 382 & 383 Based on historical spending, a significa nt modific ati on is req uired to reduce the total all ocation for this project and use the surplus fu nds to create one new CW project, to adv ance the program . This significant modific ati on also assign this project the f ollowing project no. 340. BBC -GO B Project No. Municipal Project Location BCC Distri ct Project Name Project Description Street Address Total E xisti ng Alloc ation M odification/D eletion/ Addition Amo unt Balance Remaini ng Project Recipie nt Descriptio n of Action and J ustification for Action 255 U MSA 3 & 5 Historic Hampton House Rehabilitate the b uilding as a multi -use center of social and cultural life for the local community, through the Office of Historic Preservation . The most significant repres entative building of the civil rights movement in Miami -Dade County, this former hotel a nd e ntert ainment ce nter served as a major s ocial and p olitical gathering place during the 1950s a nd 1960s . Closed a nd abandoned for years , Co unty CDBG funds have rece ntly been secured for its public acq uisition. 4240 NW 27th Ave #3010, Miami, FL $ 4,700,000 $ (11,629) $ 4,688,371 382 & 383 Based on completed project status, a significant modification is required to reduce the total allocation of the project and use the s urplus f unds to create one new municipal project and one new CW project to advance the progr am. 294 Miami CW Cultura l Cen ter Facility Renov ation and Rehabilita tion Replace tile, re -grout expansion joints, and address structural problems . Cracked or lo os e tiles a nd degraded e xpansion joi nts have all owed water pe netrati on into basement areas th at will weaken some structural elements . The Miami Art Museum, Hist orical Muse um a nd M ain Library are located in this complex. NW lst St, Miami, FL 33128 $ 700,000 $ (655,959) $ 44,041 382 & 383 Based on current project scope, a significant modification is requ ired to reduce the total allocation of the project a nd use the surplus funds to create one new municipal pr oject a nd one new CW project to adva nce the progr am. __ CD 382 O paLocka 1 Restoration & Renovatio n of O paLocka City Hall Perform required u pgrades, restoration and ren ovation s to H istoric Opa-Locks City Ha ll Sharazad Blvd, Op a-locks, FL 33054 S - S 600,000 S 600,000 382 Surpl us fu nds are us ed to c reate a new muoidpal protect to address upgrades & improvements to OpaLocka City Hall . The restor ation and rehabilitation of Opa- Lock a City als o previ ously recei ved S2 million of Bond Program funds from Project No . 293 - "Ilistoric Preserv ation F und" . This new project is assigned Project No . 382. 383 CW CW Mia mi -Dade County Cu ltural Facilities Upgrades & Improve ments Perfor m requir ed u pgrades and ren ovation s to all Miami -Dade C ou nty maintain ed Cultural Facilities Various S - S 25 ,921,936 S 25,921,936 383 Surplus funds are allocated to food improvement of additio nal sites . 301 UMSA 8 & 10 Construct Killian Libra ry Con structio n of the Killian Library - 15,000 sq. ft. 11161 SW 87th A ve, Miami, FL $ 9,000,000 $ (8,985,763) $ 14,237 384 Based on current project sc ope, a sig nificant modification is required to reduce the tot al allocation of the project in order to create o ne new pr oject that will address Library improveme nts in Commissio n District 7 to ad vance th e progr am. 384 Variou s CW Miami -Dade Coun ty Library FaciBtles U pgra des & Improvemen ts Perform Upgrades an d Improvements to existin g Miami -Dade County Library facilities that a re required to address life safety, buildin g code an d o ther man datory requiremen ts Various S - S 8,985,763 S 8,985,763 384 S urplus fu nds are used to create a new c ountywide pr otect to address upgrades & improvements to Library fa cilities . The new project is assig ned Project No . 384 . Total Modification Amou nt for Qu estion 8 S 35,575 ,978 Tota l Modification for all GOB Question s S 250,335,091 MEMORANDUM (Revised) TO: Honorable Chairwoman Audrey M. Edmonson DATE: August 31, 2020 and Members, Board of County Commissioners FRO Please note any items checked. igail rice -Williams unty Attorney SUBJECT: Agenda Item No. 5(P) "3 -Day Rule" for committees applicable if raised 6 weeks required between first reading and public hearing 4 weeks notification to municipal officials required prior to public hearing Decreases revenues or increases expenditures without balancing budget Budget required Statement of fiscal impact required Statement of social equity required Ordinance creating a new board requires detailed County Mayor's report for public hearing No committee review Applicable legislation requires more than a majority vote (i.e., 2/3's present , 2/3 membership , 3/5's , unanimous , CDMP 7 vote requirement per 2-116.1(3)(h) or (4)(c) , CDMP 2/3 vote requirement per 2-116.1(3)(h) or (4)(c) , or CDMP 9 vote requirement per 2-116.1(4)(c)(2) ) to approve Current information regarding funding source, index code and available balance, and available capacity (if debt is contemplated) required 17 Approved Mayor Agenda Item No. 5(P) Veto 8-31-20 Override RESOLUTION NO. R-830-20 RESOLUTION APPROVING, AFTER A PUBLIC HEARING, SIGNIFICANT MODIFICATIONS AND DELETIONS OF MULTIPLE PROJECTS IN AND ADDITIONS OF MULTIPLE PROJECTS TO BUILDING BETTER COMMUNITIES GENERAL OBLIGATION BOND PROGRAM CONTAINED IN APPENDIX A TO EACH RESOLUTION NOS. R-912-04, R- 913-04, R-914-04, R-915-04, R-916-04, R-917-04, R-918-04 AND R-919-04; AND APPROVING THE USE OF SURPLUS FUNDS WHEREAS, this Board desires to accomplish the purposes outlined in the accompanying memorandum, a copy of which is incorporated herein by reference, NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF MIAMI-DADE COUNTY, FLORIDA, that: Section 1. The foregoing recital is incorporated in this resolution and is approved. Section 2. This Board approves, following a public hearing, the significant modifications and deletions of multiple projects and additions of multiple projects to the Building Better Communities General Obligation Bond Program contained in Appendix A to each Resolution Nos. R-912-04, R-913-04, R-914-04, R-915-04, R-916-04, R-917-04, R-918-04 and R-919-04 (the "Authorizing Resolutions") all as specifically set forth in Attachment 1 to the accompanying memorandum. This Board further approves the use of surplus funds to fund certain significant modifications, as shown in Attachment 1 to the accompanying memorandum, and the addition of the new projects in the Authorizing Resolutions. The foregoing resolution was offered by Commissioner Xavier L. Suarez who moved its adoption. The motion was seconded by Commissioner Barbara J. Jordan and upon being put to a vote, the vote was as follows: 18 Agenda Item No. 5(P) Page No. 2 Audrey M. Edmonson, Chairwoman aye Rebeca Sosa, Vice Chairwoman aye Esteban L. Bovo, Jr. aye Daniella Levine Cava aye Jose "Pepe" Diaz aye Sally A. Heyman aye Eileen Higgins aye Barbara J. Jordan aye Joe A. Martinez aye Jean Monestime aye Dennis C. Moss aye Sen. Javier D. Souto aye Xavier L. Suarez aye The Chairperson thereupon declared this resolution duly passed and adopted this 31St day of August, 2020. This resolution shall become effective upon the earlier of (1) 10 days after the date of its adoption unless vetoed by the County Mayor, and if vetoed, shall become effective only upon an override by this Board, or (2) approval by the County Mayor of this resolution and the filing of this approval with the Clerk of the Board. Approved by County Attorney as to form and legal sufficiency. Monica Rizo Perez mu MIAMI-DADE COUNTY, FLORIDA BY ITS BOARD OF COUNTY COMMISSIONERS HARVEY RUVIN, CLERK Melissa Adames By: Deputy Clerk 19