Loading...
HomeMy Public PortalAbout22-082 - Final Site Plan Approval 14585 NW 22 AVESponsored by: Interim City Manager RESOLUTION NO. 22-082 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA APPROVING THE FINAL SITE PLAN REQUEST FOR THE CONSTRUCTION AND OPERATION OF CONVENIENCE STORE, TWO RETAIL SPACES AND A SERVICE STATION WITH A HAND CAR -WASH AT 14585 NW 22 AVENUE AND IDENTIFIED BY FOLIO 08- 2122-005-0690 IN THE B-2 ZONING DISTRICT; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Applicant, Mauricio Falla, on behalf of property owner, Maclam Investment, LLC, has submitted an application for site plan approval for a Project located at 14585 NW 22nd Avenue, Opa-Locka, Florida and identified by folio 08-2122- 005-0690 in the B-2 Zoning District; and WHEREAS, the Applicant intends to re -develop the site into a new convenience store, with two retail spaces and a service station with a hand car -wash at this location in the City of Opa-Locka ("City"); and WHEREAS, the Project will consist of the demolition of the current building and the new construction and operation of a convenience store, retail spaces and a service station with a hand car -wash; and WHEREAS, the redevelopment of this site is intended to provide two new retail spaces and a new convenience store and a service station with a hand car -wash at this location; and WHEREAS, the development will also include 9 car parking spaces, 19 new assorted trees, 359 shrub plants and landscaped open space; and WHEREAS, the Planning & Zoning Board reviewed this request on September 13, 2022, for final site plan approval and recommended approval by a 4-0 vote; and WHEREAS, after the applicant, Mauricio Falla presented this request to the Planning & Zoning Board and obtained a traffic study that conveyed the site plan must be modified and this site plan reflects applicable changes; and WHEREAS, the request for site plan approval meets the review criteria set forth in the Land Development Regulations, Section 22-55 H. Resolution No. 22-082 WHEREAS, the City Commission of the City of Opa-Locka finds that it is in the best interest of the City and its residents to approve the final site plan of Applicant within the City, as provided herein and attached hereto as Exhibit "A". NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, AS FOLLOWS: SECTION 1. Recitals. The above recitals are true and correct and are incorporated into this Resolution by reference. SECTION 2. Approval/Denial. Approval/Denial of Site Plan. The City Commission of the City of Opa-Locka has reviewed the recommendation of the Planning & Zoning Board and hereby approves / denies the Site Plan request for the demolition of the current building and the new construction and operation of a convenience store, two retail spaces and a service station with a hand car -wash located at 14585 NW 22nd Avenue, Opa-Locka, Florida and identified by folio 08-2122-005-0690 in the B-2 Zoning District. A copy of the Site Plan is attached hereto and incorporated herein as Exhibit "A". SECTION 3. SCRIVENER'S ERRORS. Sections of this Resolution may be renumbered or re -lettered and corrections of typographical errors, which do not affect the intent of this Resolution may be authorized by the City Manager, following review by the City Attorney, without need of public hearing, by filing a corrected copy of same with the City Clerk. SECTION 4. EFFECTIVE DATE. This Resolution shall, upon adoption, become effective as specified by the City of Opa- Locka Code of Ordinances and the City of Opa-Locka Charter. PASSED and ADOPTED this 14th day of December, 2022. 2 Resolution No. 22-082 TTEST: Jo.1 na Flores, City Clerk APPROVED AS TO FORM AND LEGAL SUFFICIENCY: Burnadette Norris City Attorney tsy• r-c)x eeks, P.A. Moved by: Commissioner Williams Seconded by: Commissioner Bass VOTE: 5-0 Commissioner Bass YES Commissioner Kelley YES Commissioner Williams YES Vice Mayor Ervin YES Mayor Taylor YES 3 DocuSign Envelope ID: 6FBFOE7B-1 B4C-497C-A75B-13BF91AAA552 City of Opa-locka Agenda Cover Memo Department Director: Gregory D. Gay Department Director Signature: ,— oc gne City Manager: Darvin Williams CM Signature �AYLUbL l gtMS Commission Meeting Date: December 14, 2022 Item Type: (Enter X in box) Resolution `—caoc �c,ceocaaz... Ordinance Other X Fiscal Impact: (Enter Xit, Yes No Resolution Reading: (EnterX in box) 1st Reading 2nd Reading X X Public Hearing: g (Enter Xill box) Yes No Yes No X X Funding Source: Account# : (Enter Fund & Dept) Ex: N/A See Financial Impact section below Advertising Requirement: (Enter X in box) Yes No X ILA Required: (Enter X in box) Yes No RFP/RFQ/Bid#: X Strategic Plan Related (EnterX in box) Yes No Strategic Plan Priority Area: Enhance Organizational Ei Bus. & Economic Dev MI item Public Safety El Quality of Education El Qual. of Life & City Image • Communication El Strategic Plan Obj./Strategy: (list the specific objective/strategythis will address) X Sonsor P Name City Manager Department: Planning & Community Development P City Manager Short Title: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA APPROVING THE SITE PLAN REQUEST FOR THE CONSTRUCTION AND OPERATION OF CONVENINENCE STORE, TWO RETAIL SPACES AND A SERVICE STATION WITH A HAND CAR -WASH AT 14585 NW 22 AVENUE AND IDENTIFIED BY FOLIO 08-2122-005-0690 IN THE B-2 ZONING DISTRICT; PROVIDING FOR AN EFFECTIVE DATE. Staff Summary: The applicant, Mauricio Falla has submitted an application for site plan approval to demolish the current building at 14585 NW 2211,1 Avenue, Opa-locka, Florida and identified by folio 08-2122-005-0690 in the B-2 Zoning District and within the Corridor Mixed Use Overlay. The applicant intends to develop this site into a new convenience store and service station with two separate retail spaces with a hand car -wash. The development will also include nine parking spaces and 19 assorted trees and 359 shrub plants and landscaped open space. Background DocuSign Envelope ID: 6FBFOE7B-1B4C-497C-A75B-13BF91AAA552 This property is located in the southeast section of the City at the intersection of Service Road and NW 22nd Avenue. The property owner, Maclam Investment, LLC, according to Maimi-Dade County Property Appraiser's website obtained this vacant, unused (and no licensed business occupies this space) 20,886 square foot parcel and has submitted a formal request for site plan review approval and development agreement approval to construct a service station/fueling facility and convenience store and include two retail spaces and a hand car - wash. According to the applicant's site plan the redevelopment of this site will provide a 3,579 square foot building with 1,975 square feet allocated for the Convenience Store and two 802 square foot sections for new retail spaces. This use, Auto Service Station is permitted in the B-2 zoning district, The outside had car wash is permitted as an accessory use for any Auto Service Station. The City of Opa-locka 's Comprehensive Plan, Future Land Use map provides that the property has a future land use designation of "Commercial" and the zoning map provides that the property is zoned Commercial Liberal (B-2) and is within the "Corridor Mixed Use Overlay". This proposed operation is adjacent to Single -Family homes on the eastside of this parcel. According to the site plan a 6 -foot concrete wall will be built on the eastside of this property to buffer the use from the single- family residential properties. For additional buffering there is a 12 -foot dedicated alley between the service station/convenience store and the single-family residential properties. The subject property is generally surrounded by residential properties to the east and commercial and residential properties to the west and south of this site and State Road #9 to the north of this site. The proposed use of Auto Service with two retail spaces and a hand car wash will provide an opportunity for retail services as well as auto services to this community, which are in harmony with the general characteristics of the surrounding neighborhood for commercial and residential uses. Financial Impact Approval of this site plan and development agreement will not provide any negative financial impact. Proposed Action: Staff recommended approval of this Resolution Attachment: DRAFT Resolution P&Z Application Package P&Z Board Meeting Minutes 9-13-22 FIALLOS MEP DESIGN INC • fir Ooie // (4/7/e /i•-irilfr (-ywirr./INI('N/•i, LETTER OF INTENT October 7, 2020 City of Opa Locka Building Department 780 Fisherman St, Opa-Locka, FL 330154 Reference: New Gas Station, Retail Building and Carwash 14585 NW 22 Ave, Miami FL 33054. Folio: 08-2122-005-0690 To City of Opa Locka, Planning and Community Development. I, Mauricio Falla, owner of "Joes Unlimited, Inc" and mailing address of: 11904 SW 59 St, Cooper City, FL 33330 intent to renovate the above property, the proposed renovation consist in a new fueling system, new building with a convenience store and two retail spaces and a hand car -wash. We will also include new landscape design, drainage system and parking lot area as per City requirements and governing codes. For this purpose I have hired an NE Company for development of the construction documents and permitting procedures. If I can be of any further assistance in this matter, please feel free to contact me at (305) 877-1845. Thank You. Sincerely, Jorge Fiallo, PE Professional Engineer FL PE No. 65527 Digitally signed by Jorge Fiallo Date: 2021.10.08 12:34:18 -04'00' IRSDEPARTMENT OF THE INTERNAL REVENUE SERVICERY CINCINNATI OH 45999-0023 Date of this notice: 11-02-2020 Employer Identification Number: 85-3726617 Form: SS -4 Number of this notice: CP 575 B MACLAM INVESTMENT LLC MAURICIO FALLA MBR 10773 NW 58TH ST APT 140 DORAL, FL 33178 For assistance you may call us at: 1-800-829-4933 IF YOU WRITE, ATTACH THE STUB AT THE END OF THIS NOTICE. WE ASSIGNED YOU AN EMPLOYER IDENTIFICATION NUMBER Thank you for applying for an Employer Identification Number (EIN). We assigned you EIN 85-3726617. This EIN will identify you, your business accounts, tax returns, and documents, even if you have no employees. Please keep this notice in your permanent records. When filing tax documents, payments, and related correspondence, it is very important that you use your EIN and complete name and address exactly as shown above. Any variation may cause a delay in processing, result in incorrect information in your account, or even cause you to be assigned more than one EIN. If the information is not correct as shown above, please make the correction using the attached tear off stub and return it to us. Based on the information received from you or your representative, you must file the following form(s) by the date(s) shown. Form 1065 03/15/2021 If you have questions about the form(s) or the due date(s) shown, you can call us at the phone number or write to us at the address shown at the top of this notice. If you need help in determining your annual accounting period (tax year), see Publication 538, Accounting Periods and Methods. We assigned you a tax classification based on information obtained from you or your representative. It is not a legal determination of your tax classification, and is not binding on the IRS. If you want a legal determination of your tax classification, you may request a private letter ruling from the IRS under the guidelines in Revenue Procedure 2004-1, 2004-1 I.R.B. 1 (or superseding Revenue Procedure for the year at issue). Note: Certain tax classification elections can be requested by filing Form 8832, Entity Classification Election. See Form 8832 and its instructions for additional information. A limited liability company (LLC) may file Form 8832, Entity Classification Election, and elect to be classified as an association taxable as a corporation. If the LLC is eligible to be treated as a corporation that meets certain tests and it will be electing S corporation status, it must timely file Form 2553, Election by a Small Business Corporation. The LLC will be treated as a corporation as of the effective date of the S corporation election and does not need to file Form 8832. To obtain tax forms and publications, including those referenced in this notice, visit our Web site at www.irs.gov. If you do not have access to the Internet, call 1-800-829-3676 (TTY/TDD 1-800-829-4059) or visit your local IRS office. (IRS USE ONLY) 575B 11-02-2020 MACL B 9999999999 SS -4 IMPORTANT REMINDERS: * Keep a copy of this notice in your permanent records. This notice is issued only one time and the IRS will not be able to generate a duplicate copy for you. You may give a copy of this document to anyone asking for proof of your EIN. * Use this EIN and your name exactly as they appear at the top of this notice on all your federal tax forms. * Refer to this EIN on your tax -related correspondence and documents. If you have questions about your EIN, you can call us at the phone number or write to us at the address shown at the top of this notice. If you write, please tear off the stub at the bottom of this notice and send it along with your letter. If you do not need to write us, do not complete and return the stub. Your name control associated with this EIN is MACL. You will need to provide this information, along with your EIN, if you file your returns electronically. Thank you for your cooperation. Keep this part for your records. CP 575 B (Rev. 7-2007) Return this part with any correspondence so we may identify your account. Please correct any errors in your name or address. CP 575 B 9999999999 Your Telephone Number Best Time to Call DATE OF THIS NOTICE: 11-02-2020 ( ) - EMPLOYER IDENTIFICATION NUMBER: 85-3726617 FORM: SS -4 NOBOD INTERNAL REVENUE SERVICE CINCINNATI OH 45999-0023 111.111111.11111111111111111111111111.1.1.1111111111 MACLAM INVESTMENT LLC MAURICIO FALLA MBR 10773 NW 58TH ST APT 140 DORAL, FL 33178 Electronic Articles of Organization For Florida Limited Liability Company Article I The name of the Limited Liability Company is: MACLAM INVESTMENT LLC L20000335744 FILED 8:00 AM October 22, 2020 Sec. Of State jafason Article II The street address of the principal office of the Limited Liability Company is: 10773 NW 58TH STREET 140 DORAL, FL. UN 33178 The mailing address of the Limited Liability Company is: 10773 NW 58TH STREET 140 DORAL, FL. UN 33178 Article III The name and Florida street address of the registered agent is: BIZCPAS 1300 NW 84TH AVE DORAL, FL. 33126 Having been named as registered agent and to accept service of process for the above stated limited liability company at the place designated in this certificate, I hereby accept the appointment as registered agent and agree to act in this capacity. I further agree to comply with the provisions of all statutes relating to the proper and complete performance of my duties, and I am familiar with and accept the obligations of my position as registered agent. Registered Agent Signature: OBDULIA LEMUS Article IV The name and address of person(s) authorized to manage LLC: Title: MGR MAURICIO FALLA 10773 NW 58TH STREET APT 140 DORAL, FL. 33178 UN Title: MGR CLARA I DUENAS 9995 NW 75 STREET DORAL, FL. 33178 UN Title: MGR AMILKAR J CONTRERAS 10710 NW 66 STREET APT 512 MIAMI, FL. 33178 UN L20000335744 FILED 8:00 AM October 22, 2020 Sec. Of State jafason Article V The effective date for this Limited Liability Company shall be: 10/22/2020 Signature of member or an authorized representative Electronic Signature: MAURICIO FALLA I am the member or authorized representative submitting these Articles of Organization and affirm that the facts stated herein are true. I am aware that false information submitted in a document to the Department of State constitutes a third degree felony as provided for in s.817.155, F.S. I understand the requirement to file an annual report between January 1st and May 1st in the calendar year following formation of the LLC and every year thereafter to maintain "active" status. The Opa-locka Planning & Zoning Meeting P&Z Clerk's Summary Minutes P&Z Meeting Tuesday, September 13, 2022 7:00 P.M. • CALL TO ORDER: Chairman Elio Guerrero called the Planning & Zoning Meeting to order at 7:05 p.m. on Tuesday, September 13, 2022. An opportunity was given to the public to email the Planning & Zoning Clerk prior to the Planning & Zoning Meeting with any questions/comments/concerns on items we will hear on this evening's P&Z agenda. I ROLL CALL: The Planning & Zoning Board of the City of Opa-locka, Miami -Dade County, met in a session on Tuesday, September 13, 2022, at 7:05 p.m. The following members of the Planning & Zoning Meeting were present: Chairman Elio Guerrero, Board Member Germane Barnes, Board Member Dorothy Johnson, and Board Member Claudienne Hibbert-Smith. Absent Board Member: Board Member Dawn Mangham Also, in Attendance were Planning & Zoning Director, Gregory Gay, Zoning Official Gerald Lee, Planning & Zoning Board Clerk, Kinshannta Hall, and Attorney Pam Booker. II INVOCATION AND PLEDGE: Prayer was led by Board Member Johnson and the Pledge of Allegiance was stated after the Prayer. III APPROVAL OF MINUTES: Discussion of Minutes from May 10, 2022, Meeting Chairman Elio Guerrero asked if a motion could be made to have the minutes approved from May 10, 2022, meeting. 11 Page Paae 5 of 201 Board Member Dorothy Johnson made a motion to approve the minutes. Board Member Claudienne Hibbert Smith second the motion. *Board Member Germane Barnes abstained from voting on the reading minutes due to his temporary absent/leave from the board. There being no discussion, the motion passed by a 3-0. Claudienne Hibbert Smith Yes Elio Guerrero Yes Dorothy Johnson Yes IV. PUBLIC HEARING: A) A RESOLUTION OF THE PLANNING & ZONING BOARD OF THE CITY OF OPA-LOCKA, FLORIDA RECOMMENDING APPROVAL OF THE SPECIAL EXCEPTION SITE PLAN REVIEW REQUEST FOR THE OPERATION OF A PLACE OF RELIGIOUS WORSHIP AT 2560 SERVICE ROAD AND IDENTIFIED BY FOLIO 08-2122-000-0130 IN THE B-2 ZONING DISTRICT; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE. On the record, Mr. Gay stated that the applicant decided to withdraw their application. The applicant was under a time constraint of getting certain things approved and will not be moving forward. The item was withdrawn from this Planning & Zoning Board meeting. Board Member Johnson: I noticed that it has been withdrawn. This application was riot in our May package. We were not here June or July. In addition to that I really have reservation when I see a registered agent application dated September 10, 1996. Staff get it together if I recall it is an annual renewal, so before any applications are presented before the board it needs to be current. I want this on the record. 21 Page Paae 6 of 201 B.) A RESOLUTION OF THE PLANNING & ZONING BOARD OF THE CITY OF OPA-LOCKA, FLORIDA RECOMMENDING APPROVAL OF THE FINAL SITE PLAN REQUEST FOR THE CONSTRUCTION AND OPERATION OF CONVENINENCE STORE, TWO RETAIL SPACES AND A SERVICE STATION WITH A HAND CAR -WASH AT 14585 NW 22 AVENUE AND IDENTIFIED BY FOLIO 08-2122-005-0690 IN THE B-2 ZONING DISTRICT; PROVIDING FOR AN EFFECTIVE DATE. My name is Mauricio Falla and I'm the project manager for this project. This application was previously approved with one item pending the traffic impact study. Based on the result of the study we modified the proposed the site plan. *Staff Presentation (For Item B & Item C on the agenda) Mr. Lee: The subject property is currently owned by Maclam Investment, LLC C/O Mauricio Falla according to Miami -Dade County Property Appraiser's website. The property site is currently vacant pending the review and approval of this site plan review request which would allow the demolition and construction of the convenience store, service station, two retail spaces and a hand car wash in this B-2 zoning district. The applicant proposes to construct a 3,579 sq ft building with 1,975 sq ft allocated for the Convenience Store and two 802 sq ft section for new retail spaces and provide 9 vehicle parking spaces. Provide 22 new trees, 359 shrub plants, and appropriate landscaped open space. Use is permitted after special exception review in this zoning district. Use will not adversely affect the general character of the neighborhood. Use will not generate or create unfavorable vehicular traffic or circulation problems. Staff recommend approval of this revised Site Plan with any conditions that may be imposed by the Planning & Zoning Board. Chairman Guerrero: What was the change? Mr. Lee: Orientation of property change. Board Member Johnson: Did we reach out to the neighbors? I'm concerned of the entry and drainage that area holds a lot of water. Mr. Lee: Regarding drainage it's a part of the application. Mr. Gay: It will be reflected in the Development Agreement. 31 Page Paae 7 of 201 Board Member Dorothy Johnson made a motion to approve Item B on the agenda and Board Member Germane Barnes second the motion. There being no discussion, the motion passed by a 4-0. Claudienne Hibbert Smith Yes Elio Guerrero Germane Barnes Dorothy Johnson Yes Yes Yes C.) A RESOLUTION OF THE PLANNING & ZONING BOARD OF THE CITY OF OPA-LOCKA, FLORIDA RECOMMENDING APPROVAL OF THE DEVELOPMENT AGREEMENT REQUEST FOR THE CONSTRUCTION AND OPERATION OF CONVENINENCE STORE, TWO RETAIL SPACES AND A SERVICE STATION WITH A HAND CAR -WASH AT 14585 NW 22 AVENUE AND IDENTIFIED BY FOLIO 08-2122-005-0690 IN THE B-2 ZONING DISTRICT; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE. Mr. Lee: Staff recommend approval of the revised Development Agreement with any conditions that may be imposed by the Planning & Zoning Board. Board Member Germane Barnes made a motion to approve Item C with modifications applied on the agenda and Board Member Johnson second the motion. There being no discussion, the motion passed by a 4-0. Claudienne Hibbert Smith Yes Elio Guerrero Yes Germane Barnes Yes Dorothy Johnson Yes 4IPage Paae 8 of 201 D.) A RESOLUTION OF THE PLANNING AND ZONING BOARD OF THE CITY OF OPA-LOCKA, FLORIDA, RECOMMENDING SITE PLAN REVIEW APPROVAL FOR THE CONSTRUCTION AND OPERATION OF AN INDUSTRIAL AND COMMERCIAL MIXED -USE RETAIL AND WAREHOUSE DISTRIBUTION FACILITY ON THE PROPERTY LOCATED AT 12691 NW 42ND AVENUE AND 12705 NW 42ND AVENUE, OPA-LOCKA, FLORIDA 33054, IDENTIFIED BY FOLIOS 08-2129-000-0050 AND 08-2129-000-0064, IN THE B-3 ZONING DISTRICT; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE. Public Comments: Brian Dennis -2140 York Street Let's get some equality in this City. We need to give the residents a voice before you go before this project. We need to have where residents are being hired by these companies moving in our city. Board Member Barnes: I would like to thank the resident. We will do the best we can and make sure this happens. Brian Dennis: Use your attorney an ordinance is already in place. Board Member Johnson: I'm very familiar with ordinance 95-6 and it can be integrated. There is a lack of knowledge, research needs to be done. We must make sure the commission is informed. The ordinance has more weight. How can we do this in good faith. We need the resources. Chairman Guerrero: We must enforce this and make it happen. Alex Van Mechl: Two warehouses expertise paying attribute to our community. I would like for our community to look like "Opa-locka" not "Doral." I inspire everyone to look like Opa-locka. * Public Comments Closed Attorney Robert Holland spoke on behalf of the applicants and made a presentation as well. Attorney Robert Holland: I plan to give you, my commitment. Retail is on the decline. This project is considered light industrial. Cities like Miramar and Doral are built on light industrial. A video presentation was presented. There will be entry level positions clean logistic jobs that will be created for residents. No other city can compete with Opa-locka. You would be creating a lane that eliminates the competition. There will be 1,000 jobs and 765 permanent jobs. I spoke with Mr. Beasley with Florida Memorial. There will be retail space and a show room. I 51 Page Paae 9 of 201 want to know if there is a PR firm in place. I want to follow up before the next City Commission. Goldstein: There are six buildings and opportunity for more logistics. There is commercial uses movement and proposed commercial logistics. *Staff Presentation (For Item D & Item E on the agenda) Mr. Lee: The subject properties are currently owned by GPT NW 42nd Avenue Owner II & III LLC c/o Gramercy Property Trust according to Miami -Dade County Property Appraiser website. The property site is currently the location of the Opa-locka Flea Market, assorted retail uses and truck parking operations; Assorted Special Events -The review and approval of this site plan review request would allow the demolition and construction of six new commercial mixed -use buildings for retail, warehouse, and distribution facilities to operate from the property at 12691 NW 42nd Avenue and 12705 NW 42nd Avenue in this B-3 zoning district. The Land Use for 12691 NW 42nd Avenue is Commercial and the Land Use for 12705 NW 42nd Avenue is Industrial. The Applicant proposes to construct six buildings that total 741,837 square feet to accommodate both retail and industrial warehouse & distribution uses and provide 74,182 square feet of office space. The site plan provides that it complies with the required landscaping and parking for this 43.76 +/- acre combined site. The uses proposed are permitted through property zoning and incorporation of uses permitted by the Corridor Mixed Use Overlay. As a mixed -use development there must be clear indications of retail, sales and service uses and distinct indicators of where those uses will be located. The MXUOD District permits Retail and Service Uses as well as Hotels, Movie Theaters, Health Spas, and Medical and Business Offices. The commercial mixed use also includes Recreational Facilities that include recreation buildings for indoor sports, i.e., indoor soccer, swimming pools, parks, (which could include a water park) open space and recreational area for tennis courts, basketball courts, etc. The site plan provides for the location of smaller businesses with office / showroom / retail spaces for commercial business uses. For horizontal Mixed -Use with multiple buildings, each building may be a separate use, however there must be clear indicators as to the area designated for retail/commercial uses and those for industrial uses. The site plan provides for shallower depths on bldgs. Facing LJD/LJ Staff recommends an Economic and Fiscal Impact Analysis, and a Market Feasibility Study are provided, and the Final Site Plan is modified accordingly and with the conditions listed in the staff report and conditions that may be imposed by the Planning & Zoning Board. Chairman Guerrero: There is two lot covered under the overlay? Mr. Lee: Yes Board Member Johnson: It allows future growth? 61 Page Paae 10 of 201 r Mr. Lee: Yes. Based on the requirement code they are complying. We are in support. Board Member Dorothy Johnson made a motion to approve Item D on the agenda and Board Member Germane Barnes second the motion. There being no discussion, the motion passed by a 4-0. Claudienne Hibbert Smith Yes Elio Guerrero Germane Barnes Dorothy Johnson Yes Yes Yes E.) A RESOLUTION OF THE PLANNING AND ZONING BOARD OF THE CITY OF OPA-LOCKA, FLORIDA, RECOMMENDING DEVELOPMENT AGREEMENT REVIEW APPROVAL FOR THE CONSTRUCTION AND OPERATION OF AN INDUSTRIAL AND COMMERCIAL MIXED -USE RETAIL AND WAREHOUSE DISTRIBUTION FACILITY ON THE PROPERTY LOCATED AT 12691 NW 42ND AVENUE AND 12705 NW 42ND AVENUE, OPA- LOCKA, FLORIDA 33054, IDENTIFIED BY FOLIOS 08-2129-000- 0050 AND 08-2129-000-0064, IN THE B-3 ZONING DISTRICT; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE. Mr. Lee: Staff recommend approval of the Development Agreement with any modifications of the site plan as a result of an Economic and Fiscal Impact Analysis and a Market Feasibility Study and any conditions that may be imposed by the Planning & Zoning Board. Board Member Dorothy Johnson made a motion to approve Item E on the agenda and Board Member Claudienne Hibbert Smith second the motion. There being no discussion, the motion passed by a 4-0. Claudienne Hibbert Smith Elio Guerrero Germane Barnes Dorothy Johnson Yes Yes Yes Yes 7IPage Paae 11 of 201 F.) AN ORDINANCE OF THE PLANNING AND ZONING BOARD OF THE CITY OF OPA-LOCKA, FLORIDA, TO RECOMMEND THE ADOPTION OF A TEXT AMENDMENT TO THE LAND DEVELOPMENT REGULATION, ORDINANCE 15-31, TO PERMIT TRACTOR TRAILER TRUCK AND / OR MAJOR VEHICLE (10,000 LBS OR GREATER) PARKING IN THE I-4 ZONING DISTRICT; PROVIDING FOR CONFLICT AND REPEALER; PROVIDING FOR SEVERABILITY; PROVIDING FOR AN EFFECTIVE DATE. Public Comments: Attorney Hope Calhoun: This ordinance is beneficial to the city. I'm in support of this Ordinance. Public Comments Closed. Board Member Johnson: In compliance very much needed take it to the next step. *Staff Presentation (For Item F on the agenda) Mr. Lee: This use is permitted two industrial zoning districts which includes I-2 Industrial Planned District and I-3 Liberal Industrial District. The I-4 Liberal Industrial District for junkyard, salvage/scrap metal and storage. There is great need for this use in South Florida. This use is less intensive than the current permitted uses of the I-4 district. Staff recommend approval of the amendment to Ordinance 15-31, land development regulations with any conditions that may be imposed by the Planning & Zoning board. Board Member Dorothy Johnson made a motion to approve Item F with modification applied on the agenda and Board Member Claudienne Hibbert Smith second the motion. There being no discussion, the motion passed by a 4-0. Claudienne Hibbert Smith Yes Elio Guerrero Germane Barnes Dorothy Johnson Yes Yes Yes Wage Paae 12 of 201 STAFF UPDATE VI ADJOURNMENT The meeting was adjourned. Submitted by ATTEST: Ki shannta Hall Plannin • & Zonin Cler Elio Guerrero Chairman 9 1 I> E� Paae 13 of 201 Page 1 of 5 " THE GREAT CITY " v,19 re r a PII od OQ aQ giorkia Received: By: Date: PLANNING & ZONING BOARD MEETING SCHEDULE AND REQUIREMENTS FY 2020-2021 TOTAL FEES: $ // c200 New Fees as of October 1, 2015 FY 2020-20211 Meeting Dates Date Application Found Sufficient 1st Tuesday of Each Month) October 5, 2021 November 2, 2021 December 7, 2021 January 4, 2022 February 1, 2022 March 1, 2022 April 5, 2022 May 3, 2022 June 7, 2022 July 5, 2022 August 2, 2022 September 6, 2022 August 20, 2021 September 17, 2021 October 15, 2021 November 19, 2021 December 17, 2021 January 14, 2022 February 18, 2022 March 18, 2022 April 15, 2022 May 20, 2022 June 17, 2022 July 22, 2022 1. All individuals seeking to appear before the Planning & Zoning Board must submit a complete Planning & Zoning Board application, with the required documents and fees totaling (as established by ordinance), paid by check or money order to the City of Opa-locka. Failure to submit all documents and fees will result in your case not being scheduled to be heard at a meeting. 2. If the applicant seeking to appear before the Planning & Zoning Board is not the property owner he must provide an affidavit of authorization from the property owner. 3. All regular meetings are held on the first Tuesday of each month at the City of Opa-locka City Commission Chambers, Meeting Time 7:00 P.M. (time and location are subject to change, please check with the Planning and Commmmity Development Deparmienl for exact time and location of the meetings). 4. Application package must include all required documents per checklist and fees of The City of Opa-locka. The application will be reviewed by the Department and will be scheduled for the next P&Z meeting upon finding of sufficiency. 5. You are required to complete and return this application along with all the information and documentation (see page 2 check list) requested to the: City of Opa-locks Planning & Coimnunity Development Department 780 Fishermen Street 01 floor Opa-locka, FL 33054 Telephone: 305-953-2868, Ext. 1503 Facsimile: 305-953-3060 Reference to Ordinance 15-13 Land Development Regulations/ Zoning Code: Ordinance 15-31 Page 2 of 5 " THE GREAT CITY " Off//' //' grtorkia PLANNING & ZONING BOARD APPLICATION Received: By: Date: APPLICATION NUMBER: CHECK NUMBER: DATE RECEIVED: PROPERTY OWNER'S NAME: Maclam Investment LLC PROPERTY OWNER'S ADDRESS: 10773 NW 58th ST #140 DOral, FL 33178 Number/Street City State/Zip Code APPLICANT'S NAME: Mauricio Falla APPLICANT'S ADDRESS: 10773 NW 58th ST #140 Doral, FL 33178 Number/Street City State/Zip Code PHONE NUMBER: OFFICE 786-797-6086 CELLFIOME OTHER SUBJECT PROPERTY ADDRESS: 14585 NW 22 Ave Number/Street TAX FOLIO NUMBER: 08-2122-005-0690 PRESENT ZONING: LEGAL DESCRIPTION: Magnolia Gardens Consolidated PB 50-5 lots 41 thru 44 BLK 336 LESS BEG NW COR of 525 FT of lot 43 TH SELY AD 119.46 FT SELY AD 49.29 FT SWLY Please check specific request: Tentative Plat Final Plat Comprehensive Plan Amendment: .Small Scale; Large Scale (please specify type of amendment below.) Rezoning _Drainage Ilan Fill Pennit Request preliminary Site Plan Review s Finat Site Plan Review Conditional Use Pennit — No Plans Conditional Use Permit — With Plans Special Exception — No Plans Special Exception — With Plans Development Agreement Restrictive Covenant Other — Please specify: Add any additional information that may be of importance to this request: Site Plan Modification Reference to Ordinance 15-13 Land Development Regulations/ Zoning Code: Ordinance 15-31 Page 3 of 5 PLANNING & ZONING BOARD APPLICATION (Checklist) Received: By: Date: Applications will not be accepted without the following data. For a public hearing, all items below are necessary and must be submitted. Completed application form Application fcc payable to the City of Opa-locka by check or money order Copy of property owner's and/or applicant's driver license/photo I.D. & Incorporation Documents (Inc., LI,C, ...) Affidavit (sec below), and power of attorney of the property owner (page 3) (Both must be Notarized) A completed Neighborhood Petition form (attached) with the signature of each properly owner in front, in the rear, to the left and to the right of the subject property, indicating his or her support for the proposed project. (Must include name, address, folio and phone number). All preliminary and final site plans, along with property survey, signed and notarized application(s) must be submitted on flash drive in PDF format. Fifteen (15) certified boundary and topographic surveys of the property (size 36 x 24 inches). (The submitted property survey must not exceed a maximum of two (2) years from date created in order to be considered acceptable by the City of Opa-Iocka) Fifteen (15) copies of Site Development Plan showing all drainage, water, sewer, structures, landscaping and parking in accordance with the City's zoning ordinance; (size 36 x 24 & at least 7 Sealed Copies Map showing parcel to be considered and all properties' legal descriptions thereof, within 375' radius of said parcel. Map to be 1" = 100" scale. Owner's name, address, folio number and legal description on each parcel (Original and 2 copies size of document to accommodate scale) Narrative concept must be submitted with application AFFIDAVIT being first duly sworn, depose and say that I am the OWNER of the property ,and I understand that this application must be complete and accurate before a public hearing can be advertised. I, V`c \Uo�� hla1 /g, o a- Date Sworn to and subscribed before me: This _ _day of 44a - otary Public • Attach copy of identification 6204—? Reference to Ordinance 15-13 Land Development Regulations/ Zoning Code: Ordinance 15-31 My commission expires Page 4 of 5 PLANNING & ZONING BOARD APPLICATION POWER OF ATTORNEY Received: By: Date: This form is to be attached to all applications, and to be returned with the application. No application will be honored or persons heard by the Planning & Zoning Board unless a notarized copy of this Power of Attorney is submitted. To: City of Opa-locka From: Mauricio Falla, Maclam Investment LLC 1) Jorge Fiallo Fiallo's MEP Design Inc. 10010 SW 83rd Si 2) Sonia Gonzalez The Permit Shop 4100 N. 58th Ave #109 Miami, FL 33173 Hollywood, FL 33021 05-796-0141 305-877-1845 jfiallo@fiallomepdesign.com thepermitshopagmail.com Subject: Power of Attorney (authorization for a person, other than the property owner, to speak in the property owner's behalf). I Mauricio Falla , being first duly sworn, depose and say that 1 am the owner of the property legally described as: Magnolia Gardens Consolidated PB 50-5 lots 41 thru 44 BLK 336 LESS BEG NW COR of 525 FT of lot 43 TH SELY AD 119.46 FT SELY AD 49.29 FT SWLY I do give to Jorg- Fiallo / Sonia Gonzalez the power of Attorney and authority to speak in my behalf in reference to the above described property. Further, by affixing my notarized signature to this document, I also authorize Inrge Fiallo / Sonia Gonzalez to negotiate and commit to the City Commission and City Adminis tion in my behalf. I will abide by all final detenninations of the City Commission and City Administration. Signature 5/ r7/.., -O)- - Date Sworn to and subscribed before me: :o e•••..,q, GABRIELAPEREZ * -'E * Commission # HH 230207 4oFI Expires February 17, 2026 My commission expires:`Ejh L.7 ,,0'-6 Reference to Ordinance 15-13 Land Development Regulations/ Zoning Code: Ordinance 15-31 Page 5 of 5 Attach copy of identification PLANNING & ZONING BOARD NEIGHBORHOOD PETITION RE: PROPERTY ADDRESS: 14585 NW 22 Ave Received: By: Date: LEGAL DESCRIPTION: Magnolia Gardens Consolidated PB 50 -slots 41 thru 44 BLK 336 LESS BEG NW COR of 525 FT of lot 43 TH SELY AD 119.46 FT SELY AD 49.29 FT SWLY I SUPPORT THIS DEVELOPMENT REQUEST I DO NOT SUPPORT THIS DEVELOPMENT REQUEST PROPERTY OWNER'S NAME: Mauricio Falla PHONE: 786-797-6086 ADDRESS (If different): 10773 NW 58th ST #140 Doral, FL 33178 Signature Reference to Ordinance 15-13 Land Development Regulations/ Zoning Code: Ordinance 15-31 MN GENERAL N OTES, /NON . r FIBER REI NFORCED CONC. PAVEMENT ON IT CO MPACTED BUBGRA DE, 9596 COMP ACTION DENSITY , CO MPRES SIVE S TRENGT H CLASS I/ - 3,500 7510 28 DAYS E -STORY BUILDING£NIENC FINISHED FLOOR EL. - 63 11.00 NG VD HANDICAP PARKING SPA CE AND ACCESS AI SLE SH N1 NOT EXCEED 3E SLOPE IN ANY DIRECTION 12 D3N cale0 Allay Way AB Per P8 50-5 M,Brn r005 ,/ C o. FL P ROP. NAND CM-WAS0 MEN (EfER TO PLU MBING PL ANS P0N DAM 4 _ CB I 1� RI EL IIAP CBI ] IM El. 14.00 NW 22 AVE PROP. TS IF OF ,ro FD WEEP HOLE FOR TR ASH ENCLOSURE DRAINAGE, REFER To NC H. PUNS FOR DETAIL PR01. TR AS H DU MPSTER LOC ATION SLOPE TOW ARDS G REEN AREA (REFER TO ARC H, ANSI PRO P, r FIBER REINFORCED CONC. PAVE MENT ON IT COMPARE D SUBGRADE , 9. CO MPACTION DENsm . CO MPRESSIVE STRENGTH CLASS II - 3 300 PSI 0 38 DAYS CB I3 NIA EL 031 R OVIDET NI tro AD ATOO DSLOP CR 55 A4 NT FOR F WIDtN MI N. SITE PLAN SCALE: r - 10 AI M EL 9.5 0 i 1 60573061(51381100720 PAR IREMNTS MON TH E PLAN S. A LL CONSTRUCTION SH TL COMPLY W ITH TH E DADS COUN TY PUBLIC W ORKS MANUAL NUT., FOOT STA NDARD PLANS FOR ROAD CONSTRUCTION AND SPECIFICATIONS LA TEST EDITION, MAP. WILD,. CODE 3030 ACTH EDITION AND ANY APPLICABLE GOVERNING AGENCY O . ALL ELEVATIONS SH OWN ON THE CONSTRUCTION DRAWINGS ARE EA SED ON TH E NLVD OF 1939, AS SH OWN ON TOPOGRAP HIC SURV EY BY MA b COM PAN Y, INC. DATED ON -01-2 120. 3. ALL DIM ENSIONS OM THESE PL WS ME MIROX IMATE AND SH ALL BE VERIFIED BY THE 0 00 86700 IN THE FIELD PRIOR TO 0 010 NO WON. MY DISCREPANCIES SH ALL BE REFERRED TO THE ENGINEER FONT DIREC TION AND/OR APP ROVA L PR IOR TO STABrIE W ORK A BLE N EITH ER THE E NGINEE R, NOR TH E OW NER. SHA LL BE WESPONSIFOR DMA GES R ESULTING FROM THE CONTRACT ORS WORK. S 0 OR 0003 PA NTSNO CIRCUM STAN CES SH ALL TH E OF. EXPOSED OR OPEN T TH E EN CON TRACTO R D OF TH E AW ORK W OVE RK ING DAY. TRENCH ES. W EEKEND S.VA TED HOLIDAYS, OR OTHER TIMES W HEN TH E CONT RA CTOR IS NOT WORK, . 6. ALL DEBRIS FROM 000011TION W OE AND EXCAVATED MA TERIAL NOT SUITA BLE F00 84(01(01 SHA LL BE 015 POSED OFF -SITE BY THE CONTRA CTOR IN A 1031 M ANNER ALL 015TU8BED AREA S SHALL 8E CBVEED WITH SOLID 500 IN ORD ER 10 PROTECT TH EM FROM EROSION. 7. FOR AREAS OF W OE BEYOND SWA LES, PROVID E FILL TO ENSURE ,MA T TIM FINISHED M GR4OE IS T LEVEL OF LWDSCME AE. AND/ON SID EWALK. IMER TO M ATCH EXISTIN G GRAD ES. B. CoMrwroit SH ALL COM PLY W ITH TH E EMIR... OF THT` E TRENCH SAF ETY AC D ALL REWN EN ENTS OF O.SMA 9. CO NTRA CTOR TO VERIFY LOCATIO N, ELEV ATION. MA TERIT AN D CON DITION OF ALL EX ISTING U TILITIES ORION TO THE SEAM OF CONST RUCTION. A FTER OBTAINING LOCATIONS FROM SUNSHIN E STATE ONE CA LL OF FLORIDA AND TH EE UTILITY COMPA NIES, A ID PRIM TO THE STMT OF CONSTR UCTION, CONTRACTOR SHALL UNCOVER ALL KNO WN UNDERGROUND UTILITIES IN TH E PATH OF THE W.K. WHETHER OR NOT THE UTILITIES ME SHOWN ON THE PLANS, AND TAK E VERTICAL AND HORI30NTAL M EA SUREM ENTS OF TH E LOCATION OF TH ESE UTILITIES, A ND IF ANY CONFLICTS .04E AP MEAN REPORT THEM TO TH E ENGINEER. 10. ALL C.STRUCTION STAKEOU T SH ALL BE P ERFORMED UNDER TH E SUIERV 15100 OF A FLORIDA REGISTERED SURVEYOR. Il. GENERAL CONTMROR SH ALL UNCOV ER ALL KNOW N UNDERGROUN D U TILITIES IN TH E PATH OF THE WORK, WH ETH ER OR NOT TH E UTILITIES ARE SH OWN ON THE PLAN S AND SH ALL BE H ELD RESPONSIBLE FOR AN Y DAMA GES RESULTING FROM H IS W OE. 10. GENER AL MOTFI 52 INF00500 N ON ON SHA LL S ECIFICTIONME ENGINEER AE NEEDED TO LAYOUT OpSIONE R IF CONSTRU CT TH E PROPOSED W ORK. Il. ME 0 356ENGINEER000 INCORPORATED OINTO 15000 PLANS ASRESPON SIBILITY FOR A RE SULT S OR OMISSIONS THA T T OF 1070803 1100 FURN ISH ED BY OTH ERS. LEGEN D: - STRUCTURE ID (SEE STRUCTURE TA BLE ON DETAILS SHEET, EXIST . Ea-INTIM IELA PROP. ELEVATION (W ORK WITH MCH ITERUNT 023351 CBI I -+ " FLOW ARROW IRUM OFF DIRECT ION, UTILITY S TATEME NT. I. THERE IS UNITED AS -BUILT INFOR MATION 4v5I ABLE WIT HIN THE PRIVATE PROPERTY AREA T HE CONTRACTOR S MALL USE EXTRE ME C AUTION WRING EXCA VATION AC TIVITIES . O ON S HALL VERIFY EXISTING UTILITIES FOR THE PROPOSED WORK AREA IF AM UTILITIE S ARE IN CONFLI CT WIT H T HE DEMOLI TION ,ACTIVITIES . T HE E NGINEER OF RECORD SHALL BE NOTIFIED PRIOR TO CONTINUI NG WITH T HE WORK. ANT DMAEE TO E XISTING UTILITIES S HALL BE REPAIRED T THE CONTRACTORS EXPENSE. KEY NOTES: I ISIMD MD C ANOPY (ELECT TO NCH . PUN51 PRDI. ASPHA LT PAVEMEN T. SEE TYPICAL ITEN EM SECT ION' E_ PROP. TYPE •p CURB PROP. CONCRETE P4VENEM ID_ NOT USED IRUP. PTENEM NMKIXGS !SERE SILNINL MD ITENENT NAEINGS PL AN) 5.- P.P. DETECTABLE WARNING REFE R ro INDEX N0. 301 E.. IN01. C TR ICK <OM[. DRIVE WAY, W/ P 1( 0ER000 BARE MO IT COMPARED SUBGRADE o- PROP. T THICK CON C. 5(DEN0K PROP. SOD F LANDSCA PING (5EE LANDSCAPING PLA NS) TY PICA L PAVEME NT SEC TION: IA r1E 5 -III M9H ALTIC CONC. SURFACE ON r OM EN. BA SE (M IN. MIR 100 COM 9KTED TO 9.. DETERMINED BY A ISNTO T-180 AS DETE NED SY NA SMO IrlqfDTO 95% Z 0 U CC (1) 0 0 cc 0 0 J 7 Z W CC CC 0 _ 3S r y m u a Z_; Z o N€ Mr. EADMa 3022 .04.1115 O5O4 04W mconnect CONNECT ENGINEERING, LLC 505.101.. FIALLO'S MEP DESIGN, INC 10010 SW 83rd ST. Miami, Florida 33173 305.877.1845 Jfislo@fislomepoaspn.com 0819 28637 z O rQ V/ -x W (h w (7)a C 0 > O O w<LL N U Qzo 5mcoJ ILIZa Z o .711.1.1 •76. 2. E 41 .0.441, OWED PO RMS.. GTE AOB TAMPER 0E11172020 VD 1AMMO C HECKED BY AR u-. PAVIKO LAsl0, MIDDRAINAGERAN C-1.0 MEET NAME D FIALLO'S MEP VARIES (SEE PLA N) BAFFLE (SEE MAW TYP ICAL EXFILTRATION TRENCH DETAIL SCALE: N. T.5. 0-0 (MIND (00 P 070(0. T PAVE MENT RESTORATION (SEE TRANS VERSE SECTION) PLASTIC FILTER FAB RIC LENGTH OF TRENCH — ... .- UP TO 50 FOR ONE STRUCTURE (SEE PLA NS) WO RK 05(5 DETAILS W ITH TH E MINI -DADS COUNTY PUBLIC W ORKS STA NDARDS EL3. DNGV0 AVERA GE OCTOBER GROUND W ATER LEVEL W .C. 2.2 FINISH GR AD E (ELEVA TION V201E5) RESTORE EXIST. FLEXIBLE PAVEM EN T WH ERE A PPLICABLE AS PER MARI-DADE COW', PUBLIC WO RKS STAN DARDS P COMPACTED 110 50070 BASE COURSE COM PACTED TO 9BN PER ANF00 T-180. 100 LBR IT COMPACTED LIM EROCK BA SE COURSE COM PACTED 10 9016 PER AASHTO T-180. 100 UR PLASTIC FILTER FA BRIC 1LP MIN . OV ERLAP PERFOR ATED CORRUGATED DRAINAGE PIPE (SEE PLANS FOR 512E AND INV. EL.) PLA STIC FILTER FAB RIC (ALL AROUND) TRANSVERSE SECTION EXFILTRATION TRENCH SCALE: N.T.S. SPECIFIC NOTES: I. A FTER THE BALLAST R OCK HA S BEEN PLACED TO TH E PROPER ELEVATION IT SHALL BE CA REFULLY WA SH ED D OW N WITH CLEAN W ATER IN ORDER TO ALLOW FOR INITIAL SETTLEMENT THAT M AT OCCUR. IF INITIAL SETTLEM ENT TAKES PLACE. ADDITIONAL BALLAST ROCK SHALL BE ADDED TO 8051000 TO THE PROPER ELEVATION. 50 THAT TH E EXFILTRATION TRENCH IS COM PLETED IN ACCORDANCE W ITH THE DETAILS. 2. TRENCH END S AND SID ES SHA LL BE EXCAVA TED AS NEAR VERTICAL N CONDITIONS ALLOW. ). CONTRACTOR IS REQUIRED TO 5000 T SHOP DRAWINGS FOR A LL DRAI NAGE STRU CTURES FOR ENGIN EER S A PPROVAL. I. STRU CTURES G ADAPTERS SPECIFICATIONS ARE AVAIUBLE FROM MANUFACTURER AND SMALL BE INCLUD ED AS PART OF TH E SH OP DRAW ING SUBMTAL PACKAGE. 11• 1T SEE ARCHITECTURAL MIN . AND TITI) rr. w TYPICAL SWALE DETAIL NOT TO SCALE IT MIN . TO BLDG IS OR STRUCTURE MI N. \EE PLN FMf. EL. TOP AND BO SWALE SLOPE S HALL NOT BE GREATER T HAN )3 S PECIFIC NOTE . FOR ANY PROPOSED FILL MATERIAL: N0 MUCK 15 PER MITTED. POS T CONSTRUCTION PERCOL ATION RAT ES MUST EQUAL OR EXCEE D PRE -CONSTR UCTION PERCOUTIOM RATES . P1 CONTRACTOR TO VERIFY T HAT ADJ ACENT PROPERTY 15 LOWE R I NN PROPOSED ELEVATION OF THE TOP OF SW ALE. IF ADJACE NT PROPE RTY 15 HIGHER . CONTRA CTOR TO PROVIDE A P MIN. B ERM AT PROPE RTY LINE ABOVE ADJACENT GRADE. TOP OF BERM f•1 SEE PLANS FOR ELE VATIONS MATC H EXISTING EL PI IS MIN. TO BLD9 020105 0R 5750010E TYPICAL BERM DETAIL NET TO SCALE SEE 2 00 50ECTURAI AND LANDSCAPIN G PLANS SEE PAN G RADI NG SPECIFIC NOTE: FOR ANY PROPOSED FILL MATERIAL N0 MUCK 15 PER MITTED. POST CONSTRUCTION PERCOLATION RATES MUST EQUAL OR EXCEED PRE -CONST RUC TION PERCOLATION RATES. (•1 CO NTRACTOR TO VERIFY T HAT ADJ ACENT PROPERTY IS TOWER TH AN PROPOSED ELEVATION OF THE TOP OF BER M. IF ADJ ACE NT PROPERTY 15 HIGHER. CO NTR ACTOR TO PROVIDE A P MI N. BERM AT PROPERTY LINE ABOVE ADJACENT GRADE. N IE SPEN IRE alb �P CONE . rrY���FF I:=0 ;LW VARIES CURB TRANSITION War V ISIS DEMEA LLE P P1_ BOTTOFIf �CIIN ry OR VE0AY 00010 DROP CURB MIOTH VARIE51 FUN URB TR ANSITION TURNSIf/o r SID ANNIEEWAU HEIGHT 0(0E WNK AS PEN IN DEX0310 VN1E5 Of NN 10 DRIV EWAY WIDTH RACK OF SIDEW ALK PR OFILE M ODIFIED FDOT DRIVEWA Y DETAIL 5CALE: N.T. S. NOTES: 1 5(00044105088950 0000 TH ESE DETAILS SM ALL RE PAIN TED T. CONCRETE JOINTS SH ALL BE AS PER INDEX 515 A ND INDEX 310. ;ZIT> rDR STORMWATER BAFFLE DETAIL SC ALE: N. T.S. DOOR DETAI � T -X• SECTION A -A or Roo ra AXIM IO NAM ABS STORM DRAIN BAFFLE Y MT H C.O. OR APPROVED EO AL , emum ao sto nMw MW rtnta REV=I STANDARD STOR M DRAINAGE DETAIL III L STORM WATER BAFFLE SHOP DRAWINGS ARE REWIRED: SUB MI T S HOP DRAWINGS F OR ALL PRECAST DRAINAGE STRUCTURES. INCLUNNG CATCH BASIN INLETS. OPTIONAL PIPE MATE RIAL A ND BAFFLE SPECS. SHOP DRA WINGS MUST SHOW BAFFLE LOCATION AND SUMP PROVIDED. IIAONR(lobar+ 000.2.04.11154/551.00 9 M.1((55 m re,4'ar manned NNEC ENGINEERING. LTC AirSo .191 DESIGN, INC 10010 SW 83rd ST . Miami, Florida 33173 305 .877.1845 Jfi050®08I Ioma0005iQn. W T CA N 25637 Z 0 co V) O co 7 l0 w NC 0w<i i Z 0 a zJro pan Z:4..4%., N rrr o y3\ _`75772 ASTIO N RL APE FIpOA M0. RFNIO NB OAIE JOSI AKKEIL CE11172020 MONK BY . C HE MED OK N OBOE, WANG. GRADING, AN000100060ETAEB C-2 .0 r EET \\ MN /\ GENERAL N OT ES: r my I. EXCEK AS PA RTICULARLY NOTED ON THE PLA NS. ALL CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF MIMI-OBE COUN TY W ATER AND SEWER DEPAR TMENT M -NA SD. FLOR ID A BUILD ING CODE NM. FTH EDITION AND ANY APPLICABLE GOVERNING AGENCY. 2. ALL ELEVATIONS SH OWN ON TH E CON STRUCTION D RAWINGS ARE BASED OX TH E REV D OF 1929_ 3. ALL D IM ENSIONS ON TH ESE PLA YS A RE APP ROXIMA TE AN D SHA LL BE VERIFIED BY TH E CONTRA CTOR IN TH E FIELD PRIOR TO STARTING W OK. MI DISCREPANCIES SH ALL BE REFERRED TO TH E EN GINEER FOR DIRECT ION AN D/OR APPROVAL PRIOR TO STARTING 1. NETH ER TH E ENGIN EER. NOR TH E OW NER. SH ALL BE RESPONSIBLE 12' Deo, cale d Al as Way 05 P er P8 5D-5 M, 655- 0005 Co .. FL NEW O NE- STORY BUILDING (CONVENIE NCE STORE, REFER TO MEP FOR CON, REP.CE EXIST. A• (PRIVATE, SAN. SE WER L AY. POTION NEW A• WC S.W. SE WER L AT. ®I W SLO PE PROW 0.0 W EXIST . SAN . SE WER LATERAL PER II -WAS(' STAND ARDS I EXIST. 4 5AN. SEW ER LA T. 170 REMA IN/ FOR D AMAGES RESULTING FR ON TH E CONTRACTORS W ORK. S. UNDER NO CIRCUMSTA NCES SH ALL THE CONTRACTOR LEAVE EXCAV ATED TRENCHES. OR PARIS OF. EXPOSED OR OPEN AT TH E EN D OF THE W ORKING OAT. w EEK ENDS. H OLIDAYS. OR OTH ER TIM ES WH EN THE CON TRA CTOR IS NOT WORKING. 6 A U. DEBRIS FROM D EM OLITION W ORK AND EXCAVA TED MATERIAL NOT SUITABLE FOR BKKFIII SHALL BE DISP OSED OFF -SITE BY THE CONTRACTOR IN A LEGAL MAN NER. ALL DISTURBED A REAS SHA LL BE COVERED W ITH SOLID SOD IN ORD ER TO PROTECT THEM FROM EROSION. OR AREA 5 OF W ORK BEYOND SERIES. PR OVIDE FILL TO ENSURE ric o. THE FIN ISH ED AN D/OR SID... TAPER LA NDSCAPE IS AT LEvEL OF AR EA S TO M ATCH EXISTIN G GRADES NW 22 AVE SITE PLAN SCALE: I - 10 • 4) — - R AW\ P ROP T 20062500 6502060600201240 PVC WM UPEN N-ORR. STA NDARDS, PROP N)� ,SERVICE RAIN STAND... STANDMO IP PRpPI2- WA TER METER REFER TO PLUMBING HAYS FOR CONT . PROW W DO MESTIC WATER SER VICE MAIN REMOVE EXIS T. WATER SERVICE METER AND RESTORE CONC. SIDEW ALK CUTS 0LUG EXIST. 1 'WATER SERVICE RESTORE ASPHALT PAVE MENT UTILITY STATEMENT: 1. T HERE IS UNITED AS -WILT INFORMATION A VAILABLE WT HIN THE PRIV ATE PROPERTY A REA T HE CONTRACTOR S HALL USE EXTREME CAUTION D URING EXCAVATION ACTI VITIES . CO NT RACTOR2. PROPOSEDA F AIRY UTILITIES ARE IM CONfUCT WIT H T HE 00 00A CTI VITIES,I0N A CTI VITIES, THE ENGI NEER OF RECORD S HALL BE NOTIFIED PRIOR TO CONTINUING WI TH T HE DPW. ANY DA MAGE TO EXISTING UTILITIES SHALL BE REP AIRED AT THE CONTRACTORS EXPENSE. B. CONTRACTOR SH ALL COMP LY W ITH TH E REQUIREM EN TS OF TH E TRENCH S.F. ACT AND ALL REQUIREM ENTS OF O.S. HA 9. CON TRACTOR TO v... LOCATION. ELEVA TION. MATERIAL A ID CONDITION OF ALL EXISTIN G UTILITIES PR IOR TO THE STMT OF CONSTR ICTION, AFTER OBTAINING LOCATIONS FROM SUNSH INE SPATE ONE CALL OF FLOR IDA A ND OTHER UTILITY COM PA NIES. AN D PRIOR TO TH E STMT OF CONSTRICTION. CON TACTOR SHA LL UNCOVER ALL KNOWN UNDERGROUND UTILITIES IN TH E PATH of THE W ORK. H OWN . THE PLANS. A ND TAKE' VU TILITIES ERTICAL AND H ORIH ER OR N OT TH E 20NTAL MEAA RE SUREM ENTS OF THE LOCA TION OF TH ESE UTILITIES. MO IF AN Y CONFLICTS ME ARIAREM REPO RT THEM TO THE ENGINEER. lo A LL SUPE RVISION OFON A FLORIDA REGISTERED SU RVEYOR SHALL BE UND ER THE 11. GENERAL CONTRACT OR SHALL UNCOVER AU KNOW N UNDERGRO UND UTILITIES IN TH E PATH OF THE WORK. WHETHER OR NOT T HE UTILITIES ARE SH OWN ON THE PLANS AND SH ALL BE HELD RESPONSIBLE FOR ANY DAMAGES RESULTING FROM HIS WOR K. 13. GENERAL CONTACTOR SHALL CBNTKT T HE ENGINEER OF RECORD AND/OR DESIGNER 1F ANY ADDITIONAL INFORM ATION OR SPECIFICATION A RE NEEDED TO UIOUT OR CO NSTRUCT T HE PROPOSED W ORK. 13. TH E EN GINEER A SSUM ES NO RESPONSIBILITY FOR AIR ERRORS ON OM ISSIONS THA T H AVE BEEN INCORPORATED AS A RESULT OF INFORMA TION FURNISH ED BYI OTHERS..SF PIA. Z 0 U D CC co Z 0 1c 0 0 Z J 5, E C 0 L`I � — CO B � a Z z; o MAI U u roe me nutrAran ssA OVL mcann ect CON NEC T WROINWE RIII6 . II MYR. WI .11R33 FIALLO'S MEP DESIGN, INC 10010 SW 83rd ST. Miami, Florida 33173 305.877 .1845 Jfieb@fiellomeprlesign.com C AB 28837 Z 0 VJ 8 o M 7 al W E c cc OwQL- LL H N Z> UQZo >mcoJ Q ZJ,-O ..H ROBAXIA PE N0. P EN RDTIB DAIS .100H MM CE11172020 MOUE GTE: MR2 0. DINW N PM WAR CIE CUWD at: WBUE: 00110711CWATER AND BAWTAWV HE WER RAM C-3.0 10- BEI W ADER • CALTRAN ENGINEERING GROUP 7 FT Fil II ETE •U 1 FFE THE E E E I E•31.1 E GDYE4ED w+`cMr ^tai q ,, d u u n u I 11 61 11 11 IN L01. .c- • II E II 1 MIS r r -f-i r--77.47,1, T---1 r •I • 1=1 I E : E ...TE [. vR I 1_,1{ I ` I I Ir,l I I '' I ! ID I 1151 1! Ii[jI I ! I. 1 I I` I I I`. I I I I I I I I I I I L_L_J L___ —__J L__L__J L L - New C -Store & Gas Station Traffic Impact Study P d 7 Caltran Engineering Group, Inc. 790 NW 107 Avenue, Suite 200 Miami, FL 33172 Phone: 786-456-7700 Fax: 786-513-0711 TRAFFIC IMPACT STUDY ENGINEER's CERTIFICATION DATE: PROJECT LOCATION: REPORT BY: March 4th, 2022 NEW C -STORE & GAS STATION 14585 NW 22nd Avenue Opa-Locka, Florida CALTRAN Engineering Group, Inc. 790 NW 107th Avenue, Suite 200 Miami, FL 33172 Certificate of Authorization 29379 ENGINEER'S CERTIFICATION I, JUAN S. CALDERON, CERTIFY THAT I CURRENTLY HOLD AN ACTIVE PROFESSIONAL ENGINEER'S LICENSE IN THE STATE OF FLORIDA AND I AM COMPETENT THROUGH EDUCATION AND EXPERIENCE TO PROVIDE ENGINEERING SERVICES IN THE CIVIL AND TRAFFIC ENGINEERING DISCIPLINES CONTAINED IN THIS REPORT. I FURTHER CERTIFY THAT THIS REPORT WAS PREPARED BY ME, OR UNDER MY RESPONSIBLE CHARGE, AS REQUIRED BY CHAPTER 61G15-18. F.A.C. AND THAT ALL STATEMENTS, CONCLUSIONS AND RECOMMENDATIONS MADE HEREIN ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND ABILITY. ````` % S �,CALi ",,i :•,JP.•�0 E�NS� .70'0,' * • No 58569 ••1.:‘',,-<\,cis)..:<2.4. 0 R ... 0.21\•••0,../ O'. STATE OF • � •• THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY Juan S Calderon 2022.03.04 16:50:20 -05'00' ON THE DATE ADJACENT TO THE SEAL PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. CALTRAN ENGINEERING GROUP 790 NW 107 AVENUE, Suite 200 MIAMI, FL 33172 CERTIFICATE OF AUTHORIZATION 29379 JUAN S. CALDERON, P.E. NO. 58569 Caltran Engineering Group Pagell TRAFFIC IMPACT STUDY CITY OF OPA-LOCKA, FL Traffic Impact Study NEW C -STORE & GAS STATION 14585 NW 22"d Avenue Opa-Locka, Florida PREPARED FOR: City of Opa-Locka PREPARED BY: CALTRAN ENGINEERING GROUP 790 NW 107 AVENUE Suite 200 MIAMI, FL 33176 MARCH 2022 Caltran Engineering Group Pt c;c'I2 TRAFFIC IMPACT STUDY TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY 5 2.0 INTRODUCTION 8 3.0 PROJECT BACKGROUND 10 3.1 Roadway Design Characteristics 10 4.0 TRAFFIC GENERATION 12 5.0 SITE TRAFFIC DISTRIBUTION 13 6.0 TRAFFIC VOLUME 16 5.1 Existing Traffic - Scenario 1 16 5.2 Historic Traffic Growth 16 5.3 Background Traffic - Scenario 2 17 5.4 Build -Out Traffic - Scenario 3 17 7.0 CAPACITY ANALYSIS 21 7.1 SR 9 at NW 22nd avenue 22 7.2 NW 22nd avenue at Rutland Street 27 7.3 NW 22nd avenue at Service Road 30 7.4 NW 22nd avenue & Driveway 32 7.5 Rutland Street & Driveway 33 8.0 CONCURRENCY ANALYSIS 34 8.0 PARKING ANALYSIS 35 8.0 CONCLUSSIONS AND RECOMENDATIONS 36 EXHIBITS Exhibit 1. AM- SR9 at NW 22 Ave - Proposed Signal Timing 6 Exhibit 2. PM- SR9 at NW 22 Ave - Proposed Signal Timing 6 Exhibit 3. Site Location 9 Exhibit 4. Roadway Network Characteristics 11 Exhibit 5. Entrance Site Trip Route Assignment 14 Exhibit 6. Exit Site Trip Route Assignment. 15 Exhibit 7.Hourly Traffic Volume -Scenario 1 18 Exhibit 8. Background Hourly Traffic Volume -Scenario 2 19 Exhibit 9. Total Future Hourly Traffic Volume -Scenario 3 20 Exhibit 10. AM- SR9 at NW 22 Ave - Proposed Signal Timing 37 Exhibit 11. PM- SR9 at NW 22 Ave - Proposed Signal Timing 37 Caltran Engineering Group Pagel3 TRAFFIC IMPACT STUDY TABLES Table 1. Trip Generation 12 Table 2. SR 9 at NW 22nd Street — AM LOS 23 Table 3. SR 9 at NW 22nd Street — PM LOS 24 Table 4. SR 9 at NW 22nd Street — Mitigation Measures LOS 25 Table 5. SR 9 at NW 22nd Street — AM Queue Analysis 25 Table 6. SR 9 at NW 22nd Street — PM Queue Analysis 26 Table 7. NW 22nd Avenue & Rutland Street — AM LOS 27 Table 8. NW 22nd Avenue & Rutland Street — PM LOS 28 Table 9. NW 22nd Avenue & Rutland Street — AM Queue Analysis 29 Table 10. NW 22nd Avenue & Rutland Street — PM Queue Analysis 29 Table 11. NW 22nd Avenue & Service Road — AM LOS 30 Table 12. NW 22nd Avenue & Service Road — PM LOS 31 Table 13. NW 22nd Avenue & Service Road — AM Queue Analysis 31 Table 14. NW 22nd Avenue & Service Road — PM Queue Analysis 31 Table 15. NW 22nd Avenue & Driveway — AM & PM LOS Analysis 32 Table 16. NW 22nd Avenue & Driveway — AM & PM LOS Analysis 32 Table 17. Rutland Street & Driveway — AM & PM LOS Analysis 33 Table 18. Rutland Street & Driveway — AM & PM LOS Analysis 33 Table 19. NW 22nd Avenue — Concurrency Analysis 34 APPENDICES Appendix A. Site Plan Appendix B. OTISS Reports Appendix C. Trip Distribution Appendix D. Data Collection Appendix E. Growth Data Appendix F. VISTRO Reports Appendix G. Concurrency Analysis Caltran Engineering Group PageI4 TRAFFIC IMPACT STUDY 1.0 EXECUTIVE SUMMARY Caltran Engineering Group, Inc was retained to perform a traffic impact analysis (TIA) for a proposed Gas Station with a convenience store, as well as a proposed retail space located in 14585 NW 22nd Avenue, Opa-Locka, FL under Folio No. 082122-005-0690. This report presents trip generation, distribution, traffic analyses, and recommendations for transportation improvements required to meet anticipated traffic demands in conjunction with the development. The traffic conditions studied include the existing (2022) traffic condition as well as the projected (2024) background and build -out traffic conditions. The proposed gas station will consist of 6 pumps, in addition to the proposed 1,604 Square Feet (Sf) of retail space. The proposed development has the potential to generate 1,902 daily weekday trips for the proposed driveways. Out of the total weekday daily trips, 105 driveway trips are anticipated to occur during the AM peak hour and 122 driveway trips are expected to occur during the PM peak hour. Based on the results of the traffic analysis, the future impacts associated with the proposed development are anticipated to be minimal overall, with some deterioration in operations anticipated at the signalized intersections of SR 9 and Rutland Street along NW 22nd Avenue. As a result, the following improvements are recommended as mitigation measures: (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group PageI5 TRAFFIC IMPACT STUDY NW 22nd Avenue at SR 9 A split optimization of its current Time of Day (TOD), signal timing, anticipates traffic improvements after the addition of the forecasted growth and potential trip generation. Said process yielded the results summarized in Section 7, Capacity Analysis, Table 4. AM and PM Signal Timing are illustrated on Exhibit 1 and Exhibit 2, respectively. Cycle Length [s] 160 Coordination Type Time of Day Pattem Coordinated Actuation Type Semi -actuated Lost time [s] 0.00 Control Type ProtPer Permiss Permiss ProtPer Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal Group 6 1 5 2 3 8 7 4 Auxiliary Signal Groups Lead/Lag Lead Lead Lead Lead Minimum Green [s] 5 7 5 7 5 18 5 18 Maximum Green [s] 30 50 30 50 0 22 50 22 50 Amber [s] 4.0 4.0 4 0 4.0 0 5 4.8 3.0 4.8 3.0 All red [s] 2.0 2.2 2.0 2.2 0 5 2.0 2.0 2.0 2.0 Split [s] 11 50 29 68 12 52 29 69 Walk [s] 7 7 7 7 Pedestrian Clearance [sj 36 36 32 32 Exhibit 1. AM- SR9 at NW 22 Ave - Proposed Signal Timing Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Lost time [s] 0.00 Control Type ProtPer Permiss Permiss ProtPer Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal Group 6 1 5 2 3 8 7 4 Auxiliary Signal Groups Lead/Lag Lead Lead Lead Lead Minimum Green [s] 5 7 5 7 5 18 5 18 Maximum Green [s] 30 50 30 50 22 50 22 50 Amber [s] 4.0 4.0 4.0 4.0 4.8 4.8 4.8 4.8 All red [s] 2.0 2.2 2.0 2.2 2.0 2.0 2.0 2.0 Split [s] 32 62 26 56 21 52 21 52 Walk [s] 7 7 7 7 Pedestrian Clearance [s] 36 36 32 32 Exhibit 2. PM- SR9 at NW 22 Ave - Proposed Signal Timing Caltran Engineering Group Pagel6 TRAFFIC IMPACT STUDY Rutland Street and Proposed Driveway Traffic simulation forecasted ±150 feet of westbound queues at the intersection of NW 22nd Avenue at Rutland Street. Said queues could potentially create conflict points at the proposed development access point. Although, VISTRO simulation did not yield excessive queues, the implementation of "DO NOT BLOCK INTERSECTION' sign R10- 7 and/or pavement markings are recommended to mitigate potential intersection conflict points. Beyond the above -mentioned improvements, no other offsite geometric or traffic control improvements are recommended as part of the proposed development. (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group PageI7 TRAFFIC IMPACT STUDY 2.0 INTRODUCTION Caltran Engineering Group, Inc. was retained to perform a traffic impact analysis (TIA) for a proposed Gas Station, as well as a retail space. The proposed Gas Station will consist of a 1,975 square foot (sf) convenience market with 6 fueling positions, in addition to 1,604 square feet (sf) of retail space. The proposed sites are adjacent to each other, and bounded by Rutland Street to the south, and NW 22nd Avenue, as illustrated in Exhibit 3. A conceptual site plan is found in Appendix A. The purpose of this TIA is to examine existing and future traffic conditions within the study area upon project implementation, identify traffic impacts resulting from the proposed development on the surrounding local road network, and recommend transportation improvements if needed. (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group Pagel8 uogeool a;lS t i!q!4X3 _7 CALTRAN ENGINEERING GROUP Proposed Site Location 14585 NW 22"d Avenue Opa-Locka, Florida Folio No. 082122-005-0690 TRAFFIC IMPACT STUDY 3.0 PROJECT BACKGROUND 3.1 ROADWAY DESIGN CHARACTERISTICS The study area for this analysis includes four (3) existing roadways, three (3) existing intersections, and three (2) future intersections/access points planned to support the proposed development. The study area roadways and intersections are as follows: Roadways 1. SR 9 2. Rutland Street 3. NW 22nd Avenue Intersections 1. Rutland Street and NW 22nd Avenue 2. NW 22nd Avenue and Service Road 3. SR 9 and NW 22nd Avenue Exhibit 4 depicts existing lane designations throughout the study area along with existing full width storage and taper lengths for exclusive turn lanes. The following provides a short description of the existing roadway characteristics for each facility: SR 9 — is a four -lane, divided Urban Principal Arterial within the limits of the study area. SR 9 is oriented in an approximate east/west direction with a posted speed limit of 35 miles per hour (mph). FDOT historic counts reported an average vehicle count of 27,576 vehicles per day (vpd) during the 2016-2020 (Information taken from FDOT traffic station 870096). NW 22"d Avenue - is a four -lane, divided Urban Minor Arterial within the limits of the study area. NW 22nd Avenue is oriented in an approximate north/south direction with a posted speed limit of 30 miles per hour (mph). FDOT historic counts reported an average vehicle count of 21,260 vehicles per day (vpd) during the 2016-2020 (Information taken from FDOT traffic station 878621). Rutland Street - is primarily a two-lane, undivided local road within the limits of the study area. Rutland runs in an approximate east/west direction. The posted speed limit is 30 mph. Caltran Engineering Group Pagel10 0 iy m CO 0 0 1 0 0 Exhibit 4. Roadway Network Characteristics 0 Geometric Characteristics CALTRAN ENGINEERING GROUP Ei 14585 NW 22nd Avenue Opa-locka, Florida Folio No. 082122-005-0690 TRAFFIC -WIDE OPERATIONS SAFETY STUDIES 4.0 TRAFFIC GENERATION The potential traffic generation of the proposed development was determined using the traffic generation rates published in the Institute of Transportation Engineers, Eleventh Edition, through the Online Traffic Impact Study Software (OTISS). As currently envisioned the site is assumed to consist of approximately: 1,604 Sf of retail space and a 6 -pump gas station with a convenience store. Table 1 summarizes the estimated traffic generation for the proposed development. Table 1. Trip Generation Land Use Size Weekday Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Entry Exit Entry Exit Total Entry Exit Total 945 - Convenience Store/Gas Station - 6 Vehicle Fueling Positions 900 900 50 50 100 56 55 111 814 - Variety Store 1.6 1000 Sq. Ft. GFA 51 51 2 3 5 6 5 11 Total 951 951 52 53 105 62 60 122 As shown in Table 1, the proposed development has the potential to generate 105 new trips in the AM peak hour (52 entering and 53 exiting) and 122 new trips in the PM peak hour (62 entering and 60 exiting) on a typical weekday. While ITE methodology suggests a potential pass -by rate of 62% AM / 56% PM for land use 945 and 34% for retail use, no such reduction was assumed in order to maintain a conservative approach. Please refer to Appendix B for OTISS reports. Caltran Engineering Group Pagel12 TRAFFIC -WIDE OPERATIONS SAFETY STUDIES 5.0 SITE TRAFFIC DISTRIBUTION The proposed generated trips were assigned to the surrounding roadway network. The directional distribution and assignment are based on land uses in the area and existing travel patterns and a review of area origins and destinations. Site trips were assigned to the network based on the following distribution: ➢ NNE (17.4%) trips were equally distributed to/from SR 9 westbound left turns and NW 22nd Avenue southbound through movements. ➢ NNW (11.7%) trips were equally distributed to/from SR 9 eastbound right turns and NW 22nd Avenue southbound through movements. ➢ ENE (12.9%) + ESE (4.6%) site trips were assigned to/from westbound Rutland Street. ➢ SSE + SSW + WSW (40.5%) site trips were assigned to/from northbound NW 22nd Avenue. ➢ WNW (9.8%) site trips were assigned to/from northbound eastbound Rutland Street. Year TAZ NNE ENE ESE SSE SSW WSW WNW NNW TOTAL 2024 251 394 293 104 370 396 222 223 265 % 17.4% 12.9% 4.6% 16.3% 17.4% 9.8% 9.8% 11.7% The site traffic distribution and percent assignment for the development are shown on Exhibit 5 and Exhibit 6. Please refer to Appendix C for a detail site traffic distribution. (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group Pagel13 50% of % NNE site trips 14. 55% ENE + ESE 8. 7% ) (1-7. 5%) r0 d rN r, -o d 0 J N G Site ) ..26(29) F 231((226) .4. 24 (28) 50% of % NNE site trips 50% of % NNW site trips 9(7) + ` en 18 (14) 18(14)9 18(14)/ M ...k NW 22nd Avenue 585% C9-.8;) 50% of % NNW site trips WNW SSE + SSW + WSW AM /PM Entrance Site Trip Distribution Exhibit 5. Entrance Site Trip R oute Assignment. Caltran Engineering Group Page114 50% of %NNE site trips s 14.55% - - -- D 5O% of % NNE site trips SO% of % NNW site trips ENE + ESE 17. 5% d p ✓o) `n ra G 0 ✓ 0 S DO ✓ C. co .. 0▪ l d 7 it, 4 (5) F 719) 4 3(3) cri S 50% of %NNW site trips Site 4- 14(17) 29 (32)-- % WNW Exhibit 6. E xit Site Trip Route Assignment. Caltran Engineering Group NW 22nd Avenue 43 .5 % SSE + SSW + WSW Page115 .N X w a 0 a=+ • 4L+ 0 i1 1L 4—' N TRAFFIC -WIDE OPERATIONS SAFETY STUDIES 6.0 TRAFFIC VOLUME 5.1 EXISTING TRAFFIC - SCENARIO 1 AM peak hour (7:00 to 9:00 AM) and PM peak hour (4:00 to 6:00 PM) turning movement counts were performed at the following intersections on January 25th, 2022: • SR 9 and NW 22nd Avenue. • NW 22nd and Service Road. • NW 22nd Avenue and Rutland Street. It is important to note that the collected data was adjusted by applying each corresponding Peak Hour Factor (PHF) and a Seasonal Factor of 1.0 as per the Florida Department of Transportation (FDOT) online data. Existing AM and PM peak hour traffic volumes are shown on Exhibit 7. Data Collection reports can be found on Appendix D. 5.2 HISTORIC TRAFFIC GROWTH The analysis was based on the FDOT Monitoring Site — 878621 located at NW 22nd Avenue, 200 feet North of NW 132nd Street; It is important to note that Station 878621 was selected for growth representation as 100% of the forecasted trips will be traveling through this segment. Based on the annual growth rates obtained and traffic analysis zone patterns characteristics and knowledge of the area, it was determined that a conservative 2.00% Compounded Annual Historic Growth Rates could be applied to the studied roadway network. It is important to note that upon calculation of the annual growth rates, the future volumes are developed by adjustments upon multiplying the existing volume by the Growth Rate Factor; this Growth Rate Factor (GF) was calculated by using the following formula: GF=(1+r)Y where, r = Annual Growth Rate y= number of years to opening year (2 Years) (2024) GF= 1.04 Background traffic growth calculations are detailed on Appendix E. Caltran Engineering Group Pagel16 TRAFFIC -WIDE OPERATIONS SAFETY STUDIES 5.3 BACKGROUND TRAFFIC - SCENARIO 2 Background traffic volumes, which include existing and historic growth traffic, is shown on Exhibit 8. It is important to note that no in -process traffic was reported. 5.4 BUILD -OUT TRAFFIC - SCENARIO 3 To obtain the projected (2024) build -out traffic volumes, the projected site traffic was added to the projected background traffic. Exhibit 9 illustrate the projected AM and PM peak hour build -out traffic volumes. (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group Pagel17 n m CO CD CD 0 Exhibit 7.Hourly Traffic Volume -Scenario 1. Roaa SeC�1ce RUt SR 9 \1668 61.1 11 rn o 351126 i 44 Ad + O _ *�► A 1696° ri Ti 016 v anuand pu?? MN 151151 ao$ r gk41 0 y� 2llol O t ?► `30113 At; et 11,2 V� ara ce `1111 Z V'f rP (D SeN1,ce Read R�t\a� tCee< -710 CALTRAN ENGINEERING GROUP Existing Conditions Scenario No.1 LEGEND XX AM Traffic Volume (X() PM Traffic Volume *PHF not included on Illustrated traffic Volume 4‘, m CO CD (Q 0 0 C v CO 0 CO Exhibit 8. Background Hourly Traffic Volume -Scenario 2. oaa 5e'\�e Sheet co o co rCe N anuany puZZ MN k16o-6) m j 25 \10 - A pCO VI VI N - Se Jce CALTRAN ENGINEERING GROUP Future Condition Scenario No.2 LEGEND XX AM Traffic Volume (XX) PM Traffic Volume •PHF not included on Illustrated traffic Volume Exhibit 9. Total Future Hourly Traffic Volume -Scenario 3. Sk9 0 rn 0 00 SeNtce Read < 101101 N t N.1 14(17) co IN 7 fD m N l0 k 161161 m 3191 ca -; o �c 4. 1 = w I*I 4 „91311 V V Rat\2AW -t <eet SR () rD 9 111 j1 C231� Se Ace - \a�d St (eet CALTRAN ENGINEERING GROUP Future Condition + New Site Trips Scenario No.3 LEGEND XX AM Traffic Volume (XX) PM Traffic Volume •PHF not included on Illustrated traffic Volume TRAFFIC IMPACT STUDY 7.0 CAPACITY ANALYSIS Capacity analyses were performed for the AM and PM peak hours for the existing (2022) traffic condition, the projected (2025) background and build -out traffic conditions using PTV America, VISTRO 2022 software to determine the operating characteristics of the adjacent road network and the impacts of the proposed project. It is important to note that LOS analysis was evaluated under the Highway capacity Manual 7th Edition. Capacity is defined as the maximum number of vehicles that can pass over a particular road segment or through a particular intersection within a set time duration. Said capacity is combined with Level -of -Service (LOS) to describe the operating characteristics of a road segment or intersection. LOS is a qualitative measure that describes operational conditions and motorist perceptions within a traffic stream. The Highway Capacity Manual defines six levels of service, LOS A through LOS F, with A representing the shortest average delays and F representing the longest average delays. For unsignalized intersections, only the movements that must yield right-of-way experience control delay. Therefore, V/C criteria for the overall intersection is not reported by PTV America, VISTRO 22, or computable using methodology published in the Highway Capacity Manual. It is typical for stop sign -controlled side streets and driveways intersecting major streets to experience long delays during peak hours. VISTRO reports can be found at APPENDIX F. (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group PageI21 TRAFFIC IMPACT STUDY 7.1 SR 9 AT NW 22ND AVENUE Results from the capacity analyses at this signalized intersection are shown in Table 2 and Table 3, respectively. Under existing conditions, SR 9 and NW 22nd Avenue operates with an overall LOS E during the AM and PM traffic conditions. The northbound and southbound movements operate under an acceptable Level of Service D; however, the eastbound and westbound traffic demands experience excessive delays during the above mention periods. With the addition of the proposed development trips and the 2024 background traffic, AM peak hour conditions are projected to maintain an overall level of service. However, during the PM peak hour, the eastbound and westbound traffic demands were observed to experience an increase in delays causing the overall intersection to operate under a qualitative measure F. As part of this analysis, a different signal improvement scenario was considered providing mitigation measures to improve traffic flow at those critical movements. Said improvement was performed by optimizing the provided split time allocated per group. By split optimization, the overall morning peak period delay was observed to decrease to a total of 53.61 sNeh. Additionally, an equivalent split optimization process was performed to the afternoon peak period in which the overall LOS decreased to 73.06 sNeh. It is important to note that the performed local split optimization targeted the improvement of the existing excessive westbound delays. Detailed results can be observed on Table 4. As per the VISTRO model, through and turning movement queues are projected to lengthen without altering existing behaviors. However, it is important to note that under current conditions storage capacity at the northbound right turn is overcapacity. Existing queue lengths will remain at this intersection. Detailed results are shown in Table 5 and Table 6. Caltran Engineering Group PageI22 TRAFFIC IMPACT STUDY Table 2. SR 9 at NW 22nd Street - AM LOS Name NW 22 Avenue NW 22 Avenue 5R 9 SR 9 Approach Northbound Southbound Eastbound Westbound 0 z CO d X Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Delay for Lane Group [s/veh] 17.0 39.9 51.7 43.5 24.2 19.2 81.4 74.7 74.8 188.7 50.8 43.2 Lane Group LOS B D D D C B F E E F D D Approach Delay 44.81 30.86 75.18 92.88 Intersection Delay [s/veh] 61.15 Intersection LOS E Intersection V/C 0.731 Scenario 2 Delay for Lane Group [s/veh] 17.8 42.5 57.7 50.2 25.4 19.9 81.6 75.1 75.2 209.3 50.2 42.5 Lane Group LOS B D E D C B F E E F D D Approach Delay 48.86 33.95 75.55 98.82 Intersection Delay [s/veh] 64.78 Intersection LOS E Intersection V/C 0.764 Scenario 3 Delay for Lane Group [s/veh] 18.0 42.8 58.9 51.2 26.0 20.3 81.6 75.23 75.27 216.6 50.1 42.37 Lane Group LOS B D E D C C F E E F D D Approach Delay 49.44 36.64 75.6 101.47 Intersection Delay [s/veh] 65.85 Intersection LOS E Intersection V/C 0.77 (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group PageI23 TRAFFIC IMPACT STUDY Table 3. SR 9 at NW 22nd Street - PM LOS Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Approach Northbound Southbound Eastbound Westbound Scenario 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Delay for Lane Group [s/veh] 20.3 45.2 211.6 48.7 28.9 23.2 83.4 78.4 78.4 107.9 48.3 45.8 Lane Group LOS C D F D C C F E E F D D Approach Delay 121.95 33.68 78.88 62.47 Intersection Delay [s/veh] 79.64 Intersection LOS E Intersection WC 0.935 Scenario 2 Delay for Lane Group [s/veh] 21.2 50.3 272.4 54.8 30.2 24.0 83.3 80 80.0 122.5 47.9 45.3 Lane Group LOS C D F D C C F F F F D D Approach Delay 152.79 36.15 80.29 65.76 Intersection Delay [s/veh] 91.71 Intersection LOS F Intersection WC 0.977 Scenario 3 Delay for Lane Group [s/veh] 21.5 51.17 280.76 55.64 30.97 24.43 83.33 80.22 80.24 130.66 47.8 45.19 Lane Group LOS C D F E C C F F F F D D Approach Delay 156.49 36.80 80.48 36.8 Intersection Delay [s/veh] 93.79 Intersection L05 F Intersection WC 0.983 (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group PageI24 TRAFFIC IMPACT STUDY Table 4. SR 9 at NW 22nd Street - Mitigation Measures - LOS Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Approach Northbound Southbound Eastbound Westbound Scenario 3 -AM Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Delay for Lane Group [s/veh] 21.38 44.95 63.81 56.77 30.5 23.81 81.97 75.56 75.6 76.38 44.06 37.45 Lane Group LOS C D E E C C F E E E D D Approach Delay 52.69 39.43 Intersection Delay [s/veh] 53 61 Intersection LOS D Intersection V/C 0.784 Scenario 3 - PM Delay for Lane Group [s/veh] 19.84 33.75 125.13 157.1 28.84 22.77 83.61 97.91 97.93 102.23 49.04 46.36 Lane Group LOS B C F F C C F F F F D D Approach Delay 75.65 60.77 Intersection Delay [s/veh] 73 06 Intersection LOS E Intersection V/C 0.949 Table 5. SR 9 at NW 22nd Street - AM Queue Analysis Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Approach Northbound Southbound Eastbound Westbound Scenario 1 -AM Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Storage Capacity 100 - 80 - - 415 - - 400 - 275 95th %ile Queue Length Veh/In 0.07 12.37 19.68 16.68 12.86 1.6 1.66 21.95 21.9 17.44 17.93 6.98 95th %Ile Queue Length Feet/In 1.63 309.33 491.91 417.05 321.38 40.11 41.4 548.7 547.57 436.06 448.26 174.49 Scenario 3 - AM 95th %ile Queue Length Veh/In 0.17 13.41 21.84 18.36 13.88 1.73 1.74 22.89 22.82 19.28 18.46 7.18 95th %ile Queue Length Feet/In 4.18 335.2 545.99 459.04 346.95 43.24 43.38 572.28 570.53 482.04 461.58 179.43 (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group PageI25 TRAFFIC IMPACT STUDY Table 6. SR 9 at NW 22nd Street - PM Queue Analysis Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Approach Northbound Southbound Eastbound Westbound Scenario 1 -PM Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Storage Capacity 100 - - 80 - - 415 - - 400 - 275 95th %ile Queue Length Veh/In 0.22 20.86 68.04 11.34 14.03 2.27 2.85 25.58 25.55 11.37 16.64 11.7 95th %ile Queue Length Feet/In 5.42 521.52 1701.06 283.5 350.68 56.83 71.22 639.54 638.7 284.37 415.97 292.43 Scenario 3 - PM 95th %ile Queue Length Veh/In 0.37 23.15 80.42 11.98 15.19 2.46 3 26.89 26.83 12.79 17.17 12.03 95th %ile Queue Length Feet/In 9.27 578.85 2010.41 299.38 379.65 61.62 75.02 672.28 670.78 319.74 429.2 300.84 (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group PageI26 TRAFFIC IMPACT STUDY 7.2 NW 22ND AVENUE AT RUTLAND STREET Results from the capacity and queuing analyses at this signalized intersection are shown in Table 7 through Table 10. Under all peak hour scenarios, this intersection is anticipated to operate at an overall LOS A with all individual turning movements operating at its current level of service. With the addition of the proposed future site traffic, vehicle delays are expected to experience minor increases in comparison to No Build conditions. All simulated queues are projected to be contained within the existing available storage. However, westbound queue lengths presented blocking occurrences at the proposed Rutland Street Driveway. Therefore, the addition of the proposed development traffic is anticipated to have minimal impacts to this intersection with no additional improvements required. Table 7. NW 22nd Avenue & Rutland Street - AM LOS Name NW 22 Avenue NW 22 Avenue Rutland Street Rutland Street Approach Northbound Southbound Eastbound Westbound Scenario 1 Turning Movement Left Thru Right U -Turns Left Thru Right Left Thru Right Left Thru Right Delay for Lane Group [s/veh] 3.58 2.55 2.55 3.61 2.89 2.89 72.96 72.87 80.55 Lane Group LOS A A A A A A E E F Approach Delay 2.56 2.92 72.92 80.55 Intersection Delay [s/veh] 5.75 Intersection LOS A Intersection V/C 0.334 Scenario 2 Delay for Lane Group [s/veh] 3.82 2.68 2.68 3.85 3.06 3.06 72.68 72.41 80.32 Lane Group LOS A A A A A A E E F Approach Delay 2.69 3.09 72.57 80.32 Intersection Delay [s/veh] 5.89 Intersection LOS A Intersection V/C 0.348 Scenario 3 Delay for Lane Group [s/veh] 5.74 3.98 3.98 6.07 4.42 4.42 67.55 66.74 77.3 Lane Group LOS A A A A A A E E E Approach Delay 3.99 4.52 67.29 77.3 Intersection Delay [s/veh] 8.22 Intersection LOS A Intersection V/C 0.375 Caltran Engineering Group Pagel 27 TRAFFIC IMPACT STUDY Table 8. NW 22"d Avenue & Rutland Street - PM LOS Name NW 22 Avenue NW 22 Avenue Rutland Street Rutland Street Approach Northbound Southbound Eastbound Westbound Scenario 1 Turning Movement Left Thru Right U -Turns Left Thru Right Left Thru Right Left Thru Right Delay for Lane Group [s/veh] 2.88 2.7 2.7 4.43 2.19 2.2 78.25 76.51 84.52 Lane Group LOS A A A A A A E E F Approach Delay 2.7 2.3 77.79 84.52 Intersection Delay [s/veh] 5.26 Intersection LOS A Intersection V/C 0.384 Scenario 2 Delay for Lane Group [s/veh] 3.15 2.83 2.83 5.01 2.28 2.28 77.98 76.23 82.63 Lane Group LOS A A A A A A E E F Approach Delay 2.69 3.09 72.57 80.32 Intersection Delay [s/veh] 5.31 Intersection LOS A Intersection V/C 0.391 Scenario 3 Delay for Lane Group [s/veh] 6.03 3.91 3.91 10.78 10.78 3.13 3.13 73.19 73.19 Lane Group LOS A A A B B A A E E Approach Delay 3.8 3.59 72.99 3.59 Intersection Delay [s/veh] 7.47 Intersection LOS A Intersection V/C 0.42 (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group PageI28 TRAFFIC IMPACT STUDY Table 9. NW 22nd Avenue & Rutland Street - AM Queue Analysis Name NW 22 Avenue NW 22 Avenue Rutland Street Rutland Street Approach Northbound Southbound Eastbound Westbound Turning Movement Left Thru Right U -Turns Left Thru Right Left Thru Right Left Thru Right Storage Capacity [Feet] 100 - - 100 - - - - 50 - - - Scenario 1 -AM 95th %ile Queue Length [Veh/In] 0.05 3.44 3.43 0.63 4.65 4.63 1.1 0.81 3.78 96th %ile Queue Length [Feet/In] 1.37 86 85.84 15.74 116.31 115.74 27.54 20.31 94.49 Scenario 3 -AM 95th %ile Queue Length Veh/In 0.07 5.41 5.4 1.18 7.07 7.04 1.61 0.77 6.09 96th %Ile Queue Length Feet/In 1.84 135.36 135.05 29.62 176.8 175.93 40.37 19.14 152.36 Table 10. NW 22nd Avenue & Rutland Street - PM Queue Analysis Name NW 22 Avenue NW 22 Avenue Rutland Street Rutland Street Approach Northbound Southbound Eastbound Westbound Turning Movement Left Thru Right U -Turns Left Thru Right Left Thru Right Left Thru Right Storage Capacity [Feet] 100 - - 100 - - - - 50 - - - Scenario 1 -PM 95th %ile Queue Length [Veh/In] 0.08 4.77 4.76 0.63 3.12 3.11 2.54 0.92 2.38 96th %Ile Queue Length [Feet/In] 2.03 119.2 119.05 15.72 77.92 77.78 63.48 23.05 59.61 Scenario 3 -PM 95th %Ile Queue Length Veh/In 0.13 7.53 7.52 1.69 4.68 4.69 3.09 0.87 4.9 96th %Ile Queue Length Feet/In 3.28 188.28 187.93 42.19 117.31 117.31 77.36 21.74 122.47 (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group PageI29 TRAFFIC IMPACT STUDY 7.3 NW 22ND AVENUE AT SERVICE ROAD Under all future build scenarios, this un-signalized intersection is anticipated to operate at an overall LOS B with the eastbound and westbound movements operating at LOS B. Therefore, the addition of the proposed development traffic is anticipated to have minimal impacts to this intersection with no additional improvements required. Results from the capacity at this un-signalized intersection are shown in Table 11 through Table 12. After the addition of the proposed development trips, the VISTRO simulation yielded a total maximum queue of 1 vehicle along the eastbound and westbound during the AM and PM peak periods. Results from the capacity at this un-signalized intersection are shown in Table 13 through Table 14. Table 11. NW 22"d Avenue & Service Road — AM LOS Name NW 22 Avenue NW 22 Avenue Service Road Service Road Approach Northbound Southbound Eastbound Westbound Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Scenario 1 Lane Group LOS - - - - - - - B - - B Approach Delay - - 13.69 12 49 Intersection Delay [s/veh] 0.14 Intersection LOS B Intersection V/C - Scenario 2 Lane Group LOS - - - - - - - - B - - B Approach Delay - - 13.98 12 69 Intersection Delay [s/veh] 0.13 Intersection LOS B Intersection V/C - Scenario 3 Lane Group LOS - - - - - - - - B - - B Approach Delay - - - - - - 14.07 12.69 Intersection Delay [s/vehj 0.13 Intersection LOS B Intersection V/C - Caltran Engineering Group Page 130 TRAFFIC IMPACT STUDY Table 12. NW 22nd Avenue & Service Road — PM LOS Name NW 22 Avenue NW 22 Avenue Service Road Service Road Approach Northbound Southbound Eastbound Westbound Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right o c g Intersection Lane Group LOS - - - - - - - - B - - C Approach Delay - - 13.13 17.93 Intersection Delay [s/veh] 0.11 LOS C Intersection V/C - Scenario 2 Lane Group LOS - - - - - - - - B - - C Approach Delay - - 13.37 18.59 Intersection Delay [s/veh] 0.11 Intersection LOS C Intersection V/C - Scenario 3 Lane Group LOS - - - - - - - - B - - C Approach Delay 13.34 18.17 Intersection Delay [s/veh] 0.12 Intersection LOS C Intersection V/C - Table 13. NW 22"d Avenue & Service Road — AM Queue Analysis Name NW 22 Avenue NW 22 Avenue Service Road Service Road Approach Northbound Southbound Eastbound Westbound Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Scenario 1 -AM 95th %Ile Queue Length [Veh/In] - - - - - - - - 0.07 - - 0.06 96th %ile Queue Length [Feet/In] - - - - - - - - 1.81 - - 1.56 Scenario 3 -AM 95th %ile Queue Length Veh/In - - - - - - - - 0.08 - - 0.07 96th %ile Queue Length Feet/In - - - - - - - - 1.89 - - 1.63 Table 14. NW 22"d Avenue & Service Road — PM Queue Analysis Name NW 22 Avenue NW 22 Avenue Service Road Service Road Approach Northbound Southbound Eastbound Westbound Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Scenario 1 -PM 95th Vie Queue Length [Veh/In] - - - - - - - - 0.05 - - 0.12 96th %iie Queue Length [Feet/In] - - - - - - - - 1.18 - - 2.95 Scenario 3 -PM 95th %ile Queue Length Veh/In - - - - - - - - 0.07 - - 0.11 96th %Ile Queue Length Feet/In - - - - - - - - 1.74 - - 2.73 Caltran Engineering Group Page131 TRAFFIC IMPACT STUDY 7.4 NW 22ND AVENUE & DRIVEWAY The proposed driveway is located within the exclusive northbound NW 22nd Avenue right turn at SR 9. With the addition of background traffic and site generated traffic, short delays are expected for the westbound right turn movements exiting the proposed development during the AM and PM periods. It is important to reiterate that ingress and egress through this driveway will be performed by right turn movements only through. As entrance maneuvers are to be performed by uncontrolled right turn movements, no queues are expected along the mainline. Results from the capacity and queue analyses are summarized in Table 15 through Table 16. Table 15. NW 22"d Avenue & Driveway — AM & PM LOS Analysis Name NW 22 Avenue NW 22 Avenue - Driveway Approach Northbound Southbound - Westbound Turning Movement Left Thru Right Left Thru Right - - - Left Thru Right Scenario 3 -AM Lane Group LOS - - - - - - - - - - - B Approach Delay - - - 11.26 Intersection Delay [s/veh] 0.18 Intersection LOS B Intersection V/C - a A o v u `" Lane Group LOS - - - - - - - - - - - C Approach Delay - - - 16.14 Intersection Delay [s/veh] 0.17 Intersection LOS C Intersection V/C - Table 16. NW 22"d Avenue & Driveway — AM & PM LOS Analysis Name NW 22 Avenue NW 22 Avenue - Rutland Street Approach Northbound Southbound - Westbound Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Scenario 3 -AM 95th %ile Queue Length [Veh/In] - - - - - - - - - - - 0.07 96th %ile Queue Length [Feet/In] - - - - - - - - - - - 1.82 Scenario 3 -PM 95th %ile Queue Length Veh/In - - - - - - - - - - - 0.16 96th %ile Queue Length Feet/In - - - - - - - - - - - 3.93 Caltran Engineering Group Page132 TRAFFIC IMPACT STUDY 7.5 RUTLAND STREET & DRIVEWAY This driveway is proposed to be located ±150 feet east of NW 22nd Avenue along Ruland Street. Ingress and egress will allow left turn maneuvers. VISTRO simulation yielded acceptable Level of Services overall forecasting delays of 2.71 and 3.52 sec/veh. during the AM and PM, respectively. Westbound queues at the intersection of NW 22nd Avenue at Rutland Street are expected to extend up to ±150 feet blocking the proposed driveway. Said blockages cause the eastbound left traffic at the proposed driveway; VISTRO traffic simulation forecasted queue lengths of 1 vehicle during the AM and PM peak hours respectively. Although queues appear to be minimal, the implementation of "DO NOT BLOCK INTERSECTION' sign R10-7 and pavement markings are recommended to mitigate potential intersection conflict points. Results from the capacity and queue analyses are summarized in Table 17 through Table 18. Table 17. Rutland Street & Driveway — AM & PM LOS Analysis Name Driveway Rutland Street Rutland Street - Approach Southbound Eastbound Westbound - Turning Movement Left Thru Right Left Thru Right Left Thru Right - - - Scenario 3 -AM Lane Group LOS A - A A A - - A A - - - Approach Delay 9.0 2.38 - - Intersection Delay [s/veh] 2 65 Intersection LOS A Intersection V/C - Scenario 3 -PM i Lane Group LOS A - A A A - - A A - - Approach Delay 8.33 2.34 - - Intersection Delay [s/veh] 3 52 Intersection LOS A Intersection V/C - Table 18. Rutland Street & Driveway — AM & PM LOS Analysis Name Driveway Rutland Street Rutland Street - Approach Southbound Eastbound Westbound - Turning Movement Left Thru Right Left Thru Right Left Thru Right - - - Scenario 3 -AM 95th %ile Queue Length [Veh/In] 0.13 - 0.13 0.03 0.03 - - 0 0 - - - 96th %ile Queue Length [Feet/In] 3.25 - 3.25 0.85 0.85 - - 0 0 - - - Scenario 3 -PM 95th %Ile Queue Length Veh/In 0.14 - 0.14 0.04 0.04 - - 0 0 - - - 96th %Ile Queue Length Feet/In 3.43 - 3.43 1.12 1.12 - - 0 0 - - - Caltran Engineering Group Page133 TRAFFIC IMPACT STUDY 8.0 CONCURRENCY ANALYSIS Pursuant to the Miami -Dade County Concurrency Management System, the study area traffic count station on the roadway adjacent to the Amendment Site has to be operating at an acceptable level of service during the peak hour period of the proposed development. Available capacity and acceptable level of service is maintained for the adjacent count station, and the study area roadway segment, meet the traffic concurrency standards from the Miami -Dade County. Please refer to Table 19 for a summary of the concurrency analysis. Table 19. NW 22nd Avenue — Concurrency Analysis Station Location LOS D Traffic Volume 2020 PM Peak Volume 2024 PM Peak Volume PM Peak Forecasted Trips Buildout Traffic Volume 991300 NW 22ND AVENUE South OF SERVICE RD 2,920* 2,046 2,127 122 2,249 Note*- LOS traffic Volume was taken from the Florida Department of Transportation (FDOT) Generalized Peak Hour Two -Way Table 4. As summarized on Table 19, the trip generation yielded a total of 122 PM peak hour vehicle trips forecasted to travel through NW 22nd Avenue without negatively impacting the adopted LOS traffic volumes. Please refer to Appendix G for FDOT generalized LOS table. Caltran Engineering Group PageI34 TRAFFIC IMPACT STUDY 8.0 PARKING ANALYSIS Parking Calculations were performed as per the City of Opa-Locka Municipality Code. Please refer to the site plan provided in Appendix A. (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group PageI35 TRAFFIC IMPACT STUDY 8.0 CONCLUSSIONS AND RECOMENDATIONS Caltran Engineering Group was retained to perform a traffic impact analysis (TIA) for a proposed Gas Station with a convenience store, as well as a proposed retail space located in 14585 NW 22nd Avenue under Folio No. 082122-005-0690. This report presents trip generation, distribution, traffic analyses, and recommendations for transportation improvements required to meet anticipated traffic demands in conjunction with the development. The traffic conditions studied include the existing (2022) traffic condition as well as the projected (2024) background and build -out traffic conditions. The proposed gas station will consist of 6 pumps, in addition to the proposed 1,600 Sqf of retail space and has the potential to generate 1,902 daily weekday trips for the proposed driveways. Out of the total weekday daily trips, 105 driveway trips are anticipated to occur during the AM peak hour and 122 driveway trips are expected to occur during the PM peak hour. Based on the results of the traffic analysis, the future impacts associated with the proposed development are anticipated to be minimal overall, with some deterioration in operations anticipated at the signalized intersections of SR 9 and Rutland Street along NW 22nd Avenue. As a result, the following improvements are recommended as mitigation measures: (SPACE INTENTIONALLY LEFT BLANK) Caltran Engineering Group Pagel 36 TRAFFIC IMPACT STUDY NW 22"d Avenue at SR 9 A split optimization of its current TOD, signal timing, anticipates traffic improvements after the addition of the forecasted growth and potential trip generation. Said process yielded the results summarized in Section 7, Capacity Analysis, Table 4. AM and PM Signal Timing are illustrated on Exhibit 10 and Exhibit 11, respectively. Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Lost time [s] 0.00 Control Type ProtPer Permiss Permiss ProtPer Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal Group 6 1 5 2 3 8 7 4 Auxiliary Signal Groups Lead/Lag Lead Lead Lead Lead Minimum Green [s] 5 7 5 7 5 18 5 18 Maximum Green [s] 30 50 30 50 22 50 22 50 Amber [s] 4.0 4.0 4.0 4.0 4.8 3.0 4.8 3.0 All red [s] 2.0 2.2 2.0 2.2 2.0 2.0 2.0 2.0 Split [s] 11 50 29 68 12 52 29 69 Walk [s] 7 7 7 7 Pedestrian Clearance [s] 36 36 32 32 Exhibit 10. AM- SR9 at NW 22 Ave - Proposed Signal Timing Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Lost time [s] 0.00 Control Type ProtPer Permiss Permiss ProtPer Permiss Permiss Protecte Permiss Permiss Protecte Permiss Perrniss Signal Group 6 1 5 2 3 8 7 4 Auxiliary Signal Groups Lead/Lag Lead Lead Lead Lead Minimum Green [s] 5 7 5 7 5 18 5 18 Maximum Green [s] 30 50 30 50 22 50 22 50 Amber [s] 4.0 4.0 4.0 4.0 4.8 4.8 4.8 4.8 All red [s] 2.0 2.2 2.0 2.2 2.0 2.0 2.0 2.0 Split [s] 32 62 26 56 21 52 21 52 Walk [s] 7 7 7 7 Pedestrian Clearance [s] 36 36 32 32 Exhibit 11. PM- SR9 at NW 22 Ave - Proposed Signal Timing Caltran Engineering Group Page137 TRAFFIC IMPACT STUDY Rutland Street and Proposed Driveway Traffic simulation forecasted ±150 feet of westbound queues at the intersection of NW 22nd Avenue at Rutland Street. Said queues could potentially create conflict points at the proposed development access point. Although, VISTRO simulation did not yield excessive queues, the implementation of "DO NOT BLOCK INTERSECTION' sign R10- 7 and pavement markings are recommended to mitigate potential intersection conflict points. Beyond the above -mentioned improvements, no other offsite geometric or traffic control improvements are recommended as part of the proposed development. Caltran Engineering Group PageI38 TRAFFIC IMPACT STUDY APPENDIX A Architectural Site Plan Caltran Engineering Group PageI39 NEW C -STORE AND GAS STATION UNBRANDED 14585 NW 22 AVENUE OPA-LOCKA, FLORIDA 33054 AE RIAL MAP SCA LE: N.TB. 7 Q NIB BUILDING AND ZO NING CRITERIA 09000 0 0920.20 0-2 2000109 . 000 0.02232 00102 TOr 021 . T OTT 2100 50 POMICIPM.10020 on4ar 1030. 000 0000 0 Kw 90 2190 12 012110 _ 10+12011 0-0 �� . xL• .a. nvern, FR OM 1Ks n 020 0.- 929 2229 31100 0040 s ut 2190, e00 o' -a' r10i1. 1020.000 .1 0021 0900 41220. 20100{T en 21 00 100 2903 1, 900 21101. 12 9110.9 0 .00 92000 On 00 00 .011 .00 012,4 2103 1120010 03210 n wn SOT 9000. 000 9.000 20.22 21 .900 20 fl Ns :„10:0.19 ..20. 4 ST OWS Va n 002 20 n 002 20 1, 40 n We n 10.002 SO n 2327 n 4,392 20 2014 4.422 SO FT 3 .3111 17./ w, ,, .2 09009 ,.2 0212 Im n 101 :es 00020 FS 09 Moo rm.. FIALLO'S MEP DESIGN, INC 10010 SW 83rd ST Mi ami, Fl orida 33173 305 .877.1845 Jhall o®he l lom epdesig n. corn CAir 28637 NEW C -STORE & GAS STATI ON UNBRANDED 14585 NW 22 A venue OP A-L OCKA, Florida 33054 3 01209 E .eam No. 110/1500 on1E 30009100 20-200-00585 01002 DV 019.2991119 1900 COVERSHIET A-0.0 40911.90031 .1 fin 0,, CONCRETE N. 10 6UEEEA 111 E 950 FROM F1E50 E011L ZON E RETAL *AL1 2 Ow 01 \X411 wt ® L•2764. R.2500' D•63'20 5'' TM.t5.2' NEw SPAR t 1012 sn ARCHITECT URAL GROUND SITE PL AN WUP 12' 00006150 ALLET My AS 988 PR 50-5 INC617 mr.k. USEC�GR0u RESIDE.. O DE 1M. ZONE 50030. 531 00).16' G616R.SDP LK 50030' 5.1 16163' NO RTHWEST 22ND AVE NUE •51.144.7 PAVE ME NT 60' O(00*EdG20 0/re A5 PER P6 50-5 0.0 0 -ONE CO. 7L SCALE :3/32. - 8.2 000' 0-116'39 '09' IA N -40 52' FIALLO'S MEP DESIGN, INC 10010 SW 83rd ST Miami, Florid a 33173 305.877 1845 JSiallo®8aliomepdes+g r corn C A/ 28637 NEW C -ST ORE & G AS STATI ON UNBR ANDED 14585 NW 22 Aven ue OPA-L OCK A, Florid a 33054 UCNE FlIZ LO R OMA N.E I ONS/ 110 . FEvisi ON6 DATE J OB NumBEN 20-200-00585 69AWN ON' CHEF NT 2020 II1EPEAN A-1.0 TRAFFIC IMPACT STUDY PPPENDIX B Trip Generation OTISS Reports Caltran Engineering Group Pagel40 Land Use: 945 Convenience Store/Gas Station Description A convenience store/gas station is a facility with a co -located convenience store and gas station. The convenience store sells grocery and other everyday items that a person may need or want as a matter of convenience. The gas station sells automotive fuels such as gasoline and diesel. A convenience store/gas station is typically located along a major thoroughfare to optimize motorist convenience. Extended hours of operation (with many open 24 hours, 7 days a week) are common at these facilities. The convenience store product mix typically includes pre-packaged grocery items, beverages, dairy products, snack foods, confectionary, tobacco products, over-the-counter drugs, and toiletries. A convenience store may sell alcohol, often limited to beer and wine. Coffee and pre - made sandwiches are also commonly sold at a convenience store. Made-to-order food orders are sometimes offered. Some stores offer limited seating. The sites in this land use include both self -pump and attendant -pumped fueling positions and both pre -pay and post -pay operations. Convenience store (Land Use 851), gasoline/service station (Land Use 944), and truck stop (Land Use 950) are related uses. Land Use Subcategory Multiple subcategories were added to this land use to allow for multi -variable evaluation of sites with single -variable data plots. All study sites are assigned to one of three subcategories, based on the number of vehicle fueling positions (VFP) at the site: between 2 and 8 VFP, between 9 and 15 VFP, and between 16 and 24 VFP. For each VFP range subcategory, data plots are presented with GFA as the independent variable for all time periods and trip types for which data are available. The use of both GFA and VFP (as the independent variable and land use subcategory, respectively) provides a significant improvement in the reliability of a trip generation estimate when compared to the single -variable data plots in prior editions of Trip Generation Manual. Further, the study sites were also assigned to one of three other subcategories, based on the gross floor area (GFA) of the convenience store at the site: between 2,000 and 4,000 square feet, between 4,000 and 5,500 square feet, and between 5,500 and 10,000 square feet. For each GFA subcategory range, data plots are presented with VFP as the independent variable for all time periods and trip types for which data are available. The use of both VFP and GFA (as the independent variable and land use subcategory, respectively) provides a significant improvement in the reliability of a trip generation estimate when compared to the single -variable data plots in prior editions of Trip Generation Manual. 864 Trip Generation Manual 11th Edition • Volume 5 When analyzing the convenience store/gas station land use with each combination of GFA and VFP values as described above, the two sets of data plots will produce two estimates of site - generated trips. Both values can be considered when determining a site trip generation estimate. Data plots are also provided for three additional independent variables: AM peak hour traffic on adjacent street, PM peak hour traffic on adjacent street, and employees. These independent variables are intended to be analyzed as single independent variables and do not have sub- categories associated with them. Within the data plots and within the ITETripGen web app, these plots are found under the land use subcategory "none." Additional Data ITE recognizes there are existing convenience store/gas station sites throughout North America that are larger than the sites presented in the data plots. However, the ITE database does not include any site with more than 24 VFP or any site with gross floor area greater than 10,000 square feet. Submission of trip generation data for larger sites is encouraged. The technical appendices provide supporting information on time -of -day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/trip- and-parking-generation/). The sites were surveyed in the 1980s, the 1990s, the 2000s, and the 2010s in Alberta (CAN), Arkansas, California, Connecticut, Delaware, Florida, Indiana, Iowa, Kentucky, Maryland, Massachusetts, Minnesota, Nevada, New Hampshire, New Jersey, Pennsylvania, Rhode Island, South Dakota, Texas, Utah, Vermont, Washington, and Wisconsin. Source Numbers 221, 245, 274, 288, 300, 340, 350, 351, 352, 355, 359, 385, 440, 617, 718, 810, 813, 844, 850, 853, 864, 865, 867, 869, 882, 883, 888, 904, 926, 927, 936, 938, 954, 960, 962, 977, 1004, 1024, 1025, 1027,1052 General Urban/Suburban and Rural (Land Uses 800-999) 865 Convenience Store/Gas Station - GFA (2-4k) (945) Vehicle Trip Ends vs: Vehicle Fueling Positions On a: Weekday Setting/Location: General Urban/Suburban Number of Studies: 48 Avg. Num. of Vehicle Fueling Positions: 8 Directional Distribution: 50% entering, 50% exiting Vehicle Trip Generation per Vehicle Fueling Position Average Rate Range of Rates Standard Deviation 265.12 68.50 - 701.00 142.37 Data Plot and Equation ANII •- 866 Trip Generation Manual 11th Edition • Volume 5 Convenience Store/Gas Station - GFA (2-4k) (945) Vehicle Trip Ends vs: Vehicle Fueling Positions On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 76 Avg. Num. of Vehicle Fueling Positions: 8 Directional Distribution: 50% entering, 50% exiting Vehicle Trip Generation per Vehicle Fueling Position Average Rate Range of Rates Standard Deviation 16.06 3.75 - 50.00 8.79 Data Plot and Equation 500 X 400 X X N c 300 , X W a F II 1- x x X - X x X X x 200 X JC ''X X X X X X' X 100 X i i X X X X X X X X 0 0 10 20 30 X = Number of Vehicle Fueling Positions X Study Site Average Rate Fitted Curve Equation: Not Given R2= *** Mritemow MEI General Urban/Suburban and Rural (Land Uses 800-999) 867 Convenience Store/Gas Station - GFA (2-4k) (945) Vehicle Trip Ends vs: Vehicle Fueling Positions On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 93 Avg. Num. of Vehicle Fueling Positions: 8 Directional Distribution: 50% entering, 50% exiting Vehicle Trip Generation per Vehicle Fueling Position Average Rate Range of Rates Standard Deviation 18.42 5.75 - 57.80 10.16 Data Plot and Equation 868 Trip Generation Manual 11th Edition • Volume 5 III rteMI . Land Use Size Weekday Weekday, Peak Ho ur of Adjacent Street Traffic, One Ho ur Between 7 and 9 a. m. Weekday, Peak Ho ur of Adjacent Street Traffic, One Ho ur Between 4 and 6 p. m. Entry Exit Entry Exit Entry Exit 945 - Conv en ie nce Sto re /Gas Station - GFA (2-4k) (Ge neral Urban /Suburban) 6 Vehicle Fueling Positions 900 900 50 50 56 55 Reduction 0 0 0 0 0 0 Internal 0 0 0 0 0 0 Pass -by 0 0 0 0 0 0 Non -pass -by 900 900 50 50 56 55 814 - Varie ty Store (General Urban/Suburban) 1.6 1000 Sq. Ft. GFA 51 51 2 3 6 5 Reductio n 0 0 0 0 0 0 In ternal 0 0 0 0 0 0 Pass -by 0 0 0 0 0 0 No n -pass -by 51 51 3 2 6 5 Total 951 951 51 50 62 60 Total Reduction 0 0 0 0 0 0 Total Internal 0 0 0 0 0 0 Total Pass -by 0 0 0 0 0 0 Total Non -pass -by 951 951 52 53 62 60 TRAFFIC IMPACT STUDY APPEN DiIX C Trip Distribution Caltran Engineering Group PageI41 DIRECTIONAL TRIP DISTRIBUTION REPORT Miami -Dade 2015 Base Year Direction Trip Distribution Summary TAZ of Origin County TAZ Regional TAZ Trips / Percent NNE ENE ESE Cardinal Directions SSE SSW WSW WNW NNW Total Trips 235 235 236 236 237 237 238 238 239 239 240 240 241 241 242 242 243 243 244 244 245 245 246 246 247 247 248 248 249 249 250 250 251 3135 3135 3136 3136 3137 3137 3138 3138 3139 3139 3140 3140 3141 3141 3142 3142 3143 3143 3144 3144 3145 3145 3146 3146 3147 3147 3148 3148 3149 3149 3150 3150 3151 Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips 114 16.3 621 16.9 166 19.3 1,665 28.4 261 22.1 608 22.7 93 19.2 726 16.9 388 19.7 526 17.3 499 18.1 415 18.6 326 14.8 511 16.7 361 18.9 874 17.0 390 67 9.6 379 10.4 95 11.1 434 7.4 40 3.4 142 5.3 22 4.6 408 9.5 154 7.8 285 9.4 261 9.4 252 11.3 283 12.8 307 10.0 233 12.3 581 11.3 288 28 4.1 200 5.5 43 5.0 147 2.5 53 4.5 115 4.3 23 4.8 214 5.0 79 4.0 176 5.8 197 7.1 108 4.9 161 7.3 195 6.4 134 7.0 389 7.6 88 102 14.7 591 16.1 98 11.4 518 8.9 160 13.6 349 13.0 60 12.4 758 17.6 258 13.1 458 15.1 355 12.9 321 14.4 339 15.4 466 15.2 260 13.6 806 15.7 356 109 15.7 604 16.5 124 14.4 753 12.9 211 17.9 508 18.9 76 15.6 587 13.7 378 19.2 591 19.4 545 19.7 386 17.3 390 17.7 604 19.8 318 16.7 1,083 21.0 332 105 15.1 546 14.9 112 13.0 691 11.8 218 18.5 413 15.4 95 19.7 644 15.0 269 13.7 451 14.8 297 10.8 285 12.8 370 16.8 407 13.3 264 13.9 598 11.6 181 72 10.4 306 8.4 87 10.1 578 9.9 120 10.2 221 8.2 55 11.3 433 10.1 230 11.7 223 7.3 269 9.8 222 10.0 161 7.3 232 7.6 105 5.5 340 6.6 238 99 14.2 419 3,715 11.4 136 867 15.8 1,071 6,038 18.3 119 1,190 10.1 329 2,739 12.2 61 484 12.6 526 4,502 12.3 212 1,993 10.8 335 3,172 11.0 338 2,821 12.2 238 2,236 10.7 177 2,236 8.0 335 3,161 11.0 230 1,942 12.1 481 5,411 9.3 249 697 2,151 251 3151 Percent 18.4 13.6 4.1 16.8 15.7 8.5 11.2 11.7 252 3152 Trips 319 327 167 390 561 313 213 336 2,683 252 3152 Percent 12.1 12.5 6.4 14.9 21.4 11.9 8.1 12.8 253 3153 Trips 103 106 56 137 180 128 71 161 942 253 3153 Percent 10.9 11.3 6.0 14.6 19.1 13.6 7.5 17.1 254 3154 Trips 257 244 169 234 383 217 213 273 2,000 254 3154 Percent 12.9 12.3 8.5 11.8 19.3 10.9 10.7 13.7 255 3155 Trips 597 489 369 680 794 271 407 440 4,143 255 3155 Percent 14.7 12.1 9.1 16.8 19.6 6.7 10.1 10.9 256 3156 Trips 257 321 150 274 382 243 163 253 2,102 256 3156 Percent 12.6 15.7 7.3 13.4 18.7 11.9 8.0 12.4 257 3157 Trips 567 480 283 498 684 391 290 499 3,788 257 3157 Percent 15.4 13.0 7.7 13.5 18.5 10.6 7.8 13.5 258 3158 Trips 368 195 138 309 350 157 114 187 1,850 258 3158 Percent 20.3 10.7 7.6 17.0 19.2 8.7 6.3 10.3 259 3159 Trips 393 436 210 388 461 355 255 392 2,907 259 3159 Percent 13.6 15.1 7.3 13.4 16.0 12.3 8.8 13.6 260 3160 Trips 436 389 235 359 498 393 235 439 3,076 260 3160 Percent 14.6 13.0 7.9 12.0 16.7 13.2 7.9 14.7 DIRECTIONAL TRIP DISTRIBUTION REPORT Miami -Dade 2045 Cost Feasible Plan Direction Trip Distribution Summary TAZ of Origin County TAZ 235 235 236 236 237 237 238 238 239 239 240 240 241 241 242 242 243 243 244 244 245 245 246 246 247 247 248 248 249 249 250 250 Regional TAZ Trips / Percent 3135 Trips 3135 Percent 3136 Trips 3136 Percent 3137 Trips 3137 Percent 3138 Trips 3138 Percent 3139 Trips 3139 Percent 3140 Trips 3140 Percent 3141 Trips 3141 Percent 3142 3142 3143 3143 3144 3144 3145 3145 3146 3146 3147 3147 3148 3148 3149 3149 3150 3150 Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Trips Percent Cardinal Directions NNE 228 16.9 561 15.8 173 18.5 1,932 26.3 ENE 130 9.7 329 9.3 142 15.2 396 5.4 302 58 18.3 3.5 548 128 19.4 4.5 171 29 20.6 3.5 862 376 16.9 7.4 368 126 16.1 5.5 678 283 18.1 7.6 581 324 18.9 10.6 354 242 13.2 9.0 424 321 15.0 11.4 581 373 16.5 10.6 213 8.8 901 11.7 340 14.1 1,386 18.0 ESE 35 2.6 182 5.2 55 5.8 226 3.1 52 3.1 91 3.2 34 4.1 274 5.4 131 5.7 165 4.4 164 5.3 155 5.8 188 6.6 164 4.6 122 5.1 613 8.0 SSE 155 11.5 633 17.9 114 12.2 777 10.6 247 14.9 451 16.0 143 17.2 888 17.4 344 15.1 606 16.2 467 15.2 445 16.6 365 12.9 491 13.9 397 16.4 1,185 15.4 SSW 229 17.0 600 16.9 149 15.9 1,149 15.6 343 20.8 553 19.6 172 20.7 865 17.0 387 16.9 664 17.8 544 17.7 461 17.2 514 18.2 702 19.9 573 23.7 1,387 18.0 WSW 238 17.7 545 15.4 95 10.1 912 12.4 288 17.5 454 16.1 94 11.3 793 15.5 337 14.7 549 14.7 361 11.8 390 14.6 435 15.4 556 15.7 347 14.3 950 12.4 WNW 100 7.5 288 8.1 100 10.7 817 11.1 131 7.9 270 9.6 73 8.8 506 9.9 287 12.5 361 9.7 307 10.0 300 11.2 310 11.0 297 8.4 202 8.3 577 7.5 NNW 232 17.2 405 3,704 11.4 108 951 11.6 1,136 7,707 15.5 232 1,696 14.0 330 2,873 11.7 116 842 13.9 537 5,321 10.5 308 2,309 13.5 432 3,858 11.6 322 3,119 10.5 333 2,696 12.4 267 2,882 9.4 369 3,576 10.4 225 2,443 9.3 688 9.0 Total Trips 1,374 8,004 251 3151 Trips 251 3151 Percent 404 305 141 404 544 318 15.5 11.7 5.4 15.5 20.9 12.2 187 303 2,700 7.2 11.6 252 3152 Trips 502 365 195 437 630 480 394 418 3,494 252 3152 Percent 14.7 10.7 5.7 12.8 18.4 14.0 11.5 12.2 253 3153 Trips 128 150 98 213 254 136 101 120 1,245 253 3153 Percent 10.6 12.5 8.2 17.8 21.2 11.3 8.4 10.0 254 3154 Trips 488 378 177 393 582 313 341 380 3,061 254 3154 Percent 16.0 12.4 5.8 12.9 19.1 10.2 11.2 12.5 255 3155 Trips 763 643 377 886 1,057 541 520 571 5,531 255 3155 Percent 14.2 12.0 7.0 16.5 19.7 10.1 9.7 10.7 256 3156 Trips 394 404 192 446 492 284 210 309 2,819 256 3156 Percent 14.4 14.8 7.0 16.3 18.0 10.4 7.7 11.3 257 3157 Trips 640 544 382 634 877 575 471 455 4,718 257 3157 Percent 14.0 11.9 8.4 13.9 19.2 12.6 10.3 9.9 258 3158 Trips 355 320 184 419 455 293 261 206 2,523 258 3158 Percent 14.3 12.8 7.4 16.8 18.2 11.8 10.5 8.3 259 3159 Trips 372 380 209 369 554 379 339 395 3,110 259 3159 Percent 12.4 12.7 7.0 12.3 18.5 12.6 11.3 13.2 260 3160 Trips 716 592 373 740 933 592 579 670 5,284 260 3160 Percent 13.8 11.4 7.2 14.2 18.0 11.4 11.1 12.9 TRAFFIC IMPACT STUDY APPENJDI Data Col X D lection Caltran Engineering Group PageI42 TRAFFIC IMPACT STUDY 24 Hr. -Road Tube Count Caltran Engineering Group Pagel43 County: 99 Station: 1300 Description: NW 22ND AVENUE EAST OF SERVICE RD Start Date: 01/25/2022 Start Time: 0000 Direction: N Direction: S Combined Time 1st 2nd 3rd 4th Total 1st 2nd 3rd 4th Total Total 0000 39 40 40 16 135 0100 26 32 13 12 83 0200 15 45 8 9 77 0300 16 14 11 20 61 0400 16 19 29 39 103 0500 27 53 63 71 214 0600 76 114 148 158 496 0700 150 182 190 184 706 0800 210 214 177 158 759 0900 179 168 175 143 665 1000 162 181 157 147 647 1100 154 169 168 163 654 1200 191 183 205 179 758 1300 201 190 192 154 737 1400 193 203 188 254 838 1500 223 242 272 262 999 1600 276 271 268 290 1105 1700 293 289 208 281 1071 1800 258 241 242 273 1014 1900 191 188 190 147 716 2000 154 112 113 118 497 2100 110 102 94 80 386 2200 70 65 77 63 275 2300 58 67 39 39 203 29 25 34 16 104 239 20 16 14 14 64 147 19 13 20 11 63 140 8 12 17 13 50 111 17 12 17 18 64 167 32 30 49 67 178 392 73 134 183 204 594 1090 236 244 279 283 1042 1748 229 217 219 283 948 1707 208 193 154 157 712 1377 158 150 144 160 612 1259 118 138 149 152 557 1211 169 168 159 141 637 1395 150 145 148 176 619 1356 157 176 194 214 741 1579 191 199 232 262 884 1883 201 228 232 223 884 1989 206 245 213 236 900 1971 173 212 191 163 739 1753 164 121 103 105 493 1209 101 80 91 73 345 842 81 78 77 57 293 679 59 54 43 48 204 479 47 46 39 31 163 366 24 -Hour Totals: 13199 11890 25089 Peak Volume Information Direction: N Direction: S Combined Directions Hour Volume Hour Volume Hour Volume A.M. 730 798 700 1042 730 1806 P.M. 1630 1140 1530 923 1630 2046 Daily 1630 1140 700 1042 1630 2046 Generated by SPS 5.0.53P TRAFFIC IMPACT STUDY SR 9 and NW 22nd Avenue. Caltran Engineering Group Pagel 44 SR 9 at NE 22nd Avenue File Name : TMC-1 SR -9 at NW 22nd Avenue Site Code : 00000000 Start Date : 1/25/2022 Page No : 1 Groups Printed- V ehicle - Trucks NW 22n d Av enue NW 22nd Avenu e SR 9 SR 9 Southbo und Northbound We stbou nd Eastb ound , Start Time u -Toms Left , Thru Right App. Total 1 u -Turns Left Thru Right App. Total u-Tums Left Thru Right App. Total U-Tums Left Thru Right App. Total Int. Total 07:00 AM 0 60 144 4 208 0 1 90 69 160 0 74 114 36 224 0 4 163 1 168 760 07:15 AM 0 49 157 6 212 0 0 109 82 191 0 67 142 31 240 0 1 192 1 194 837 07:30 AM 0 74 180 9 263 ' 0 0 110 81 191 0 98 137 31 266 0 3 182 0 185 905 07:45 AM 0 102 205 12 319 0 0 105 94 199 0 82 162 33 2771 0 10 146 0 156 951 Total 0 285 686 31 1002 0 1 414 326 741 0 321 555 131 1007 0 18 683 2 703 3453 08:00 AM 0 121 160 11 292 0 1 140 81 222 0 78 174 32 284 0 10 173 2 185 983 08:15 AM 0 87 116 12 215 0 1 133 98 232 0 99 195 27 3211 0 19 186 4 209 977 08:30 AM 0 132 149 13 294 0 4 104 79 187 0 75 159 31 2651 0 17 127 1 145 891 08:45 AM 0 86 183 13 282 : 0 2 97 70 169 . 0 83 117 23 223 1 0 16 108 0 124 . 798 Total 0 426 608 49 1083 1 0 8 474 328 810 0 335 645 113 1093 0 62 594 7 663 3649 *** BREA K ** * 04:00 PM 0 55 141 13 209 0 1 199 127 327 0 70 150 37 257 0 22 240 1 263 1056 04:15 PM 0 66 167 12 245 0 3 196 151 350 0 71 144 44 2591 0 21 191 1 213 1067 04:30 PM 0 59 170 13 242 0 2 191 140 333 0 61 170 38 269 1 0 16 183 1 200 1044 04:45 PM 0 58 156 16 230 0 1 203 145 349 0 76 135 47 258 0 14 193 1 208 1045 Total 0 238 634 54 926 0 7 789 563 1359 0 278 599 166 1043 0 73 807 4 884 4212 05:00 PM 0 51 147 15 213 0 2 195 205 402 0 68 150 52 270 0 19 191 1 211 1096 05:15 PM 0 69 168 10 247 0 1 196 188 385 0 62 156 73 291 0 20 202 1 223 1146 05:30 PM 0 77 144 11 232 0 1 159 126 286 0 68 145 62 275 0 22 175 0 197 990 05:45 PM 0 77 191 16 284 0 0 203 145 348 0 59 168 48 275 0 25 164 1 190 1097 Total 0 274 650 52 976 0 4 753 664 1421 0 257 619 235 1111 0 86 732 3 821 4329 Grand Total 0 1223 2578 186 3987 0 20 2430 1881 4331 0 1191 2418 645 4254 0 239 2816 16 30711 15643 Apprch % 0 30.7 64. 7 4.7 0 0. 5 56.1 43.4 0 28 56 .8 15.2 0 7.8 91 .7 0.5 Total % 0 7.8 16. 5 1.2 25. 5 , 0 0.1 15.5 12 27 .7 0 7.6 15.5 4 .1 27.2 , 0 1.5 18 0 .1 19 .6 V ehicle 0 1187 2481 181 3849 0 17 2368 1806 4191 0 1152 2216 622 3990 0 232 2529 15 27761 14806 % Vehicle 0 97.1 96.2 97.3 96. 5 0 85 97.4 96 96 .8 0 96.7 91.6 96 .4 93.8 0 97.1 89.8 93 .8 90.4 1 94 .6 Trucks 0 36 97 5 138 0 3 62 75 140 0 39 202 23 264 0 7 287 1 295 837 % Trucks ' 0 2. 9 3.8 2. 7 3. 5 0 15 2.6 4 3 .2 0 3 .3 8 .4 3.6 6.2 0 2.9 10 .2 6.2 9.6 5.4 SR 9 at NE 22nd Avenue File Name : TMC-1 SR -9 at NW 22nd Avenue Site Code : 00000000 Start Date : 1/25/2022 Page No : 2 m'Wo r'n Q 7 8 o C A N a) ID O C O N N N 01 04 N �7 •- N 60 N m 2_� NW 22nd Avenue Out In To tal 7071 230 3222 92 3314 3849 138 3687 181 5 2481 97 1187 36 186 iht Tiro LeLf+ t 2578 1223 North 1/25/2022 07:00 AM 1/25/2022 05:45 PM Vehicle Trucks 47 T r Left Thru Right 17 3 2368 62 2430 1806 75 20 1881 I 3648 4191 17839! 137 140 277 3785 4331_ 8116 Out In Total NW 22nd Av en ue 4_a• 2 82 W m m m�60 T VS O m Do 01 J N N 0 N Sp m SR 9 at NE 22nd Av enue File Name : TMC-1 SR -9 at NW 22nd Avenue Site Code : 00000000 Start Date : 1/25/2022 Page No : 3 NW 22n d Avenue Southbo und NW 22nd Ave nue Northbo und SR 9 Westbo und Start Time U -Turn s Left Thru Right App. Total U-Tums Left Thru Right SR 9 Eastbound App. To tal U-Tums Le ft Thru Right I App. Total U-Tums Left Thru Right App . Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Pea k 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 0 74 180 9 263 0 0 110 81 191 0 98 137 31 266 0 3 182 0 185 905 07:45 AM 0 102 205 12 319 0 0 105 94 199 0 82 162 33 277 0 10 146 0 156 951 08:00 AM 0 121 160 11 292 0 1 140 81 222 0 78 174 32 284 0 10 173 2 185 983 08:15 AM 0 87 116 12 215 0 1 133 98 232 0 99 195 27 321 0 19 186 4 209 977 Total Volume 0 384 661 44 1089 0 2 488 354 844 0 357 668 123 1148 0 42 687 6 735 3816 % App. Total 0 35.3 60.7 4 0 0.2 57.8 41.9 0 31. 1 58.2 10. 7 0 5 .7 93.5 0.8 PHF .000 .793 .806 .917 . 853 .000 .500 .871 .903 . 909 . 000 .902 . 856 . 932 .894 .000 .553 .923 .375 .879 .970 SR 9 at NE 22nd Avenue File Name : TMC-1 SR -9 at NW 22nd Avenue Site Code : 00000000 Start Date : 1/25/2022 Page No : 4 NW 22nd Avenue Out In Total 653 1089 1742 44 661 384 Right Thru Left 4 Peak Hour Data North Peak Hour Begins at 07:30 AM, Vehicle Trucks Left Thru Right 2 488 . 354 1024 844 186 8 Out In Total NW 22nd Av en ue 4 73. fG —1 2 N cn 0) 01 0 0 y o cn W 0 SR 9 at NE 22nd Avenue File Name : TMC-1 SR -9 at NW 22nd Avenue Site Code : 00000000 Start Date : 1/25/2022 Page No : 5 NW 22nd Av enue Southbo und NW 22nd Av enue No rthbo und SR 9 Westbound Start Time u --rums Left Thru Right App. Total U-Tums Left Thru Right App. Total U-Tums Left Thru Right Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 0 59 170 13 242 04:45 PM 0 58 156 16 230 05:00 PM 0 51 147 15 213 05:15 PM 0 69 168 10 247 Total Volume 0 237 641 54 932 % A pp. Total 0 25. 4 68.8 5.8 PHF .000 . 859 .943 .844 .943 0 2 191 140 333 0 1 203 145 349 0 2 195 205 402 0 1 196 188 385 0 6 785 678 1469 0 0. 4 53. 4 46.2 .000 .750 . 967 . 827 .914 App. Total U-Tums SR 9 Eastbound Left Thru Right App. Total Int. Total 0 61 170 38 269 0 76 135 47 258 0 68 150 52 270 0 62 156 73 291 0 267 611 210 1088 0 24. 5 56. 2 19. 3 .000 .878 .899 .719 .935 0 16 183 1 200 1044 0 14 193 1 208 1045 0 19 191 1 211 1096 0 20 202 1 223 1146 0 69 769 4 842 4331 0 8 .2 91 .3 0.5 .000 .863 .952 1.00 .944 .945 SR 9 at NE 22nd Av enue File Name : TMC-1 SR -9 at NW 22nd Avenue Site Code : 00000000 Start Date : 1/25/2022 Page No : 6 NW 22nd Avenue Out In Total F1064 932 1 1996 541 641 2371 Right Thru Lleft Peak Hour Data 0 North Peak Hour Begins at 04:30 PM Vehicle Trucks � T r Left Thru Ri ht 745 678 912 1469, 1 23811 Out In Total NW 22 nd Aven ua 2 - 0 co V TRAFFIC IMPACT STUDY Service Road and NW 22nd Avenue. Caltran Engineering Group Pagel45 NW 22nd Avenue at Service Rd File Name : TMC-2 NW 22nd Avenue at Service Rd Site Code : 00000000 Start Date : 1/25/2022 Page No : 1 Start Time 07:00 AM 07:15 AM 07:30 AM 07:45 AM Total 08:00 AM 08:15 AM 08:30 AM 08:45 AM Total ** BREAK * ** 04:00 PM 04:15 PM 04:30 PM 04:45 PM Total 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total Grand Total Apprch % Total % Vehicle % Vehicle Trucks % Trucks NW 22nd Avenue So uthbound Groups Prin ted- Vehicle - Trucks NW 22nd Av enue No rthbound Service Rd Westbound Service Rd Eastbound Left Thru Right App. Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 O 0 0 1 O o 0 0 0 0 0 3 o 0 0 5 0 0 0 0 O 0 0 1 0 0 0 1 O 0 0 7 2 0 1 0 31 5 0 1 1 7 0 0 0 10 10 0 0 0 100 0 0 0 12.5 12. 5 0 0 0 9 9 0 0 0 90 90 0 0 0 1 1 O 0 0 10 10 U-Tums 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Left 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Thru 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Right 0 0 0 0 0 0 0 1 1 2 2 0 1 2 5 0 0 0 0 0 App. Total 0 0 0 0 0 0 0 1 1 2 2 0 1 2 5 0 0 0 0 0 O 0 0 7 7 0 0 0 100 0 0 0 8 .8 8.8 0 0 0 7 7 O 0 0 100 100 O 0 O 0 0 0 0 0 U-Tums 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Left 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Thru 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Right 4 2 1 2 9 3 1 5 1 10 3 2 2 1 8 5 3 1 3 12 o 0 0 39 0 0 0 100 O 0 0 48.8 O 0 0 38 38 0 0 0 97 .4 97 .4 0 0 0 1 O 0 0 2.6 App. Total 4 2 1 2 9 3 1 5 1 10 3 2 2 1 8 5 3 1 3 12 39 48 .8 U-Tums 1 2 .6 0 0 0 0 0 0 0 3 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 2 1 3 10 0 2 2 1 5 2 1 2 1 6 App . Total 0 0 2 1 3 4 2 1 3 10 0 2 2 1 5 2 1 2 1 6 0 0 0 24 24 0 0 0 100 0 0 0 30 30 0 0 0 24 24 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 Int. Total 4 2 3 3 12 7 3 7 5 22 7 4 6 4 21 12 4 4 5 25 80 78 97 .5 2 2.5 NW 22nd Av enue at Service Rd File Name : TMC-2 NW 22nd Avenue at Service Rd Site Code : 00000000 Start Date : 1/25/2022 Page No : 2 NW 22nd Avenue Out In Total 38 9 47 1 1 2 38 �I10 4$ 0i O' P 00 00 0 0 9 1 0 0 0 0 0 0 Right Thru Left 10 No rth 1/25/2022 07:00 AM 1/25/2022 05:45 PM Vehicle Trucks I_' Left Thru Right O 0 7 O 0 0 O 0 7 24 7! 31 0 0 0 24 7 31 Out In Total NW 22 nd Avenue 0 r 0 00 0 0. m ls W C.3 0 4,5T P — cn 0 2 N a NW 22nd Avenue at Service Rd File Name : TMC-2 NW 22nd Avenue at Service Rd Site Code : 00000000 Start Date : 1/25/2022 Page No : 3 NW 22nd Ave nue Sou thbo und Start Time U-Tums Left Thru Right App. Total U-Tums NW 22nd Avenue Northbound Left Thru Right Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 0 0 0 0 0 0 0 0 0 08:15 AM 0 0 0 0 0 0 0 0 0 08:30 AM 0 0 0 0 0 0 0 0 1 08:45 AM 0 0 0 0 0 0 0 0 1 1 App. Total Total Vo lume % App. Total PHF 0 0 0 0 0 0 0 0 0 .000 .000 .000 .000 . 000 0 0 1 0 0 0 2 2 0 0 0 100 . 000 . 000 .000 . 500 .500 U-Tums Service Rd We stbo und Left Thru Right App. Total 0 0 0 3 3 0 0 0 1 1 0 0 0 5 5 O 0 0 1 1 O 0 0 10 10 O 0 0 100 .000 .000 . 000 .500 .500 U-Tums Left 0 0 0 0 0 0 0 0 0 0 0 10 10 0 0 0 100 Service Rd Eastbou nd Thr u Right 0 0 0 0 4 2 1 3 App . Total 4 2 1 3 .000 .000 .000 .625 .625 Int . Total 7 3 7 5 22 .786 NW 22nd A venue at Service Rd File Name : TMC-2 NW 22nd Avenue at Service Rd Site Code : 00000000 Start Date : 1/25/2022 Page No : 4 NW 22nd A venue Out In Total 10i L-0 10 cal 0 O 0 0 Right Thru 0 Left Peak Hour Data North Peak Hour Begins at 08:00 AM 1 Vehicle Trucks Left Thru Right 0 0 2 10 2 12 Out In Total NW 22nd Av enue � to NW 22nd Av enue at Service Rd File Name : TMC-2 NW 22nd Avenue at Service Rd Site Code : 00000000 Start Date : 1/25/2022 Page No : 5 NW 22nd A ve nue NW 22nd Av enue So uthbo und No rthbound Start Time U-Tums Left Thru Right App. To ta l U-Tums Left Thru Right Peak Hour Analysis From 04:00 PM to 05:45 PM - Pe ak 1 of 1 Peak Hour for Entire Inte rsection Be gins at 04:15 PM 04:15 PM 0 0 0 0 0 0 0 0 0 04:30 PM 0 0 0 1 1 0 0 0 1 04:45 PM 0 0 0 0 0 0 0 0 2 05:00 PM 0 0_ 0 5_ 5 0 0 0 0 Total Volume 0 0 0 6 6 0 0 0 3 % ' . •. Total 0 0 0 100 0 _ 0 0 100 PHF . 000 . 000 .000 .300 .300] . 000 . 000 .000 .375 App. Total Service Rd Westbound U-Tums Left Thru Right App. Total U-Tums Se rvice Rd Ea stbound Left Thru Right App. Total Int . Total 0 0 0 0 2 2 1 0 0 0 2 2 2 0 0 0 1 1 0 0 0 0 5 5 3 0 0 0 10 10 0 _ 0 0 100 .375 I . 000 . 000 . 000 .500 .500 0 0 0 2 2 0 0 0 2 2 0 0 0 1 1 0 0 0 2 2 0 0 0 7 7 0 0 0 100 .000 .000 .000 .875 .875 4 6 4 12 26 .542 NW 22nd Avenue at Service Rd File Name : TMC-2 NW 22nd Avenue at Service Rd Site Code : 00000000 Start Date : 1/25/2022 Page No : 6 NW 22nd Avenue Out In Total 10 6 16 6 0 0 Right Thru Left Peak Hour Data 0 0 co a 0 0 r- North Pe ak Hour Begins at 04:15 PM Ve hicle Trucks '-1 T r' Left Thru a ht 3 1_7_1 3 Eio Out In T otal NW 22nd Avenue �o 11 2 0 CD o 0 im TRAFFIC IMPACT STUDY Rutland Road and NW 22"d Avenue. Caltran Engineering Group Pagel 46 NW 22nd Avenue at Rutland St File Name : TMC-3 NW 22nd A venue at Rutland St Site Code : 000000 Start Date : 1/25/2022 Page No : 1 Start Time 07:00 AM 07:15 AM 07:30 AM 07:45 AM Total 08:00 AM 08:15 AM 08:30 AM 08:45 AM Total * ** BREAK *** 04:00 PM 04:15 PM 04:30 PM 04:45 PM Total 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total NW 22nd Avenue Southbound U -Turns Left Thru Right App. Total U-Tums 4 5 207 1 217' 0 2 12 222 2 238 0 8 7 266 4 285 0 1 6 258 3 268. 0 15 30 953 10 1008 0 Groups Printed- Vehicle - Trucks NW 22nd Av enue Rutland St Rutland St Northbound Westbo und Eastbound Left Thru Right ' App. Total U-Tums Left Thru Right App. Total U-Tums Left 1 Thru Right App. T otal Int. Total 1 0 132 1 133 0 1 0 5 6 0 163 0 163 0 0 2 7 9 0 175 0 175 0 6 0 4 10 2 177 1 180, 0 7 2 5 14 2 647 2 651 0 14 4 21 39I 0 13 1 9 5 8 212 4 229 0 1 208 2 4 7 184 4 199 0 1 214 2 3 2 191 7 203 0 3 159 0 3 9 274 8 294, 0 2 147 1 15 26 861 23 925 0 7 728 5 0 6 186 1 193 0 1 282 1 0 7 214 0 221 0 1 280 2 0 12 199 0 2111 0 4 276 1 0 9 226 1 236. 0 1 269 2 0 34 825 2 861 0 7 1107 6 0 0 0 0 0 Grand Total 30 Apprch % 0.8 Tota l % 0.4 Vehicle 30 % Vehicle 100 Trucks 0 % Trucks 0 4 15 5 6 30 187 212 191 219 809 2 2 2 6 12 120 3448 47 3. 3 94.6 1. 3 1.6 46 0.6 119 3306 46 99.2 95. 9 97. 9 1 142 1 0.8 4.1 2.1 193 229 198 231 851 0 1 295 0 1 273 0 1 210 0 0 277 0 3 1055 3645 0 0 48. 7 , 0 3501 0 96 0 144 0 4 0 211 217 162 150. 740 284 283 281 272 1120 0 7 4 0 4 2 0 1 0 0 2 0 0 14 6 0 0 0 0 0 2 4 2 2 10 3 0 0 2 5 2 13 4 101 6 7 5 7 17 37' 4 4 2 4 14 9 8 4 8 29 0 296 0 5 0 3 8 1 275 0 1 2 6 9 1 212 0 3 2 1 6 0 277 . 0 2 0 1 3, 2 1060' 0 11 4 11 26 19 3537 15 0.5 99 0.4 0.3 47.2 0.2 19 3408 15 100 96.4 100 0 129 0 0 3.6 0 3571 0 0 47 .7', 0 3442 1 0 96.4 0 129 0 3.6 0 49 37.4 0.7 46 93.9 3 6.1 19 63 14 .5 48.1 0.3 0.8 18 63 94 .7 100 1 0 5.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 131 0 0 1.7 0 127 0 96 .9 0 4 1 0 3.1 0 6 1 1 5 3 4 5 7 19 8 4 9 5 26 0 1 0 3 1 1 0 4 1 2 0 4 0 1 0 1 1 8 0 0 0 0 0 5 2 3 1 11 7 4 3 9 363 414 473 471 23 1721 6 8 6 8 28 13 6 12 6. 37 459 434 378 459 1730 499 518 508 522 2047 9 1 3 13 510 7 1 5 13 526 9 4 3 16 432 8 3 4 15 . 526 33 9 15 57 1994 91 11 43 145 7492 62.8 7.6 29 .7 1.2 0.1 0.6 1 .9 89 11 41 141 7211 97.8 100 95.3 97.2 , 96.2 2 0 2 4 281 2.2 0 4 .7 2.8 3.8 NW 22nd Avenue at Rutland St File Name : TMC-3 NW 22nd Avenue at Rutland St Site Code : 000000 Start Date : 1/25/2022 Page No : 2 03 CV co 0 N N fn V LO C M N 0 as co O a rn d J v NW 22nd Aven ue Out In Total 3501 7061 144 275 3845 335 3560 131 3691 46 1 47 3306 142 149 1 150 3448 Right Thru Left 1 North 1/25/2022 07:00 AM 1/25/2022 05:45 PM Vehicle Trucks Left Thru Right 19 3408 151 0 129 0 19 3537 15 33931 34421 6835 147. 129 276 3540 3571_ 7111 Out In Total NW 22nd Avenue W F. 0 73 N5 o. co o .. NW 22nd A venue at Rutland St File Name : TM C-3 NW 22nd Avenue at Rutland St Site Code : 000000 Start Date : 1/25/2022 Page No : 3 NW 22nd A venue Southbo und Start Time U-Tums Left Thru Right App. Total U -Turns Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Inte rsection Begins at 07:30 AM 07:30 AM 8 7 266 4 285 07:45 AM 1 6 258 3 268 08:00 AM 5 8 212 4 229 08:15 AM 4 7 184 4 199 Total Volume 18 28 920 15 981 App. Total 1. 8 2. 9 93. 8 1.5 PHF . 563 . 875 .865 .938 . 861 NW 22n d Ave nu e No rthbo und Left Thru Right Rutland St Wes tbound App. Total U-Tums Left Th Right Rutland St Eastbound App. Total U-Tums Left Thru Right App . Total Int. Total 0 0 175 0 175 0 6 0 4 10 0 1 1 1 3 473 0 2 177 1 180 0 7 2 5 14 0 5 0 4 9 471 0 1 208 2 211 0 7 4 2 13 0 3 1 2 6 459 o 1 214 2 217 0 4 2 4 10 0 4 0 4 8 434 0 4 774 5 783 0 24 8 15 47 0 13 2 11 26 1837 0 0. 5 98.9 0. 6 0 51. 1 17 31.9 0 50 7.7 42.3 . 000 .500 . 904 . 625 .902 .000 . 857 .500 . 750 .839 .000 .650 .500 .688 .722 .971 NW 22nd Avenue at Rutland St File Name : TMC-3 NW 22nd Avenue at Rutland St Site Code : 000000 Start Date : 1/25/2022 Page No : 4 NW 22nd Aven ue Out In Tota l 1 8021 981 1783 115 9201 46 Right Thru Left Peak Hour Data 0 North Peak Hour Begins at 07:30 AM Ve hicle Trucks 4-1 r' Left Thru Rjght 774 5 F. — 955 I _ 784 ! 17381 Out In Total NW 22nd Avenu e 4 2 m l� 01 m W _a a y 0 NW 22nd Avenue at Rutland St File Name : TMC-3 NW 22nd Avenue at Rutland St Site Code : 000000 Start Date : 1/25/2022 Page No : 5 NW 22nd Avenue Southbo und Start Time U -Turns Left Thru Right NW 22nd Av enue Northbo und App. To tal U-Tums Left Thru Right App. To tal Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Pe ak Hou r for Entire Inte rsection Begins at 04:30 PM 04:30 PM 0 12 199 0 211 0 4 276 1 281 04:45 PM 0 9 226 1 236 0 1 269 2 272 05:00 PM 0 4 187 2 193 0 1 295 0 296 05:15 PM 0 15 212 2 229 0 1 273 1 275 Total Volume 0 40 824 5 869 0 7 1113 4 1124 % App. Total 0 4. 6 94.8 0.6 _ 0 0.6 99 0. 4 PHF . 000 .667 . 912 . 625 .921 .000 .438 .943 .500 . 949 U-Tums Rutland St Westbo und Left Thru Right App. To tal Rutland St Eastbound U-Tums Left Thru Right App. Total Int. Total 0 2 0 2 4 0 2 2 4 8 0 5 0 3 8 0 1 2 6 9 0 10 4 15 29 0 34.5 13. 8 51.7 .000 . 500 . 500 .625 .806 0 9 0 3 0 5 0 1 0 9 1 3 0 7 1 5 0 30 2 12 0 68 .2 4 .5 27 .3 .000 .833 .500 .600 12 6 13 13 44 508 522 510 526 2066 .846 1 .982 NW 22nd Avenue at Rutland St File Name : TMC-3 NW 22nd Avenue at Rutland St Site Code : 000000 Start Date : 1/25/2022 Page No : 6 NW 22nd Avenue Out In Total 11581 L§69 20271 5 824 40 Right Thru Left Peak Hour Data North Peak Ho ur Begins at 04:30 PM V ehicle Trucks Left Thru Right L 11 3 4! [ 846 1 11241 1970 Out In Total NW 22nd Av enue L 73 -+o —1 -2 TRAFFIC IMPACT STUDY APPENDIX Growth Data Caltran Engineering Group PageI47 FLORIDA DEPARTMENT OF TRANSPORTATION TRANSPORTATION STA TISTICS OFFICE 2020 HISTORICAL A ADT REPORT COUN TY: 87 - M IAM I-DADE SITE: 8621 - NW 22 AVE, 200' NORTH OF NW 132 ST (2011 OFF SYSTEM CYCLE) YEAR A ADT DIRECTION 1 DIRECTION 2 *K FA CTOR D FACTOR T FACTOR 2020 19900 C N 10500 S 9400 9. 00 56.00 5.20 2019 20100 T N 10500 S 9600 9.00 56.00 8. 30 2018 20300 S N 10500 S 9800 9.00 54.30 6. 00 2017 23000 F N 12000 S 11000 9.00 55.70 8.50 2016 23000 C N 12000 S 11000 9. 00 56.10 6. 50 2015 17900 T N 9600 S 8300 9.00 57.40 8. 50 2014 18100 S N 9700 S 8400 9.00 59.30 7.50 2013 18300 F N 9800 S 8500 9.00 58. 90 16. 20 2012 18400 C N 9900 S 8500 9. 00 59. 70 16.00 AADT FLA GS: C = COMPUTED; E = MANUAL ESTIMA TE; F = FIRST YEAR ESTIMATE S = SECOND YEA R ESTIMA TE; T = THIRD YEAR ESTI MATE; R = FOURTH YEAR ESTIMATE V = FIFTH YEA R ESTIMATE; 6 = SIXTH YEAR ESTIMATE; X = UNKNOWN *K FACTOR: STARTING W ITH YEAR 2011 IS STANDARDK, PRIOR YEARS ARE K30 VALUES Traffic Tren ds - V03. a FIN# Location 1234 1 County: Station #: Highway: M iami -Dade (87) 0 0 Average Daily Traffic (Vehicles/Day) 25000 20000 15000 10000 5000 0 t I f 2015 2020 =Observed Count Fitted Curve 2025 2030 2035 Year I I Trend R -squared: Compounded Annual Historic Gro wth Rate: Compounded Growth Rate (2019 to Design Year): Printed: 11 .08% 2.20% 0.48 % 3 -Feb -22 Decaying Expo nential Growth Option Year Traff ic (A DT/AADT) Count* Trend** 2015 17900 19800 2016 23000 20600 2017 23000 21000 2018 20300 21300 2019 20100 21600 2032 Op ening Yea Trend 2032 N/A 23100 2033 Mid -Year Trend 2033 N/A 23100 2034 Design Yea Trend 2034 N/A 23200 TRANPLAN Forecasts/Trends *Axle -Adjusted Traffic Trends - V03.a FIN# Location Av erage Daily Traffic (Vehicles/Day) 1234 1 County: Station #: Highway: M iami -Dade (87) 0 0 2015 2020 2025 2030 2035 Trend R -squared: Compounded Annual Historic Growth Rate: Compounded Growth Rate (2019 to Design Year): Printed: 2.57 % 1 .09% 1 .08 % 3 -Feb -22 Ex pon ential Growth Opti on Year Traffic (A DT/AADT) Co unt* Trend** 2015 17900 20300 2016 23000 20500 2017 23000 20800 2018 20300 21000 2019 20100 21200 2032 Opening Year Trend 2032 N/A 24400 2033 Mid -Y ear Trend 2033 N/A 24600 2034 Design Year Trend 2034 N/A 24900 TRANPLAN Forecasts/Trends *Axle -Adjusted Traffic Trends - V03. a FIN# Location 1234 1 Coun ty: Station #: Highway: Miami -Da de (87) 0 0 Av erage Daily Traff ic (Vehicles/Day) 30000 25000 20000 15000 10000 5000 0 =Observed Count 4.Fitted Curve 2015 2020 2025 2030 2035 Yea r " Annual Trend Increase: Trend R -squared: Trend Annual Historic Growth Rate: Trend Growth Rate (2019 to Design Year): Printed: 170 1.54% 0 .85 % 0.82% 3 -Feb -22 Straight Line Growth Option Year Traffic (ADT/AADT) Count* Trend** 2015 2016 2017 2018 2019 17900 23000 23000 20300 20100 20500 20700 20900 21000 21200 2032 Opening Year Trend 2032 N/A 23400 2033 Mid -Year Trend 2033 N/A 23600 2034 Design Year Trend 2034 N/A 23800 TRANPLAN For ecasts/Trends *Axle -Adjusted TRAFFIC IMPACT STUDY APPEINDIX Vistro Reports Caltran Engineering Group Pagel 48 TRAFFIC IMPACT STUDY Signal Timing Caltran Engineering Group PageI63 Print Date: 10/4/2021 Asset 5166 TOD Schedu le Repo rt for 5166: Rutland St&NW 22 Av Print Time: 7:52 PM TOD TOD A ctive Acti ve Intersection Schedu le Op Mode Plan # Cycle Offset Setting PhaseBank Maxim um Rutland St&NW 22 Av DOW -2 TOD [05] POST -AM PEAK 110 0 N/A 2 Max 2 Splits PH1 PH2 P113 PH PH PH PH7 PH8 SBT - WBT - NBT - EBT 0 62 0 34 0 62 0 34 A ctiv e Phase Bank: Phase Walk Don't Walk M in Initial Veh Ex t Max Limit Max 2 Yellow Red Phase Bank 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1- 0- 0- 0 0- 0- 0 0- 0- 0 0 - 0 - 0 0- 0- 0 0- 0- 0 0 0 2 SBT 0 - 7 - 7 0 - 18 - 18 18 - 7 - 7 1 - 1 - 1 32 - 26 - 26 0 - 48 - 48 4 3 3- 0- 0- 0 0- 0- 0 0- 0- 0 0 - 0 - 0 0- 0- 0 0- 0- 0 0 0 4 WBT 0 - 0 - 0 0 - 0 - 0 7 - 7 - 7 2.5 -2. 5 - 2.5 12 - 12 - 12 24 - 24 - 32 4 3 5- 0- 0- 0 0- 0- 0 0- 0- 0 0- 0 - 0 0- 0- 0 0- 0- 0 0 0 6 NBT 0 - 7- 7 0 -18 -18 18- 7 - 7 1 -1 - 1 32- 26- 26 0 -48-48 4 3 7- 0- 0- 0 0- 0- 0 0- 0- 0 0- 0 - 0 0- 0- 0 0- 0- 0 0 0 8 EBT 0 - 7 - 7 0 - 26 - 26 7 - 7 - 7 2.5 -2. 5 - 2.5 12 - 12 - 12 24 - 24 - 32 4 3 T Phase Bank 2 Last In Service Date: unknown Permitt ed Phases 12345678 Default -234-6-8 External Permit 0 External Permit 1 External P ermit 2 P age 1 of 2 Print Date: 10/4/2021 TO D Schedule Report for 5166: Rutland St&N W 22 Av Print Time: 7:52 PM Curre nt Plan Cycle 1 2 - SBT Green Time 6 NBT 7 8 - EBT Ring Offset Offset 3 4 - WBT 5 - TOD Schedule 2 85 0 24 0 47 0 24 0 47 0 0 3 140 0 88 0 38 0 88 0 38 0 42 4 120 0 82 0 24 0 82 0 24 0 0 5 110 0 62 0 34 0 62 0 34 0 0 6 120 0 51 0 55 0 51 0 55 0 0 7 160 0 75 0 7 0 75 0 71 0 0 8 160 0 75 0 71 0 75 0 71 0 152 0 12 9 145 0 91 0 4U U 91 U 40 10 160 0 71 0 75 0 71 0 75 0 152 13 130 0 92 0 24 0 92 0 24 0 0 14 130 0 92 0 24 0 92 0 24 0 0 16 120 0 72 0 34 0 72 0 34 0 28 18 70 0 32 0 24 0 32 0 24 0 0 19 70 0 63 0 0 0 63 0 0 0 0 20 70 0 32 0 24 0 32 0 24 0 0 21 70 0 63 0 0 0 63 0 0 0 0 Current Time of Day Function Time Fun ction 0000 TOD OUTPUTS 0700 TOD OUTPUTS 0930 TOD OUTPUTS 1330 TOD O UTPUTS 1600 TOD OUTPUTS Settin gs * Day of Week 7 1 SuMTWThFS MTWThF 7 1 M TWThF MTWThF -7 1 M TWThF Local TOD Schedule Time 0000 0600 0700 0700 0930 1330 1600 1900 2100 Plan Free 16 9 10 3 7 8 5 Free DOW SuMTWThF S MTWThF Su S MTWThF MTWThF MTWThF MTWThF MTWThF SuMTWThF S Loca l Time of Da y Function Time Function 0000 0700 0930 1330 1600 TOD OUTPUTS TOD OUTPUTS TOD OUTPUTS TOD OUTPUTS TOD OUTPUTS Setti ngs * Day of W eek 7 1 SuMTWThFS MTWThF -7 1 MTWThF MTWThF -7 1 MTWThF No Ca le nda r D efined/Enabled * S etti ngs Blank - FREE - Phase Bank 1, Max 1 Bl ank - Plan - Phase Bank 1, Max 2 1 - Phase Bank 2, Max 1 2 - Phase Bank 2, Max 2 3 - Phase Bank 3, Max 1 4 - Phase Bank 3, Max 2 5 - EXTERNAL PERMIT 1 6 - EXTERNAL PERMIT 2 7 - X-PED O MIT 8 - TBA Page 2 of 2 Print Date: 10/4/2021 Asset 2981 TOD Schedu le Report for 2981: SR- 9&N W 22 Av T OD Intersection Schedule Op Mode SR- 9&NW 22 Av DO W -2 TOD Plan # Splits PH 1 PH 2 PH 3 PH 4 PH 5 PH 6 PH 7 PH 8 NBL SBT EBL WBT SBL NBT WBL EBT 0 0 0 0 0 0 0 0 J`4* -1 ra ÷ nom_.._ o....t. N/A Print Tim e: 3:55 PM TO D Active Active Cycle Offset Settin PhaseBa nk M axim um 0 0 N/A 0 Max 0 ^ M Phase Jy vy Walk Wv Don't Walk M in Initial Veh Ex t Max Limit Max 2 Yello w Red Phase Bank 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 NBL 0 - 0 - 0 0 - 0 - 0 5 - 5 - 5 2 - 2 - 2 16 - 20 - 20 30 - 30 - 30 4 2 2 SBT 7 - 7 - 7 36 - 36 - 36 7 - 7 - 7 1 - 1 - 1 40 - 40 - 40 0 - 50 - 50 4 2 .2 3 EBL 0 - 0 - 0 0 - 0 - 0 5 - 5 - 5 2.5 -2. 5 - 2.5 16 - 15 - 15 22 - 22 - 22 4 .8 2 4 WBT 7 - 7 - 7 32 - 32 - 32 18 - 18 - 18 2.5 -2.5 - 2.5 38 - 35 - 35 50 - 50 - 50 4 .8 2 5 SBL 0 - 0 - 0 0 - 0 - 0 5 - 5 - 5 3.5 - 2 - 2 16 - 20 - 20 30 - 30 - 30 4 2 6 NBT 7 - 7 - 7 36 - 36 - 36 7 - 7 - 7 1 - 1 - 1 40 - 40 - 40 0 - 50 - 50 4 2.2 7 WBL 0 - 0 - 0 0 - 0 - 0 5 - 5 - 5 2.5 -2. 5 - 2. 5 16 - 15 - 15 22 - 22 - 22 4 .8 2 8 EBT 7 - 7 - 7 32 - 32 - 32 18 - 18 - 18 2.5 -2. 5 - 2. 5 38 - 35 - 35 50 - 50 - 50 4.8 2 Gre en Time Curren t 1 2 3 4 5 6 7 8 Plan Ring Offs et Offs et TOD Schedule . ycle NBL SBT EBL WBT SBL NBT WBL EBT 2 145 29 42 15 33 29 42 15 33 0 0 3 140 16 46 15 37 16 46 15 37 0 0 4 150 25 51 15 33 25 51 15 33 0 0 6 140 9 54 14 35 20 43 16 35 0 0 0 7 140 16 46 16 36 16 46 16 36 0 8 160 26 50 14 44 20 56 14 44 0 136 9 145 29 42 15 33 29 42 15 33 0 0 10 160 12 60 15 47 28 44 15 47 0 126 11 140 8 54 14 36 23 39 17 35 0 0 16 120 12 44 12 26 12 44 12 26 0 0 Last In Service Date: unknown Permitted Phases 12345678 Default 12345678 External Permit 0 External Permit 1 External Permit 2 Local TOD Schedule Time Plan DOW 0000 Free Su M T W Th F S 0600 16 M T W Th F 0700 9 Su S 0700 10 M T W Th F 0930 3 M T W Th F 1330 7 M T W Th F 1500 8 M T W Th F 1900 Free M T W Th F Page 1 of 2 Print Date: 10/4/2021 TOD Sche du le R eport for 2981: SR- 9&NW 22 Av Print Time: 3:55 PM Current Time of Day Function Time Function Settings * Day of Week 0000 TOD OUTPUTS SuM T W ThF S Loca l Time of Day Function Time Func tion Settin gs * Day of We ek 0000 TOD OUTPUTS SuM T W ThF S No Cale ndar Defined/Ena bled * Settings Blank - FREE - Phase Bank 1, Max 1 Blank - Plan - Phase Bank 1, Max 2 1 - Phase Bank 2, Max 1 2 - Phase Bank 2, Max 2 3 - Phase Bank 3, Max 1 4 - Phase Bank 3, Max 2 5 - EXTERNAL PERMIT 1 6 - EXTERNAL PER MIT 2 7 - X-PED O MIT 8 - TBA Page 2 of 2 TRAFFIC IMPACT STUDY Scen.ar'io No1.i SR 9 & NW 22nd Avenue Caltran Engineering Group PageI49 TRAFFIC IMPACT STUDY Caltran Engineering Group Pagel 61 Generated with Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Signalized HCM 7th Edition 15 minutes Intersection Level Of Service Report Intersection 1: NW 22 Avenue and SR 9 Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 61.1 E 0.731 Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Approach Northbound Southbound Eastbound Westbound Lane Configuration Iiir ii1r iiih iilir Tuming Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width (ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 0 1 0 0 2 0 0 2 1 Entry Pocket Length [ft] 100.00 100 00 100 00 80.00 100 00 100.00 415.00 100.00 100.00 400.00 100-00 275.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 _ 1 0 0 Exit Pocket Length [ft] 1. 0= 0 00 ,.0 00 0 00 0 00 0 X1() 0 00 0 00 400.00 i' 0r 0 00 0 1 Speed [mph] 30.00 30.00 45.00 45.00 Grade [%] 0.00 0.00 0.00 0.00 Curb Present Yes Yes Yes Yes Crosswalk Yes Yes Yes Yes Generated with Era Version 2022 (SP 0-2) Volumes VISTRO Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Base Volume Input [veh/h] 2 488 354 384 661 44 42 687 6 357 668 123 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 I 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Right Turn on Red Volume [veh/h] 0 0 0 0 Total Hourly Volume [veh/h] 2 488 354 384 661 44 42 687 6 357 668 123 Peak Hour Factor 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 1 126 91 99 170 11 11 177 2 92 172 32 Total Analysis Volume [veh/h] 2 503 365 396 681 45 43 708 6 368 689 127 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] Local Bus Stopping Rate [/h] 0 0 0 0 vdo, Outbound Pedestrian Volume crossing 0 0 0 0 v_di, Inbound Pedestrian Volume crossing m 0 0 0 0 v_co, Outbound Pedestrian Volume crossing 0 0 0 0 v_ci, Inbound Pedestrian Volume crossing mi 0 0 0 0 v_ab, Corner Pedestrian Volume [ped/h] 0 0 0 0 Bicycle Volume [bicycles/h] 0 0 0 0 Generated with COO Version 2022 (SP 0-2) Intersection Settings VISTRO Located in CBD Yes Signal Coordination Group - Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Offset [s] 126.0 Offset Reference Lead Green - Beginning of First Green Permissive Mode SingleBand Lost time [s] 0.00 Phasing 8 Timing Control Type ProtPer Permiss Permiss ProtPer Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal Group 6 1 0 5 2 0 3 8 0 7 4 u Auxiliary Signal Groups Lead / Lag Lead Lead - Lead Lead Minimum Green [s] 5 7 0 5 7 0 5 18 i• 5 18 0 Maximum Green [s] 30 50 0 30 50 0 22 50 0 22 50 0 Amber [s] 4.0 4.0 0.0 4.0 4.0 0.0 4.8 3.0 0.0 4.8 3.0 0.0 All red [s] 2.0 2.2 00 2.0 2.2 00 2.0 2.0 00 2.0 2.0 00 Split [s] 18 49 0 34 66 0 22 54 0 22 54 0. Vehicle Extension [s] 3.0 3.0 0.0 3.0 3.0 0 0 3.0 3.0 0-0 3.0 3.0 0 0 Walk [s] i? 7 7 0 0 7 0 7 Pedestrian Clearance [s] 0 36 (1 0 36 0 32 0 0 32 0 Delayed Vehicle Green [s] 0.0 0.0 0 0 0.0 0.0 0 0 0.0 0.0 0 n 0.0 0.0 t! Rest In Walk No No No No 11, Start -Up Lost Time [s] 2.0 2.0 0.0 2.0 2.0 0 0 2.0 2.0 0.0 2.0 2.0 `: 0 12, Clearance Lost Time [s] 4.0 4.2 0.0 4.0 4.2 0 0 4.8 3.0 0.0 4.8 3.0 0.0 Minimum Recall No No No No No No No No Maximum Recall No No No No No No No No Pedestrian Recall No No No No No No No No Detector Location [ft] 3.0 0.0 0 0 3.0 0 0 3.0 3.0 3.0 3.0 0 c Detector Length [ft] 40.0 0 0 0) 0 40.0 0 0 0 0 40.0 40.0 0 0) 40.0 40.0 n r_ 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Generated with mg Version 2022 (SP 0-2) VISTRO Lane Group Calculations Lane Group L C R L C R L C C L C R C, Cycle Length [s] 160 160 160 160 160 160 160 160 160 160 160 160 L, Total Lost Time per Cycle [s] 6.20 6.20 6.20 6.20 6.20 6.20 6.80 5.00 5.00 6.80 5.00 5.00 11_p, Permitted Start -Up Lost Time [s] 0.00 0 00 0.00 0.00 0 00 0.00 0 00 0 00 0.00 0 00 0.00 12, Clearance Lost Time [s] 0.00 4.20 4.20 0.00 4.20 4.20 4.80 3.00 3.00 4.80 3.00 3.00 g i, Effective Green Time [s] 90 58 58 90 83 83 4 37 37 15 48 48 g / C, Green / Cycle 0.56 0.36 0.36 0.56 0.52 0.52 0.03 0.23 0.23 0.10 0.30 0.30 (v / s)_i Volume / Saturation Flow Rate 0.00 0.16 0.26 0.50 0.21 0.03 0.01 0.21 0.21 0.12 0.22 0.09 s, saturation flow rate [veh/h] 703 3204 1431 788 3204 1431 3113 1683 1678 3113 3204 1431 c, Capacity [veh/h] 370 1158 517 459 1662 742 85 392 391 296 964 430 d1, Uniform Delay [s] 17.00 38.72 43.82 24.55 23.53 19.13 76.77 59.75 59.75 72.40 49.81 42.91 k, delay calibration 0.50 0.50 0.50 0.50 0.50 0.50 0.11 0.22 0.22 0.11 0.11 0.11 I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 0.03 1.19 7.90 18.96 0.75 0.16 4.66 15.03 15.08 116.34 1.00 0.38 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.01 0.43 0.71 0.86 0.41 0.06 0.51 0.91 0.91 1.24 0.71 0.30 d, Delay for Lane Group [s/veh] 17.03 39.91 51.72 43.51 24.28 19.29 81.44 74.78 74.83 188.74 50.82 43.29 Lane Group LOS B D D D C B F E E F D D Critical Lane Group Nr. No Yes Yes No No No No Yes Yes No No 50th -Percentile Queue Length [veh/In] 0.04 7.79 13.62 11.19 8.17 0.89 0.92 15.49 15.46 10.77 12.20 3.88 50th -Percentile Queue Length [ft/In] 0.90 194.86 340.58 279.87 204.20 22.28 23.00 387.32 386.38 269.18 305.05 96.94 95th -Percentile Queue Length [veh/In] 0.07 12.37 19.68 16.68 12.86 1.60 1.66 21.95 21.90 17.44 17.93 6.98 95th -Percentile Queue Length [ft/In] 1.63 309.33 491.91 417.05 321.38 40.11 41.40 548.70 547.57 436.06 448.26 174.49 Generated with Era Version 2022 (SP 0-2) VISTRO d_M, Delay for Movement [s/veh] 17.03 39.91 51.72 43.51 24.28 19.29 81.44 74.81 74.83 188.74 50.82 43.29 Movement LOS B D D D C B F E E F D D d_A, Approach Delay [s/veh] 44.81 30.86 75.18 92.88 Approach LOS D C E F d_I, Intersection Delay [s/veh] 61 15 Intersection LOS E Intersection V/C 0.731 Other Modes g_Walk,mi, Effective Walk Time [s] 11.0 11.0 11.0 11.0 M_comer, Comer Circulation Area [ft2/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft2/pedI 0.00 0.00 0.00 0.00 d p, Pedestrian Delay [s] 69.38 69.38 69.38 69.38 I_p,int, Pedestrian LOS Score for Intersecticn 2.793 2.772 2.935 3.386 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/11 535 748 613 613 d_b, Bicycle Delay [s] 42.92 31.38 38.50 38.50 I_b,int, Bicycle LOS Score for Intersection 2.277 2.485 2.184 2.536 Bicycle LOS B B B B Sequence Ring 1 Ring 2 Ring 3 Ring 4 5 1 3 4 6 2 7 8 111.1111111.1111111.11 111.1111111.1111111, 2 43s MP 39s TRAFFIC IMPACT STUDY PM Caltran Engineering Group PageI62 Generated with Gia Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Signalized HCM 7th Edition 15 minutes Intersection Level Of Service Report Intersection 1: NW 22 Avenue and SR 9 Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 79.6 E 0.935 Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Approach Northbound Southbound Eastbound Westbound Lane Configuration I I i r i i i r "rill* i i i i r Tuming Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 1 0 2 it 0 2 1 Entry Pocket Length [ft] 100.00 100 00 100.00 80.00 100.00 100 00 415.00 100 00 100.00 400.00 )00 00 275.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 1 0 0 Exit Pocket Length [ft] 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 400.00 1, 0 n0 0 0C' Speed [mph] 30.00 30.00 45.00 45.00 Grade [%] 0.00 0.00 0.00 0.00 Curb Present Yes Yes Yes Yes Crosswalk Yes Yes Yes Yes Generated with Ing Version 2022 (SP 0-2) Volumes VISTRO Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Base Volume Input [vehlh] 6 785 678 237 641 54 69 769 4 267 611 210 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Right Turn on Red Volume [veh/h] 0 0 0 0 Total Hourly Volume [veh/h] 6 785 678 237 641 54 69 769 4 267 611 210 Peak Hour Factor 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 209 180 63 170 14 18 205 1 71 163 56 Total Analysis Volume [veh/h] 6 835 721 252 682 57 73 818 4 284 650 223 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] Local Bus Stopping Rate [/h] 0 0 I 0 0 v_do, Outbound Pedestrian Volume crossing 0 0 0 0 v_di, Inbound Pedestrian Volume crossing m 0 0 0 0 v_co, Outbound Pedestrian Volume crossing 0 0 0 0 v_ci, Inbound Pedestrian Volume crossing mi 0 0 0 0 v_ab, Corner Pedestrian Volume [ped/h] 0 0 0 0 Bicycle Volume [bicycles/h] 0 0 0 0 Generated with PTV Version 2022 (SP 0-2) Intersection Settings VISTRO Located in CBD Yes Signal Coordination Group - Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Offset [s] 136.0 Offset Reference Lead Green - Beginning of First Green Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type ProtPer Permiss Permiss ProtPer Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal Group 6 1 5 2 3 8 7 4 Auxiliary Signal Groups Lead / Lag Lead Lead Lead Lead Minimum Green [s] 5 7 0 5 7 (i 5 18 0 5 18 u Maximum Green [s] 30 50 0 30 50 0 22 50 0 22 50 0 Amber [s] 4.0 4.0 0.)i• 4.0 4.0 0.0 4.8 4.8 O.i 4.8 4.8 0.0 All red [s] 2.0 2.2 0C' 2.0 2.2 00 2.0 2.0 0_, 2.0 2.0 0.0 Split [s] 32 62 0 26 56 0 21 52 0 21 52 0 Vehicle Extension [s] 3.0 3.0 0.C• 3.0 3.0 0 L. 3.0 3.0 0.0 3.0 3.0 0.0 Walk [s] 7 0 7 0 7 0 7 0 Pedestrian Clearance [s] 36 0' 36 0 32 0 c 32 0 Delayed Vehicle Green [s] 0.0 0.0 0 !. 0.0 0.0 0 0 0.0 0.0 0.0 0.0 0.0 Rest In Walk No No No No 11, Start -Up Lost Time [s] 2.0 2.0 0.0 2.0 2.0 0 0. 2.0 2.0 0.0 2.0 2.0 0.0 12, Clearance Lost Time [s] 4.0 4.2 0.0 4.0 4.2 0.0 4.8 4.8 0.0 4.8 4.8 0.0 Minimum Recall No No No No No No No No Maximum Recall No No No No No No No No Pedestrian Recall No No No No No No No No Detector Location [ft] 3.0 0.0 3.0 0.0 3.0 3.0 0.0 3.0 3.0 0.0 Detector Length [ft] 40.0 `' 0 40.0 0 n 0 40.0 40.0 0 n 40.0 40.0 0 0 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Generated with MI Version 2022 (SP 0-2) VISTRO Lane Group Calculations Lane Group L C R L C R L C C L C R C, Cycle Length [s] 161 161 161 161 161 161 161 161 161 161 161 161 L, Total Lost Time per Cycle [s] 6.20 6.20 6.20 6.20 6.20 6.20 6.80 6.80 6.80 6.80 6.80 6.80 11_p, Permitted Start -Up Lost Time [s] 0.00 0.00 0.00 000 0.00 000 000 0.00 0 00 0 00 12, Clearance Lost Time [s] 0.00 4.20 4.20 0.00 4.20 4.20 4.80 4.80 4.80 4.80 4.80 4.80 g i, Effective Green Time [s] 84 61 61 84 77 77 6 42 42 14 50 50 g / C, Green / Cycle 0.52 0.38 0.38 0.52 0.48 0.48 0.04 0.26 0.26 0.09 0.31 0.31 (v / s)_i Volume / Saturation Flow Rate 0.01 0.26 0.50 0.40 0.21 0.04 0.02 0.24 0.24 0.09 0.20 0.16 s, saturation flow rate [veh/h] 708 3204 1431 626 3204 1431 3113 1683 1680 3113 3204 1431 c, Capacity [veh/h] 339 1213 541 326 1527 682 110 438 438 275 1004 448 dl, Uniform Delay [s] 20.23 42.05 50.03 32.47 28.04 22.99 76.73 58.27 58.27 73.40 47.60 44.95 k, delay calibration 0.50 0.50 0.50 0.50 0.50 0.50 0.11 0.28 0.28 0.11 0.11 0.11 I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 0.10 3.21 161.57 16.28 0.95 0.24 6.76 20.19 20.21 34.58 0.71 0.85 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.02 0.69 1.33 0.77 0.45 0.08 0.67 0.94 0.94 1.03 0.65 0.50 d, Delay for Lane Group [s/veh] 20.33 45.26 211.60 48.75 28.98 23.23 83.49 78.45 78.48 107.98 48.31 45.81 Lane Group LOS C D F D C C F E E F D D Critical Lane Group NC. No Yes Yes No No No No Yes Yes No No 50th -Percentile Queue Length [veh/In] 0.12 14.60 45.99 7.00 9.08 1.26 1.58 18.52 18.49 6.92 11.16 7.27 50th -Percentile Queue Length [ft/ln] 3.01 364.88 1149.63 175.01 227.10 31.57 39.57 463.08 462.37 173.02 279.00 181.85 95th -Percentile Queue Length [veh/In] 0.22 20.86 68.04 11.34 14.03 2.27 2.85 25.58 25.55 11.37 16.64 11.70 95th -Percentile Queue Length [ft/In] 5.42 521.52 1701.06 283.49 350.68 56.83 71.22 639.54 638.70 284.37 415.97 292.43 Generated with Mg Version 2022 (SP 0-2) VISTRO Movement. Aaaroach. & Intersection Results d_M, Delay for Movement [s/veh] 20.33 45.26 211.60 48.75 28.98 23.23 83.49 78.47 78.48 107.98 48.31 45.81 Movement LOS C D F D C C F E E F D D d_A, Approach Delay [s/veh] 121.95 33.68 78.88 62.47 Approach LOS F C E E d_I, Intersection Delay [s/veh] 79 64 Intersection LOS E Intersection V/C 0.935 Other Modes g_Walk,mi, Effective Walk Time [s] 11.0 11.0 11.0 11.0 M_comer, Comer Circulation Area [ft2/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft2/ped I 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 69.88 69.88 69.88 69.88 I_p,int, Pedestrian LOS Score for Intersecticn 2.892 2.825 2.962 3.378 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/1 693 619 561 561 d_b, Bicycle Delay [s] 34.37 38.40 41.64 41.64 I_b,int, Bicycle LOS Score for Intersection 2.848 2.377 2.298 2.514 Bicycle LOS C B B B Sequence Ring 1 5 1 3 4 Ring 2 Ring 3 Ring 4 6 2 7 8 =EA 43111WIIMIH AMMIMI--11 111.)B 39s TRAFFIC IMPACT STUDY Scenario No .J 1 NW 22nd Avenue & Service Road Caltran Engineering Group Pagel 50 TRAFFIC IMPACT STUDY AM Caltran Engineering Group PageI61 Generated with GEZI Version 2022 (SP 0-2) Control Type: Analysis Method: Analysis Period: Intersection Setup VISTRO Intersection Level Of Service Report Intersection 3: NW 22 Avenue and Service Road Two-way stop HCM 7th Edition 15 minutes Delay (sec / veh): 13.7 Level Of Service: B Volume to Capacity (v/c): 0.024 Name NW 22 Avenue NW 22 Avenue Service Road Service Road Approach Northbound Southbound Eastbound Westbound Lane Configuration Itir 1 r r Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 1 12.00 12 00 12.00 12.00 12.00 1200 12.00 No. of Lanes in Entry Pocket 1 0 1 0 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 60.00 1000 95.00 100 00 100.00 100 00 100 00 100.00 100.00 100.00 100.00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0.00 0.00 0 01 0.00 0 00 0.00 0.00 0.00 0.00 0 00 0.00 Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name NW 22 Avenue NW 22 Avenue Service Road Service Road Base Volume Input [veh/h] 0 834 0 0 1024 0 0 10 10 Base Volume Adjustment Factor ' .0000 1.0000 1.0000 1.0000 1.0000 1.0000 1 .0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1 0000 1 0000 1.0000 In -Process Volume [veh/h] 0 0 0 (1 0 0 1 ( 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 ( 0 1) 0 Diverted Trips [veh/h] 0 0 0 0 0 0 (1 0 0 0 0 Pass -by Trips [veh/h] (1 0 0 (1 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 ( u 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 f 0 0 0 0 Total Hourly Volume [veh/h] 0 834 0 0 1024 0 10 10 Peak Hour Factor 0000 0.9710 0.9710 1 0000 0.9710 0.9710 1.0000 1.0000 0.9710 1.0000 1.0000 0.9710 Other Adjustment Factor 1 0000 1.0000 1.0000 1 0000 1.0000 1.0000 ' .0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 215 0 0 264 0 0 0 3 0 ( 3 Total Analysis Volume [veh/h] 859 0 1055 0 0 r 10 10 Pedestrian Volume [ped/h] 0 0 Generated with Mg Version 2022 (SP 0-2) Intersection Settings Priority Scheme Free Free Stop Stop Flared Lane Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u 0 0 0 VISTRO + A roach k Intersection Results V/C, Movement V/C Ratio 0 0C 0,01 0.00 0.00 0.01 0.00 0.00 0.00 0.02 0.00 0.00 0.02 d_M, Delay for Movement [s/veh] Q0 0 00 0.00 0.00 0.00 0.00 0.00 0.00 13.69 0.00 0.00 12.49 Movement LOS A A A A B B 95th -Percentile Queue Length [veh/In] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.07 0.00 0.00 0.06 95th -Percentile Queue Length [ft/In] 0 0C' 0.00 0 00 C,11:, 0.00 0 00 0 00 0.00 1.81 0 00 0.00 1.56 d_A, Approach Delay [s/veh] 0.00 0.00 13.69 12.49 Approach LOS A A B B d_l, Intersection Delay [s/veh] 0.14 Intersection LOS B TRAFFIC IMPACT STUDY Caltran Engineering Group Pagel 62 Generated with g Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 3: NW 22 Avenue and NW Servic - Road Two-way stop Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c): 17.9 C 0.038 Name NW 22 Avenue NW 22 Avenue Service Road Service Road Approach Northbound Southbound Eastbound Westbound Lane Configuration 111r IF' r r Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.0u 12.00 12.00 12 00 12.00 12.00 12.00 12 00 12.00 12 0r 0 12.00 No. of Lanes in Entry Pocket 1 0 1 0 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 60.00 100.00 95.00 100 00 100 0: "00 100 00 100 00 100 100.00 100 0 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 00 0 00 0.00 0 00 0-00 0 00 0 00 0 :! 0 00 0 r it Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name NW 22 Avenue NW 22 Avenue Service Road Service Road Base Volume Input [veh/h] 0 1469 0 0 912 6 0 7 0 10 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1 0000 1.0000 1.0000 1 0000 1.0000 1.0000 1 0000 1 0000 1.0000 1 0000 1 0000 1.0000 In -Process Volume [veh/h] G 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] ( 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 C 0 Pass -by Trips [veh/h] .. 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 1469 0 912 6 0 7 0 0 10 Peak Hour Factor 1 0000 0.9400 0.9400 1.0000 0.9400 0.9400 1.0000 1.0000 0.9400 1.0000 1.0000 0.9400 Other Adjustment Factor 1 0000 1.0000 1.0000 1 0000 1.0000 1.0000 1 0000 1.0000 1.0000 1 0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 391 0 0 243 2 0 0 2 0 0 3 Total Analysis Volume [veh/h] 1563 0 0 970 6 0 0 7 0 0 11 Pedestrian Volume [ped/h] 0 0 0 Generated with GE Version 2022 (SP 0-2) Intersection Settings VISTRO Priority Scheme Free Free Stop Stop Flared Lane Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median 0 Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.02 0.00 0.00 0.0 1 0.00 0.00 0 00 0.02 0 00 0.00 0.04 d_M, Delay for Movement [s/veh] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.13 0.00 0.00 17.93 Movement LOS A A A A B C 95th -Percentile Queue Length [veh/In] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.00 0.00 0.12 95th -Percentile Queue Length [ft/In] 0 00 0.00 0 00 0 00 0.00 0.00 0 00 0 00 1.18 0 00 0 00 2.95 d_A, Approach Delay [s/veh] 0.00 0.00 13.13 17.93 Approach LOS A A B C d I, Intersection Delay [s/veh] 0.11 Intersection LOS C TRAFFIC IMPACT STUDY Scenaro Nio.. 1 NW 22"d Avenue & Rutland Street Caltran Engineering Group Pagel51 TRAFFIC IMPACT STUDY AM Caltran Engineering Group PageI61 Generated with rag Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: NW 22 Avenue & Rutland Street Signalized HCM 7th Edition 15 minutes Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 5.8 A 0.334 Name NW 22 Avenue NW 22 Avenue Rutland Avenue Rutland Avenue Approach Northbound Southbound Eastbound Westbound Lane Configuration 1 1 1 11 1 4"1 r 1 Tuming Movement Left Thru Right U-tu Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 0 1 0 0 0 0 0 1 0 0 0 Entry Pocket Length [ft] 55.00 100.00 100.00 60.00 100.0 100 0 100 0 100.00 100.00 50.00 100.00 100.00 100 00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 00 0 0U 0 00 i 0 ('0 0 00 C 00 0 00 0 0U 0 00 0 00 0 00 0 00 Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Curb Present Yes Yes Yes Yes Crosswalk Yes No Yes Yes Generated with Mg Version 2022 (SP 0-2) Volumes VISTRO Name NW 22 Avenue NW 22 Avenue Rutland Avenue Rutland Avenue Base Volume Input [veh/h] 4 744 5 18 28 920 15 13 2 11 24 8 15 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.000 1.000 1.000 1.000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.000 1.000 1.000 1.000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Right Turn on Red Volume [veh/h] 0 0 0 0 Total Hourly Volume [veh/h] 4 744 5 18 28 920 15 13 2 11 24 8 15 Peak Hour Factor 0.9710 0.9710 0.9710 0.971 0.971 0.971 0.971 0.9710 0.9710 0.9710 0.9710 0.9710 0.9710 Other Adjustment Factor 1.0000 1.0000 1.0000 1.000 1.000 1.000 1.000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 1 192 1 5 7 237 4 3 1 3 6 2 4 Total Analysis Volume [veh/h] 4 766 5 19 29 947 15 13 2 11 25 8 15 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] 0 G L Local Bus Stopping Rate [/h] 0 0 0 0 0 0 0 0 v_do, Outbound Pedestrian Volume crossing 0 0 0 0 v_di, Inbound Pedestrian Volume crossing m 0 0 0 v_co, Outbound Pedestrian Volume crossing 0 0 0 0 v_ci, Inbound Pedestrian Volume crossing mi 0 0 0 0 vab, Corner Pedestrian Volume [ped/h] 0 0 0 0 Bicycle Volume [bicycles/h] 0 0 0 0 Generated with CM Version 2022 (SP 0-2) Intersection Settings VISTRO Located in CBD Yes Signal Coordination Group - Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Offset [s] 152.0 Offset Reference Lead Green - Beginning of First Green Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type Permiss Permiss Permiss Permi Permi Permi Permi Permiss Permiss Permiss Permiss Permiss Permiss Signal Group 6 2 8 4 Auxiliary Signal Groups Lead / Lag Minimum Green [s] 1 18 0 0 18 7 7 Maximum Green [s] 0 48 0 0 0 48 0 0 24 0 0 24 0 Amber [s] 0.0 4.0 0.0 0.0 0.0 4.0 0.0 0.0 4.0 0.0 0.0 4.0 0.0 All red [s] 0 0 3.0 0.0 0.0 0.0 3.0 0 0 0 ' 3.0 0.0 0.0 3.0 0.0 Split [s] 0 78 0 0 0 78 0 0 82 0 0 82 0 Vehicle Extension [s] 0' 3.0 0.0 0.0 0 0 3.0 0.0 0.0 3.0 0.0 0.0 3.0 0.0 Walk [s] 0 7 0 0 0 7 0 C 26 0 0 7 0 Pedestrian Clearance [s] C 18 f; 0 18 C 10 0 0 10 0 Delayed Vehicle Green [s] 0 " 0.0 0.0 0.0 0.0 0 0 '. n' 0.0 0 r Rest In Walk No No No No 11, Start -Up Lost Time [s] 0.0 2.0 0.0 0.0 2.0 0.0 0 0 2.0 0.0 0.0 2.0 0 0 12, Clearance Lost Time [s] 0.0 5.0 0.0 0.0 5.0 0.0 0 . 5.0 0.0 0.0 5.0 Minimum Recall No No No No Maximum Recall No No No No Pedestrian Recall No No No No Detector Location [ft] 0 0.0 0.0 0.0 0.0 0 0 2.0 0.0 0 0 2.0 Detector Length [ft] n0 nn 00 0n n 40.0 0 0 40.0 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Generated with Version 2022 (SP 0-2) VISTRO Lane Group Calculations Lane Group L C C L C C C R C C, Cycle Length [s] 160 160 160 160 160 160 160 160 160 L, Total Lost Time per Cycle [s] 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 11_p, Permitted Start -Up Lost Time [s] 2.00 0 00 0 00 2.00 0 00 0 00 2.00 0 0C 2.00 12, Clearance Lost Time [s] 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 g_i, Effective Green Time [s] 137 137 137 137 137 137 9 9 9 g / C, Green / Cycle 0.86 0.86 0.86 0.86 0.86 0.86 0.06 0.06 0.06 (v / s)_i Volume / Saturation Flow Rate 0.01 0.23 0.23 0.08 0.29 0.29 0.01 0.01 0.05 s, saturation flow rate [veh/h] 525 1683 1679 628 1683 1674 1147 1431 1010 c, Capacity [veh/h] 460 1444 1441 551 1444 1436 105 78 89 d1, Uniform Delay [s] 3.55 2.10 2.10 3.30 2.26 2.26 72.34 72.06 75.62 k, delay calibration 0.50 0.50 0.50 0.50 0.50 0.50 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 0.03 0.45 0.46 0.31 0.62 0.63 0.62 0.81 4.93 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.01 0.27 0.27 0.09 0.33 0.33 0.14 0.14 0.54 d, Delay for Lane Group [s/veh] 3.58 2.55 2.55 3.61 2.89 2.89 72.96 72.87 80.55 Lane Group LOS A A A A A A E E F Critical Lane Group No No No No No Yes No No Yes 50th -Percentile Queue Length [veh/In] 0.03 1.91 1.91 0.35 2.58 2.57 0.61 0.45 2.10 50th -Percentile Queue Length [ft/In] 0.76 47.78 47.69 8.75 64.62 64.30 15.30 11.28 52.49 95th -Percentile Queue Length [veh/In] 0.05 3.44 3.43 0.63 4.65 4.63 1.10 0.81 3.78 95th -Percentile Queue Length [ft/In] 1.37 86.00 85.84 15.74 116.31 115.74 27.54 20.31 94.49 Generated with MEI Version 2022 (SP 0-2) VISTRO d_M, Delay for Movement [s/veh] 3.58 2.55 2.55 3.61 3.61 2.89 2.89 72.96 72.96 72.87 80.55 80.55 80.55 Movement LOS A A A A A A A E E E F F F d_A, Approach Delay [s/veh] 2.56 2.92 72.92 80.55 Approach LOS A A E F d_I, Intersection Delay [s/veh] 5.75 Intersection LOS A Intersection V/C 0.334 er moaes g_Walk,mi, Effective Walk Time [s] 30.0 0.G 11.0 11.0 M_comer, Comer Circulation Area [ft2/ped: 0.00 0 00 0.00 0.00 M_CW, Crosswalk Circulation Area [Wiped' 0.00 0 00 0.00 0.00 d p, Pedestrian Delay [s] 52.81 0 00 69.38 69.38 I_p,int, Pedestrian LOS Score for Intersecticn 2.695 0 000 1.990 1.851 Crosswalk LOS B F A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/F] 888 888 938 938 d_b, Bicycle Delay [s] 24.75 24.75 22.58 22.58 l_b,int, Bicycle LOS Score for Intersection 2.199 2.369 1.603 1.639 Bicycle LOS B B A A Sequence Ring 1 Ring 2 Ring 3 2 4 6 8 Ring 4 12 25s 1111)6 25s TRAFFIC IMPACT STUDY PM Caltran Engineering Group PageI62 Generated with 1121 Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: NW 22 Avenue & Rutlarri Street Signalized HCM 7th Edition 15 minutes Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 5.3 A 0.384 Name NW 22 Avenue NW 22 Avenue Rutland Street Rutland Street Approach Northbound Southbound Eastbound Westbound Lane Configuration 11 F 1 1 1� 1 r Tuming Movement Left Thru Right U-tu Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 0 1 0 0 0 0 0 1 0 0 Entry Pocket Length [ft] 55.00 100.00 100 00 60.00 100 0 100.0 100.0 100 00 100.00 50.00 100.00 1 00.00 100 00 No. of Lanes in Exit Pocket 0 2 0 0 0 0 0 0 0 0 0 C' 0 Exit Pocket Length [ft] 0 00 0 00 0 00 0 00 0 0(1 (; 00 n ou 0 00 n 00 Ci 00 :100 0 00 0 00 Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Curb Present Yes Yes Yes Yes Crosswalk Yes No Yes Yes Generated with mg Version 2022 (SP 0-2) Volumes VISTRO Name NW 22 Avenue NW 22 Avenue Rutland Street Rutland Street Base Volume Input [veh/h] 7 1113 4 0 40 824 5 30 2 12 10 4 15 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.000 1.000 1.000 1.000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.000 1.000 1.000 1.000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Right Turn on Red Volume [veh/h] 0 r 0 0 0 0 Total Hourly Volume [veh/h] 7 1113 4 0 40 824 5 30 2 12 10 4 15 Peak Hour Factor 0.9800 0.9800 0.9800 0.980 0.980 0.980 0.980 0.9800 0.9800 0.9800 0.9800 0.9800 0.9800 Other Adjustment Factor 1.0000 1.0000 1.0000 1.000 1.000 1.000 1.000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 284 1 0 10 210 1 8 1 3 3 1 4 Total Analysis Volume [veh/h] 7 1136 4 0 41 841 5 31 2 12 10 4 15 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] C C. 0 Local Bus Stopping Rate [/h] 0 0 0 0 0 0 0 0 v_do, Outbound Pedestrian Volume crossin ! 0 ( 0 v_di, Inbound Pedestrian Volume crossing 0 0 C v_co, Outbound Pedestrian Volume crossin ' 0 0 0 0 v_ci, Inbound Pedestrian Volume crossing i 0 0 0 0 v_ab, Corner Pedestrian Volume [ped/h] 0 0 0 0 Bicycle Volume [bicycles/h] 0 0 0 0 Generated with Ege Version 2022 (SP 0-2) Intersection Settings VISTRO Located in CBD Yes Signal Coordination Group - Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Offset [s] 152.0 Offset Reference Lead Green - Beginning of First Green Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timin Control Type Permiss Permiss Permiss Permi Permi Permi Permi Permiss Permiss Permiss Permiss Permiss Permiss Signal Group 6 0 2 8 4 Auxiliary Signal Groups Lead / Lag Minimum Green [s] 0 18 0 0 18 0 7 7 Maximum Green [s] 0 48 0 0 0 48 0 0 24 C 0 24 0 Amber [s] 0.( 4.0 0 (` 0.0 0.0 4.0 0.0 0.0 4.0 0_C 0.0 4.0 0.0 All red [s] 00 3.0 0( 0.0 0.0 3.0 0.0 0! 3.0 0C 0.0 3.0 0.0 Split [s] 0 82 0 0 0 82 0 78 0 0 78 0 Vehicle Extension [s] 0 0 3.0 0.0 0.0 0.0 3.0 0.0 0.r 3.0 0.0 0. - 3.0 0 Walk [s] 7 _ 0 0 7 0 26 0 0 7 Pedestrian Clearance [s] 18 ( 0 0 18 ) 10 0 0 10 0 Delayed Vehicle Green [s] 0 i 0.0 0 0.0 , 0 0.0 ' 0 0 0.0 " 0.0 n r-' Rest In Walk No No No No 11 , Start -Up Lost Time [s] 0.0 2.0 0.0 0.0 0.0 2.0 0.0 0.0 2.0 0.0 0.0 2.0 0.0 12, Clearance Lost Time [s] 0.0 5.0 0.0 0 0 0.0 5.0 0.0 0.0 5.0 0.0 0.0 5.0 0.0 Minimum Recall No No No No Maximum Recall No No No No Pedestrian Recall No No No No Detector Location [ft] i 1 0.0 0.0 0.0 0 0 0.0 2.0 0.0 0.0 2.0 0.0 Detector Length [ft] '" - n 0 " n c n 40.0 C n 0 0 40.0 0 0 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group Pedestrian Walk [s] Pedestrian Clearance [s] 0 0 0 Generated with mg Version 2022 (SP 0-2) VISTRO Lane Group Calculations Lane Group L C C L C C C R C C, Cycle Length [s] 160 160 160 160 160 160 160 160 160 L, Total Lost Time per Cycle [s] 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 11_p, Permitted Start -Up Lost Time [s] 2.00 0 00 0 00 2.00 0 00 '1 00 2.00 i C}c 2.00 12, Clearance Lost Time [s] 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 g_i, Effective Green Time [s] 140 140 140 140 140 140 6 6 6 g / C, Green / Cycle 0.87 0.87 0.87 0.87 0.87 0.87 0.04 0.04 0.04 (v / s)_i Volume / Saturation Flow Rate 0.01 0.34 0.34 0.09 0.25 0.25 0.03 0.01 0.05 s, saturation flow rate [veh/h] 586 1683 1681 444 1683 1679 1255 1431 638 c, Capacity [veh/h] 521 1471 1469 396 1471 1468 92 55 55 d1, Uniform Delay [s] 2.83 1.92 1.92 3.91 1.70 1.70 75.91 74.57 76.87 k, delay calibration 0.50 0.50 0.50 0.50 0.50 0.50 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 0.05 0.77 0.77 0.53 0.49 0.50 2.34 1.94 7.65 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.01 0.39 0.39 0.10 0.29 0.29 0.36 0.22 0.53 d, Delay for Lane Group [s/veh] 2.88 2.70 2.70 4.43 2.19 2.20 78.25 76.51 84.52 Lane Group LOS A A A A A A E E F Critical Lane Group No No Yes No No No No No Yes 50th -Percentile Queue Length [veh/In] 0.05 2.65 2.65 0.35 1.73 1.73 1.41 0.51 1.32 50th -Percentile Queue Length [ft/In] 1.13 66.21 66.14 8.73 43.29 43.21 35.27 12.80 33.12 95th -Percentile Queue Length [veh/In] 0.08 4.77 4.76 0.63 3.12 3.11 2.54 0.92 2.38 95th -Percentile Queue Length [ft/In] 2.03 119.17 119.05 15.72 77.92 77.78 63.48 23.05 59.61 Generated with MI Version 2022 (SP 0-2) V I STRO nlvY aUI lol , /+MMlvu�.l ll r •I lwl�vv�.v., ..aa..r.w d_M, Delay for Movement [s/veh] 2.88 2.70 2.70 4.43 4.43 2.19 2.20 78.25 78.25 76.51 84.52 84.52 84.52 Movement LOS A A A A A A A E E E F F F d_A, Approach Delay [s/veh] 2.70 2.30 77.79 84.52 Approach LOS A A E F d_I, Intersection Delay [s/veh] 5.26 Intersection LOS A Intersection V/C 0.384 Other Modes g_Walk,mi, Effective Walk Time [s] 30.0 0 r, 11.0 11.0 M_comer, Comer Circulation Area [Wiped: 0.00 0 00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft2/ped 0.00 ( '!( 0.00 0.00 d_p, Pedestrian Delay [s] 52.81 0.00 69.38 69.38 I_p,int, Pedestrian LOS Score for Intersecticn 2.722 0 000 1.997 1.838 Crosswalk LOS B F A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 938 938 888 888 d_b, Bicycle Delay [s] 22.58 22.58 24.75 24.75 I_b,int, Bicycle LOS Score for Intersection 2.506 2.258 1.634 1.607 Bicycle LOS B B A A Sequence Ring 1 Ring 2 2 4 6 8 Ring 3 Ring 4 IW 25s 1 _6 25s TRAFFIC IMPACT STUDY Sc;enair'io N.o.2 SR 9 & NW 22nd Avenue Caltran Engineering Group PageI52 TRAFFIC IMPACT STUDY AM Caltran Engineering Group PageI61 Generated with Mg Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 1: NW 22 Avenue and SR 9 Signalized Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c): 64.8 E 0.764 Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Approach Northbound Southbound Eastbound Westbound Lane Configuration iiir iiir iiiih iiiir Tuming Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 1 0 2 0 2 1 Entry Pocket Length [ft] 100.00 100 00 100 X00 80.00 1 00.00 100.00 415.00 100 00 100 00 400.00 100 00 275.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 1 0 0 Exit Pocket Length [ft] 0 00 0 00 0.00 0 00 0 00 0 00 0.00 0 0 . 400.00 0 00 0 00 0 00 Speed [mph] 30.00 30.00 45.00 45.00 Grade [%] 0.00 0.00 0.00 0.00 Curb Present Yes Yes Yes Yes Crosswalk Yes Yes Yes Yes Generated with mg Version 2022 (SP 0-2) Volumes VISTRO Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Base Volume Input [veh/h] 2 488 354 384 661 44 42 687 6 357 668 123 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Right Turn on Red Volume [veh/h] 0 0 0 0 Total Hourly Volume [veh/h] 2 508 368 399 687 46 44 714 6 371 695 128 Peak Hour Factor 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 1 131 95 103 177 12 11 184 2 96 179 33 Total Analysis Volume [veh/h] 2 524 379 411 708 47 45 736 6 382 716 132 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] Local Bus Stopping Rate [/h] 0 0 0 0 v_do, Outbound Pedestrian Volume crossin p 0 0 0 0 v_di, Inbound Pedestrian Volume crossing 0 0 0 0 v_co, Outbound Pedestrian Volume crossinl 0 0 0 0 v_ci, Inbound Pedestrian Volume crossing i 0 0 0 0 v_ab, Corner Pedestrian Volume [ped/h] 0 0 0 0 Bicycle Volume [bicycles/h] 0 0 0 0 Generated with ME Version 2022 (SP 0-2) Intersection Settings VISTRO Located in CBD Yes Signal Coordination Group - Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Offset [s] 126.0 Offset Reference Lead Green - Beginning of First Green Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type ProtPer Permiss Permiss ProtPer Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal Group 6 1 5 2 3 8 7 4 Auxiliary Signal Groups Lead / Lag Lead Lead Lead Lead - Minimum Green [s] 5 7 c 5 7 0 5 18 0 5 18 0 Maximum Green [s] 30 50 0 30 50 0 22 50 0 22 50 0 Amber [s] 4.0 4.0 0.0 4.0 4.0 0.:: 4.8 3.0 0.0 4.8 3.0 0.0 All red [s] 2.0 2.2 0 2.0 2.2 0 .` 2.0 2.0 00 2.0 2.0 0.0 Split [s] 18 49 0 34 66 0 22 54 0 22 54 0 Vehicle Extension [s] 3.0 3.0 0.0 3.0 3.0 0 ( 3.0 3.0 0.0 3.0 3.0 0.0 Walk [s] 7 0 7 0 7 0 7 0 Pedestrian Clearance [s] 36 0 36 (1 32 0 32 0 Delayed Vehicle Green [s] 0.0 0.0 0 ' 0.0 0.0 0 " 0.0 0.0 0 1' 0.0 0.0 0.0 Rest In Walk No No No No 11, Start -Up Lost Time [s] 2.0 2.0 0 • 2.0 2.0 0J' 2.0 2.0 0.0 2.0 2.0 0.0 12, Clearance Lost Time [s] 4.0 4.2 0 4.0 4.2 0 (. 4.8 3.0 0 0 4.8 3.0 0.0 Minimum Recall No No No No No No No No Maximum Recall No No No No No No No No Pedestrian Recall No No No No No No No No Detector Location [ft] 3.0 3.0 3.0 3.0 3.0 3.0 Detector Length [ft] 40.0 40.0 40.0 40.0 40.0 40.0 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Generated with Ma Version 2022 (SP 0-2) VISTRO Lane Group Calculations Lane Group L C R L C R L C C L C R C, Cycle Length [s] 160 160 160 160 160 160 160 160 160 160 160 160 L, Total Lost Time per Cycle [s] 6.20 6.20 6.20 6.20 6.20 6.20 6.80 5.00 5.00 6.80 5.00 5.00 11_p, Permitted Start -Up Lost Time [s] 0.00 0 00 0 00 0.00 0 00 0 00 0 00 0 00 0-0u 0.00 0.00 0 00 12, Clearance Lost Time [s] 0.00 4.20 4.20 0.00 4.20 4.20 4.80 3.00 3.00 4.80 3.00 3.00 g_i, Effective Green Time [s] 88 55 55 88 82 82 4 39 39 15 49 49 g / C, Green / Cycle 0.55 0.34 0.34 0.55 0.51 0.51 0.03 0.24 0.24 0.10 0.31 0.31 (v / s)_i Volume / Saturation Flow Rate 0.00 0.16 0.26 0.52 0.22 0.03 0.01 0.22 0.22 0.12 0.22 0.09 s, saturation flow rate [veh/h] 687 3204 1431 791 3204 1431 3113 1683 1678 3113 3204 1431 c, Capacity [veh/h] 352 1104 493 455 1636 730 86 406 405 296 989 442 d1, Uniform Delay [s] 17.78 41.09 46.76 26.39 24.60 19.82 76.76 59.11 59.11 72.40 49.23 42.12 k, delay calibration 0.50 0.50 0.50 0.50 0.50 0.50 0.11 0.24 0.24 0.11 0.11 0.11 I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 0.03 1.46 10.99 23.82 0.84 0.17 4.89 16.05 16.10 136.90 1.02 0.38 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.01 0.47 0.77 0.90 0.43 0.06 0.52 0.92 0.92 1.29 0.72 0.30 d, Delay for Lane Group [s/veh] 17.81 42.55 57.75 50.20 25.44 19.99 81.66 75.15 75.20 209.30 50.26 42.50 Lane Group LOS B D E D C B F E E F D D Critical Lane Group No No Yes Yes No No No No Yes Yes No No 50th -Percentile Queue Length [veh/In] 0.04 8.44 15.03 12.44 8.76 0.95 0.96 16.19 16.15 11.61 12.66 3.99 50th -Percentile Queue Length [ft/In] 0.93 211.04 375.78 310.99 218.95 23.77 24.10 404.70 403.74 290.29 316.42 99.85 - 95th -Percentile Queue Length [veh/In] 0.07 13.21 21.39 18.22 13.61 1.71 1.74 22.79 22.74 18.79 18.49 7.19 95th -Percentile Queue Length [ft/In] 1.67 330.16 534.74 455.60 340.28 42.78 43.38 569.67 568.50 469.87 462.28 179.74 Generated with mig Version 2022 (SP 0-2) VISTRO Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh] 17.81 42.55 57.75 50.20 25.44 19.99 81.66 75.18 75.20 209.30 50.26 42.50 Movement LOS B D E D C B F E E F D D d_A, Approach Delay [s/veh] 48.86 33.95 75.55 98.82 Approach LOS D C E F d_l, Intersection Delay [s/veh] 64 78 Intersection LOS E Intersection V/C 0.764 Other Modes g_Walk,mi, Effective Walk Time [s] 11.0 11.0 11.0 11.0 M_comer, Comer Circulation Area [ft2/ped; 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft2/pedl 0.00 0.00 0.00 0.00 d p, Pedestrian Delay [s] 69.38 69.38 69.38 69.38 I_p,int, Pedestrian LOS Score for Intersecticn 2.805 2.784 2.947 3.406 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 535 748 613 613 d_b, Bicycle Delay [s] 42.92 31.38 38.50 38.50 l_b,int, Bicycle LOS Score for Intersection 2.306 2.522 2.209 2.574 Bicycle LOS B B B B Sequence Ring 1 5 1 3 4 Ring 2 6 2 7 8 Ring 3 Ring 4 TRAFFIC IMPACT STUDY PM Caltran Engineering Group PageI62 Generated with rizi Version 2022 (SP 0-2) VISTRO Intersection Level Of Service Report Intersection 1: NW 22 Avenue and SR 9 Control Type: Signalized Delay (sec / veh): 91.7 Analysis Method: HCM 7th Edition Level Of Service: F Analysis Period: 15 minutes Volume to Capacity (v/c): 0.977 Intersection Setup Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Approach Northbound Southbound Eastbound Westbound Lane Configuration iiih Thru Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 1 0 2 0 2 1 Entry Pocket Length [ft] 100.00 100.00 100.00 80.00 100.00 100 00 415.00 100 00 10000 400.00 100.00 275.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 1 0 0 0 Exit Pocket Length [ft] 0 00 0 00 0.00 0 00 0 00 0.00 0 00 0 00 400.00 0 00 0.00 0.00 Speed [mph] 30.00 30.00 45.00 45.00 Grade [%] 0.00 0.00 0.00 0.00 Curb Present Yes Yes Yes Yes Crosswalk Yes Yes Yes Yes Generated with 121/ Version 2022 (SP 0-2) Volumes VISTRO Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Base Volume Input [veh/h] 6 785 678 237 641 54 69 769 4 267 611 210 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%1 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Right Turn on Red Volume [veh/h] 0 0 0 0 0 0 ( 0 0 0 0 Total Hourly Volume [veh/h] 6 816 705 246 667 56 72 800 4 278 635 218 Peak Hour Factor 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 217 188 65 177 15 19 213 1 74 169 58 Total Analysis Volume [veh/h] 6 868 750 262 710 60 77 851 4 296 676 232 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] Local Bus Stopping Rate [/h] 0 0 0 0 v_do, Outbound Pedestrian Volume crossing 0 0 0 0 v_di, Inbound Pedestrian Volume crossing m 0 0 0 0 v_co, Outbound Pedestrian Volume crossing 0 0 0 0 v_ci, Inbound Pedestrian Volume crossing mi 0 0 0 0 v_ab, Comer Pedestrian Volume [ped/h] 0 0 0 0 Bicycle Volume [bicycles/h] 0 0 0 0 Generated with ram Version 2022 (SP 0-2) Intersection Settings VISTRO Located in CBD Yes Signal Coordination Group - Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Offset [s] 136.0 Offset Reference Lead Green - Beginning of First Green Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type ProtPer Permiss Permiss ProtPer Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal Group 6 1 5 2 3 8 7 4 Auxiliary Signal Groups Lead / Lag Lead Lead Lead Lead Minimum Green [s] 5 7 5 7 5 1 18 5 18 Maximum Green [s] 30 50 0 30 50 0 22 50 0 22 50 0 Amber [s] 4.0 4.0 0.(' 4.0 4.0 0.( 4.8 4.8 0,0 4.8 4.8 0.0 All red [s] 2.0 2.2 2.0 2.2 2.0 2.0 0.0 2.0 2.0 0.0 Split [s] 32 62 26 56 21 52 0 21 52 0 Vehicle Extension [s] 3.0 3.0 0. ' 3.0 3.0 3.0 3.0 0.0 3.0 3.0 n0 Walk [s] 7 ( 7 r 7 0 7 Pedestrian Clearance [s] 36 36 32 0 32 Delayed Vehicle Green [s] 0.0 0.0 00 0.0 0.0 0 0.0 0.0 or 0.0 0.0 0.0 Rest In Walk No No No No 11, Start -Up Lost Time [s] 2.0 2.0 0 2.0 2.0 00 2.0 2.0 2.0 2.0 12, Clearance Lost Time [s] 4.0 4.2 4.0 4.2 4.8 4.8 4.8 4.8 Minimum Recall No No No No No No No No Maximum Recall No No No No No No No No Pedestrian Recall No No No No No No No No Detector Location [ft] 3.0 0.0 3.0 3.0 3.0 0.0 3.0 3.0 0.0 Detector Length [ft] 40.0 0 40.0 0.0 40.0 40.0 00 40.0 40.0 0.0 I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Generated with MEI Version 2022 (SP 0-2) VISTRO Lane Group Calculations Lane Group L C R L C R L C C L C R C, Cycle Length [s] 161 161 161 161 161 161 161 161 161 161 161 161 L, Total Lost Time per Cycle [s] 6.20 6.20 6.20 6.20 6.20 6.20 6.80 6.80 6.80 6.80 6.80 6.80 11_p, Permitted Start -Up Lost Time [s] 0.00 0 00 (-00 0.00 0 , • 1 00 0 00 !', 00 0 OP 0 00 0 00 0 00 12, Clearance Lost Time [s] 0.00 4.20 4.20 0.00 4.20 4.20 4.80 4.80 4.80 4.80 4.80 4.80 g_i, Effective Green Time [s] 83 58 58 83 76 76 6 43 43 14 52 52 g / C, Green / Cycle 0.51 0.36 0.36 0.51 0.47 0.47 0.04 0.27 0.27 0.09 0.32 0.32 (v / s)_i Volume / Saturation Flow Rate 0.01 0.27 0.52 0.40 0.22 0.04 0.02 0.25 0.25 0.10 0.21 0.16 s, saturation flow rate [veh/h] 692 3204 1431 652 3204 1431 3113 1683 1680 3113 3204 1431 c, Capacity [veh/h] 321 1145 511 333 1501 670 114 452 451 275 1025 458 d1, Uniform Delay [s] 21.09 45.60 51.73 37.81 29.22 23.74 76.59 57.77 57.77 73.40 47.18 44.44 k, delay calibration 0.50 0.50 0.50 0.50 0.50 0.50 0.11 0.30 0.30 0.11 0.11 0.11 I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 0.11 4.72 220.72 16.99 1.07 0.26 6.73 22.24 22.26 49.16 0.73 0.87 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.02 0.76 1.47 0.79 0.47 0.09 0.67 0.95 0.95 1.08 0.66 0.51 d, Delay for Lane Group [s/veh] 21.20 50.31 272.45 54.80 30.29 24.01 83.33 80.00 80.03 122.56 47.92 45.31 Lane Group LOS C D F D C C F F F F D D Critical Lane Group No No Yes Yes No No No No Yes Yes No No 50th -Percentile Queue Length [veh/In] 0.12 16.14 51.91 7.47 9.74 1.36 1.67 19.52 19.49 7.48 11.60 7.54 50th -Percentile Queue Length [ft/In] 3.07 403.47 1297.72 186.79 243.44 33.89 41.68 487.88 487.16 186.92 290.05 188.58 95th -Percentile Queue Length [veh/In] 0.22 22.73 78.89 11.95 14.86 2.44 3.00 26.76 26.73 12.29 17.19 12.05 95th -Percentile Queue Length [ft/In] 5.53 568.18 1972.18 298.86 371.38 61.00 75.02 669.00 668.14 307.23 429.71 301.19 Generated with Version 2022 (SP 0-2) VISTRO Movement. Aaaroach, & Intersection Results d_M, Delay for Movement [s/veh] 21.20 50.31 272.45 54.80 30.29 24.01 83.33 80.02 80.03 122.56 47.92 45.31 Movement LOS C D F D C C F F F F D D d_A, Approach Delay [s/veh] 152.79 36.15 80.29 65.76 Approach LOS F D F E d_I, Intersection Delay [s/veh] 91 71 Intersection LOS F Intersection V/C 0.977 Other Modes g_Walk,mi, Effective Walk Time [s] 11.0 11.0 11.0 11.0 M_comer, Comer Circulation Area [ft2/ped; 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft2/ped 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 69.88 69.88 69.88 69.88 l_p,int, Pedestrian LOS Score for Intersecticn 2.908 2.839 2.975 3.400 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/1] 693 619 561 561 d_b, Bicycle Delay [s] 34.37 38.40 41.64 41.64 l_b,int, Bicycle LOS Score for Intersection 2.899 2.411 2.329 2.553 Bicycle LOS C B B B Sequence Ring 1 Ring 2 5 1 3 4 6 2 7 8 Ring 3 Ring 4 E1 43s =WI TRAFFIC IMPACT STUDY Scenario No. 2 NW 22nd Avenue & Service Road Caltran Engineering Group PageI53 TRAFFIC IMPACT STUDY Caltran Engineering Group Pagel61 Generated with MI Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 3: NW 22 Avenue and Service Road Two-way stop HCM 7th Edition 15 minutes Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 14.0 B 0.024 Name NW 22 Avenue NW 22 Avenue Service Road Service Road Aooroach Northbound Southbound Eastbound Westbound Lane Configuration 111r 1 h r r Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] ire 12.00 12.00 12 12.00 12.00 1200 1201' 12.00 12.00 12 00 12.00 No. of Lanes in Entry Pocket 1 0 1 0 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 60.00 1000. 95.00 10000 10000 100 100 100.00 10000 100 00 100.00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0.00 0.00 Orn 0.0 0.00 0 00 0.00 00. 0 0'. 0 n' Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name NW 22 Avenue NW 22 Avenue Service Road Service Road Base Volume Input [veh/h] .. 834 0 0 1024 0 0 10 0 10 Base Volume Adjustment Factor 1 0000 1.0000 1.0000 1.0000 1.0000 1.0000 1 0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1 0000 1.0400 1.0400 1.0000 1.0400 1.0400 1 0000 1 0000 1.0400 1 0000 1.0000 1.0400 In -Process Volume [veh/h] 0 0 0 0 0 0 0 C, 0 ( 0 0 Site -Generated Trips [veh/h] ( 0 0 0 0 0 (' 0 1' 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 (0 0 Pass -by Trips [veh/h] _ 0 0 0 0 0 0 0 ( 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 867 0 1065 0 0 0 10 i 10 Peak Hour Factor '1.0000 0.9710 0.9710 1.0030 0.9710 0.9710 1 .0000 1.0000 0.9710 1 0000 1.0000 0.9710 Other Adjustment Factor 1.0000 1.0000 1.0000 1 0000 1.0000 1.0000 1 0000 1 0000 1.0000 1 0000 1 .0000 1.0000 Total 15 -Minute Volume [veh/h] 0 223 0 0 274 0 0 0 3 0 0 3 Total Analysis Volume [veh/h] 893 0 ( 1097 0 0 G 10 0 0 10 Pedestrian Volume [ped/h] 0 0 Generated with rigi Version 2022 (SP 0-2) Intersection Settings VISTRO Priority Scheme Free Free Stop Stop Flared Lane Storage Area [veh] 0 Two -Stage Gap Acceptance No No Number of Storage Spaces in Median ! Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0 01 0 00 0.00 0.01 0 00 0.00 0 00 0.02 0 00 0.00 0.02 d_M, Delay for Movement [s/veh] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.98 0.00 0.00 12.69 Movement LOS A A A A B B 95th -Percentile Queue Length [veh/In] 0 00 0.00 0.00 0.0. 0.00 0.00 0 0!' JU 0.07 a 00 0.06 95th -Percentile Queue Length [ft/In] i W 0.00 n 00 0.00 ^ i ' 1.87 1.60 d_A, Approach Delay [s/veh] 0.00 0.00 13.98 12.69 Approach LOS A A B B d I, Intersection Delay [s/veh] 0.13 Intersection LOS B TRAFFIC IMPACT STUDY PM Caltran Engineering Group PageI62 Generated with 1121 Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 3: NW 22 Avenue and NW Service Road Two-way stop HCM 7th Edition 15 minutes Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 18.6 C 0.040 Name NW 22 Avenue NW 22 Avenue Service Road Service Road Approach Northbound Southbound Eastbound Westbound Lane Configuration 111r 1 h r r Tuming Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] '2 00 12.00 12.00 2 `1 . 12.00 12.00 '2 00 12.00 12.00 7 0' 12 00 12.00 No. of Lanes in Entry Pocket 1 0 1 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 60.00 100.00 95.00 100.00 100 0 100 , 100.00 100.00 100.; No. of Lanes in Exit Pocket 0 0 0 0 U 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0.00 0.0. 0.0' 0 0 0.00 0.00 0.00 Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name NW 22 Avenue NW 22 Avenue Service Road Service Road Base Volume Input [veh/h] 0 1469 0 (1 912 6 7 10 Base Volume Adjustment Factor '.00' 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage (%] 2.0. 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor ' .00' 1.0400 1.0400 1 0000 1.0400 1.0400 1 0000 1 0000 1.0400 1.0000 1.0000 1.0400 In -Process Volume [veh/h] 0 0 (1 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 r 0 Diverted Trips [veh/h] 0 0 0 0 0 0 n 0 0 Pass -by Trips [veh/h] 0 0 0 ( 0 0 0 ( 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 1528 0 0 948 6 0 7 0 0 10 Peak Hour Factor 1.00(1 0.9400 0.9400 1.000, 0.9400 0.9400 1.0000 1 0.9400 1 0000 1 .0000 0.9400 Other Adjustment Factor ' .00 1.0000 1.0000 1.00' 1.0000 1.0000 1 0000 1 00' 1.0000 1 0000 1.000n 1.0000 Total 15 -Minute Volume [veh/h] 0 406 0 0 252 2 C! 0 2 0 0 3 Total Analysis Volume [veh/h] 0 1626 0 ( 1009 6 0 7 0 0 11 Pedestrian Volume [ped/h] 1 0 Generated with cia Version 2022 (SP 0-2) Intersection Settings VISTRO Priority Scheme Free Free Stop Stop Flared Lane Storage Area [veh] 0 0 C Two -Stage Gap Acceptance No No Number of Storage Spaces in Median 0 0 0 0 Its V/C, Movement V/C Ratio 0 00 002 0 00 0 `i0 0 01 0 Oi 0.00 0 00 0.02 0 00 0 00 0.04 d_M, Delay for Movement [s/veh] 0 00 0.00 0.00 0 00 0 00 0.00 0.00 0 00 13.37 0.00 0.00 18.59 Movement LOS A A A A B C 95th -Percentile Queue Length [veh/In] 0 00 0.00 0 00 0 00 0.00 0.00 0.00 0 fit 0.05 0 00 0 00 0.12 95th -Percentile Queue Length [ft/In] 0 00 0.00 0 00 C u(: 0.00 0.00 a 00 0 01; 1.22 0 00 0 00 3.10 d_A, Approach Delay [s/veh] 0.00 0.00 13.37 18.59 Approach LOS A A B C d_I, Intersection Delay [s/veh] 0.11 Intersection LOS C TRAFFIC IMPACT STUDY Scenar'ito N O _' NW 22nd Avenue Rutland Street Caltran Engineering Group PageI54 TRAFFIC IMPACT STUDY AM Caltran Engineering Group PageI61 Generated with Gra Version 2022 (SP 0-2) Control Type: Analysis Method: Analysis Period: Intersection Setup VISTRO Intersection Level Of Service Report Intersection 2: NW 22 Avenue 8 Rutland Street Signalized HCM 7th Edition 15 minutes Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 5.9 A 0.348 Name NW 22 Avenue NW 22 Avenue Rutland Avenue Rutland Avenue Approach Northbound Southbound Eastbound Westbound Lane Configuration 11 F ri 1 F 41 r Turning Movement Left Thru Right U-tu Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 0 1 0 0 1 0 0 Entry Pocket Length [ft] 55.00 100.00 100 60.00 100 0 100.0 100 0 100.00 100.00 50.00 100.00 100. 100.00 No. of Lanes in Exit Pocket 0 0 0 0 1) 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 00 0.00 0.00 0 00 Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Curb Present Yes Yes Yes Yes Crosswalk Yes No Yes Yes Generated with cal Version 2022 (SP 0-2) Volumes VISTRO Name NW 22 Avenue NW 22 Avenue Rutland Avenue Rutland Avenue Base Volume Input [veh/h] 4 744 5 18 28 920 15 13 2 11 24 8 15 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.000 1.000 1.000 1.000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Proportion of CAVs [%] Growth Factor 1.0400 1.0400 1.0400 1.040 1.040 1.040 0.00 1.040 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/hj 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Right Turn on Red Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 4 774 5 19 29 957 16 14 2 11 25 8 16 Peak Hour Factor 0.9710 0.9710 0.9710 0.971 0.971 0.971 0.971 0.9710 0.9710 0. Other Adjustment Factor 1.0000 1.0000 1.0000 1.000 1.000 1.000 1.000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 1 199 1 5 7 246 4 4 1 3 6 2 Total Analysis Volume [veh/h] 4 797 5 20 30 986 16 14 2 11 26 8 Presence of On -Street Parking No No No No No No No 4 16 No On -Street Parking Maneuver Rate [/h] u Local Bus Stopping Rate [/h] 0 0 0 0 0 0 v do, Outbound Pedestrian Volume crossin g 0 0 0 nd Pedestrian Volume crossing n 0 0 0 v_co, Outbound Pedestrian Volume crossing 0 0 0 0 v ci, Inbound Pedestrian Volume crossing mi 0 0 0 0 v ab, Corner Pedestrian Volume [ped/h] 0 0 0 Bicycle Volume [bicycles/h] 0 0 0 0 Generated with Cal Version 2022 (SP 0-2) Intersection Settings VISTRO Located in CBD Yes Signal Coordination Group Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Offset [s] 152.0 Offset Reference Lead Green - Beginning of First Green Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type Permiss Permiss Permiss Permi Permi Permi Permi Permiss Permiss Permiss Permiss Permiss Permiss Signal Group 6 2 8 4 Auxiliary Signal Groups Lead / Lag Minimum Green [s] C. 18 C 0 18 7 0 7 0 Maximum Green [s] 0 48 0 0 0 48 0 24 0 24 0 Amber [s] 0l 4.0 0.0 0.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 All red [s] 0 3.0 0.0 0.0 00 3.0 0 0 3.0 0.0 00 3.0 0.0 Split [s] C 78 0 0 0 78 82 0 82 0 Vehicle Extension [s] 3.0 0.0 0.0 0.0 3.0 0 0 0.0 3.0 0.0 00 3.0 0.0 Walk [s] 7 0 0 7 0 26 0 7 0 Pedestrian Clearance [s] 0 18 0 0 18 r 10 0 10 0 Delayed Vehicle Green [s] 0 i 0.0 0.0 0.0 u.0 0.0 0.0 0.0 0.0 0,0 0 0 0.0 0.0 Rest In Walk No No No No 11 , Start -Up Lost Time [s] 0. 2.0 0.0 0.0 2.0 0.0 0 0 2.0 0.0 0.0 2.0 0.0 12, Clearance Lost Time [s] 0 0 5.0 0 0 0.0 5.0 0 0 n 5.0 0.0 0 n 5.0 0.0 Minimum Recall No No No No Maximum Recall No No No No Pedestrian Recall No No No No Detector Location [ftj 0.0 2.0 2.0 0.0 Detector Length [ft] 0.0 40.0 00 40.0 00 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Generated with mg Version 2022 (SP 0-2) VISTRO Lane Group Calculations Lane Group L C C L C C C R C C, Cycle Length [s] 160 160 160 160 160 160 160 160 160 L, Total Lost Time per Cycle [s] 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 11_p, Permitted Start -Up Lost Time [s] 2.00 0.00 0.00 2.00 000 0.00 2.00 000 2.00 12, Clearance Lost Time [s] 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 g_i, Effective Green Time [s] 137 137 137 137 137 137 9 9 9 g / C, Green / Cycle 0.85 0.85 0.85 0.85 0.85 0.85 0.06 0.06 0.06 (v / s)_i Volume / Saturation Flow Rate 0.01 0.24 0.24 0.08 0.30 0.30 0.01 0.01 0.05 s, saturation flow rate [veh/h] 506 1683 1679 610 1683 1674 1122 1431 1010 c, Capacity [veh/h] 441 1440 1436 533 1440 1431 106 82 92 d1, Uniform Delay [s] 3.78 2.20 2.20 3.50 2.39 2.39 72.04 71.67 75.39 k, delay calibration 0.50 0.50 0.50 0.50 0.50 0.50 0.11 0.11 0.11 I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 0.04 0.48 0.48 0.35 0.67 0.67 0.65 0.74 4.93 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.01 0.28 0.28 0.09 0.35 0.35 0.15 0.13 0.54 d, Delay for Lane Group [s/veh] 3.82 2.68 2.68 3.85 3.05 3.06 72.68 72.41 80.32 Lane Group LOS A A A A A A E E F Critical Lane Group No No No No No Yes No No Yes 50th -Percentile Queue Length [veh/In] 0.03 2.07 2.07 0.38 2.82 2.81 0.65 0.45 2.18 50th -Percentile Queue Length fft/In 0.80 51.82 51.72 9.53 70.53 70.18 16.29 11.23 54.61 95th -Percentile Queue Length [veh/In] 0.06 3.73 3.72 0.69 5.08 5.05 1.17 0.81 3.93 95th -Percentile Queue Length [ft/1n] 1.43 93.28 93.10 17.16 126.96 126.32 29.32 20.21 98.29 Generated with GE Version 2022 (SP 0-2) VISTRO Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh] 3.82 2.68 2.68 3.85 3.85 3.06 3.06 72.68 72.68 72.41 80.32 80.32 80.32 Movement LOS A A A A A A A E E E F F F d_A, Approach Delay [s/veh] 2.69 3.09 72.57 80.32 Approach LOS A A E F d_l, Intersection Delay [s/veh] 5.89 Intersection LOS A Intersection V/C 0.348 Other Modes g_Walk,mi, Effective Walk Time [s] 30.0 11.0 11.0 M_comer, Comer Circulation Area [ft2/ped: 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft2/pedl 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 52.81 :,c 69.38 69.38 I_p,int, Pedestrian LOS Score for Intersecticn 2.710 :0 000 1.991 1.856 Crosswalk LOS B F A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 888 888 938 938 d_b, Bicycle Delay [s] 24.75 24.75 22.58 22.58 I_b,int, Bicycle LOS Score for Intersection 2.225 2.403 1.604 1.642 Bicycle LOS B B A A Sequence Ring 1 Ring 2 2 4 6 8 Ring 3 Ring 4 _)2 25s 11111.6 25s TRAFFIC IMPACT STUDY PM Caltran Engineering Group PageI62 Generated with 1213 Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: NW 22 Avenue & Rutland Street Signalized HCM 7th Edition 15 minutes Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 5.3 A 0.391 Name NW 22 Avenue NW 22 Avenue Rutland Street Rutland Street Approach Northbound Southbound Eastbound Westbound Lane Configuration r' 1 F 1 1 1 1 i t Tuming Movement Left Thru Right U-tu Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 ( 0 1 0 0 0 1 0 0 0 Entry Pocket Length [ft] 55.00 100.00 100 00 60.00 100 0 100.0 100.0 100.00 100.00 50.00 100.00 100 00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 0 0 0 n 0 Exit Pocket Length [ft] 0 00 000 0.00 0.00 n 00 0 00 0 00 0 00 0.00 0 00 0 00 0 00 : 00 Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Curb Present Yes Yes Yes Yes Crosswalk Yes No Yes Yes Generated with rEgi Version 2022 (SP 0-2) Volumes VISTRO Name NW 22 Avenue NW 22 Avenue Rutland Street Rutland Street 1 Base Volume Input [veh/h] 7 1113 4 0 40 824 5 30 2 12 10 4 15 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.000 1.000 1.000 1.000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0400 1.0400 1.0400 1.040 1.040 1.040 1.040 1.0400 1.0400 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 1.0400 1.0400 0 0 1.0400 0 1.0400 0 Site -Generated Trips [veh/h] 0 0 O 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 O 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 Right Turn on Red Volume [veh/h] 0 0 Total Hourly Volume [veh/h] 7 1158 4 0 42 857 5 31 2 0 0 0 0 0 12 10 4 16 Peak Hour Factor 0.9800 0.9800 0.9800 0.980 0.980 0.980 0.980 0.9800 0.9800 0.9800 0.9800 0.9800 Other Adjustment Factor 1.0000 1.0000 1.0000 1.000 1.000 1.000 1.000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 295 1 0 11 219 1 8 1 3 3 1 4 Total Analysis Volume [veh/h] 7 1182 4 0 43 874 5 32 2 12 10 4 16 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] u Local Bus Stopping Rate [/h] 0 0 0 0 ✓ do, Outbound Pedestrian Volume crossin 0 0 ✓ di, Inbound Pedestrian Volume crossing 0 0 ✓ co, Outbound Pedestrian Volume crossin 0 0 0 0 ✓ ci, Inbound Pedestrian Volume crossing i 0 0 0 0 v ab, Comer Pedestrian Volume [ped/h] 0 0 0 0 Bicycle Volume [bicycles/h] 0 0 0 0 Generated with Version 2022 (SP 0-2) Intersection Settings VISTRO Located in CBD Yes Signal Coordination Group - Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Offset [s] 152.0 Offset Reference Lead Green - Beginning of First Green Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type Permiss Permiss Permiss Permi Permi Permi Permi Permiss Permiss Permiss Permiss Permiss Permiss Signal Group 6 2 8 4 Auxiliary Signal Groups Lead / Lag - Minimum Green [s] 0 18 0 0 0 18 0 7 7 0 Maximum Green [s] 0 48 0 0 0 48 0 24 C' 24 0 Amber [s] 0.0 4.0 0 c 0.0 0.0 4.0 u.l' 0.0 4.0 01 0..• 4.0 0.0 All red [s] 0 C 3.0 0 00 00 3.0 00 0: 3.0 0.0 0 3.0 0.0 Split [s] 0 82 0 0 0 82 0 0 78 0 0 78 0 Vehicle Extension [s] 0 C 3.0 0.1. 0.0 0 0 3.0 0.0 0 0 3.0 0.0 0.( 3.0 0.0 Walk [s] 0 7 0 0 7 0 26 0 Ce 7 0 Pedestrian Clearance [s] 0 18 0 0 18 0 10 0 C 10 0 Delayed Vehicle Green [s] 0 _ 0.0 0 ' 0.0 0.0 0.0 0 0 0 : 0.0 0 0 0.0 0.0 0 0 Rest In Walk No No No No 11 , Start -Up Lost Time [s] 2.0 0.n 0.0 0.0 2.0 0.0 0 C 2.0 0.(° 0 t 2.0 0.0 12, Clearance Lost Time [s] 5.0 n r ,0 0 0 0 5.0 n n n 5.0 0.0 0 ' 5.0 0.0 Minimum Recall No No No No Maximum Recall No No No No Pedestrian Recall No No No No Detector Location [ft] 0 _ 0.0 0.0 0.0 0.0 0. 2.0 0.0 2.0 Detector Length [ft] 0 :. 0.0 0.0 0 0 0 C' 40.0 0 0 40.0 I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [sj 0 Pedestrian Clearance [s] 0 Generated with Ein Version 2022 (SP 0-2) VISTRO Lane Group Calculations Lane Group L C C L C C C R C C, Cycle Length [s] 160 160 160 160 160 160 160 160 160 L, Total Lost Time per Cycle [s] 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 11_p, Permitted Start -Up Lost Time [s] 2.00 0 00 0.00 2.00 , 0 00 000 2.00 0 00 2.00 12, Clearance Lost Time [s] 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 g_i, Effective Green Time [s] 140 140 140 140 140 140 6 6 6 g / C, Green / Cycle 0.87 0.87 0.87 0.87 0.87 0.87 0.04 0.04 0.04 (v / s)_i Volume / Saturation Flow Rate 0.01 0.35 0.35 0.10 0.26 0.26 0.03 0.01 0.04 s, saturation flow rate [veh/h] 568 1683 1681 425 1683 1680 1299 1431 774 c, Capacity [veh/h] 502 1469 1467 376 1469 1466 95 57 61 d1, Uniform Delay [s] 3.10 2.00 2.00 4.39 1.75 1.75 75.73 74.40 76.53 k, delay calibration 0.50 0.50 0.50 0.50 0.50 0.50 0.11 0.11 0.11 I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 0.05 0.83 0.83 0.62 0.52 0.52 2.25 1.83 6.10 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.01 0.40 0.40 0.11 0.30 0.30 0.36 0.21 0.49 d, Delay for Lane Group [s/veh] 3.15 2.83 2.83 5.01 2.27 2.28 77.98 76.23 82.63 Lane Group LOS A A A A A A E E F Critical Lane Group No No Yes No No No No No Yes 50th -Percentile Queue Length [veh/In] 0.05 2.85 2.85 0.40 1.85 1.85 1.45 0.51 1.35 50th -Percentile Online Length [ft/In] 1 20 71 34 71 27 9.95 46 22 46 13 36.24 12.77 33.69 95th -Percentile Queue Length [veh/In] 0.09 5.14 5.13 0.72 3.33 3.32 2.61 0.92 2.43 95th -Percentile Queue Length [ft/1n] 2.16 128.41 128.29 17.90 83.19 83.04 65.23 22.98 60.65 Generated with MI Version 2022 (SP 0-2) VISTRO Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh] 3.15 2.83 2.83 5.01 5.01 2.28 2.28 77.98 77.98 76.23 82.63 82.63 82.63 Movement LOS A A A A A A A E E E F F F d_A, Approach Delay [s/veh] 2.83 2.40 77.52 82.63 Approach LOS A A E F d_I, Intersection Delay [s/veh] 5.31 Intersection LOS A Intersection V/C 0.391 Other Modes g_Walk,mi, Effective Walk Time [s] 30.0 11.0 11.0 M_comer, Comer Circulation Area [ftz/ped: 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft'/pedi 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 52.81 , r,,;, 69.38 69.38 I_p,int, Pedestrian LOS Score for Intersecticn 2.738 n ov, 1.998 1.842 Crosswalk LOS B F A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/I-] 938 938 888 888 d_b, Bicycle Delay [s] 22.58 22.58 24.75 24.75 I_b,int, Bicycle LOS Score for Intersection 2.544 2.285 1.636 1.609 Bicycle LOS B B A A Sequence Ring 1 2 4 Ring 2 6 8 Ring 3 Ring 4 Min 25s TRAFFIC IMPACT STUDY Scenario No SR 9 & NW 22nd Avenue Caltran Engineering Group Pagel55 TRAFFIC IMPACT STUDY Caltran Engineering Group PageI61 Generated with MI Version 2022 (SP 0-2) V I STRO Control Type: Analysis Method: Analysis Period: Intersection Setup Signalized HCM 7th Edition 15 minutes Intersection Level Of Service Report Intersection 1: NW 22 Avenue and SR 9 Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 65.8 E 0.770 Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Approach Northbound Southbound Eastbound Westbound Lane Configuration i i i r i i i r r 1 1 1 1 i i i i r Tuming Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 1 0 2 0 2 1 Entry Pocket Length [ft] 100.00 100 0{- 100 00 80.00 100 00 100 00 415.00 100 0' ' or. ,)0 400.00 100.00 275.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 1 0 0 0 Exit Pocket Length [ft] i0 0 n :, , 0 n 0 00 400.00 r, Op 0 00 0 00 Speed [mph] 30.00 30.00 45.00 45.00 Grade [%] 0.00 0.00 0.00 0.00 Curb Present Yes Yes Yes Yes Crosswalk Yes Yes Yes Yes Generated with Version 2022 (SP 0-2) Volumes Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Base Volume Input [veh/h] 2 488 354 384 661 44 42 687 6 357 668 123 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 3 7 4 0 7 0 0 0 3 4 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Right Turn on Red Volume [veh/h] 0 0 0 0 Total Hourly Volume [veh/h] 5 515 372 399 694 46 44 714 9 375 695 128 Peak Hour Factor 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 0.9700 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 1 133 96 103 179 12 11 184 2 97 179 33 Total Analysis Volume [veh/h] 5 531 384 411 715 47 45 736 9 387 716 132 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] Local Bus Stopping Rate [/h] 0 0 0 0 v_do, Outbound Pedestrian Volume crossing 0 0 0 0 v_di, Inbound Pedestrian Volume crossing m 0 0 0 0 v_co, Outbound Pedestrian Volume crossing 0 0 0 0 v ci, Inbound Pedestrian Volume crossing m 0 0 0 0 v_ab, Corner Pedestrian Volume [ped/h] 0 0 0 0 Bicycle Volume [bicycles/h] 0 0 0 0 Generated with COM Version 2022 (SP 0-2) Intersection Settings VISTRO Located in CBD Yes Signal Coordination Group - Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Offset [s] 126.0 Offset Reference Lead Green - Beginning of First Green Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type ProtPer Permiss Permiss ProtPer Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal Group 6 1 5 2 3 8 7 4 Auxiliary Signal Groups Lead / Lag Lead Lead Lead Lead Minimum Green [s] 5 7 5 7 0 5 18 5 18 0 Maximum Green [s] 30 50 30 1 50 22 50 22 50 0 Amber [s] 4.0 4.0 0.i 4.0 4.0 0 i' 4.8 3.0 0 C 4.8 3.0 0.0 All red [s] 2.0 2.2 0/ 2.0 2.2 0i 2.0 2.0 0i 2.0 2.0 0.0 Split [s] 18 49 0 34 66 22 54 22 54 0 Vehicle Extension [s] Walk [s] Pedestrian Clearance [s] Delayed Vehicle Green [s] Rest In Walk 11, Start -Up Lost Time [s] 12, Clearance Lost Time [s] Minimum Recall 3.0 3.0 0C 3.0 3.0 0.0 3.0 3.0 0 3.0 3.0 0.0 7 7 0 7 0 7 0 36 0 36 0 32 0 0 32 0 0.0 0.0 0.0 0.0 0.0 00 0.0 0.0 0.0 0.0 0.0 0 0 No No No No 2.0 2.0 0.0 2.0 2.0 0.0 2.0 2.0 0.0 2.0 2.0 0.0 4.0 4.2 oC 4.0 4.2 00 4.8 3.0 0.0 4.8 3.0 0.0 No No No No No No No No Maximum Recall No No No No No No No No Pedestrian Recall Detector Location [ft] Detector Length [ft] 1, Upstream Filtering Factor No No No No No No No No 3.0 3.0 0 3.0 3.0 3.0 3.0 40.0 0 C' 40.0 0.0 40.0 40.0 40.0 40.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Generated with Earil Version 2022 (SP 0-2) VISTRO Lane Group Calculations Lane Group L C R L C R L C C L C R C, Cycle Length [s] 160 160 160 160 160 160 160 160 160 160 160 160 L, Total Lost Time per Cycle [s] 6.20 6.20 6.20 6.20 6.20 6.20 6.80 5.00 5.00 6.80 5.00 5.00 11_p, Permitted Start -Up Lost Time [s] 0.00 0 nr 0 00 0.00 i, 0n 0 n0 0 n0 0 0(0 c ,)0 0 00 0.00 0 00 12, Clearance Lost Time [s] 0.00 4.20 4.20 0.00 4.20 4.20 4.80 3.00 3.00 4.80 3.00 3.00 g_i, Effective Green Time [s] 88 55 55 88 81 81 4 39 39 15 50 50 g / C, Green / Cycle 0.55 0.34 0.34 0.55 0.51 0.51 0.03 0.24 0.24 0.10 0.31 0.31 (v / s)_i Volume / Saturation Flow Rate 0.01 0.17 0.27 0.52 0.22 0.03 0.01 0.22 0.22 0.12 0.22 0.09 s, saturation flow rate [veh/h] 690 3204 1431 788 3204 1431 3113 1683 1676 3113 3204 1431 c, Capacity [veh/h] 352 1100 491 453 1621 724 86 408 406 296 992 443 dl, Uniform Delay [s] 17.96 41.36 47.17 26.64 25.13 20.19 76.76 59.02 59.03 72.40 49.09 41.99 k, delay calibration 0.50 0.50 0.50 0.50 0.50 0.50 0.11 0.24 0.24 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 0.07 1.52 11.75 24.64 0.87 0.17 4.89 16.17 16.24 144.29 1.01 0.37 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.01 0.48 0.78 0.91 0.44 0.06 0.52 0.92 0.92 1.31 0.72 0.30 d, Delay for Lane Group [s/veh] 18.04 42.88 58.92 51.28 26.01 20.36 81.66 75.19 75.27 216.69 50.10 42.37 Lane Group LOS B D E D C C F E E F D D Critical Lane Group No No Yes Yes No No No No Yes Yes No No 50th -Percentile Queue Length [veh/In] 0.09 8.60 15.40 12.55 8.97 0.96 0.96 16.28 16.22 11.92 12.63 3.99 50th -Percentile Queue Length [ft/In] 2.32 214.97 385.08 313.79 224.18 24.02 24.10 406.88 405.43 297.88 315.85 99.68 95th -Percentile Queue Length [veh/In] 0.17 13.41 21.84 18.36 13.88 1.73 1.74 22.89 22.82 19.28 18.46 7.18 95th -Percentile Queue Length [ft/In] 4.18 335.20 545.99 459.04 346.95 43.24 43.38 572.28 570.53 482.04 461.58 179.43 Generated with CM Version 2022 (SP 0-2) V I STRO Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh] 18.04 42.88 58.92 51.28 26.01 20.36 81.66 75.23 75.27 216.69 50.10 42.37 Movement LOS B D E D C C F E E F D D d_A, Approach Delay [s/veh] 49.44 34.64 75.60 101.47 Approach LOS D C E F d_I, Intersection Delay [s/veh] 65 85 Intersection LOS E Intersection V/C 0.770 Other Modes g_Walk,mi, Effective Walk Time [s] 11.0 11.0 11.0 11.0 M_comer, Comer Circulation Area [ft2/ped: 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft2/pedl 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 69.38 69.38 69.38 69.38 I_p,int, Pedestrian LOS Score for Intersectic n 2.810 2.786 2.950 3.407 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/11 535 748 613 613 d_b, Bicycle Delay [s] 42.92 31.38 38.50 38.50 I_b,int, Bicycle LOS Score for Intersection 2.319 2.527 2.211 2.578 Bicycle LOS B B B B Sequence Ring 1 Ring 2 5 1 3 4 6 2 7 8 Ring 3 Ring 4 MID 1 43s 111.2 43s 111.4 39s l 11W -39s- TRAFFIC IMPACT STUDY AM Mitigation Caltran Engineering Group Pagel61 Generated with Mg Version 2022 (SP 0-2) Unmitigated VISTRO Number 1 Intersection NW 22 Avenue and SR 9 Control Type Signalized Analysis Method HCM 7th Edition Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Approach Northbound Southbound Eastbound Westbound Lane Configuration i i i r i i i r I I i F i i i i r Tuming Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Base Volume Input [veh/h] 6 785 678 237 641 54 69 769 4 267 611 210 Total Analysis Volume [veh/h] 10 878 755 262 719 60 77 851 7 302 676 232 Intersection Settings Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Lost time [s] 0.00 Control Type ProtPer Permiss Permiss ProtPer Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal Group 6 1 C 5 2 3 8 7 4 Auxiliary Signal Groups Lead / Lag Lead Lead Lead Lead Minimum Green [s] 5 7 5 7 5 18 5 18 Maximum Green [s] 30 50 30 50 22 50 22 50 Amber [s] 4.0 4.0 4.0 4.0 4.8 4.8 4.8 4.8 C' All red [s] 2.0 2.2 2.0 2.2 C 2.0 2.0 2.0 2.0 Split [s] 32 62 26 56 21 52 21 52 Walk [s] 7 7 !` 7 7 Pedestrian Clearance [s] 36 ) 36 C 0 32 32 Delayed Vehicle Green [s] 0.0 0.0 _ 0.0 0.0 2 C 0.0 0.0 0.0 0.0 11, Start -Up Lost Time [s] 2.0 2.0 2.0 2.0 0 C 2.0 2.0 _ 2.0 2.0 Minimum Recall No No No No No No No No Maximum Recall No No No No No No No No Pedestrian Recall No No No No No No No No Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Lane Group Calculations g / C, Green / Cycle 0.51 0.36 0.36 0.51 0.46 0.46 0.04 0.27 0.27 0.09 0.32 0.32 (v / s)_i Volume / Saturation Flow Rate 0.01 0.27 0.53 0.40 0.22 0.04 0.02 0.26 0.26 0.10 0.21 0.16 so, Base Saturation Flow per Lane [pc/h/In, 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Arrival type 3 3 3 3 s, saturation flow rate [veh/h] 695 3204 1431 653 3204 1431 3113 1683 1678 3113 3204 1431 c, Capacity [veh/h] 320 1138 508 333 1486 663 114 453 452 275 1028 459 X, volume / capacity 0.03 0.77 1.49 0.79 0.48 0.09 0.67 0.95 0.95 1.10 0.66 0.51 d, Delay for Lane Group [s/veh] 21.50 51.17 280.76 55.64 30.97 24.43 83.33 80.20 80.24 130.66 47.80 45.19 Lane Group LOS C D F E C C F F F F D D Critical Lane Group No No Yes Yes No No No No Yes Yes No No Generated with Mg Version 2022 (SP 0-2) VISTRO 50th -Percentile Queue Length [veh/InJ 0.21 16.49 52.76 7.49 10.00 1 1.37 1.67 19.63 1 19.58 7.79 11.59 7.53 50th -Percentile Queue Length [ft/In 5.15 412.34 1319.04 187.19 250.00 1 34.23 41.68 490.65 489.38 194.64 289.65 188.32 95th -Percentile Queue Length [veh/In] 0.37 23.15 80.42 11.98 15.19 2.46 3.00 26.89 26.83 12.79 17.17 12.03 95th -Percentile Queue Length [ft/In] 9.27 578.85 2010.41 299.38 379.65 61.62 75.02 672.28 670.78 319.74 429.20 300.84 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh] 21.50 51.17 280.76 55.64 30.97 24.43 83.33 80.22 80.24 130.66 47.80 45.19 Movement LOS C D F E C C F F F F D D Critical Movement No No Yes No No No No No No No No No d_A, Approach Delay [s/veh] 156.49 36.80 80.48 67.98 Approach LOS F D F E d_I, Intersection Delay [s/veh] 93 79 Intersection LOS F Intersection V/C 0.983 TRAFFIC IMPACT STUDY PM Caltran Engineering Group PageI62 Generated with Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 1: NW 22 Avenue an Signalized Delay (sec / veh): 93.8 HCM 7th Edition Level Of Service: F 15 minutes Volume to Capacity (v/c): 0.983 Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Approach Northbound Southbound Eastbound Westbound Lane Configuration 111 r 111 r 1 ro 1 1 1 1 111 r Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 1 0 2 0 2 1 Entry Pocket Length [ft] 100.00 100..L 100 U 80.00 100.00 100.00 415.00 100 400.00 100.00 275.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 1 0 0 0 Exit Pocket Length [ft] 0 00 0 00 0.00 0.00 0.00 0.00 0.00 0.00 400.00 0 00 0.00 0 00 Speed [mph] 30.00 30.00 45.00 45.00 Grade [%] 0.00 0.00 0.00 0.00 Curb Present Yes Yes Yes Yes Crosswalk Yes Yes Yes Yes Generated with Mg Version 2022 (SP 0-2) Volumes VISTRO Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Base Volume Input [veh/h] 6 785 678 237 641 54 69 769 4 267 611 210 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 1 In -Process Volume [veh/h] 0 0 0 0 I 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 3 9 5 0 9 0 0 0 3 6 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Right Turn on Red Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 9 825 710 246 676 56 72 800 7 284 635 218 Peak Hour Factor 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 0.9400 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 219 189 65 180 15 19 213 2 76 169 58 Total Analysis Volume [veh/h] 10 878 755 262 719 60 77 851 7 302 676 232 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] 0 _ 0 0 Local Bus Stopping Rate [/h] 0 0 0 0 v_do, Outbound Pedestrian Volume crossing 0 0 0 0 v_di, Inbound Pedestrian Volume crossing m 0 0 0 0 v_co, Outbound Pedestrian Volume crossing 0 0 0 0 v_ci, Inbound Pedestrian Volume crossing mi 0 0 0 0 v_ab, Comer Pedestrian Volume [ped/h] 0 0 0 0 Bicycle Volume [bicycles/h] 0 0 0 0 Generated with MS Version 2022 (SP 0-2) Intersection Settings VISTRO Located in CBD Yes Signal Coordination Group - Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Offset [s] 136.0 Offset Reference Lead Green - Beginning of First Green Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type ProtPer Permiss Permiss ProtPer Permiss Permiss Protecte Permiss Permiss Protecte Permiss Permiss Signal Group 6 1 5 2 3 8 7 4 Auxiliary Signal Groups Lead/Lag Lead Lead Lead Lead Minimum Green [s] 5 7 5 7 i 5 18 ( 5 18 Maximum Green [s] 30 50 30 50 0 22 50 0 22 50 Amber [s] 4.0 4.0 0.0 4.0 4.0 0 , 4.8 4.8 0.0 4.8 4.8 v.0 All red [s] 2.0 2.2 00 2.0 2.2 0 . 2.0 2.0 0 0 2.0 2.0 0.0 Split [s] 32 62 0 26 56 0 21 52 0 21 52 0 Vehicle Extension [s] 3.0 3.0 0.0 3.0 3.0 0.0 3.0 3.0 0.0 3.0 3.0 0.0 Walk [s] 7 0 7 0 7 0 7 Pedestrian Clearance [s] 36 0 ( 36 0 0 32 0 i 32 Delayed Vehicle Green [s] 0.0 0.0 0 0 0.0 0.0 0 ,' 0.0 0.0 0 0 0.0 0.0 0 0 Rest In Walk No No No No 11 , Start -Up Lost Time [s] 2.0 2.0 2.0 2.0 2.0 2.0 0.0 2.0 2.0 12, Clearance Lost Time [s] 4.0 4.2 4.0 4.2 4.8 4.8 0.0 4.8 4.8 Minimum Recall No No No No No No No No Maximum Recall No No No No No No No No Pedestrian Recall No No No No No No No No Detector Location [ft] 3.0 0 ". 3.0 3.0 3.0 0.0 3.0 3.0 0.0 Detector Length [ft] 40.0 0 ; 40.0 40.0 40.0 0 0 40.0 40.0 0 0 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Generated with Mg Version 2022 (SP 0-2) VISTRO Lane Group Calculations Lane Group L C R L C R L C C L C R C, Cycle Length [s] 161 161 161 161 161 161 161 161 161 161 161 161 L, Total Lost Time per Cycle [s] 6.20 6.20 6.20 6.20 6.20 6.20 6.80 6.80 6.80 6.80 6.80 6.80 11_p, Permitted Start -Up Lost Time [s] 0.00 0 00 0 00 0.00 0 0)0 0 00 0 00 0 00 0.00 0 00 0 00 0-00 12, Clearance Lost Time [s] 0.00 4.20 4.20 0.00 4.20 4.20 4.80 4.80 4.80 4.80 4.80 4.80 g_i, Effective Green Time [s] 83 57 57 83 75 75 6 43 43 14 52 52 g / C, Green / Cycle 0.51 0.36 0.36 0.51 0.46 0.46 0.04 0.27 0.27 0.09 0.32 0.32 (v / s)_i Volume / Saturation Flow Rate 0.01 0.27 0.53 0.40 0.22 0.04 0.02 0.26 0.26 0.10 0.21 0.16 s, saturation flow rate [veh/h] 695 3204 1431 653 3204 1431 3113 1683 1678 3113 3204 1431 c, Capacity [veh/h] 320 1138 508 333 1486 663 114 453 452 275 1028 459 dl, Uniform Delay [s] 21.32 46.09 51.90 38.59 29.84 24.16 76.59 57.72 57.72 73.40 47.07 44.33 k, delay calibration 0.50 0.50 0.50 0.50 0.50 0.50 0.11 0.30 0.30 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 0.18 5.08 228.85 17.05 1.13 0.27 6.73 22.48 22.52 57.26 0.72 0.86 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.03 0.77 1.49 0.79 0.48 0.09 0.67 0.95 0.95 1.10 0.66 0.51 d, Delay for Lane Group [s/veh] 21.50 51.17 280.76 55.64 30.97 24.43 83.33 80.20 80.24 130.66 47.80 45.19 Lane Group LOS C D F E C C F F F F D D Critical Lane Group No No Yes Yes No No No No Yes Yes No No 50th -Percentile Queue Length [veh/In] 0.21 16.49 52.76 7.49 10.00 1.37 1.67 19.63 19.58 7.79 11.59 7.53 50th -Percentile Queue Length [ft/In] 5.15 412.34 1319.04 187.19 250.00 34.23 41.68 490.65 489 38 194.64 289.65 188.32 95th -Percentile Queue Length [veh/In] 0.37 23.15 80.42 11.98 15.19 2.46 3.00 26.89 26.83 12.79 17.17 12.03 95th -Percentile Queue Length [ft/In] 9.27 578.85 2010.41 299.38 379.65 61.62 75.02 672.28 670.78 319.74 429.20 300.84 i43s Generated with 121 Version 2022 (SP 0-2) VISTRO d_M, Delay for Movement [s/veh] 21.50 51.17 280.76 55.64 30.97 24.43 83.33 80.22 80.24 130.66 47.80 45.19 Movement LOS C D F E C C F F F F D D d_A, Approach Delay [s/veh] 156.49 36.80 80.48 67.98 Approach LOS F D F E d_l, Intersection Delay [s/veh] 93 79 Intersection LOS F Intersection V/C 0.983 Other Modes g_Walk,mi, Effective Walk Time [s] 11.0 11.0 11.0 11.0 M_comer, Comer Circulation Area [Wiped: 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft2/pedl 0.00 0.00 0.00 0.00 d p, Pedestrian Delay [s] 69.88 69.88 69.88 69.88 l_p,int, Pedestrian LOS Score for Intersecticn 2.915 2.843 2.980 3.402 Crosswalk LOS C C C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/I•] 693 619 561 561 d_b, Bicycle Delay [s] 34.37 38.40 41.64 41.64 I_b,int, Bicycle LOS Score for Intersection 2.915 2.418 2.331 2.558 Bicycle LOS C B B B Sequence Ring 1 Ring 2 5 1 3 4 6 2 7 8 Ring 3 Ring 4 I 111111111.11=1111 ?4 39s 111111111 111111.1=_I 111111111111111111.1111 M8 39s I TRAFFIC IMPACT STUDY PM tigaton. Caltran Engineering Group PageI62 Generated with gila Version 2022 (SP 0-2) Unmitigated VISTRO Number 1 Intersection NW 22 Avenue and SR 9 Control Type Signalized Analysis Method HCM 7th Edition Name NW 22 Avenue NW 22 Avenue SR 9 SR 9 Approach Northbound Southbound Eastbound Westbound Lane Configuration 111r 111r «1 «11 h 1111r Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Base Volume Input [veh/h] 6 785 678 237 641 54 69 769 4 267 611 210 Total Analysis Volume [veh/h] 10 878 755 262 719 60 77 851 7 302 676 I 232 Intersection Settings Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Lost time [s] 0.00 Control Type ProtPer Permiss Permiss ProtPer Permiss Permiss Protecte 1 Permiss Permiss Protecte Permiss Permiss Signal Group 6 1 5 2 3 8 7 4 Auxiliary Signal Groups Lead / Lag Lead Lead Lead Lead Minimum Green [s] 5 7 5 7 5 18 5 18 Maximum Green [s] 30 50 (. 30 50 22 50 22 50 Amber [s] 4.0 4.0 0 4.0 4.0 4.8 4.8 00 4.8 4.8 0.0 All red [s] 2.0 2.2 0.. 2.0 2.2 00 2.0 2.0 0.0 2.0 2.0 0.0 Split [s] 32 62 26 56 21 52 21 52 0 Walk [s] 7 7 7 7 Pedestrian Clearance [s] 36 36 0 32 32 Delayed Vehicle Green [s] 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11, Start -Up Lost Time [s] 2.0 2.0 2.0 2.0 00 2.0 2.0 0.0 2.0 2.0 0.0 Minimum Recall No No No No No No No No Maximum Recall No No No No No No No No Pedestrian Recall No No No No No No No No Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Lane Group Calculations g / C, Green / Cycle 0.51 0.36 0.36 0.51 0.46 0.46 0.04 0.27 0.27 0.09 0.32 0.32 (v / s)_i Volume / Saturation Flow Rate 0.01 0.27 0.53 0.40 0.22 0.04 0.02 0.26 0.26 0.10 0.21 0.16 so, Base Saturation Flow per Lane [pc/h/In 1900 1 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Arrival type 3 3 3 3 s, saturation flow rate [veh/h] 695 3204 1431 653 3204 1431 3113 1683 1678 3113 3204 1431 c, Capacity [veh/h] 320 1138 508 333 1486 663 114 453 452 275 1028 459 X, volume / capacity 0.03 0.77 1.49 0.79 0.48 0.09 0.67 0.95 0.95 1.10 0.66 0.51 d, Delay for Lane Group [s/veh] 21.50 51.17 280.76 55.64 30.97 24.43 83.33 80.20 80.24 130.66 47.80 45.19 Lane Group LOS C D F E C C F F F F D D Critical Lane Group No No Yes Yes Nc N.1(, N:; No Yes Yes No No Generated with pm VISTRO V V 50th -Percentile Queue Length [veh/In] 0.21 16.49 52.76 7.49 10.00 1.37 1.67 19.63 19.58 7.79 11.59 7.53 50th -Percentile Queue Length [ft/In] 5.15 412.34 1319.04 187.19 250.00 34.23 41.68 490.65 489.38 194.64 289.65 188.32 95th -Percentile Queue Length [veh/In] 0.37 23.15 80.42 11.98 15.19 2.46 3.00 26.89 26.83 12.79 17.17 12.03 95th -Percentile Queue Length [ft/In] 9.27 578.85 2010.41 299.38 379.65 61.62 75.02 672.28 670.78 319.74 429.20 300.84 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh] 21.50 51.17 280.76 55.64 30.97 24.43 83.33 80.22 80.24 130.66 47.80 45.19 Movement LOS C D F E C C F F F F D D Critical Movement No No Yes No No No No No No No No No d_A, Approach Delay [s/veh] 156.49 36.80 80.48 67.98 Approach LOS F D F E d_I, Intersection Delay [s/veh] 93 79 Intersection LOS F Intersection V/C 0.983 TRAFFIC IMPACT STUDY Scenario No.. 3 NW 22nd Avenue & Service Road Caltran Engineering Group Pagel 56 TRAFFIC IMPACT STUDY AM Caltran Engineering Group PageI61 Generated with Mg Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 3: NW 22 Avenue and Service Road Two-way stop HCM 7th Edition 15 minutes Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 14.1 B 0.025 Name NW 22 Avenue NW 22 Avenue Service Road Approach Northbound Southbound Eastbound Westbound Lane Configuration 111r 1 r r Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] ai 12.00 12.00 12.00 12.00 12.00 12 00 12.00 12 00 12 00 12.00 No. of Lanes in Entry Pocket 1 1 0 ( 0 0 0 0 0 0 0 Entry Pocket Length [ft] 60.00 100 20.00 100.00 100.00 100 00 ^or 00 100.00 100.00 100.00 100,00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0.00 0.00 0.00 000 0.00 000 0.00 0.00 0.00 0.00 000 0.00 Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name NW 22 Avenue NW 22 Avenue Service Road Base Volume Input [veh/h] 844 0 1024 0 10 0 10 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1 0000 1.0400 1.0400 1 0000 1.0400 1.0400 1.0000 1 0000 1.0400 1 0000 10000 1.0400 In -Process Volume [veh/h] 0 0 0 1 0 0 0 0 0 0 Site -Generated Trips [veh/h] 14 0 14 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 ( 0 0 0 3 0 0 Existing Site Adjustment Volume [veh/h] (S 0 0 0 0 0 L 0 0 Other Volume [veh/h] r 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] r 892 0 3 1079 0 0 0 10 0 10 Peak Hour Factor 1.0000 0.9710 0.9710 1 ,0000 0.9710 0.9710 1.0000 1.0000 0.9710 1.0000 1.0000 0.9710 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1 0000 1.0000 1 0000 1 0000 1.0000 Total 15 -Minute Volume [veh/h] 0 230 0 0 278 0 0 n 3 0 3 Total Analysis Volume [veh/h] 919 0 1111 0 10 10 Pedestrian Volume [ped/h] Generated with EM Version 2022 (SP 0-2) Intersection Settings VISTRO Priority Scheme Free Free Stop Stop Flared Lane Storage Area [veh] 0 0 0 0 Two -Stage Gap Acceptance No No Number of Storage Spaces in Median a 0 V/C, Movement V/C Ratio 0 00 0 01 0 00 0 00 0 01 0 00 0 00 0 00 0.02 0 OC 0 00 0.02 d_M, Delay for Movement [s/veh] 0 00 0 00 0 00 0 00 0.00 0.00 0,00 0 00 14.07 0.00 0 00 12.84 Movement LOS A A A A B B 95th -Percentile Queue Length [veh/In] 0 00 0.00 0 00 0 00 0.00 0.00 0 00 0 00 0.08 0 00 0 00 0.07 95th -Percentile Queue Length [ft/In] 0 ou 0.00 C 00 0 00 0.00 0 00 0 0( 0 00 1.89 0 ti(' C 0,D 1.63 d_A, Approach Delay (s/vehl 0.00 0.00 14.07 12.84 Approach LOS A A B B d_I, Intersection Delay [s/veh] 0.13 Intersection LOS B TRAFFIC IMPACT STUDY Caltran Engineering Group Pagel 62 Generated with Mil Version 2022 (SP 0-2) V I STRO Control Type: Analysis Method: Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 3: NW 22 Avenue and Service Road Two-way stop HCM 7th Edition 15 minutes Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 18.2 C 0.035 Name NW 22 Avenue NW 22 Avenue Service Road Approach Northbound Southbound Eastbound Westbound Lane Configuration 1 1 1 r IF' r r Tuming Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12 0.0 12.00 12.00 10 ioC' 12.00 12.00 112 00 12 r'0 12.00 2 1200 12.00 No. of Lanes in Entry Pocket 1 1 0 0 0 0 0 0 0 Entry Pocket Length [ft] 60.00 100.00 20.00 100 (10 100 00 100 [0 100 00 100 00 100 00 100 00 '00 OC 10C 0( No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] C'0 o1i 2 OD X12 ( rt' 0 02 1 On . nn 0 00 0 _i ' i ''0 n 00 Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name NW 22 Avenue NW 22 Avenue Service Road Base Volume Input [veh/h] 1469 0 912 6 0 .1 10 n 10 Base Volume Adjustment Factor ' Dliri0 1.0000 1.0000 1 0)000 1.0000 1.0000 0 1 20.''(' 1.0000 1.0C 1P ' O'i0L 1.0000 Heavy Vehicles Percentage [%] < JO 2.00 2.00 2 ('h 2.00 2.00 0 iv". 2.00 2 '2' 2 00 2.00 Growth Factor ' :oo(0 1.0400 1.0400 1 ('022 1.0400 1.0400 , __ 1 '.'Gun 1.0400 1 (''01» . r,10(K: 1.0400 In -Process Volume [veh/h] 0 0 0 0 0 2 0 Site -Generated Trips [veh/h] 17 0 18 0 J 0 11 C 0 Diverted Trips [veh/h] 0 0 C 0 0 c O 0 C 2 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 (' 0 Existing Site Adjustment Volume [veh/h] 0 0 ! 0 0 O 00 n Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 1545 0 966 6 _ 10 0 10 Peak Hour Factor 0:,`_'r 0.9710 0.9710 1 0000 0.9710 0.9400 ' ,q0,[ 1 nO,'»' 0.9710 1 00 i0 (iniu' 0.9710 Other Adjustment Factor ' :1001: 1.0000 1.0000 ' (1211'' 1.0000 1.0000 1 C) h1 , 1 20(i( 1.0000 1 00112 1 0000 1.0000 Total 15 -Minute Volume [veh/h] 398 0 249 2 3 3 Total Analysis Volume [veh/h] 1591 0 ,_ 995 6 _ 10 C, 10 Pedestrian Volume [ped/h) c 0 o Generated with GM Version 2022 (SP 0-2) Intersection Settings VISTRO Priority Scheme Free Free Stop Stop Flared Lane Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median u Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0 000 0 02 0 00 0 00 0 0' 0 00 0 00 0 00 0.02 0, :) i` 00 0.04 d_M, Delay for Movement [s/veh] 0.00 C.00 0 00 0 00 0.00 0.00 0.00 0 00 13.34 1!.o0 _ _ 18.17 Movement LOS A 0 A A B C 95th -Percentile Queue Length [veh/In] 0.00 !` :1 . t r-,, 0.00 0.00 c u0 C , l ? 0.07 ' oo 0.11 95th -Percentile Queue Length [ft/In] < < 0.00 , , ,, 0.00 0.00 ; ' 0 0 00 1.74 1" 0 on 2.73 d_A, Approach Delay [s/veh] 0.00 0.00 13.34 18.17 Approach LOS A A B C d_I, Intersection Delay [s/veh] 0.12 Intersection LOS C TRAFFIC IMPACT STUDY Sc;enar'ioNNo. 3 NW 22nd Avenue & Rutland Street Caltran Engineering Group PageI57 TRAFFIC IMPACT STUDY AM Caltran Engineering Group Pagel61 Generated with MI Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: NW 22 Avenue & Rutland Street Signalized HCM 7th Edition 15 minutes Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 8.2 A 0.375 Name NW 22 Avenue NW 22 Avenue Rutland Street Rutland Street' Approach Northbound Southbound Eastbound Westbound Lane Configuration 1 11"► 11 h l i r 1 Tuming Movement Left Thru Right U-tu Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 0 1 0 0 0 0 1 0 0 Entry Pocket Length [ft] 55.00 100.00 100.00 60.00 100.0 100.0 110.0 100.00 100.00 50.00 100 00 100 00 100 0(, No. of Lanes in Exit Pocket 0 0 0 0 n 0 0 0 0 0 0 Exit Pocket Length [ft] 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 0 00 000 U 00 0 0i' r, X1)0 Speed [mph] 30.00 30.00 30.00 30.00 Grade (%] 0.00 0.00 0.00 0.00 Curb Present Yes No Yes No Crosswalk Yes No Yes Yes Generated with Version 2022 (SP 0-2) Volumes Name NW 22 Avenue NW 22 Avenue Rutland Avenue Rutland Avenue Base Volume Input [veh/h] 4 744 5 18 28 920 15 13 2 11 24 8 15 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.000 1.000 1.000 1.000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Proportion of CAVs [%] 0.00 J Growth Factor 1.0400 1.0400 1.0400 1.040 1.040 1.040 1.040 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 23 1 0 14 0 0 3 3 0 24 5 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 I 0 I 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Right Turn on Red Volume [veh/h] 0 0 0 0 Total Hourly Volume [veh/h] 4 0.9710 Peak Hour Factor 0.9710 Other Adjustment Factor 1.0000 Total 15 -Minute Volume [veh/h] 1 Total Analysis Volume [veh/h] 4 797 6 0.9710 1 001501 1.0000 205 821 2 6 No No No 1.000 5 20 1.000 11 44 957 0.971 1.000 246 986 16 0.971 1.000 4 16 17 0.9710 1.0000 4 18 5 0.9710 1.0000 1 5 11 0.9710 1.0000 3 11 49 0.9710 1.0000 13 50 13 0.9710 1.0000 3 13 No No No 0.9710 4 16 Presence of On -Street Parking No No On -Street Parking Maneuver Rate [/h] 0 Local Bus Stopping Rate [/h] 0 0 0 0 0 v_do, Outbound Pedestrian Volume crossing 0 0 v_di, Inbound Pedestrian Volume crossing m 0 0 v_co, Outbound Pedestrian Volume crossing 0 0 0 0 v ci, Inbound Pedestrian Volume crossing ni 0 0 0 0 v_ab, Corner Pedestrian Volume [ped/h] 0 0 0 0 Bicycle Volume [bicycles/h] 0 0 0 0 Generated with 121 Version 2022 (SP 0-2) Intersection Settings VISTRO Located in CBD Yes Signal Coordination Group - Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Offset [s] 152.0 Offset Reference Lead Green - Beginning of First Green Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type Permiss Permiss Permiss Permi Permi Permi Permi Permiss Permiss Permiss Permiss Permiss Permiss Signal Group 6 2 8 4 Auxiliary Signal Groups Lead / Lag Minimum Green [s] 0 18 0 18 7 7 0 Maximum Green [s] 0 48 0 48 C 24 n 24 0 Amber [s] 0.( 4.0 0 (' 0.0 0.0 4.0 0.0 0 " 4.0 0.0 0.0 4.0 0.0 All red [s] 0 0 3.0 0 0 0 0 0.0 3.0 0 0 0 '.'0 3.0 0.0 0 0 3.0 0.0 Split [s] 0 78 0 0 0 78 O 82 0 0 82 0 Vehicle Extension [s] 0.0 3.0 0.0 0.0 0.0 3.0 0.0 0.0 3.0 0.0 0, 3.0 0.0 Walk [s] 7 0 0 0 7 0 26 0 7 0 Pedestrian Clearance [s] 0 18 0 0 18 10 0 10 0 Delayed Vehicle Green [s] 0.0 0.0 0.0 0.0 0 (: 0.0 0.0 0.0 00 00 0.0 0.0 Rest In Walk No No No No 11, Start -Up Lost Time [s] 0C 2.0 0 0.0 0.0 2.0 0.0 0.0 2.0 0.0 2.0 0.0 12, Clearance Lost Time [s] 0 (? 5.0 0.' 0.0 0.0 5.0 0.0 0.0 5.0 0.0 0.0 5.0 0.0 Minimum Recall No No No No Maximum Recall No No No No Pedestrian Recall No No No No Detector Location [ft] QO 0.0 2.0 : .0 0(; 2.0 Detector Length [ft] 40.0 0(. 40.0 I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Generated with Gag Version 2022 (SP 0-2) VISTRO Lane Group Calculations Lane Group L C C L C C C R C C, Cycle Length [s] 160 160 160 160 160 160 160 160 160 L, Total Lost Time per Cycle [s] 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 11_p, Permitted Start -Up Lost Time [s] 2.00 1) 00 r. 00 2.00 1, N o n0 2.00 0 0i) 2.00 12, Clearance Lost Time [s] 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 g_i, Effective Green Time [s] 131 131 131 131 131 131 15 15 15 g / C, Green / Cycle 0.82 0.82 0.82 0.82 0.82 0.82 0.09 0.09 0.09 (v / s)_i Volume / Saturation Flow Rate 0.01 0.25 0.25 0.11 0.30 0.30 0.02 0.01 0.08 s, saturation flow rate [veh/h] 506 1683 1679 596 1683 1674 1197 1431 1028 c, Capacity [veh/h] 416 1381 1377 493 1381 1373 150 132 131 d1, Uniform Delay [s] 5.70 3.42 3.42 5.52 3.67 3.67 67.08 66.47 72.93 k, delay calibration 0.50 0.50 0.50 0.50 0.50 0.50 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 0.04 0.56 0.56 0.54 0.74 0.75 0.47 0.27 4.37 d3, Initial Queue Delay [5] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.01 0.30 0.30 0.13 0.36 0.36 0.15 0.08 0.60 d, Delay for Lane Group [s/veh] 5.74 3.98 3.98 6.07 4.42 4.42 67.55 66.74 77.30 Lane Group LOS A A A A A A E E E Critical Lane Group No No No No No Yes No No Yes 50th -Percentile Queue Length [veh/In] 0.04 3.01 3.00 0.66 3.93 3.91 0.90 0.43 3.39 50th -Percentile Queue Length [ft/In] 1.02 75.20 75.03 16.46 98.25 97.74 22.43 10.63 84.64 95th -Percentile Queue Length [veh/In] 0.07 5.41 5.40 1.18 7.07 7.04 1.61 0.77 6.09 95th -Percentile Queue Length [ft/In] 1.84 135.36 135.05 29.62 176.84 175.93 40.37 19.14 152.36 Generated with ma Version 2022 (SP 0-2) VISTRO d_M, Delay for Movement [s/veh] 5.74 3.98 3.98 6.07 6.07 4.42 4.42 67.55 67.55 66.74 77.30 77.30 77.30 Movement LOS A A A A A A A E E E E E E d_A, Approach Delay [s/veh] 3.99 4.52 67.29 77.30 Approach LOS A A E E d_I, Intersection Delay [s/veh] 8.22 Intersection LOS A Intersection WC 0.375 Other Modes g_Walk,mi, Effective Walk Time [s] 30.0 0.0 11.0 11.0 M_comer, Comer Circulation Area [ftz/ped: 0.00 0 00 0.00 0.00 M_CW, Crosswalk Circulation Area [ftz/pedl 0.00 0.00 0.00 0.00 d p, Pedestrian Delay [s] 52.81 0.00 69.38 69.38 I_p,int, Pedestrian LOS Score for Intersectic n 2.754 0.000 1.995 1.899 Crosswalk LOS C F A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/11 888 888 938 938 d_b, Bicycle Delay [s] 24.75 24.75 22.58 22.58 I_b,int, Bicycle LOS Score for Intersection 2.245 2.403 1.616 1.690 Bicycle LOS 8 B A A Sequence Ring 1 2 4 Ring 2 6 8 Ring 3 Ring 4 1102 25s TRAFFIC IMPACT STUDY PM Caltran Engineering Group Pagel 62 Generated with 1211 Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: NW 22 Avenue & Rutland Street Signalized Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c): 7.5 A 0.420 Name NW 22 Avenue NW 22 Avenue Rutland Street Rutland Street Approach Northbound Southbound Eastbound Westbound Lane Configuration 1 1 I 11 r 1 r Tuming Movement Left Thru Right U-tu Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 1 0 0 0 0 1 0 0 Entry Pocket Length [ft] 55.00 100 00 loo 00 60.00 100.0 100 0 10 0 100 00 100 00 50.00 1 C?.? ;u1 100.00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 u0 0 00 0 00 0 00 0 00 0 00 0 00 1: 00 0 00 0 00 0 00 0 00 0 00 Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Curb Present Yes No Yes No Crosswalk Yes No Yes Yes Generated with GE Version 2022 (SP 0-2) Volumes VISTRO Name NW 22 Avenue NW 22 Avenue Rutland Street Rutland Street Base Volume Input [veh/h] 7 1113 5 0 40 824 5 30 2 12 10 4 15 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.000 1.000 1.000 1.000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Proportion of CAVs [% 0.00 Growth Factor 1.0400 1.0400 1.0400 1.040 1.040 1.040 1.040 1.0400 1.0400 1.0400 1.0400 1.0400 1.0400 In -Process Volume [veh/h] 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 26 2 0 18 0 0 4 4 0 27 5 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 0 Right Turn on Red Volume [veh/h] U 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 7 1184 7 0 60 857 5 35 6 12 37 9 16 Peak Hour Factor 0.9800 0.9710 0.9710 0.971 0.971 0.971 0.971 0.9710 0.9710 0.9800 0.9710 0.9710 0.9710 Other Adjustment Factor 1.0000 1.0000 1.0000 1.000 1.000 1.000 1.000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 305 2 0 15 221 1 9 2 3 10 2 4 Total Analysis Volume [veh/h] 7 1219 7 0 62 883 5 36 6 12 38 9 16 Presence of On -Street Parking No No No No No No No No On -Street Parking Maneuver Rate [/h] 0 0 0 0 0 0 Local Bus Stopping Rate [/h] 0 0 0 0 0 0 0 0 0 0 v_do, Outbound Pedestrian Volume crossing 0 0 0 v_di, Inbound Pedestrian Volume crossing m 0 0 v_co, Outbound Pedestrian Volume crossin 9 0 0 0 0 v_ci, Inbound Pedestrian Volume crossing m 0 0 0 0 v_ab, Comer Pedestrian Volume [ped/h] 0 0 0 0 Bicycle Volume [bicycles/h] 0 0 0 0 Generated with 1211 Version 2022 (SP 0-2) Intersection Settings VISTRO Located in CBD Yes Signal Coordination Group - Cycle Length [s] 160 Coordination Type Time of Day Pattern Coordinated Actuation Type Semi -actuated Offset [s] 152.0 Offset Reference Lead Green - Beginning of First Green Permissive Mode SingleBand Lost time [s] 0.00 Phasing & Timing Control Type Permiss Permiss Permiss Permi Permi Permi Permi Permiss Permiss Permiss Permiss Permiss Permiss Signal Group 6 1 ii 2 0 r 8 u 4 0 Auxiliary Signal Groups Lead / Lag Minimum Green [s] a 18 0 0 18 0 7 7 Maximum Green [s] C, 48 48 0 24 24 0 Amber [s] ._ _ 4.0 ,. 0 :i . u 4.0 G.0 0 •: 4.0 . _ 0 0 4.0 Allred[s] GO 3.0 r_" 0 _'0 "_ 3.0 -, 3.0 '. 00 3.0 Split [s] 0 82 J 82 0 78 0 78 Vehicle Extension [s] 3.0 . -, 0 _. 3.0 '? (' 3.0 0 (0 0.0 3.0 Walk [s] 7 7 26 7 0 Pedestrian Clearance [s] 18 18 ( 10 10 Delayed Vehicle Green [s] 0.0 0.0 ' 0.0 0.0 0 Rest In Walk No No No No 11, Start -Up Lost Time [s] 2.0 2.0 : 0 2.0 0 P 2.0 0 12, Clearance Lost Time [s] 5.0 _ 5.0 ("' 5.0 5.0 0 :' Minimum Recall No No No No Maximum Recall No No No No Pedestrian Recall No No No No Detector Location [ft] 2.0 2.0 Detector Length [ft] 40.0 40.0 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Exclusive Pedestrian Phase Pedestrian Signal Group 0 Pedestrian Walk [s] 0 Pedestrian Clearance [s] 0 Generated with Mg Version 2022 (SP 0-2) VISTRO Lane Group Calculations Lane Group L C C L C C C R C C, Cycle Length [s] 160 160 160 160 160 160 160 160 160 L, Total Lost Time per Cycle [s] 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 11_p, Permitted Start -Up Lost Time [s] 2.00 n. 00 0 00 2.00 0.0,, ,' 00 2.00 ,_L_0, 2.00 12, Clearance Lost Time [s] 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 g_i, Effective Green Time [s] 135 135 135 135 135 135 11 11 11 g / C, Green / Cycle 0.85 0.85 0.85 0.85 0.85 0.85 0.07 0.07 0.07 (v / s)_i Volume / Saturation Flow Rate 0.01 0.36 0.36 0.15 0.26 0.26 0.03 0.01 0.06 s, saturation flow rate [veh/h] 563 1683 1680 409 1683 1680 1385 1431 1138 c, Capacity [veh/h] 455 1425 1422 324 1425 1422 133 94 111 d1, Uniform Delay [s] 5.97 2.96 2.96 9.48 2.55 2.55 71.84 70.42 74.53 k, delay calibration 0.50 0.50 0.50 0.50 0.50 0.50 0.11 0.11 0.11 1, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 d2, Incremental Delay [s] 0.06 0.95 0.95 1.31 0.57 0.57 1.35 0.60 4.51 d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Group Results X, volume / capacity 0.02 0.43 0.43 0.19 0.31 0.31 0.32 0.13 0.57 d, Delay for Lane Group [s/vehl 6.03 3.91 3.91 10.78 3.12 3.13 73.19 71.02 79.04 Lane Group LOS A A A B A A E E E Critical Lane Group No No Yes No No No No No Yes 50th -Percentile Queue Length [veh/In] 0.07 4.18 4.18 0.94 2.61 2.60 1.72 0.48 2.72 50th -Percentile Queue Length [ft/In] 1.82 104.57 104.41 23.44 65.17 65.05 42.98 12.08 68.04 95th -Percentile Queue Length [veh/In] 0.13 7.53 7.52 1.69 4.69 4.68 3.09 0.87 4.90 95th -Percentile Queue Length [ft/In] 3.28 188.23 187.93 42.19 117.31 117.09 77.36 21.74 122.47 6 25s Generated with gin Version 2022 (SP 0-2) VISTRO d_M, Delay for Movement [s/veh] 6.03 3.91 3.91 10.78 10.78 3.13 3.13 73.19 73.19 71.02 79.04 79.04 79.04 Movement LOS A A A BB A A E E E E E E d_A, Approach Delay [s/veh] 3.92 3.63 72.70 79.04 Approach LOS A A E E di, Intersection Delay [s/veh] 7.47 Intersection LOS A Intersection V/C 0.420 Other Modes g_Walk,mi, Effective Walk Time [s] 30.0 0 n 11.0 11.0 M_comer, Comer Circulation Area [ft2/ped; 0.00 0 00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft2/ped 0.00 0 0 0! 1 0.00 0.00 dam, Pedestrian Delay [s] 52.81 0 00 69.38 69.38 l_p,int, Pedestrian LOS Score for Intersecticn 2.793 0 nor, 2.002 1.898 Crosswalk LOS C F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/t1 938 938 888 888 d_b, Bicycle Delay [s] 22.58 22.58 24.75 24.75 I_b,int, Bicycle LOS Score for Intersection 2.577 2.292 1.649 1.664 Bicycle LOS B B A A Sequence Ring 1 Ring 2 2 4 6 8 Ring 3 Ring 4 1111111111111.1.1.111111 TRAFFIC IMPACT STUDY Scenarlo N a!, 3 NW 22nd Avenue & Proposed Driveway Caltran Engineering Group PageI58 TRAFFIC IMPACT STUDY AM Caltran Engineering Group Pagel61 Generated with MI Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Two-way stop HCM 6th Edition 15 minutes Intersection Level Of Service Report Intersection 8: Drivewa Not Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 11.3 B 0.024 Name NW 22 Avenue NW 22 Avenue Driveway No1 Approach Northbound Southbound Westbound Lane Configuration 11 r 11 r Tuming Movement Thru Right Left Thru Left Right Lane Width [ft] 12.00 12.00 12 00 12.00 12no 12.00 No. of Lanes in Entry Pocket 0 1 0 0 0 0 Entry Pocket Length [ft] . 00.00 20.00 100.00 ' 00.00 100 00 100 00 No. of Lanes in Exit Pocket 0 0 0 1 0 0 Exit Pocket Length [ft] n 00 n 000 0 on 100.00 n ,0n 0 (111 Speed [mph] 30 00 30 00 30 00 Grade [%] 0.00 0.00 0.00 Crosswalk No No Yes Volumes Name NW 22 Avenue NW 22 Avenue Driveway No1 Base Volume Input [veh/h] 823 0 C 0 0 Base Volume Adjustment Factor 1.0000 1.0000 " 0000 1.0000 lor,;, 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2 OC 2.00 2 0:' 2.00 Growth Factor 1.0000 1.0000 1oUC, 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 Site -Generated Trips [veh/h] 0 25 14 14 Diverted Trips [veh/h] 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 r 0 0 Other Volume [veh/h] 0 0 0 0 0 Total Hourly Volume [veh/h] 823 25 n 14 14 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 ' _?( Ib, 1.0000 0.1, _ 1.0000 Total 15 -Minute Volume [veh/h] 206 6 4 4 Total Analysis Volume [veh/h] 823 25 14 14 Pedestrian Volume [ped/h] 0 Generated with 1011 Version 2022 (SP 0-2) Intersection Settings VISTRO Priority Scheme Free Free Stop Flared Lane Storage Area [veh] 0 ', 0 Two -Stage Gap Acceptance No Number of Storage Spaces in Median 0 n V/C, Movement V/C Ratio 0 01 0 00 0 0n 0 00 00 0G 0.02 d_M, Delay for Movement [s/veh] 0-00 000 0 00 0 00 0.00 11.26 Movement LOS A A A B 95th -Percentile Queue Length [veh/In] 0.00 0.00 0 00 0.00 n 00 0.07 95th -Percentile Queue Length [ft/Inj 0.00 0.00 0 0; 0.00 `, 00 1.82 d_A, Approach Delay [s/veh] 0.00 0.00 11 26 Approach LOS A A B d_I, Intersection Delay [s/veh] 0.18 Intersection LOS B TRAFFIC IMPACT STUDY PM Caltran Engineering Group Page162 Generated with Mg Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Two-way stop HCM 6th Edition 15 minutes Intersection Level Of Service Report Intersection 8: Driveway Not Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 16.1 C 0.050 Name NW 22 Avenue NW 22 Avenue Driveway Not Approach Northbound Southbound Westbound Lane Configuration 11 r» 11 r Tuming Movement Thru Right Left Thru Left Right Lane Width [ft] 12.00 12.00 12 00 12.00 2 .0; 12.00 No. of Lanes in Entry Pocket 0 1 0 0 0 0 Entry Pocket Length [ft] ' 00 000 20.00 ' 0 1 00.00 00.00'0 No. of Lanes in Exit Pocket 0 0 0 1 0 0 Exit Pocket Length [ft] 0 00 n _1': n 0,, 100.00 1'" 00 Speed [mph] 30 00 30 00 30 00 Grade [%] 0.00 0.00 0.00 Crosswalk No No Yes Volumes Name NW 22 Avenue NW 22 Avenue Driveway No1 Base Volume Input [veh/h] 1552 0 0 0 Base Volume Adjustment Factor 1.0000 1.0000 . _ 1.0000 .1 a 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2 n 2.00 Growth Factor 1.0000 1.0000 1 .n'.00 1.0000 01,1 1.0000 In -Process Volume [veh/h] 0 0 0 0 Site -Generated Trips [veh/h] 0 29 C 18 17 Diverted Trips [veh/h] 0 0 .. 0 0 Pass -by Trips [veh/h] 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 Other Volume [veh/h] 0 0 Ci 0 0 Total Hourly Volume [veh/h] 1552 29 18 17 Peak Hour Factor 1.0000 1.0000 ,: 1.0000 .: i02 1.0000 Other Adjustment Factor 1.0000 1.0000 • ,,,Qo 1.0000 l'' 1, 1.0000 Total 15 -Minute Volume [veh/h] 388 7 5 4 Total Analysis Volume [veh/h] 1552 29 18 17 Pedestrian Volume [ped/h] 0 Generated with gia Version 2022 (SP 0-2) Intersection Settings VISTRO Priority Scheme Free Free Stop Flared Lane Storage Area [veh] 0 Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0 G2 0.00 ; o0 0 (Ill r_, 0.05 d_M, Delay for Movement [s/veh] 0 00 0.00 0.00 0.00 ri. 00 16.14 Movement LOS A A A C 95th -Percentile Queue Length [veh/In] 0.00 0.00 0.00 '' K 0.16 95th -Percentile Queue Length [ft/In] 0.00 0.00 0.00 (0 3.93 d_A, Approach Delay [s/veh] 0.00 0.00 16 14 Approach LOS A A C d_I, Intersection Delay [s/veh] 0.17 Intersection LOS C TRAFFIC IMPACT STUDY Scenarlo N 0.) 44 Rutland Street Proposed Driveway Caltran Engineering Group PageI59 TRAFFIC IMPACT STUDY AM Caltran Engineering Group Pagel61 Generated with Gra Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Two-way stop HCM 6th Edition 15 minutes Intersection Level Of Service Report Intersection 10: Driveway 2 Delay (sec / veh): Level Of Service: Volume to Capacity (v/c): 9.5 A 0.012 Name Driveway No.2 Rutland Avenue Rutland Avenue Approach Southbound Eastbound Westbound Lane Configuration r'r► 1 r Tuming Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] CSC n0 1 OO.00 .01' 01 1 CCI UO ' D!s C'C I00-00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] n oG o 00 0 00 00 (10 Speed [mph] 30 00 30 00 30 00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes No No Volumes Name Driveway No.2 Rutland Avenue Rutland Avenue Base Volume Input [veh/h] 0 0 0 37 78 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 10 29 17 0 0 9 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 10 29 17 37 78 9 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 3 7 4 9 20 2 Total Analysis Volume [veh/h] 10 29 17 37 78 9 Pedestrian Volume [ped/h] 0 Generated with Version 2022 (SP 0-2) Intersection Settings VISTRO Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] 0 Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement roach & Intersection Results V/C, Movement V/C Ratio 0.01 0.03 0.01 o ii(, i Dr; G D% d_M, Delay for Movement [s/veh] 9.51 8.85 7.41 G 01 L, u.00 Movement LOS A A A A A A 95th -Percentile Queue Length [veh/In] 0.13 0.13 0.03 0.03 0.00 0.00 95th -Percentile Queue Length [ft/In] 3.26 3.26 0.85 0.85 0.00 0.00 d_A, Approach Delay [s/veh] 9.02 2.33 0.00 Approach LOS A A A d_l, Intersection Delay [s/veh] 2.65 Intersection LOS A TRAFFIC IMPACT STUDY PM Caltran Engineering Group PageI62 Generated with ma Version 2022 (SP 0-2) VISTRO Control Type: Analysis Method: Analysis Period: Intersection Setup Two-way stop HCM 6th Edition 15 minutes Intersection Level Of Service Report Intersection 10: Driveway 2 Delay (sec 1 veh): Level Of Service: Volume to Capacity (v/c): 9.4 A 0.013 Name Driveway No. 2 Rutland Street Rutland Avenue Approach Southbound Eastbound Westbound Lane Configuration 4r Ii 1 1 M Tuming Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] 100.00 '0C 00 100 00 100 G0 1 70 00 ;ir_, 00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] n 00 0 00 000 Cr 0 (0 n 0i Speed [mph] 30 00 30 00 30 00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes No No Volumes Name Driveway No. 2 Rutland Street Rutland Avenue Base Volume Input [veh/h] 0 0 0 49 30 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 11 32 23 0 0 11 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 11 32 23 49 30 11 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 3 8 6 12 8 3 Total Analysis Volume [veh/h] 11 32 23 49 30 11 Pedestrian Volume [ped/h] 0 Generated with ari Version 2022 (SP 0-2) Intersection Settings VISTRO Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] 0 00 Two -Stage Gap Acceptance No Number of Storage Spaces in Median 0 0 V/C, Movement V/C Ratio 0.01 0.03 0.01 000 G_00 0 00 d_M, Delay for Movement [s/veh] 9.40 8.64 7.33 0 00 0 00 0 00 Movement LOS A A A A A A 95th -Percentile Queue Length Iveh/In] 0.14 0.14 0.04 0.04 0.00 0.00 95th -Percentile Queue Length [ft/In] 3.43 3.43 1.12 1.12 0.00 0.00 d_A, Approach Delay [s/veh] 8.83 2.34 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 3.52 Intersection LOS A TRAFFIC IMPACT STUDY A.PPENDIX Concurrence Analysis Caltran Engineering Group Pagel 60 TABLE 4 Generalized Peak Hour Two -Way Volumes for Florida's Urbanized Areas' Lanes 2 4 6 8 Lanes 2 4 6 8 Lanes 2 2 Multi Multi INTERRUPTED FLOW FACILITIES STATE SIGNALIZED ARTERIALS Class I (40 mph or higher posted speed limit) Median B C D Undivided * 1,510 1,600 Divided * 3,420 3,580 Divided * 5,250 5,390 Divided * 7,090 7,210 Class II (35 mph or slower posted speed limit) Median Undivided Divided Divided Divided B C * 660 * 1,310 * 2,090 * 2,880 D 1,330 2,920 4,500 6,060 Non -State Signalized Roadway Adjustments (Alter corresponding state volumes by the indicated percent.) Non -State Signalized Roadways - 10% E ** ** ** ** E 1,410 3,040 4,590 6,130 Median & Turn Lane Adjustments Exclusive Exclusive Adjustment Median Left Lanes Right Lanes Factors Divided Undivided Undivided Undivided Yes No Yes No No No No No Yes One -Way Facility Adjustment Multiply the corresponding two -directional volumes in this table by 0.6 +5% - 20% -5% - 25% + 5% Lanes 4 6 8 10 12 Lanes 4 6 8 10 UNINTERRUPTED FLOW FACILITIES B 4,050 5,960 7,840 9,800 11,600 B 4,130 6,200 8,270 10,350 FREEWAYS Core Urbanized C 5,640 8,310 10,960 13,510 16,350 D 6,800 10,220 13,620 17,040 20,930 Urbanized C D 5,640 7,070 8,450 10,510 11,270 13,960 14,110 17,310 January 2020 Freeway Adjustments Auxiliary Lanes Ramp Present in Both Directions Metering + 1,800 + 5% E 7,420 11,150 14,850 18,580 23,200 E 7,690 11,530 15,380 19,220 Lanes 2 4 6 Lanes 2 Multi Multi UNINTERRUPTED FLOW HIGHWAYS Median B C D E Undivided Divided Divided 1,050 3,270 4,910 1,620 4,730 7,090 2,180 5,960 8,950 2,930 6,780 10,180 Uninterrupted Flow Highway Adjustments Median Exclusive left lanes Adjustment factors Divided Yes +5% Undivided Yes -5% Undivided No -25% BICYCLE MODE2 (Multiply vehicle volumes shown below by number of directional roadway lanes to determine two-way maximum service volumes.) Paved Shoulder/Bicycle Lane Coverage 0-49% 50-84% 85-100% B * 190 830 C 260 600 1,700 D 680 1,770 >1,770 E 1,770 >1,770 ** PEDESTRIAN MODE2 (Multiply vehicle volumes shown below by number of directional roadway lanes to determine two-way maximum service volumes.) Sidewalk Coverage 0-49% 50-84% 85-100% B C * * * 150 340 960 D E 250 850 780 1,420 1,560 >1,770 BUS MODE (Scheduled Fixed Route)3 (Buses in peak hour in peak direction) Sidewalk Coverage 0-84% 85-100% B >5 >4 C >4 >3 D >3 >2 E >2 >1 'Values shown are presented as peak hour directional volumes for levels of service and are for the automobile/truck modes unless specifically stated. This table docs not constitute a standard and should be used only for general planning applications. The computer models from which this table is derived should be used for more specific planning applications. The table and deriving computer models should not be used for corridor or intersection design, where more refined techniques exist. Calculations are based on planning applications of the HCM and the Transit Capacity and Quality of Service Manual. 2 Level of service for the bicycle and pedestrian modes in this table is based on number of vehicles, not number of bicyclists or pedestrians using the facility. 3 Buses per hour shown are only for the peak hour in the single direction of the higher traffic flow. * Cannot be achieved using table input value defaults. ** Not applicable for that level of service letter grade. For the automobile mode, volumes greater than level of service D become F because intersection capacities have been reached. For the bicycle mode, the level of service letter grade (including F) is not achievable because there is no maximum vehicle volume threshold using table input value defaults. Source: Florida Department of Transportation Systems Implementation Office https://www.fdot.gov/planning/systems/ QUALITY/LEVEL OF SERVICE HANDBOOK TABLE 4 (continued) Generalized Peak Hour Two -Way Volumes for Florida's Urbanized Areas January 2020 INPUT VALUE ASSUMPTIONS Uninterrupted Flow Facilities Interrupted Flow Facilities State Arterials Class I Freeways Core Freeways Highways Class I Class II Bicycle Pedestrian ROADWAY CHARACTERISTICS Area type (urban, rural) urban urban Number of through lanes (both dir.) 4-10 4-12 2 4-6 2 4-8 2 4-8 4 4 Posted speed (mph) 70 65 50 50 45 50 30 30 45 45 Free flow speed (mph) 75 70 55 55 50 55 35 35 50 50 Auxiliary Lanes (n,y) n n Median (d, twit, n, nr, r) d n r n r r r Terrain (I,r) 1 1 1 1 1 1 1 1 1 1 % no passing zone 80 Exclusive left turn lane impact (n, y) [n] y y y y y y y Exclusive right turn lanes (n, y) n n n n n n Facility length (mi) 3 3 5 5 2 2 1.9 1.8 2 2 TRAFFIC CHARACTERISTICS Planning analysis hour factor (K) 0.090 0.085 0.090 0.090 0.090 0.090 0.090 0.090 0.090 0.090 Directional distribution factor (D) 0.55 0.55 0.55 0.55 0.550 0.560 0.565 0.560 0.565 0.565 Peak hour factor (PHF) 0.95 0.95 0.95 0.95 1.000 1.000 1.000 1.000 1.000 1.000 Base saturation flow rate (pcphpl) 2,400 2,400 1,700 2,200 1,950 1,950 1,950 1,950 1,950 1,950 Heavy vehicle percent 4.0 4.0 2.0 2.0 1.0 1.0 1.0 1.0 2.5 2.0 Speed Adjustment Factor (SAF) 0.975 0.975 0.975 Capacity Adjustment Factor (CAF) 0.968 0.968 0.968 % left turns 12 12 12 12 12 12 % right turns 12 12 12 12 12 12 CONTROL CHARACTERISTICS Number of signals 4 4 10 10 4 6 Arrival type (1-6) 3 3 4 4 4 4 Signal type (a, c, p) c c c c c c Cycle length (C) 120 150 120 120 120 120 Effective green ratio (g/C) 0.44 0.45 0.44 0.44 0.44 0.44 MULTIMODAL CHARACTERISTICS Paved shoulder/bicycle lane (n, y) n, 50%, y n Outside lane width (n, t, w) t t Pavement condition (d, t, u) t On -street parking (n, y) Sidewalk (n, y) n, 50%, y Sidewalk/roadway separation(a, t, w) t Sidewalk protective barrier (n, y) n LEVEL OF SERVICE THRESHOLDS Level of Service Freeways Highways Arterials Bicycle Ped Bus Density Two -Lane Multilane Class I Class II Score Score Buses/hr. %ffs Density ats ats B <17 >83.3 <17 >31mph >22mph <2.75 <2.75 <6 C < 24 > 75.0 < 24 > 23 mph > 17 mph < 3.50 < 3.50 < 4 D < 31 > 66.7 < 31 > 18 mph > 13 mph < 4.25 < 4.25 < 3 E <39 >58.3 <35 >15mph >10mph <5.00 <5.00 <2 % ffs = Percent free flow speed ats = Average travel speed QUALITY/LEVEL OF SERVICE HANDBOOK 74 PiN a.u NET 0w00 SAO.- PALM m -s DAMN e urTONNO OD ML\£R PJJTTO NNOO D nTPJ PRELIMINARY LANDSCAPE PLAN 8CAL6:313 0 =1, P RAP E mRTLE CT , P OO TIP =C ON,/ ITT, NO RTHWEST 22ND AVENUE A SPNN I PAw6 [NI w' OEEMAIEE W+' As PEN Laura Digitally signed by L aur a Ll er ena- LIerena- Hernandez Hernandez D13374i/240522- :1ale4:45: 20522.0400.31 -09' below • wCaOww.PaW DESIGNI NG BE AUTIFUL SP ACES LLA LAURA LLERENA 8 ASSOCIATES LANDSCAPE ARCHI TE CTURE 131905 . W. 12816 SINN. Suite 207, Mimi. FL 331116 TN: 305 .2561199 / PM: 105 3561155 Nww.0laenruwu En.coE FIALLO'S N'EP DESIGN, INC 10010 SW 83rd ST. Miami, Fl orid a 33173 305.877.1845 Jfl ello®08IIOmepdeelgn .com CAI 28837 NEW C -STORE & G AS ST ATION UNBR ANDED 14548 NW 22 Aven ue OPA-LOCKA, Fl orid a 33054 wOUM we ENR.IINP Am FLOPPY, PL A eeeer:PS NO. PC ANCI NIII DAIS eiE PLA N 04-01-1¢ Joe MAMA: 20-200-00585 IS SUE OAIE OIEONE D L-1 MEET NUMBE D PLANT LIS7 OT1XE-: ao A, CA _ N- = CO 1ON N AME 0. 5 -_ . !MEP b G EE PPROCARI. L.P. RIC EUR N Ly ERWTONW000 C RAP E MYRTLE /.GLASS ED FLOWER*. PG • C ry ORRO US...IR NANA LIVE PR ex x mm is NT • ' DB E+. F4. P3 SP SA SAL PALM ETTO SABA L PALM A RR PON 6. -23' OD , BO OTED. STAG ERRED ws. F4 ry1R>ADA LANW .... m...LIP C. SR I BA 3. ILE X VCA DDRIA D WA RF T'AUPON LT Axx 3 4AL. DP DC . T S. -RAPOERO N a CA R ... PNG I IVU.Y GRASS 6X6 3OA- 00 L,O R. M SOD TO BE D ETER -I EO • • SO D STENO TARRUM TU+ bT NOW. FLORA ,. A SOL ID WO SRO. SO D ......O T N OTAT 1 D AwA BCD 4 R SO LID 500 AS0FRNATIO N>. ORO.WT TOLERAN CE • PR ON. .GA T e • BTAG EROED 6iD StAVO ARD RR V ERY O RTW2 TO. TERANTI 5R SINGLE O. CENTER ANATIVE Tb. BA R 6P AO NG G AL. • &N GLE TRAK 4HL G RE Y .C.C. Mt. TR. NEW TREE - 1 TEA R MAIN TENA NCE PLAN MATE R RI u TREES TO BE ON A...TED IRR GATION SY STEM urc R Gam SENSOR EN MON . TAPIR VAR. IND T.0 1.1.2TpOW - E VERY CORER DAY 1.1 t..10 .4COMP LETE Y EAR • J 111.5 A W EEK KorE EO N DU RA TIO N TREE r0 .SURE THAT TREES ROOT 8 4L 16 G ORETILT.SUREEL T' ...RA MO WrtH uTER nONS MY yaR Y D UE 10 TAR OF Y EAR AND C o.. CONDITONS FERTILI_ OE A P ALM SPEC IAL FER TILSE R 5.2.0. FRF r ATLANTIC FERTILOER I LDS PE R N CH C ALIPER OF TR EE EVERT J MON. NG• 4Y nYS OR PEL ALO CA MAC. ONLY P ONT. LIO N A PP ROVED FLO RtSaCH NO RED C0.O RED OR C YPRESS Re . TO BE UOEO PRNE ONLY CR ITIC AL BRMIC.R6 r0 E. OR B ROcEN. IN SPEC • T AL LTR EEETIE MATERRI Ii A LLTR EEAL TAAT IS N AVD6i UNTA CT NTRE AND Ap Rr mR. CR Om A1ORE .:.>` STAK ING P ONT.B AF TER MALL PLANTING d THE TREE .PILD DE .LL E>Tap LS.ED DT THEY. PRE LIMINARY PLANT L IST BCALs: NIS LA NDSCAP E N OTES ALL P LAN T MATER. SUMA C Be.AD ED FLORIDA * OR B ETTER Y DEFSED m TH E... ANC STANDA RDS FOR MAT.. RA MS PART I AND F B+ TA E STATE OF FLO RID A, DEPARTMEN T OA .6 710. 1..6E UITA CO-NtY . CITY OR LO CAL O RD INA NCE S 3. STROPS REPRE.0 PL.NTSA Mlli iSTAfE.FEVER TTR E OP Wr4 5.61.6.0 126 MY ¢x br lw R.D ERGROAD N.IL TIT¢6 A1O r0 R We wBrA LL AT.2 CR PLAN T MAIERUL 0 ALL TRE ES. ORAL A1D GRO :MO.. SHA LL R EC OM J" PEPt.. P Swterxmo eLORnsACW OR IS R E>POBB LE FOR 1.02 O WN G RANT., TAKE O.. N CASE GA ANY DS CFE PANCIES. TAKE PR ECEDENCE OV ER RAN T LIST SIOO LO a D'NALL BE S. .BG,6TRE RO RATAM B 0486 >WALI BE A 26" WIDE STOOP 0 ROR RULC H B ETWEEN SCC PA3D N.LB BFNOO YD COVER B. B 2�io Eo. M E 1.12RG RAN ULES 6.NA LL Be A DDED TO AL L TREE. PALn RI* AT nE R ATE ▪ c .0 PLANTIN G SOIL MMAN LiEl iCOO. WO RTLIER YBLL BE ADD ED EACu RIC K 2. ONO . 7064ANN IPCR.Y iR D CP TOE 4 N O OiiPEAT 1'10 86 4 Of WEE P 6 BETWEEN b .B . 10 AFTER MIX. 4 AD DInP.6 FER IILU ER NO .*. Y MIXED L N A CO TER CIA L .RED DER 1- 0x S.I Rx ALL BE FREE CV ROOM LIMB S. ROOM OT PAM . NL IT O E XIST. SOD OITSID E THE LOX OF WOW L. DA MAG ED D .. CO NSTR .,. BE REP LA CED u1rH O E ALL AT NO CO ST TO 0 ER PLANTING B ED S MT DE RISE OF SURFACE .OK WrtH A D IA METER O. N . PR Y L RLc C AD. PLANT MATER IAL. ENCL .,. S00. 10 BE WARRAN TED A*FOLLOWS.AND FO VE R R +D DAY S LARW /KA T PL.1 TOyERMATEMAL 03 D IDEO RECEIV ING P ROPER mANTENANCE PRE•CR IB ED B L A.... CONTR AC TO R N ew AC C. W R. ,c•ro.2 w ew. cA.... R.*c.. . w cwvel AR IMF I.ro.F.w .c IAA ALA rot6 ALL WARRANTIES TO RN cw.w w r r L+PR E CON STRU CTIO N P RA .. WY ODC TCON TR OL O T. NS TALLER • R. S TAE R ESPONSIOLIP OF THE N6tALLER 0.WNO T.,E .TALLAT N F NA6E IwnL AP IA, ACC EPTAN CE a LAND SCAPE CONTR....2I6 RESP LONOLE. FOR CO ORP.TING EWER WO RK .616 THE IRYGA TION CONTRA CTOR TREES 3.13 NOT BE N.AN TE0 ON TO P O RIN GATION L.6. .TAL LA TION IS PROPERLY MEOG ESSIN G AND y ORTFOR GOO D GROW. OR IS rrH E 0 .IER OR IRRIGATIO NO MONNE ROROT BE NO TPIED M LAT E G OF ANY PROBLEMS wnH TFL .. OR PERFOR INAN CE IRR IG AT.4 10 fE WED (IF AP P-CAB LEI S TOW B RO NIT TO a WOO FyCn ONPY . STANDARD o PROPER WA TePEw a A LL PLAN T N IA TEwA L 2 OR ND ENO R ROO M. r. IRR IGA TION CO VPOI. 6NxL BE ...Fa FOR A LL LAND SCAP E A REAS 1,0 IB D ES . iPA NELS. IL* E PLACE ALPO P ERNTER O ALL LANDSC APE ISL.. iwPAN DO COWAN G DO Loa TR EES. MNV R122'... PANELS r0 DE RED . EXISTING TR EE LIST: ER Laura Digitally signed by Laura Llerena- Llerena- Hernandez Hernandez Date: 2022.04.01 13:17:18 -04'00' 81� below. D83IONINO BE AUTIFUL SPACES L LAURA LLEREN A & ASSOCIAT ES LANDSCAPE ARCHITECT URE 131700 S.W.1284 SUIXL Suns 207.64.04. FL 33186 Tel: 305 .2564 X99 /,L F. 303.261155 verew,Ill FIALLO'S MEP DESIGN, INC 10010 SW 83rd ST. Miami, Florida 33173 305 .877.1845 JBBIIo@flal bmepde &9n .com CA I 28637 NEW C -STORE & GAS STATION UNBRANDED 14548 NW 22 Avenu e OPA-L OCKA, Florid a 33054 H 0. IRVIERE GTE _ PIER. _040014 LAUR A 01L LB FNRA ERTANDE2 .IOBNA®E 20-200-00585 8!88616 2021 116 ISSUE: L-2 SOHT NNMR AFA & Company, Inc Prepued By. AFA & COMPANY, INC. PRO FESSIO NA L LA ND SURVEYORS AN D MA PPERS FLO RID A CER77FICA7E OF AU THORIZATION No . LB 7498 13050 SW 133917 COURT. MIAML F LORID A 33186 E -MILL' AFACO @BELLS OUTHN ET PH 305-234-0588 FXr 206495.0778 Abbrev t:ttons o! Lovoai AVE. -AV ENUE ASPH -A SPHALT A /W-ANC HO RD WIRE MC-AIR coNDmONER BLDG -BUILDING B. COR. -BLOCK CORNER CAL -CALCULATED C. B. -CATCH BASIN CLF -CHAIN LIN K FENCE CON C -C ONCRE TE COL -C OLUM N C.U .P. -C ON CR ETE UTILITY PO LE C.L.P. -CONCRE TE LIGHT POLE CBS -CONCRETE BLOCK STRUC TURE C. M.E. -CANAL MAINTE NA NCE EASEMENT D -DELTA D /W -DRIVEWA Y D.M.E. -DRAINAGE& MAIN TENANC E EASEMENT ENC. -ENCROA CHM ENT E T.9. -ELECTRIC TRANSFORM ER PAD F.P.L -FL ORIDA POWER AND LIGHT F.H. -FIRE HYDRANT F. I. P. -FOUND IRON PIPE F.F. -FI NISH PL000 MR -FOU ND DRILL HOLE F.R. -FOUND REBAR F/D -FOUND D ISC FM -FOUN D NA IL VF -IRON FENCE L -LENGH T LTA E. -LAKE MAINTENAN CE EASEMEN T L.F.E. -LOWEST FLO OR ELEV ATION LP. -LIGHT POLE MEAS. -MEASURED M. H. -MA N HOLE MA. -MONUMENT LINE N.8.V. D. -NATIO NA L G EODETIC VORTICAL DA TUM N. T. S. -NOT TO SC ALE 0. E. -O VER HEAD ELECTIUC LIN E OIL -0N LIN E P.C. P. -PERMANENT CON TR OL POINT PM. -PARKING M ET ER P.C. -POIN T OF CURVA TURE P/W -PARK WAY PL -PLANTER P.O.0 -POINT OF COMMENCEM ENT P.O .B -POINT OF BEGINNING R -RADIU S RES -RESIDEN CE R/W -RIGH T OF WAY S.D.H. .1E7 D RILL HO LE SIN -SET NAIL S.LP. -SET IRON PTE SOWLK -SIDEWALK ST-9TRFF1 T -TANGENT U.E-U TILITY EASEMENT W/F -WOOD FENC E W.V. -WATER VALVE W.U.P. -WOOD U I1.nY POLE "— —"- •IR0N FENCE CBS WA LL --I—I - -CHAIN LINK FENCE — — — OVERH EAD ELEC. — — — -CENTERLIN E — -EASEMEN T •em -D ENOTES ELEV ATIONS • BUILDING -D ISTA NCE ® -C ATCH B ASIN -WATERM ETER • -STA TE ROAD O -US HIGHWAY F/N • OCS SO 03^N NZ C/B Lot 1, Bloc k 336 2 FIP No Id Bf_114114. Lot 40 . WUP 12 De dicated Alley Way As P er PB 50-5 Miami - Dade Co., FL. 80030'54'E 223 .78' \ Co ncrete M/W M/W Bad Conditio n Asph alt Service Box 9/ ONE ST ORY CBS COMMER CIAL BLDG . 014585 10 t0 9 Car Porch 6) Bad Condition Asph alt 2050 R oof CD CO 2 8 o o O O m CO J "0 B ad C ondition Asphalt \,h/IV E M/ W M/ W Servic e B ox L=27.64' R=25.00' / Y2 FIP No Id D=6320'51 ' Tan=15.42' F/N 11 5' Sidewalk \ 2' Valley Gutter Turning Lane WUP 30030'54 'E 2' Curb and Gutt er WUP Northw est 22nc Asphalt Pa vem ent 60' Dedicat ed R/W As Per PB 50-5 Miami -Dad e Co ., FL. S0030'54'E AFA & COMPANY, INC. Owner's List within 375 -foot Radius Map Folio # and Legal Description 1. Magnolia Gardens Consolidated Lots 41-44, Block 336, PB 50-5 08-2122-005-0690 P.A. 14585 NW 22 AVE 2. Magnolia Gardens Consolidated Lot 1, Block 336, PB 50-5 08-2122-005-0270 P.A. 2180 SERVICE RD 3. Magnolia Gardens Consolidated Lot 2, Block 336, PB 50-5 08-2122-005-0280 P.A. 2170 SERVICE RD 4. Magnolia Gardens Consolidated Lot 3, Block 336, PB 50-5 08-2122-005-0290 P.A. 2160 SERVICE RD 5. Magnolia Gardens Consolidated Lot 4, Block 336, PB 50-5 08-2122-005-0300 P.A. 2150 SERVICE RD 6. Magnolia Gardens Consolidated Lot 5, Block 336, PB 50-5 08-2122-005-0310 P.A. 2140 SERVICE RD 7. Magnolia Gardens Consolidated Lot 6, Block 336, PB 50-5 08-2122-005-0320 P.A. 2130 SERVICE RD 8. Magnolia Gardens Consolidated Lot 7, Block 336, PB 50-5 08-2122-005-0330 P.A. 2120 SERVICE RD 9. Magnolia Gardens Consolidated Lot 8, Block 336, PB 50-5 08-2122-005-0340 P.A. 2110 SERVICE RD Owners Maclam Investment LLC 10773 NW 58th ST, Ste. 140 Doral, FL 33178 Edward Alonza Frierson 2180 Service Rd. Opa Locka, FL 33054 Kimberly Jackson / Brandon Bailey 4291 NW 44th Ct Lauderdale Lakes, FL 33319 Porfirio M. Bonet 19201 S. St. Andrews Dr. Hialeah, FL 33015 John S. Bailey & w Tanya 2150 Service Rd. Opa Locka, FL 33054 McCoy Fam Legacy Prtnship LLLP 101 Nw 3`d Ave. 1420 Ft. Lauderdale, FL 33301 Odalys Isabel Ramirez Reyes 2130 Service Rd. Opa Locka, FL 33054 Porfirio M. Bonet 19201 S. St. Andrews Dr. Hialeah, FL 33015 Debbie P. Nails 18040 NW 2nd PL. Miami, FL 33169 1 AFA & COMPANY, INC. Owner's List within 375 -foot Radius Map Folio # and Legal Description 10. Magnolia Gardens Consolidated Lot 40, Block 336, PB 50-5 08-2122-005-0660 P.A. 2181 RUTLAND ST 11. Magnolia Gardens Consolidated Lot 39, Block 336, PB 50-5 08-2122-005-0650 P.A. 2171 RUTLAND ST 12. Magnolia Gardens Consolidated Lot 38, Block 336, PB 50-5 08-2122-005-0640 P.A. 2161 RUTLAND ST 13. Magnolia Gardens Consolidated Lot 37, Block 336, PB 50-5 08-2122-005-0630 P.A. 2151 RUTLAND ST 14. Magnolia Gardens Consolidated Lot 36, Block 336, PB 50-5 08-2122-005-0660 P.A. 2141 RUTLAND ST 15. Magnolia Gardens Consolidated Lot 35, Block 336, PB 50-5 08-2122-005-0610 P.A. 2131 RUTLAND ST 16. Magnolia Gardens Consolidated Lot 34, Block 336, PB 50-5 08-2122-005-0600 P.A. 2121 RUTLAND ST 17. Magnolia Gardens Consolidated Lot 33, Block 336, PB 50-5 08-2122-005-0590 P.A. 2111 RUTLAND ST 18. Magnolia Gardens Consolidated Lot 32, Block 336, PB 50-5 08-2122-005-0580 P.A. 2101 RUTLAND ST Owners Edward Tynes & w Valerie 5275 NW 18151 Ter. Opa Locka, FL 33055 US Housing Equity Fund LLC 20295 NE 29th PL 100A Aventura, FL 33180 Althea Jacobs 2161 Rutland St. Opa Locka, FL 33054 Notsas Renaissance LLC 1189 NW 44th Ave. Lauderhill, FL 33313 Marion Denson & w Catherine 4344 NW 202nd St. Carol City, FL 33055 Savannah Allen / Shirley Wallace 2131 Rutland St. Opa Locka, FL 33054 34 Ways Foundation Inc. PO Box 308 Metaire, LA 70004 Randall Neal Thomas LE 2111 Rutland St. Opa Locka, FL 33054 Stacy Lewis Thomas 2101 Rutland St. Opa Locka, FL 33054 2 AFA & COMPANY, INC. Owner's List within 375 -foot Radius Map Folio # and Legal Description 19. Magnolia Gardens Consolidated Lots 41-44, Block 339, PB 50-5 08-2122-005-1120 P.A. 14495 NW 22 AVE 20. Magnolia Gardens Consolidated Lot 1, Block 339, PB 50-5 08-2122-005-0700 P.A. 2190 RUTLAND ST 21. Magnolia Gardens Consolidated Lot 2, Block 339, PB 50-5 08-2122-005-0710 P.A. 2180 RUTLAND ST 22. Magnolia Gardens Consolidated Lot 3, Block 339, PB 50-5 08-2122-005-0720 P.A. 2170 RUTLAND ST 23. Magnolia Gardens Consolidated Lot 4, Block 339, PB 50-5 08-2122-005-0730 P.A. 2160 RUTLAND ST 24. Magnolia Gardens Consolidated Lot 5, Block 339, PB 50-5 08-2122-005-0740 P.A. 2150 RUTLAND ST 25. Magnolia Gardens Consolidated Lot 6, Block 339, PB 50-5 08-2122-005-0750 P.A. 2140 RUTLAND ST 26. Magnolia Gardens Consolidated Lot 7, Block 339, PB 50-5 08-2122-005-0760 P.A. 2130 RUTLAND ST 27. Magnolia Gardens Consolidated Lot 8, Block 339, PB 50-5 08-2122-005-0770 P.A. 2120 RUTLAND ST Owners NW22LLC 20281 E. Country Club Dr. Ste. 1805 Aventura, FL 33180 Sharon Ann Brown 2190 Rutland St. Opa Locka, FL 33054 Elituob 2016 LLC 1301 Miami Gardens Dr. Unit 806W Miami, FL 33179 Yunior Rodriguez / Marianela Perez 2170 Rutland St. Opa Locka, FL 33054 Tercena Raffelita Lawrence 2160 Rutland St. Opa Locka, FL 33054 Jorge Rojas De Leon 2150 Rutland St. Opa Locka, FL 33054 Romisa 2140 LLC 3450 SW 32nd St. Opa Locka, FL 33055 Marta Argelia Alvarado 2130 Rutland St. Opa Locka, FL 33054 Marion Sims 2120 Rutland St. Opa Locka, FL 33054 3 AFA & COMPANY, INC. Owner's List within 375 -foot Radius Map Folio # and Legal Description 28. Magnolia Gardens Consolidated Lot 9, Block 339, PB 50-5 08-2122-005-0780 P.A. 2110 RUTLAND ST 29. Magnolia Gardens Consolidated Lot 40, Block 339, PB 50-5 08-2122-005-1090 P.A. 2181 WILMINGTON ST 30. Magnolia Gardens Consolidated Lot 39, Block 339, PB 50-5 08-2122-005-1080 P.A. 2171 WILMINGTON ST 31. Magnolia Gardens Consolidated Lot 38, Block 339, PB 50-5 08-2122-005-1070 P.A. 2161 WILMINGTON ST 32. Magnolia Gardens Consolidated Lot 37, Block 339, PB 50-5 08-2122-005-1060 P.A. 2151 WILMINGTON ST 33. Magnolia Gardens Consolidated Lot 36, Block 339, PB 50-5 08-2122-005-1050 P.A. 2141 WILMINGTON ST 34. Magnolia Gardens Consolidated Lot 35, Block 339, PB 50-5 08-2122-005-1040 P.A. 2131 WILMINGTON ST 35. Magnolia Gardens Consolidated Lot 34, Block 339, PB 50-5 08-2122-005-1030 P.A. 2121 WILMINGTON ST 36. Magnolia Gardens Consolidated Lot 33, Block 339, PB 50-5 08-2122-005-1020 P.A. 2111 WILMINGTON ST Owners Bene Homes LLC 9030 SW 48th Ter. Miami, FL 33165 Mitchell Allen Jackson & Icilda 2181 Wilmington St. Opa Locka, FL 33054 Lucky O. Connor 291 N. Biscayne River Dr. Miami, FL 33169 Herman Fluitt & Eloise Fluitt 2606 Raven Lake Ct. Pearland, TX 77584 Luciferous Holdings LLC 2151 Wilmington St. Opa Locka, FL 33054 Camelle Joseph 2141 Wilmington St. Opa Locka, FL 33054 Linda B. Jackson 2131 Wilmington St. Opa Locka, FL 33054 Johnnie Mae Mosley & Charrise 2121 Wilmington St. Opa Locka, FL 33054 Tracy White & Kirby White 2111 Wilmington St. Opa Locka, FL 33054 4 AFA & COMPANY, INC. Owner's List within 375 -foot Radius Map Folio # and Legal Description 37. Magnolia Gardens Consolidated Lot 32, Block 339, PB 50-5 08-2122-005-1010 P.A. 2101 WILMINGTON ST 38. Magnolia Gardens Consolidated 2nd Add. Lot 32, Block 343, PB 49-70 08-2122-009-0050 P.A. N/A 39. Magnolia Gardens Consolidated Lot 1, Block 343, PB 50-5 08-2122-005-1570 P.A. 14430 NW 21 CT 40. Magnolia Gardens Consolidated Lot 2, Block 343, PB 50-5 08-2122-005-1580 P.A. 14420 NW 21 CT 41. Magnolia Gardens Consolidated Lot 32, Block 344, PB 50-5 08-2122-005-2160 P.A. 14445 NW 21 CT 42. Magnolia Gardens Consolidated Lot 31, Block 344, PB 50-5 08-2122-005-2150 P.A. 14435 NW 21 CT 43. Magnolia Gardens Consolidated Lot 1, Block 344, PB 50-5 08-2122-005-1850 P.A. 2130 WILMINGTON ST 44. Magnolia Gardens Consolidated Lot 2, Block 344, PB 50-5 08-2122-005-1860 P.A. 2120 WILMINGTON ST 45. Magnolia Gardens Consolidated Lots 12, 13 & N21.5' Lot 14, Block 335, PB 50-5 08-2122-005-0120 P.A. 14566 NW 22 AVE Owners Shirley B. Daniels 2101 Wilmington St. Opa Locka, FL 33054 Abbas Ugur 46 NW 95th St. Miami, FL 33150 Maua Investments LLC 4699 N. Federal Hwy, Ste. 109E Pompano Beach, FL 33064 Jose Esquivel 3282 NW 50`b St. Miami, FL 33142 Alicia L. Donald 3422 NW 5th Ave. Miami, FL 33127 Laura Adams Roberts 14435 NW 21st Ct. Opa Locka, FL 33054 Lorenzo Akin 15421 NW 27th PL. Miami Gardens, FL 33054 Marie E. Falaise 268 SW Grove Ave. Port St. Lucie, FL 34983 M&N Property Investment Inc. 14566 NW 22nd Ave. Opa Locka, FL 33054 5 AFA & COMPANY, INC. Owner's List within 375 -foot Radius Map Folio # and Legal Description 46. Magnolia Gardens Consolidated S28.5' Lot 14, Block 335, PB 50-5 08-2122-005-0140 P.A. N/A 47. Magnolia Gardens Consolidated Lot 15, Block 335, PB 50-5 08-2122-005-0150 P.A. N/A 48. Magnolia Gardens Consolidated Lot 11, Block 335, PB 50-5 08-2122-005-0110 P.A. 2210 SERVICE RD 49. Magnolia Gardens Consolidated Lot 10, Block 335, PB 50-5 08-2122-005-0100 P.A. 2220 SERVICE RD 50. Magnolia Gardens Consolidated Lot 9, Block 335, PB 50-5 08-2122-005-0090 P.A. 2230 SERVICE RD 51. Magnolia Gardens Consolidated Lot 8, Block 335, PB 50-5 08-2122-005-0080 P.A. 2240 SERVICE RD 52. Magnolia Gardens Consolidated Lot 16, Block 335, PB 50-5 08-2122-005-0160 P.A. 2211 RUTLAND ST 53. Magnolia Gardens Consolidated Lot 17, Block 335, PB 50-5 08-2122-005-0170 P.A. 2221 RUTLAND ST 54. Magnolia Gardens Consolidated Lot 18, Block 335, PB 50-5 08-2122-005-0180 P.A. 2231 RUTLAND ST Owners M&N Property Investment Inc. 14566 NW 22nd Ave. Opa Locka, FL 33054 M&N Property Investment Inc. 14566 NW 22nd Ave. Opa Locka, FL 33054 Geraldine Jones 1610 NW 154th St. Opa Locka, FL 33054 Constance Green Syder LE 2601 NW 162nd Ter. Miami Gardens, FL 33054 De Jesus 2 Realty LLC 5445 Collins Ave. CU28 Miami Beach, FL 33140 Cruz M. Matos LE 2240 Service Rd. Opa Locka, FL 33054 William Boyd III 2211 Rutland St. Opa Locka, FL 33054 Sofia Garcia & Sofia Cruz 2221 Rutland St. Opa Locka, FL 33054 Terell Killings 2161 NW 60th St. Miami, FL 33142 6 AFA & COMPANY, INC. Owner's List within 375 -foot Radius Map Folio # and Legal Description 55. Magnolia Gardens Consolidated Lot 12, Block 340, PB 50-5 08-2122-005-1240 P.A. N/A 56. Magnolia Gardens Consolidated Lot 13, Block 340, PB 50-5 08-2122-005-1250 P.A. N/A 57. Magnolia Gardens Consolidated Lot 14, Blk 340 & Lot 1, Blk 356, PB 50-5 08-2122-005-1260 P.A. 14460 NW 22 AVE 58. Magnolia Gardens Consolidated Lot 11, Block 340, PB 50-5 08-2122-005-1230 P.A. 2210 RUTLAND ST 59. Magnolia Gardens Consolidated Lot 10, Block 340, PB 50-5 08-2122-005-1220 P.A. 2220 RUTLAND ST 60. Magnolia Subdivision 2nd Add. Lot 6, Block 1, PB 46-89 08-2122-004-0050 P.A. 2236 ALI BABA AVE 61. Magnolia Subdivision 2nd Add. Portion of Block 1, PB 46-89 08-2122-004-0040 P.A. 2222 ALI BABA AVE 62. Magnolia Subdivision 2nd Add. Portion of Block 1, PB 46-89 08-2122-000-0420 P.A. 2218 ALI BABA AVE 63. Magnolia Subdivision 2nd Add. Lots 1 & 2, Block 1, PB 46-89 08-2122-004-0020 P.A. 2216 ALI BABA AVE Owners M&N Property Investment Inc. 14566 NW 22nd Ave. Opa Locka, FL 33054 M&N Property Investment Inc. 14566 NW 22nd Ave. Opa Locka, FL 33054 FT SB Ingram LLLP 703 Waterford Way 780 Miami, FL 33126 Melanie Cozart 2210 Rutland St. Opa Locka, FL 33054 Kathryn L. Williams LE 2220 Rutland St. Opa Locka, FL 33054 Roy De La Pena 841 NE 3rd PL. Hialeah, FL 33010 Arturo Raboso 2222 Ali Baba Ave. Opa Locka, FL 33054 Arturo Raboso & Onasis Morris 671 E. 34th St. Hialeah, FL 33013 Nestor J. Lopez & Diana M. Suarez 19284 SW 66th St. Weston, FL 33332 7 AFA & COMPANY, INC. Owner's List within 375 -foot Radius Map Folio # and Legal Description 64. Magnolia Subdivision Lots 1-3, Block 12, PB 40-80 08-2122-003-1960 P.A. 2196 ALI BABA AVE 65. Magnolia Gardens Consolidated Lot 19, Block 335, PB 50-5 08-2122-005-0190 P.A. 2241 RUTLAND ST List prepared by: AFA & Company, Inc. Professional Land Surveyors & Mappers 13050 SW 133`d Court, Miami, FL 33186 O. 305.234.0588 Email: afaco@bellsouth.net Owners Amara Construction Group LLC 14201 SW 41St St. Miramar, FL 33027 Michael Perrier & Shemika Carter 2241 Rutland St. Opa Locka, FL 33054 The List hereon is true and accurate representation thereof to the best of my knowledge and belief. Armando F. Alvarez Professional Surveyors & Mappers #5526 State of Florida 8 AFA & Company, Inc I \i uclam Inc csu ncnt I I.( I'ol 08-21 .22-0(b Cl n411 14585 .1 it 22nd A ve. Upa-Lo cha, Flo rida 151Cs.t JOB # 21-695 DATE 05-28-2021 PB 50-5 375' P?aJdi. ;. Jss ra pt Sheet I of Scale t "_ AFA &T Company, Inl. Professional S urveyors & Mappers LB 7498 13050 S .W . 133rd Co urt Miami Florida, 33186 E-mail: afaco@bellso uth .net Ph . # (305) 234-0588 Fa x # (206) 495-0778 The sketch here on is a true and Accurate representation thereof to the best of my knowledge and belief, Subject to notes and Notations show n here on. A rm ando F. Al varez P rofe ssional S rvry ar & Mapp er #5526 Stat e of Fl ori da N ot Vali d unle ss Signed if Stamp ed with Emb ossed S eal AFA & Company, Inc 1al Ii.�� Ix I. MaLIani Investme nt LLC Ful: 08-2122-005-069(1 14585 N6{' 22trr! , -1 ve . Opa -Loc•ka, Florida 33054 GG `O 04\G I' 1a 1+1l, Il,n.u:aW IiI, 1'.• I IA,1;;:'• IIU.i-III?11 41, NUN ISopvit Ins cxllnc nl Illy Is. 'IS :172 IxN IIr1U 47 %Lit, Prul.rl7 lu..>Iman lu. Iu ut 11_ !uIl< 01% •. ,. ‘i&6 I.11gmm 111.¢,1111.1„ Ili I• ,1. ,* -2I''_ uu` 14.111 u nI.C� rlo pa 11rv.au 1, tn, Uan IJ 1105 .SI, lul:l.uli l ! l. I. 0 z N z I S 1..1 JI!:- 11111 nui isr C) 4l '4Illl p l ...11.,1.1 I-i• 114 I1 ,s.-11. .0 0 01.S4,100 00110 0N 1. Inl..rl,l1 JOB # 21-695 DATE 05-28-2021 37 5' . s 111 AFA &t Company, I nc Pr ofessional Surveyors & Mappers I 13050 S.W. 133rd ( Miami Florida, 33 E-mail: afaco@bellso PLANNING & ZONING BOARD September 13, 2022 MACLAM INVESTMENT LLC C/O MAURICIO FALLA SERVICE STATION -CONVENIENCE STORE -RETAIL SPACES -HAND CAR WASH: Site Plan APPLICANT'S REQUEST: A RESOLUTION OF THE PLANNING & ZONING BOARD OF THE CITY OF OPA-LOCKA, FLORIDA RECOMMENDING APPROVAL OF THE FINAL SITE PLAN REQUEST FOR THE CONSTRUCTION AND OPERATION OF CONVENINENCE STORE, TWO RETAIL SPACES AND A SERVICE STATION WITH A HAND CAR -WASH AT 14585 NW 22 AVENUE AND IDENTIFIED BY FOLIO 08-2122-005-0690 IN THE B-2 ZONING DISTRICT; PROVIDING FOR AN EFFECTIVE DATE. Staff Report City of Opa-locka 1 Planning and Community Development Depart nent I.Site Background • According to Miami -Dade County Property Appraiser's website, the subject Property's legal description is as follow: MAGNOLIA GARDENS CONSOLIDATED; PB 50-5 LOTS 41 THRU 44 BLK 336 LESS BEG NW COR OF S25FT OF LOT 43 TH SELY AD 119.46FT SELY AD 49.29FT SWLY AD 4.23FT NWLY AD 50.90FT NLY 119.67FT TO POB FOR R/W LOT SIZE 20,886 SQ FT • The subject property is currently owned by Maclam Investment LLC according to Miami -Dade County Property appraiser's website. The subject Property is currently vacant pending the review and approval of this request for the construction of a convenience store, service station, two proposed retail spaces and a hand car wash. The applicant, Mauricio Falla, has submitted a site plan review application, a development agreement application and the supporting documentation for the City to consider approval of their request for the redevelopment of this site. This parcel is located at 14585 NW 22' Avenue and is identified by Folio #08-2122-005-0690 and the zoning designation of this property is B-2 Liberal Commercial, and it is within the Corridor Mixed Use Overlay. • Currently the site conditions are as follow: This property is vacant and is not being used by any business. (see Existing Condition Section). The site is located in the southeast section of the City at the intersection of Service Road and NW 22"d Avenue. NORTH NW 22nd Ave Figure 1: Google Street View, dated: October 2021 SOUTH City of Opa-locka 1 Planning and Community Development Department Page 3 of 12 11. Project Details • Applicant's intent The applicant wishes to redevelop and construct a service station (fueling station) and a 3,579 square foot building with 1,975 square feet allocated for the Convenience Store and two 802 square foot sections for new retail spaces. This development will also include an 808 square foot section for a hand car wash. The new development will include 9 car parking spaces, 22 new assorted trees 359 shrub plants and appropriate landscaped open space. The City of Opa-locka's Comprehensive Plan, Future Land Use map provides that the property has a future land use designation of "Commercial" and the zoning map provides that the property is zoned Commercial Liberal and is within the "Corridor Mixed Use Overlay". This use, Auto Service Station is permitted in the B-2 zoning district after Special Exception review approval and the Retail Sales and Services uses are permitted in the B-2 zoning district. The outside hand car wash is permitted as an accessory use for any Auto Service Station. This proposed operation is adjacent to Single -Family homes on the eastside of this parcel. According to the site plan a 6 -foot concrete wall will be built on the eastside of this property to buffer the use from the single-family residential properties. For additionally buffering there is a 12 -foot dedicated alley between the service station and the single-family residential properties. Applican Folio Number (s Address Locatio �. Building (s) Footprin Floor Area Zoning Zoning Code Consistency Existing Land Use Future Land Use Designation, Comprehensive Plan Consistency, Applicable LDR Sections. SET BACKS/ YARD Front (West);' Rear (East) Alley way Side (North) Corner Side (South) Corner Corner Lots/ Other Lot Covera ' e Maclam Investment LLC Opa-locka: 08-2121-005-0690 14585 NW 22nd Avenue Total Site Area — 20,886 SF Convenience Store Bldg. Area —1,975 SF (2) Retail Spaces — 802 SF each Hand Car Wash Area — 808 SF Fueling Area —1,440 SF Total 3,579 SF B-2 — Liberal Commercial / CMU — Corridor Mixed Use Overlay The proposed use for an Auto Service Station is consistent with the B-2 Zoning after Special Exception review approval. Commercial Use Commercial Use - The proposed use for an Auto Service Station and retail sales are consistent with the Comprehensive Plan. and service use Ordinance no. 15-31, Article III Sec; 22-55; Article IV Sec. 22-80, Sec. 22-112, Article VII, VIII and X 22-90; Article V REQUIRED 10 Feet 0 Feet 15 Feet 15 Feet N/A 80% PROPOSED 83 Feet N/A 15 Feet 15 Feet N/A 80% COMPLIANCE YES YES YES YES N/A YES City of Opa-locka 1 Planning and Community Development Department Page 4 of 12 Lot Densi Lot Size Lot Width Building Height Structure Length Open Space (Landscaping) Trees Parking Details Parking Details (Cont' Landscape/ Pervious Lot Coverage Notification Requirement Local Government Action Required N/A 10,000 SF (0.23 Acres) NIA 3 Stories or 45 Feet whichever Tess N/A 4,177.2 SF 22 Auto Service Station (Gas Stations and Mini Marts): pursuant to the Land development Regulation Ordinance 15-31: Article VI, one (1) Parking per 500 square feet of floor area. - 3.92 spaces required Retail Sales & Service (General Commercial): pursuant to the Land Development Regulation, Ordinance 15-31: Article VI, one (1) Parking per 500 square feet of floor area. 1,604 sq. ft. floor area — 3.2 spaces required Total Required Parking Spaces: 7 parking spaces N/A N/A 20,886 SF (.479 Acres) YES N/A Convenience Store & 2 Retail Spaces: (16' 8") Less than 45 Feet / 3 Stories N/A 4,177.2 sq. ft. 22 N/A Auto Service Station. Total Parking Spaces Provided: 5 Total Spaces 3 Total Spaces 1 Handicapped Spaces Provided YES N/A YES YES YES YES YES 20% minimum required pervious 20% provided YES This request will be properly noticed pursuant to state law and city charter by the city clerk's office. - A copy of notice for advertisement titles were given to the Clerk's Office on Tuesday, August 31st, 2022. To be advertises at least 10 days prior to this Planning and Zoning Board meeting on Tuesday, September 13th, 2022. - City Commission Meeting: TBD The City Commission must review this site plan and consider approval/disapproval after it is reviewed by the Planning and Zoning Board and any other applicable boards or agency(s). I II . Overall Analysis Existing Conditions: • The Subject Property is generally surrounded by Residential properties to the east and commercial and residential properties to the west and south of this site and State Road #9 to the north of this site. • Sidewalk alongside the west edge of the Property. • The property is currently vacant and no licensed business operates at this site. • The last approved commercial use of this site was for a Car Wash. City of Opa-locka 1 Planning and Community Development Department Page 5 of 12 South -East View of property from NW 22nd Avenue / East View of Property from NW 22nd Avenue laW City of Opa-locka I Planning and Community Development Department Page 6of12 North View of Property from Rutland Street City of Opa-locka I Planning and Community Development Department Page 7 of 12 City of Opa-locka !Planning and Community Development Department Page 8 of 12 Surrounding Land Use and Zoning: Table 2 Location North South East West Id Use ROW Low Density Residential/Commercial Low Density Residential ROW Surrounding Zoning Designation Map The Site is Highlighted in Image Future Land Use FLU ROW (State Road 9) Low Density Residential/Commercial Low Density Residential ROW (NW 22nd Avenue) R-1 N/A R-1 IB-2 R-1 N/A w • General Character / Neighborhood Compatibility: The proposed development use is permitted if approved after special exception review. This site is adjacent to a single-family residential area in need of services beyond fueling, however the most recent licensed use of this site was a hand car wash. This development proposed to buffer the site from the adjacent east -side residential properties through a 6 ft tall concrete wall and because of the alley between the site and the residential properties. Will this proposed use be in Harmony with the general character of the surrounding neighborhood considering population density, design, scale, and bulk of any proposed new structures, intensity and character of activity, traffic and parking conditions? Findings: ■ The proposed development use 'Auto Service Station with 2 retail spaces and a hand car wash" is permitted by the LDR and an opportunity to provide retail services as well as auto services which may be in harmony with the general characteristic of the surrounding neighborhood: Commercial/Residential Uses COMPLIES • Tree Preservation: Compliance with Tree Preservation Ordinance required pursuant to City ORDINANCE NO.10-03 - Findings: The Applicant is proposing to include 22 new assorted trees, 359 shrub plants and appropriate landscaped open space. COMPLIES ■ (Please see attached Landscape Plan for Trees detailed information). City of Opa-locka I Planning and Community Development Departrnent Page 9 of 12 • Fence: All walls fences and hedges placed within required yard areas shall conform to the following regulations, except where special requirements are set for5th for specific buffering or screening purpose elsewhere in this Code. Fences shall be constructed in a way so as not to obstruct or impair the view of any vehicle driver's ability to see other vehicles or pedestrians within two hundred (200) feet of any intersection within the district. In commercial or mixed use districts, the maximum height for walls, fences and hedges shall not exceed 6 feet in height, measured from the final grade in front yards and 10 feet in height in side and rear yards. Findings: ■ The Applicant is not required to have fencing as the property is on a commercial corridor pursuant to the City Land development Regulation/Zoning Code 15-31, B-2 Commercial Liberal District (Section 22-90). • Future Land Use: Commercial - Findings: ■ According to the City of Opa-locka Comprehensive Plan; the proposed project shall be located within the City's Commercial land use designation category location. COMPLIES COMPLIES • B-2 (Commercial Liberal) Permitted Uses: Project Specific: Auto Service Station, Two Retail Spaces, and Hand - Car Wash Findings: ■ According to the City's Land Development Regulation/ Zoning Code B-2 (Commercial Liberal) allows for Auto Service Station, Two Retail Spaces, and Hand -Car Wash within this zoning district. COMPLIES • Community Comments/Petitions: The Applicant provided a mailing list to the Planning and Community development Department that will inform the surrounding businesses for signatures, comments or possible opposition. Findings: The Planning and community Development Department has not received any public opinions concerning this development in support or in opposition. Residents will have opportunity to support or oppose this action at the public hearings. IV. Project Need Assessment / other Required Approvals V COMPLIES 1. Site Plan • Application submitted for Planning & Zoning Board Meeting (last meeting) Tuesday, September 13th, 2022 2. Development Agreement • Application submitted for Planning & Zoning Board Meeting (last meeting) Tuesday, September 13th, 2022 Development Review Committee (DRC): Meeting Review Comments 1. Capital Improvement Project (CIP): • No issues reported for the proposed Site Plan 2. Building: • N/A 3. Police: City of Opa-locka 1 Planning and Community Development Departrnent Page 10 of 12 ■ N/A 4. Community Redevelopment Agency (CRA): ■ N/A 5. City Manager's Office (CMO): ■ N/A 6. Code Enforcement: ■ N/A 7. City Attorney's Office: • Development Agreement under review 8. Public works: • N/A 9. Inter -jurisdictional Review: ■ N/A VI. Staff Recommendation: - Staff recommend approval of this Site Plan. Approval of this site plan should include the following other approvals: • A Development Agreement must be submitted along with this Auto Service Station, with two Retail Spaces, and a Hand Car Wash Site Plan pursuant to the city Land Development Regulation/ Zoning Code Ordinance no. 15-31: Article V Section 22-112 and F.S. Section 163.3220-163.3243; • Traffic Statement was provided and the site plan was modified in accordance. • All signage shall comply with the City's Sign Code Ordinance no. 15-31 Article X; • All landscaping and parking areas must be provided and maintained as shown in the Site Plan; • Trees to be planted in accordance with the City LDR • Adequate landscape buffer around parking area; • Extend employment and educational opportunities to City residents through local employment centers, and collaboration with The Meek Group, Miami -Dade Chamber of Commerce and local higher learning centers. M -D College, Florida Memorial University, & St. Thomas University ; • Maintain 100% the use, function, or any recommendation the Planning and Zoning Board deem necessary for this Auto Service Station site plan and or not limited to the provision of satisfying all other city's land development code pertaining to the site, landscape and structures; • All trash & garbage containers shall comply with the City dumpster enclosure requirements; • The Development Agreement (D.A.) shall specifically address the site plan, the daily operation, business, behaviors and any other requirements set forth by the City's Land Development Code, Planning and Zoning Board and the City Commission for this proposed development site plan; • Address all Miami -Dade County's input/recommendations as appropriate VII. Attachments: • Site Plan • Development Agreement Planning and Community Development Department City of Opa-locka 1 Planning and Community Development Department Page 11 of 12 VIII. Staff Report Will be Updated After the Planning and Zoning Board Meeting on September 13, 2022. Reflected Actions: I. Planning and Zoning Board Decision: (PLEASE SEE MEETING MINUTES FOR DETAIL DISCUSSIONS) Resolution No. 2022-09-13-02, RESOLUTION OF THE PLANNING AND ZONING BOARD, OF THE CITY OF OPA-LOCKA, RELATING TO THE APPLICATION OF: MACLAM INVESTMENT LLC C/O MAURICIO FALLA, FOR: SITE PLAN APPROVAL REQUEST TO CONSTRUCT AND OPERATE THE FOLLOWING: A CONVENINENCE STORE, TWO RETAIL SPACES AND A SERVICE STATION WITH A HAND CAR -WASH WITH 9 CAR PARKING SPACES. WHEREAS, applicant has appeared before this Board for the request in the application, and all evidence, documents and exhibits have been received and marked pursuant to the Code of Ordinance of the City of Opa- locka. NOW, THEREFORE, IT IS RESOLVED AS FOLLOWS: 1) That the request in the application by the applicant be and the same is hereby a. APPROVED b. DENIED El DATE: 09-13-2022 c. NOT DETERMINE ❑ until additional consideration at the regular meeting to be held on / _ / 2) That the following special condition be and they are hereby imposed, conditioning the determination aforementioned: a. b. *** The Planning and Zoning Board Approval of this request was approved by a - vote*** I HEREBY CERTIFY that the resolution containing the determination of this Board is a true and correct copy as is reflected upon the public records of the City of Opa-locka this day of Chairperson or Designee City of Opa-locka I Planning and Community Development Department Page 12 of 12 The Following changes/recommendations will reflect recommendations from the Planning and Zoning Board discussions in regard to the proposed Service Station, Retail uses and Car Wash. City of €pa-Iocka 1 Planning and Community Development Department