Loading...
HomeMy Public PortalAbout114 N Main St - Triple R Agreement - Signed 11.3.22Init „MA Document AIOI® - 2017 v Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the 1st day of November in the year 2022 (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status, address and other information) City of Crestview 198 N. Wilson St. Crestview, Fl. 32536 and the Contractor: (Name, legal status, address and other information) Triple R. Construction 8010 Sleepy Bay Blvd. Navarre, 1.32566 for the following Project: Name, location and detailed description) 114 N. Main St. Crestview FI. The Architect: (Name, legal status, address and other information) NONE The Owner and Contractor agree as follows. As shown on_G 703 Remodel 114 N. Main St., Crestview, Fl. 32536 ADDITIONS AND DELETIONS: The author of this document has added information.needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. The parties should complete A1010-2017, Exhibit A, Insurance and Bonds, contemporaneously with this Agreement. AIA Document A201®-2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. AIA Document A101®— 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The `American Institute of Architects," "AIA," the AIA Logo, "A101," and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software 0116:05:27 CT on 11/01/2022 under Order No.2114366152 which expires on 09/20/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1717196594) 4 TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS EXHIBIT A INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary, and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contact Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be: (Check one of the following boxes.) The date of this Agreement. 4/6/..e-0 A date set forth in a notice to proceed issued by the Owner. Established as follows: (Insert a date or a means to determine the date of commencement of the Work) If a date of commencement of the Work is not selected, then the date of commencement shall be the date of this Agreement. § 3.2 The Contract Time shall be measured from the date of commencement of the Work. § 3.3 Substantial Completion § 3.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Contractor shall achieve Substantial Completion of the entire Work: (Check one of the following boxes and complete the necessary information.) AIA Document A101 e — 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects," "AIA," the AIA Logo, "A101," and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 16:05:27 CT on 11/01/2022 under Order No.2114366152 which expires on 09/20/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1717196594) [1 [ 1 Not later than (/ alendar days from the date of commencement of the Work. By the following date: § 3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the.Work are to be completed prior to Substantial Completion of the entire Work, the Contractor shall achieve Substantial Completion of such portions by the following dates: Portion of Work Substantial Completion Date § 3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3, liquidated damages, if any, shall he assessed as set forth in Section 4.5. ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be One Hundred Forty One Thousand, five hundred twenty eight Dollars and Zero Cents (S 141,528.011 ), subject to additions and deductions as provided in the Contract Documents. 42 Alternates § 4.2.1 Alternates, if any, included in the Contract Sum: Item None Price § 42.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Agreement. Upon acceptance, the Owner shall issue a Modification to this Agreement. (Insert below each alternate and the conditions that must be met for the Owner to accept the alternate) Item Price Conditions for Acceptance None § 4.3 Allowances if any, included to the Contract Sum: (Identif? each allowance:) Item None Price § 4.4 Unit prices, if any.:...... (ldentiji' the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price per Unit ($0.00) § 45 Liquidated damages, if any: (Insert terms and conditions for liquidated damages, if any) At it,11 ,h § 46 Other (Insert provisions for bonus or other incentives, if anv, that might result in a change to the Contract Sum.) AIA Document A101®— 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects, "AIA," the AIA Logo, "Al01," and °AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 16:05:27 CT on 11/3112022 under Order No.2114366152 which expires on 09/20/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1717196594) ARTICLE 5 PAYMENTS § 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the City by the Contractor and Certificates for Payment, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: As progress payment per G 703. § 5..1.3 Provided that an Application for Payment is received by the City not later than the 10th day of a month, the Owner shall make payment of the amount certified to the Contractor not later than the 30th day of the month. If an Application for Payment is received by the Contractor after the application date fixed above, payment of the amount certified shall be made by the Owner not later than ( ) days (Federal, state or heal laws may require payment within a certain period of time) §. 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form, and supported by such data to substantiate its accuracy by the contractor. This schedule of values shall be used as a basis for reviewing the Contractor's Applications fm Payment. § 5.1.5 Applications • for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.6 In accor:daance with AIA Document A201TM-2017, General Conditions of the Contract for Construction, and subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: § 5.1.6.1 The amount of each progress payment shall first include: .1 That portion of the Contract Sum properly allocable to completed Work; .2 That portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction, or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing; and .3 That portion of Construction Change Directives that the Contractor determines is necessary. § 5.1.6.2 The amount of each progress payment shall then be reduced by: .1 The aggregate of any amounts previously paid by the Owner; . 2 The amount, if any, for Work that remains uncorrected and for which the Architect has previously withheld a Certificate for Payment as provided in Article 9 of AIA Document A201-2017; . 3 Any amount for which the Contractor does not intend to pay a Subcontractor or material supplier, unless the Work has been performed by others the Contractor intends to pay; .4 For Work performed or defects discovered since the last payment application, any amount for which the Architect may withhold payment, or nullify a Certificate of Payment in whole or in part, as provided in Article 9 of AIA Document A201-2017; and . 5 Retainage withheld pursuant to Section 5.1.7. -§ 5.1.7 Retainage § 5.1.7.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the following amount, as retainage, from the payment otherwise due: Zero percent retainage. (Insert apercentage or amount to be withheld as retainage from each Application for Payment. The amount of retainage may be'limited by governing law.) § 5.1.7.1.1 The following items are not subject to retainage: All items are not subject to retainage. !nit AIA Document A101®— 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects," "AIA," the AIA Logo, "A101," and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 16:05:27 CT on 11/01/2022 under Order No.2114366152 which expires on 09/20/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1717196594) (Insert any items not subject to the withholding of retainage, such as general conditions. insurance, etc.) § 5.1.3.2 Reduction or limitation of retainage, if any, shall be as follows: (11. the retainage established in Section 5.1.7.1 is to be modified prior to Substantial Completion of the entire Work, including modifications for Substantial Completion of portions of the Work as provided in Section 3.3.2, insert provisions for such modifications) § 5.1.7.3 Except as set forth in this Section 5.1.7.3, upon Substantial Completion of the Work, the Contractor may submit an Application for Payment that includes the retainage withheld from prior Applications for Payment pursuant to this Section 5.1.7. The Application for Payment submitted at Substantial Completion shall not include retainage as follows: (Insert any other conditions ibr release of retainage upon Substantial Completion.) § 5.1.8 If final completion of the Work is materially delayed through no fault of the Contractor, the Owner shall pay the Co tract& any additional amounts in accordance with Article 9 of AIA Document A201-2017. § 5`1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. §: 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Article 12 of AAA Document A201-2017, and to satisfy other requirements, if any, which extend. eyond final payment; and .2 a filial Certificate for Payment has been issued by the Architect. 5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows: § 5.3 Interest Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate ofinterest agreed upon, if any) ARTICLE 6 DISPUTE RESOLUTION § 61 Initial Decision Maker The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A201-2017, unless the parties appoint below another individual, not a party to this Agreement, to serve as the Initial Decision Maker. (If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.) AIA Document A101®— 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects,' "AIA," the AIA Logo, "A101," and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 16:05:27 CT on 11/01/2022 under Order No.2114366152 which expires on 09/20/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1717196594) § 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Article 15 of A1A Document A201-2017, the method of binding dispute resolution shall be as follows: (Check the appropriate box.) X ] Arbitration pursuant to Section 15.4 of AIA Document A201-2017 [ ] Litigation in a court of competent jurisdiction [ ] Other (Specify) If the Owner and Contractor do not select a method of binding dispute resolution, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction. ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201-2(117. § 7,1,1 If the Contract is terminated for the Owner's convenience in accordance with Article 14 of AIA Document A201-2017, then the Owner shall pay the Contractor a termination fee as follows: (insert the amottnt of, or method for determining, the fee, flatly, payable to the Contractor following a termination for the Owner's convenience.) § 7,2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-2017. ARTICLE 8 MISCELLANEOUS PROVISIONS § &1 Where reference Ls made in this Agreement to a provision of AIA Document A201-2017 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Docutnenta. § &2 The Owner's representative: (Name, address, email address, and other information) § &3 The Contractor's representative: (Name, address, email address, and other information) § 8.4 Neither the Owner's nor the Contractor's representative shall be changed without ten days' prior notice to the other party. Init. AIA Document A1010 — 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The `American Institute of Architects," "AIA," the AIA Logo, "A101," and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 16:05:27 CT on 11/01/2022 under Order No.2114366152 which expires on 09/20/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1717196594) § 8.5 Insurance and Bonds § 8=5.1 The Owner and the Contractor shall purchase and maintain insurance as set forth in AIA Document A 1'01 Tom -:2017, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum, Exhibit A, Insurance and Bonds, and elsewhere in the Contract Documents. § 8.5.2 The Contractor shall provide bonds as set forth in AIA Document A101TM-2017 Exhibit A, and elsewhere in the Contract Documents. vpvt.11" § 86 Notice in electronic format, pursuant to Article 1 of AIA Document A201-2017, may be given in accordance with AIA Document E203T"_2013, Building Information Modeling and Digital Data Exhibit, if completed, or as otherwise set forth below: (If other than in accordance with ALA Document E203-2013, insert requirements for delivering notice in electronic format such as name, title, and email address of the recipient and whether and how the system will he required to generate a read receipt for the transmission.) § 8;7 Other provisions: ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 This Agreement is comprised of the following documents: . 1 AIA Document A101TM-2017, Standard Form of Agreement Between Owner and Contractor . 2 ALA Document A 101TM-2017, Exhibit A, Insurance and Bonds . 3 AEA Document A201TM-2017, General Conditions of the Contract for Construction .4 AIA Doetment E203TM-2013, Building Information Modeling and Digital Data Exhibit, dated as indicated below: (Insert the date of the E203-2013 incorporated into this Agreement.) .5 Drawings Number f Title Date .6 Specifications Section Title Date Pages .7 Addenda, if any: Init. Number Date Pages Portions of Addenda relating to bidding or proposal requirements are not part of the Contract Documents unless the bidding or proposal requirements are also enumerated in this Article 9. .8 Other Exhibits: (Check all boxes that apply and include appropriate information identifying the exhibit where required.) AIA Document E204TM_2017, Sustainable Projects Exhibit, dated as indicated below: (Insert the date of the E204-2017 incorporated into this Agreement.) AIA Document A101®— 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects," "AIA," The AIA Logo, "A101," and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 16:05:27 CT on 11/01/2022 under Order No.2114366152 which expires on 09/20/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1717196594) [ ] The Sustainability Plan: Init Title Date Pages [ ] Supplementary and other Conditions of the Contract: Document Title Date Pages .9 Other documents, if any, listed below: (List here any additional documents that are intended to form part of the Contract Documents. AIA Document .42°01 TM_2017 provides that the advertisement or invitation to hid, Instructions to Bidders, sample forrns, the Contractor's bid or proposal, portions' of Addenda relating to bidding or proposal requirenientss, and other information furnished by the Owner in anticipation of receiving bids or pr osaic, are not part of the Contract Documents unless enumerated in this Agreement. Any such documents should be listed here only if intended to be part of the Contract Documents) This Agreement entered into as of the day and year first written above. (Stnaitare) CONTRACTOR (Signature) City ctf Crestview (Printd name and title) Triple R. Construction Inc. (Printed name and title) AIA Document A101®— 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects," "AIA," the AIA Logo, "A101," and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 16:05:27 CT on 11/01/2022 under Order No.2114366152 which expires on 09/20/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1717196594) Additions and Deletions Report for AIA® Document A101® — 2017 This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the original AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by AIA Software at 16:05:27 CT on 11/01/2022. PAGE 1 AGREEMENT made as of the 1st day of November in the year 2022 Qity of:Crestview 198 N. Wilson St. Crestview, F1..32.536 Triple R. Construction. Inc:. 8010 S1eepv. Bav Blvd, Navarre, F1.32566. 1.14 N. Main St. Crestview FI. NONE The Owner and Contractoragreeas follows. As shown on G 703 Remodel 114 N. Mein St.. Crestview, Fl. 32536 Additions and Deletions Report for AIA Document A101®— 2017. Copyright ©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects," "AIA," the AIA Logo, "A101," and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 16:05:27 CT on 11/01/2022 under Order No.2114366152 which expires on 09/20/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1717196594) PAGE 3 § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be One Hundred Forty One Thousand, five hundred twenty eight Dollars and Zero Cents ($ 141,528.00 ), subject to additions and deductions as provided in the Contract Documents. Norte None None PA GE 5.1.1 Based upon Applications for Payment submitted to the Architect City by the Contractor and Certificates for payment inoued by the Architect,.' Payment, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. As progress payment per G 7:03. § 5.1.3 Provided Mat an Application for Payment is received by the Architect City not later than the 10th day of a month, the Owner shall make payment of the amount certified to the Contractor not later than the 30th day of the month. If an Application for Payment is received by the Architect Contractor after the application date fixed above, payment of the amount certified shall be made by the Owner not later than ( ) days after the Architect receives the A:pp,riication f r,Payment § 5.14 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form, and supported by such data to substantiate its accuracy, as the Architect may require. accuracy by the contractor. This schedule of values shall be used asa basis for reviewing the Contractor's Applications for Payment. .3 That portion of Construction Change Directives that the Architect determines, in the Architect's Yvi o` �o 13e - - eel .sti ficd Contractor detemunes is necessary �t 51.7.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the Mowing amount, as retainage, from the payment otherwise due: Zero percent retainage. § 5.1.7.1.1 The following items are not subject to retainage: All items are not subject to retainage. PAGE 6 Additions and Deletions Report for AIA Document A1015 — 2017. Copyright© 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects," "AIA," the AIA Logo, "A101," and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 16:05:27 CT on 11/01/2022 under Order No.2114366152 which expires on 09/20/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1717196594) [ X ] Arbitration pursuant to Section 15.4 of AIA Document A2O1-2017 PAGE 8 Ch.,. . of Crestview Additions and Deletions Report for AIA Document A101®— 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects," "AIA," the AIA Logo, "A101," and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 16:05:27 CT on 11/01/2022 under Order No.2114366152 which expires on 09/20/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1717196594) (Dated) Certification of Document's Authenticity AIA6 Document 0401 TM — 2003 1, Richard R Rausch, hereby certify, to the best of my knowledge, information and belief, that 1 created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 16:05:27 CT on 11/01/2022 under Order No. 2114366152 from AIA Contract Documents software and that in preparing the attached final document [ made no changes to the original text of Ale Document A101 TM - 2017, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum, as published by the AIA in its software, other than those additions and deletions shown in the associated Additions and Deletions Report. AIA Document D401 TM - 2003. Copyright © 1992 and 2003 by The American Institute of Architects. All rights reserved. The "American Institute of ArchitectS," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 16:05:27 CT on 11/01/2022 under Order No.2114366152 which expires on 09/20/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1717196594) AIA Document G703' -1992 Continuation Sheet AIA D ocument G702 ®, • Application and Certification for Payment, or G732TM, Application and Certificate for Payment, Constructi on Manager as Adviser Edition, contain ng Contractor's signed certificati on is attached. APPLICATION NO: APPLICATION DATE: PERIOD TO: 001 ��. .... .. ...... ...........z.aa, ,i„,,,.;rte va►rauiC r et ainage for li ne items m ay apply . D E F ARCHITECT'S PROJECT NO: Jason Floyd H~ I A 13 C G ITEM NO. DESCRIPTION OF WORK S CHEDULED VALUE WORK COMPLETE D , MATERIALS PRESENTLY STORE D (NOTINDORE) TOTAL COMPLETED AND STORED TO DATE (D+E+F) % (G=C) BALANCE TO FINISH (C - G) RL'TAINAGE (IF VARIABLE' RATE) FROM PREVIOUS APPLICATION (D+E) THIS PERIOD 1 ' Supervision - 5,000.00 0.00 0,00 0.00 0 .00 0.00% 5,000.00 0.00 2 General Labor 1,500.00 0.00' - 0.00 0.00 0 .00 0.00% 1,500.00 0.00 3 Cleani►nt; 600.00 0.0(1 0 .00 0.00 0.00 0 .00% 600.00 0.00 4 Dunlpster 1,000.00 0.00 _ 0 .00 0 .00 0.00 0.00% 1,000 .00 0.0(1 5 Site Work 540.00 0.00 0.00 _ 0 .00 0.00 0.00% 540.00 0.00 6 7 Lumber _ 3,750. 00 0,00 0.00 0.00' _ 0.00 0.00% 3,750.00 0 .00 Framing! Labor 6,000. 00 0 .00 0 .00 0.00 0.00 0 .00% _ 6,000.00 0 .00 8 Exterior Trim 4,000.00 0.00 0 .00 0 .00 0.00 0 .00% 4,000 .00 0.00 ') Trim Labor _ 2,500,00, 0.00 0.00 0.00 0.00 0.00% 2 ,500 .00 0 .00 10 Ceiling Wo od 750.00 0.00 0.00 _ 0 .00 0.00% 750.tll) 0 .00 1 I Ceiling Roof 800.00 0.00 _0.00 0.00 0.00 0 .00 0.00% 800.00 0 .00 12 Roofing 2,000. 00 0.00 0 .00 0.00 _ 0.00 _ 0.00% 2,000.00 0 .00 ,13 Patch 2,500.00 0.00 0 .00 0 .00 0.00 0.00% 2,500.00 0.00 14 Windows _ 10,000.00 0, 00 0.00 0.00 _ 0.00 0.00% 10,000.00 0.00 15 Doors & In terior Trim 14,000.00 0.00 0.00 0.00 0.00 0 .00% 14,000 .00 0.00 16 Fron t D oo rs 3,000.00 0.00 0.00 0.00 0.00 0.00% 3,000 .00 0 .00 17 - Back Door _ i 1,500.00 0.00 0.00 0.00 0.00 0.00% 1,500 .00 0.00 18_ Stucco 4,000.00 0.00 0.00 0. 00 0.00 0.00 0.00% 4,000.00 0.00 19 Paint interior . 5,500. 00 0.00 0.00 0.00 0 .00% 5.500.00 0 .00 20 Floors - 10,500. 00 0. 00 0.00 0.00 13 .00 0.00% 10,500 .00 0 .00 21 Plumbing; 4,500,00 0,00 0.00 0.00 _ 0,00 0.00% 4,500.00 0.00 22 23 HV AC 16,000.00 0.00 0. 00 0.00 0 .00 0 .00% 16,000.00 0 .00 Wiring 13,000.00 0.00 0. 00 0.00 0.00 0.00% 13,000 .00 0.00 24 _ Fix ture 5,000.00 0.00 0. 00 0. 00 0.00 Q .00 % 5,000.00 0 .00 . 25 Overhead _ 5,897.00 0. 00, 0. 00 0. 00 0.00 0 .00% 5,897.00 0 .00 26 _ Profit 17,691.001 0. 00 0. 00 _ 0.00 _ 0.00 0.00% 17,691.00 0 .00 AIA Document G703e-1992. Copyright © 1963, 1965, 1966, 1967.1970, 1978, 1983 and 1992 by The A merican Institute of Architects. All rights reserved. The "Americ an Institut e of Architects," "AIA," the AI A Logo, "G703," and " AIA Contract Documents" are registered tradema rks a nd may not be used without permission. This document w as produced by AIA so ftwa re at 14:46:40 CT on 11/01/2022 und er Order No .2114366152 which expires on 00/20/2023, is no t for resale , Is licensed for o ne-time use o nly, and may only be us ed In acco rdance with the AIA Contra ct Documents® Terms of Service. To report copyright violati ons, e -mall copyright@ aia. org. lgser Note s: (3B9ADAA4) 1 ti ITEM DESCRIPTION OF WORK GRAND TOTAL SCHEDULED " VALUE D E WORK COMPLETED FROM PRE VIOUS APPLICATIO N (D +E) THIS PERIOD M ATERI ALS PRESE NTLY STORED (N OT IN D OR E) $141,528 .00 $0 .00 $0.00 $0.00 G H I TOTAL COMPLETED AND' STORED TO D ATE (D -1- El- F) % (G=C) BALANCE TO FINISH i (C - G) RETAINAGE (IF VARIABLE RATE) $0.00 _ 0.00% $141,528.00 $0.00. AIA Documen t G703°— 1992. Copyright ©1963, 1965, 1966, 1967,1970, 1978, 1983 and 1992 by The American Institu te of Architects. MI rights reserved. The "American Institute of Archit ects," "AIA," the AIA Log o, "G703," and "AIA Contract Documents" are registere d trademarks and may not be used without permission. This do cument was produced by AIA software at 14:46:40 CT on 11/01/2022 under Order No.2114366152 which e xpire s on 09/20/2023, is not fo r resale, Is licensed for o ne-time use only, and may only be used In accordance with the AIA Contract Documents® Terms of Serv ice. To r eport copyright violations, e-mail opyright@a ia. org. • User Notes : 2 (3B9ADAA4) )•3)' 1 3 5) 11/1../14 9 I `_y c 6Xi ,7`)S' rICCTIM1 ROOFING sr REPAIRS • REROOFING • NEW ROOFS YKUYUSAL SUf M1'1" 1'W 'lU: N- AME: Triple R Cction PROPOSAL P.O. Box 233 • Destin, FL 32540 Phone (850) 837-2845 • Fax (850) 837-0325 STREET: C- H Y: STATE Rick.TRC®Gmail.Com We hereby submit specifications and estimates for: PHONE: 850-585-7682 Page 1 of DATE: 12-15-22 JOB NAME: STREET: 114 North Main S CITY: Crestview STATE: Florida 11.0114.11 TPO ROOFING SYSTEM. Roofing as follows to meet all codes: Remove existing 3 roofs and replace new, Install Recovery board. Install 60 mil TPO Reflash all pipes. Install Cap Metal. Install 5V Crimp on new built metal hangover. Install Headwall,Wall, Rake and Eave Metal. Clean and remove all roofing debris. 1.0-year material warranty. 10-year workmanship warranty. *Any rotten wood will be replaced at an additional $I2(1 per sheet any additional wood cost plus 30%. *NOTE Destin Roofing,Inc. will not be responsible for any damaged electrical lines or water lines under roof decking that do not meet code, or driveways. We hereby propose to furnish labor and materials . compi ; acicordaance with the above specifications, for the sum of: Thirty Seven Thousand Three Hundred Ninety do ars (S37,390.09 ) withpayment to be made as follows: 50% due on acceptance -remainder due on completion. AU material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. Ali Agreements contingent upon strikes, accidents, or delays beyond our control. This proposal subject to acceptance within 30 days and is void thereafter et the option of the undersigned_ No baoic charges will be acceptable unless notified In writing of the nature of back charges and approved by our job superintendent or an officer of this Co. This notice is to be binding and made an attachment to any contract that is agreed upon by Destin Roofing, Title to all equipment and materials is to remain with DESTIN ROOFING until all payments are paid in full. Authorized Si re .., fiefifdifil ACCEPTANCE OF PROPOSAL The above process, specifications, and conditions are hereby accepted. You are authorized to do the work as specified, Payment will be made as outlined above. itsrr lioNEs CXDF ING LICENSED 64 INSURED tic WORKERS COAII4 - LICENSE NUM -ER: IICN66989 kect.ctii$cti by the Better BoKiness bureau Proposal Submitted to: Tripler R Construction INC Phone: (8505054682 Address: I 14 Main St Crestview, FL 32536 Ensaih Job Coordinator: VINCENT JONES We hereby propose to furnish all materials and labor necessaiyfor the completion fjob listed below. We will remove the existing roof down to- the wood deck. Cost of wood if necessary: $3.50 per square foot on 'ir-inch plywood. $4.50 for 3/4-inch plywood, per linear foot on plank board: $4,50 for 2x4. $5.00 for 2x6. $5.50 for 20 and 2x10. t‘ will rt. nail roof t i,„ Npproval attic. Vincent Jones Roofing will install a two-ply bitumen roof system, consisting of bass sheet fasten to wood deck. A bitumen smooth layer applied with type 3 asphalt the finish ply will be a granulated bitumen. We will remote all roofing debris raalting front the installation. This contract carries a 5-year workmanship warm* and Fifteen -year manufadurer warranty. All required pennits will be Vincent Jones Roofing. All material.is.guaranteed to be as specified. and the above work is to be performed in accordance with the -specifications subniiirallor above work and completed in a substantial workmanlike manner for the sum of $15.700.00 (Fifteo..-thimsand seven hundred dollars) NOTE: Total payment shall be made upon completion ofjob. The above prices. specifications. and conditions are satisfactory and are hereby accepted. Vincent Jones Roofing, inc. is authorized to do the work aS specified. Payment will be made as outlined above. DATE: DEC /14/ 2022 Homeowner: Note: This proposal may be withdrawn by us if not accepted within 30 days. SIGNATURE SERVES AS ACCEPTANCE OP PROPOSAL DATE PROPOSED: 12/14/2022 Badness Agee • Vincent Jones 640.9 Anchors St, Port Walton Om*, Ft 32548 Phone: (8S0)0634019; Fax: (050)8634045 vincontOvincentionesroOting.com Gmat FW: proposal 1 message Diane Gordon <dianegamblegordon@cox,net> To: RICK RAUSCH <rick.trc@gmail.com> Cc: Diane Gamble -Gordon <dianegamblegordon@cox.net> From: Diane Gordon <dianegamblegordon@cox.net> Sent: Thursday, December 8, 2022 9:27 PM To: 'RICK RAUSCH' <rick.trc@gmail.com> Subject: invoice JOhn G. Gordon, Jr. Roofing, LLC CCC1330680 509 SpringAcres Cove Niceville, FI. 32578 December 8, 2022 Triple R Construction 114 Main St. Crestview, FI. New TPO Roof Remove and Replace 1. Remove old roofs down to deck (5 layers) 2. Repair wood as needed EXTRA plywood'/ inch $110 per sheet 3. Renail decking as per code 4. Install'/2 recovery board screwed down 5. Install new solid adhered 60 mil white TPO with heat welded seams 6. All new flashing 7. Clean up and remove all trash Price: $13,600.00 Payments: 50% deposit; 50% at completion RICK RAUSCH <rick.trc@gmail.com> Fri, Dec 16, 2022 at 1:27 PM BOR(�Ki C +17"Fir 550'Mary ls� CL UUC # COO 1330929 FWB, FL, 32548 ROBERT ROBBIE BOROVSKI EFRAIN EJ SANCHEZ (850-362-8134.. { i-217-077. fSnrhez2Civehoo.c om To: Triple R Construction. Address :114 Main Street Crestview Florida 32536 This is just a roof quote If you decide let me know and P11 send yocr a contract to sign WG.supply all materials For said project Remove aA layers of existing roof 12 free sheets plywood included in the price 2:Any other Cotten plywood is $11 0 per sheet 3:Renal' decking 6 inch on center according to code 4:inataii Tpd root system flat roof 5:lrii half Inch insulation screwed down 6: 60 mil tpo solid adhered 7: Heat weld ail seams 8:. installed' new fleshing 9: Haul off aN debris Magnetic sweep daily Wind mitigation is done by a third party after completion of project. Skylights are wet plus item Hurricane chips are a cost plus item Hurricane are not warranted: Good fur 15 days due to materials. Increase 10 Year. transferals workmanship warranty Price goes as follow 5O% 000 Fascia Board is ►10,00 a linear foot Any fraying done is $ 10.00 a linear foot df you have any questions please feel free to call me ej Please let me no if I can help you in anyway Thank you for the opportunity E.i (eau-a17-0771