Loading...
HomeMy Public PortalAboutTO 23-01Septage Process Review - JacobsTask Order 23-01 TASK ORDER 2023- 01 Jacobs THIS TASK ORDER IS ISSUED PURSUANT TO THE PROFESSIONAL ENGINEERINGCONTINUING SERVICES CONTRACT DATED MAY 3, 2021 (AGREEMENT), FOR THE CITY OF CRESTVIEW, FLORIDA, WHICH 15 INCORPORATED HEREIN BY THIS REFERENCE, WITH RESPECT TO Professional Engineering and Consulting Services for the Crestview WWTP Septage Receiving Station Preliminary Design Summary Article A. Purpose The City of Crestview (City) and the surrounding areas has seen significant growth in recent years and that growth has introduced a need for new residential communities. A number of these new residential communities, as well as many existing residential neighborhoods, utilize septic systems for their sanitary sewer system. There is a growing need for a septage receiving system more centralized to these residential areas to receive and treat septage from these septic systems. The City has expressed interest in developing a septage receiving system to receive septage waste from the nearby service areas. Such a facility could be considered a regional facility and would serve portions of Santa Rosa, Okaloosa, and Walton Counties. The City has requested Jacobs provide a task order for professional services to review the existing loading at the WWTP, estimate the septage flow that could be received by the facility, and identify the impact that the high concentration waste stream associated with septage waste might have on the operation of the WWTP. The purpose of Task Order 2023-01 is to authorize and direct Jacobs Engineering Group (Jacobs), to proceed with the professional engineering and consulting services to for a preliminary review of a septage receiving station for the City of Crestview. Article B. Scope of Services Task 1 — Review impact of septage loading on the WWTP Septage waste is typically a much stronger wastewater with significantly higher concentrations of constituents such as biochemical oxygen demand (BOD), total suspended solids (TSS), and nutrients than domestic wastewater. As part of this task, Jacobs wilt review the current flow, BOD, and TSS loading at the WWTP and compare it to the design values for each of these constituents. Following this review, Jacobs will develop typical waste load concentrations associated with septage waste and review potential volumes for daily septage receiving. Jacobs will develop a process model for the WWTP and use these current WWTP and proposed septage loadings to evaluate the effect of septage waste on the treatment plant. Deliverables • Information developed in this task will be included in the design summary listed in Task 2 Task 2 — Preliminary Design Summary Jacobs will develop a brief technical memorandum (TM) outlining the results from the process modeling effort. The TM will estimate the anticipated septage loading for the facility and identify processes that will be impacted by this waste stream. This information will be (Document number] 1 Task Order 23-01 summarized in a TM and a draft will be submitted to the City for review and comment. Following receipt of comments from the City, Jacobs will prepare a final version of the TM. Deliverables • Draft Preliminary Design Summary TM (PDF copy) • Final. Preliminary Design Summary TM (2 hard copies and a PDF copy) Assumptions The following assumptions were used to prepare this scope of work. • Sampling is not included in this scope of work. • Construction drawings and specifications will not be prepared under this scope of work Article C. Compensation As compensation for providing the services described in Artic B. Scope of Services in this task order, the CLIENT shall pay Jacobs, in accordance w' h Se ti'n Saf e Agreement, on a time and material basis with a not -to -exceed amount of- e e imated breakdown of fees is shown in the table 2 below. We propose to deliver the draft TM 12 weeks after issuance of notice to proceed from the City. We propose to deliver the final TM two weeks after receipt of comments from the City. Table 1 — Estimated Fee Schedule Milestone Estimated Fee Amount Task 1 — Review impact of septage loading on WWTP $17,200 Task 3 — Preliminary design summary $4,400 Total $21,600 Article D. Authorized Representative The Authorized Representatives designated below are authorized to act with respect to Task Order 23-01. Communications between the City and Jacobs shall be through the Authorized Representatives: For the City of Crestview, Florida Name: Michael Criddle Address: P.O. Drawer 1209 Crestview, Florida 32536 Telephone: (850) 682-6134 For Jacobs Name: Scott Jernigan, PE Address: 25 W. Cedar Street, Suite 350 Pensacola, FL 32502 Telephone: (850) 941-7282 (Document number] 2 Task Order 23-01 Article E. Authorization Task Order 23-01 is effective as of N OY r4ARE Q I (p 2022 Accepted for CITY by: Accepted for Jacobs by: Name: J.B Whitten Title: Mayor (Document number] Name: Scott Jernigan, PE ITitle: Senior PM 3