HomeMy Public PortalAboutGulfstream site clearing
IPM.Note
Gulfstream site clearing
Dustin Demmery
SMTP
Dustin@Landscapesofdistinction.com
Gulfstream site clearing
Received: from impinc04.yourhostingaccount.com ([10.1.13.104] helo=impinc04.yourhostingaccount.com)
by mailscan02.yourhostingaccount.com with esmtp (Exim)
id 1Vh6rf-0006F2-5x
for dbrannon@bngengineers.com; Thu, 14 Nov 2013 19:02:23 -0500
Received: from p3plsmtpp1ded03.prod.phx3.secureserver.net ([208.109.80.57])
by impinc04.yourhostingaccount.com with NO UCE
id pc2P1m00Y1EBjR402c2PnZ; Thu, 14 Nov 2013 19:02:23 -0500
Received: from ip-72-167-252-121.ip.secureserver.net ([72.167.252.121])
by p3plsmtpp1ded03.prod.phx3.secureserver.net with : DED :
id pc2N1m0042dv0HC01c2Nld; Thu, 14 Nov 2013 17:02:22 -0700
Received: (qmail 756 invoked from network); 14 Nov 2013 18:02:20 -0600
Received: from c-98-249-205-78.hsd1.fl.comcast.net (HELO LofDIncPC) (98.249.205.78)
by ip-72-167-201-71.ip.secureserver.net with SMTP; 14 Nov 2013 18:02:20 -0600
From: Dustin Demmery <dustin@landscapesofdistinction.com>
To: Danny Brannon <DBrannon@BnGEngineers.com>
Subject: Gulfstream site clearing
Thread-Topic: Gulfstream site clearing
Thread-Index: AQG6K5T1PzW/Umj+ey996C9BKISWvg==
X-MS-Exchange-MessageSentRepresentingType: 1
Date: Fri, 15 Nov 2013 00:02:24 +0000
Message-ID: <6B4F401CAAD2490DBD14E75C316A711D@LofDIncPC>
Content-Language: en-US
X-MS-Has-Attach: yes
X-MS-TNEF-Correlator:
x-mailer: Microsoft Windows Live Mail 14.0.8089.726
x-en-origip: 208.109.80.57
Content-Type: multipart/mixed;
boundary="_004_6B4F401CAAD2490DBD14E75C316A711DLofDIncPC_"
MIME-Version: 1.0
Dustin Demmery
SMTP
Dustin@Landscapesofdistinction.com
Danny Brannon
Landscaping Dustin
Gulfstream site clearing
Danny,
See the attached spreadsheet for the clearing of the site locations.
1) My schedule looks now like it'd be Monday 12/2/13 for a start date if you can commit to me in the next few days. I could possibly do it a little earlier (depending on how smooth my
other commitments go)
2) 2 consecutive days to complete the work
3) The only items I saw work relocating would be the 3 areca palms @ location 36.....but it would depend on how they come out and if we can get a good root ball
4) $4905.00
Let me know asap if you want me to schedule the work...and I'll make sure we get it at our first opportunity.
Thanks,
Dustin Demmery
Landscapes of Distinction, Inc
561-386-1561 (cell)
www.landscapesofdistinction.com<http://www.landscapesofdistinction.com>
934123215157B34A9C9CC65873C9A19B@namprd09.prod.outlook.com
<6B4F401CAAD2490DBD14E75C316A711D@LofDIncPC>
Renee Basel
Renee Basel
EX
/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL
EX
/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL
Dustin Demmery
Dustin Demmery
Renee Basel
Renee Basel
Dustin@Landscapesofdistinction.com
Dustin@Landscapesofdistinction.com
rbasel@gulf-stream.org
rbasel@gulf-stream.org
II=[CID=52bf353f-fe68-2f7b-7de8-2f41288496be;IDXHEAD=01BA2B94F5;IDXCOUNT=1];TFR=NotForking;Version=Version 15.20 (Build 2157.0), Stage=H4;UP=10;DP=1C5
en
A289EC1D26ED657A
RBasel@gulf-stream.org
00000002/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=3baa9f04d837426b9ed16b03ec111b7b-rbasel
Danny Brannon
SMTP
DBrannon@BnGEngineers.com
DBrannon@BnGEngineers.com
Danny Brannon
Cost sheet for clearing 11.14.13.xlsx
20
1
327
22
2
654
24
2
654
25
0.5
163.5
26
1
327
28
1.5
490.5
29
1
327
31
1.5
490.5
33
1
327
35
0.5
163.5
36
2
654
37
0.5
163.5
40
0.5
163.5
15
4905
75
35
17
100
100
327
Location #
notes:
cost allocated
time allocated in hours
cut back mahoe limbs, remove old stump
remove 1 large mahoe, fan palm, scrub, trash
remove 1 large areca palm, 1 large mahoe
remove 3-5'oa cocoplum
remove 4-10'oa ficus hedge plants
remove 1 large mahoe and scrub
misc scrub and vegetation
remove multiple 8-10ft scrub plants and shrubs
cut limbs and remove scrub (leave large seagrape)
remove scrub and small plants, trim limbs as needed
remove 3-12'oa areca palms
trim plants as needed
trim plants as needed and remove vines
approx # of hours needed to complete above locations
Foreman
Labor (3)
Project manager
Dump Truck (1)
Loader (small) (1)
Cost per hour for above equipment and labor
Rates per exhibit B hourly rate sheet
***Cost includes dump fees to properly dispose of all debris and vegetation
Landscapes of Distinction, Inc - Town of Gulfstream utility site clearing
Cost to complete clearings on above locations
.xlsx
Costsh~1.xls
Cost sheet for clearing 11.14.13.xlsx
application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
B3649DF941A2DE45975AF7CBF5BB8AE1@namprd09.prod.outlook.com
EnUs Danny, See the attached spreadsheet for the clearing of the site locations. 1) My schedule looks now like it'd be Monday 12/2/13 for a start date if you can commit to me in
the next few days. I could possibly do it a little earlier (depending on how smooth my other commitments go) 2) 2 consecutive days to complete the work 3) The only items I saw work
relocating would be the 3 areca palms @ location 36.....but it would depend on how they come out and if we can get a good root ball 4) $4905.00 Let me know asap if you want me
to schedule the work...and I'll make sure we get it at our first opportunity. Thanks, Dustin Demmery
Landscapes of Distinction, Inc
561-386-1561 (cell)
http://www.landscapesofdistinction.comwww.landscapesofdistinction.com
Landscapes of Distinction, Inc - Town of Gulfstream utility site clearing
Location #notes:time allocated in hours
20cut back mahoe limbs, remove old stump1
22remove 1 large mahoe, fan palm, scrub, trash2
24remove 1 large areca palm, 1 large mahoe2
25remove 3-5'oa cocoplum0.5
26remove 4-10'oa ficus hedge plants1
28remove 1 large mahoe and scrub1.5
29misc scrub and vegetation1
31remove multiple 8-10ft scrub plants and shrubs1.5
33cut limbs and remove scrub (leave large seagrape)1
35remove scrub and small plants, trim limbs as needed0.5
36remove 3-12'oa areca palms2
37trim plants as needed 0.5
40trim plants as needed and remove vines0.5
approx # of hours needed to complete above locations15
Cost to complete clearings on above locations
Rates per exhibit B hourly rate sheet
Project manager $ 75.00
Foreman $ 35.00
Labor (3)$ 17.00
Dump Truck (1)$ 100.00
Loader (small) (1)$ 100.00
Cost per hour for above equipment and labor$ 327.00
***Cost includes dump fees to properly dispose of all debris and vegetation
cost allocated
$ 327.00
$ 654.00
$ 654.00
$ 163.50
$ 327.00
$ 490.50
$ 327.00
$ 490.50
$ 327.00
$ 163.50
$ 654.00
$ 163.50
$ 163.50
$ 4,905.00