Loading...
HomeMy Public PortalAboutGulfstream site clearing IPM.Note Gulfstream site clearing Dustin Demmery SMTP Dustin@Landscapesofdistinction.com Gulfstream site clearing Received: from impinc04.yourhostingaccount.com ([10.1.13.104] helo=impinc04.yourhostingaccount.com) by mailscan02.yourhostingaccount.com with esmtp (Exim) id 1Vh6rf-0006F2-5x for dbrannon@bngengineers.com; Thu, 14 Nov 2013 19:02:23 -0500 Received: from p3plsmtpp1ded03.prod.phx3.secureserver.net ([208.109.80.57]) by impinc04.yourhostingaccount.com with NO UCE id pc2P1m00Y1EBjR402c2PnZ; Thu, 14 Nov 2013 19:02:23 -0500 Received: from ip-72-167-252-121.ip.secureserver.net ([72.167.252.121]) by p3plsmtpp1ded03.prod.phx3.secureserver.net with : DED : id pc2N1m0042dv0HC01c2Nld; Thu, 14 Nov 2013 17:02:22 -0700 Received: (qmail 756 invoked from network); 14 Nov 2013 18:02:20 -0600 Received: from c-98-249-205-78.hsd1.fl.comcast.net (HELO LofDIncPC) (98.249.205.78) by ip-72-167-201-71.ip.secureserver.net with SMTP; 14 Nov 2013 18:02:20 -0600 From: Dustin Demmery <dustin@landscapesofdistinction.com> To: Danny Brannon <DBrannon@BnGEngineers.com> Subject: Gulfstream site clearing Thread-Topic: Gulfstream site clearing Thread-Index: AQG6K5T1PzW/Umj+ey996C9BKISWvg== X-MS-Exchange-MessageSentRepresentingType: 1 Date: Fri, 15 Nov 2013 00:02:24 +0000 Message-ID: <6B4F401CAAD2490DBD14E75C316A711D@LofDIncPC> Content-Language: en-US X-MS-Has-Attach: yes X-MS-TNEF-Correlator: x-mailer: Microsoft Windows Live Mail 14.0.8089.726 x-en-origip: 208.109.80.57 Content-Type: multipart/mixed; boundary="_004_6B4F401CAAD2490DBD14E75C316A711DLofDIncPC_" MIME-Version: 1.0 Dustin Demmery SMTP Dustin@Landscapesofdistinction.com Danny Brannon Landscaping Dustin Gulfstream site clearing Danny, See the attached spreadsheet for the clearing of the site locations. 1) My schedule looks now like it'd be Monday 12/2/13 for a start date if you can commit to me in the next few days. I could possibly do it a little earlier (depending on how smooth my other commitments go) 2) 2 consecutive days to complete the work 3) The only items I saw work relocating would be the 3 areca palms @ location 36.....but it would depend on how they come out and if we can get a good root ball 4) $4905.00 Let me know asap if you want me to schedule the work...and I'll make sure we get it at our first opportunity. Thanks, Dustin Demmery Landscapes of Distinction, Inc 561-386-1561 (cell) www.landscapesofdistinction.com<http://www.landscapesofdistinction.com> 934123215157B34A9C9CC65873C9A19B@namprd09.prod.outlook.com <6B4F401CAAD2490DBD14E75C316A711D@LofDIncPC> Renee Basel Renee Basel EX /O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL EX /O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL Dustin Demmery Dustin Demmery Renee Basel Renee Basel Dustin@Landscapesofdistinction.com Dustin@Landscapesofdistinction.com rbasel@gulf-stream.org rbasel@gulf-stream.org II=[CID=52bf353f-fe68-2f7b-7de8-2f41288496be;IDXHEAD=01BA2B94F5;IDXCOUNT=1];TFR=NotForking;Version=Version 15.20 (Build 2157.0), Stage=H4;UP=10;DP=1C5 en A289EC1D26ED657A RBasel@gulf-stream.org 00000002/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=3baa9f04d837426b9ed16b03ec111b7b-rbasel Danny Brannon SMTP DBrannon@BnGEngineers.com DBrannon@BnGEngineers.com Danny Brannon Cost sheet for clearing 11.14.13.xlsx 20 1 327 22 2 654 24 2 654 25 0.5 163.5 26 1 327 28 1.5 490.5 29 1 327 31 1.5 490.5 33 1 327 35 0.5 163.5 36 2 654 37 0.5 163.5 40 0.5 163.5 15 4905 75 35 17 100 100 327 Location # notes: cost allocated time allocated in hours cut back mahoe limbs, remove old stump remove 1 large mahoe, fan palm, scrub, trash remove 1 large areca palm, 1 large mahoe remove 3-5'oa cocoplum remove 4-10'oa ficus hedge plants remove 1 large mahoe and scrub misc scrub and vegetation remove multiple 8-10ft scrub plants and shrubs cut limbs and remove scrub (leave large seagrape) remove scrub and small plants, trim limbs as needed remove 3-12'oa areca palms trim plants as needed trim plants as needed and remove vines approx # of hours needed to complete above locations Foreman Labor (3) Project manager Dump Truck (1) Loader (small) (1) Cost per hour for above equipment and labor Rates per exhibit B hourly rate sheet ***Cost includes dump fees to properly dispose of all debris and vegetation Landscapes of Distinction, Inc - Town of Gulfstream utility site clearing Cost to complete clearings on above locations .xlsx Costsh~1.xls Cost sheet for clearing 11.14.13.xlsx application/vnd.openxmlformats-officedocument.spreadsheetml.sheet B3649DF941A2DE45975AF7CBF5BB8AE1@namprd09.prod.outlook.com EnUs Danny, See the attached spreadsheet for the clearing of the site locations.  1) My schedule looks now like it'd be Monday 12/2/13 for a start date if you can commit to me in the next few days. I could possibly do it a little earlier (depending on how smooth my other commitments go) 2) 2 consecutive days to complete the work 3) The only items I saw work relocating would be the 3 areca palms @ location 36.....but it would depend on how they come out and if we can get a good root ball 4) $4905.00   Let me know asap if you want me to schedule the work...and I'll make sure we get it at our first opportunity.   Thanks, Dustin Demmery Landscapes of Distinction, Inc 561-386-1561 (cell) http://www.landscapesofdistinction.comwww.landscapesofdistinction.com Landscapes of Distinction, Inc - Town of Gulfstream utility site clearing Location #notes:time allocated in hours 20cut back mahoe limbs, remove old stump1 22remove 1 large mahoe, fan palm, scrub, trash2 24remove 1 large areca palm, 1 large mahoe2 25remove 3-5'oa cocoplum0.5 26remove 4-10'oa ficus hedge plants1 28remove 1 large mahoe and scrub1.5 29misc scrub and vegetation1 31remove multiple 8-10ft scrub plants and shrubs1.5 33cut limbs and remove scrub (leave large seagrape)1 35remove scrub and small plants, trim limbs as needed0.5 36remove 3-12'oa areca palms2 37trim plants as needed 0.5 40trim plants as needed and remove vines0.5 approx # of hours needed to complete above locations15 Cost to complete clearings on above locations Rates per exhibit B hourly rate sheet Project manager $ 75.00 Foreman $ 35.00 Labor (3)$ 17.00 Dump Truck (1)$ 100.00 Loader (small) (1)$ 100.00 Cost per hour for above equipment and labor$ 327.00 ***Cost includes dump fees to properly dispose of all debris and vegetation cost allocated $ 327.00 $ 654.00 $ 654.00 $ 163.50 $ 327.00 $ 490.50 $ 327.00 $ 490.50 $ 327.00 $ 163.50 $ 654.00 $ 163.50 $ 163.50 $ 4,905.00