Loading...
HomeMy Public PortalAboutCost for clearing gulfstream locations 2 thru 18 IPM.Note Cost for clearing gulfstream locations 2 thru 18 Dustin Demmery SMTP Dustin@Landscapesofdistinction.com Cost for clearing gulfstream locations 2 thru 18 Received: from impinc06.yourhostingaccount.com ([10.1.13.106] helo=impinc06.yourhostingaccount.com) by mailscan23.yourhostingaccount.com with esmtp (Exim) id 1Vo2P1-0000Kt-AD for dbrannon@bngengineers.com; Tue, 03 Dec 2013 21:41:27 -0500 Received: from p3plsmtpp1ded03.prod.phx3.secureserver.net ([208.109.80.57]) by impinc06.yourhostingaccount.com with NO UCE id xEhR1m00s1EBjR402EhR8K; Tue, 03 Dec 2013 21:41:26 -0500 Received: from ip-72-167-252-121.ip.secureserver.net ([72.167.252.121]) by p3plsmtpp1ded03.prod.phx3.secureserver.net with : DED : id xEhQ1m0012dv0HC01EhQdN; Tue, 03 Dec 2013 19:41:25 -0700 Received: (qmail 3402 invoked from network); 3 Dec 2013 20:41:21 -0600 Received: from c-98-249-205-78.hsd1.fl.comcast.net (HELO LofDIncPC) (98.249.205.78) by ip-72-167-201-71.ip.secureserver.net with SMTP; 3 Dec 2013 20:41:21 -0600 From: Dustin Demmery <dustin@landscapesofdistinction.com> To: Danny Brannon <DBrannon@BnGEngineers.com> Subject: Cost for clearing gulfstream locations 2 thru 18 Thread-Topic: Cost for clearing gulfstream locations 2 thru 18 Thread-Index: AQJdJ4uzafMHUPmGtYXGWoWYFzAppQ== X-MS-Exchange-MessageSentRepresentingType: 1 Date: Wed, 4 Dec 2013 02:41:17 +0000 Message-ID: <2F196B8BA5274014A1DC70A318362399@LofDIncPC> Content-Language: en-US X-MS-Has-Attach: yes X-MS-TNEF-Correlator: x-mailer: Microsoft Windows Live Mail 14.0.8089.726 x-en-origip: 208.109.80.57 Content-Type: multipart/mixed; boundary="_004_2F196B8BA5274014A1DC70A318362399LofDIncPC_" MIME-Version: 1.0 Dustin Demmery SMTP Dustin@Landscapesofdistinction.com Danny Brannon Landscaping Dustin Cost for clearing gulfstream locations 2 thru 18 Danny, See the attached spreadsheet for the cost associated with clearing locations 2 thru 18 that I visited today. I can schedule the clearing at the beginning of next week (12/9-12/10) if that works for you. Let me know. Thanks for the opportunity, Dustin Demmery Landscapes of Distinction, Inc 561-386-1561 (cell) www.landscapesofdistinction.com<http://www.landscapesofdistinction.com> B85043CC4D2C0A41890EED23015845E8@namprd09.prod.outlook.com <2F196B8BA5274014A1DC70A318362399@LofDIncPC> Renee Basel Renee Basel EX /O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL EX /O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL Dustin Demmery Dustin Demmery Renee Basel Renee Basel Dustin@Landscapesofdistinction.com Dustin@Landscapesofdistinction.com rbasel@gulf-stream.org rbasel@gulf-stream.org II=[CID=5007f369-86f9-85b5-c65a-8598173029a5;IDXHEAD=025D278BB3;IDXCOUNT=1];TFR=NotForking;Version=Version 15.20 (Build 2157.0), Stage=H4;UP=10;DP=1C5 en 4860D3A1A5B65D18 RBasel@gulf-stream.org 00000002/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=3baa9f04d837426b9ed16b03ec111b7b-rbasel Danny Brannon SMTP DBrannon@BnGEngineers.com DBrannon@BnGEngineers.com Danny Brannon Cost sheet for clearing 12.3.13.xlsx 20 1 327 22 2 654 24 2 654 25 0.5 163.5 26 1 327 28 1.5 490.5 29 1 327 31 1.5 490.5 33 1 327 35 0.5 163.5 36 2 654 37 0.5 163.5 40 0.5 163.5 15 4905 75 35 17 100 100 327 2 1 327 3 3 981 4 3 981 6 0.5 163.5 7 0.5 163.5 8 2 654 9 1 327 10 1 327 11 0.5 163.5 13 3 981 15 1 327 16 0.25 81.75 17 0.25 81.75 18 0.25 81.75 17.25 5640.75 75 35 17 100 100 327 Location # notes: cost allocated time allocated in hours cut back mahoe limbs, remove old stump remove 1 large mahoe, fan palm, scrub, trash remove 1 large areca palm, 1 large mahoe remove 3-5'oa cocoplum remove 4-10'oa ficus hedge plants remove 1 large mahoe and scrub misc scrub and vegetation remove multiple 8-10ft scrub plants and shrubs cut limbs and remove scrub (leave large seagrape) remove scrub and small plants, trim limbs as needed remove 3-12'oa areca palms trim plants as needed trim plants as needed and remove vines approx # of hours needed to complete above locations Foreman Labor (3) Project manager Dump Truck (1) Loader (small) (1) Cost per hour for above equipment and labor Rates per exhibit B hourly rate sheet ***Cost includes dump fees to properly dispose of all debris and vegetation Landscapes of Distinction, Inc - Town of Gulfstream utility site clearing Cost to complete clearings on above locations remove large holly and scrub remove thick scrub and sanseveria, leave permiter buffer all around remove scrub remove medium holly and scrub remove large maho and scrub remove dead pine trunks and scrub remove 2 large oleander behind fence and scrub trim misc vegetation around easement remove 4 large maho and stumps remove scrub in 30'x24' easment remove 1 oleander trim maho .xlsx Costsh~1.xls Cost sheet for clearing 12.3.13.xlsx application/vnd.openxmlformats-officedocument.spreadsheetml.sheet D672DDE4891B3C4799BA4BB229B6E48A@namprd09.prod.outlook.com EnUs Danny, See the attached spreadsheet for the cost associated with clearing locations 2 thru 18 that I visited today. I can schedule the clearing at the beginning of next week (12/9-12/10) if that works for you. Let me know.   Thanks for the opportunity,   Dustin Demmery Landscapes of Distinction, Inc 561-386-1561 (cell) http://www.landscapesofdistinction.comwww.landscapesofdistinction.com Landscapes of Distinction, Inc - Town of Gulfstream utility site clearing Location #notes:time allocated in hours 21 remove large holly and scrub 33 remove thick scrub and sanseveria, leave permiter buffer all around 43 remove thick scrub and sanseveria, leave permiter buffer all around 60.5 remove scrub 70.5 remove medium holly and scrub 82 remove large maho and scrub 91 remove dead pine trunks and scrub 101 remove 2 large oleander behind fence and scrub 110.5 trim misc vegetation around easement 133 remove 4 large maho and stumps 151 remove scrub in 30'x24' easment 160.25 remove 1 oleander 170.25 trim maho 180.25 trim plants as needed approx # of hours needed to complete above locations17.25 Cost to complete clearings on above locations Rates per exhibit B hourly rate sheet Project manager $ 75.00 Foreman $ 35.00 Labor (3)$ 17.00 Dump Truck (1)$ 100.00 Loader (small) (1)$ 100.00 Cost per hour for above equipment and labor$ 327.00 ***Cost includes dump fees to properly dispose of all debris and vegetation cost allocated $ 327.00 $ 981.00 $ 981.00 $ 163.50 $ 163.50 $ 654.00 $ 327.00 $ 327.00 $ 163.50 $ 981.00 $ 327.00 $ 81.75 $ 81.75 $ 81.75 $ 5,640.75