HomeMy Public PortalAboutCost for clearing gulfstream locations 2 thru 18
IPM.Note
Cost for clearing gulfstream locations 2 thru 18
Dustin Demmery
SMTP
Dustin@Landscapesofdistinction.com
Cost for clearing gulfstream locations 2 thru 18
Received: from impinc06.yourhostingaccount.com ([10.1.13.106] helo=impinc06.yourhostingaccount.com)
by mailscan23.yourhostingaccount.com with esmtp (Exim)
id 1Vo2P1-0000Kt-AD
for dbrannon@bngengineers.com; Tue, 03 Dec 2013 21:41:27 -0500
Received: from p3plsmtpp1ded03.prod.phx3.secureserver.net ([208.109.80.57])
by impinc06.yourhostingaccount.com with NO UCE
id xEhR1m00s1EBjR402EhR8K; Tue, 03 Dec 2013 21:41:26 -0500
Received: from ip-72-167-252-121.ip.secureserver.net ([72.167.252.121])
by p3plsmtpp1ded03.prod.phx3.secureserver.net with : DED :
id xEhQ1m0012dv0HC01EhQdN; Tue, 03 Dec 2013 19:41:25 -0700
Received: (qmail 3402 invoked from network); 3 Dec 2013 20:41:21 -0600
Received: from c-98-249-205-78.hsd1.fl.comcast.net (HELO LofDIncPC) (98.249.205.78)
by ip-72-167-201-71.ip.secureserver.net with SMTP; 3 Dec 2013 20:41:21 -0600
From: Dustin Demmery <dustin@landscapesofdistinction.com>
To: Danny Brannon <DBrannon@BnGEngineers.com>
Subject: Cost for clearing gulfstream locations 2 thru 18
Thread-Topic: Cost for clearing gulfstream locations 2 thru 18
Thread-Index: AQJdJ4uzafMHUPmGtYXGWoWYFzAppQ==
X-MS-Exchange-MessageSentRepresentingType: 1
Date: Wed, 4 Dec 2013 02:41:17 +0000
Message-ID: <2F196B8BA5274014A1DC70A318362399@LofDIncPC>
Content-Language: en-US
X-MS-Has-Attach: yes
X-MS-TNEF-Correlator:
x-mailer: Microsoft Windows Live Mail 14.0.8089.726
x-en-origip: 208.109.80.57
Content-Type: multipart/mixed;
boundary="_004_2F196B8BA5274014A1DC70A318362399LofDIncPC_"
MIME-Version: 1.0
Dustin Demmery
SMTP
Dustin@Landscapesofdistinction.com
Danny Brannon
Landscaping Dustin
Cost for clearing gulfstream locations 2 thru 18
Danny,
See the attached spreadsheet for the cost associated with clearing locations 2 thru 18 that I visited today. I can schedule the clearing at the beginning of next week (12/9-12/10) if
that works for you.
Let me know.
Thanks for the opportunity,
Dustin Demmery
Landscapes of Distinction, Inc
561-386-1561 (cell)
www.landscapesofdistinction.com<http://www.landscapesofdistinction.com>
B85043CC4D2C0A41890EED23015845E8@namprd09.prod.outlook.com
<2F196B8BA5274014A1DC70A318362399@LofDIncPC>
Renee Basel
Renee Basel
EX
/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL
EX
/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL
Dustin Demmery
Dustin Demmery
Renee Basel
Renee Basel
Dustin@Landscapesofdistinction.com
Dustin@Landscapesofdistinction.com
rbasel@gulf-stream.org
rbasel@gulf-stream.org
II=[CID=5007f369-86f9-85b5-c65a-8598173029a5;IDXHEAD=025D278BB3;IDXCOUNT=1];TFR=NotForking;Version=Version 15.20 (Build 2157.0), Stage=H4;UP=10;DP=1C5
en
4860D3A1A5B65D18
RBasel@gulf-stream.org
00000002/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=3baa9f04d837426b9ed16b03ec111b7b-rbasel
Danny Brannon
SMTP
DBrannon@BnGEngineers.com
DBrannon@BnGEngineers.com
Danny Brannon
Cost sheet for clearing 12.3.13.xlsx
20
1
327
22
2
654
24
2
654
25
0.5
163.5
26
1
327
28
1.5
490.5
29
1
327
31
1.5
490.5
33
1
327
35
0.5
163.5
36
2
654
37
0.5
163.5
40
0.5
163.5
15
4905
75
35
17
100
100
327
2
1
327
3
3
981
4
3
981
6
0.5
163.5
7
0.5
163.5
8
2
654
9
1
327
10
1
327
11
0.5
163.5
13
3
981
15
1
327
16
0.25
81.75
17
0.25
81.75
18
0.25
81.75
17.25
5640.75
75
35
17
100
100
327
Location #
notes:
cost allocated
time allocated in hours
cut back mahoe limbs, remove old stump
remove 1 large mahoe, fan palm, scrub, trash
remove 1 large areca palm, 1 large mahoe
remove 3-5'oa cocoplum
remove 4-10'oa ficus hedge plants
remove 1 large mahoe and scrub
misc scrub and vegetation
remove multiple 8-10ft scrub plants and shrubs
cut limbs and remove scrub (leave large seagrape)
remove scrub and small plants, trim limbs as needed
remove 3-12'oa areca palms
trim plants as needed
trim plants as needed and remove vines
approx # of hours needed to complete above locations
Foreman
Labor (3)
Project manager
Dump Truck (1)
Loader (small) (1)
Cost per hour for above equipment and labor
Rates per exhibit B hourly rate sheet
***Cost includes dump fees to properly dispose of all debris and vegetation
Landscapes of Distinction, Inc - Town of Gulfstream utility site clearing
Cost to complete clearings on above locations
remove large holly and scrub
remove thick scrub and sanseveria, leave permiter buffer all around
remove scrub
remove medium holly and scrub
remove large maho and scrub
remove dead pine trunks and scrub
remove 2 large oleander behind fence and scrub
trim misc vegetation around easement
remove 4 large maho and stumps
remove scrub in 30'x24' easment
remove 1 oleander
trim maho
.xlsx
Costsh~1.xls
Cost sheet for clearing 12.3.13.xlsx
application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
D672DDE4891B3C4799BA4BB229B6E48A@namprd09.prod.outlook.com
EnUs Danny, See the attached spreadsheet for the cost associated with clearing locations 2 thru 18 that I visited today. I can schedule the clearing at the beginning of next week (12/9-12/10)
if that works for you. Let me know. Thanks for the opportunity, Dustin Demmery
Landscapes of Distinction, Inc
561-386-1561 (cell)
http://www.landscapesofdistinction.comwww.landscapesofdistinction.com
Landscapes of Distinction, Inc - Town of Gulfstream utility site clearing
Location #notes:time allocated in hours
21
remove large holly and scrub
33
remove thick scrub and sanseveria, leave permiter buffer all around
43
remove thick scrub and sanseveria, leave permiter buffer all around
60.5
remove scrub
70.5
remove medium holly and scrub
82
remove large maho and scrub
91
remove dead pine trunks and scrub
101
remove 2 large oleander behind fence and scrub
110.5
trim misc vegetation around easement
133
remove 4 large maho and stumps
151
remove scrub in 30'x24' easment
160.25
remove 1 oleander
170.25
trim maho
180.25
trim plants as needed
approx # of hours needed to complete above locations17.25
Cost to complete clearings on above locations
Rates per exhibit B hourly rate sheet
Project manager $ 75.00
Foreman $ 35.00
Labor (3)$ 17.00
Dump Truck (1)$ 100.00
Loader (small) (1)$ 100.00
Cost per hour for above equipment and labor$ 327.00
***Cost includes dump fees to properly dispose of all debris and vegetation
cost allocated
$ 327.00
$ 981.00
$ 981.00
$ 163.50
$ 163.50
$ 654.00
$ 327.00
$ 327.00
$ 163.50
$ 981.00
$ 327.00
$ 81.75
$ 81.75
$ 81.75
$ 5,640.75