Loading...
HomeMy Public PortalAboutRCO 6247-004 OH Feeder Delay Renee Basel From:John Zoerhof <jzoerhof@HYPOWERINC.COM> Sent:Thursday, August 28, 2014 6:13 PM To:Danny Brannon (DBrannon@BnGEngineers.com) Subject:RCO 6247-004 OH Feeder Delay Attachments:Hypower RCO 6247-004 OH Feeder.pdf , Regards John Zoerhof Division Manager – Power Services Direct 954.917.1439 Cell 954.448.0369 954.978.9300 – Main 954.978.8666. - Fax Please consider the environment before printing this e-mail  NOTICE: This email is intended solely for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt from disclosure. If the reader of this email is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify us by telephone and return the original message to us at the listed email address. Thank You. 1 5913 NW 31 AVE Request for Change Order 6247‐004 Fort Lauderdale, FL 33309 Project Number 2012/ 13‐50 Date 8/27/14 P 954‐978‐9300 F 954‐978‐8666 Page 1 OF 1 Location: ‐$               ‐$               ‐$               10 Submitted By: Name &Title: John Zoerhof, Hypower, Inc Recommended: Name &Title: Approved: Name &Title: Hypower reserves the right to correct this quote for errors and omissions. Overall Contract Delay Due to OH Work by Others on N & S Feeder Riser Poles OH work required in order to build risers delayed – Poles set w/o framing – Wait on Contractor to return  Incorrect Switches Installed ‐ Wait on Contractor to return to rectify Switches Corrected w/o Double Dead Ends or Top Side Jumpers – Wait on  Contractor to return Double Dead End Installed w/o Top Side Jumpers – requested schedule Ultimately self‐performed the Top Side Jumpers directly for FPL in August 2014.  Overall impact drove back energizing the feeder at an earlier date which would have  allowed switching to energize URD and associated Services as planned. Now all  condensed work requiring additional crews.  THIS IS A NO COST CHANGE TO EXTEND CONTRACT DURATION ONLY Narrative Description of Required Change Change Order Cost from Breakdown Page 2 Change Order Duration Impact Change Order Cost from Breakdown Page 3 Change Order Cost Total