HomeMy Public PortalAboutRCO 6247-003 T-11 Jamaica
Renee Basel
From:John Zoerhof <jzoerhof@HYPOWERINC.COM>
Sent:Thursday, August 28, 2014 5:50 PM
To:Danny Brannon (DBrannon@BnGEngineers.com)
Subject:RCO 6247-003 T-11 Jamaica
Attachments:Hypower RCO 6247-003 T-11 Jamaica.pdf
,
Regards
John Zoerhof
Division Manager – Power Services
Direct 954.917.1439
Cell 954.448.0369
954.978.9300 – Main 954.978.8666. - Fax
Please consider the environment before printing this e-mail
NOTICE: This email is intended solely for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt
from disclosure. If the reader of this email is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are
hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately
notify us by telephone and return the original message to us at the listed email address. Thank You.
1
5913 NW 31 AVE Request for Change Order 6247‐003
Fort Lauderdale, FL 33309 Project Number 2012/ 13‐50
Date 8/11/14
P 954‐978‐9300 F 954‐978‐8666 Page 1 OF 3
Location:
7,259.50$
‐$
7,259.50$
2
Submitted By:
Name &Title: John Zoerhof, Hypower, Inc
Recommended:
Name &Title:
Approved:
Name &Title:
Hypower reserves the right to correct this quote for errors and omissions.
Conflict with existing Utility Structure Eliminate T‐11 extend Service from T‐12
Structure in Easement area prohibited placement of T‐11. T‐11 eliminated and
Service extended across Ocean back to T‐12.
Remove single TX Pad.
Add 48” Primary HH
Install 1‐6” Via Directional Bore (50’).
Trench and install 1‐6” (90’)
Pull 3‐750 MCM Service Cable 150’
Narrative Description of Required Change
Change Order Cost from Breakdown Page 2
Change Order Duration Impact
Change Order Cost from Breakdown Page 3
Change Order Cost Total
Request for Change Order 6247‐003
Job Number 2012/ 13‐50
Date 8/11/14
Page 2 OF 3
#Item Unit of
Measure
Unit Price CO
Quantity
Line Item
Total
1 Install FP&L Single Phase Transformer Pad Complete
(includes all site and conduit work)
EA $ 515.00 ‐1 $ (515.00)
2Install FP&L 48" Polymer Primary Pull Box Complete
(includes all site and conduit work)
EA $ 632.00 1 $ 632.00
3Directional Bore Machine Setup with Pits Complete
(includes all pits and site restoration work) Includes
Remob
EA $ 2,500.00 1 $ 2,500.00
4Install FP&L 1‐6" Conduit via Directional Bore Complete
(includes all labor and materials, excludes machine
setup &
conduit)
LF $ 18.20 50 $ 910.00
5Install 30" Trench ( Machine Dig with Backfill )LF $ 19.00 90 $ 1,710.00
6Install FP&L 1‐6" Conduit Compete (Labor for conduit,
string, caps as needed; excludes materials and
trenching)
LF $ 2.25 90 $ 202.50
7Install FP&L 3CC‐750KCMIL SEC cable in 6"
conduit over 50 feet.
EA $ 1,820.00 1 $ 1,820.00
8 $ ‐
9 $ ‐
10 $ ‐
11 $ ‐
12 $ ‐
13 $ ‐
14 $ ‐
15 $ ‐
A
1
Ea $ ‐
$ 7,259.50
$ 7,259.50
Unit Price Cost Total
Unit Price Schedule of Values for Change Order Work
Page Total
Request for Change Order 6247‐003
Job Number2012/ 13‐50
Date 08/11/14
Page 3 OF 3
OTY. MATERIAL & INVOICE COSTS UNIT UNIT EQUIPMENT COST UNIT EXT.
PRICE RATE
1 0.00 28.13 $0.00
18.85 $0.00
25.60 $0.00
130.85 $0.00
25.95 $0.00
25.40 $0.00
63.20 $0.00
104.65 $0.00
80.85 $0.00
18.00 $0.00
22.90 $0.00
45.79 $0.00
49.61 $0.00
57.24 $0.00
210.00 $0.00
142.50 $0.00
400.00 $0.00
$0.00
TOTALS
QTY Classification Reg OT Reg OT Total Line Labor Cost
Rate Rate Hours Hours SUMMARY
1 Lineman 89.70 115.70 TOTAL REIMBURSIBLES
1 Supt. 70.69 95.06 SALES TAX
1Poject Engineer 51.84 69.71 MARK‐UP 15%
1 Operator 41.32 55.57 TOTAL REIMBURSIBLE COST
1 Driver 33.85 45.52
2 Laborer 24.89 33.47 TOTAL REG.LABOR
1 Equipment Transport Driver 33.85 45.52
1 Electrician 64.53 78.32 0 TOTAL O.T. LABOR
EQUIPMENT COST
QTY PER DIEM Daily Rate Days
PERMIT FEES
9Per Man 34.5
OTHER COSTS
TOTALS BASE COST
FORM HP 405 PAGE TOTAL $0.00
tractor/trailer
5x8 road plates/Day (4)
T‐330 Pick up truck 4x4
EV‐147 Pick up Truck
Mex‐2 Mini Excavator
EX‐2 Excavator
T‐290 box van
T‐223 F550 dump truck
L‐2 Loader
15 yard dump truck
$0.00
$0.00 $0.00
$0.00
Total Labor $0.00
Total Per Diem
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00
‐$ Estimated Frieght
Reimbursibles Total ‐$ Equipment Total
‐$ Hyd pump / Day
‐$ Auger Truck w Operator/ HR
‐$ Crane w Operator / Hr
‐$ 40 ‐ 64 Hyd Jacks / Day
‐$ 52 ‐ 88 Hyd Jacks / Day
‐$
‐$ 4X8 Shoring Boards / Day
‐$
‐$
‐$
‐$
‐$
‐$
TIME, EQUIPMENT, MATERIAL & REIMBURSABLES BREAKDOWN
(Based upon Blue Book Rates)
‐$
‐$
EXTENSION
‐$
REIMBURSIBLES