Loading...
HomeMy Public PortalAboutA Phase @ Pelican & Andrews_ Renee Basel From:John Zoerhof <jzoerhof@HYPOWERINC.COM> Sent:Thursday, August 21, 2014 8:19 AM To:Danny Brannon (DBrannon@BnGEngineers.com) Cc:Wayne Wilson - JHV (wwilson@jordanhighvoltage.com); Cliff Spitzer; Lehr, John Subject:A Phase @ Pelican & Andrews. Attachments:Conduit A Phase Pelican - Andrews.pdf; Line Diagram A Phase Pelican - Andrews.pdf Danny, Walking the job yesterday I noticed that A Phase, as installed by the supplemental drawings, does not allow for the path indicated on the Line Diagram 158. The Supplemental plans show 3PN3C (A,B,C) going down Andrews to T-6 then on to the pole @ G.B. with 4PN4C going west down Pelican to the T-1 location for the A and B loops. T-6 is shown in the incorrect location on the 158 drawing. There are not enough conduits at the present T-6 location to do what is shown on the line diagram. Therefore, please see attached Conduit and Line As-Built drawings. In simple terms, it changes; The A Phase from the pole @ GB to T-1 instead of T-6. And A Phase from T-10 to T-6 instead of T-1. , Regards John Zoerhof Division Manager – Power Services Direct 954.917.1439 Cell 954.448.0369 954.978.9300 – Main 954.978.8666. - Fax Please consider the environment before printing this e-mail  NOTICE: This email is intended solely for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt from disclosure. If the reader of this email is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify us by telephone and return the original message to us at the listed email address. Thank You. 1 4P N 4 C B I VQKVA(55) f 18566-5 (NA.) 6-8105-4498-0-9 q 1 18566-2 2 O =� 3 18566-4 � I�r I m® f roiwrr wo URDPNGP RD I I Ilm A05R187 I I - _ I PELICM LN - 16565-7 (A#664`)LZ A — _ _A _ _A .�. _ —A —A — — —A T �-- —A — (Ab309') 18565-5 (A6184" 1' 7 3 18565-6 1 18565-4 (80445') T- A 100KVA(55) I A 6-8105-4191-0--1 IT -2 8- A I DOKVA(SS) I8-8105-4891-0-0 I I 0) 00 I ala T-8 A05RI85 r = 8 167KVA(53)(UG) T-7 C50KVA(SS)(PWR) M _ 6-8105-6094-0-7 PRIVATE LN OPEN DELTA — — -- n A IOOWA(5S) t I91 6--8105-5492-0-0 ?� I I 18555-8 18886-9(N.1 _A'...L _C t� I � i(A037� —a —A 3r3 1 I 18585-2 A(SS) 5-5191-0-8 bm I Liz 18566-7 T"9 1� 18566-6 C 50KVA(SS) 18567-3(N.D.) 6-8i05-6595 167-4 1 --18567-2 AAO0S5RR 118885gy of I 1 I i SW#.55i 6-8105 AL�_ A .... ...... p __. g ...... 9 - - C (3O6705 C w PEfJCAN W �' Zt W ro T I rA5--BUILT COPY A5—BUILT CREW PRINT I Easement? 4 T1to f 5_1 ix I LnL I 6-1 7-1 41 Q 3a o 80 "K" I rs-sse5W0--1 { t _ � — I 00RCE BUSH BLVD I rA5--BUILT COPY A5—BUILT CREW PRINT I Easement?