Loading...
HomeMy Public PortalAboutChange Order Sawcross Solids HandlingSECTION 00843 CHANGE ORDER FORM Project: City of Crestview Solids Handling Improvements CHANGE ORDER NO. DATE OF ISSUANCE:.Februar- e 01. 2023 CONTRACTOR: Sawcross, Inc. EFFECTIVE DATE: ENGINEER: Jacobs OWNER'S CONTRACT NO.: The following changes are hereby made to the Contract Documents: CHANGE IN CONTRACT PRICE: Original Contract Price CHANGE IN CONTRACT TIMES: Original Contract Times Digester Completion: 210 Days $4,473,000.00 Substantial Completion: 360 Days Ready for final payment: 420 Days dais or dates Net changes from previous Change Orders No. to Net change from previous Change Orders No. No. No. $ 0 _ 0 days Contract Price prior to this Change Order $4,473,000.00 Net Increase of this Change Order $635,867.93 Contract Price with all approved Change Orders $5,108,867.93 days Contract Times prior to this Change Order Digester Completion: 210 Days Substantial Completion: 360 days Ready for final payment: 420. days da, s or dates Net Increase of this Change Order 130 Days {Base contractl 157 rDi=.ester schedule for a total of 367 days days Contract Times with all approved Change Orders Digester Completion: 269 Days Substantial Completion: 490 days Ready for final payment: 550 days dacs or dates 00843-1 CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The General Conditions, Supplementary Conditions, Specifications and all parts of the Project Manual listed in Article 1, Definitions, of the General Conditions apply to and govern all work under this change order. Change Order No. 1 II. REQUIRED CHANGES: 1.) The contract price is to be increased in an amount equal to the material and labor cost increases since the bid openin{g date and time of notice of award. The contract price increase also includes labor and materials cost increases to meet SRF American Iron and Steel reuulations and Davis Bacon Minimum Wage Rates. 2.) Addition of anew traffic rated electrical manhole in the entrance drive to p otect an existing fiber optic duct bank handhole. 3. 1 Change the ductile iron pipe lining from ceramic epoxy to double lined cement and and also change the dewaterin, building exterior drairuiping from ductile iron to PVC. 4.) Reduction in ductile iron pining in accordance with moving the digesters 7-ft south. 5.) Addition of 130 Days to the contract duration_ III. JUSTIFICATION: 1 The contractor submitted their bid at the bid opening. on May 18 2021 and the notice of award was provided on January 10, 2022. Inflation has increased the construction costs during this time duration and the City agreed to par the Contractor the representative increase in cost rather than re -bidding the project. Additionally, the City applied for an FDEP SRF Construction Loan for the project .which requires AIS and Davis Bacon adherence. 2. The fiber optic handhole was found after start of construction to be in the way of the New access drive modifications. 3.) Manufacturer lead times for ceramic epoxy lined ductile iron are an additional 3-4 months which would have resulted in delays to constructing the diesters. Additionally the lead time for receiving the ductile iron pine for the building drains would have delayed the building completion. 4 LTank manufacturer needed additional clearance between the new tanks and„roDerty 5.1 The construction schedule has been impacted by delays in materials and equipment manufacturerin=.e and delivery. IV. PAYMENT: This chancre order will result in an increase of $635.867.93 to the total contract amount. 00843-2 V. APPROVAL AND CHANGE AUTHORIZATION: Acknowledgments: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. Change Order Request by: Sawcross. Inc. Change(s) Ordered by: NA RECOMMENDED BY: Kevin Waddell - Jacobs (Engineer) By: �•��.� lL1x. l 02/01/2023 (Authorized Signature) (Date) Project Manager (Title) APPROVED BY: City of Crestview, Florida (Owner) B ACCEPTED BY: 1�.15`Ti,- an5Gvl - `JaU3ux965 N �r1 4_3 Authorized Signature) (Date) (Contractor) Z-� - ZoZ3 (AuYorized Signature) (Date) k) ro' 11 U t (kli1 y.(_ (Title) END OF SECTION 00843-3 Change Order No. 1 Item Description 1 Bid Price Escalation 2 Davis Bacon and AIS Change Order #1 Accepted 3/28/22 3 Ductile Iron Pipe Lining 4 Traffic Rated Manhole 5 Building Drain 6 Digester Relocation 7 Electrical Bid Escalation Change Order #1 Addition Base Bid Price Change Order #1 Total Amount Revised Contract Price Cost Change $ 448,605.29 $ 117,498.39 $ 566,103.68 $ (28,619.25) $ 4,410.60 $ (3,279.60) $ (1,187.50) $ 98,440.00 $ 69,764.25 $ 4,473,000.00 $ 635,867,93 $ 5,108,867.93 ATTACHMENT #02 BID ESCALATION (NOTICE OF PROCEED DELAY)