HomeMy Public PortalAboutRE_ Request for minor clearing
Renee Basel
From:John Zoerhof <jzoerhof@HYPOWERINC.COM>
Sent:Tuesday, March 25, 2014 7:55 AM
To:Danny Brannon
Subject:RE: Request for minor clearing
This shot was made however due to the timing it will be reamed and pulled today weather
permitting.
Thanks,
John Zoerhof
Division Manager – Power Services
From: John Zoerhof
Sent: Monday, March 24, 2014 1:29 PM
To: Danny Brannon
Subject: Re: Request for minor clearing
Correct. The FPL will now be on the east of the comm ducts for this section.
The conduits will be shot or trenches diagonally to the switch cabinet as discussed onsite Friday
John Zoerhof, Hypower, Inc.
Sent from my Smartphone, please disregard typos or grammatical errors
----- Reply message -----
From: "Danny Brannon" <DBrannon@BnGEngineers.com>
To: "John Zoerhof" <jzoerhof@HYPOWERINC.COM>
Subject: Request for minor clearing
Date: Mon, Mar 24, 2014 1:06 PM
I understand the shot will be moved out into the right-of-way to avoid the tree trimming.
Danny P. Brannon, P.E.
Brannon & Gillespie,
LLC
Consulting Engineers
631 US Highway One, Suite 301
North Palm Beach, Florida 33408
Off: (561) 847-4435 Cell: (561) 307-9454
Website: www.BnGEngineers.com
From: John Zoerhof \[mailto:jzoerhof@HYPOWERINC.COM\]
Sent: Monday, March 24, 2014 10:30 AM
1
To: Danny Brannon
Subject: Request for minor clearing
Danny,
In order to make the shot back to hidden harbor and then turn around and make the shot south to the
termination pole the crew will need to make some clearing for the equipment. See attached photos.
This location is between the TX location with the gate issue and the driveway leading back to 1122 Ocean. This
is required to stay within the 3' allowable from the ROW.
John Zoerhof, Hypower, Inc.
Sent from my Smartphone, please disregard typos or grammatical errors
This email is free from viruses and malware because avast! Antivirus protection is active.
To
help
prot
ect
your
priva
cy,
2