Loading...
HomeMy Public PortalAboutRCO-005 Unknown SErvice @ Hidden Harbor Renee Basel From:John Zoerhof <jzoerhof@HYPOWERINC.COM> Sent:Wednesday, October 1, 2014 12:33 PM To:Danny Brannon (DBrannon@BnGEngineers.com) Subject:RCO-005 Unknown SErvice @ Hidden Harbor Attachments:Hypower RCO 6247-005 Add'l Service.pdf , Regards John Zoerhof Division Manager – Power Services Direct 954.917.1439 Cell 954.448.0369 954.978.9300 – Main 954.978.8666. - Fax Please consider the environment before printing this e-mail  NOTICE: This email is intended solely for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt from disclosure. If the reader of this email is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify us by telephone and return the original message to us at the listed email address. Thank You. 1 5913 NW 31 AVE Request for Change Order 6247‐005 Fort Lauderdale, FL 33309 Project Number 2012/ 13‐50 Date 9/26/14 P 954‐978‐9300 F 954‐978‐8666 Page 1 OF 1 Location: 4,204.60$     ‐$              NA 4,204.60$     1 Submitted By: Name &Title: John Zoerhof, Hypower, Inc Recommended: Name &Title: Approved: Name &Title: Hypower reserves the right to correct this quote for errors and omissions. Unknown Service not shown on plans located on SW corner of Hidden Harbor and  Ocean presently fed overhead from the east. Requires additional directional Bore  diagonally across Ocean to new Secondary Splice Box, Cable, connections and  terminations. This will not affect any residential power service as it is for a  Communication Pedestal Box. Narrative Description of Required Change Change Order Cost from Breakdown Page 2 Change Order Duration Impact Change Order Cost from Breakdown Page 3 Change Order Cost Total Request for Change Order 6247‐005 Job Number 2012/ 13‐50 Date 9/26/14 Page 2 OF 3 #Item Unit of  Measure  Unit Price CO  Quantity  Line Item  Total  1 Directional Bore Machine Setup with Pits Complete (includes all pits and site restoration work) EA  $ 2,500.00 1  $   2,500.00  2InstallFP&L1‐2" Conduit via Directional Bore Complete (includes all labor and materials, excludes machine setup & conduit) LF  $        8.30 80  $       664.00  3Install 36" Trench ( Hand Dig with Backfill )LF $      32.00 20  $       640.00  4Install FP&L #4/0 HDPE‐TPX secondary cable in 2" conduit 51 to 200 feet. EA  $    273.00 1  $       273.00  5 Terminate #4/0 HDPE TPX secondary cable complete (Each End = 2) EA  $      45.50 2  $         91.00  6InstallFP&L1‐2" Conduit Compete (Labor for conduit,string, caps as needed; excludes materials and trenching) LF  $        1.83 20  $         36.60  7  $               ‐    8  $               ‐    9  $               ‐    10  $               ‐    11  $               ‐    12  $               ‐    13  $               ‐    14  $               ‐    15  $               ‐    A 1 Ea  $               ‐     $   4,204.60   $   4,204.60  Unit Price Cost Total Unit Price Schedule of Values for Change Order Work Page Total Request for Change Order 6247‐005 Job Number2012/ 13‐50 Date 09/26/14 Page 3 OF 3 OTY.               MATERIAL & INVOICE COSTS UNIT UNIT                                    EQUIPMENT COST UNIT EXT. PRICE RATE 1 0.00 28.13 $0.00 18.85 $0.00 25.60 $0.00 130.85 $0.00 25.95 $0.00 25.40 $0.00 63.20 $0.00 104.65 $0.00 80.85 $0.00 18.00 $0.00 22.90 $0.00 45.79 $0.00 49.61 $0.00 57.24 $0.00 210.00 $0.00 142.50 $0.00 400.00 $0.00 $0.00 TOTALS QTY Classification Reg OT Reg OT Total Line  Labor Cost Rate Rate Hours Hours SUMMARY 1 Lineman 89.70 115.70 TOTAL REIMBURSIBLES 1 Supt. 70.69 95.06 SALES TAX 1Poject Engineer 51.84 69.71 MARK‐UP 15% 1 Operator 41.32 55.57 TOTAL REIMBURSIBLE COST 1 Driver 33.85 45.52 2 Laborer 24.89 33.47 TOTAL REG.LABOR 1 Equipment Transport Driver 33.85 45.52 1 Electrician 64.53 78.32 0 TOTAL O.T. LABOR EQUIPMENT COST QTY PER DIEM Daily Rate Days PERMIT FEES 9Per Man 34.5 OTHER COSTS TOTALS BASE COST FORM HP 405 PAGE TOTAL $0.00 tractor/trailer 5x8 road plates/Day (4) T‐330 Pick up truck 4x4 EV‐147 Pick up Truck Mex‐2 Mini Excavator EX‐2 Excavator T‐290 box van T‐223 F550 dump truck L‐2 Loader 15 yard dump truck $0.00 $0.00 $0.00 $0.00 Total Labor $0.00 Total Per Diem $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ‐$                     Estimated Frieght Reimbursibles Total ‐$                     Equipment Total ‐$                     Hyd pump / Day ‐$                     Auger Truck w Operator/ HR ‐$                     Crane w Operator / Hr ‐$                     40 ‐ 64 Hyd Jacks / Day ‐$                     52 ‐ 88 Hyd Jacks / Day ‐$                      ‐$                     4X8 Shoring Boards / Day ‐$                      ‐$                      ‐$                      ‐$                      ‐$                      ‐$                      TIME, EQUIPMENT, MATERIAL & REIMBURSABLES BREAKDOWN (Based upon Blue Book Rates) ‐$                      ‐$                      EXTENSION ‐$                      REIMBURSIBLES 5913 NW 31 AVE Request for Change Order 6247‐005 Fort Lauderdale, FL 33309 Project Number 2012/ 13‐50 Date 9/26/14 P 954‐978‐9300 F 954‐978‐8666 Page 1 OF 1 Location: 4,690.60$     ‐$              NA 4,690.60$     2 Submitted By: Name &Title: John Zoerhof, Hypower, Inc Recommended: Name &Title: Approved: Name &Title: Hypower reserves the right to correct this quote for errors and omissions. Unknown Service not shown on plans located on SW corner of Hidden Harbor and  Ocean presently fed overhead from the east. Requires additional directional Bore  across Ocean to new Secondary Splice Box, Cable, connections and terminations. This will not affect any residential power service as it is for a Communication  Pedestal Box. Narrative Description of Required Change Change Order Cost from Breakdown Page 2 Change Order Duration Impact Change Order Cost from Breakdown Page 3 Change Order Cost Total