Renee Basel
From:John Zoerhof <jzoerhof@HYPOWERINC.COM>
Sent:Thursday, August 21, 2014 9:20 AM
To:Danny Brannon (DBrannon@BnGEngineers.com)
Cc:Wayne Wilson - JHV (wwilson@jordanhighvoltage.com); Cliff Spitzer; Lehr, John
Subject:RE: A Phase @ Pelican & Andrews.
Sorry, Typo;
The A Phase from the pole @ GB to T-6 instead of T-1.
And A Phase from T-10 to T-1 instead of T-6.
,
Regards
John Zoerhof
Division Manager – Power Services
Direct 954.917.1439
Cell 954.448.0369
954.978.9300 – Main 954.978.8666. - Fax
Please consider the environment before printing this e-mail
NOTICE: This email is intended solely for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt
from disclosure. If the reader of this email is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are
hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately
notify us by telephone and return the original message to us at the listed email address. Thank You.
From: John Zoerhof
Sent: Thursday, August 21, 2014 8:17 AM
To: Danny Brannon (DBrannon@BnGEngineers.com)
Cc: Wayne Wilson - JHV (wwilson@jordanhighvoltage.com); Cliff Spitzer; Lehr, John
Subject: A Phase @ Pelican & Andrews.
Danny,
Walking the job yesterday I noticed that A Phase, as installed by the supplemental drawings,
does not allow for the path indicated on the Line Diagram 158.
1
The Supplemental plans show 3PN3C (A,B,C) going down Andrews to T-6 then on to the pole @
G.B. with 4PN4C going west down Pelican to the T-1 location for the A and B loops.
T-6 is shown in the incorrect location on the 158 drawing. There are not enough conduits at the
present T-6 location to do what is shown on the line diagram.
Therefore, please see attached Conduit and Line As-Built drawings. In simple terms, it changes;
The A Phase from the pole @ GB to T-1 instead of T-6.
And A Phase from T-10 to T-6 instead of T-1.
,
Regards
John Zoerhof
Division Manager – Power Services
Direct 954.917.1439
Cell 954.448.0369
954.978.9300 – Main 954.978.8666. - Fax
Please consider the environment before printing this e-mail
NOTICE: This email is intended solely for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt
from disclosure. If the reader of this email is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are
hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately
notify us by telephone and return the original message to us at the listed email address. Thank You.
2