HomeMy Public PortalAbout01) Rosemead Construction Slides PresentationROSEMEAD BOULEVARD
SAFETY ENHANCEMENT & BEAUTIFICATION PROJECT
CONSTRUCTION INFORMATION MEETING
WEDNESDAY, JAN. 161 7 P.M.
TEMPLE CITY HISTORICAL SOCIETY HALL
WELCOME
PROGRESS TO DATE, PROJECT OVERVIEW
TONIGHT'S MEETING
• Discussion topics
• Information resources
SUBMJ
CARDS BY 7-.30
DBE RELATED TO
0
UL
mvp\'ESCTION
CONSTRU
Cp 0 d
b
Of NNE
otor j
ralm+
tm--+Hv11`e. '.:�&1iPolydl.
11'.(6261477376 . o,l - AbIAOh.d.oy,m
,EMn2F
O �{ CAM,?e `
� F
/E#WE V «A
�44ro*
PROGRESS i0 DATE
IN-DEPTH PLANNING
EXTENSIVE COMMUNITY ENGAGEMENT
CONSTRUCTION APPROACH
PHASING STRATEGY
What is the method to our madness?
JOB START: JAN. 24, 2013
• No parking, lane restriping, motorist distractions.
DURATION OF EACH PHASE
• 2-3 months/phase; some overlap.
CONSTRUCTION APPROACH
HOLIDAY SEASON
• No work in front of major shopping areas.
NIGHT WORK: 9 P.M. - 5:30 A.M.
• In major shopping areas to minimize disruption.
ROAD CLOSURES
• Necessary but brief; will provide notification.
JOB COMPLETION: SUMMER 2014
CONSTRUCTION PHASING
COMVERC14 MG
py
yV
C
/ SXEME SHFE15: SN[f15. SNEER FME SEE
E3 SRS:
1 ioz _1w _10E im,i lae lai woe .I
Y, &
l �R4��
WINTER SPRING
2013 2013
umurvu ulu eeaemwnrvu
�reeweawauua
wmweewvwsorma.
yxaNRmMeeawluw roew
ewro.yxsyecn�ase wmMu
we wraw luew ro w Siwe
eyeeoexuc uxrounna
iy�.'aiu..ua,uumaw
RESIOENIIBL AREA
ryffi
z
E.
SEE
SFE SEE
WINTER
ME
ME
SFE
SEE
43
SEE
�NffR.
SNEE
SNJ
SHEER
SH78
SHUTS
S, EE1T1Se'
110 JID
III
SMf['R'B:
_115
Ie��rr �11
-Iq
�
I
'
SUMMER
FALL
WINTER
SPRING
2013
2013
2014
2014
SUMMER
2014
I
CONSTRUCTION PHASING
®PHASE 1 & 3: MEDIANS
Restriping to provide two traffic lanes each way
during peak hours.
PHASE 2: CENTER LANES @ LAS TUNAS
Road closures at a minimum.
■PHASE 4: EAST SIDEWALKS - UPRR TO LAS TUNAS
Work to
be
done within
flow
of
traffic;
one lane
of
traffic each
way
at
all times.
■PHASE 5: S/E-N/E CORNERS -LAS TUNAS TO EL
O 1 c
Heavy traffic congestion; expect delays.
P%O
1/FORK%
CONSTRUCTION PHASING
PHASE 6: N/W-S/W CORNERS - LAS TUNAS TO ELM
Heavy traffic congestion; expect delays.
■PHASE 7: WEST SIDEWALKS - ELM TO UPRR
Work in front of major shopping areas done at night and
completed by the holiday season.
PHASES 8 & 9: SIDEWALKS - ELM TO CALLITA
Major landscaping through entire project.
CONSTRUCTION IMPACTS
SERVICE INTERRUPTIONS
TRASH PICKUP: Leave behind curb.
WATER: Minimal; water companies to provide
advance notice.
TRAFFIC SIGNALS: Replacements done by
intersection during the day and within 8 hrs.
ROADS: North/south travel generally not closed;
west/east access at certain locations closed
occasionally for concrete pours.
f-0FO0.N0.
CONSTRUCTION IMPACTS
TRAFFIC/PARKING RESTRICTIONS
• Traffic flow reduced to 25 mph at all times.
• No parking on Rosemead Blvd starting Jan. 22.
• You may have to park at other locations.
• Lane closures on an as -needed basis.
• Left turn pockets reduced; City will extend crossing
time.
• Detours are occasional but necessary.
Flag men will direct traffic for safety purposes (as
needed). ""°
A �`oi C4M If i
Utility crossings may impact traffic flow.
,�o
C,!/so0.N\P
CONSTRUCTION IMPACTS
PROPERTY ACCESS/ENCROACHMENTS
Driveway access may be restricted.
• City, contractor to notify homeowners and businesses
in advance.
Sidewalk routes will be impacted.
• Refer to signage at corner locations.
There will be open trenches.
• Be alert in construction zones.
STAY INFORMED
NIXLE NOTIFICATION SYSTEM
SIGN UP ON CITY WEBSITE or
TEXT ROSEMEAD TO 888777
PROJECT WEBSITE
WWW. ROSEM EADBLVD.COM
AM 1690 RADIO STATION
ROADSIDE MESSAGE BOARDS
CONTACT
Response within 24 hours:
HOTLINE
(626) 476-7376
ROSEM EADBLVD@TEM PLECITY. US
CITY HALL
9701 LAS TUNAS DR.
Tonight's questions will be made into an FAQ, to
be available online.
ADDITIONAL QUESTIONS:
HOTLINE (626) 476-7376
E-MAIL ROSEMEADBLVD@TEMPLECITY.US
CITY HALL 9701 LAS TUNAS DR.
INFORMATION RESOURCES:
NIXLE TEXT ROSEMEAD TO 888777
WEBSITE WWW.ROSEMEADBLVD.COM
OTHER AM 1690, MESSAGE BOARDS