Loading...
HomeMy Public PortalAboutRE_ Town of Gulf Stream - IMAG0680_jpg (3) IPM.Note RE: Town of Gulf Stream - IMAG0680.jpg RE: John Zoerhof SMTP jzoerhof@HYPOWERINC.COM Town of Gulf Stream - IMAG0680.jpg Received: from impinc04.yourhostingaccount.com ([10.1.13.104] helo=impinc04.yourhostingaccount.com) by mailscan02.yourhostingaccount.com with esmtp (Exim) id 1WQIDd-00013g-Gs for dbrannon@bngengineers.com; Wed, 19 Mar 2014 11:15:49 -0400 Received: from na01-bn1-obe.outbound.protection.outlook.com ([207.46.163.187]) by impinc04.yourhostingaccount.com with NO UCE id fTFq1n00242uDp302TFqnD; Wed, 19 Mar 2014 11:15:50 -0400 Received: from DM2PR07MB416.namprd07.prod.outlook.com (10.141.104.156) by DM2PR07MB413.namprd07.prod.outlook.com (10.141.104.147) with Microsoft SMTP Server (TLS) id 15.0.898.11; Wed, 19 Mar 2014 15:15:44 +0000 Received: from DM2PR07MB416.namprd07.prod.outlook.com ([169.254.16.209]) by DM2PR07MB416.namprd07.prod.outlook.com ([169.254.16.35]) with mapi id 15.00.0898.005; Wed, 19 Mar 2014 15:15:44 +0000 From: John Zoerhof <jzoerhof@HYPOWERINC.COM> To: Danny Brannon <DBrannon@BnGEngineers.com> Subject: RE: Town of Gulf Stream - IMAG0680.jpg Thread-Topic: Town of Gulf Stream - IMAG0680.jpg Thread-Index: AQLdOgs+voEjTCZutSKBU5S4A24CsQKh7B1wAhI/XwUBx/QwxALwIx2E X-MS-Exchange-MessageSentRepresentingType: 1 Date: Wed, 19 Mar 2014 15:15:43 +0000 Message-ID: <8aab01bbd5534c6888a81fca51d58028@DM2PR07MB416.namprd07.prod.outlook.com> References: <940049D1B55A954F9E32D19A1B54023530F8F752@GOXSA1808.fplu.fpl.com> <002e01cf4382$e4f3dbf0$aedb93d0$@BnGEngineers.com> <f1ec8fdbacf64cb5857e930438152109@DM2PR07MB416.namprd07.prod.outlook.com> <004301cf4385$433cc080$c9b64180$@BnGEngineers.com> In-Reply-To: <004301cf4385$433cc080$c9b64180$@BnGEngineers.com> Content-Language: en-US X-MS-Has-Attach: X-MS-TNEF-Correlator: x-en-origip: 207.46.163.187 Content-Type: text/plain; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable MIME-Version: 1.0 John Zoerhof SMTP jzoerhof@HYPOWERINC.COM Danny Brannon Hypower Town of Gulf Stream - IMAG0680.jpg Cliff verified that we do have the 11 duplex pads in the yard. When I asked why then did he use two pads, he stated that he saw a discrepancy in the counts of pads and decided to use these in that location particular location because it seemed the least affected by size and talked to John L about it. Thanks, John Zoerhof Division Manager - Power Services -----Original Message----- From: Danny Brannon [mailto:DBrannon@BnGEngineers.com] Sent: Wednesday, March 19, 2014 11:10 AM To: John Zoerhof Subject: RE: Town of Gulf Stream - IMAG0680.jpg The depth of the space on Hidden Harbor drive where we are installing the open delta at the top of the hill would benefit from using two single phase pads as we need to be 6 feet off the road and we only had inches to spare. This is the only place I know of that we would benefit by using two pads. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com -----Original Message----- From: John Zoerhof [mailto:jzoerhof@HYPOWERINC.COM] Sent: Wednesday, March 19, 2014 10:56 AM To: Danny Brannon; 'Lehr, John' Cc: Cliff Spitzer; 'Owen, Jay D' Subject: RE: Town of Gulf Stream - IMAG0680.jpg I am looking into why they used 2 pads when there are supposed to be single duplex pads in the yard. Thanks, John Zoerhof Division Manager - Power Services -----Original Message----- From: Danny Brannon [mailto:DBrannon@BnGEngineers.com] Sent: Wednesday, March 19, 2014 10:53 AM To: 'Lehr, John' Cc: Cliff Spitzer; John Zoerhof; 'Owen, Jay D' Subject: RE: Town of Gulf Stream - IMAG0680.jpg Two pads require a space of 54" x 96", while one 3phase pad requires 60" x 80". So, for space, one is better. I will look into what they are doing. We have some locations along Hidden Harbor road that would benefit from the reduced depth. Is JD the Contract Rep on this job? Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com -----Original Message----- From: Lehr, John [mailto:John.Lehr@fpl.com] Sent: Wednesday, March 19, 2014 10:48 AM To: Danny Brannon Cc: 'Cliff Spitzer'; 'John Zoerhof'; Owen, Jay D Subject: Town of Gulf Stream - IMAG0680.jpg Danny, FYI .................. The job was MECA'd & issued 11 Duplex pads, but if the installation is tight, as in the past, the 2-pad configuration can work. And, no, no shortage of concrete pads. John C. Lehr, Jr. Project Manager FPL (561)-845-4624 -----Original Message----- From: Danny Brannon [mailto:DBrannon@BnGEngineers.com] Sent: Wednesday, March 19, 2014 9:28 AM To: 'John Zoerhof' Cc: Lehr, John; 'Cliff Spitzer' Subject: RE: IMAG0680.jpg Do you look at the FPL Distribution Construction Standards. This setup is correct. Make sure the ground has been compacted and that pads are level. Make sure the leading phase is going into the lighting transformer. John, Did you approve the contractor using two single phase pads versus the three phase pad for open delta banks? Does FPL have a material shortage problem? Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com -----Original Message----- From: John Zoerhof [mailto:jzoerhof@HYPOWERINC.COM] Sent: Tuesday, March 18, 2014 4:06 PM To: Danny Brannon (DBrannon@BnGEngineers.com) Cc: Lehr, John; Cliff Spitzer Subject: FW: IMAG0680.jpg Before we get too far here, what is the set up with respect to the transformer locations? This looks to me like the low profile will be on the left. Is that correct? Thanks, John Zoerhof Division Manager - Power Services -----Original Message----- From: Cliff [mailto:cliffspitzer@yahoo.com] Sent: Tuesday, March 18, 2014 3:30 PM To: Cliff Spitzer; John Zoerhof Subject: IMAG0680.jpg --- This email is free from viruses and malware because avast! Antivirus protection is active. http://www.avast.com --- This email is free from viruses and malware because avast! Antivirus protection is active. http://www.avast.com --- This email is free from viruses and malware because avast! Antivirus protection is active. http://www.avast.com 3C94F7F28945CE46B023DF7C381F0011@namprd09.prod.outlook.com <8aab01bbd5534c6888a81fca51d58028@DM2PR07MB416.namprd07.prod.outlook.com> <940049D1B55A954F9E32D19A1B54023530F8F752@GOXSA1808.fplu.fpl.com> <002e01cf4382$e4f3dbf0$aedb93d0$@BnGEngineers.com> <f1ec8fdbacf64cb5857e930438152109@DM2PR07MB416.namprd07.prod.outlook.com> <004301cf4385$433cc080$c9b64180$@BnGEngineers.com> <004301cf4385$433cc080$c9b64180$@BnGEngineers.com> Renee Basel Renee Basel EX /O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL EX /O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL John Zoerhof John Zoerhof Renee Basel Renee Basel jzoerhof@HYPOWERINC.COM jzoerhof@HYPOWERINC.COM rbasel@gulf-stream.org rbasel@gulf-stream.org II=[CID=4c2381be-6e26-22b5-8153-94b8036e02b1;IDXHEAD=02DD3A0B3E;IDXCOUNT=5];SBMID=5;S1=<940049D1B55A954F9E32D19A1B54023530F8F752@GOXSA1808.fplu.fpl.com>;RTP=Related;TDN=Removed;TFR=ParticipantChanged ;Version=Version 15.20 (Build 2157.0), Stage=H1, TC, REF;UP=50;DP=5 en EAB7C78A616E34AA RBasel@gulf-stream.org 00000002/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=3baa9f04d837426b9ed16b03ec111b7b-rbasel Danny Brannon SMTP DBrannon@BnGEngineers.com DBrannon@BnGEngineers.com Danny Brannon