HomeMy Public PortalAboutRe_ Conduit removal (6)
IPM.Note
Re: Conduit removal
Re:
John Zoerhof
SMTP
jzoerhof@HYPOWERINC.COM
Conduit removal
Received: from impinc05.yourhostingaccount.com ([10.1.13.105] helo=impinc05.yourhostingaccount.com)
by mailscan19.yourhostingaccount.com with esmtp (Exim)
id 1WS68F-0000cX-KI
for dbrannon@bngengineers.com; Mon, 24 Mar 2014 10:45:43 -0400
Received: from na01-bn1-obe.outbound.protection.outlook.com ([207.46.163.184])
by impinc05.yourhostingaccount.com with NO UCE
id hSkY1n0173z1CoF02SkY5x; Mon, 24 Mar 2014 10:44:44 -0400
Received: from DM2PR07MB416.namprd07.prod.outlook.com (10.141.104.156) by
DM2PR07MB416.namprd07.prod.outlook.com (10.141.104.156) with Microsoft SMTP
Server (TLS) id 15.0.898.11; Mon, 24 Mar 2014 14:44:24 +0000
Received: from DM2PR07MB416.namprd07.prod.outlook.com ([169.254.16.190]) by
DM2PR07MB416.namprd07.prod.outlook.com ([169.254.16.190]) with mapi id
15.00.0898.005; Mon, 24 Mar 2014 14:44:24 +0000
From: John Zoerhof <jzoerhof@HYPOWERINC.COM>
To: Danny Brannon <DBrannon@BnGEngineers.com>
Subject: Re: Conduit removal
Thread-Topic: Conduit removal
Thread-Index: AQEAhtGLRmfad0LdeE/ZaOQ0XkvrDAHLOV8b
X-MS-Exchange-MessageSentRepresentingType: 1
Date: Mon, 24 Mar 2014 14:44:23 +0000
Message-ID:
<d0b94e38575b44ada94d59b0df54a46f@DM2PR07MB416.namprd07.prod.outlook.com>
References:
<4f1e0583d0dd4f64a411eceb8bd0e83a@DM2PR07MB416.namprd07.prod.outlook.com>
In-Reply-To:
<4f1e0583d0dd4f64a411eceb8bd0e83a@DM2PR07MB416.namprd07.prod.outlook.com>
Content-Language: en-US
X-MS-Has-Attach: yes
X-MS-TNEF-Correlator:
x-en-origip: 207.46.163.184
Content-Type: multipart/mixed;
boundary="_005_d0b94e38575b44ada94d59b0df54a46fDM2PR07MB416namprd07pro_"
MIME-Version: 1.0
John Zoerhof
SMTP
jzoerhof@HYPOWERINC.COM
Danny Brannon
Hypower
Conduit removal
Forgot the pictures
John Zoerhof, Hypower, Inc.
Sent from my Smartphone, please disregard typos or grammatical errors
----- Reply message -----
From: "John Zoerhof" <jzoerhof@HYPOWERINC.COM>
To: "Danny Brannon" <DBrannon@BnGEngineers.com>
Subject: Conduit removal
Date: Mon, Mar 24, 2014 10:38 AM
Multiple attempts to remove the conduit along hidden harbor as requested were unsuccessful. The conduit is present terminated. below 3' on each end and the depth along the shot ranges
form 4-6'.
Removal by excavation would be extremely invasive.
John Zoerhof, Hypower, Inc.
Sent from my Smartphone, please disregard typos or grammatical errors
A4235E003604954B96316D204F06CBC2@namprd09.prod.outlook.com
<d0b94e38575b44ada94d59b0df54a46f@DM2PR07MB416.namprd07.prod.outlook.com>
<4f1e0583d0dd4f64a411eceb8bd0e83a@DM2PR07MB416.namprd07.prod.outlook.com>
<4f1e0583d0dd4f64a411eceb8bd0e83a@DM2PR07MB416.namprd07.prod.outlook.com>
Renee Basel
Renee Basel
EX
/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL
EX
/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL
John Zoerhof
John Zoerhof
Renee Basel
Renee Basel
jzoerhof@HYPOWERINC.COM
jzoerhof@HYPOWERINC.COM
rbasel@gulf-stream.org
rbasel@gulf-stream.org
II=[CID=77da6746-dd42-4f78-d968-e4345e4beb0c;IDXHEAD=010086D18B;IDXCOUNT=2];SBMID=4;SBT=2;THA=3832310003;TFR=NotForking;Version=Version 15.20 (Build 2157.0), Stage=H7;UP=10;DP=1C5
en
6C95D163549E77F5
RBasel@gulf-stream.org
00000002/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=3baa9f04d837426b9ed16b03ec111b7b-rbasel
Danny Brannon
SMTP
DBrannon@BnGEngineers.com
DBrannon@BnGEngineers.com
Danny Brannon
IMAG0856.jpg
.jpg
IMAG0856.jpg
IMAG0856.jpg
application/octet-stream
0F3F32D6157F76438FC2A30A3A816891@namprd09.prod.outlook.com
EnUs
IMAG0857.jpg
.jpg
IMAG0857.jpg
IMAG0857.jpg
application/octet-stream
E97C012FA0A55043B9CC3FA81F0D7FD1@namprd09.prod.outlook.com
EnUs Forgot the pictures
John Zoerhof, Hypower, Inc. Sent from my Smartphone, please disregard typos or grammatical errors
----- Reply message -----
From: "John Zoerhof" <jzoerhof@HYPOWERINC.COM>
To: "Danny Brannon" <DBrannon@BnGEngineers.com>
Subject: Conduit removal
Date: Mon, Mar 24, 2014 10:38 AM
Multiple attempts to remove the conduit along hidden harbor as requested were unsuccessful. The conduit is present terminated. below 3' on each end and the depth along the shot
ranges form 4-6'. Removal by excavation would be extremely invasive.
John Zoerhof, Hypower, Inc. Sent from my Smartphone, please disregard typos or grammatical errors