Loading...
HomeMy Public PortalAboutRe_ Conduit removal (6) IPM.Note Re: Conduit removal Re: John Zoerhof SMTP jzoerhof@HYPOWERINC.COM Conduit removal Received: from impinc05.yourhostingaccount.com ([10.1.13.105] helo=impinc05.yourhostingaccount.com) by mailscan19.yourhostingaccount.com with esmtp (Exim) id 1WS68F-0000cX-KI for dbrannon@bngengineers.com; Mon, 24 Mar 2014 10:45:43 -0400 Received: from na01-bn1-obe.outbound.protection.outlook.com ([207.46.163.184]) by impinc05.yourhostingaccount.com with NO UCE id hSkY1n0173z1CoF02SkY5x; Mon, 24 Mar 2014 10:44:44 -0400 Received: from DM2PR07MB416.namprd07.prod.outlook.com (10.141.104.156) by DM2PR07MB416.namprd07.prod.outlook.com (10.141.104.156) with Microsoft SMTP Server (TLS) id 15.0.898.11; Mon, 24 Mar 2014 14:44:24 +0000 Received: from DM2PR07MB416.namprd07.prod.outlook.com ([169.254.16.190]) by DM2PR07MB416.namprd07.prod.outlook.com ([169.254.16.190]) with mapi id 15.00.0898.005; Mon, 24 Mar 2014 14:44:24 +0000 From: John Zoerhof <jzoerhof@HYPOWERINC.COM> To: Danny Brannon <DBrannon@BnGEngineers.com> Subject: Re: Conduit removal Thread-Topic: Conduit removal Thread-Index: AQEAhtGLRmfad0LdeE/ZaOQ0XkvrDAHLOV8b X-MS-Exchange-MessageSentRepresentingType: 1 Date: Mon, 24 Mar 2014 14:44:23 +0000 Message-ID: <d0b94e38575b44ada94d59b0df54a46f@DM2PR07MB416.namprd07.prod.outlook.com> References: <4f1e0583d0dd4f64a411eceb8bd0e83a@DM2PR07MB416.namprd07.prod.outlook.com> In-Reply-To: <4f1e0583d0dd4f64a411eceb8bd0e83a@DM2PR07MB416.namprd07.prod.outlook.com> Content-Language: en-US X-MS-Has-Attach: yes X-MS-TNEF-Correlator: x-en-origip: 207.46.163.184 Content-Type: multipart/mixed; boundary="_005_d0b94e38575b44ada94d59b0df54a46fDM2PR07MB416namprd07pro_" MIME-Version: 1.0 John Zoerhof SMTP jzoerhof@HYPOWERINC.COM Danny Brannon Hypower Conduit removal Forgot the pictures John Zoerhof, Hypower, Inc. Sent from my Smartphone, please disregard typos or grammatical errors ----- Reply message ----- From: "John Zoerhof" <jzoerhof@HYPOWERINC.COM> To: "Danny Brannon" <DBrannon@BnGEngineers.com> Subject: Conduit removal Date: Mon, Mar 24, 2014 10:38 AM Multiple attempts to remove the conduit along hidden harbor as requested were unsuccessful. The conduit is present terminated. below 3' on each end and the depth along the shot ranges form 4-6'. Removal by excavation would be extremely invasive. John Zoerhof, Hypower, Inc. Sent from my Smartphone, please disregard typos or grammatical errors A4235E003604954B96316D204F06CBC2@namprd09.prod.outlook.com <d0b94e38575b44ada94d59b0df54a46f@DM2PR07MB416.namprd07.prod.outlook.com> <4f1e0583d0dd4f64a411eceb8bd0e83a@DM2PR07MB416.namprd07.prod.outlook.com> <4f1e0583d0dd4f64a411eceb8bd0e83a@DM2PR07MB416.namprd07.prod.outlook.com> Renee Basel Renee Basel EX /O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL EX /O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=3BAA9F04D837426B9ED16B03EC111B7B-RBASEL John Zoerhof John Zoerhof Renee Basel Renee Basel jzoerhof@HYPOWERINC.COM jzoerhof@HYPOWERINC.COM rbasel@gulf-stream.org rbasel@gulf-stream.org II=[CID=77da6746-dd42-4f78-d968-e4345e4beb0c;IDXHEAD=010086D18B;IDXCOUNT=2];SBMID=4;SBT=2;THA=3832310003;TFR=NotForking;Version=Version 15.20 (Build 2157.0), Stage=H7;UP=10;DP=1C5 en 6C95D163549E77F5 RBasel@gulf-stream.org 00000002/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=3baa9f04d837426b9ed16b03ec111b7b-rbasel Danny Brannon SMTP DBrannon@BnGEngineers.com DBrannon@BnGEngineers.com Danny Brannon IMAG0856.jpg .jpg IMAG0856.jpg IMAG0856.jpg application/octet-stream 0F3F32D6157F76438FC2A30A3A816891@namprd09.prod.outlook.com EnUs IMAG0857.jpg .jpg IMAG0857.jpg IMAG0857.jpg application/octet-stream E97C012FA0A55043B9CC3FA81F0D7FD1@namprd09.prod.outlook.com EnUs Forgot the pictures John Zoerhof, Hypower, Inc. Sent from my Smartphone, please disregard typos or grammatical errors ----- Reply message ----- From: "John Zoerhof" <jzoerhof@HYPOWERINC.COM> To: "Danny Brannon" <DBrannon@BnGEngineers.com> Subject: Conduit removal Date: Mon, Mar 24, 2014 10:38 AM Multiple attempts to remove the conduit along hidden harbor as requested were unsuccessful. The conduit is present terminated. below 3' on each end and the depth along the shot ranges form 4-6'.  Removal by excavation would be extremely invasive.  John Zoerhof, Hypower, Inc. Sent from my Smartphone, please disregard typos or grammatical errors